Loading...
HomeMy WebLinkAbout0108 BREEDS HILL ROAD (2) Tn ., r: e fits - ° i , . -\ , , , : ., • • • . It ; ) . Ilk it ,, ll,li klik tt rk • • • r �:''' ' - ✓ �....�-- -r , • , 11 8 �._ .. i TOWN OF BARNSTABLE.BUILDING PERMIT APPLICATION,,,, �f F; ti Map $ `.1/ Parcel ; 0 :'Application Health Division ' Date Issued (Q Conservation Division "lr--" ' Application Fee 1 07° Planning'Dept. pt Permit Fee' I 1 ST1 Date Definitive Plan Approved by Planning Board Historic = OKI-I Preservation / Hyannis Project Street Address 1 O% reed S l-H\ 1d Village iPt,i.anzas Owner FW• :Welsh Address Kd) '.M idd`eczx Tur n pi le Telephone (NO Z7�J� g321 f raj Permit Request i ilitYlb1v and c ale .h.Vt 1. 111,w of Exi -1 no c) u c i-u n - This Bice To Pie Fok Wove,housr. , Viholtcci le 1i bah on Office and Shawrocvrn Square feet: 1st floor: existing22,56Epropo ed 22,5p02nd floor: existing t,Grnproposed11,4q5 Total new 62,095 To Rai YktN Nt Zoning District L.i Flood Plain N f A Groundwater Overlay X-`Ies i.SD, e-°-0 Project VaI ation- 12—, Construction Type 2E l�O Lot Size ,o.v5R Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family :❑ Two Family ❑ Multi-Family(# units) Age of Existing Structure FRI Historic House: ❑Yes It No On Old King's Highway: ❑Yes No Basement Type: ❑ Full ❑ Crawl ❑Walkout ❑ Other MIN Basement Finished Area(sq.ft.). N!A Basement Unfinished Area(sq.ft) NIA Number of Baths: Full: existing N new NIA Half: existing y- new 3 Number of Bedrooms: _NIA existing _new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑ Oil ❑ Electric Other(_2C,O - Central Air: Yes ❑ No Fireplaces: Existing New Existing wood/coal stove: dYes U No Detached garage: ❑ existing ❑ new size_Pool: ❑ existing ❑ new size Barn: ❑ existing ❑ nrw size_ Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: CI -t Zoning Board of Appeals Authorization ❑ Appeal # A Recorded ❑ rt .. = Commercial d Yes ❑ No If yes; site plan review# SPR.. O3-OiS L Current Use 14/4e6.1eas(Aro i cr Proposed Use 52 —G.-magma-sr, iiigatGsk,er, ocPiie APPLICANT INFORMATION (BUILDER OR HOMEOWNER) -� ��oogluvitre'w (NLe, c1-033o ><// -Name �0�'`"� ��`" Telephone Number y Address 20 ? r 1/14 0/f 2) License# �n /rt� -fp 1 01 Home Improvement Contractor# �/# Worker's Compensation # "' S,3Se_S?. - 'r ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO p,*se. See e ( ��a�- G3 ,- 4 SIGNATURE -7 0if* c- 'Attic›.4? DATE /2gip�f Ada / cE-) s {' FOR OFFICIAL USE ONLY , ALICATION# DATE ISSUED 7 , MAP/PARCEL NO. I l' _ 4a } { I lihti ADDRESS VILLAGE 1 �� fY 1 r .OWNER .4 L 1\cv !�' i ,, I .+ `• I ,t j rFll DATE OF INSPECTION: 1 1 FOUNDATION �, �,,i i I \, FRAME —,' N. �, rr INSULATION t. 4-1.1 s (12 m g x.' IF., -~ i .FIREPLACE 1 , ! t. n ? ELECTRICAL: ROUGH FINAL D. f13 A r -? i. '-ifI. PLUMBING: ROUGH FINAL `t `•+/ GAS: ROUGH FINAL , , ...1, 1 ( 1 . %FINAL BUILDING f I',_' 1 . • k DATE CLOSED OUT r ' 1 , • ASSOCIATION PLAN NO. . I , . e APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name D0i `41 /4 rt`'v , e'&4 Tele hone Number y�(.off > i, - p /1 Address 2 o ? r 1 License# I't -'r^ GO- 01 Home Improvement Contractor# /14 Worker's Compensation # `E- ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO Pose See 2 - X p;"3 ij )-S_ SIGNATURE -731* ) DATE C/2•VO7 "SW/ c) TOWN OF BARNSTABLE BUILDING PERMIT,.APPLICATION,,, Map . S 6-9 Parcel::: 0"0 41 e 0 'Application#o?i 9Q . / Health Division ' Date Issued Le t?\.ol Conservation Division Ir---• .',;Application Fee I 07° .'"t- t•TO Planning'.Dept. .'Permit Fee': l2 ( S � Date Definitive Plan Approved by Planning Board V)1?..., Historic = OKH Preservation / Hyannis itm e) .izzAt Project Street Address 10% $IVCI S l l'1\` Road ' Village 1 .15 '›c�� hS`P . Owner Rfq. :We[' ') Address R& 'Wort le ex Tl tr n p( L Telephone ( 121) ,2-13-g32-1 -DATA , fDrci ,:;M A Permit Request t nittdb1' and of h ve 1 xno .of 'Existing Brae i-ure n - 111 I SpOCC To 13e t Accf •c2. Wovelleuse, , Ulhole le 11)i bu-hon Office and tow(Dorn Re- Qx- .) Square feet: 1st floor: existing22,50Lbropo ed 22,50D2nd floor: existing 5,( bproposed 11,1425 Total new (o2,CR5 7D REM RIN Nevi Zoning District i_1 Flood Plain N IA Groundwater Overlay X-`le , Project Val ation?,,f31�f),E?�� Construction Type 2B lO Lot Size ,o.v5F Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family 0 Two Family ❑ Multi-Family (# units) Age of Existing Structure Iqri1 Historic House: Cl Yes d No On Old King's Highway: ❑Yes Gi{No Basement Type: ❑ Full ❑ Crawl ❑Walkout ❑ Other 1\1 i!N Basement Finished Area(sq.ft.) N!A Basement Unfinished Area (sq.ft) NIA Number of Baths: Full: existing NIA new N Jl Half: existing it new 3 Number of Bedrooms: NM existing _new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑Oil U Electric d Other(wti er Mal r.., Central Air: dYes ❑ No Fireplaces: Existing New Existing wood/coal stove: 4Yes:°0 No cz Detached garage: ❑existing ❑ new size_Pool: ❑ existing ❑ new size _ Barn: U exidf 6g ❑ n' w size_ Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size _ Other:' 61 T Zoning Board of Appeals Authorization ❑ Appeal # 1�1I A Recorded ❑ -' , Commercial ai Yes ❑ No If yes, site plan review# b-P12 031' f co CO '�'` Current Use 4/Aeemoc str/ore i cr Proposed Use 52 what/kw-sr, (,JNot.Csacr' ocpiiC • APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name Kr, ^1 N 6vi„r s'' ., MO—Telephone Number l-l{D -1(,) -a) Address 20 R&r • i WU RQQd License # ea thviskrA CS 6yet May nard ) I Q115t-V ,ome Improvement Contractor# Work: 's Compensation # ALL CONSTRUCTION DEBRIS RES .TING FROM THIS PROJECT , L BE TAKEN TO p(.r— -ser. Civil, P«Ni • CS roe_ D,/40,pjr Lo.Ai)aAS SIGNATURE -.AIKll .A DATE --64,!tri .9 is t" FOR OFFICIAL USE ONLY ' AI LICATION it ,i `r ' DATE ISSUED f: MAP/PARCEL NO. ADDRESS VILLAGE OWNER ' j. f, • I i DATE OF INSPECTION: . FOUNDATION FRAME INSULATION - ,i - FIREPLACE `r ELECTRICAL: ROUGH • FINAL • PLUMBING: ROUGH FINAL GAS: ROUGH FINAL r +FINAL BUILDING r 3 • c DATE CLOSED OUT I y, ASSOCIATION PLAN'NO. "a , ,y y+/' F 7 3 - CONSTRUCTION CONTROL AFFIDAVIT Project Number: Project Title: FW Webb Company r , e, c°,J s 1v L.IE Project Location: 108 Breeds Hill Road, Hyannis,MA � '$ �; �; Name of Building: Scope of Project: Addition, Renovation In accordance with Section 116.0 of the Massachusetts State Building Code, I, Harold Turner, Jr. Mass Reg. # 30941 being a registered professional engineer hereby certify that I have prepared or directly supervised the preparation of all design plans, computations as specifications concerning: Entire Project Architectural Structural X Mechanical Electrical Fire Protection Other: For the above named project and that,to the best of my knowledge, such plans, computations, and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable laws for the proposed project. I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and shall be responsible for the following as specified by Section 116.2.2: 1. Review, for the conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar itla Aikthe progress and quality of work and to determine, in general, if the work is being perfo 4 • manner consistent with the construction documents. C\''� qss 1 HAROLD N k. Pursuant to Section 116.1,I shall submit periodically a progress report together with p- in0.44I��� UC JR to the Building Inspector. Upon completion of the work, I shall submit a final report .s to `� ,, tut iAL • completion and readiness of the project for occupancy. ! • A Q/si <:ts / ,ONALO �! Sinr re of Engineer Sub •bed and sworn t efo me this 3 r� day of its— ,2 O O o%..�. � /� My Commission Expires: /�„// AT No Public .ti 'r •�, ' SARA A.IHLE Notary Public-New Hampshire 3` I *Commission Expires December 1,2009 y., a ;i • f` .' I Ted Greenlaw P.E. - 183 Columbia Road - Hanover MA 02339 f ' TABLE • Phone 781-826-8369 Fax 781-826-8399 29 �� PH t• 4 CONSTRUCTION CONTROL AFFIDAVIT • Building Permit# 10 SJOM. Project: F W Webb Company 108 Breeds Hill Road Hyannis,MA In accordance with Section 116.2.1 of the Massachusetts Building Code, 780 CMR 7th edition. I,Theodore Greenlaw a Massachusetts Registered Engineer#29093 hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: ENTIRE PROJECT ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION ELECTRICAL OTHER(SPECIFY) For the above named project and to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts Building Code 7th Ed.,all acceptable engineering practices and all applicable laws and ordinances for the proposed use and occupancy. I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and shall be responsible for the following as specified in Section 116.2.2: 1. Review, for conformance to the design concept, shop drawings,samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction,to become generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. Pursuant to Section 116.4,I shall submit periodically, a progress report together with pertinent comments to the Town of Barnstable/Hyannis Building Official.Upon satisfactory completion of the work, I shall submit a final report as to the satisfactory completion and readiness of the project for occupancy. ORIG L TURE AND SEAL DATE t �ya1N s OF ° • • THEODORE 'SA g to . v GREENLAW y • NO.29093 t Mechanical Design Affidavit 4'° t !"T r t' CAB LE . Project Title: F.W. Webb Company LUGS JUN -8 Pp 14 Project Location: 108 Breeds Hill Road,Hyannis, MA OI 'IS 0 In accordance with Section 116.0 of the Massachusetts State Building Code, 780 CMR, I hereby certify that I have prepared or overseen the preparation of all design plans, computations and specifications concerning the Mechanical portion of the above named project. To the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, 780 CMR and acceptable engineering practices and applicable laws for the proposed project. I further certify that I shall oversee the necessary professional services and have a member of our firm present on the construction site on a periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit. During the construction, I will be responsible for the following as specified by section 116.2.2: 1.Review for the conformance to the design concept,shop drawings,samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2.Review and approval of the quality control procedures for all code-required controlled materials. 3.Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. William A. Turner, PE ENGINEER Massachusetts Registration No. 15078 �H OF Alc, l REGISTRATION airWILLIAM A. yG�, aTURNER 1 Turner Building Science and Design, LLC :I 8 MECHANICAL V No. 1�78 26�Pinewood Lane, Harrison, ME 04040o,� AfGtSTEa������ f:PONAt 0 . SIGNATURE NOTARY PUBLIC SUBSCRIBED AND SWORN TO BEFORE ME THIS Li DAY OFAIM A - I �CQ , 20 Oe l 0 N 'i',#Rl.'I.,:3I.,IC.;SIGNATURE I(.jltl:? a MY COMMISSION EXPIRES ghtio -/ ` t .. _ ,, ),, f' ;k: 3376 f) sign Mil day it 6-3_69.tIoc " ' 6:.4/2(09 Massachusetts Department of Environmental Protection Bureau of Waste Prevention •Air Quality Please Enter Decal# ,,,,,,,, ._ 1 BWP AQ 06 1 ;� � 1 4'� S � � T Notification Prior to Construction or Demolition ____- ,„:„2.,-,-,...., : f q 2 -,2-r. r rl t fir. F lY t A. Applicability Important:When filling out forms A Construction or Demolition operation of an industrial, commercial, or institutional building, or on the computer, residential building with 20 or more units is regulated by the Department of Environmental Protection use only the tab (DEP), Bureau of Waste Prevention-Air Quality Division, under Regulations 310 CMR 7.09. key to move your cursor-do not Notification of Construction or Demolition operations is required under 310 CMR 7.09(2)ten (10) use the return days prior to any work being performed.The following information is required pursuant to 310 CMR key. 7.09. et B. General Project Description Mill� 1. Facility Information: F.W. Webb Company Name 108 Breeds Hill Road Address Instructions Hyannis MA 0261 City/Town State Zip Code 1.All sections of N/A this form must be Telephone Number E-mail Address(optional) completed in order to comply with the Size: Department of Environmental —30,000 SF 2 Protection Square Feet Number of Floors notification requirements of 310 CMR 7.09 Was the facility built prior to 1980? ❑ Yes ® No 2.Submit Original Describe the current or prior use of the facility: Form To: Commonwealth of Warehouse distribution with office space above Massachusetts Asbestos Program P.O.Box 120087 Is the facility a residential facility? ❑ Yes ® No Boston,MA 02112-0087 If yes, how many units? 2. Facility Owner: F.W.Webb Company Name 160 Middlesex Turnpike Address Bedford MA 01730 City/Town State Zip Code (781)272-6600 e. Telephone Number(include area code and extension) E-mail Address(optional) Robert Mucciarone On-site Manager AQ06•6/04 BWP AQ 06•Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Waste Prevention •Air Quality Please Enter Decal# WH BWP AQ 06 Notification Prior to Construction or Demolition B. General Project Description (cont.) 3. General Contractor: J.M. Coull Inc. Name t 20 Powder Mill Road Address Maynard MA 01754 City/Town State Zip Code (978)461-0330 amcbeth@JMCoull.com Telephone Number(include area code and extension) E-mail Address(optional) Andrew McBeth On-site Manager C. General Construction or Demolition Description General Statement:If 1. Construction or demolition contractor: _ asbestos is found during a J.M. Coull Construction or Name Demolition 20 Powder Mill Road operation,all • Address responsible parties must (978)461-0330 amcbeth@JMCoull.com comply with 310 Telephone Number(include area code and extension) E-mail Address(optional) CMR 7.00,7.09, Andrew McBeth 7.15,and Chapter 21E of the On-site Manager • General Laws of the 2. On-Site Supervisor: Commonwealth. This would Steve Tsoukalas include,but would Name not be limited to, filing an asbestos 3. Is the entire facility to be demolished? ❑ Yes ® No removal notification with the Department 4. Describe the area(s)to be demolished: and/or notice Interior demolition. Newroof, hanical systems, electrical, interior walls etc. as release/threat off selective mechanical release of a hazardous Exterior selective demo: Remove existing pavement and gravel areas to re-pave. substance to the Department,if applicable. 5. If this is a construction project, describe the building(s)or addition(s)to be constructed: Renovation to the existing building. New construction of 22,500 SF footprint with 11,250 SF second floor. Pre-Engineered metal building to be used for wholesale distribution, showroom and office I AQ06•6/04 BWP AC)06•Page 2 of 3 ' Massachusetts Department of Environmental Protection 7 ,' (0 97 Bureau of Waste Prevention •Air Quality Please Enter Decal# BWP AQ 06 Notification Prior to Construction or Demolition C. General Construction or Demolition Description (cont.) 6. If this is a demolition project, were the structure(s)surveyed for the presence of asbestos containing material(ACM)? ❑ Yes ® No If yes,who conducted the survey? Name • Division of Occupational Safety Certification Number • • 7. Construction or Demolition 6/8/09 01/31/10 Start Date End Date • 8. For demolition and construction projects, indicate dust suppression techniques to be used: ® seeding ® paving If other, please specify: ® wetting ❑ shrouding ❑ covering ❑ other 9. For Emergency Demolition Operations, who is the DEP official who evaluated the emergency? Name of DEP official Title Date of Authorization DEP Waiver# D. Certification I certify that I have examined the D.Andrew McBeth above and that to the best of my Print Name knowledge it is true and complete. ,Z9171//t � The signature below subjects the Authorized Signature signer to the general statutes Preconstruction Project Manager regarding a false and misleading Positionrritle statement(s). J.M. Coull, Inc. Representing 5/21/2009 Date P.E.# AQ06.6/04 BWP AQ 06•Page 3 of 3 is M20 Powder Mill Road Maynard,MA 01754 .... T COULL, INC. Ph:(978) 461-0330 a Building Your Vision Letter of Transmittal J To: Asbestos Program Transmittal#: 15 Comm of Massachusetts DEP Date: 5/21/2009 P.O. Box 120087 Job: 08-JMC-448 F.W.Webb-Hyannis Boston, MA 02112-0087 Subject: WE ARE SENDING YOU F. Attached C Under separate cover via Next-day service the following items: IT Shop drawings f i Prints r Plans r Samples ✓ Copy of letter C. Change order IT Specifications r Other Document Type Copies Date No. Description • Other 1 5/21/09 Completed Air Quality BWP AQ 06 Form THESE ARE TRANSMITTED as checked below: IT For approval IT Approved as submitted r Resubmit_copies for approval C For your use r Approved as noted P Submit_copies for distribution C As requested r Returned for corrections r Return—corrected prints ✓ For review and comment r Other ✓ FOR BIDS DUE n PRINTS RETURNED AFTER LOAN TO US Remarks: Copy To: From: Signature: If enclosures are not as noted,kindly notify us at once. Page 1 of 1 FW Webb - emergency work determination Page 1 of 1 Roma, Paul From: Andy McBeth [amcbeth@JMCoull.com] Sent: Friday, May 29, 2009 2:09 PM To: Perry, Tom; Roma, Paul Cc: Kevin Neville Subject: FW: FW Webb Hyannis -CCC emergency work determination Tom, Paul Please find attached to go with our interior demo and re-roof permit. You should receive the hard in the mail on Monday The only other open item is our AQ-06 receipt,which we are chasing down as fast as we can get it from Mercedes Mitchell Thanks, Andrew McBeth Preconstruction Project Manager JM Coull, Inc 20 Powder Mill Road Maynard, MA 01754 P: 978-461-0330 x117 F: 978-461-0480 W: www.jmcoull.com `�j Please consider the environment before printing this email. From: Kristy Senatori [mailto:ksenatori@capecodcommission.org] Sent: Friday, May 29, 2009 8:29 AM To: Andy McBeth Subject: FW Webb - emergency work determination Good morning Andy, The Commission approved the Emergency Work Determination as presented yesterday. Attached please find the form signed by the Commission chair. Please let me know if you have trouble opening the file or if you have any additional questions. I will mail hard copies to both you and Tom Perry. Kind regards, Kristy Kristy Senatori Chief Regulatory Officer Cape Cod Commission 3225 Main Street, P.O. Box 226 Barnstable, MA 02630 508.362.3828 (phone) 508.362.3136 (fax) 6/12/2009 , ov BAh , CAPE COD COMMISSION _ S t�r ,f`,rF . 3225 MAIN STREET l A Uf lii,11 , P.O. BOX 226 ,,;- B;s,4`�.1 �` BARNS I ABLE, MA 02630' % ' ;�K `�,' (508) 362-3828 Q5 \! - ' 5,; FAX(508) 362-3136,m ��l.�tA - i E-mail: frontdesk(c�capecodcommission.orq Development of Regional Impact (DRI)---, ES10 Emergency Work Determination 1'l Pursuant to Section 24 of the Cape Cod Commission Act and the Emergency Work section of the Cape Cod Commission Enabling Regulations Governing Review of Developments of Regional Impact, the Cape Cod Commission(CCC) hereby determines that: IX1 The work described below is of an emergency nature and is immediately necessary to protect the health or safety of the public. 1 1 The work described below is ordered to be stayed and shall not continue without further DRI review by the Cape Cod Commission. Description of Work: Roof repair of existing building ; `1' CD( o Location: 108. Breeds Hill Road, Barnstable 1 Applicant: F.W. Webb Address/Phone: 160 Middlesex Turnpike, Bedford, MA Contact: Andy McBeth, Preconstruction Pros Property Owner: RAM Construction, I I C JM Coull, Inc. Mgr. Address/Phone: 160 Middlesex Turnpike, Bedford, MA (978) 461-0330 x117 Description of Emergency: Leaking roof compromising integrity of interior of building. Action necessary to protect the health and safety of the public. i Municipal/State agency(ies) responsible for emergency determination and issuance of development permit(s): Thomas Perry, Building Commissioner, Building Division--Town of Barnstable Site visit conducted by: Building Commissioner on May 20, 2009 (state/municipal agency) (date) Date CCC Executive Director notified: May 20, 2009 Date of Executive Committee review: May 26, 2009 This emergency work authorization expires on June 25, 2009 . Work beyond this date shall require DRI review by the Cape Cod Commi ' I • ,-- DATE Tis, Chair E • , r--- ---, - - , - - r -COMPLETE THIS SEC--Va ON DEL ERY 4 _I D Complete items,1,2,and 3.Also complete A2 Su nat item 4 if Restricted Delivery is desired ' /� cl Print your name and address on the revers- / i ` j.�' 'dent X 7 /i so that we can returni -- ddr-, the card to you: � ,�R • .. cl Attach this card to.the'back of the malipiece;: y nn a 7- `', fiat % p it e or 44 on the front if space permits '^ fiat 1. Article Addressed to: '" D7,Is delivery address dlffare -.m item 1? 0 if YES,enter delivery address below: El.No ::::).'.,.-.,:'i.;:-'..' . !,,•;:',,..:'...,..F.-,!,''',...i.'.1-#,. , ,„ ., ' . COMMONWEALTH OF MASSACHUSE fi ASBESTOS PROGRAM `n ,' , z POBox120087 - i BOSTON} }� i 3..Servie Type , MA°02112 0087 - i�Certit ed Mall 'I Express Mail. , �., rem :- = � ,' O Registered . D.Return Receipt for Merchandise{ O Insured Mail 0 C.O.D. ' 4. Restricted Delivery?(Extra Fee) O Yes 2. Article Number , t; i s ," -77 . -ArticleNfrornservicei'aabeij ,7`005_ 3. 11,0 0003 2420 4'],23 ? i PS Form 3811 February 2004 Domestic Return Receipt _. ___ 162595 oZ M;isdo Massachusetts Department of Environmental Protection Bureau of Waste Prevention •Air Quality Please Enter Decal# BWP AQ 06 Notification Prior to Construction or Demolition Affix Notification Decal Here A. Applicability Important:When filling out forms A Construction or Demolition operation of an industrial, commercial, or institutional building, or on the computer, residential building with 20 or more units is regulated by the Department of Environmental Protection use only the tab (DEP), Bureau of Waste Prevention-Air Quality Division, under Regulations 310 CMR 7.09. key to move your cursor-do not Notification of Construction or Demolition operations is required under 310 CMR 7.09(2)ten (10) use the return days prior to any work being performed. The following information is required pursuant to 310 CMR key. 7.09. B. General Project Description 1. Facility Information: F.W.Webb Company Name 108 Breeds Hill Road Address Instructions Hyannis MA 0261 City/Town State Zip Code 1.All sections of N/A this form must be Telephone Number E-mail Address(optional) completed in order to comply with the Size: Department of Environmental •30 000 SF 2 Protection ' notification Square Feet Number of Floors requirements of Was the facilitybuilt prior to 1980? 310 CMR 7.09 ❑ Yes ® No 2.Submit Original Describe the current or prior use of the facility: Form To: Commonwealth of Warehouse distribution with office space above Massachusetts Asbestos Program P.O.Box 120087 Is the facility a residential facility? ❑ Yes ® No Boston,MA 02112-0087 If yes, how many units? 2. Facility Owner: F.W.Webb Company Name 160 Middlesex Turnpike Address Bedford MA 01730 City/Town State Zip Code (781)272-6600 Telephone Number(include area code and extension) E-mail Address(optional) Robert Mucciarone On-site Manager AQ06.6/04 BWP AQ 06•Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Waste Prevention •Air Quality Please Enter Decal# BWP AQ 06 Notification Prior to Construction or Demolition B. General Project Description (cont.) 3. General Contractor: J.M. Coull Inc. Name 20 Powder Mill Road Address Maynard MA 01754 City/Town State Zip Code (978)461-0330 amcbeth@JMCoull.com Telephone Number(include area code and extension) E-mail Address(optional) Andrew McBeth On-site Manager C. General Construction or Demolition Description General Statement:If 1. Construction or demolition contractor: asbestos is found during a J.M. Coull Construction or Name Demolition 20 Powder Mill Road operation,all Address responsible parties must (978)461-0330 amcbeth@JMCoull.com comply with 310 Telephone Number(include area code and extension) E-mail Address(optional) CMR 7.00,7.09, Andrew McBeth 7.15,and Chapter 21 E of the On-site Manager General Laws of the 2. On-Site Supervisor: Commonwealth. This would Steve Tsoukalas include,but would Name not be limited to, filing an asbestos 3. Is the entire facility to be demolished? ❑ Yes ® No removal notification with the Department 4. Describe the area(s)to be demolished: and/ora notice Interior selective demolition. New roof, mechanical s stems, electrical, interior walls etc. release/threat of y release of a hazardous Exterior selective demo: Remove existing pavement and gravel areas to re-pave. substance to the Department,if applicable. 5. If this is a construction project, describe the building(s)or addition(s)to be constructed: Renovation to the existing building. New construction of 22,500 SF footprint with 11,250 SF second floor. Pre-Engineered metal building to be used for wholesale distribution, showroom and office AQ06.6/04 BWP AQ 06•Page 2 of 3 Massachusetts Department of Environmental Protection 0,, Bureau of Waste Prevention • Air Quality Please Enter Decal# BWP AQ 06 Notification Prior to Construction or Demolition • C. General Construction or Demolition Description (cont.) 6. If this is a demolition project, were the structure(s)surveyed for the presence of asbestos containing material (ACM)? ❑ Yes ® No If yes, who conducted the survey? Name Division of Occupational Safety Certification Number 7. Construction or Demolition 6/8/09 01/31/10 Start Date End Date 8. For demolition and construction projects, indicate dust suppression techniques to be used: ►1 seeding ® paving ® wetting D shrouding If other, please specify: ❑ covering ❑ other 9. For Emergency Demolition Operations, who is the DEP official who evaluated the emergency? Name of DEP official Title Date of Authorization DEP Waiver# D. Certification I certify that I have examined the D. Andrew McBeth above and that to the best of my Print Name knowledge it is true and complete. a7 `X-r The signature below subjects the Authorized Signature signer to the general statutes Preconstruction Project Manager regarding a false and misleading Position/Title statement(s). J.M. Coull, Inc. Representing 5/21/2009 Date P.E.# AQ06•6/04 BWP AQ 06•Page 3 of 3 Y • of SHE roi, Towns of Barnstable , °: Regulatory Services g • Mia BIE$ Thomas F.Geller,Director �Eot '` Building Division Tom Perry,Building Commissioner 200 Main Street,Hyannis,MA 02601 ' www.town.b arnstab l e.ma.us Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder AA I, Re.rie/ei— /v kid Gc'At-t a rs e , as Owner of the subject property hereby authorize Co✓u. 1144 to act on my behalf, in all matters relative to work authorized by this building permit application for: lad aR&E&s K,�, c...D k N*.s / (Address of Job • , AAd 4 ...r7/1 Signature .' Owner Date Print Name If Property Owner is applying for permit please complete the Homeowners License Exemption Form on the reverse side. Q:FO RMS:O WNERPERMISSION Town of Barnstable , of z roii „,- ; o . 9, ' Regulatory Services BARNsrABLE, : Thomas F.Geiler,Director • 165¢ ..1 Building Division Tom Perry,Building Commissioner • f 200 Main•Street, Hyannis,MA 02601 iwww.town.barnstable.ma.us I Office: 56 8-862-403 8 Fax: 508-790-6230 1 HOMEOWNER LICENSE EXEMPTION Please Print DATE:; . } JOB LOCATIO`: number street village I • "HOMEOWNER": , na a home phone# work phone# CURRENT MAILING ADD• -S: city/town state zip code The current exemption for"homeown`'.. "was extended to include owner-occu..ed dwellings of six units or less and to allow homeowners to engage an indivi:•: :1 for hire who does notposbss'a`' cense,proWdedTthat the owner acts as supervisor. ' DEh `.'. ION OP 4OMEOWN Person(s)who owns a parcel of land on which he/sh -sides or inten. 'o reside, on which there is, or is intended to• be, a one or two-family dwelling, attached or detached s . ctures ac ssory to such use and/or farm structures. A person who constructs more than one home in a two-year pe ` . 'all not be considered a homeowner. Such "homeowner'shall submit to the Building Official'on a form a .ble to the Building Official,that he/she shall be responsible for all such work .erformed under the biiildin: • rmit. ction 109.1.1) '.i 'i, ...a� , ,.,'0.., I The undersigned"homeowner"assumes responsibility .r compliance with th • tate Building Code and other applicable codes, bylaws,rules and regulations. I The undersigned"homeowner"certifies that he/:.e understands the-Town of Barnstable lding Department _ minimum inspection procedures and'require... nts and that he/she will comply with said proc-cures and requirements. . -• ° , ' ' Signature of Homeowner • 1 . Approval of Burg Official , z Note: Three-family dwellin:s containing 35,000 cubic feet or larger will be required to comply with the . State Building Code Section 127.0 C instruction Control. HOMEOWNER'S EXEMPTION The Code states that: "Any ho owner performing work for which a building permit is required shall be exempt from the provisions of this section.(Sc"ction 109.1.1-Licensi :of construction Supervisors);provided that if the homeowner engages a person(s)for hire to do such work,that such Homeowner shall act:_ .pervisor." Many homeowners who --c this exemption are unaware that they arc assuming the responsibilities of a supervisor(see Appendix Q, Rules&Regulations for Lie. r. g Construction Supervisors,Section 2.15) This lack of awareness often results in serious problems,particularly when the homeowner hir .nlicen`sed persons. In this case,our Board cannot proceed against the unlicensed person as it would with a licensed Supervisor. The horn •wner acting as Supervisor is ultimately responsible. r To ensure that the homeowner is fully aware of his/her responsibilities,many communities require,as part of the permit application, that the homeowner certify that he/she understands the responsibilities of a Supervisor. On the last page of this issue is a form currently used by several towns. You may care t amend and adopt such a form/certification for use in your community. . i • Q:forms:homeexcmpt 1 FORMAL SITE PLAN REVIEW RESULTS Meeting held September 25,2008 Growth Management Department 9:00 am-2°d Floor Hearing Room Regulatory Review NEW APPLICATIONS: SPR 038-08 F. W. Webb Company 108 Breeds Hill Road,Barnstable (Map 314,Parcel24-2 Zoning District: Limited Industrial, WP Overlay District Proposal: Expand existing warehouse/office building and add wholesale use. Project includes new paved and gravel parking,outdoor storage,drainage infrastructure,landscape,site lighting, and natural open space. Existing utility infrastructure is to remain. Continued. Referral to the CCC for Mandatory DRL Zoning Board of Appeals relief may be required. CONSTRUCTION CONTROL AFFIDAVIT Project Number: 2008-065 Project Title: F W Webb Company Project Location: 108 Breed' s Hill Road, Hyannis, MA Name of Building: Scope of Project: Addition, Renovation In accordance with Section 116.0 of.the Massachusetts State Building Code, I, Andrew Love rud Mass Reg. # 73 95 1 being a registered professional; architect hereby certify that I have prepared or directly supervised the preparation of all design plans, computations as specifications concerning: Entire P, oject Architectural X Structural Mechanical Electrical Fire Protection Other: For the above named project and that, to the best of my knowledge, such plans, computations; and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable laws for the proposed project. I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and shall be responsible for the , following as specified by Section116.2.2: 1. Review, for the conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of e ,. _ construction documents. \,,„ogED ARcy> 2. Review_and approval of the quality control procedures for all code-required controlled .'4„�'0.44 R. LO1,�Fp� ^ 1 materials. r(, �o 1G . ., • Q No.T c 3. Be present at intervals appropriate to the stage of construction to become generally f.ii. ,. H cm with the progress and quality of the work and to determine,in general,if the work is i, , y� ` performed in a manner consistent with the construction documents. o �J G ' �(t;;?F M�`SSP Pursuant to Section 116.1, I shall submit periodically a progress report together with pertinent comments to the Building Inspector. Upon completion of the work, I shall submit a final report as to the satisfactory completion and readiness of the project fo c1pan ,r' Signature ofrdArchitect Subscribed and sworn to before me this 9o7 day of J`iA/ ,2c_c MY COMMISSION EXPIRES - My Commission Expires: OCTOBER zr;9nj2 Notary Public ,, ,,,cuiu,i/ ^t l� �411 , :(fill AeFNJ. f� c AFFIDAVIT STRUCTURAL DESIGN Permit No. To Building Inspector: I certify that to the best of my knowledge, information and belief, the plans and computations accompanying the attached application concerning the locus at: FW Webb, Townline Road &VIP Parkway, DeWitt, NY Ward: are in accordance with the requirements of the New York State Building Code and all other pertinent laws and ordinances. ,kq 0 TURN 9,� Harold Turner,Jr. -064243 ,eon' Fd4 ENGINEER-REG. NO. * ' �- 11 ' 14 t f • W H.L.Turner Group Inc. 6 I , ate Lu COMPANY �r 27 Locke Road, Concord, NH 03301 S' '• 1�SS • 1 0�pv1141 "� ADDRESS 1. a - v' (603)228-1122 PHONE State of New York On this 26th day of May , 2009, before me, the undersigned notary public, personally appeared Harold Turner,Jr. ,proved to me through satisfactory evidence of identification,which were Personal Knowledge ,to be the person who signed the preceding or attached document in my presence, and who swore or affirmed to me that the contents of the document are truthful and accurate to the best of his/her knowledge and belief. Before , "-ilk _ q^.w. a • SARA A.IHLE Notary Public-New Hampshire My Commission Expires December 1,2009 MyA9%//0/ Commission expires ''` d`" P ,x�= , r , '��., Structural Pre-Construction Design Affidavit HT NY.doc 780 CMR 116 CONSTRUCTION CONTROL - PRELIMINARY AFFIDAVIT PROJECT LOCATION /08 e4EA(0S /LL A' . LS,,¢,Q,re<S% LSj/t2q, TENANT NAME c.aJ', NATURE OF PROJECT ,4uj./a�,q,'!G/�� OF /!/�� 94,0)To,..,1 ARCH.AND/OR ENGINEER A7 ,g4NILZ ?ki1Z C221 ADDRESS AND TELEPHONE ,S o Dr R e,,•.v1-v P P S . ('1 A D Z 3 rah IN ACCORDANCE WITH 780 CMR 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, AA71 +-c/ ?A-/r•PI REGISTRATION NO. 3 5 51.17 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS rnurcFNINn: ENTIRE PROJECT ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION 0( ELECTRICAL OTHER(SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST.OF MY KNOWLEDGE,INFORMATION AND BELIEF SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASES TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN 780 CMR 116.2.2. 1.Review of shop drawings,samples and other submittals of the contractor as required by the construction documents as submitted for building permit,and approval for conformance to the design concept. 2.Review and approval of the quality control procedures for all code-required controlled materials. 3.Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO 780 CMR 11 6.4. 1 SHALL SUBMIT PERIODICALLY, DAILY, WEEKLY,OR /1/4^- r V • (OTHER PERIODS,specify)PROGRESS REPORTS TOGETHER. WITH PERTINENT COMMENTS TO THE BUILDING DEPARTMENT. UPON COMPLETION OF THE WORK,I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. SIGNATURE 7� —��2" SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF / y 20 0? NO RY.PUBLIC My COMMISSION EXPIRES \J,gii[w4". r /7 ad/� i &iFiaAi;4JiiLn THANIEL y Commission Expires Jan.17,?014 FIRE ECTC4 A A _ HVAC, PLUMBING AND FIRE PROTECTION INSPECTION AFFIDAVIT To Town of Barnstable Inspectional Service: -I certify to the best of my knowledge, information and belief that Turner Building Science has inspected the HVAC, Plumbing and Fire Protection work associated with the tenant fit-up for F.W. Webb, 108 Breeds Hill Road, Hyannis, MA 02601 and to the best of my knowledge, information and belief the HVAC, Plumbing and Fire Protection work completed is in conformance with the permit and plans approved by the Inspectional Services Department`and with the provisions of the Massachusetts State Building Code, sixth edition. BY: William A. Turner eidos,6.1 SIGNATURE Alk OF Turner Building Science &Design, LLC �40- M,'we 26 Pinewood Ln a WILLIAM A. Gin 711 Harrison, ME 04040 S TURNER AL MECHANICAL v► 207-583-4571 Na /5018 • gel.S/pp t Ewv E Then personally appeared the above named William A. Turner and made oath that the above statement by said person is true. Before me, GC�� • , My Commission expires 11S a TOWN OF HYANNIS CONSTRUCTION CONTROL AFFIDAVIT Project Numbers: 29030 Project Title: F.W.Webb Company Project Location: 108 Breeds Hill Road Name of Building: 108 Breeds Hill Road Nature of Project: Modifications of Existing Building In accordance with section 116.0 Registered Architectural and Professional Engineering Service-Construction Control of the Massachusetts State Building Code 7th Edition,I, John A.Harper Registration No. 45041 being a Registered Professional Engineer,HEREBY CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Entire Project: Architectural: Structural: Mechanical: Fire Protection: Electrical: X Fire Alarm X FOR THE ABOVE-NAMED PROJECT AND THAT SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE 780 CMR MASSACHUSETTS STATE BUILDING CODE,7TK EDITION,ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED 1N SECTION 116.2.2. 1. Review,for conformance to the design concept,shop drawings,samples and other submittals,which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the state of construction to become,generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. UNDER SECTION 116.4,I SHALL PERIODICALLY SUBMIT A PROGRESS REPORT,TOGETHER WITH PERTINENT COMMENTS,TO THE HYANNIS BUILDING INSPECTOR.UPON COMPLETION OF THE WORK,I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION INESS OF THE PROJECT FOR OCCUPANCY. OF/448 _ if oJdNN a GPEq WAR IA r ELECTRICAL. gJA/ 4y No.d59a1 ri = �pA'9fGISTE05)4e Signatur and Stamp(no facsimile) SS/aNAI SUBSCRIBED AND SWORN TO B THIS 26th DAY OF May 2009 SCO1T A.SCHUEFF,Notary Public My Commission Expires D c ember 11,2012 Engineered Building Systems,Inc. 22 Manchester Road,Sui e 8A erry,New Hampshire 03038 TEL 603-870-9009 FAX 603-432-4255 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ F: W. 'ebb Company Drawing Date:05/05/09 5/11/09 11: 4 HYDRAULIC DESIGN INFORMATION SHEET • Job Name: F. W. Webb Company Location: 108 Breeds Hill Road Barnstable, MA. 02601 Drawing Date: 05/05/09 Remote Area Number: 1 Contractor: Rustic Fire Protection, Inc. Telephone: 508-431-9938 www.rusticfireprotection.com 320 West Main Street Norton, MA. 02766 Designer: GDM Calculated By:SprinkCAD www.sprinkcad.com 451 N.-Cannon Ave. Lansdale, PA 19446 Construction: Steel Occupancy:Mixed Reviewing Authorities:Barnstable Fire Dept. SYS TEL1 LEJSI GL' Code:NFPA 13 Hazard:Light System Type:WET Area of Sprinkler Oper. 1500 sq ftl Sprinkler or Nozzle Density (gpm/sq ft) 0.100 I Make: VICTAUL Area per Sprinkler 168.0 sq ftl Model: V2707 Hose Allowance Inside 0 gpm I K-Factor: 5. 60 Hose Allowance Outside 500 gpm 1 Temperature Rating: 155 CALCULATION SUMMARY 13 Flowing Outlets gpm Required: 732.8 psi Required: -38.0 @ City Supply WATER SUPPLY Water Flow Test I Pump Data Date of Test 2/17/09 I Rated Capacity 1500 gpm Static Pressure 75.0 psi I Rated Pressure 80.0 psi Residual Pres 70.0 psi I Elevation 0 At a Flow of 1290 gpm I Make: Peerles Elevation 0" I Model: Location: Hydrants on Breeds Hill Rd. Source of Information: Barnstable Water Dept. SYSTEM VOLUME 3267 Gallons Notes: L`L��TN Ofi A�"As / NA TIOWEL ti� L s Iv R.PHILLIP3 °" " FIRE PROTECTION r NO 89850 F.' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 1 233 36.9 psi 1 6" Grvd Alarm Valve "G" CHART LOSS 233 -0 .0 1 8" x 6" Flngd Reducer 0' 120 8 .071 233 0.0 1 80 psi@1500 gpm PUMP Peerles Pump CHART BOOST 233 87 .7 2 8" Flngd Gate Valve "721U" PIV 8 ' 120 8 .071 233 0.0 1 8" Flngd Back Flow Valve Ames "4000 CHART LOSS 233 9.0 Elevation Change 8 ' 6" 3.7 Fixed Flow Inside Hose Stream 0 gpm Total Loss for Riser -75.1 psi Hydr Ref R1 Required at Base of Riser 233 -38.1 psi 5 8" Flngd 90 Ell 90' 120 8 .071 233 0.1 1 Pipe 8" DIx18 Ci 350 180 ' 140 8 .488 233 0.1 Fixed Flow Outside Hose Stream 500 gpm Total Loss for Underground 0.1 psi Hydr Ref R2 Required at City Supply 733 -38.0 psi Water Source 75.0 psi static, 70.0 psi residual @ 1290 gpm 733 gpm 73.2 psi SAFETY PRESSURE 111.3 psi NOTE: Negative values in REQUIRED PRESSURE fields are acceptable in DEMAND calculations. Verify that AVAILABLE & SAFETY pressures are positive values. Available Pressure of 73.2 psi Exceeds Required Pressure of -38.0 psi This is a safety margin of 111.3 psi Maximum Water Velocity is 8 . 9 fps F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 : 4 Page 3 FITTING NAME TABLE ABBREV. NAME • • C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. K FACTOR Flow factor for -pen hearq or p th where Flow (gpm) = K x -\ /P Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0.433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4.52 x (Q/C) ^1.85 / ID^4 .87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0. 01 psi. Pressures are listed to 0 .1 psi. Addition may vary by 0 .1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered 'in these Calculations F.' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Page 4 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 1 23.25 7 .9 1S 22.00 5. 60 8 .2 16. 0 14 .8 0.11 2 23.25 8 .2 2S 22.00 5. 60 8 . 5 16.3 14.8 0.11 3 23.25 8 .8 3S 22.00 5. 60 9.0 16.8 16.8 0.10 4 23.25 8 . 9 4S 22 .00 5. 60 9.2 16.9 14 .8 0.17 5 23.25 9.2 5S 22.00 5.60 9.4 17.2 14. 8 0. 17 6 23.25 9. 6 6S 22.00 5. 60 9.8 17.5 16.8 0. 10 7 23.25 10.5 7S 22.00 5. 60 10.7 18 .3 14 .8 0.13 8 23.25 10.5 8S 22.00 5. 60 10. 6 18.3 14 .8 0. 13 9 23.25 10.8 9S 22.00 5. 60 11.0 18.5 14 .8 0. 13 10 23.25 10. 6 10S 22.00 5. 60 10.8 18.4 14 .8 0.13 11 23.25 12 .1 11S 22.00 5. 60 12 .2 19. 6 14 .8 0.14 12 23.25 12.0 12S 22.00 5. 60 12 .1 19.5 14.8 0.14 13 23.25 11.9 13S 2.2.00 5. 60 12.1 19.5 14.8 0.14 20 30.46 21.2 21 30 .46 21.2 22 30.46 21.2 23 30. 41 21.2 1 24 30.86 21.0 25 30.90 21.0 26 30. 41 21.2 27 30. 86 21 .0 28 30. 90 21.0 29 30.41 21.2 30 30.86 21.0 31 30. 90 21.0 40 24 .88 23.6 41 25.09 23.5 42 25.29 ' 23.4 43 25.50 23.3 44 24 .88 23. 6 45 25.09 23.5 46 25.29 23.4 . 47 25.50 23. 3 48 24.88 23. 6 49 25.09 23.5 50 25.29 23.4 51 25.50 23.3 70 23. 00 14 . 9 F. ' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Page 5 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 71 23.00 14.3 72 23.00 13.9 73 23.00 13.7 74 23.00 13. 6 . 75 23.00 16.7 76 23.00 16. 4 77 23.00 16.3 78 23.00 16.2 79 23.00 18 . 6 80 23.00 18.4 81 23.00 18 .4 Al 25.33 23.4 A2 25.33 23.4 A3 25.33 23.4 A4 25.33 23.4 A5 25.33 23.4 A6 25.33 23.4 A7 25.33 23. 4 A8 25.33 23.4 A9 25.33 23.4 A10 25.33 23.4 All 25.33 23.4 Al2 25.33 23.4 A13 25.33 23.4 A14 26.25 23.0 A15 26.25 23.0 A16 26.25 23.0 A17 26.25 23.0 1 A18 26.25 23.0 1 A19 9.08 30.5 . A20 3.00 33.2 B1 26.25 23.0 B2 26.25 23.0 B3 26.25 23.0 B4 26.25 23.0 B5 26.25 23.0 B6 26.25 23.0 B7 26.25 23.0 B8 26.25 23.0 B9 26.25 23.0 B10 26.25 23.0 B11 26.25 23.0 B12 26.25 23.0 Cl 23.00 20.4 C2 23.00 20.5 C3 23.00 20. 6 C4 23.00 20.8 C5 23.00 20. 9 C6 10.83 29.7 D1 23.08 24. 4 D2 23.08 24 .4 F.'` W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Page 6 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) D3 23.08 24 . 4 D4 23.08 24 .4 D5 23.08 24 . 4 D6 23.08 24 . 4 D7 23.08 24 . 4 D8 23.08 24.4 D9 23.08 24 . 4 D10 23.08 24 .4 Dli 23.08 24 . 4 D12 23.08 24 .4 I El 26.25 23. 0 E2 26.25 23.0 E3 26.25 23.0 E4 26.25 23. 0 ' E5 26.25 23.0 E6 26.25 23.0 E7 26.25 23.0 E8 26.25 23.0 E9 26.25 23.0 E10 26.25 23. 0 Ell 26.25 23.0 E12 26.25 23.0 E13 26.25 23. 0 E14 26.25 23. 0 E15 26.25 23.0 E16 26.25 23.0 E17 26.25 23.0 Fl 12. 67 27.3 F2 10.83 29. 4 G1 26.25 23. 0 H1 10.83 29.7 W -5.50 36. 9 Max velocity of 8 . 93 occurs in the pipe from 70 TO Cl Nodes with "S" indicate a node at the top of a sprig or bottom of drop pendent. The node without an "S" is on the branch. i F. ' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Tyco Fire Products Page 7 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 1 TO W (PRIMARY PATH) 16.01 1.049 lE 1.25 8 .2 8 .2 K = 5. 60 1S C=120 2.00 -0.5 0. 0 16.01 0.086 3.25 0.3 8 .2 Vel = 6.00 1 .049 3E 53.76 7. 9 7. 9 EqK = 5. 69 1 0=120 1T 11 .00 0. 1 0.0 16. 01 0.086 64 .76 ' 5. 6 7 . 9 Vel = 6.00 16. 32 2 .157 9.74 13. 6 13. 6 74 C-120 0.00 0. 0 0. 0 See PATH 2 32.33 0.009 9.74 0.1 13. 6 Vel = 2.87 16.80 2. 157 11 .25 13.7 13.7 73 C=120 0.00 0.0 0.0 See PATH 3 49.13 0.021 11.25 0.2 13.7 Vel = 4 .36 16.94 2 .157 10.25 13.9 13.9 72 C=120 0.00 0.0 0.0 See PATH 4 66.07 0.035 10.25 0. 4 13. 9 Vel = 5.86 17.16 2.157 11.17 14.3 14 .3 71 C=120 0.00 0.0 0.0 See PATH 5 83.23 0.054 11. 17 0. 6 14 .3 Vel = 7 .38 17.52 2 .157 1T 61.58 14 .9 14 .9 70 C=120 10.00 0.0 0.0 See PATH 6 100.75 0.077 71.58 5.5 14 .9 Vel = 8 . 93 4 .260 3.34 20. 4 20. 4 Cl C=120 0. 00 0.0 0.0 100.75 0.003 3.34 . 0.0 20.4 Vel = 2.29 73.48 4 .260 17 . 66 20.5 20.5 C2 C=120 0.00 0.0 0.0 See PATH 7 174 .23 0.008 17 . 66 0.1 20.5 Vel = 3.96 58 . 52 4.260 13.89 20. 6 20. 6 C3 C=120 0.00 0.0 0. 0 See PATH 11 232.75 0.013 13. 89 0.2 20. 6 Vel = 5.29 • UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. ` W. Webb Company Drawing Date:05/05/09 5/11/09 11 : 4 Tyco Fire Products Page 8 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 1 TO W (PRIMARY PATH) 4 .260 12.00 20.8 20.8 C4 C=120 0.00 0.0 0. 0 232 .75 0.013 12.00 0.2 20.8 Vel = 5.29 4 .260 lE 91.02 20.9 20. 9 C5 C=120 2T 50.00 4 .5 0.0 232.75 0.013 • 141.02 1 . 9 20. 9 Vel = 5.29 4 .260 2E 42. 47 27.3 27 .3 Fl C-120 2T 60.0n 0,8 n,n 232.75 0.013 102.47 1.4 27.3 Vel = 5.29 . 4 .260 lE 6.04 29.4 29. 4 F2 C=120 10. 00 0. 0 0.0 232.75 0.013 16.04 0.2 29.4 Vel = 5.29 6.357 iT , 0.46 29.7 29.7 C6 C=120 30.00 0.0 0.0 232.75 0.002 30. 46 0.1 29.7 Vel = 2.38 6.357 lE 1.75 29.7 29.7 H1 C=120 14 .00 0.8 0.0 232 .75 0.002 15.75 0.0 29.7 Vel = 2 .38 6.357 2E 7 .26 30.5 30.5 A19 C=120 28 .00 2 . 6 0.0 232.75 0.002 35.26 0.1 30.5 Vel = 2 .38 8 .249 2E 22. 82 33.2 33.2 A20 0=120 36. 00 3.7 0.0 232.75 0.001 58 .82 0.0 33.2 Vel = 1.41 W 232.75 36. 9 K = 38 .30 PATH 2 FROM HYDRAULIC REFERENCE 2 TO 74 16.32 1.049 lE 1 .25 8 . 5 8 .5 K '= 5. 60 2S C=120 2 . 00 -0.5 0.0 16.32 0. 089 3.25 0. 3 8 .5 Vel = 6. 12 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) I F.' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Tyco Fire Products Page 9 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 2 TO 74 CONTINUED 1.049 3E 47. 92 8 .2 8 .2 EqK = 5. 69 2 C=120 1T 11 .00 0. 1 0.0 16.32 0 . 089 58.92 5.3 8 .2 Vel = 6.12 74 16.32 13. 6 K = 4.42 PATH 9 FROM HYDrL%C7'IVTT P Dati FEIi'YLJ+aCE J T/1 73 16.80 1.049 1E 1.25 9.0 9.0 K = 5. 60 3S C=120 2.00 -0. 5 • 0. 0 16.80 0.094 3.25 0.3 9.0 Vel = 6.30 1.049 lE 44.25 8 .8 8.8 EqK = 5. 67 3 C=120 1T 7 .00 0. 1 0.0 16.80 0.094 51.25 4 .8 8 .8 Vel = 6.30 73 16.80 13.7 K = 4.54 PATH 4 FROM HYDRAULIC REFERENCE 4 TO 72 16.94 1 .049 lE 1 .25 9.2 9.2 K = 5. 60 4S C=120 2.00 -0.5 0.0 16. 94 0.096 3.25 0.3 9.2 Vel = 6.35 1.049 lE 44.25 8 . 9 8.9 EqK = 5. 67 4 C=120 1T 7 .00 0.1 0.0 16. 94 0.096 51 .25 4 . 9 8.9 Vel = 6.35 72 16. 94 13.9 K = 4 .54 PATH 5 FROM HYDRAULIC REFERENCE 5 TO 71 17.16 1. 049 lE 1 .25 9.4 9.4 K = 5. 60 5S C=120 2.00 -0.5 0.0 17 . 16 0.098 3.25 0.3 9. 4 Vel = 6.43 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) e F. W. Webb Company Drawing Date:05/05/09 5/11/09 11: .4 Tyco Fire Products Page 10 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 5 FROM HYDRAULIC REFERENCE 5 TO 71 CONTINUED 1.049 lE 44 .25 9.2 9.2 EqK = 5. 67 5 C=120 1T 7 .00 0. 1 0. 0 17. 16 0.098 51 .25 5.0 9.2 Vel = 6.43 71 17. 16 14 .3 K = 4 .54 Ct11 L1 O CLw='L Lil LL%LiVLlV L\SaE6.Lyi'JL v Jo., ,v 17.52 1.049 lE 1 .25 9.8 9. 8 K = 5. 60 6S C=120 2 .00 -0.5 0 .0 17.52 0. 102 3.25 0.3 9. 8 Vel = 6.57 1.049 lE 44 .25 9. 6 9. 6 EqK = 5.66 6 C=120 1T 7 .00 0.1 0.0 17.52 0.102 51 .25 5.2 9. 6 Vel = 6.57 70 17.52 14. 9 K = 4 .54 PATH 7 FROM HYDRAULIC REFERENCE 8 TO C2 18 .27 1.049 lE 1.25 . 10. 6 10. 6 K = 5.60 8S C=120 2.00 -0.5 0.0 18 .27 0.110 3.25 0.4 10. 6 Vel = 6.85 1.049 lE 44 .25 10.5 10.5 EqK = 5. 65 8 C=120 1T 7 .00 0.1 0.0 18 .27 0. 110 ,51.25 5. 6 10.5 Vel = 6.85 2.157 12 .00 16.2 16.2 78 C=120 0.00 0.0 0.0 18 .27 0.003 12 .00 0.0 16.2 Vel = 1 . 62 18.29 2. 157 12 .00 16.3 16.3 77 C=120 0. 00 0.0 0.0 See PATH 8. 36.57 0.012 12.00 0. 1 16.3 Vel = 3.24 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. ' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Tyco Fire Products Page 11 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 7 FROM HYDRAULIC REFERENCE 8 TO C2 CONTINUED 18 . 37 2 .157 12 .00 16. 4 16.4 76 C=120 0 .00 0. 0 0.0 See PATH 9 54 .94 0. 025 12. 00 0.3 16.4 Vel = 4 .87 18 .54 2. 157 2E 67 .06 16.7 16.7 75 C=120 1T 20. 00 0.0 0.0 See PATH 10 73.48 0. 043 87 . 06 3.8 16.7 Vel = 6.51 C2 73.48 20.5 K = 16.25 PATH 8 FROM HYDRAULIC REFERENCE 7 .TO 77 18.29 1 .049 lE 1.25 10.7 10.7 K = 5. 60 7S C=120 2 .00 -0.5 0.0 18 .29 0.110 3.25 0.4 10.7 Vel = 6.86 1 .049 lE 44 .25 10.5 10.5 EqK = 5. 65 7 C=120 1T 7 .00 0.1 0.0 18 .29 0.110 51.25 5.7 10.5 Vel = 6.86 77 18 .29 16. 3 K = 4 .54 PATH 9 FROM HYDRAULIC REFERENCE 10 TO 76 18 .37 1 .049 lE 1 .25 10. 8 10.8 K = 5.60 10S C=120 2 .00 -0.5 0.0 18 . 37 0. 111 3.25 0. 4 10.8 Vel = 6.89 1.049 lE 44 .25 10. 6 10. 6 EqK = 5. 65 10 0=120 1T 7 .00 0. 1 0.0 18 .37 0 . 111 51 .25 5.7 10. 6 Vel = 6.89 76 18 .37 16. 4 K = 4 . 54 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) f F. ' W. Webb Company Drawing Date:05/05/09 5/11/09 11: 4 Tyco Fire Products Page 12 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 10 FROM HYDRAULIC REFERENCE 9 TO 75 18.54 1 .049 lE 1.25 11.0 11 . 0 K = 5. 60 9S C=120 2 .00 -0.5 0.0 18 . 54 0.113 3.25 0. 4 11 .0 Vel = 6.95 1.049 1E 44 .25 10.8 10.8 EqK = 5. 65 9 C=120 1T 7 .00 0.1 0. 0 18 .54 0.113 51.25 5.8 10.8 Vel = 6. 95 75 RA 18.54 16.7 K = 4 .54 PATH 11 FROM HYDRAULIC REFERENCE 13 TO C3 19.46 1.049 lE 1.25 12. 1 12 .1 K = 5.60 13S C=120 2.00 -0.5 0.0 19.46 0.124 3.25 0.4 12.1 Vel = 7 .30 1.049 lE 44 .25 11 . 9 11. 9 EqK = 5. 63 13 C=120 1T 7 .00 0. 1 0.0 19.46 0.124 51 .25 6.3 11. 9 Vel = 7 .30 2 .157 12 .00 18 .4 18 . 4 81 C=120 0.00 0.0 0. 0 19.46 0. 004 12 . 00 0.0 18 .4 Vel = 1.73 19.49 2. 157 12 .00 18 .4 18 .4 80 C=120 0.00 0.0 0 .0 See PATH 12 38 .95 0.013 12.00 0.2 18 .4 Vel = 3.45 19.57 2 .157 1T 60.54 18 . 6 18 . 6 79 C=120 10.00 0.0 0.0 See PATH 13 58 .52 0. 028 70.54 2 .0 18 . 6 Vel = 5. 19 C3 58 .52 20. 6 K = 12.90 1 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. ' &. liebb Company Drawing Date:05/05/09 5/11/09 11: 4 Tyco Fire Products Page 13 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 12 FROM HYDRAULIC REFERENCE 12 TO 80 19. 49 1 .049 lE 1 .25 12 .1 12 . 1 K = 5. 60 12S C=120 2. 00 -0. 5 0.0 19.49 0.124 3.25 0.4 12 .1 Vel = 7.30 1 .049 lE 44 .25 12 .0 12.0 EqK = 5. 63 12 0=120 1T 7 .00 0. 1 0.0 19. 49 0.124 51 .25 6.4 12 .0 Vel = 7 .30 80 19.49 18 .4 K = 4 ,54 PATH 13 FROM HYDRAULIC REFERENCE 11 TO 79 19.57 1.049 lE 1.25 12.2 12.2 K = 5. 60 11S C=120 2.00 -0.5 0.0 19.57 0.125 3.25 0.4 12.2 Vel = 7.34 1.049 lE 44.25 12 .1 12.1 EqK = 5. 63 11 0=120 1T 7.00 0. 1 0.0 19. 57 0.125 51 .25 6. 4 12.1 Vel = 7.34 79 19.57 18 . 6 K = 4 .54 • UNITS - DIAMETER (INCH), LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) Joninane, ....M.... ._ F. W. Webb Company Static Pres: 75.0 psi Pressure: -38.0 psi In: 0 gpm Rtd Pres: 80 psi 0 1 108 Breeds Hill Road Resid. Pres: 70.0 psi Sys Flow: 233 gpm Out: 500 gpm Rtd Flow: 1500 gpm 1500 I 00 Barnstable, MA. 02601 Flow: 1290 gpm Sys+Hose: 733 gpm 220 Remote Area: 1 Date: 2/17/09 Safety Pres: 111.3 psi 0 Loc: Hydrants on Breeds Hill R Hd Ely Pres: 15.6 psi 140 • 120 100 80 ) Supply - 1 60 40 20 .-15.6 psi 150 22 300 375 45 500 gpm hose 525 600 675 ® 750 Flow (gpm) P F. W. Webb ,company Drawing Date:05/05/09 5/11/09 11: 8 HYDRAULIC DESIGN INFORMATION SHEET Job Name: F. W. Webb Company Location: 108 Breeds Hill Road Barnstable, MA. 02601 Drawing Date: 05/05/09 Remote Area Number: 2 Contractor: Rustic Fire Protection, Inc. Telephone:508-431-9938 www.rusticfireprotection.com 320 West Main Street Norton, MA. 02766 Designer: GDM Calculated By:SprinkCAD • www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: Steel Occupancy:Mixed Reviewing Authorities:Barnstable Fire Dept. SYSTEM DESIGN ' Code:NFPA 13 Hazard:Class A Plc System Type:WET Area of Sprinkler Oper. 1000 sq ftl Sprinkler or Nozzle Density (gpm/sq ft) 1.200 I Make: VICTAUL Area per Sprinkler 100.0 sq ftl Model: V4404 Hose Allowance Inside 0 gpm 1 K-Factor: 16.80 Hose Allowance Outside 250 gpm 1 Temperature Rating: 162 CALCULATION SUMMARY 12 Flowing Outlets gpm Required: 1734.9 psi Required: 50.9 @ City Supply WATER SUPPLY Water Flow Test Pump Data Date of Test 2/17/09 Rated Capacity 1500 gpm 1 Static Pressure 75.0 psi Rated Pressure 80.0 psi 1 Residual Pres 70.0 psi Elevation 0 1 At a Flow of 1290 gpm Make: Peerles 1 Elevation 0" Model: 1 Location: Hydrants on Breeds Hill Rd. . • Source of Information: Barnstable Water Dept. T'fcyq , s SYSTEM VOLUME 3267 Gallons E;_y/ ri.PHi 'p Notes: A GRID PEAKED Leo CURRENT LOCATION REQUIRED 50.934 `psi1734 .87 gpm SHIFT LEFT (DOWN) REQUIRED 50.729 psi1733.78 gpm SHIFT RIGHT (UP) REQUIRED 50 .894 psi1735.51 gpm F. W. Webb Company Drawing Date:05/05/09 5/11/09 11: 8 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 2 1485 111.4 psi 1 6" Grvd Alarm Valve "G" CHART LOSS 1485 2 .0 1 8" x 6" Flngd Reducer 0' 120 8 .071 1485 0 .0 1 80 psi@1500 gpm PUMP Peerles Pump CHART BOOST 1485 80.1 2 8" Flngd Gate Valve "721U" PIV 8' 120 8.071 1485 0.1 1 8" Flngd Back Flow Valve Ames "4000 CHART LOSS 1485 10.3 Elevation Change 8 ' 6" 3.7 Fixed Flow Inside Hose Stream 0 gpm Total Loss for Riser -64.1 psi Hydr Ref R1 Required at Base of Riser 1485 47.3 psi 5 8" Flngd 90 Ell 90' 120 8 .071 1485 1.7 -Inn, -Inn n n8n 1 4np n Pip e Yi e 8" Dixie Cl 350 10V 14V 0 ..10U 1•11).) 1. Fixed Flow Outside Hose Stream 250 gpm Total Loss for Underground 3.6 psi Hydr Ref R2 Required at City Supply 1735 50.9 psi Water Source 75.0 psi static, 70.0 psi residual @ 1290 gpm 1735 gpm 66.3 psi SAFETY PRESSURE 15.4 psi Available Pressure of 66.3 psi Exceeds Required Pressure of 50.9 psi This is a safety margin of 15.4 psi or 23 % of Supply Maximum Water Velocity is 15.2 fps F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 : 8 Page 3 FITTING NAME TABLE ABBREV. NAME C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. K FACTOR Plow factor for open head or path where Flow (oom) = K x -\/P Qa Flow added or subtracted 1 J1 Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG' S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0 .433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4 .52 x (Q/C) ^1.85 / ID^4 .87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0.01 psi. Pressures are listed to 0.1 psi. Addition may vary by 0.1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 : 8 Page 4 , NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 20 30.46 75.9 20S 30.08 16.80 55.4 125. 0 120 .0 1.25 21 30.46 75.9 21S 30.08 16.80 55.3 124 . 9 120.0 1.25 22 30. 46 75.9 22S 30.08 16.80 55.3 124 . 9 120.0 1.25 23 30. 41 76.0 23S 30.08 16.80 55.5 125.2 120. 0 1.25 24 30.86 75. 6 24S 28 .75 16. 80 51 .1 120. 1 120 . 0 1.20 25 30. 90 75. 6 25S 30 .58 16.80 55. 3 124 .9 120. 0 1.25 26 30_41 75. 9 26S 30.08 16.80 55.5 125.1 120.0 1 .25 27 30 .86 75. 6 27S 28 .75 16.80 51.0 120.0 120 . 0 1.20 28 30. 90 75. 6 , 28S 30.58 16. 80 55.2 124 . 8 120 .0 1.25 29 30.41 75.9 29S 30 .08 16.80 55.5 125.1 120.0 1.25 30 30 .86 75. 6 30S 28 .75 16.80 51.0 120.0 120.0 1.20 31 30 .90 75.5 31S 30 .58 16.80 55.2 124 .8 120.0 1.25 40 24 .88 83.4 41 25.09 83.3 42 25.29 83.2 43 25.50 83.1 44 24 .88 83.4 45 25.09 83. 3 46 25.29 83.2 . 47 .25.50 83.1 48 24 .88 83 . 4 49 25.09 83. 3 50 25.29 83.2 51 25.50 83.1 Al 25.33 83.2 A2 25.33 83.2 A3 25.33 83.2 A4 25.33 83.2 A5 25. 33 83.2 A6 25. 33 83.2 A7 25.33 83.2 A8 25.33 83.2 A9 25.33 83.2 A10 25.33 83 .2 All 25. 33 83 .2 Al2 25.33 83 .2 A13 25. 33 83.2 A14 26.25 83 .0 A15 26. 25 83 .2 F. W. ,Webb ;Company Drawing Date:05/05/09 5/11/09 11 : 8 Page 5 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) A16 26.25 83. 5 A17 26.25 83. 9 A18 26.25 84 .3 A19 9.08 102 .0 A20 3.00 106.7 B1 26.25 81. 1 B2 26.25 81 . 1 B3 26.25 81 .2 B4 26.25 81 .3 B5 26.25 81. 5 B6 26.25 81 . 6 B7 26.25 81 .8 B8 26.25 81 .9 B9 26.25 82 .1 B10 26.25 82.3 Bil 26.25 82.5 B12 26.25 82.7 D1 23 .08 84.1 D2 23.08 84.1 D3 23.08 84.1 D4 23.08 84 .1 D5 23.08 84 .1 D6 23.08 84.1 D7 23.08 84.1 D8 23.08 84.1 D9 23.08 84 .1 D10 23.08 84 .1 Dl1 23.08 84.1 D12 23.08 84 . 1 El 26.25 81.1 , E2 26.25 - 81 .1 E3 26.25 81 .2 E4 26.25 81 .3 E5 26.25 81 .4 E6 26.25 81 . 6 E7 26.25 81 .7 E8 26.25 81 .8 E9 26.25 81 . 9 E10 26.25 82 . 0 Ell 26.25 82 .1 E12 26.25 82 . 1 E13 26.25 82 .2 E14 26.25 82 .2 E15 26.25 82 . 2 E16 26.25 82 .3 E17 26.25 82 . 3 82 . 8 G1 26.25 Hl 10 .83 100 . 3 W -5.50 111 .4 Max velocity of 15. 16 occurs in the pipe from H1 TO A18 Nodes with "S" indicate a node at the top of a sprig or bottom of drop pendent. The node without an "S" is on the branch. F. W. .Webb •Company Drawing Date:05/05/09 5/11/09 11 : 8 Tyco Fire Products Page 6 f HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 31 TO W (PRIMARY PATH) 124 .82 1 .049 1T 0 . 32 55.2 55.2 K = 16.80 31S C=120 5. 00 -0. 1 0. 0 124 .82 3.851 5.32 20.5 55.2 Vel = 46.79 3.260 10 . 01 75.5 75.5 EqK = 14 .36 31 C=120 0.00 0.2 0 .0 119.86 0 .014 10 . 01 0 . 1 75.5 Vel = 4 . 65 124 .92 3.260 lE 41. 64 75.9 75. 9 EqK = 14.34 22 C-12n 11, 22.nn 1 .8 n_n 244 .78 0 .054 63. 64 3. 4 75. 9 Vel = 9.50 6. 357 8 .25 81.1 81 .1 El C=120 0.00 0 .0 0.0 244 .78 0.002 8 .25 0.0 81.1 Vel = 2.50 244 .80 6. 357 8 .25 . 81.1 81.1 E2 C=120 0.00 0.0 0.0 See PATH 3 489.58 0.007 8 .25 0.1 81 .1 Vel = 5.00 244 .85 6.357 8 .50 81.2 81 .2 E3 C=120 0.00 0.0 0.0 See PATH 5 734 .44 0.016 8 . 50 0 .1 81 .2 Vel = 7 .50 -12 .06 6.357 7 .50 81 .3 81 .3 E4 C=120 0.00 0.0 0.0 See PATH 7 722 .37 0.015 7 .50 0.1 81 .3 Vel = 7 .37 -14 .37 6.357 8 .25 81 .4 81 .4 E5 C=120 0.00 0 .0 0 .0 See PATH 8 708 .01 0.015 8 .25 0 .1 81.4 Vel = 7.23 -18 .03 6. 357 8 .50 81. 6 81 . 6 E6 C=120 0.00 0.0 0 .0 See PATH 9 689. 98 0.014 8 .50 0.1 81 .6 Vel = 7 .04 -22 .75 6.357 8 .25 81 .7 81.7 E7 C=120 0 . 00 0 .0 0 .0 See PATH 10 667 .23 0. 013 8 .25 0.1 81 .7 Vel = 6. 81 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) k F. W. 'Webb Company Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 7 t: 1 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 31 TO W (PRIMARY PATH) -28 . 19 6.357 8 .25 81 .8 81.8 E8 C=120 0.00 0.0 0.0 See PATH 11 639.03 0.012 8 .25 0.1 81.8 Vel = 6.52 -34 . 47 6. 357 8 .50 81. 9 81. 9 E9 C=120 0.00 0.0 0.0 See PATH 12 604 .56 0 .011 8. 50 0 .1 81 .9 Vel = 6.17 -41.76 6.357 8 .25 82 .0 82 .0 E10 C=120 n , nn n .n n.n cee Pnmu 13 562.80 0 .010 8 .25 0.1 82 .0 Vel = 5.74 -49. 66 6.357 8 .25 82 .1 82.1 Ell C=120 0.00 0 .0 0.0 See PATH 14 513.14 0 .008 8 .25 0 .1 82 .1 Vel = 5.24 -58 .40 6. 357 8 .50 82 .1 82.1 E12 C=120 0.00 0.0 0.0 See PATH 15 454.75 0.007 8 .50 0 . 1 82.1 Vel = 4 .64 -68 .26 6.357 8 .25 82 .2 82.2 E13 C=120 0.00 0. 0 0.0 See PATH 16 386.49 0 .005 8 .25 0.0 82 .2 Vel = 3.95 -78 .67 6.357 8 .25 82 .2 82 .2 E14 C=120 0.00 0.0 0.0 See PATH 17 307.82 0.003 8 .25 0 . 0 82 .2 Vel = 3.14 -89.95 6.357 8 .50 82 .2 82 .2 E15 C=120 0.00 0 .0 0 .0 See PATH 18 217 .87 0.002 8 .50 0.0 82.2 Vel = 2.22 -102. 45 6.357 8 .25 82 .3 82.3 E16 C=120 0 .00 0. 0 0.0 See PATH 19 115. 42 0 .001 8 .25 0.0 82 .3 Vel = 1.18 3.260 2E 111 .05 82 .3 82 .3 E17 0=120 2T 44 .00 0.0 0.0 115.42 0 .013 155.05 2 . 1 82 .3 Vel = 4 .48 1369.45 6.357 5E 90 .36 84 . 3 84 .3 A18 C=120 70 .00 6.7 0.0 See PATH 2 1484 . 87 0 .058 160 . 36 9.3 84 .3 Vel = 15.16 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. 'Webb Company Drawing Date:05/05/09 5/11/09 11 : 8 Tyco Fire Products Page 8 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 31 TO W (PRIMARY PATH) 6. 357 lE 1 .75 100.3 100.3 H1 C=120 14 .00 0.8 0.0 1484 .87 0.058 15.75 0.9 100 .3 Vel = 15.16 6.357 2E 7 .26 102.0 102 .0 . A19 C=120 28 .00 2. 6 0.0 1484 .87 0 .058 35.26 2 .0 102 .0 Vel = 15. 16 8 .249 2E 22 .82 106.7 106.7 A20 C-' 2n 36.nn 3.7 n.n 1484 .87 0 .016 58 .82 1.0 106.7 Vel = 9.00 W 1484 .87 111.4 K = 140.71 124.92 1 .049 1T 0.38 55.3 55.3 K = 16.80 22S C=120 • 5.00 -0.2 0 .0 124 . 92 3.857 5.38 20.7 55.3 Vel = 46.83 22 124 . 92 75.9 K = 14 .34 PATH 2 FROM HYDRAULIC REFERENCE 31 TO A18 124 .82 1 .049 1T 0 .32 55.2 55.2 K = 16.80 31S C=120 5.00 -0.1 0.0 124.82 3.851 5.32 20.5 55.2 Vel = 46.79 3.260 10.01 75.5 75. 5 EqK = 14 .36 31 C=120 0.00 0.0 0 .0 4 .96 0.000 10 .01 0.0 75.5 Vel = 0 .19 120 .00 3.260 10 .01 75. 6 75. 6 EqK = 13.81 30 C=120 0.00 0.2 0 .0 124 .96 0.015 10 .01 0.2 75. 6 Vel = 4 .85 125. 11 3.260 lE 39.38 75.9 75.9 EqK = 14 .36 29 0=120 1T 22 . 00 1.8 • 0.0 250.07 0.056 61 . 38 3.4 75. 9 Vel = 9.71 - UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. w. .ivebb ,Company Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 9 HYD. Qa DIA. FITTING PIPE Pt Pt 1 REF "C" ' TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 31 TO A18 CONTINUED 6. 357 8 .25 81 . 1 81 .1 B1 C=120 0.00 0.0 0.0 250.07 0 . 002 8 .25 0 .0 81 .1 Vel = 2.55 250.11 6.357 8 .25 81 .1 81.1 B2 C=120 0.00 0.0 0.0 See PATH 4 500.18 0.008 8 .25 0 .1 81.1 Vel = 5.11 250.25 6.357 8 . 50 81 .2 81.2 B3 r=12n n,.nn n,n n_n q'PP PATH 6 750.43 0. 016 8 .50 0 .1 81.2 Vel = 7 .66 12 .06 6.357 7 .50 81.3 81.3 B4 C=120 0.00 0 .0 0.0 See PATH 7 762 . 49 0 .017 7 .50 0.1 81.3 Vel = 7 .78 14 .37 6.357 8 .25 81.5 81.5 B5 C=120 0 .00 0.0 0.0 See PATH 8 776.86 0 .018 8 .25 0.1 81.5 Vel = 7.93 18 .03 6.357 8 .50 81.6 81. 6 B6 C=120 0 .00 0.0 0.0 See PATH 9 794 .89 0.018 8 .50 0 .2 81 . 6 Vel = 8.11 22.75 6.357 8 .25 81.8 81 .8 B7 C=120 0 .00 0.0 0.0 See PATH 10 817. 64 0.019 8 .25 0.2 81.8 Vel = 8.35 28 . 19 6. 357 8 .25 81.9 81. 9 B8 C=120 0.00 0.0 0.0 See PATH 11 845.84 0.021 8 .25 0 .2 81.9 Vel = 8. 63 34. 47 6.357 8 .50 82 . 1 82.1 B9 C=120 0 .00 0 .0 0.0 See PATH 12 ` 880.31 0.02.2 8 . 50 0.2 82 .1 Vel = 8.99 41 .76 6.357 8 .25 82.3' 82.3 B10 C=120 0. 00 0. 0 0.0 See PATH 13 922. 07 0.024 8 . 25 0 .2 82 .3 Vel = 9.41 49. 66 6. 357 8 .25 82. 5 82 .5 B11 C=120 0 . 00 0.0 0.0 See PATH 14 971 .72 0.027 8 .25 0 .2 82.5 Vel = 9.92 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. .Webb •Company Drawing Date:05/05/09 5/11/09 11 : 8 Tyco Fire Products Page 10 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 31 TO A18 CONTINUED 58 . 40 6. 357 2.25 82.7 82.7 B12 C=120 0.00 0.0 0. 0 See PATH 15 1030.12 0.030 2.25 0. 1 82 .7 Vel = 10.51 6.357 6.25 82 .8 82 .8 G1 C=120 0. 00 0. 0 0 .0 1030. 12 0 . 030 6.25 0.2 82 . 8 Vel = 10.51 68 .26 6. 357 8 .25 83.0 83.0 1V74 r_12n n. nn n_n n.0 See PATH 16 1098 .38 0 .033 8 .25 0 .3 83. 0 Vel = 11.21 78 . 67 6.357 8 .25 83.2 83.2 A15 C=120 0.00 0.0 0. 0 See PATH 17 1177 .05 0 .038 8 .25 0 .3 83.2 Vel = 12 .01 89.95 6. 357 8 .50 83.5 83. 5 A16 C=120 0.00 0.0 0.0 See PATH 18 1267 .00 0.043 8 . 50 0.4 83.5 Vel = 12.93 102.45 6.357 8 .25 83.9 83.9 A17 C=120 0 .00 0.0 0.0 See PATH 19 1369.45 0.050 8 .25 0.4 83. 9 Vel = 13.98 A18 1369.45 84 .3 K = 149.13 120.00 1 .049 1T 2 .11 51 .0 51.0 K = 16.80 30S C=120 5. 00 -0 .9 0 .0 120.00 3.581 7 . 11 25.4 51 .0 Vel = 44 .98 30 120.00 75.6 K = 13.81 125. 11 1 .049 1T 0 .32 55.5 55 .5 K = 16.80 29S C=120 5. 00 -0.1 0 .0 125. 11 3 .868 5. 32 20 . 6 55 .5 Vel = 46.90 29 125. 11 75. 9 K = 14 .36 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. GV. , Webb•Company Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 11 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 3 FROM HYDRAULIC REFERENCE 28 TO E2 124 .83 1.049 1T 0.32 55.2 55.2 K = 16.80 28S C=120 5.00 -0.1 0.0 124 .83 3. 852 5.32 20.5 55.2 Vel = 46.80 3 .260 10.01 75. 6 75. 6 EqK = 14 .36 28 C=120 0.00 0.2 0. 0 119.86 0 . 014 10.01 0 . 1 75. 6 Vel = 4. 65 124 . 94 3.260 lE 41 . 64 75. 9 75. 9 EqK = 14 .34 21 C=120 1T 22 . 00 1 .8 n_n 244 .80 0. 054 63. 64 3.4 75.9 Vel = 9.50 E2 244 . 80 81. 1 K = 27 .18 124 . 94 1 . 049 1T 0 .38 55.3 55.3 K = 16.80 21S C=120 5.00 -0 .2 0.0 124 .94 3.858 5. 38 20.7 55.3 Vel = 46.83 21 124 .94 75.9 K = 14 .34 PATH 4 FROM HYDRAULIC REFERENCE 28 TO B2 1 124 .83 1.049 1T 0.32 55.2 55.2 K = 16.80 28S C=120 5.00 -0.1 0.0 124 .83 3. 852 5.32 20.5 55.2 Vel = 46.80 3.260 10.01 75. 6 75. 6 EqK = 14 .36 28 C=120 0.00 0.0 0.0 . 4 .97 0 .000 10.01 0.0 75. 6 Vel = 0.19 120.01 3.260 10.01 75. 6 75.6 EqK = 13.81 27 C=120 . 0.00 0.2 0.0 124 .99 0 . 015 10.01 0 .2 75. 6 Vel = 4 . 85 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. ,Webb .Company Drawing Date:05/05/09 5/11/09 11 : 8 Tyco Fire Products Page 12 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 4 FROM HYDRAULIC REFERENCE 28 TO B2 CONTINUED 125.12 3.260 lE 39.38 75. 9 75. 9 EqK = 14 .36 26 C=120 1T 22.00 1.8 0. 0 250. 11 0.056 61 .38 3. 4 75.9 Vel = 9.71 B2 250. 11 81 . 1 K = 27 .77 120.01 1.049 1T 2.11 51 .0 51 .0 K = 16.80 27S r=i2n S_Of -nq n n 120.01 3.581 7.11 25.5 51.0 Vel = 44 . 99 27 120.01 75. 6 K = 13.81 125. 12 1.049 1T 0.32 55.5 55.5 K = 16.80 26S C=120 5.00 -0.1 0.0 125.12 3.869 5.32 20 . 6 55.5 Vel = 46.90 26 125. 12 75. 9 K = 14 .36 PATH 5 FROM HYDRAULIC REFERENCE 25 TO E3 124 .88 1.049 1T 0.32 55.3 55.3 K = 16.80 25S C=120 5.00 -0 . 1 0 .0 124 .88 3.855 5.32 20 . 5 55.3 Vel = 46.81 3.260 10 .01 75. 6 75. 6 EqK = 14 .36 25 C=120 0 .00 0.2 0.0 119.86 0.014 10 .01 0. 1 75. 6 Vel = 4 .65 124 . 99 3.260 1E 41 . 64 75. 9 75.9 EqK = 14 .34 20 C=120 1T 22 . 00 1 . 8 0 . 0 244 .85 0 .054 63. 64 3. 4 75. 9 Vel = 9.50 E3 244 .85 81 .2 K = 27 .18 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW .(GPM) PRESSURE (PSI ) F. W. , Webb •Company Drawing Date:05/05/09 5/11/09 11 : 8 Tyco Fire Products Page 13 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn 124 . 99 1 . 049 1T 0 .38 55. 4 55. 4 K = 16.80 20S C=120 5.00 -0.2 0.0 124 .99 3.861 5.38 20.8 55.4 Vel = 46.85 20 124. 99 75. 9 K = 14 .34 PATH 6 FROM HYDRAULIC REFERENCE 25 TO B3 124 . 88 1 .049 1T 0.32 55. 3 55.3 K = 16. 80 2c r=12n 5. nn _n .1 n_n 124 .88 3.855 5.32 20. 5 55.3 Vel = 46.81 3 .260 10.01 75.6 75. 6 EqK = 14 .36 25 C=120 0. 00 0.0 0 .0 5.02 0 . 000 10.01 0 .0 75. 6 Vel = 0.19 120. 06 3.260 10.01 75.6 75.6 EqK = 13.81 24 C=120 0. 00 0.2 0.0 125.08 0.015 10. 01 0 .2 75. 6 Vel = 4 .85 125.17 3.260 lE 39. 38 76.0 76.0 EqK = 14 .36 23 C=120 1T 22. 00 1 .8 0.0 250 .25 0.056 61.38 3.4 76.0 Vel = 9.71 B3 250.25 81 .2 K = 27 .77 120 . 06 1 .049 iT 2 . 11 51 .1 51 .1 K = 16.80 24S C=120 5. 00 -0. 9 0.0 120 .06 3. 584 7 . 11 25. 5 51. 1 Vel = 45.01 24 120.06 75. 6 K = 13.81 125.17 1 .049 1T 0. 32 55.5 55.5 K = 16.80 23S C=120 5. 00 -0.1 0.0 125. 17 3 .871 5 . 32 20 . 6 55.5 Vel = 46.92 23 125.17 76.0 K = 14 . 36 PATH 7 FROM HYDRAULIC REFERENCE E4 TO B4 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) R F. W., Webb, Company' Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 14 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 7 FROM HYDRAULIC REFERENCE E4 TO B4 CONTINUED 12 . 06 3.260 2E 111 .05 81 .3 81.3 E4 C=120 2T 44 .00 0.0 0.0 See PATH 1 12 .06 0.000 155.05 0.0 81.3 Vel = 0.47 B4 12 . 06 81 .3 K = 1 .34 DA'PR Q L'DCM uvnvarr Tr P777.1:'1.TC Fri 'rn RR 14 .37 3.260 2E 111 .05 81 .4 81. 4 E5 C=120 2T 44 .00 0 .0 0.0 See PATH 1 14 .37 0.000 155.05 0.0 81. 4 Vel = 0.56 B5 14 . 37 81.5 K = 1.59 PATH 9 FROM HYDRAULIC REFERENCE E6 TO B6 18 . 03 3.260 2E 111.05 81. 6 81. 6 E6 C=120 2T 44 .00 0.0 0.0 See PATH 1 18 .03 0.000 155.05 0.1 81. 6 Vel = 0.70 B6 18 .03 81. 6 K = 2.00 PATH 10 FROM HYDRAULIC REFERENCE E7 TO B7 22 .75 3.260 2E 111 .05 81.7 81 .7 E7 C=120 2T 44 .00 0.0 0 .0 See PATH 1 22 .75 0.001 155.05 0.1. 81 .7 Vel = 0.88 • B7 22 .75 81 .8 K = 2 . 52 PATH 11 FROM HYDRAULIC REFERENCE E8 TO B8 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. . Webb Compan DrawingDate:05 05 09 Y / / 5/11/09 11: 8 Tyco Fire Products Page 15 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 11 FROM HYDRAULIC REFERENCE E8 TO 88 CONTINUED 28 . 19 3.260 2E 111 .05 81 .8 81 .8 E8 C=120 2T 44 . 00 0.0 0.0 See PATH 1 28 .19 0.001 155.05 0 .2 81 .8 Vel = 1 .09 B8 28 . 19 81.9 K = 3.11 DnTR 9') PROM AVTIDMTTT-T( DF.PRpRAT R F,O To AO 34.47 3.260 2E 111 . 05 81.9 81 . 9 • E9 C=120 2T 44 . 00 0.0 0.0 See PATH 1 34 . 47 0.001 155. 05 0.2 81. 9 Vel = 1 .34 B9 34 . 47 • 82.1 K = 3.80 PATH '13 FROM HYDRAULIC REFERENCE E10 TO B10 41 .76 3.260 2E 111.05 82. 0 82.0 E10. C=120 2T 44 .00 0.0 0. 0 See PATH 1 Y. 41 .76 0.002 155.05 0.3 82.0 Vel = 1 . 62 B10 41.76 82 .3 K = 4 . 60 PATH 14 FROM HYDRAULIC REFERENCE Ell TO B11 49. 66 3.260 2E 111 .05 82 . 1 82 . 1 Ell C=120 2T 44 . 00 0 .0 0.0 See PATH 1 49. 66 0.003 155. 05 0.4 82 . 1 Vel = 1 .93 • B11 49 . 66 82 . 5 K = 5. 47 PATH 15 FROM HYDRAULIC REFERENCE E12 TO B12 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. ' Webb. Company Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 16 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 15 FROM HYDRAULIC REFERENCE E12 TO B12 CONTINUED 58 .40 3.260 2E 111. 05 82 .1 82 .1 E12 C=120 2T 44 . 00 . 0.0 0.0 See PATH 1 58 .40 0 . 004 155.05 0.6 82.1 . Vel = 2.27 B12 58 .40 82.7 K 6. 42 PATH 76 FROM HYDRAULIC pprpr SINCE 711 mn Aid 68 .26 3.260 2E 111 .05 82.2 82 .2 E13 C=120 2T 44 .00 0.0 0. 0 See PATH 1 68 .26 0 .005 155. 05 0.8 82.2 Vel = 2. 65 A14 68 .26 83.0 K = 7 .49 • PATH 17 FROM HYDRAULIC REFERENCE E14 TO A15 78. 67 3.260 2E 111 .05 82 .2 82 .2 E14 C=120 2T 44 .00 0.0 0.0 See PATH 1 78 . 67 0 .007 155.05 1.0 82.2 Vel = 3.05 A15 78 . 67 83.2 K = 8 . 62 PATH 18 FROM HYDRAULIC REFERENCE E15 TO A16 89. 95 3.260 2E 111 .05 82.2 82 .2 E15 C=120 2T 44 .00 0.0 0.0 See PATH 1 89. 95 0.008 155. 05 1.3 82 .2 Vel = 3.49 A16 89. 95 83.5 K = 9.84 PATH 19 FROM HYDRAULIC REFERENCE E16 TO A17 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. ,Webb, Company Drawing Date:05/05/09 5/11/09 11: 8 Tyco Fire Products Page 17 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 19 FROM HYDRAULIC REFERENCE E16 TO A17 CONTINUED 102 . 45 3.260 2E 111.05 82 .3 82. 3 E16 C=120 2T 44 .00 0.0 0.0 See PATH 1 102.45 0.011 155.05 1.7 82 .3 Vel = 3. 98 A17 102 .45 83. 9 K = 11 . 18 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI ) Joo YYQLCI psigpm Rtd 80 psi u F. W. Webb Company Static Pres: 75.0 psi Pressure: 50.9 In: 0 Rtd Pres:low: 1500gpm 1500u 8 108 Breeds Hill Road Resid. Pres: 70.0 psi Sys Flow: 1485gpm Out: 250 gpm2250 5 Barnstable, MA. 02601 Flow: 1290 gpm Sys+Hose: 1735 gpm 0 Remote Area: 2 Date: 2/17/09 Safety Pres: 15.4 psi 0 Loc: Hydrants on Breeds Hill R Hd Ely Pres: 19.3 psi 140 120 I i i 100 80 . Sup.ly - --I.-- - 60 250 g DM hose 40 •.----- 20.y- 19.3 psi • 400 600 800 1000 1200 1400 1600 1800 2000 Flow (gpm) - • F. W: Webb Company Drawing Date:05/05/09 5/12/09 11:24 HYDRAULIC DESIGN INFORMATION SHEET Job Name: F. W. Webb Company Location: 108 Breeds Hill Road Barnstable, MA. 02601 ' Drawing Date: 05/05/09 Remote Area Number: 3 Contractor: Rustic Fire Protection, Inc. Telephone:508-431-9938 www.rusticfireprotection.com 320 West Main Street Norton, MA. 02766 Designer: GDM Calculated By:SprinkCAD www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: Steel Occupancy:Mixed Reviewing Authorities:Barnstable Fire Dept. SYSTEM DESIGN Code:NFPA 13 Hazard:Class A Plc System Type:WET Area of Sprinkler Oper. 1000 sq ft1 Sprinkler. or Nozzle Density (gpm/sq ft) 1 .210 I Make: VICTAUL Area per Sprinkler 100.0 sq ft1 Model: V4404 Hose Allowance Inside 0 gpm I K-Factor: 16.80 Hose Allowance Outside 250 gpm I Temperature Rating: 162 CALCULATION SUMMARY 12 Flowing Outlets gpm Required: 1703.5 psi Required: 46.6 @ City Supply WATER SUPPLY Water Flow Test Pump Data Date of Test 2/17/09 Rated Capacity 1500 gpm Static Pressure 75.0 psi Rated Pressure 80.0 psi Residual Pres 70.0 psi Elevation 0 At a Flow of 1290 gpm Make: Peerles Elevation 0" Model: Location: Hydrants on Breeds Hill Rd. Source of .Information: Barnstable Water Dept. SYSTEM VOLUME 3267 Gallons • . Notes: GRID PEAKED 1/4ct�a��`` CURRENT LOCATION REQUIRED 46. 609 psi1703.48 gpm <� 4441, SHIFT LEFT (DOWN) REQUIRED 46.576 psi1703. 47 gpm �� SHIFT RIGHT (UP) REQUIRED 46.544psi1703. 48 m f`°' gpm r =�: R.PNILIiPS \ Kongo ss Y > F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 3 1453 107.6 psi 1 6" Grvd Alarm Valve "G" CHART LOSS 1453 1.9 1 8" x 6" Flngd Reducer 0' 120 8 .071 1453 0 .0 1 80 psi@1500 gpm PUMP Peerles Pump CHART BOOST 1453 80.5 2 8" Flngd Gate Valve "721U" PIV 8 ' 120 8. 071 1453 0. 1 1 8" Flngd Back Flow Valve Ames "4000 CHART LOSS 1453 10.3 Elevation Change 8 ' 6" 3.7 Fixed Flow Inside Hose Stream 0 gpm Total Loss for Riser -64.5 psi Hydr Ref Ri Required at Base of Riser 1453 43.1 psi 5 8" Flngd 90 Ell 90 ' 120 8 .071 1453 1. 6 1 Pipe 8" DIxl8 Cl 350 180' 140 8 .488 1453 1 . 9 Fixed Flow Outside Hose Stream 250 gpm Total Loss for Underground 3.5 psi Hydr Ref R2 Required at City Supply 1703 46. 6 psi Water Source 75.0 psi static, 70.0 psi residual @ 1290 gpm 1703 gpm 66.6 psi SAFETY PRESSURE 20.0 psi Available Pressure of 66. 6 psi Exceeds Required Pressure of 46. 6 psi This is a safety margin of 20.0 psi or 30 % of Supply Maximum Water Velocity is 14 .8 fps F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Page 3 FITTING NAME TABLE ABBREV. NAME C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. u L 'TAD Flow fa-tor for Cnen he d Or math. i.rhero Flow (rrrm) = K x -\ /D Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0.433 x change in elevation Pf Friction loss (psi) to fitting • where Pf = 1 x 4.52 x (Q/C) ^1.85 / ID^4.87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0 .01 psi. Pressures are listed to 0.1 psi. Addition may vary by 0.1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 y Page 4 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^'-�) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 20 30.46 77.2 21 30.46 77 .2 22 30.46 77 .2 23 30.41 77 .2 24 30.86 77 .0 25 30. 90 77.0 26 30.41 77.2 27 30.86 77 .0 28 30.90 77.0 29 30.41 77.2 30 30.86 77 . 0 31 30. 90 77 . 0 40 24 .88 71 .5 40S 24 .54 16.80 52. 1 121 .3 121.0 1.21 41 25.09 71. 3 41S 24.75 16. 80 52 .0 121.1 121.0 1.21 42 25.29 71.2 42S 24 .96 16.80 51. 9 121.1 121.0 1.21 43 25.50 71.3 43S 25.17 16.80 52.0 121.1 121.0 1.21 44 24 .88 71 . 4 44S 24.54 16. 80 52.1 121 .3 121.0 1.21 45 25.09 71 .2 45S 24 .75 16. 80 51. 9 121. 1 121.0 1.21 46 25.29 71 .1 46S 24 .96 16.80 51 .9 121.0 121.0 1.21 47 25.50 71.2 47S 25.17 16.80 52.0 121.1 121.0 1.21 48 24.88 71 .4 48S 24 .54 16.80 52 . 1 121.2 121.0 1.21 49 25.09 71.2 49S 24 .75 16. 80 51. 9 121.1 121.0 1.21 50 25.29 71 .1 50S 24.96 16.80 51.9 121.0 121.0 1.21 51 25.50 71.2 51S 25.17 16. 80 51 . 9 121. 1 121.0 1.21 Al 25.33 74 . 6 A2 25.33 74 .7 A3 25.33 74 .7 A4 25.33 74 . 9 A5 25.33 75. 0 A6 25.33 75.2 A7 25.33 75.4 A8 25.33 75. 6 A9 25.33 75. 9 A10 25.33 76.2 All • 25.33 76. 5 Al2 25.33 76. 9 A13 25.33 78 .2 A14 26.25 79.7 A15 26.25 80 .0 F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Page 5 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) A16 26.25 80 .3 A17 26.25 80.7 A18 26.25 81 .1 A19 9.08 98 .4 A20 3. 00 103.0 B1 26.25 78 . 9 B2 26.25 78 . 9 B3 26.25 78 . 9 ' B4 26.25 78 .9 B5 26.25 78 .9 ' B6 26.25 78 .9 B7 26.25 78 .9 PP 26.25 7R . 9 B9 26.25 78.9 B10 26.25 78 .8 Bli 26.25 78.8 B12 26.25 78.8 D1 23.08 75.2 D2 23.08 75.2 D3 23.08 75.3 D4 23 . 08 75.4 D5 23.08 75.5 D6 23.08 75. 6 D7 23.08 75.7 D8 23.08 75.7 D9 23 .08 75.8 D10 23.08 75.8 Dl1 23.08 75. 8 1 D12 23.08 75.8 El 26.25 79.1 E2 26.25 79.1 E3 26.25 79.1 E4 26.25 79.1 E5 26.25 79.1 E6 26.25 79. 1 E7 26.25 - 79. 1 E8 26.25 79.1 E9 26.25 79.1 E10 26.25 79.1 ' Ell 26.25 79.1 E12 26.25 79.2 E13 26.25 79.2 E14 26.25 79.3 El5 26.25 - 79.3 E16 26.25 79.3 E17 26.25 79.3 - G1 26.25 78 . 6 H1 10.83 96.7 W -5.50 107. 6 Max velocity of 14 .84 occurs in the pipe from Al3 TO Al2 Nodes wits "S" indicate a node at the top of a sprig or bottom of drop pendent. The node without an "S" is on the branch. F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Tyco Fire Products Page 6 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 49 TO W (PRIMARY PATH) 121 .07 1 . 049 1T 0. 34 51. 9 51. 9 K = 16.80 49S C=120 5.00 -0.1 0.0 121.07 3. 640 5.34 19.4 51. 9 Vel = 45.38 3.260 10.00 71.2 71.2 EqK = 14 .35 49 C=120 0 .00 0. 1 0.0 111 .03 0. 012 10.00 0.1 71 .2 Vel = 4.31 121 .24 3.260 lE 40.03 71 .4 71.4 EqK = 14 .35 48 C=120 1T 22 , 0n 0.8 n.0 232 .27 0 . 049 62.03 3.0 71.4 Vel = 9.02 6.357 8 .25 75.2 75.2 D1 C=120 0.00 0. 0 0.0 232 .27 0.002 8 .25 0. 0 75.2 Vel = 2.37 232.25 6.357 8 .25 75.2 75.2 D2 C=120 0.00 0.0 0.0 See PATH 3 464.53 0.007 8 .25 0. 1 75.2 Vel = 4 .74 232 . 18 6.357 8 .50 75. 3 75. 3 D3 C=120 0.00 0.0 0.0 See PATH 5 696.71 0.014 8 .50 0.1 75.3 Vel = 7 .11 -50.39 6.357 7 .50 75. 4 75. 4 D4 C=120 0 .00 0.0 0. 0 See PATH 7 646.32 0. 012 7 .50 0.1 75.4 Vel = 6. 60 -53.29 6.357 8 .25 75.5 75.5 D5 C=120 0.00 0.0 0.0 See PATH 8 593.03 0.011 8 .25 0.1 75.5 Vel = 6.05 -58 .28 6.357 8 .50 75.6 75. 6 D6 C=120 0.00 0.0 0.0 See PATH 9 534 .76 0.009 8 .50 0.1 75. 6 Vel = 5. 46 -65.04 6.357 8 .25 75.7 75.7 D7 C=120 0.00 0.0 0.0 See PATH 10 469. 72 0.007 8 .25 0.1 75.7 Vel = 4 .79 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 7 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 49 TO W (PRIMARY PATH) -73.02 6.357 8 .25 75.7 75.7 D8 C=120 0.00 0. 0 0.0 See PATH 11 396.70 0. 005 8 .25 0.0 75.7 Vel = 4 .05 -82.27 6.357 8 . 50 75.8 75.8 D9 C=120 0. 00 0.0 0 .0 See PATH 12 314.42 0.003 8 .50 0. 0 75.8 Vel = 3.21 -92 . 99 6.357 8 .25 75. 8 75.8 D10 C=120 0. 00 0.0 0 .0 See PATH 13 221 .43 0.002 8 .25 0 .0 75.8 Vel = 2.26 -104 .47 6.357 8 .25 75.8 75.8 Dll C=120 0. 00 0.0 0 .0 See PATH 14 116.96 0.001 8 .25 0. 0 75.8 Vel = 1. 19 3.260 2E 107 . 67 75. 8 75. 8 D12 0=120 2T 44 . 00 -1.0 0.0 116.96 0.014 151. 67 2 . 1 75.8 Vel = 4 .54 1336.52 6.357 lE 8 .79 76.9 76. 9 Al2 C=120 14. 00 0.0 0.0 See PATH 2 1453.48 0.056 22.79 1.3 76.9 Vel = 14 .84 6.357 1E 0. 92 78 .2 78 .2 A13 C=120 14 . 00 -0.4 0.0 1453.48 0.056 14 . 92 0..8 78 .2 Vel = 14 .84 -400. 07 6.357 1T . 6.25 78 . 6 78 . 6 G1 C=120 30. 00 0.0 0.0 See PATH 15 1053.41 0.031 36.25 1. 1 78 . 6 Vel = 10.75 53.86 6. 357 8 .25 79.7 79.7 . A14 C=120 0.00 0.0 0.0 See PATH 27 1107.27 0.034 8 .25 0.3 79.7 Vel = 11.30 66.78 6.357 8 .25 80.0 80.0 A15 C=120 0.00 0.0 0.0 See PATH 28 1174 .05 0.038 8 .25 0.3 80.0 Vel = 11. 98 79. 63 6.357 8 .50 80. 3 80.3 A16 C=120 0. 00 0.0 0.0 See PATH 29 1253. 67 0. 043 8 . 50 0. 4 80.3 Vel = 12 .80 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 8 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 49 TO W (PRIMARY PATH) 93. 13 6.357 8 .25 80.7 80.7 A17 C=120 0.00 0.0 0.0 See PATH 30 1346.80 0. 049 8 .25 0.4 80.7 Vel = 13.75 106. 68 6.357 5E 90. 36 81 . 1 81. 1 A18 C=120 70.00 6.7 0. 0 See PATH 15 1453. 48 0.056 160.36 9.0 81 .1 Vel = 14 . 84 6. 357 lE 1 .75 96.7 96.7 ul r-I2n 14 . 00 n 8 n 0 Li., \.-1 L V 1 V V V V V V 1453.48 0. 056 15.75 0. 9 96.7 Vel = 14.84 6.357 2E 7 .26 98 . 4 98 .4 A19 C=120 28 .00 2. 6 0.0 1453.48 0.056 35.26 2.0 98 .4 Vel = 14 . 84 8 .249 2E 22.82 103.0 103.0 A20 C=120 36.00 3.7 0.0 1453.48 0.016 58 .82 0. 9 103.0 Vel = 8.81 W . 1453.48 107 . 6 K = 140.12 121.24 1.049 1T 0.34 - 52 .1 52 .1 K = 16.80 48S C=120 5.00 -0.1 0.0 121.24 3. 650 5.34 19.5 52.1 Vel = 45.45 48 121.24 71.4 K = 14 .35 PATH 2 FROM HYDRAULIC REFERENCE 49 TO Al2 121 .07 1.049 1T 0 .34 51. 9 51. 9 K = 16.80 49S C=120 5.00 -0.1 0.0 121 .07 3. 640 5.34 19.4 51. 9 Vel = 45. 38 3.260 10.00 71.2 71.2 EqK = 14 .35 49 C=120 0 . 00 -0. 1 0 .0 10.04 0 .000 10.00 0.0 71.2 Vel = 0. 39 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Tyco Fire Products Page 9 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 49 TO Al2 CONTINUED 121 .00 3.260 10.00 71. 1 71.1 EqK = 14 .35 50 C=120 0.00 -0. 1 0.0 131.04 0 .017 10.00 0.2 71. 1 Vel = 5.09 121.08 3.260 lE 37 . 64 71.2 •71 .2 EqK = 14 .35 51 0=120 1T 22 .00 0. 1 0 .0 252.11 0 .057 59. 64 3.4 71 .2 Vel = 9.79 6.357 8 .25 74 . 6 74 . 6 Al C=120 0. 00 0.0 0.0 252 . 11 0 .002 8 .25 0.0 74 . 6 Vel = 2.57 252 . 19 6.357 8 .25 74.7 74 .7 A2 C=120 0.00 0.0 0.0 See PATH 4 504.30 0.008 8 .25 0.1 74 .7 Vel = 5.15 252.46 6.357 8 .50 74 .7 74 .7 A3 C=120 0. 00 0.0 0.0 See PATH 6 756.76 0.017 8 . 50 0.1 74 .7 Vel = 7.72 50.39 6.357 7 .50 74 . 9 74 .9 A4 C=120 0.00 0.0 0.0 See PATH 7 807 .15 0.019 7 .50 0 .1 74 .9 Vel = 8 .24 53.29 6.357 8.25 75.0 75.0 A5 C=120 0.00 0. 0 0.0 See PATH 8 860. 44 0.021 8 .25 0.2 75.0 Vel = 8 .78 58.28 6.357 8 .50 75.2 75.2 A6 C=120 0. 00 0.0 0.0 See PATH 9 918 .72 0.024 8 .50 0.2 75.2 Vel = 9.38 65. 04 6.357 8 .25 75.4 75. 4 A7 C=120 0.00 0.0 0.0 See PATH 10 983.76 0.027 8 .25 0.2 75.4 Vel = 10.04 73.02 6.357 8 .25 75. 6 75. 6 A8 C=120 0. 00 0.0 0 . 0 See PATH 11 1056.78 0. 031 8 .25 0.3 75. 6 Vel = 10.79 82.27 6. 357 8 .50 75. 9 75. 9 A9 . C=120 0. 00 0.0 0. 0 See PATH 12 1139.05 0 .036 8 .50 0.3 75.9 Vel = 11 . 63 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 10 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 49 TO Al2 CONTINUED 92. 99 6.357 8 .25 76.2 76.2 A10 C=120 0. 00 0.0 0.0 See PATH 13 1232 .05 0.041 8 .25 0.3 76.2 Vel = 12.58 104 .47 6. 357 8 .25 76.5 76. 5 All C=120 0. 00 0.0 0.0 See PATH 14 1336.52 0.048 8 .25 0. 4 76.5 Vel = 13. 64 Al2 1336.59 76. 9 K = 12.40 121 .00 1.049 1T 0.33 51 . 9 51. 9 K = 16.80 50S C=120 5. 00 -0.1 0.0 121.00 3. 636 5.33 19.4 51 .9 Vel = 45.36 50 121.00 71.1 K = 14.35 121.08 1.049 1T 0.33 51.9 51 .9 K = 16.80 51S C=120 5.00 -0. 1 0. 0 121.08 3. 640 5.33 19. 4 51. 9 Vel = 45.39 51 121 .08 71.2 K = 14.35 PATH 3 FROM HYDRAULIC REFERENCE 45 TO D2 121.08 1.049 1T 0.34 51.9 51. 9 K = 16.80 45S C=120 5. 00 -0.1 0.0 121.08 3. 641 5.34 19.4 51. 9 Vel = 45.39 3.260 10.00 71.2 71 .2 EqK = 14 .35 45 C=120 0 .00 0.1 0. 0 111 .00 0.012 10 .00 0.1 71.2 Vel = 4 .31 121.26 3.260 lE 40.03 71 . 4 71 .4 EqK = 14 .35 44 0=120 1T 22 .00 0.8 0 .0 232.25 0. 049 62.03 3. 0 71 . 4 Vel = 9.01 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 11 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn D2 232 .25 75.2 K = 26. 78 121.26 1 .049 1T 0.34 52. 1 52.1 K = 16. 80 44S C=120 5.00 -0.1 0.0 121.26 3. 650 5.34 19. 5 52. 1 Vel = 45.45 44 121 .26 71. 4 K = 14 .35 PATH 4 FROM HYDRAULIC REFERENCE 45 TO A2 121.08 1.049 1T 0.34 51. 9 51 .9 K = 16. 80 45S C=120 5.00 -0. 1 0.0 121.08 3. 641 5.34 19. 4 51 .9 Vel = 45.39 3.260 10.00 71.2 71 .2 EqK = 14 .35 45 C=120 0.00 -0.1 0.0 10.08 0.000 10.00 0.0 71.2 Vel = 0.39' 121.01 3.260 10.00 71. 1 71 . 1 EqK = 14 .35 46 C=120 0.00 -0. 1 0.0 131 . 10 0.017 10.00 0.2 71.1 Vel = 5.09 121.09 3.260 lE 37 . 64 71.2 71.2 EqK = 14 .35 47 0=120 1T 22.00 0. 1 0.0 252 . 19 0.057 59. 64 3. 4 71.2 Vel = 9.79 A2 252.19 74 .7 K = 29.19 121.01 1 .049 1T 0.33 51 . 9 51.9 K = 16.80 _ 46S C=120 5. 00 -0.1 0.0 121.01 3. 637 5.33 19. 4 51 .9 Vel = 45.36 46 121.01 71 .1 K = 14 .35 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Tyco Fire Products Page 12 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn 121.09 1.049 iT 0. 33 52.0 52. 0 K = 16.80 47S C=120 5. 00 -0.1 0.0 121 .09 3. 641 5. 33 19.4 52.0 Vel = 45.39 47 121 .09 71.2 K = 14 .35 PATH 5 FROM HYDRAULIC REFERENCE 41 TO D3 121. 13 1.049 1T 0 .34 52.0 52 . 0 K = 16.80 41S r-12n 5.00 -0.1 0.0 121. 13 3.643 5.34 19.4 52 .0 Vel = 45. 41 3.260 10 .00 71.3 71. 3 EqK = 14 .35 41 C=120 0. 00 0.1 0 .0 110 .88 0.012 10.00 0.1 71.3 Vel = 4. 30 121 .31 3.260 1E 40 .03 71 .5 71.5 EqK = 14.35 40 0=120 iT 22 .00 0.8 0.0 232. 18 0.049 62 .03 3.0 71 . 5 Vel = 9.01 D3 232. 18 . 75.3 K = 26.76 121.31 1 .049 1T 0 .34 52.1 52 .1 K = 16.80 40S C=120 5.00 -0.1 0.0 121. 31 3. 653 5.34 19.5 52.1 Vel = 45. 47 40 121. 31 71. 5 K = 14.35 PATH 6 FROM HYDRAULIC REFERENCE 41 TO A3 121. 13 1.049 1V. 0 .34 52.0 52 .0 K = 16.80 41S C=120 5. 00 -0. 1 0.0 121 . 13 3. 643 5.34 19.4 52.0 Vel = 45.41 3.260 10 . 00 71 .3 71 .3 EqK = 14 .35 41 C=120 0.00 -0. 1 0. 0 10.25 0.000 10 .00 0.0 71 .3 Vel = 0.40 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. N. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 13 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 6 FROM HYDRAULIC REFERENCE 41 TO A3 CONTINUED 121.06 3.260 10.00 71.2 71.2 EqK = 14 . 35 42 C=120 0.00 -0.1 0.0 131 .32 0.017 10.00 0.2 71.2 Vel = 5.10 121. 14 3.260 lE 37 . 64 71.3 71.3 EqK = 14 .35 43 C=120 1T 22.00 0.1 0.0 252.46 0.057 59. 64 3.4 71 .3 Vel = 9.80 n3 252 . 46 . 74 .7 K = 29.20 121.06 1 . 049 1T 0.33 51 .9 51.9 K = 16.80 42S C=120 5.00 -0. 1 0.0 121 .06 3. 640 5.33 19.4 51. 9 Vel = 45.38 42 121 .06 71 .2 K = 14.35 121.14 1 .049 1T 0.33 52 .0 52 .0 K = 16.80 43S C=120 5.00 -0.1 0. 0 121. 14 3. 644 5.33 19.4 52.0 Vel = 45. 41 43 121.14 71.3 K = 14 .35 PATH 7 FROM HYDRAULIC REFERENCE D4 TO A4 50.39 3.260 2E 107 .67 75.4 75.4 D4 C=120 2T 44.00 -1 .0 0.0 See PATH 1 50.39 0'.003 151. 67 0.4 75. 4 Vel = 1. 96 A4 50.39 74 . 9 K = 5.82 PATH 8 FROM HYDRAULIC REFERENCE D5 TO A5 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Tyco Fire Products Page 14 HYD. Qa . DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 8 FROM HYDRAULIC REFERENCE D5 TO A5 CONTINUED 53.29 3.260 2E 107 . 67 75.5 75.5 D5 C=120 2T 44 . 00 -1.0 0.0 See PATH 1 53.29 0.003 151. 67 0.5 75.5 Vel = 2.07 A5 53.29 75.0 K = 6. 15 T%M.A. A TnT/s%f TTVTDATTT rt DLt'L7L7D47T.T"L7 TC TA 21C. rtfan 7 liNYVA DiaLl1MWallY LtiC L1T\.L' LV ay iiV 58 .28 3.260 2E 107. 67 75. 6 75. 6 D6 C=120 2T 44 .00 -1 .0 0.0 See PATH 1 58 .28 0.004 151. 67 0. 6 75. 6 Vel = 2 .26 A6 58 .28 75.2 K = 6.72 PATH 10 FROM HYDRAULIC REFERENCE D7 TO A7 65.04 3.260 2E 107 . 67 75.7 75.7 D7 C=120 2T 44 . 00 -1 .0 0.0 See PATH 1 65. 04 0.005 151. 67 0.7 75.7 Vel = 2.52 A7 65.04 75.4 K = 7 .49 , PATH 11 FROM HYDRAULIC REFERENCE D8 TO A8 73. 02 3.260 2E 107 . 67 75.7 75.7 D8 C=120 2T 44 . 00 -1.0 0.0 See PATH 1 73.02 0.006 151 . 67 0.9 75.7 Vel = 2. 83 A8 73.02 75.6 K = 8 . 40 PATH 12 FROM HYDRAULIC REFERENCE D9 TO A9 , UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 15 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 12 FROM HYDRAULIC REFERENCE D9 TO A9 CONTINUED 82 .27 3.260 2E 107. 67 75.8 75.8 D9 C=120 2T 44 .00 -1. 0 0.0 See PATH 1 82 .27 0. 007 151. 67 1 .1 75.8 Vel = 3.19 A9 82 .27 75. 9 K = 9. 45 PATH 13 FROM HYD:"'UT IC REFERENCE D10 TO R10 92 .99 3.260 2E 107 . 67 75.8 75.8 D10 C=120 2T 44 .00 -1 .0 0.0 See PATH 1 92 .99 0 . 009 151. 67 1. 4 75. 8 Vel = 3. 61 A10 92 . 99 76.2 K = 10. 66 PATH 14 FROM HYDRAULIC REFERENCE Dli TO All 104 .47 3.260 2E 107 . 67 75.8 75.8 Dli C=120 2T 44 .00 -1 .0 0.0 See PATH 1 104.47 0.011 151 . 67 1 .7 75.8 Vel = 4.05 All 104 . 47 76.5 K = 11. 94 PATH 15 FROM HYDRAULIC REFERENCE G1 TO A18 400.07 6.357 1T 2 .25 78 . 6 78 .6 GI C=120 30 .00 0.0 0.0 See PATH 1 400.07 0 .005 32.25 0.2 78 . 6 Vel = 4 .08 -47 .72 6.357 8 .25 78 .8 78 .8 B12 C=120 0 .00 0.0 0.0 See PATH 16 352.34 0.004 8 .25 0. 0 78 .8 Vel = 3.60 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 16 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 15 FROM HYDRAULIC REFERENCE G1 TO A18 CONTINUED -43.25 6.357 8 .25 78 . 8 78 .8 B11 C=120 0.00 0. 0 0.0 See PATH 17 309.09 0.003 8 .25 0. 0 78 .8 Vel = 3.16 -39.45 6.357 8 .50 78 . 8 78 .8 B10 C=120 0 . 00 0.0 0.0 See PATH 18 269. 64 0.002 8 .50 0 .0 78 .8 Vel = 2.75 -36. 17 6.357 8 .25 78 . 9 78 . 9 B9 C=120 n_nn n_ n n.n Sea. PATH 19 233. 47 0.002 8 .25 0.0 78 . 9 Vel = 2 .38 -33.55 6. 357 8 .25 78 . 9 78 . 9 B8 C=120 0. 00 0.0 0.0 See PATH 20 199. 91 0.001 8 .25 0.0 78 . 9 Vel = 2 .04 -31.47 6.357 8 .50 78.9 78 .9 B7 C=120 0.00 0.0 0.0 See PATH 21 168 .44 0.001 8 .50 0.0 78 . 9 Vel = 1.72 -29.83 6.357 8 .25 78 . 9 78 . 9 B6 C=120 0 .00 0.0 0.0 See PATH 22 138 .61 0.001 8 .25 0.0 78 .9 Vel = 1.41 -28 . 67 6.357 7 .50 78 .9 78 . 9 B5 C=120 0.00 0.0 0.0 See PATH 23 109. 95 0.000 7.50 0.0 78 . 9 Vel = 1.12 -27.96 6.357 8 .50 78 . 9 78 . 9 B4 C=120 0. 00 0.0 0. 0 See PATH 24 81 .98 0.000 8 . 50 0.0 78 .9 Vel = 0.84 -27 .49 6.357 8.25 78 . 9 78 . 9 B3 C=120 0. 00 0. 0 0.0 See PATH 25 54 . 49 0.000 8 .25 0.0 78 . 9 Vel = 0.56 -27.21 3.260 1E 39.38 78 . 9 78 . 9 B2 C=120 1T 22. 00 -1 . 8 0.0 See PATH 26 27.27 0.001 61.38 0 . 1 78 . 9 Vel = 1.06 3.260 10.01 77.2 77.2 26 C=120 0.00 -0 .2 0. 0 27 .27 0.001 10.01 0. 0 . 77 .2 Vel = 1.06 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 17 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 15 FROM HYDRAULIC REFERENCE G1 TO A18 CONTINUED 3.260 10 .01 77. 0 77.0 27 C=120 0.00 -0.0 0.0 27 .27 0. 001 10 .01 0.0 77.0 Vel = 1 . 06 3.260 10. 01 77 .0 77 .0 28 C=120 0.00 0.2 0.0 27 .27 0.001 10.01 0.0 77 .0 Vel = 1.06 3.260 1E 41 . 64 77.2 77 .2 ni m-1 n n 1 m 7!) n n 1 0 n n G1 V-1GU 11 GG.UU 1.0 U. 0 27 .27 0.001 63. 64 0.1 77 .2 Vel = 1.06 27 .21 6.357 8 .25 79.1 79. 1 E2 C=120 0.00 0.0 0.0 See PATH 26 54 .49 0.000 8 .25 0.0 79.1 Vel = 0.56 27.49 6.357 8 .50 79. 1 79. 1 E3 C=120 0.00 0.0 0.0 See PATH 25 81.98 0.000 8 .50 0.0 79.1 Vel = 0.84 27 .96 6.357 7.50 79. 1 79.1 E4 C=120 0.00 0.0 0. 0 See PATH 24 109. 95 0.000 7 .50 0.0 79. 1 Vel = 1 . 12 28 . 67 6.357 8 .25 79.1 79. 1 E5 C=120 0.00 0.0 0.0 See PATH 23 138 . 61 0.001 8 .25 0.0 79.1 Vel = 1.41 29.83 6.357 8 .50 79. 1 79. 1 E6 C=120 0.00 0. 0 0.0 See PATH 22 168 . 44 0.001 8.50 0 .0 79.1 Vel = 1 .72 31 .47 6.357 8.25 79. 1 79. 1 E7 C=120 0.00 0. 0 0.0 See PATH 21 199. 91 0. 001 8.25 0.0 79.1 Vel = 2 .04 33.55 6. 357 8.25 79. 1 79. 1 E8 C=120 0. 00 0. 0 0.0 See PATH 20 233.47 0. 002 8 .25 0. 0 79. 1 Vel = 2.38 36.17 6. 357 8 . 50 79. 1 79.1 E9 C=120 0.00 0. 0 0.0 See PATH 19 269.64 0 .002 8 .50 0. 0 79.1 Vel = 2.75 • UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 18 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 15 FROM HYDRAULIC REFERENCE G1 TO A18 CONTINUED 39. 45 6.357 8 .25 79.1 79.1 E10 C=120 0. 00 0.0 0.0 See PATH 18 309. 09 0.003 8 .25 0.0 79.1 Vel = 3.16 43.25 6.357 8 .25. 79. 1 79. 1 Ell C=120 0. 00 0.0 0.0 See PATH 17 352. 34 0.004 8 .25 0. 0 79.1 Vel = 3. 60 47 .72 6.357 8 . 50 79.2 79.2 E12 0=i20 0. 00 0.0 0.0 See PATH 16 400. 07 0.005 8 . 50 0.0 79.2 Vel = 4 .08 -53.86 6. 357 8 .25 79.2 79.2 E13 C=120 0 .00 0.0 0.0 See PATH 27 346.21 0.004 8 .25 0.0 79.2 Vel = 3.53 -66.78 6.357 8 .25 79.3 79.3 E14 C=120 0.00 0.0 0.0 See PATH 28 279. 43 0.003 8 .25 0.0 79.3 Vel = 2 .85 -79. 63 6.357 8 .50 79.3 79.3 El5 C=120 0.00 0. 0 0.0 See PATH 29 199.80 0.001 8 .50 0.0 79.3 Vel = 2 .04 -93. 13 6.357 8 .25 79.3 79.3 E16 C=120 0 .00 0.0 0.0 See PATH 30 106. 68 0.000 8 .25 0.0 79.3 Vel = 1.09 3.260 2E 111 .05 79.3 79.3 E17 0=120 2T 44 .00 0. 0 0.0 106. 68 0 .012 155.05 1.8 79.3 Vel = 4 . 14 A18 106. 68 81.1 K = 11. 85 PATH 16 FROM HYDRAULIC REFERENCE B12 TO E12 47 .72 3.260 2E 111 . 05 78 .8 78 .8 B12 C=120 2T 44 .00 0.0 0. 0 See PATH 15 47 .72 0. 003 155.05 0.4 78 .8 Vel = 1.85 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W.. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 19 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn E12 47 .72 79.2 K = 5.36 PATH 17 FROM HYDRAULIC REFERENCE B11 TO Ell 43.25 3.260 2E 111.05 78 .8 78 . 8 B11 C=120 2T 44 . 00 0.0 0.0 See PATH 15 43.25 0.002 155. 05 0.3 78 .8 Vel = 1. 68 Ell 43.25 7 9.1 K = 4 R PATH 18 FROM HYDRAULIC REFERENCE B10 TO E10 39.45 3.260 2E 111.05 78 .8 78 .8 B10 C=120 2T 44.00 0 .0 0.0 See PATH 15 I ' 39.45 0.002 155.05 0.3 78 .8 Vel = 1.53 E10 39. 45 79.1 K = 4 . 44 PATH 19 FROM HYDRAULIC REFERENCE B9 TO E9 36.17 3.260 2E 111. 05 78 .9 78. 9 B9 C=120 2T 44 .00 0 .0 0.0 See PATH 15 36. 17 0.002 155.05 0.2 78 .9 Vel = 1. 40 E9 36.17 _ 79. 1 K = 4 .07 PATH 20 FROM HYDRAULIC REFERENCE B8 TO E8 33. 55 3.260 2E 111. 05 78 .9 78 .9 B8 C=120 2T 44 .00 0 .0 0.0 See PATH 15 33.55 0 .001 155.05 0.2 78 . 9 Vel = 1.30 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 20 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn E8 33.55 79.1 K = 3.77 PATH 21 FROM HYDRAULIC REFERENCE B7 TO E7 31. 4.7 3.260 2E 111.05 78 .9 78 .9 B7 C=120 2T 44 . 00 0.0 0.0 See PATH 15 31 . 47 0.001 155.05 0.2 78 .9 Vel = 1.22 E7 31. 47 79.1 K = 3,54 PATH 22 FROM HYDRAULIC REFERENCE B6 TO E6 29.83 3.260 2E 111. 05 78 . 9 7.8 .9 B6 C=120 2T 44.00 0.0 0.0 See PATH 15 29.83 0.001 155.05 0.2 78 . 9 Vel = 1.16 E6 29.83 79.1 K = 3.35 PATH 23 FROM HYDRAULIC REFERENCE B5 TO E5 28 . 67 3.260 2E 111.05 78 .9 78 . 9 B5 C=120 2T 44.00 0 .0 0.0 See PATH 15 28 . 67 0.001 155.05 0.2 78 .9 Vel = 1 .11 E5 28 . 67 79. 1 K = 3.22 PATH 24 FROM HYDRAULIC REFERENCE B4 TO E4 27. 96 3.260 2E 111.05 78 . 9 78 .9 B4 C=120 2T 44 . 00 0.0 0.0 See PATH 15 27 .96 0.001 155. 05 0.1 78 .9 Vel = 1.09 UNITS -DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 21 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn E4 27 . 96 79.1 K = 3. 15 PATH 25 FROM HYDRAULIC REFERENCE B3 TO E3 27 . 49 3.260 lE 39.38 78 .9 78 .9 B3 C=120 1T 22 . 00 -1.8 0. 0 See PATH 15 27 .49 0.001 61. 38 0.1 78 . 9 Vel = 1.07 3.260 10.01 77 .2 77.2 23 L J C=1 L 0 0. 00 -0 .2 0. 0 27 . 49 0.001 10 .01 0.0 77 .2 Vel = 1.07 3.260 10 . 01 77 .0 77 .0 24 C=120 0.00 -0.0 0.0 27 .49 0.001 10.01 0. 0 77 .0 Vel = 1.07 3.260 10. 01 77 .0 77. 0 25 C=120 0.00 0 .2 0.0 27.49 0.001 10. 01 0.0 77 .0 Vel = 1. 07 3.260 1E 41. 64 77 .2 77 .2 20 C=120 1T 22 . 00 1.8 0.0 27.49 0.001 63. 64 0.1 77.2 Vel = 1 .07 E3 27.49 79. 1 K = 3.09 I PATH 26 FROM HYDRAULIC REFERENCE B2 TO E2 27 .21 6.357 8.25 78 .9 78 . 9 B2 C=120 0.00 0 .0 0.0 See PATH 15 27.21 0.000 8 .25 0 .0 78 .9 Vel = 0 .28 3.260 lE 39.38 78 . 9 78 . 9 B1 C=120 1T 22 . 00 -1 . 8 0.0-- 27 .21 0.001 61. 38 0. 1 78 .9 Vel = 1. 06 3.260 10. 01 77.2 77 .2 29 C=120 0 . 00 -0.2 0 .0 27 .21 0.001 10 . 01 0.0 77 .2 Vel = 1 .06 • UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11 :24 Tyco Fire Products Page 22 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 26 FROM HYDRAULIC REFERENCE B2 TO E2 CONTINUED 3.260 10.01 77. 0 77 .0 30 C=120 0.00 -0.0 0. 0 27.21 0.001 10.01 0.0 77.0 Vel = 1.06 3.260 10.01 77 .0 77 . 0 31 C=120 0.00 0 .2 0.0 27 .21 0.001 10.01 0.0 77 . 0 Vel = 1.06 3.260 lE 41 . 64 77 .2 77 .2 22 C=120 1T 22 .00 1 .8 0. 0 L L • V V . • 27 .21 0.001 63. 64 0 .1 77 .2 Vel = 1.06 6.357 8 .25 79. 1 79. 1 El C=120 0.00 0.0 0.0 ` 27 .21 0.000 8 .25 0.0 79. 1 Vel = 0.28 E2 27.21 79.1 K = 3.06 PATH 27 FROM HYDRAULIC REFERENCE E13 TO A14 53.86 3.260 2E 111.05 79.2 79.2 E13 C=120 2T 44 .00 0.0 0 .0 See PATH 15 53.86 0.003 155.05 0.5 79.2 Vel = 2. 09 A14 53. 86 79.7 K = 6.03 PATH 28 FROM HYDRAULIC REFERENCE E14 TO A15 66.78 3.260 2E 111.05 79.3 79.3 E14 C=120 2T ' 44 . 00 0.0 0.0 See PATH 15 66.78 0.005 155.05 0.8 79.3 Vel = 2.59 A15 66.78 80. 0 K = 7.47 PATH 29 FROM. HYDRAULIC REFERENCE E15 TO A16 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/12/09 11:24 Tyco Fire Products Page 23 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 29 FROM HYDRAULIC REFERENCE E15 TO A16 CONTINUED 79. 63 3.260 2E 111.05 79.3 79.3 E15 C=120 2T 44.00 0. 0 0.0 See PATH 15 79. 63 0. 007 155.05 1.0 79.3 Vel = 3.09 A16 79. 63 80.3 K = 8 . 88 DlITH 'I!1 W4(1M T7YTIGATTT.T(` AS.'.wF!RF Tf`T! rig TCl Al7 93. 13 3.260 2E 111 .05 79.3 79.3 E16 C=120 2T 44 .00 0 .0 0.0 See PATH 15 93.13 0.009 155.05 1. 4 79.3 Vel = 3. 61 A17 93.13 80.7 K = 10.37 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) JOb vva[rr ••..M.. •~" F. W. Webb Company Static Pres: 75.0 psi Pressure: 46.6 psi In: 0 gpm Rtd Pres: 80 psi 0 1 1500 i 108 Breeds Hill Road Resid. Pres: 70.0 psi Sys Flow: 1453 gpm Out: 250 gpm Rtd Flow: 1500 gpm 2250 ' Barnstable, MA. 02601 Flow: 1290 gpm Sys+Hose: 1703 gpm 0 Remote Area: 3 Date: 2/17/09 Safety Pres: 20.0 psi 0 . Loc: Hydrants on Breeds Hill R Hd Ely Pres: 16.9 psi 140 120 . 100 80 5 0-- Sup'jy I — 60 • 250 gpm hose 0 40 - ---- 20 6.9 psi r 400 600 800 1000 1200 1400 1600 1800 2000 Flow (gpm) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 HYDRAULIC DESIGN INFORMATION SHEET Job Name: F. W. Webb Company Location: 108 Breeds Hill Road Barnstable, MA. 02601 •Drawing Date: 05/05/09 Remote Area Number: 4 Contractor: Rustic Fire Protection, Inc. Telephone:508-431-9938 www.rusticfireprotection.com 320 West Main Street • Norton, MA. 02766 Designer: GDM Calculated By:SprinkCAD www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: Steel Occupancy:Mixed Reviewing Authorities:Barnstable Fire Dept. SYSTEM DESIGN Code:NFPA 13 Hazard:Ordinary II System Type:WET Area of Sprinkler Oper. 1500 sq ftI Sprinkler or Nozzle Density (gpm/sq ft) 0.200 I Make: VICTAUL Area per Sprinkler 196.0 sq ftl Model: V2707 Hose Allowance Inside 0 gpm I K-Factor: 5. 60. Hose Allowance Outside 500 gpm I Temperature Rating: 155 CALCULATION SUMMARY 10 Flowing Outlets gpm Required: 900. 9 psi Required: 57.8 @ City Supply WATER SUPPLY Water Flow Test Pump Data Date of Test 2/17/09 Rated Capacity 1500 gpm Static Pressure 75.0 psi Rated Pressure 80.0 psi Residual Pres 70.0 psi Elevation 0 At a Flow of 1290 gpm Make: Peerles Elevation 0" Model: Location: Hydrants on Breeds Hill Rd. Source of Information: Barnstable Water Dept. SYSTEM VOLUME 3267 Gallons Notes: 174, • o R,MUMS FIRE PROTEOTIOR 4 F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 :20 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 4 401 131.8 psi 1 6" Grvd Alarm Valve "G" CHART LOSS 401 0 .1 1 8" x 6" Flngd Reducer 0' 120 8 .071 401 0.0 1 80 psi@1500 gpm PUMP Peerles Pump CHART BOOST 401 87.3 2 8" Flngd Gate Valve "721U" PIV 8 ' 120 8.071 401 0.0 ' 1 8" Flngd Back Flow Valve Ames "4000 CHART LOSS 401 9.2 Elevation Change 8 ' 6" 3.7 Fixed Flow Inside Hose Stream 0 gpm Total Loss. for Riser -74.3 psi Hydr Ref R1 Required at Base of Riser 401 57.4 psi 5 8" Flngd 90 Ell 90 ' 120 8 .071 401 0.2 1 Pipe 8CD ulx18 Ci 350 180' 140 8 .488 401 0.2 Fixed Flow Outside Hose Stream 500 gpm Total Loss for Underground 0.3 psi Hydr Ref R2 Required at City Supply 901 57.8 psi Water Source 75.0 psi static, 70.0 psi residual @ 1290 gpm 901 gpm 72.4 psi SAFETY PRESSURE 14.7 psi Available Pressure of 72.4 psi Exceeds Required Pressure of 57.8 psi This is a safety margin of 14.7 psi or 20 % of Supply Maximum Water Velocity is 25.2 fps • F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 Page 3 • FITTING NAME TABLE ABBREV. NAME C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND • HYD REF Hydraulic reference. Refer to accompanying flow diagram. rz F7�rmrD Fl^,•, factor for npen hmmA nr path ;.;here F1 rm (gpm\ = K x -\/P. i� �.i vi. Flow Y f �7L""� Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG' S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0.433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4.52 x (Q/C) ^1.85 / ID^4 .87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0. 01 psi. Pressures are listed to 0 .1 psi. Addition may vary by 0. 1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 :20 Page 4 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL 1 NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 20 30.46 115.8 21 30.46 115.8 22 30. 46 115.8 23 30.41 115. 8 24 30.86 115. 6 25 30.90 115. 6 26 30.41 115.8 27 30.86 115. 6 28 30. 90 115. 6 29 30.41 115.8 30 30. 86 115. 6 31 30.90 115. 6 40 94 .88 118 .9 41 25.09 118 .1 42 25.29 118 . 1 43 25.50 118.0 44 24 .88 118 .2 45 25.09 118 .1 46 25.29 118 .1 47 25.50 118.0 48 24 .88 118 .2 49 25.09 118 .1 50 25.29 118 .1 51 25.50 118 .0 60 23.25 36.9 60S 22.00 5.60 36.4 33.8 22.4 0.30 61 23.25 36.4 61S 22.00 5.60 35. 9 33.5 22.4 0.30 62 23.25 54 .3 62S 22.00 5. 60 53.3 40. 9 39.2 0.21 63 23.25 • 50.5 63S 22 .00 5. 60 49.5 39. 4 39.2 0.20 64 23.25 52. 0 64S 22.00 5. 60 51.0 40.0 39.2 0.20 65 23.25 49. 9 65S 22.00 5.60 49.0 39.2 39.2 0.20 66 23.25 62. 9 66S 22 .00 5. 60 61. 6 44 .0 39.2 0.22 67 23.25 60.9 67S 22.00 5. 60 59.7 43.3 39.2 0.22 68 23.25 61 .1 68S 22. 00 5. 60 59. 9 43.3 39.2 0.22 69 23.25 61 .7 69S 22 .00 5. 60 60. 4 43.5 39.2 0.22 82 23.00 79.5 83 23.00 76.1 84 23. 00 74 .0 85 23. 00 73. 3 86 23.00 57 .3 87 23.00 73.2 88 23.00 91 . 6 F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 Page 5 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^ ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) 89 23.00 89. 9 90 23.00 89.1 91 23.00 88 .8 Al 25.33 118 .0 A2 25.33 118 .0 A3 25.33 118 .0 A4 25.33 118 .0 A5 25.33 118.0 A6 25.33 118.0 A7 25.33 118 .0 A8 25.33 118 .0 A9 25.33 118 .0 A10 25.33 118 .0 All 25.33 118 .0 Al2 25.33 118 .0 A13 25.33 118 .0 A14 26.25 117. 6 A15 26.25 117 . E A16 26.25 117. 6 A17 26.25 117. 6 Al8 26.25 117 . 6 A19 9.08 125.2 A20 3.00 128.0 B1 26.25 117. 6 B2 26.25 117. 6 B3 26.25 117. 6 B4 26.25 117. 6 B5 26.25 117 . E B6 26.25 117 . 6 B7 26.25 117. 6 B8 26.25 117. 6 B9 26.25 117 . 6 B10 26.25 117. E 811 26.25 117 . 6 , B12 26.25 117 . 6 C4 23.00 109.3 C5 23.00 109.5 C6 10.83 124 .2 D1 23.08 119.0 D2 23.08 119.0 D3 23.08 119. 0 D4 23.08 119.0 D5 23. 08 • 119.0 D6 23.08 119.0 D7 23.08 ` . 119.0 D8 23.08 119.0 D9 23.08 119.0 D10 23.08 119.0 Dll 23.08 119.0 ` xD12 23.08 119.0 El 26.25 117 . 6 1 F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 Page 6 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI' ) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) E2 26.25 117. 6 E3 26.25 117.6 E4 26.25 117 . 6 E5 26.25 117. 6 E6 26.25 117. 6 E7 26.25 117. 6 E8 26.25 117. 6 E9 26.25 117. 6 E10 26.25 117 .6 Ell 26.25 117 . 6 E12 26.25 117 . 6 E13 26.25 117. 6 E14 26.25 117E E15 26.25 117. 6 E16 26.25 117 . 6 E17 26.25 117 . 6 Fl 12 . 67 119. 1 F2 10.83 123. 6 G1 26.25 117 . 6 H1 10.83 124 .3 W -5.50 131.8 Max velocity of 25.23 occurs in the pipe from 86 TO 85 Nodes with "S" indicate a node at the top of a sprig or bottom of drop pendent. The node without an "S" is on the branch. F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 i" Tyco Fire Products Page 7 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 61 TO W (PRIMARY PATH) 33. 54 1 .049 lE 1.25 35. 9 35.9 K = 5. 60 61S C=120 2.00 -0.5 0.0 33.54 0 . 339 3.25 1 . 1 35. 9 Vel = 12 .57 1.049 2E 52.36 36.4 36.4 EqK = 5. 56 61 C=120 1T 9.00 0. 1 0.0 33.54 0.339 61.36 20.8 36.4 Vel = 12 .57 33.76 1 .049 1T 8 .00 57 .3 57 .3 86 C=120 5.00 0.0 0.0 gee PATH 2 67 .30 1.228 13.00 16.0 57.3 Vel = 25.23 39.20 2 .157 8 .11 73.3 73.3 85 C=120 0.00 0.0 0.0 See PATH 3 106.50 0.086 8 .11 0.7 73.3 Vel = 9.44 39.41 2 . 157 14 . 00 74.0 74 .0 84 C=120 0.00 0.0 0. 0 See PATH 4 145. 91 0.154 14.00 2.2 74 .0 Vel = 12. 94 39.99 2.157 14 .00 76.1 76.1 83 C=120 0.00 0 .0 0.0 See PATH 5 185.90 0.240 14 .00 3.4 76.1 Vel = 16.48 40.88 2 .157 2E 65. 96 79.5 79.5 82 C=120 1T 20.00 0.0 0.0 See PATH 6 226.79 0.347 85.96 29.9 79.5 Vel = 20.11 4 .260 12 .00 109.3 109. 3 C4 C=120 0.00 0 .0 0.0 226.79 0.013 12.00 0.2 109.3 Vel = 5.15 174 .08 4 .260 1E 91.02 109.5 109.5 C5 C=120 2T 50.00 4 .5 0.0 See PATH 7 400.86 0. 036 141. 02 5. 1 109. 5 Vel = 9. 11 4 .260 2E 42.47 119. 1 119. 1 F1 C=120 2T 60.00 0 . 8 0.0 400. 86 0. 036 102 .47 3.7 119. 1 Vel = 9. 11 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 :20 Tyco Fire Products Page 8 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 61 TO W (PRIMARY PATH) • 4 .260 lE 6.04 123. 6 123. 6 F2 C=120 10. 00 0.0 0. 0 400.86 0.036 16.04 0. 6 123. 6 Vel = 9.11 6.357 1T 0.46 124 .2 124 .2 C6 C=120 30 .00 0.0 0. 0 400.86 0 .005 30.46 0.2 124 .2 Vel = 4 .09 6.357 lE 1.75 124.3 124.3 H1 C=l20 l4 ,n0 n.8 n. 0 400.86 0.005 15.75 0.1 124.3 Vel = 4 .09 6.357 2E 7 .26 125.2 125.2 A19 C=120 28 .00 2 . 6 0. 0 400.86 0.005 35.26 0.2 125.2 Vel = 4.09 8 .249 2E 22 .82 128 .0 128. 0 A20 C=120 36.00 3.7 0.0 400.86 0.001 58 .82 0.1 128 .0 Vel = 2.43 W 400.86 131 .8 K = 34. 92 PATH 2 FROM HYDRAULIC REFERENCE 60 TO 86 33.76 1.049 lE 1 .25 36.4 36.4 K = 5. 60 60S C=120 2 .00 -0.5 0.0 33.76 0.343 3.25 1. 1 36.4 Vel = 12. 66 1 .049 2E 50.14 36. 9 36.9 EqK = 5.56 60 C=120 1T 9.00 0.1 0.0 33.76 0.343 59.14, 20.3 36.9 Vel = 12. 66 86 33.76 57.3 K = 4 .46 PATH 3 FROM HYDRAULIC REFERENCE 65 TO 85 39.20 1.049 1E 1 .25 49.0 49. 0 K = 5. 60 65S C=120 - 2.00 -0. 5 0.0 39.20 0.452 3.25 1 .5 49.0 Vel = 14 . 69 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW '(GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11 :20 Tyco Fire Products Page 9 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 3 FROM HYDRAULIC REFERENCE 65 TO 85 CONTINUED 1 . 049 lE 44 .25 49. 9 49. 9 EqK = 5. 55 65 C=120 1T 7 .00 0. 1 0. 0 39.20 0. 452 51 .25 23.2 49. 9 Vel = 14. 69 2.157 5. 89 73.2 73.2 87 C=120 0. 00 0.0 0. 0 39.20 0 .014 5. 89 0. 1 73.2 Vel = 3.48 oL on on V.J JJ.L.V 73. 3 K - 458 PATH 4 FROM HYDRAULIC REFERENCE 63 TO 84 39.41 1 .049 lE 1 .25 49.5 49.5 K = 5.60 63S C=120 2.00 -0 .5 0.0 39.41 0.456 3.25 1.5 49.5 Vel = 14 .77 1. 049 lE 44 .25 50.5 50.5 EqK = 5.55 63 0=120 1T . 7 . 00 0.1 0. 0 39. 41 0. 456 51.25 23.4 50.5 Vel = 14 .77 84 39.41 74 .0 K = 4 .58 PATH 5 FROM HYDRAULIC REFERENCE 64 TO 83 39. 99 1 .049 lE 1 .25 51.0 51 .0 K = 5. 60 64S C=120 2 . 00 -0.5 0.0 39.99 0.469 3.25 1 .5 51 .0 Vel = 14 . 99 1 .049 lE 44.25 52 .0 52.0 EqK = 5.55 64 0=120 1T 7 .00 0.1 0. 0 39. 99 0. 469 51 .25 24 .0 52.0 Vel = 14. 99 83 39. 99 76.1 K = 4 .58 . UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 ` Tyco Fire Products Page 10 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 6 FROM HYDRAULIC REFERENCE 62 TO 82 40.88 1. 049 lE 1 .25 53.3 53.3 K = 5. 60 62S C=120 2.00 -0. 5 0.0 40.88 0. 488 3.25 1. 6 53.3 Vel = 15.33 1 . 049 lE 44.25 54.3 54 .3 EqK = 5. 55 62 C=120 1T 7 .00 0. 1 0.0 40.88 0. 488 51 .25 25.0 54 .3 Vel = 15.33 82 40.88 79.5 K = 4.59 PATH 7 FROM HYDRAULIC REFERENCE 67 TO C5 43.27 1. 049 1E 1.25 59.7 59.7 K = 5. 60 67S C=120 2 .00 -0.5 0. 0. 43.27 0.542 3.25 1 .8 59.7 Vel = 16.22 1.049 lE 44 .25 60.9 60.9 EqK = 5.54 67 C=120 1T 7.00 0.1 0.0 43.27 0. 542 51.25 27.8 60.9 Vel = 16.22 2. 157 14.00 88 .8 88 . 8 91 C=120 0.00 0. 0 0.0 43.27 0.016 14 .00 0.2 88 .8 Vel = 3.84 43.32 2. 157 14 .00 89.1 89.1 90 C=120 0. 00 0.0 0. 0 See PATH 8 86.59 0.058 14.00 0.8 89.1 Vel = 7. 68 43.53 2 . 157 14. 00 89. 9 89. 9 89 C=120 0.00 0.0 0.0 See PATH 9 130. 12 0 . 124 14 .00 1.7 89. 9 Vel = 11 .54 43. 96 2 . 157 2E 63. 96 91. 6 91. 6 88 C=120 1T 20. 00 0.0 0. 0 See PATH 10 174 . 08 0.213 83. 96 17 . 9 91 . 6 Vel = 15. 43 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 4' Tyco Fire Products Page 11 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn C5 174 .08 109.5 K = 16. 64 PATH 8 FROM HYDRAULIC REFERENCE 68 TO 90 43.32 1 .049 lE 1.25 59. 9 59.9 K = 5. 60 68S C=120 2 . 00 -0.5 0.0 43. 32 0.544 3.25 1 .8 59. 9 Vel = 16.24 1 .049 1E 44 .25 61. 1 61. 1 EqK = 5. 54 68 C=120 1T 7. 00 0.1 0.0 43.32 0. 544 51.25 27 . 9 61.1 Vel = 16.24 90 43.32 89.1 K = 4.59 PATH 9 FROM HYDRAULIC REFERENCE 69 TO 89 43.53 1.049 lE 1 .25 60.4 60.4 K = 5. 60 69S C=120 2 .00 -0.5 0.0 43.53 0.549 3.25 1 .8 60.4 Vel = 16.32 1 .049 lE 44 .25 61.7 61.7 EqK = 5.54 69 C=120 1T 7 . 00 0.1 . 0.0 43.53 0.549 51.25 28 .1 61.7 Vel. = 16.32 89 43.53 89.9 K = 4 .59 PATH 10 FROM HYDRAULIC REFERENCE 66 TO 88 43.96 1 .049 lE 1.25 61 . 6 61 . 6 K = 5. 60 66S C=120 2 . 00 -0.5 0.0 43.96 0. 559 3.25 1 .8 61 . 6 Vel = 16. 48 1 .049 lE 44 .25 62 . 9 62 . 9 EqK = 5.54 66 C=120 1T 7. 00 0. 1 0. 0 43.96 0.559 51 .25 28 . 6 62 . 9 Vel = 16. 48 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) F. W. Webb Company Drawing Date:05/05/09 5/11/09 11:20 9 Tyco Fire Products Page 12 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn 88 43. 96 91 . 6 K = 4 .59 • UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) JOD vvaLGI ..,.._ F. W. Webb Company Static Pres: 75.0 psi Pressure: 57.8 psi In: 0 gpm Rtd Pres: 80 psi 0 6 108 Breeds Hill Road Resid. Pres: 70.0 psi Sys Flow: 401 gpm Out: 500 gpm Rtd Flow: 1500 gpm 1500 8 Barnstable, MA. 02601 Flow: 1290 gpm Sys+Hose: 901 gpm 2250 5 Remote Area: 4 Date: 2/17/09 Safety Pres: 14.7 psi 0 Loc: Hydrants on Breeds Hill R Hd Ely Pres: 15.6 psi 0 140 120 100 80 • -- z Supply i 60 500 gpm hose 40 20 F-15.6 psi 200 300 400 500 600 700 800 900 1000 Flow (gpm) PROJECT NAME: �iw,� 7- 5-n-LE vc__ l_p_ -/-,--0 ADDRESS:/DF & c(c /"` 9 `" ` ✓1 Ma et( , ee9-g_/v- PERMIT#0Z 9-(J l G c-E// PERMIT DATE: P O 7 M/P: 3i V G a 7 --0 3-- LARGE ROLLED PLANS ARE IN: BOX I I SLOT 13 - lk Data entered inMAPS program on: 1 Alo7 BY: --V------- q/wp fi les/archive ARCHIVED SPECIFICATIONS Year : ` Project Name: U4-66 Project Address: G &6?-8-235' /4' Map & Parcel # Permit number, if assigned: f ?-3 /( Permit date: ,7A TM Per Tom Perry, these Specification books must be kept indefinitely. Check with the Commissioner before discarding any of these documents. They can be moved to storage if needed. Archived Specs