HomeMy WebLinkAboutContinuance request Christian Camp Meeting Assoc (2)From: cameron@ecrwetlands.com
Sent: Thursday, December 15, 2022 2:31 PM
To: Karle, Darcy; Cavanaugh, Kimberly
Cc: 'Tom Lee'; 'Douglas B. Farquhar'
Subject: RE: Chris an Camp Mee ng Assoc. dock NOI
Hello Darcy,
Please con nue the hearing un l January 3rd. We are working on the requested material and will send that to you and the
Commission as soon as we have it. Thank you!
Cameron Larson, WPIT
Environmental Consulting & Restoration, LLC
P.O. Box 4012
Plymouth, MA 02361
508-648-3957
www.ecrwetlands.com
HOLIDAY NOTE: ECR will be taking days off throughout the December holiday season to spend me with our families and
friends.
Our office will be closed on Thursday, December 22 to January 2, 2023. During this period, we may take longer than
usual to reply to your messages.
From: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us> Sent: Thursday, December 15, 2022 8:37 AM To: 'cameron@ecrwetlands.com' <cameron@ecrwetlands.com>; Cavanaugh, Kimberly
<Kimberly.Cavanaugh@town.barnstable.ma.us> Cc: Tom Lee <tlee@horsleywi en.com> Subject: RE: Chris an Camp Mee ng Assoc. dock NOI
Good morning Cameron,
Do you have the engineering plan ready to go into the drop off box today, as we need to get it into the Commissioners
mail for Tuesday? If not, you should request another con nuance as this applica on is lacking informa on. You could
request Jan. 3rd if that works for you.
Thanks
Darcy
From: cameron@ecrwetlands.com [mailto:cameron@ecrwetlands.com] Sent: Tuesday, December 6, 2022 9:24 AM To: Cavanaugh, Kimberly; Karle, Darcy Subject: RE: Christian Camp Meeting Assoc. dock NOI
December 20th please. Thank you!
Cameron Larson, WPIT
Environmental Consulting & Restoration, LLC
P.O. Box 4012
Plymouth, MA 02361
508-648-3957
www.ecrwetlands.com
From: Cavanaugh, Kimberly <Kimberly.Cavanaugh@town.barnstable.ma.us> Sent: Tuesday, December 6, 2022 9:21 AM
To: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us>; 'cameron@ecrwetlands.com' <cameron@ecrwetlands.com> Subject: RE: Chris an Camp Mee ng Assoc. dock NOI
Hi Cameron,
I received your request for a con nuance. Would you please pick a new hearing date? . The dates available are Dec. 20th,
Jan 3rd, Jan. 10th (a ernoon hearing), or Jan 17th .
Thank you,
Kim Cavanaugh
Planning & Development/Conserva on Program
Town of Barnstable l 230 South Street l Hyannis, MA 02601
kimberly.cavanaugh@town.barnstable.ma.us
P 508-862-4043
From: Karle, Darcy Sent: Monday, December 5, 2022 3:53 PM To: 'cameron@ecrwetlands.com' Cc: Cavanaugh, Kimberly Subject: RE: Christian Camp Meeting Assoc. dock NOI
Thank you Cameron.
From: cameron@ecrwetlands.com [mailto:cameron@ecrwetlands.com] Sent: Monday, December 5, 2022 3:14 PM To: Karle, Darcy Cc: Cavanaugh, Kimberly; 'Tom Lee'; 'Douglas B. Farquhar'; brad@ecrwetlands.com Subject: RE: Christian Camp Meeting Assoc. dock NOI
Hello Darcy,
Please consider this email a formal request to con nue the hearing for 160 Lake Elizabeth Drive that has been scheduled
for tomorrow to the December 20th hearing. The reason for con nuance is to gather the addi onal informa on that has
been requested by staff. Thank you very much.
Cameron Larson, WPIT
Environmental Consulting & Restoration, LLC
P.O. Box 4012
Plymouth, MA 02361
508-648-3957
www.ecrwetlands.com
From: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us> Sent: Thursday, December 1, 2022 9:18 AM To: 'cameron@ecrwetlands.com' <cameron@ecrwetlands.com> Cc: 'PATRICIA DEYTON' <deyton@comcast.net>; Cavanaugh, Kimberly <Kimberly.Cavanaugh@town.barnstable.ma.us>;
'Tom Lee' <tlee@horsleywi en.com> Subject: Chris an Camp Mee ng Assoc. dock NOI
Hi Cameron,
We were just reviewing the NOI applica on at an agenda mee ng for the replacement dock at 160 Lake Elizabeth. I am
confused why there are no stamped engineering plans. It is on the submission check list as a requirement. This is an
incomplete NOI package and will need a con nuance to give you me to work with an engineering firm. The engineering
plan needs to show the side eleva on as well and the spacing details of the decking and post size. Please include a
narra ve addressing the guidelines for freshwater docks as well. I see you describe some of this in your narra ve, but just
cut and paste under each sec on of the guideline sheet. When there is a replacement of an older structure the
commission prefers to have the new structure meet the guidelines. The structure should be the standard 4’ wide. I
understand some of the guidelines do not factor in here as this is a short dock, no 12’ clearance needed as this is a non-
motorized dock.
Please send a con nuance request email to Kim and copy me. Call me if you have any ques ons. I should be in the office
today by 10:30am.
Thank you
Darcy Karle
Conserva on Administrator
Town of Barnstable
Conserva on Division
230 South Street
Hyannis, MA 02601
508-862-4041
CAUTION:This email originated from outside of the Town of Barnstable! Do not click links, open a achments
or reply, unless you recognize the sender's email address and know the content is safe!
CAUTION:This email originated from outside of the Town of Barnstable! Do not click links, open a achments
or reply, unless you recognize the sender's email address and know the content is safe!
CAUTION:This email originated from outside of the Town of Barnstable! Do not click links, open a achments
or reply, unless you recognize the sender's email address and know the content is safe!