Loading...
HomeMy WebLinkAbout0388 HIGH STREET - Health 388 HIGH STREET West Barnstable a A = 111 — 012 o . e A a r` oF� Town of Barnstable P# - 3 Department of Regulatory Services ^ BARNSUBF4 : Public Health Division Dat NAM �p i639• 200 Main Street,Hyannis MA 02601 TEo r�+t � 'q Zc Date Scheduled I ( 0 Time� Fee Pd. /tw Soil Suitability Assessment for Sew e Disposal Performed By:_�/"r� MIA Witnessed By:.%lN` LOCATION & GENERAL INFORMATIOdV� Location Address S r Owner's Name C ryJ Address Assessor's Map/Parcel: f' f Engineer's Name (/4 n k e c s ✓`! NEW CONSTRUCTION REPAIR elephone Land Use Slopes(go) h Surface Stones Distances from: Open Water Body ft Possible �Wet Area 'DV ft Drinking Water Well ft Drainage Way ft Property Line I y_ft Other ft SKETCH:(Street name,dimensions of lot,exact locations of test holes&perc tests,loca�e wetlands In proximity to holes) e yI e� .ter 1 y <, 1 Cn �, Dr Parent material(geologic) Depth to Bedrock Depth to Groundwater. Standing Water in Hole: Weeping from Pit Face Estimated Seasonal High Groundwater DETERMINATION FOR SEASONAL HIGH WATER TABLE Method Used: Depth Observed standing in obs.hole: - in, Depth to soil mottles: in, Depth to weeping from side of obs.hole: In, Groundwater Adjustment ft. Index Well# Reading Date: Index Well level v, Adj.factor- Adj.droundwater bevel,, - I PERCOLATION TEST bate..�. , Time— Observation Hole# Time at 9" Depth of Perc Time at 6" ' Start Pre-soak Time @ Time(9"•6") - End Pre-soak Rate MinJInch .✓�, �W Site Suitability Assessment: Site Pass Site Failed: Additional Testing Needed(Y/N) Original: Public Health Division Observation Hole Data To Be Completed on Back----------- ***If percolation test is to be conducted within 100' of wetland,you must first notify the. Barnstable Conservation Division at least one (1) week prior to beginning. / Q:ISEPTICIPERCFORM.DOC , DEEP.OBSERVATION HOLE LOG Hole# Depth from Soil Horizon Soil Texture Sdil Color Soil_ Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones;Boulders. Consistency,% ravel 0 1Z ' a- I to kb DEEP OBSERVATION HOLE LOG Hole# ` Depth from Soil Horizon Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consi ten % ravel 44 DEEP OBSERVATION HOLE LOG Hole# Depth from Soil Horizon Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consistency,%Gravel) vvl • a DEEP OBSERVATION HOLE LOG Hole# Depth from Soil Horizon Soil Texture Soil Color Soil ther Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders, Consistency, QmveI Flood Insurance Rate Map: Above 500 year flood boundary No— Yes Within 500 year boundary No��, Yes Within 100 year flood boundary No Yes Depth of Naturally Occurrinji Pervious Material Does at least four feet of naturally occurring pervio aterial exist in all areas observed throughout the area proposed for the soil absorption system. If not,what is the depth of n turallyoccurring per ious material? -- Certification I certify that on �� (date)I have passed the soil evaluator examination approved by the Department of Enviro men 1 Protection and that the above analysis was pe orm by me consistent with . the i fining,�( send e e ence described in 310 CNM 15.01 . Signat Date l t Z QAS EPTiC1PERCFORM.DOC