HomeMy WebLinkAbout20221206 NOI CCMA 160 Lake Elizabeth Drive
APPLICANT
Christian Camp Meeting Association
Attn: Douglas Farquhar
39 Prospect Ave
Centerville, MA 02362
REPRESENTATIVE
Environmental Consulting & Restoration, LLC
P.O. Box 4012
Plymouth, MA 02361
(508) 648-3957
NOTICE OF INTENT
160 Lake Elizabeth Drive, Centerville
SUBMITTED TO
Barnstable Conservation Commission
November 2022
P.O. Box 4012, Plymouth, Massachusetts 02361 617-529-3792 | www.ecrwetlands.com
November 15, 2022
Town of Barnstable
Conservation Commission
367 Main Street
Barnstable, MA 02632
Attn.: Darcy Karle, Conservation Agent
RE: Notice of Intent, Proposed Dock and Stairway Reconstruction, 160 Lake
Elizabeth Dr, Centerville, MA
Dear Members of the Barnstable Conservation Commission:
Please accept this Notice of Intent application for the proposed dock and stairway
reconstruction project located at 160 Lake Elizabeth Dr in Barnstable (the site). The Town of
Barnstable Assessors Department references the site as Map ID: 226-137. The proposed project
is located within Land Under Lake Elizabeth as well as the Inland Bank, Bordering Vegetated
Wetland and FEMA flood zone associated with Lake Elizabeth. The proposed dock and stairway
will be constructed in the same footprint and to the same dimensions as the existing dock and
stairway. This application is being submitted in accordance with the Massachusetts Wetlands
Protection Act and the Town of Barnstable Wetlands Protection Bylaw.
If you have any questions or require additional information, please contact me at (617)-529-
3792.
Sincerely,
Environmental Consulting & Restoration, LLC
Cameron Larson
Wetland Scientist
CC: Department of Environmental Protection, Wetland Division, 20 Riverside Drive, Lakeville, MA
02347
Division of Marine Fisheries - Southeast Marine Fisheries Station, Attn: Environmental
Reviewer, 836 South Rodney French Blvd., New Bedford, MA 02744
Barnstable Marine & Environmental Affairs, Attn.: Shellfish Biologist, 1189 Phinney's Lane,
Centerville MA 02632
Barnstable Harbormaster, 1189 Phinney's Lane, Centerville, MA 02632
Christian Camp Meeting Association, Attn.: Douglas Farquhar, 39 Prospect Ave, Centerville,
MA 02632
NOTICE OF INTENT
TABLE OF CONTENTS
Item Attachment
Barnstable NOI Application Checklist 1
Notice of Intent Form 2
Project Narrative 3
Photograph Pages 4
USGS Site Locus Map 5
FEMA Map 6
Massachusetts Natural Heritage & Endangered Species Map 7
Abutter Information 8
Property Access Form 9
Barnstable Waiver 10
Site Plan 11
Chap 707/rev. March 2022 Page 1
CHAPTER 707
Regulation Governing Minimum Submission
Requirements for a Notice of Intent Application
The Barnstable Conservation Commission has adopted the following requirements in order to obtain more
consistently complete submission documents necessary for a thorough and efficient review of all Notice of Intent
(NOI) applications. Failure to complete any of the items in this checklist may result in your application being
denied.
Applicant or applicant’s agent should check each box denoting that the task has been completed or in certain
instances, like field staking, denoting that the task will be completed. The following submission checklist covers the
requirements of Chapter 237, Wetlands Protection, of the Part I General Ordinances of the Code of the Town of
Barnstable. This checklist shall be submitted to the Barnstable Conservation Division with the NOI application.
1. Requirements
a. The applicant understands, unless they’ve instructed otherwise, they are applying both
under the Massachusetts Wetlands Protection Act M.G.L. c.131,§40 and
Chapter 237 of the Town of Barnstable General Ordinances.
b. Attach a written narrative to the NOI application (WPA Form 3), available at:
www.mass.gov/eea/agencies/massdep/service/approvals/wpa-form-3.html
describing any project impacts and proposed mitigation as they relate to the following:
1) Any of the interests of Chapter 237 of the General Ordinances and the MassDEP
Wetlands Protection Act M.G.L. 131, §40.
2) The performance standards contained in the MassDEP Wetlands Protection Regulations
(310 CMR 10.00)
3) Chapter 704: Regulation Governing Activity in the 100-ft. Buffer Zone.
4) Chapter 703: Private Docks and Piers.
5) Any other applicable regulations (310 CMR 10.00 or as promulgated under Chapter 237
of the General Ordinances).
c. Enclose proper payment to cover the fee for Chapter 237 filings. Consult current Fee
Schedule at www.townofbarnstable.us/Conservation
d. Please indicate who is to record the Order of Conditions (check one):
Applicant Agent
2. Abutter Notification (See Abutter Notification Regulation, Chapter 706)
Town of Barnstable
Conservation Commission
200 Main Street
Hyannis Massachusetts 02601
Office: 508-862-4093 E-mail: conservation@town.barnstable.ma.us FAX: 508-778-2412
Chap 707/rev. March 2022 Page 2
a. Contact the Conservation Division office at (508) 862-4093 regarding the docketing
process, or see current schedule of Conservation Hearings and submission deadlines at:
www.townofbarnstable.us/Conservation/
b. Provide a copy of the list of abutters within a 100 ft radius of the project parcel.
c. Provide a copy of the Assessor’s Map indicating the parcel of the project site and
showing the 100 ft radius of the project parcel.
d. Provide a copy of the abutter notification letter. Use the form letter provided in our Abutter
Notification Regulation (Chapter 706), available on the Conservation Division
website.
e. Bring the green return receipts, from the certified mailings to the abutters, as proof of
notification to the public hearing. If any mailings are returned, bring the entire envelope,
indicating by postal service stamp the reason for return. You will retain the receipts
afterwards, not the Conservation Division.
f. I further certify under the penalties of perjury that all abutters were notified of the Notice of
Intent Application, pursuant to the requirements of Chapter 237 of the General Ordinances of the
Code of the Town of Barnstable. Notice must be made in writing by certified mail to all abutters
within 100 ft of the property line of the project location.
_______________________________________
Signature of Applicant or Representative Date
3. Field Staking:
a. On or before Tuesday, @ 8:30 a.m., one week prior to the scheduled public hearing, have
your project staked by a professional engineer or registered land surveyor showing all
outside corners of all proposed structures and the continuous proposed “limit of work” line.
b. Have a wetland scientist or other qualified professional flag all wetland resource areas on or
within 100 ft of the work area. Make sure that the flags are sequentially numbered.
c. Provide a project identification stake with bright painted top and applicant name and address,
easily visible from the street approaching the site.
4. Legal Advertisement Fees:
a. Conservation will submit the legal ad for publication in a local newspaper. The applicant or
his/her agent is responsible for payment, by check (payable to the Town of Barnstable), at the
hearing or by mail. The cost of the legal ad will be pre-calculated and posted on the hearing
agenda prior to the hearing.
5. Minimum Documentation for a Complete Application:
a. Provide a completely filled-out (in all parts) NOI application as locally
adopted for the Town of Barnstable, including MassDEP Vegetated Wetland Field Data Form.
Indicate Assessor’s map and parcel of the project, as well as the street or road address, and
pertinent village (i.e., Hyannis, Centerville, Barnstable, etc).
b. Provide two (2) original project plans, stamped in blue or red ink (wet stamp). Plans must be
signed and dated by a Massachusetts licensed, professional engineer, land surveyor, architect or
landscape architect (as applicable), and shall be drawn at a readable scale (1" = 20' preferred).
For multi-acre sites, a second site plan, drawn at larger scale showing the entire site, should also
be provided.
Chap 707/rev. March 2022 Page 3
c. Provide a signed Permission to Access Property, Form PA. The form must be signed by the property
Owner, or legal representative and submitted prior to NOI being docketed and application advertised.
Form PA is available at www.townofbarnstable.us/Conservation/. Do not send the abutter letter
out until the form is submitted to the Conservation Division office.
d. For projects requiring mitigation plantings under Chapter 704-3, 704-4, and 704-5,
mitigation planting location(s) shall clearly be shown on landscaping planting plan. The
planting plan shall include species list (chosen from the Town of Barnstable Conservation
Commission approved planting lists), sizes, densities and/or quantities. The plan shall
also provide area calculations between 0 to 50 and 50 to 100 separately for the amount of
mitigation planting required, and the amount of mitigation planting proposed.
e. Provide detailed, written street directions to the locus (site).
f. Provide a copy of a U.S.G.S. locus map indicating the general area of the project site.
g. Provide a check for the Town of Barnstable portion of the required filing fee. (The portion
payable to the Commonwealth, see 7. e. below)
h. Provide any other documentation, photographs, architectural renderings or other supporting data
prepared by professionals competent in the field which may be relevant to the application.
6. The site plan shall also show:
a. All existing and proposed contours at 2-ft. minimum intervals (1-ft. preferred).
b. Clear delineation of all existing and proposed structures and features. Building structures must
be accurately dimensioned (fixed location) from property lines and wetland resource areas. Plans
shall provide sufficient detail to show all potential wetland impacts, mitigation, compensatory
areas, engineered structures, utilities, landscaping, etc. within the area of jurisdiction. On
complicated sites, existing and proposed conditions must be shown on separate sheets.
c. Locus inset map of the site clearly showing its location relative to surrounding public streets.
d. All wetland resource area flags by individual flag number (matched to the field) to clearly
identify all resource areas on or within 100 feet of the work area. The individual who performed
the flagging and date of flagging shall be identified on the plan next to the resource line.
e. Section views showing changes in grade, cuts and fills.
7. SUBMISSION OF THE COMPLETED APPLICATION WITH PLANS:
a. Provide a signed Permission to Access Property, Form PA. The form must be signed by the property
Owner, or legal representative and submitted prior to NOI being docketed and application advertised.
Form PA is available at www.townofbarnstable.us/Conservation/. Do not send the abutter letter
out until the form is submitted to the Conservation Division office.
b. Email NOI application and all associated materials in PDF format to
Kimberly.Cavanaugh@town.barnstable.ma.us AND Darcy.Karle@town.barnstable.ma.us .
Do not include copies of checks.
All attachments must be named with the hearing date (year first), type, name, address. Examples
20220301 NOI Smith 21 Main Street or 2022031 NOI Plan Smith 21 Main Street.
c. Provide two (2) full NOI applications with folded plans (colored ink stamp) with signature/date
to the Town of Barnstable Conservation Division Office for administrative use;
2022November 8th15
wpaform3.doc • rev. 6/18/2020 Page 1 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
Important:
When filling out
forms on the
computer, use
only the tab key
to move your
cursor - do not
use the return
key.
Note:
Before
completing this
form consult
your local
Conservation
Commission
regarding any
municipal bylaw
or ordinance.
A. General Information
1. Project Location (Note: electronic filers will click on button to locate project site):
160 Lake Elizabeth Drive
a. Street Address
Centerville (Barnstable)
b. City/Town
02632
c. Zip Code
Latitude and Longitude: 41º38'26.868"
d. Latitude
70º19'56.878"
e. Longitude
Map #226
f. Assessors Map/Plat Number
Parcel #137
g. Parcel /Lot Number
2. Applicant:
a. First Name
b. Last Name
Christian Camp Meeting Association
c. Organization
39 Prospect Ave
d. Street Address
Centerville
e. City/Town
MA
f. State
02632
g. Zip Code
h. Phone Number
i. Fax Number
dfarquhar@hpm.com
j. Email Address
3. Property owner (required if different from applicant): Check if more than one owner
a. First Name
b. Last Name
Christian Camp Meeting Association
c. Organization
39 Prospect Ave
d. Street Address
Centerville
e. City/Town
MA
f. State
02632
g. Zip Code
h. Phone Number
i. Fax Number
billmckinneymass@gmail.com
j. Email address
4. Representative (if any):
Cameron
a. First Name
Larson
b. Last Name
Environmental Consulting & Restoration, LLC
c. Company
PO Box 4012
d. Street Address
Plymouth
e. City/Town
MA
f. State
02361
g. Zip Code
508-648-3957
h. Phone Number
i. Fax Number
cameron@ecrwetlands.com
j. Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$210.00
a. Total Fee Paid
$92.50
b. State Fee Paid
$117.50
c. City/Town Fee Paid
wpaform3.doc • rev. 6/18/2020 Page 2 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
A. General Information (continued)
6. General Project Description:
Proposed dock and stairway reconstruction project at 160 Lake Elizabeth Drive will include the
reconstruction of the existing wooden dock and stairway within the existing footprint. Please refer to
the Project Narrative for more information.
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. Single Family Home 2. Residential Subdivision
3. Commercial/Industrial 4. Dock/Pier
5. Utilities 6. Coastal engineering Structure
7. Agriculture (e.g., cranberries, forestry) 8. Transportation
9. Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological
Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
Proposed inland dock construction - 310 CMR 10.53(3)(j)
2. Limited Project Type
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8. Property recorded at the Registry of Deeds for:
Barnstable
a. County
b. Certificate # (if registered land)
117
c. Book
468
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
wpaform3.doc • rev. 6/18/2020 Page 3 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
For all projects
affecting other
Resource Areas,
please attach a
narrative
explaining how
the resource
area was
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Bank approx. 5 lin. ft.
1. linear feet
2. linear feet
b. Bordering Vegetated
Wetland
approx. 44 sq. ft.
1. square feet
2. square feet
c. Land Under
Waterbodies and
Waterways
approx. 46 sq. ft.
1. square feet
2. square feet
3. cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
d. Bordering Land
Subject to Flooding
1. square feet
2. square feet
3. cubic feet of flood storage lost
4. cubic feet replaced
e. Isolated Land
Subject to Flooding
1. square feet
2. cubic feet of flood storage lost
3. cubic feet replaced
f. Riverfront Area
1. Name of Waterway (if available) - specify coastal or inland
2. Width of Riverfront Area (check one):
25 ft. - Designated Densely Developed Areas only
100 ft. - New agricultural projects only
200 ft. - All other projects
3. Total area of Riverfront Area on the site of the proposed project:
square feet
4. Proposed alteration of the Riverfront Area:
a. total square feet
b. square feet within 100 ft.
c. square feet between 100 ft. and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No
3. Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
wpaform3.doc • rev. 6/18/2020 Page 4 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Designated Port Areas Indicate size under Land Under the Ocean, below
b. Land Under the Ocean
1. square feet
2. cubic yards dredged
c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. Coastal Beaches
1. square feet
2. cubic yards beach nourishment
e. Coastal Dunes
1. square feet
2. cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement (if any)
f. Coastal Banks approx. 5 lin. ft.
1. linear feet
g. Rocky Intertidal
Shores
1. square feet
h. Salt Marshes
1. square feet
2. sq ft restoration, rehab., creation
i. Land Under Salt
Ponds
1. square feet
2. cubic yards dredged
j. Land Containing
Shellfish
1. square feet
k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1. cubic yards dredged
l. Land Subject to
Coastal Storm Flowage
approx. 118 sq. ft.
1. square feet
4. Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a. square feet of BVW
b. square feet of Salt Marsh
5. Project Involves Stream Crossings
a. number of new stream crossings
b. number of replacement stream crossings
wpaform3.doc • rev. 6/18/2020 Page 5 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements
This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions
(310 CMR 10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the
Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the
Massachusetts Natural Heritage Atlas or go to
http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm.
a. Yes No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
Phone: (508) 389-6360
MassMapper
b. Date of map
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321
CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR
complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review (unless noted exceptions in Section 2 apply, see below).
c. Submit Supplemental Information for Endangered Species Review
1. Percentage/acreage of property to be altered:
(a) within wetland Resource Area
percentage/acreage
(b) outside Resource Area
percentage/acreage
2. Assessor’s Map or right-of-way plan of site
2. Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work
(a) Project description (including description of impacts outside of wetland resource area &
buffer zone)
(b) Photographs representative of the site
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma-
endangered-species-act-mesa-regulatory-review).
Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act.
MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc • rev. 6/18/2020 Page 6 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
(c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for-
a-mesa-project-review).
Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit:
(d) Vegetation cover type map of site
(e) Project plans showing Priority & Estimated Habitat boundaries
(f) OR Check One of the Following
1. Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in-
priority-habitat; the NOI must still be sent to NHESP if the project is within estimated
habitat pursuant to 310 CMR 10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking #
b. Date submitted to NHESP
3. Separate MESA review completed.
Include copy of NHESP “no Take” determination or valid Conservation & Management
Permit with approved plan.
3. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. Not applicable – project is in inland resource area only b. Yes No
If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
South Shore - Cohasset to Rhode Island border, and
the Cape & Islands:
Division of Marine Fisheries -
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 South Rodney French Blvd.
New Bedford, MA 02744
Email: dmf.envreview-south@mass.gov
North Shore - Hull to New Hampshire border:
Division of Marine Fisheries -
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
Email: dmf.envreview-north@mass.gov
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP’s Southeast Regional Office.
c. Is this an aquaculture project? d. Yes No
If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57).
wpaform3.doc • rev. 6/18/2020 Page 7 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Website for ACEC locations). Note: electronic filers click on Website.
b. ACEC
5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a. Yes No
6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. Yes No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1. Applying for Low Impact Development (LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2. A portion of the site constitutes redevelopment
3. Proprietary BMPs are included in the Stormwater Management System.
b. No. Check why the project is exempt:
1. Single-family house
2. Emergency road repair
3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project) with no discharge to Critical Areas.
D. Additional Information
This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of
the following information you submit to the Department.
1. USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
wpaform3.doc • rev. 6/18/2020 Page 8 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
D. Additional Information (cont’d)
3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. List the titles and dates for all plans and other materials submitted with this NOI.
Conservation Plan Proposed Dock & Stairway Replacement
a. Plan Title
Environmental Consulting & Restoration,
LLC
b. Prepared By
c. Signed and Stamped by
November 1, 2022
d. Final Revision Date
1" = 10'
e. Scale
f. Additional Plan or Document Title
g. Date
5. If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Report, if needed.
E. Fees
1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number
3. Check date
4. State Check Number
5. Check date
6. Payor name on check: First Name
7. Payor name on check: Last Name
4313 11/2/2022
11/2/20224315
Christian Camp Meeting Association
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: When
filling out forms
on the computer,
use only the tab
key to move your
cursor - do not
use the return
key.
A. Applicant Information
1. Location of Project:
160 Lake Elizabeth Drive
a. Street Address
Centerville
b. City/Town
c. Check number
$92.50
d. Fee amount
2. Applicant Mailing Address:
a. First Name
b. Last Name
Christian Camp Meeting Association
c. Organization
39 Prospect Ave
d. Mailing Address
Centerville
e. City/Town
MA
f. State
02632
g. Zip Code
h. Phone Number
i. Fax Number
DFarquhar@hpm.com
j. Email Address
3. Property Owner (if different):
a. First Name
b. Last Name
Christian Camp Meeting Association
c. Organization
39 Prospect Ave
d. Mailing Address
Centerville
e. City/Town
MA
f. State
02632
g. Zip Code
h. Phone Number
i. Fax Number
billmckenneymass@gmail.com
j. Email Address
To calculate
filing fees, refer
to the category
fee list and
examples in the
instructions for
filling out WPA
Form 3 (Notice of
Intent).
B. Fees
Fee should be calculated using the following process & worksheet. Please see Instructions before
filling out worksheet.
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category
(identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in
addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then
added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To
calculate the city/town share of the fee, divide the total fee in half and add $12.50.
4313
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number
of Activities
Step
3/Individual
Activity Fee
Step 4/Subtotal Activity
Fee
Cat 5) Proposed dock
reconstruction
1
$100.00
(min.)
$100.00
Cat 1a) Proposed reconstruction of
wooden stairs
1
$110.00
$110.00
Bylaw Fee
$295.00
Step 5/Total Project Fee: $210.00
Step 6/Fee Payments:
Total Project Fee: $210.00
a. Total Fee from Step 5
State share of filing Fee: $92.50
b. 1/2 Total Fee less $12.50
City/Town share of filling Fee: $117.50
c. 1/2 Total Fee plus $12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of
this form; and the city/town fee payment.
To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of
Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these
electronically.)
Notice of Intent
160 Lake Elizabeth Dr, Barnstable
PROJECT DESCRIPTION
1. Introduction
Please accept this Notice of Intent application for the proposed dock and stairway reconstruction
project located at 160 Lake Elizabeth Drive in Barnstable (the site). The Town of Barnstable
Assessors Department references the site as Map ID: 226-137. The proposed project is located
within Land Under Lake Elizabeth as well as the Inland Bank, Bordering Vegetated Wetland, FEMA
flood zone and Coastal Bank associated with Lake Elizabeth. The proposed dock and stairway will
be constructed in the same footprint and to the same dimensions as the existing dock and
stairway. This application is being submitted in accordance with the Massachusetts Wetlands
Protection Act and the Town of Barnstable Wetlands Protection Bylaw.
2. Site Description
The site is located along the western shore of Lake Elizabeth and consists of an undeveloped
embankment located just across Lake Elizabeth Drive from the single-family home property at 109
Lake Elizabeth Drive. The owner of the embankment, the Christian Camp Meeting Association,
maintains an existing dock and stairway to access Lake Elizabeth down the steep bank to the
water’s edge. The existing dock has been in place prior to before the previous owners of 109
Lake Elizabeth Drive and is believed to have been installed in the early 1980s, or earlier. The
existing stairway is a wooden stairway constructed nearly at grade down the slope to the lake. The
stairway is separated from the dock by a narrow strip of lawn. The dock is a wooden dock
approximately 5 feet wide and 18 feet long that has been constructed on wooden piles roughly 6
to 8 inches in diameter. The Bordering Vegetated Wetland and Inland Bank associated with Lake
Elizabeth were delineated by Environmental Consulting & Restoration, LLC (ECR) on July 18, 2022.
As a result of the field work and review of available environmental databases, ECR is able to
confirm that the site contains the following wetland resource areas and areas of Conservation
Commission jurisdiction:
• Land Under Lake Elizabeth
• Bordering Vegetated Wetland
• Inland Bank
• Coastal Bank
• Land Subject to Coastal Storm Flowage (FEMA Flood Zone AE el. 12 ft.)
• 100-foot buffer zone
Notes:
1. The site is not located within an area mapped as Priority Habitat & Estimated Habitat for
Rare Species according to the Massachusetts Natural Heritage & Endangered Species
Program (MaNHESP).
2. The site does not contain or is near a Certified Vernal Pool according to the MaNHESP.
3. The site is not located within an Area of Critical Environmental Concern (ACEC).
4. The site is not located within an Area of Critical Environmental Concern (ACEC.)
Mapped Resource on or Within
Proximity to Site
Yes No
Area of Critical Environmental Concern X
NHESP Certified Vernal Pool X
NHESP Potential Vernal Pool X
NHESP Estimated Habitat of Rare Wildlife X
NHESP Priority Habitat of Rare Species X
Notice of Intent
160 Lake Elizabeth Dr, Barnstable
DFW Cold Water Fisheries Resources X
Outstanding Resource Waters X
FEMA Flood Zones X
3. Proposed Activities
The purpose of this application is to authorize the proposed dock and stairway reconstruction
project at 160 Lake Elizabeth Drive in Barnstable. The proposed dock and stairway shall be located
within the same footprint and constructed to the same dimensions as the existing dock and
stairway. The proposed project will involve the following activities:
• Removal of the Existing Dock and Stairway - The existing wooden dock (planks and frame)
and stairway are partially dilapidated and shall be completely removed, with the exception
of the existing woodenpiles supporting the dock. To minimize disturbance to the pond
bottom, the existing piles shall be cut at, or just below, the existing water level and secured
to the new piles. It is anticipated that the dock’s frame and planks as well as the stairway
can all be disassembled and removed by hand. All material shall be removed and disposed
of offsite at an appropriate faciality.
• Construction of the New Dock – The new dock shall be constructed within the same
footprint as the existing dock. The dock shall be approximately 5 feet by 18 feet and
constructed of non-CCA lumber (or PVC material, such as Azek) with a minimum of 3/4 inch
plank spacing. New support piles shall consist of 4- to 8-inch diameter wood piles driven
into the subsurface by hand or helical piles driven into the subsurface using a hand-held
machine. The new piles shall be installed immediately adjacent the existing piles; the
existing piles will be cut at or near the waterline and the secured to the new piles. Due to
the depth of the pond, the site is inaccessible by barge so piles will be driven utilizing
landward access. Any disturbance to the site shall be restored as described below. The
dock is intended to provide recreational access to Lake Elizabeth for residents of and
visitors to Craigville Village. The dock will provide canoe and/or kayak access, which may
be temporarily docked at times. The dock is not intended to be utilized by motorized
vessels.
• Construction of the Stairway – The new stairway shall be constructed within the same
footprint as the existing stairway. The stairway shall be approximately 3 feet by 12 feet and
constructed of non-CCA lumber (or PVC material, such as Azek). The intent of the stairway
is to provide access to the dock along the steep bank to the pond. At this time, the current
stairway is built into the bank at grade and the proposed stairs shall maintain that design.
• Stabilization Activities - All disturbed areas associated with the proposed project will be
restored and stabilized with native plant material and native seed mix appropriate for the
site. Any disturbance to the wetland fringe to the pond will be hand planted and seeded
with native species tolerant of wetland conditions. Any disturbance landward of the wetland
will be hand planted and seeded with native species suitable for the upland environment.
The applicant intends to maintain a narrow shoulder of mowed upland along either side of
the stairway as it currently exists.
5. Summary
The proposed project includes the replacement of the existing dock and stairway at 160 Lake
Elizabeth Drive. The new dock and stairway shall be constructed in kind and in the same footprint
Notice of Intent
160 Lake Elizabeth Dr, Barnstable
as the existing dock and stairway. The proposed project has been designed to minimize
disturbance to the site and includes stabilization and restoration activities. The project shall be
overseen by an environmental monitor to ensure the methodology is followed and all wetland
resource areas are adequately protected. Once all work has been completed the applicant shall
prepare and submit a Certificate of Compliance to the Barnstable Conservation Commission to
confirm that the project has been constructed in accordance with the conditions set forth in the
Order of Conditions.
160 Lake Elizabeth Drive, Centerville
Site Photographs
Photograph #1 – View of the existing stairway and dock.
Photograph #2 – View of the existing dock that extends into Lake Elizabeth.
160 Lake Elizabeth Drive, Centerville
Site Photographs
Photograph #3 – View from the existing dock looking toward the existing stairway.
Photograph #4 – View of the existing cedar posts that support the existing dock.
USGS SITE LOCUS MAP
160 Lake Elizabeth Dr
Barnstable, Massachusetts
Source: MassGIS Mass Mapper
N
SITE
FEMA MAP
160 Lake Elizabeth Dr
Barnstable, Massachusetts
Source: FEMA Map 25001C0564J Eff. 07/16/2014
N
SITE
Priority Habitats of Rare Species, Estimated Habitat of Rare Wildlife
& Certified Vernal Pools Map
160 Lake Elizabeth Dr
Barnstable, Massachusetts
Source: MassGIS Mass Mapper
N
SITE
NOTICE OF INTENT
ABUTTER NOTIFICATION LETTER
DATE:
RE: Upcoming Barnstable Conservation Commission Public Hearing
To Whom It May Concern,
As an abutter within 100 feet of a proposed project, please be advised that a NOTICE OF INTENT
application has been filed with the Barnstable Conservation Commission.
APPLICANT:
PROJECT ADDRESS OR LOCATION:
ASSESSOR’S MAP & PARCEL: MAP PARCEL
PROJECT DESCRIPTION:
________________________________________________________
APPLICANT’S AGENT:
PUBLIC HEARING: WILL BE HELD VIA ZOOM
See agenda posting on Town Clerks website
available at least 48 hours in advance of the
meeting for details.
DATE: / /
TIME: P.M.
160 Lake Elizabeth Drive
137
Brad Holmes | ECR, LLC
Douglas & Therese Farquhar
226
PO Box 4012
Plymouth, MA 02361
Proposed dock and stairway reconstruction project located on
Lake Elizabeth.
Cameron Larson
Christian Camp Meeting Association
NOTE: Plans and application describing the proposed activity are on file with the Conservation
Commission, 367 Main Street, Hyannis (508-862-4093)
Conservation Notice of Intent (NOI) Abutter List for Subject Parcel 226137
Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
226015 GAVITT, JULIA G TR JGG CRAIGVILLE NOMINE TRUST 11 DROWNE PKWY RUMFORD 02916RI
226016 GREENE, THOMAS M & STEPHANIE
M TRS
22 BUTLER AVENUE REALTY
TRUST
287 COMMONWEALTH
AVE UNIT 3
BOSTON 02115MA
226017 KIRK, ELEANORE H S TR C/O KIRK, JAMES W 24 GRANVILLE BAKER
WAY
PLYMPTON 02367MA
226023 GREENE, JOHN J & BARBARA L C/O NRG CONCEPTS, INC 165 MAIN ST, STE 307 MEDWAY 02053MA
226044001 PLONOWSKI, THADDEUS J &
KATHLEEN F ET AL
23 DORSET LANE MILL VALLEY 94941CA
226045 REILLY, WILLIAM E JR 71 CHURCH STREET SOUTH EASTON 02375MA
226047 SHEA, KEVIN D & BLAKE, KIMBERLY
S
167 SALT MEADOW
ROAD
FAIRFIELD 06824CT
226048 DALESSANDRO, VINCENT A &
CAROLE B TRS
DALESSANDRO FAMILY REV TRUST
2011
1857 ATWOOD AVENUE JOHNSTON 02919RI
226050 99 LAKE ELIZABETH LLC 28 SUMMERBELL AVE CENTERVILLE 02632MA
226051 HERZOG, ELIZABETH HEIRS OF 61 LOUNSBURY PLACE KINGSTON 12401NY
226052 FARQUHAR,DOUGLAS B&
THERESE-FRANKLIN, ANN
1601 OLNEY-SANDY
SPRING ROAD
SANDY SPRING 20860MD
226053 CRORY, ROBERT R & LAUREN C 39 THOMSON ROAD WEST HARTFORD 06107CT
226054 GATES, BARBARA H & CLARK R TRS GATES HEWITT FAMILY TRUST 8219 N FAIRWAY VIEW
DRIVE
TUCSON 85742AZ
226055 BROUILLARD, JOHN C & ELAINE F
TRS
BROUILLARD LIVING TRUST 270 GREEN DUNES
DRIVE
WEST HYANNIS PORT 02672MA
9/21/2022 10:57 AMReport Generated On:Page 1 of 2 24Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
226055 BROUILLARD, JOHN C & ELAINE F
TRS
BROUILLARD LIVING TRUST 270 GREEN DUNES
DRIVE
WEST HYANNIS PORT 02672MA
226056 DELANEY, RYAN TR DELANEY FAMILY NOMINEE
TRUST
41 LEDGEWOOD DRIVE COHASSET 02025MA
226057 PARKE, AVIS-ANN S 135 LAKE ELIZABETH
DRIVE
CENTERVILLE 02632MA
226065 WALTERS, GARY D & SUSAN B 428 SAYRE DRIVE PRINCETON 08540NJ
226066 MATTHIJSSEN, JUDITH E 8 SKINNER TRAIL CHESTER 07930NJ
226071 BARKSDALE, KENNETH P & LISA F 947 SPERRY WAY SYKESVILLE 21784MD
226098 CHRISTIAN CAMP MEETING ASSOC 39 PROSPECT AVE CENTERVILLE 02632MA
226136 LEE, CHRISTINA A TR CHRISTOS V & MENI E
DAFNOULELIS IR TRS
17 IVEY ROAD BELMONT 02478MA
226137 CHRISTIAN CAMP MEETING ASSOC 39 PROSPECT AVE CENTERVILLE 02632MA
226138 GAVITT, JULIA G TR JGG CRAIGVILLE NOMINEE TRUST 11 DROWNE PKWY RUMFORD 02916RI
226187 GRIFFIN, SUZANNE M PO BOX 627 WEST HYANNISPORT 02672MA
9/21/2022 10:57 AMReport Generated On:Page 2 of 2 24Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
11/4/2022