HomeMy WebLinkAbout0070 STAGE COACH ROAD (8) a
M Pr r ^a
uR .».. n q ,
fiv A'xy�. •7�yy':.."�; 7 ^`' +>, .in S •ra '' .,f :"�a
r
�r a ,, .. •. '.. '.�.. ,. � �:
,
D
r
{
Y
6 rl
' r
o-
t a �
4 t
t
,
v •I Y '
9 i
I
, v
y�
4
�t
{ + J�1
n
F
TOWN OF BARNSTABLE
mot , Building
201300122
* BARNSTABLE, + Issue Date: 03/20/13 Permit
9 MASS.
1639. �� Applicant: CRAIG GABRI Permit Number: B 20130563
RFD NIA'I A
Proposed Use: HOUSING AUTHORITY VACANT Expiration Date: 09/17/13
Location 70 STAGE COACH ROAD Zoning District RC Permit Type: NEW COMMERCIAL
Map Parcel 173026 Permit Fee$ 3,865.63 Contractor CRAIG GABRI
Village CENTERVILLE App Fee$ 150.00 License Num. 92598
Est Construction Cost$ 424,794
Remarks A APPROVED PLANS MUST BE RETAINED ON JOB AND
SHELL BUILDING#3--7.OA STAGE COACH RESIDENCES THIS CARD MUST BE KEPT POSTED UNTIL FINAL
AFFORDABLE HOUSING INSPECTION HAS BEEN MADE. WHERE A
CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH
Owner on Record: BARNSTABLE HOUSING AUTHORITY BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL
Address: 146 SOUTH STREET INSPECTION HAS BEEN MADE.
HYANNIS,MA 02601
Application Entered by: TP Building Permit Issued By:
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY.PART TIFRBOF;EITHER TE ORARILY R E ENCROAC NTS:ON PUBLIC PROPERTY;NO
SPECIFICALLY PERMTTTED UNDER THE BUILDING CODE,.MUST BE APPROVED.BY THEdURISDICTION._STREET OR-ALLEY GRADES A L AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE,
OBTAINED FROM THE DEPARTMENT OF.PUBLIC WORKS,,THE ISSUANCE OF THIS PEPMrr DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY-APPLICABLE SUBDIVISION.
RESTRICTIONS. ° 'x
MINIMUM OF FIVE CALL INSPECTIONS REQUIRED FOR ALL CONSTRUCTION WORK:
1.FOUNDATION OR FOOTINGS.
2.SHEATHING INSPECTION
3.ALL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED.
4.WIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME.INSPECTION.
5.PRIOR TO COVERING STRUCTURAL MEMBERS(FRAME INSPECTION).
6.INSULATION.
7.FINAL INSPECTION BEFORE OCCUPANCY.
WHERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS.
WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION.
PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF
DATE THE PERMIT IS ISSUED AS NOTED ABOVE.
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in MGL c.142A).
BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS
� G
2 ,gF /3 2 /X,l / ��� 2 ,v
3 1 Heating Inspection Approvals Engineering Dept
Gas
2 Board of Healt
LIV
I
Town of Barnstable
Building Department - 200 Main Street
1ARNSTABLE. # Hyannis, MA 02601
MASS
�b 16g9 (508) 862-4038
RFD NUB a
Certificate of Occupancy
Application Number: 201300122 CO Number: 20130134
Parcel ID: 173026 CO Issue Date: 12/10/13
Location: 70 STAGE COACH ROAD Zoning Classification: RESIDENCE C DISTRICT
Proposed Use: HOUSING AUTHORITY VACANT
Village: CENTERVILLE
Y
Gen Contractor: CRAIG GABRI Permit Type: CC00
CERTIFICATE OF OCCUPANCY COMM
Comments: BUILDING A
Building Department Signature Date Signed
0000
BROWN LINDQUIST FENUCCIO & RABER ARCHITECTS, INC.
1 December 2013
Thomas Perry, Building Commissioner
Town of Barnstable
200 Main St.
Hyannis,,MA 02601
CD
RE: Submittal of Controlled Construction Report No. 4 ,.,
V
12 Unit Housing Development for Barnstable Housing Authority, �µ<'
70 Stage Coach Rd. c 151 Oak Street, Centerville ;: J a
Dear Mr. Perry,
This letter shall serve as our fourth and final Controlled Construction Progress Report fora,, e'
the subject project. Construction work has been on-going for approximately 8 months and"'
is nearly substantially complete. Based upon the job's final on-site construction meeting
on 11/21, the following work is now complete:
1) All framing and structural connections have been installed and inspected by the
design structural engineer(See attached final affidavits)
2) All mechanical, electrical and plumbing systems are operational and have been
inspected by the design engineers (See attached final affidavits)
3) Interior doors, millwork, finishes, cabinetry &painting
4) Fire suppression system and fire alarm control panel
5) Landscaping, and site amenities
6) Final paving, parking striping and wheel stops
7) Draft emergency egress diagrams have been provided to COMM Fire Dept. for
final approval and will be mounted once approved
The Building Contractor, Dellbrook Construction and their subcontractors have
completed all work to date in general conformance with our construction documents, and
in a good and workmanlike manner.
I have completed a final punch list walk through and the only issues I see affect the final
occupancy are as follows:
a) Final paving of the accessible walk to the basement/community laundry of
building A (aka#3).
b) Final walk paving in front of buildings A& B (aka#2 & #3)
Upon satisfactory completion of the occupancy related items above, this office will issue
to you a stamped architectural Project Completion Affidavit. We anticipate the
203 WILLOW STREET,SUITE A PH 508-362-8382
YARMOUTHPORT,MA 02675 WWW.CAPEARCHITECTS.COM FAX 508-362-2828
outstanding items will be completed by the end of this week to allow for BHA to receive
full occupancy and start moving tenants in by mid-December.
If you have any questions, please feel free to contact me at any time.
Sincerely
Tim Sawyer
Enc. Selected Site Photos
CC: Jeff Lauzon (Barnstable Building Dept.)
Tom Shevory (Dellbrook Construction)
Sandee Perry (Barnstable Housing Authority)
Kevin Maguire (Oxbow Partners)
Rick Fenuccio (BLF&R Architects, Inc.)
Final Construction Control Document
4 To be submitted at completion of construction by a
Registered Design Professional
F
for work per the 8 h edition of the
ae
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: 12 Unit Housing Development for Barnstable Housing Authority Date: November 15,2013
Property Address: Building#1-70 Stage Coach Road,Centerville,MA
Project: Check(x)one or both as applicable: X New construction Existing Construction
Project description: Two story,wood framed,residential building over full basement as specified on Consulting
Structural Engineer,Inc.structural drawings S0.1 through S5.2.
1,Brian A.Walsh,P.E.,MA Registration Number: 46077 Expiration date:June 30,2014 ,am a registered design
professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning':
Entire Project Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project. I certify that I,or my designee,have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and
that I or my designee:
9
1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Enter in the space to the right a"wet"or
electronic signature and seal: A
OF
BRIAN
A.
WALSH
S'sfitlClUR_� �
No.4'60 7
sS/ONAL
Phone number:(978)866-8354 Email: BAWalsh@cse-ma.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen,
provide a description.
Trial Version 10 09 2012 .
Final Construction Control Document
To be submitted at completion of construction by a
Registered Design Professional
Ve��a for work per the 8�'edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: 12 Unit Housing Development for Barnstable Housing Authority Date:. November 15,20.13
Property Address: Building#2-70 Stage Coach Road,Centerville,MA
Project: Check(x)one or both as applicable: X New construction Existing Construction
Project description: Two story,wood framed,residential building over full basement as specified on Consulting
Structural Engineer,Inc.structural drawings SO.1 through S5.2.
I,Brian A.Walsh,P.E.,MA Registration Number:46077 Expiration date:June 30,2014 ,am a registered design
professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning':
Entire Project Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project. I certify that I,or my designee,have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the,building permit and
that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Enter in the space to the right a"wet"or
electronic signature and seal:
BRI,AbU
A.
WALSH
STRUCTURAL ig
fit®.460I7
SsfOMAL `
Phone number:(978)866-8354 Email:BAWalsh@cse-ma.com `
Building Official Use Only 4
Building Official Name: Permit No.: Date:
Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, `
provide a description.'
Trial Version 10 09 2012
Final Construction Control Document
a To be submitted at completion of construction by a
Registered Design Professional
�< for work per the 8th edition of the
� Ye
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: 12 Unit Housing Development for Barnstable Housing Authority Date: November 15,2013
Property Address: Building#3-70 Stage Coach Road,Centerville,MA
Project: Check(x)one or both as applicable: X New construction Existing Construction
Project description: Two story,wood framed,residential building over full basement as specified on Consulting
Structural Engineer,Inc.structural drawings S0.1 through S5.2.
I, Brian A.Walsh,P.E.,MA Registration Number: 46077 Expiration date:June 30,2014 ,am a registered design
professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
Entire Project Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project. I certify that I,or my designee,have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and
that I or my designee:
1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in.780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Enter in the space to the right a"wet"or
electronic signature and seal:
jJA OF
B1e1Ad19 t?�
A.
WALSH
S3fil3CillRAL
N0.4S0 7
Ssf0IVAL �
Phone number:(978)866-8354 Email:BAWalsh@cse-ma.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen,
provide a description.
Trial Version 10 09 2012
�.\
F><nal Construction Control Document`.;
To,,be submitted at,completion of construction by a
Registered;Design;Professional
.�` for wotic per the 8t!"Edition of tke.
Massachusetts SiaCe Building Code, 780 CMR, Secton 107'
Project Title: Stage Cog RoadNousrig Developmen < Date.November,22,2013
Property Address: 70 Stage Coach Road& 1si OakStreet—Centerville,mJ s;S'achusetts.
Project Check(X)One or Both as App.l�cable [X]New Construction C E��sting Corist"ruction.
Project Description: New(12)[Fiat Housmf;Complex.
A-
a,Steven Ar Karin;PE_1VlA Registration Number 34989 Cxp1ration Date:OG/30/2704 ,v am !`rV rstere,desigyz:
professional; and 1 have prepared;or directly_supety sed the;preparation of!all design plans,computations and,.
specifications conb6thih
[]Architectural [] Structural [XjlVleclaanical
[]Fire.:Protection [] ElectricalDescribe;'[
forthe above�narned project, [,yor my designee, have,formed; necessary professional services and was;present at the.:
construction.st,eon a:reguaar and_periodic;basis To tive,bestof my::knowledge,tnformatton, and belief the work
proceeded in accord ance-.with`ttie regttireimetits of 78.0 CM'R and the sig den docarnents approved as part,of the Building
Permit and that L,,ormy Designee;;;.
1. Have reviewed,for conformance to this Gode_and the design concept,a}iop'drawings, sampie: and other
submittals by the Contractor to accordance with the_requirements, the construction documents:
2 Have performed;the duties for registered design`professioiials iii 780 CMR.Chapter?17 as.apphcalile
3. Have.been present at uitervals:appropriate to:the tage.of construction 0,become.tgenerally familiar-with:the
progress and quality of the work and to determine if;the wort.was performed in:a manner conststenfwitfi the
_ .
construction documents:and this Code..
Nothing in-this documentrel�eyes the Contractor of its respons�bilily regarding the praystons of 780 CMR.1`.07
of
.Enter .the;space.to the;,gi t a =`wet: or
electronic signature and seat.;. MECHaraeAt
a: aqn 2
y r ,b L
Phone N6mber:;..(508)•230-0260. -Email:skcnc�ii r hey? r: ej7�rneerir�4 cuiir
Building Official Use 0' 1
Building Official Name:' Pcrmit:No.-
Date`=
Final Construction Control Document;
u To:bo submitted:aueornpletion of:constructton by a_
Registered DesignProfessional
�` for work per:the $tl''.Edtton of the:;::
SY Massachusetts State Building Code, 78':0 G,1VIR, Section 1,6T
Project Title: Stage Coat} Road'Housiiij Development_: Date N'overrtter 22,201.3
Property Address: '70 Stale Coach Road&.15<1 Oak``Street_-Ceritervtlle 1 A sachuseits
Project: Check,(X),One or B ewoth„as Applicable: [X] N Construction [::] Ex�stulg Construction
Project Descr-pttoi! New`(l2)Unit lloiis�ng Cotimple
I,Marc R: plairte,.PE MA ItR.egistrattott Number, 3$L79 txpiration Date:66/3f1/ ZW ,am a„t c�;iste�ec�
professioaUl; and Lhave prepared or directly supervised the preparation of all design plans,:computatioiis and
specifications con
cemmg
[]'Architectu"ral [] Structural []Mechanicai
Fire Protection X ::Electrical: Otlier. De"sc"rtbe
for:the above named project I,oi'my designee, have`;perform A the necessary professional ser"ices and was present at fhe-
constructionsite on a regular and periodic basis T6 die'best<ofmy°knowledge, iriformatton,and belief the work:
proceeded in accordance with the requirement ;of 78Q.CMR`and the design documents approved as part"of tle$ui ding
Permit and:ahat I or,my Designee
1. Have reviewed,far con nformance to.thiS Code and the design concept, shop drawtngs,`satn 'k and.'other`
submittalstiby the Contractor in accordance with thereguirernents.ofi the cc�nstnret�on doc�unents_
2: Have performed the duties for registeeed design professionals in_780 CIVIR Chapter 17,as applicable:
3,., Have been present at intervals appropriate(O the stage of construction to become generally familiar At- this
progress and quality, of the work and;to determine if:the work was;performed in;;a manner consistent with the
construction doeuments;:antl fhs.Code:.
Nothing in'this document relmves-tlie.Contrtor ac of its responsibility regarding fhe provisions of 780 CMR l
0
*� r 1Fyg�*
Enter m the-space`to the right a wet"xor: �,� �° ^ T!r ��
c, Ct_ FDIC
electronic s%gnature and sea l: L.
; u
r-
Phone Number (SOS)230 fI2.60 E'inail �mplinlE'cc bier=c»�jiiee�nrc� i
Building F)tt'ic l Use Only
13uildi.ng Official Namc _ .. ._. Pernt t
Final Constiructoa,. tr ument
u To be sultnitted at coinpteton of construction rliy a
R -Professional'`
%'.�� for work per the A`i' l�ditian of the ,
Massachusetts Stat'Rd nt;Code, 78Q CMR, Section l t)7
Project Title:Stake Coacla.Road Housin- Development bate. November 22, 201"3_
Property Address: 70'StakCoach Road& 151 'Oak_Streef Centeryilte MassaehusetEs,
Prcj0ct:.l Check(X)On.e ar Both'as Applicable': [)C]New Construction [] Existing Construction'
Project Descnp `(12)Unit Housing Comdex.:,,
i,Steve�> A Karam:PE.MA Re tstration Number-34989 Expiration Date:06/3(1/2T 04 ,am a c�grst c�cl cli?sa _
pt vfessional; and l;Have prepared,or directly-supervised the.preparation"of al l design.plans,computations and
specifcations.concerntngx
]Architecturaa [] Structural, Mechanical
[]
]FireProtection, []Electrical. [:X] Otliet: Plum liin
for the above named project 1,or my designee, have,performed the necessary professional services and waspresent at the
construction:stte on a regular and:periodic bas "s, To"the best ofmy'knowli:nformation,and beltef;the work;
p"roceeded-in accordance`with the requirements of 7SQ CMR. Ad.the design documents approved:as part o A W.'., vi ing
Pmit and that 1"or my er Des i ee
J . Have.reviewed, for conformance to.th:s Code:and the dest n concept,shop drawings;"samples and
th, r;
suti'ntttals by the>Contractor in`accordance with the.:tequire"n s-ofttie construction documents..
2:. Have performed the dut es"for ruts"tered des gn;professioria[s in 780 CtV1R Chapter 17 as"applicable:
3;-. Ha le been;present at intervals appropriate to he stage o'construction to becon e:,generally faniiliar with the
progres5'ai d quality"of th1.e work an1.d to1 . deteirittnie if the w1.ork was,-per.'forined in a manner consistent with ti e
constructign ddcutneiits:and this Code.;.
Nothing to this documentrelieves the Coritractorof.its responsibility regarding,tie provisions of 78D CMR '1Fr
Enter.to t'lie.space to the right a wet or_.
ME N�OAL
electronic signature and sp I, V§Fq: lJ
Phone-Nii nber: (508)230-026f1 ' Email,skCrl uiT u�?I1e1=c�jt inee)rji Wi
Budding -ot--icial Use Onl}::
BuildngOfticiai Name Permit No:'
r t
hinal Construction Control Document
_ Ta be submitted:at completion of connstruction by a
Registered Aesigri Professional
for work per the 8 Edition of the,
Massachusetts State Building Code, Z80 C1VIR, Section 1 a7
Project Title,; Stage Goact Road.Housit g Development Date:November 22, 2013
Property Address: 70.Stae Coach Road&,151 Oak Street-.Centerville,lylassachusetfs
Project..Check(X)One or Both as Applicable: 'f X New Construction [I Existing Construction:=
Project Description;New`:12) (I;ntt Housing Complex.
1kf; eht A:Kara PE;.MA Registration Number:34989 Expiration Datel)6/30/2I04' ;,am a rc rs4 ere deli ii
prafessiorral and I;have preparedor directly supervised the}reparation ofall design plans, computations and
specif atii ns concerning:;;
[f Architectural [] Structural [;;]Mechanical
[Xre Protection.; I ]"Eectrieal [:"]Other Describe.,[. ]'
for the above named pro ect 1 or my designee;have:perforrrt A the necessary pr9fessio ial services arid,was.present at the<`
con5tructtonaite on a regular and;'periodc,basis To.the"best:of my;knowledge,.information,acid belief the work;
proceeded in accordancce withali`e regairetnents of�786 CMR and the design.docurn is approved as,part`of the Building:.
Permit and that I`-or my Desxgne,c.",
1. Hate reviewed;for confotYnanceto this Gode and the design-concept, shap.drawings,samples:ari other
submittals by the�Con ractor in accordance withthe requirements'o -thd'coh'structi6ii documerifs_
2: Have performect:tl`e duties,for registered des'igin professionals in 780 CM.R Chapter 17,-a�applicable:
Have been present at interval's appropriate to;the.stage of constructiion;to become generall'_fa niIiar-with e
progress'a d quality of"the work".and to'deterinine if the work was'performed in_a manner cotiststent�vitli the
construction documents and this Code:;
Nothing in-'thts documentir
elieves the Contractor of its responsibility regariiing the provisions of-.780 GMR 107 .
Enter"tn the space to the right a`wet cir
electroiitc.signature.and seal: f W,41 �
Otte Number (SO$)230-0260 ,Erhall skcrra,�u7h�r-ei�,rr,a�es,r rc�»a
13uil lm Off c N41 iJse Qnly.
Building Offii ikl.Name: 1'ermit No.`.' Date:
a t." � �" 1 n;x* � �iu� � ": ,�%3t��d✓y,.,�y dM2Wr°��a.+r a„�
1
t x
� .4f
� to ` ,� i�'J� �a y,,,.� d•P � # '"� ���,, � a � � �.r ,.� � l� ^t, r.
r ,t� / eF�,"a�+'` ✓ A ! 9� Y 'day c�e4Y.
S S y.
y T'arr� ti rt�za 1. Aop
ery#` �
-, �'(�0�Y' 4J '�11�*" gyp#•. '
X= ,t 137'r�'Y 1 j •, �, +#wq� 4f,�a9'•• "�>..t.,cyk'y�`m`,q, $' �' ":
f
r
z
t Y �
' H
Liu 1
A INK
1. mum
92
mum
k
E . .
e m "3r i 1 a�'
..axe;'.. +' offf��
MUM
r
e.
v k u +
�• IRI
e�
Al
w q,e
It IAi
'.
-
r
%a
4
16
�s IIZ'A
. .
Irmo Ill
®®
RF
1
t x
��c ✓ g'Y�"�'" �, i 5... r aar n.�,uA s, v � �sh���Yl w
A
i
T^y� �9�1'?Y',rpJ x.. Jiu�r i �'+, ♦ FriE�. 1 {t..� � f,�� ,�y�y���,...?�,��'� �T�'_�9.tYy�� �+
�',�ir�.� � �..r �•� ` Imo- l 1� � �. >-�' � .,:E}.c��',�
R` L �:.,. �. •� :1�. �eke _ _
,r
.7:
14
t . gas
.e.,w
wy \�..j�,t'. �FA' .. sg x+y • _ vr+ t •e, za -X' rn
'-,." .k °:��i, ' .s,?+r we '4{ ', ', ,. -aft• ,gf.�. t z:
Mobil
it
• � n
�« g way
f .�
* C
y
• .c•r' `M's„' } f !q r.• s"e#� '1+,
.ram � .Mf�'•a7,--:,�.�. t �. riS` '�,"�'- * � �h��tK, c7r �d
ii K a �tl " •t�"ya.r�'\"' �t � '� w,�.r°,53.x ��•,� �' ,�,.
«+terIr
r. '
.gyp; �' •opr � ��., ,�•�sr"�� r t � � �^ � '
11
1€"°'� � 'r r� � sir # "� •1 ( ..:
t r
AR
(ram.
s." ♦ p,.Y,. ""F ?ASuc.w.w..'+.c a '"ram- -;aF...AF Ao.'+f
1p-
t �
sn
F,m F t�Tr Y
4,4
Illeiii
le,
4
Al o
a_• A
s
a
� wafts"•
� t
r
r�
�s
r„ •.
I} fi Y
T'
Aw
`P
j ! '��3; ' 4 k� ,a a
45
t ; ta
Li
r € r r
IF
4 �
,aleWC
v _ f
6 T
r
M1
i r, .
rnk
MEW
pr y
y
'ar -r
{ •
pia __'E.c4 t.�x'r +*,�� '�-x:4�r "•�'� !` > �� i`
tvg6 fip F
;.y,
Cy�"!.^f�.�
py' ^r•
� :?3 5�61 � r t �:�" �,r x 5 ,��'.�r"*4,tas � ,•� ,r a f' � !�� � t"�,t�
" Of
r
. ax
'xI
a7 N
s
y�4
i� M�•1
xe '81" :aYl 4;i .'� ��o.��
��., ® ► ems[ Y
Rr'
i
C x mum
Message Page 2 of 3
r� Sent: Wednesday, March 20, 2013 9:27 AM
To: Tom Shevory
Subject: RE: Stage Coach Residences Permit Fees
Yes the fee is for the building permit&the c/o fee. The demo permit fee was paid when submitted.
Debi
-----Original Message-----
From: Tom Shevory f mailto:tshevory@dellbrook.coml
Sent: Wednesday, March 20, 2013 9:12 AM
To: Barrows, Debi
Subject: RE: Stage Coach Residences Permit Fees
Thanks Debi,
Based on Tom's email below,this cost is for the full permit, please confirm.Also, do you know if there will
be a separate fee for the demo permit? I
OL
Tom Shevory � /} � 3 �
Project Manager,LEED AP v c T
13601OTIPellbrook
NICONSTRUCTION
536 Granite Street,Braintree,MA 02184
C:508.858.7690
E: tshevorv@dellbrook.com
w: www.dellbrook.com
From: Barrows, Debi fmailto:Debi.Barrows@town.barnstable.ma.usl_
Sent: Wednesday, March 20, 2013 8:55 AM
To: Tom Shevory
Subject: FW: Stage Coach Residences Permit Fees
The fee is 3,940.63 X 3 = $11,821.89
Thanks
Debi
-----Original Message----
From: Perry,Tom
Sent: Wednesday, March 20, 2013 8:09 AM
To: Barrows, Debi
Subject: FW: Stage Coach Residences Permit Fees
Please respond.I would imagine they want to pay for the whole building not just the foundation.
Thanks
-----Original Message ----
From: Tom Shevory fmailto:tshevoryCa)dellbrook.com]
Sent:Tuesday, March 19, 2013 3:11 PM _
To: Perry,Tom
Cc: 'Kevin Maguire'
Subject: Stage Coach Residences Permit Fees
Good Afternoon Tom,
We are in receipt of the foundation permits,thank you.
11/27/2013
Message - Page 3 of 3
Can you please let me know what the fee is for the foundation permits? I will bring a check down to your
office as soon as possible.
Thanks,
Tom Shevory
Project Manager,LEED AP
D llbroo
,C0NSTRU C T10N,
536 Granite Street,Braintree,MA 02184
C:508.858.7690
E: tshevory@dellbrook.com
w: www.delibrook.com
J
11/r/2013
Message Page
Barrows, Debi
From: Tom Shevory [tshevory@dellbrook.com]
Sent: Wednesday, November 27, 2013 8:21 AM
To: Barrows, Debi
Subject: FW: Stage Coach Residences Permit Fees
Hi Debi,
Based on the email correspondence from when the project began, I was under the impression that the$11,821.89
included the cost of all of the permits and c/o fees.
Please let me know. I can be reached directly at 508-858-7690.
Thanks and have a Happy Thanksgiving..
Tom Shevory
Project Manager,LEED AP
D Ib.r o o k
C0NSTRUCT10N
One Adams Place
859 Willard Street
Quincy,MA 02169
C:508.858.7690
E: tshevory@dellbrook.com
w: www.dellbrook.com
From: Barrows, Debi [mailto:Debi.Barrows@town.barnstable.ma.us]
Sent: Wednesday, March 20, 2013 9:32 AM
To: Tom Shevory
Subject: RE: Stage Coach Residences Permit Fees
Certificate of occupancy
-----Original Message-----
From: Tom Shevory [mailto:tshevory@dellbrook.com]
Sent: Wednesday, March 20, 2013 9:29 AM
To: Barrows, Debi
Subject: RE: Stage Coach Residences Permit Fees
Please clarify what c/o stands for?Thanks.
Tom Shevory
Project Manager,LEED AP
Cl[brood
C 0 N S T R U C:T 1 0 N
536 Granite Street,Braintree,MA 02184
C:508.858.7690
E: tshevory@dellbrook.com
w: www.delibrook.com
From: Barrows, Debi rmailto:Debi.Barrows@town.barnstable.ma.us]
11/27/2013
TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION
Ou r �b
Map 173 Parcel 026 l Application #
�
Health Division Date Issued
Conservation Division`DIC 1,C, ? u-ME Application Fee $150.00
Planning Dept. Permit Fee d
Date Definitive Plan Approved by Planning Board 1&qv Wmi P �
� �r
Historic - OKH _ Preservation / Hyannis 0 ,F-
Project Street Address 70ASta a Coach Road &a Building # Sl' f 7-13
Village Centerville
-
Owner Barnstable Housing Authority Address 146 South Street, Hyannis, MA 02601
Telephone 508-771-7222
Permit Request The applicant proposes a development of "Stage Coach Residences" as an
affordable housing development of 12 rental units (6 one BR, 6 2-BR) in three buildings
to be built on the property. All units are to be affordable. Onsite parking is provided for
(24) vehicles Development includes utility services, drainage, lighting and landscaping
-
1,861.50 1,861.50
Square feet: 1 st floor: existing 0 proposed 2nd floor: existing 0 proposed Total new 3.72,
Aquifer protection overlay,
ZoningDistrict RC Flood Plain zone C Groundwater Overlayresource
4 Li c fy.33 protection overlay.
Project Valuation Construction Type 5B unprotected *'"°�"�" alrldtieft - tit `rani---- --- t"`
eeeh
Lot Size 6.94 acres Grandfathered: ❑Yes M No If yes, attach supporting documentation.
Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family(# units) 4
Age of Existing Structure Unknown Historic House: ❑Yes Ig No ' On Old King's Highway: ❑Yes M No
Basement Type: M Full ❑ Crawl ❑Walkout ❑ Other
Basements to i�ac ude
Basement Finished Area (sq.ft.) 1,861.50 Basement Unfinished Area (sq.ft) Mechanical Room,
Storage, Laundry
Number of Baths: Full: existing 0 new 4 Half: existing 0 new 2
Number of Bedrooms: 0 existing 4 new
Total Room Count (not including baths): existing 0 new 22 21 First Floor Roqa Pount �0
w
Heat Type and Fuel: M Gas ❑ Oil X1 Electric ❑ Other Z. -*►
Ln
o
Central Air: ❑Yes ® No Fireplaces: Existing 0 New 0 Existing wood/GM
stove: �4Yesdl No
'2_. W 3W
Detached garage: ❑ existing ❑ new size—Pool: ❑existing ❑ new size — Barn: ❑ exis ng ❑ n9w s
Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size — Other: .o 30
*Note: lease X'e
Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Comprehensive Permit
No. 2009-069 regarding
Commercial 99 Yes ❑ No If yes, site plan review# ZBA authorization.
Current Use Nothing Proposed Use Affordable Housing R-2 Multifamily
`--APPLICANT INFORMATION
(BUILDER OR HOMEOWNER)
Attu: Craig Gabri
Name Dellbrook Construction LLC Telephone Number 508-889-7790
Address 536 Granite Street License # LS> aZS't
Braintree, ?+AAA 02184 Home Improvement Contractor#
Worker's Compensation #
ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO
Bourne Landfill
SIGNATURE DATE `� 2
FOR OFFICIAL USE ONLY
APPLICATION#
DATE ISSUED
MAP/PARCEL NO. '.
ADDRESS VILLAGE
s
f
OWNER
DATE OF INSPECTION:
FOUNDATION
FRAME
INSULATION
,r
FIREPLACE
r
ELECTRICAL: ROUGH FINAL
PLUMBING: ROUGH FINAL
GAS: ROUGH FINAL
FINAL BUILDING
DATE CLOSED OUT
ASSOCIATION PLAN NO.