HomeMy WebLinkAboutCOA 60 Stoney Point Roadfor Comm ittee use only
By a vote o
Conditions of Approval
This Certificate is hereby APPROVED
Aye Nay Abstain Date
New Build Addition Alteration Residential
Type of Building House Garage Barn Shed Other
Project Roof Windo ws/Doors Siding/Painting Solar Other
Landscape Feature Fence Wall Flag Pole Pool Other
New Sign Replace Sign Repaint Sign
Town of Barnstable
Old King's Highway Historic District Committee
367 Main Street, Hyannis, Massachusetts 02601
Telephone (508) 862-4787, Email grayce.rogers@town.barnstable.ma.us
APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
Application is hereby made, with six (6) complete, colored sets, for the issuance of a Certificate of Appropriateness under Section 6 of Chapter 470,
Acts and Resolves of Massachusetts, 1973, for proposed work as described below and on plans, drawings, or photographs accompanying this
application for:
Date Date Built: Map & Parcel
Property Ow ner Phone
Street address Email
Village
Mailing address Signature
Agent/Contractor Phone
Agent Address Email
Agent Signature
If approved, the Certificate of Appropriateness expires one year from the stamped approval date or upon the expiration of a Building
Permit, w hichever date shall be later. A one year ex tension may be requested, in w riting, to the Old King’s Highw ay Administrative
Assistant at 367 M ain Street, Hyannis, M A 02601. This request must be received prior to the date of expiration.
There is a 10 day appeal period plus a four day waiting period for all applications after w hich time your approval paperw ork w ill be
availabl e for pickup and building per mit sign-off. All applications are subject to meeting any applicable building code requirements.
Check all categories that apply
Building Construction Commercial
Sign
Other _
Description of Proposed Work
DENIED
10/17/2022 336-043
William Stone Dow & Julia Goldstein 508-274-8878, 774-994-7108
60 Stoney Point Road
Cummaquid
P.O. Box 366 Cummaquid, 02637
williamstonedow@gmail.com
Construct a new 12' x 16' shed
1959
CERTIFICATE OF APPROPRIATENESS – SPEC SHEET
CHIMNEY Material Color
ROOF Make & style Color
Roof Pitch (s) – (7/12 minimum)
(specify on plans for new building & major additions)
GUTTER T ype/Material Color
WINDOWS, DOORS, TRIM, SHUTTERS, SKYLIGHTS
Window/Door Trim material Wood Other specify
Size of cornerboards Size of casings (1X4 min) Color
Rakes 1st member 2nd Member Depth of overhang
Windows: Make/Model Material Color
Window Grills Divided Light Exterior Glued Grills Grills Between Glass
Removable Interior Grills No Grills Grill Pattern
Doors: Style & Make Material Color
Garage doors: Style Size of opening Material
Color
Shutters: Type & Style Material Color
Skylights: Type Make & Model
Material Size Color
SIDING Type Clapboard Shingle Other
Material Red Cedar White Cedar Other
Paint Color
FOUNDATION T ype (max 12’ exposed)
DECK Material Color
SIGNS Size Materials Color
FENCE T ype (split rail, chain link) Color
Material Length
RETAING WALL Description
LIGHTING Type and location (free standing
affixed to structure, illuminated)
Asphalt shingles
10/12
Cobblestone Grey
Double beadboard Pine Black
Natural
Block above ground
whitevinyl21"x 27" Stationary
CHECKLIST – CERTIFICATE OF APPROPRIATENESS
Please complete the Checklist that is applicable to your project.
Submit electronic complete colored set, unless otherwise noted
FEES
Filing Fee according to fee schedule, please make checks payable to the Town of Barnstable
Legal Ad fee, will be billed, made payable to the Town of Barnstable
First Class Postage Sta mps for abutter notification. Please contact Barnstable Old King’s Highway Office for correct count
ALTERATIONS (new paint color, change of siding material, roofing, windows, doors, shutters, etc)
Application for Certificate of Appropriateness
Spec Sheet, brochures and color samples
Plans of building elevatio ns/photographs, ONLY if there is a change to the location and size of the window (s) or
Door (s).
MINOR ADDITIONS (decks, enclosing a porch, sheds (over 120 sqft)
Application for Certificate of Appropriateness,
Spec Sheet, brochures and color samples
Site Plan, ONLY if there are changes to the footprint (see site plan criteria below)
A site plan drawn on a mortgage survey plan or GIS map may be used for minor additions, UNLESS the porch, deck, pool, or
Shed etc. is close to lot lines, zoning setback lines, or other buildings, in which case a certified site plan must be submitted
Photographs of all building elevation affected by any proposed alterations
Plans 2 full scale plans, plus 4 copies of the plan at reduced scale to fit 8.5x11 or 11x17 paper
Company brochure of manufacturers shed or to-scale sketch or affected structure or building elevations
ASSESSORY STRUCTURES, NEW/ALTERED (fences, new stonewalls, changes to retaining walls, pools etc)
Application for Certificate of Appropriateness
Spec Sheet, brochures &/or diagram
Site Plan (see site plan criteria below)
Photographs of any existing structure that will be affected by the change
SIGNS (complete sign supplement)
Rendering of the proposed sign, showing graphics, dimensions, design and height of post, color, and materials
Site Plan on GIS map or mortgage survey, or photograp hs, or to-scale sketch of building elevation showing location of
Proposed sign; and any tree to be removed near a freestanding sign (see below for site plan criteria)
SOLAR PANELS (complete solar panel supplement)
Drawing of locations of panels on house showing roof and panel dimensions
Site Plan showing location of building on property (see site plan criteria below)
SITE PLAN CRITERIA
Name of applicant, street location, map and parcel
Name of architect, engineer, or surveyor; original stamp & signature; date of plan & revision dates
North arro w, written and drawn to scale
Changes to existing grades shown with one -foot contours
Proposed & existing footprint of building and/or structures, and distance to lot lines
Proposed driveway location
Proposed limits of clearing for building (s), assessor structure (s), driveway and septic system
Retaining walls or accessory structures (e.g. pool, tennis court, cabana, barn, garage, etc)
NEW BUILDINGS, ADDITION, OR COMMERICAL BUILDING
CHECKLIST – CERTIFICATE OF APPROPRIATENESS
Submit electronic complete colored set, unless otherwise noted
Application for Certificate of Appropriateness
Spec Sheet, brochures or diagram
Site Plan
Name of applicant, street location, map and parcel
Name of architect, engineer, or surveyor; original stamp & signature; date of plan & revision dates
North arrow, written and drawn to scale
Changes to existing grades shown with one-foot contours
Proposed & existing footprint of building and/or structures, and distance to lot lines
Proposed driveway location
Proposed limits of clearing for building (s), assessor structure (s), driveway and septic system
Retaining walls or accessory structures (e.g. pool, tennis court, cabana, barn, garage, etc)
Building Elevations
Plans at scale of ¼’ = 1 foot; a written drawn scale
Plans at a reduced scale to fit 8.5”x11 or 11x17 paper
Name of applicant, street location, map and parcel
Name of Building Designer, or architect; original signature of plan preparer and stamp; plan date, and all revision dates.
*All new house or commercial building plans must have an original signature and stamp, if any, by a registered
Architect, member of AIBD, or a licensed Massachusetts Home Improvement Contractor, unless this requirement is
waived by the Old King’s Highway Historic District Committee.
A written and bar drawn scale
Elevations of all (affected) sides of the building, with dimensions including height from the natural grade adjacent to the
Building to the top of the ridge; location and elevation of finished grade, roof pitch (s) dormer setbacks; trim style, windo w
And door styles. Changes to existing building must be clouded on drawings.
Window schedule on plans
Landscape Plan (drawn on a certified perimeter plan containing the following)
Name of applicant, street address, assessor’s map and parcel number
Name, address, and telephone number of the plan preparer, pl an date, & date of revisions
The location of existing and proposed buildings and structures, and lot lines
Natural features of site (i.e. rock outcroppings, streams, wetlands, etc)
Existing buffer areas to remain
Location and species of trees and plants
Driveway, parking areas, walkways, and patios, indicating materials to be used
Existing stone walls, and proposed walls including retaining walls for slope retention or septic systems
For removal of stone walls, you must file a demolition application
All proposed exterior lighting and signs
Sketch or Photos of adjacent properties
A sketch (s) to scale or photographs of nearby adjacent buildings, where present, along both sides of the street frontage,
Showing the proposed new house or commercial building in scale and in relationship to the existing buildings.
Please discuss with staff if you do not think this is relevant to your application.
Photographs of all sides of existing buildings to remain or being added to
Existing building, foot print
Building 1 (sq. ft.) Building 2 (sq. ft.)
Exiting building, gross floor area, including area of finished basement
Building 1 (sq. ft.) Building 2 (sq. ft.)
New Building or addition, foot print
Building 1 (sq. ft.) Building 2 (sq. ft.)
New Building or addition, gross floor area, including area of finished basement
Building 1 (sq. ft.) Building 2 (sq. ft.)
Plan preparer, signature and date
192 sq. ft.
10/17/2022
SOLAR PANEL SUPPLEMENT
STRUCTURE ONE
STRUCTURE TYPE Ho me Garage Barn
ELEVATION PLACEM ENT
North
ROOF M EASUREM ENTS
South East West
Length
SOLAR PANEL M EASUREM ENTS
Height Pitch
Length
SOLAR PANEL TYPE & FINISH
Depth Width
Color Finish (matte or glossy)
STRUCTURE TWO
STRUCTURE TYPE Ho me Garage Barn
ELEVATION PLACEM ENT
North
ROOF M EASUREM ENTS
South East West
Length
SOLAR PANEL M EASUREM ENTS
Height Pitch
Length
SOLAR PANEL TYPE & FINISH
Depth Width
T ype Roof Mounted Ground Mounted Canopy/Carport System
Color Finish (matte or glossy)
Solar Co mpany
Phone
Solar representative
Print Name Signature
Date
SIGN SUPPLEMENT
PROJECT TYPE
New Minor Change to Existing Sign
Replace Existing Color Replace Existing Sign with New
MOUNTING TYPE
Post Mount
Post Mount Installation Type Surface Installation Direct Burial Installation
Wall/Surface Mount Mounting type
Elevation affixed to
ASTHETICS
Size Material
Lettering (style) Color
Post/Mount Material Color
Height to Crossbar Single Faced Double Faced
LIGHTING
Will the sign be lit Yes No
T ype of Lighting
Placement of Lighting
ADDITIONAL INFORM ATION
CUMMAQUID, MA 02637
336038
ANDERSON, PATRICIA J & MELISSA J
PO BOX 14
Property ID:
PO BOX 355
CUMMAQUID, MA 02637
336040
DAVIS, STEPHEN S TR
S C R REALTY TRUST
Property ID:
CUMMAQUID, MA 02637
336041
DUFFY, BRIAN P
PO BOX 368
Property ID:
CUMMAQUID, MA 02637
336043
DOW, WILLIAM STONE & GOLDSTEIN, JULIA R
PO BOX 366
Property ID:
CUMMAQUID, MA 02637
336044
RICHARD, PAUL G & NANCY L
P O BOX 196
Property ID:
SUDBURY, MA 01776
33607200A
GRANDE, STEPHEN E III
60 UNION AVE
Property ID:
CUMMAQUID, MA 02637
33607200B
PORTER, STEPHEN D & LOUISE G
PO BOX 273
Property ID:
CUMMAQUID, MA 02637
336091
SCHOFIELD, KARL & KELLI
79 STONEY POINT ROAD
Property ID:
CUMMAQUID, MA 02637
336092
SCHOFIELD, KARL & KELLI
79 STONEY POINT ROAD
Property ID:
1,000.00
This map is for illustration purposes only. It is not
adequate for legal boundary determination or
regulatory interpretation. This map does not represent
an on-the-ground survey. It may be generalized, may not
reflect current conditions, and may contain
cartographic errors or omissions.
Parcel lines shown on this map are only graphic
representations of Assessor’s tax parcels. They are
not true property boundaries and do not represent
accurate relationships to physical objects on the map
such as building locations.
167083
Feet
feetApprox. Scale: 1 inch =83
Legend
Town of Barnstable GIS Unit
367 Main Street, Hyannis, MA 02601
508-862-4624
gis@town.barnstable.ma.us
Map printed on:11/2/2022
Road Names
SS
WS1
SSSTONEY POINT RD5040
40
4 0
404040
4034.65
43.35
39.41
36.79
40.99
42.49
336-038
# 65
336-039
# 3990
336-040
# 21
336-041
# 41
336-043
# 60
336-044
# 4022
336-046
# 4044
336-065
# 51
336-091
# 79
336-092
# 0
336-072 CND
#4042
Aerial Photos: May 1968
Town of BarnstableTown of Barnstable
Conservation DivisionConservation Division
http://www.town.barnstable.ma.us
200 Main Street, Hyannis, MA 02601
(508) 862-4093
ÿN
E
S
W
1 inch = 66.18 feet
0 30 60 90 12015
Feet
123-456
Wooded Areas
Catchbasins
Lamp Posts
Manholes
Utility Poles
Signs
Flagpoles
Street Trees
Monuments
(d Satellite Dish
Fuel Tanks
Water Tanks
Parcels FY2022
Address Street Numbers
Town Boundary
Approx. Building
Buildings
Decks / Patios
Above Ground Swimming Pools
In Ground Swimming Pools
Paved Walkways
Unpaved Walkways
Paths
Stairways
Paved Roads
Unpaved Roads
Paved Driveways
Unpaved Driveways
Painted Lines
Paved Parking Lots
Unpaved Parking Lots
Bridges
Railroad
Fences
Guardrails
Retaining Walls
Stone Walls
Other Walls
Hedges
Sports Areas
Golf Areas
Docks / Piers
Boardwalks
Jetties
Streams
Drainage Ditches
Marsh Areas
Water Bodies
Spot Elevations (NAVD88)
Topo 10 ft Contours (NAVD88)
Topo 2 ft Contours (NAVD88)
This map is for planning purposes only. It is
not adequate for legal boundary determination
or regulatory interpretation. This map does not
represent an on-the-ground survey.
Enlargements beyond a scale of 1”=100’ may
not meet established map accuracy standards.
Parcel lines on this map are only graphic
representations of Assessor’s tax parcels. They
are not true property boundaries and do not
represent accurate relationships to physical
objects on the map such as building locations.
Disclaimer Human-made features,
hydrography, topography, and vegetation were
interpreted from 2014 aerial photos
and may have been updated from more current
sources. Parcel lines were digitized from
FY2022 Town of Barnstable Assessor’s maps.
Data Source
Examples of the Martha's Vineyard Loft shed
by Salt Spray Sheds
Asphalt roof shingles in Cobblestone Grey to
match those on the house/garage at
60 Stoney Point Road.
Trees and vegetation around
the shed area will be
maintained so that the
structure has limited
visibility from the street