HomeMy WebLinkAbout0045 DORCAS DRIVE r
w . q
X ad
i
w!'
,
° u
r
,
e�
µ
, Ru td7.
r
n
y M
,
, , n
•.r? �:air - �+ ._ b �.,, ,� 1¢ � � ,� ^� y
1.. ..y,. �``� a «4,,.= t;. +r-t � ,•"wk�F' :�u� i� d, oA' }.;+A ,q'A0e t
a
;a
t ,
,s
e '
e; RTC
i
dy
N
L}�
y
3
a=
Town of Barnstable IfluIlRdIlng
sirAB Post.This Card So That it is Visible From the Street-Approved Plans Must be Retained.on Job and this Card Must be Kept
BAMLL KAS& Posted Until Final Inspection HaYBeen gMade. ���' n�
11 J111
r ' Where a Certificate of Occupant is Re uired,such Buildingshall Not be Occupied until a Final Inspection has been made.
Permit No. B-20-2474 Applicant Name: David Richards Approvals
Date Issued: 09/08/2020 Current Use: Structure
Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 03/08/2021 Foundation:
Location: 45 DORCAS DRIVE, BARNS TABLE Map/Lot: 277-039 Zoning District: RG Sheathing:
Owner on Record: DUGAS,MARCY S TR Contractor Name: DAVID W RICHARDS Framing: 1
Address: 45 DORCAS DRIVE Contractor License: C5=101506 2
BARNSTABLE, MA 02630 Est. Proi ct Cost: $ 15,000.00 Chimney:
Description: Strip and remove one layer of old asphalt roofing and replace with Permit Fee: $76.50
like for like in color and style Insulation:
Fee Paid:: $76.50
Project Review Req: Date: 9/8/2020 Final:
Plumbing/Gas
ti
Rough Plumbing:
This permit shall be deemed abandoned and invalid unless the work afficial
uthorized by this permit is commenced within six months after issuant Final Plumbing:
All work authorized by this permit shall conform to the approved application and the approvedconstruction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. Final Gas:
re"provided on this ermit.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building-and-Fire-Officials a p p Electrical
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Service:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the.throat level before firest flue lining is installed Rough:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
Final:
5.Prior to Covering Structural Members(Frame Inspection)
6.Insulation Low Voltage Rough:
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons racting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
nBuilding plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
�o HomeWorks
T
Energy, Inc
BUILDING DEPT.
Insulation Affidavit DEC 0 2 2020
TOWN OF BAMSTABLE
HomeWorks Energy has installed insulation at the following address that meets or exceeds
Massachusetts building code and IIC requirements.
Project Address: Permit Number: B-20-3216
Marcy Dugas ,
45 Dorcas Drive
Barnstable Massachusetts 02630
Location Material Addt'I Thickness Final Assembly R-value
Attic Floor Owens Coming Fiberglass Batting 9" 49
Attic Floor Owens Coming Fiberglass Batting 6" 49
Sincerely,
Adam Glenn
CSL#106148
HomeWorks Energy Inc.
HomeWorks Energy
101 Station Landing,Suite 110
Medford,MA 02155 -
wxperm itti ng@ homeworksenergy.com
(781)205-2201
- t
i
TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION
Map Parcel Permit#
HealthT Division ®, Date Issued On I
Conservation Division a S Fee 9 g, f
Tax Collector
SLr=._1"1C SYSTEM MUST SE
Treasurer ,� r4 .. � INSTALLED IN COMPLIANCE
WITH TITLES
P, �` L ENVIRONMENTAL COD
Planning Dept. m-�, �l �e�fR ti,. .�4��, ;e.s �a �,� . ,;,� � C o." E AND
Date Definitive Plan Approved by Planning Board —a 6. TOWN REGULATIONS
11 4-
Historic-OKH Preservation/Hyannis t.
Project Street Address On r
Village S�c��lE'
Owner Sir-yen I Ncxr cy QoLnAo 5 Address 14 U kekiec n ize, 2,c rn3tcble
Telephone 6-0 �� (off- ace 9 3
Permit Request� 10r fc� inn fcb nc_iLl3
Square feet: 1 st floor: existing proposed 3I �j 2nd floor: existing proposed Total new
Valuation ���-� ® Zoning District Flood Plain Groundwater Overlay
Construction Type WocA rrck M e
Lot Size G r)aC) Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation.
Dwelling Type: Single Family Two Family ❑ Multi-Family(#units)
Age of Existing Structure Historic House: ❑Yes ❑No On Old King's Highway: Yes ❑ No
Basement Type: CA Full ❑Crawl ❑Walkout ❑Other
Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft) � 1
Number of Baths: Full: existing new 3 Half: existing new
Number of Bedrooms: existing new AV q -7
Total Room Count(not including baths): existing new First Floor Room Count
Heat Type and Fuel: N Gas ❑Oil ❑ Electric ❑Other
Central Air: ❑Yes � No Fireplaces: Existing New _ Existing wood/coal stove: ❑Yes ❑ No
Detached garage:❑existing ❑new size Pool:❑existing ❑new size Barn:❑existing ❑new size
Attached garage:❑existing L new size'!_�(, Shed:❑existing ❑new size Other:
Zoning Board of Appeals Authorization ❑ Appeal# Recorded❑
Commercial ❑Yes ❑ No If yes, site plan review#
Current Use Proposed Use
(� BUILDER INFORMATION "�y l6/
Name J e.' k rP Y ,r-
� -h cA_� Telephone Number r 5-b - 7 71 - �l �! 7 _
Address 10 L oc.v s} S�r e e 4 License# D'S Li c , # CS o®q 2,,y 7
r.l c,n r,► 0 () t Home Improvement Contractor# 11 a q 6 -7Li
Worker's Compensation# L4 r �r3 G c,
ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO V0_r-m 4)o Jh 1 CA,r-'d F, h
SIGNATURE 11 �7 DATE 01 — t�57 6-1
FOR OFFICIAL USE ONLY _
PERMIT NO.
DATE ISSUED f -
-MAP/PARCEL NO.
ADDRESS fi' , VILLAGE '
OWNER `=M 21
DATE OF INSPECTION`: r
FOUNDATION I
FRAME
INSULATION,
5 FIREPLACE
1
ELECTRICAL: ROUGH FINAL
PLUMBING: ROUGH.; _ , FINAL
GAS: ROUGH-, FINAL i
r FINAL BUILDING r ` r•s • ,
_ f
DATE CLOSED OUT = , `• s C
tit
' ASSOCIATION PLAN NO.'
ac—
f
P `
A
k
TOWN OF BARNSTABLE
CERTIFICATE OF OCCUPANCY
PA1�CEL ID 277 039 GEOBASE ID 43517 1 '
AD£�RESS 4�, DORCAS DRIVE PHOIE
ZIP
LOT :a` BLOCK_ LOT SIZE
DBA• DEVELOPMENT DISTRICT BA
PERMIT 54982 DESCRIPTION CERTIFICATE OF OCCUPANCY---BLDG.PMT#51532
PERMIT TYPE BCOO TITLE CERTIFICATE OF OCCUPANCY
I
CONTRACTORS: Department of Health, Safety
, ARCHITECTS:
and Environmental Services
TOTAL FEES:
BOND $.00 pk
CONSTRUCTION COSTS $.00
756 CERTIFICATE OF OCCUPANCY 1 PRIVATE P .*4
* ■ARNSTA13M +►
MASS.
1639. A�O�
BUILDING DIVISI
BY -� —�----�
DATE ISSUED 08/06/2001 EXPIRATION DATE j
I
EU-f T:�5�I G 1?1'Rl ITI
�►l PARCEL lb -2� �3CC? GEOBA E ID 435.1../ 1_
�IR � ICO OwF��.
C'&j3LGCI LC�Ts, aI
1)LA DEiIE:CiOPMI N1 DySrlRI_C T 3A"
PERMIT. 51!5 _i2 D'9'�'j'iS hl
CRIPTION RW 4 BERM SING GAM. HOI�E1j SE�WPT #200 —067
PERMIT TYPE f�C ILD i.F.'.L.1113. ►WEW RESIDIFINI IAL BLDG #?Mid
CONT.RACTORS- CONRAD jEEF'REY Department of Health, Safety
- and Envir`onme>ntal Services
` OTAf.? FEES: $908. 18 lINE
CONS4'TRUCT ION. COSTS $292.9L,1iO-00
S.CNGLE ?�kZZtIA'I;F 1,k'_fw�a�.. ,, ,►
BARN31'ABI.F.,'•s.
1639.
BUILDING DIVISION' .
BY
DATE ISSUED 01/(77/20071 -DATA, �
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY.OR SIDEWALK OR ANY PART.THEREOF, EITHER TEMPORARILY OR PERMANENTLY.EN-
CROACHMENTS`ON"PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE"JURISDICTION.STREET OR
ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF.PUBLIC WORKS.THE ISSUANCE OF THIS
PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS; -
MINIMUM OF FOUR CALL INSPECTIONS REQUIRED
FOR ALL CONSTRUCTION WORK: APPROVED PLANS MUST BE,RETAINED ON JOB AND WHERE APPLICABLE, SEPARATE
1.FOUNDATIONS OR FOOTINGS THIS CARD KEPT POSTED UNTIL FINAL INSPECTION PERMITS 'ARE REQUIRED FOR
2. PRIOR TO COVERING STRUCTURAL MEMBERS HAS BEEN MADE.WHERE A CERTIFICATE OF OCCU-
(READY TO LATH). PANCY IS REQUIRED,SUCH BUILDING SHALL NOT BE ELECTRICAL,PLUMBING AND MECH-
3.INSULATION. OCCUPIED UNTIL"FINAL INSPECTION HAS BEEN MADE. ANICAL INSTALLATIONS.
4.FINAL INSPECTION BEFORE OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
I
BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS
7 2
3 1 HEATING INSPECTION APPROVALS ENGINEERING DEPARTMENT
2'7r Z S-�Q J BOARD OF.HE TH .
OTHER: r,!41SITE PLAWREVIEW APPROVAL
L I vem
WORK SHALL N6T PROCEED UNTILENF
MIT WILL BECOME NULL AND VOID IF CON- INSPECTIONS INDICATED ON THIS.
THE INSPECTOR HAS APPRQ'VEDTHE UCTION WORK IS NOT STARTED WITHIN SIX, CARD CAN BE ARRANGED-FOR BY
VARIOUS STAGES OF CONSTRUC- THS OF DATE THE PERMIT IS ISSUED AS TELEPHONE OR WRITTEN NOTIFICA-
TION. . 1.. ^ TION.
I
F,
. . BUILDING
PERIMIT
I'
ESTIMA 7'ED PROJECT COST WORKSHEET
LIVING SPACE Value
L(high end construction) square feet X$115/sq. foot
(above average construction) square feet X$96/sq. foot=
(average construction) square feet X$57/sq. foot=
GARAGE (UNFINISHED) square feet V$25/sq. foot
PORCH square feet X$20/sq. foot=
DECK square feet X$15/sq. foot=
OTHER square feet X$??/sq. foot=
Total Estimated Project Value
Y
MAScheck COMPLIANCE REPORT
Massachusetts Energy Code Permit #
MAScheck Software Version 2 .01 Release 3
Checked by/Date
CITY: Barnstable
STATE: Massachusetts
HDD: 6137
CONSTRUCTION TYPE: .1 or 2 Family, Detached
HEATING SYSTEM TYPE: Other (Non-Electric Resistance)
. DATE: 2-7-2001
COMPLIANCE: Passes
Maximum UA = 492
Your Home = 463
Area or Cavity Cont. Glazing/Door
Perimeter RLValue R-Value U-Value UA
-------------------------------------------------------------------------------
CEILINGS 1344 0.0 30.0 42
WALLS: Wood Frame, 16" O.C. 2916 0.0 13 .0 280
GLAZING: Windows or Doors 210 0.320 67
GLAZING: Skylights 13 0.320 4
DOORS 34 0.350 12
FLOORS: Over Unconditioned Space 1344 0.0 19.0 58
-------------------------------------------------------------------------------
COMPLIANCE STATEMENT: The proposed building design described here is
consistent with the building plans, specifications, and other calculations
submitted with the permit application. The proposed building has been
designed to meet the requirements of the Massachusetts Energy Code.
The heating load for this building, and the cooling load if appropriate,
has been determined using the applicable Standard Design Conditions found
in the Code. The HVAC equipment selected to heat or cool the building
shall be no greater than 125% of the design load as specified in
Sections 780CMR 1310 and J4.4.
Builder/Designer Date
c
MAScheck COMPLIANCE REPORT
Massachusetts Energy Code Permit #
MAScheck Software Version 2 .0
Checked by/Date
CITY: Hyannis
STATE: Massachusetts
HDD: 5973
CONSTRUCTION TYPE: 1 or 2 family, detached
HEATING SYSTEM TYPE: Other (Non-Electric Resistance)
DATE: 2-7-2001
DATE OF PLANS: 10-02-00
TITLE: SANTOS RESIDENCE
PROJECT INFORMATION:
45 DORCUS DRIVE
BARNSTABLE MA.
TWO STORY WOOD FRAME
SINGLE FAMILY
COMPANY INFORMATION:
CONRAD REMODELING
10 LOCUST STREET
HYANNIS MA
280-8978
COMPLIANCE: PASSES
Required UA = 670
Your Home = 491
Area or Insul Sheath Glazing/Door
Perimeter R-Value R-Value U-Value UA
CEILINGS 1344 38 .0 0 .0 40
WALLS: Wood Frame, 16" O.C. 4261 13 .0 3.0 304
GLAZING: Windows or Doors 210 0. 320 67
GLAZING: Skylights 13 0. 320 4
DOORS 34 0. 350 12
FLOORS: Over Unconditioned Space 1344 19 .0 64
COMPLIANCE STATEMENT: The proposed building g re design resented in these
P
documents is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building
has been designed to meet the requirements of the Massachusetts Energy Code.
The heating load for this building, and the cooling load if appropriate
has been determined using the applicable Standard Design Conditions found
in the Code. The HVAC equipment selected to heat or cool the building
shall be no greater than 125% of the design load as specified in
sections 780CMR 1310 and J4 .4 .
Builder/Designer Date 02- Off- of
A
MAScheck COMPLIANCE REPORT
Massachusetts Energy Code Permit #
MAScheck Software Version 2 .0
Checked by/Date
CITY: Hyannis
STATE: Massachusetts
/HDD: 5973
CONSTRUCTION TYPE: 1 or 2 family, detached
HEATING SYSTEM TYPE: Other (Non—Electric Resistance)
DATE: 2-5-2001
DATE OF PLANS: 10-02-00
TITLE: SANTOS RESIDENCE
PROJECT INFORMATION: " C`_ 4
45 DORCUS DRIVE
BARNSTABLE MA.
TWO STORY WOOD FRAME
SINGLE FAMILY
COMPANY INFORMATION:
CONRAD REMODELING
10 LOCUST STREET
HYANNIS MA
280-8978
COMPLIANCE: PASSES
Required UA = 670
Your Home = 417
Area or Insul Sheath Glazing/Door
Perimeter R—Value R—Value U—Value UA
CEILINGS 1344 38.0 0.0 40`
WALLS: Wood Frame, 16" O.C. 4261 19 .0 3. 0 230
GLAZING: Windows or Doors 210 0. 320 67
GLAZING: Skylights 13 0.320 4
DOORS 34 0. 350 12
FLOORS: Over Unconditioned Space 1344 19 .0 64
COMPLIANCE STATEMENT: The proposed building design represented in these
documents is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building
has been designed to meet the requirements of the Massachusetts Energy Code.
The heating load for this building, and the cooling load if appropriate
has been determined using the applicable Standard Design Conditions found
in the Code. The HVAC equipment selected to heat or cool the building
shall be no greater than 125% of the design load as specified in
sections 780CMR 1310 and J4 .4 .
Builder/Designer P Date QS O
l
MAScheck INSPECTION CHECKLIST
Massachusetts Energy Code
MAScheck Software Version 2 .0
SANTOS RESIDENCE
DATE: 2-5-2001
Bldg.
Dept.
Use
CEILINGS:
[ ] 1 . R-38
Comments/Location
WALLS:
[ ] 1. Wood Frame, 16" O.C. , R-19 + R-3
Comments/Location
WINDOWS AND GLASS DOORS:
[ ] 1. U-value: 0 . 32
For windows without labeled U-values, describe features :
# Panes Frame Type Thermal Break? [ ] Yes [ ] No
Comments/Location
SKYLIGHTS:
[ ] 1 . U-value: 0.32
For skylights without labeled U-values, describe features :
# Panes Frame Type Thermal Break? ( ] Yes [ ] No
Comments/Location
DOORS:
[ ] 1. U-value: 0.35
Comments/Location
FLOORS:
[ J 1 . Over Unconditioned Space, R-19
Comments/Location
AIR LEAKAGE:
[ ] Joints, penetrations, and all other such openings in the building
envelope that are sources of air leakage must be sealed. Recessed
lights must be type IC rated and installed with no penetrations
or installed inside an appropriate air-tight assembly with a 0.5"
clearance from combustible materials and 3" clearance from insulation.
VAPOR RETARDER:
[ J Required on the warm-in-winter side of all non-vented framed
ceilings, walls, and floors .
MATERIALS IDENTIFICATION:
( ] Materials and equipment must be identified so that compliance can
be determined. Manufacturer manuals for all installed heating
and cooling equipment and service water heating equipment must be
provided. Insulation R-values and glazing U-values must be clearly
marked on the building plans or specifications.
DUCT INSULATION:
( ], Ducts in unconditioned spaces must be insulated to R-5 .
Ducts outside the building must be insulated to R-8.0.
DUCT CONSTRUCTION:
[ ] All ducts must be sealed with mastic and fibrous backing tape.
Pressure—sensitive tape may be used for fibrous ducts . The HVAC
system must provide a means for balancing air and water systems .
TEMPERATURE CONTROLS:
[ ] Thermostats are required for each separate HVAC system. A manual
or automatic means to partially restrict or shut off the heating
and/or cooling input to each zone or floor shall be provided.
HVAC EQUIPMENT SIZING:
[ ] Rated output capacity of the heating/cooling system is
not greater than 125% of the design load as specified
in sections 780CMR 1310 and J4 .4 .
MISC REQUIREMENTS:
[ ] Refer to 780 CMR, Appendix J for requirements relating to swimming
pools, HVAC piping conveying fluids above 120 F or chilled fluids
below 55 F, and circulating hot water systems.
NOTES TO FIELD (Building Department Use Only)
1V
o,
N
Q
h
J
s
Spa /'s
w
0
A4 g
�cib
F
L 0 T 5 „� �AV�
Q
65459 + S. F.
Fa
6 NI
/' C`` G'piy `•
� ,
�tisf
�1
LiI,; OCT 12 2000 7ij
03��tag � �,o y� T t Ta
STEPH00 `� ,,� i:`v F;;LLi 1I+1 tEi•ti1i,�.
HAA14
CIVIL
No.35461 PLOT PLAN
At
8,4,RN T,4BLE , MASS .
�v��z/try PREPARED FOR:
PROPERTY LINES SHOWN HEREON S T E V E I V S A /1/ TO S
WERE COMPILED FROM AVAILABLE
PLANS OF RECORD AND DO NOT SCALE: l -50 ' OCTOBER l2. 2000
REPRESENT AN ACTUAL SURVEY
ON THE GROUND. E A IL_ E SURVEY I N G , I N c
923 iRo u t e 6A
THIS PLAN IS FOR PLOT PLAN �' =_� Ya rmo u t h p o r t , MAN . 02675
ONLY AND NOT FOR jel-
PURPOSES ,- � ��/ ,4 ��� ( 508 ) 362—8 1 32
��/ � c; �
RECORDING, DEED DESCRIPTIONS. 508 4322 5333
ESTABLISHING PROPERTY LINES
OR FOR CONSTRUCTION PURPOSES. �®
0 25 50 /00
PROJECT MO. 00-f00
2000 208
36•E
N 2 286 2� W Ul
ry �
ni
0
o�
Z
01 V
LOT 5
54*1
ao
65459 f S. F.
C � /
/
/
/
`vA�\p�
', 72•t
y
A
�00 N
N
O
W nl
O
S'Bus/
TOWN OF BARNSTABLE ZONING % �' D ORCAS DR I VE
ZONE R G
SETBACKS
FRONT - 30'
SIDE - 15'
REAR - 15' I CERTIFY THAT TO THE BEST OF MY PROFESSIONAL
KNOWLEDGE. INFORMATION AND BELIEF THE DWELLING
PROPERTY LINES SHOWN HEREON SHOWN HEREON CONFORMS TO THE HORIZONTAL SETBACKS
WERE COMPILED FROM AVAILABLE OF THE ZONING BY-LAW FOR THE RG DISTRICT,
PLANS OF RECORD AND DO NOT
REPRESENT AN ACTUAL SURVEY
ON THE GROUND.
0.
THE DWELL I NG DEP/CTED ON THIS
PLAN WAS LOCATED ON THE GROUND " WNm�fl >
.� iVo.29$Ss ,� , PLOT PLAN
BY SURVEY ON MAR. l9. 2001 ANDST
0
EXISTS AS SHOWN AS OF THE DATE I N
OF LOCATION.
Al
1� BARNSTABLE, MA.
THIS PLAN IS FOR PLOT PLAN
/moo/ SCALE: I '-40• MAR. 20. 2001
..
PURPOSES ONLY AND NOT FOR EAGLE SURVEYING , INC
RECORDING. DEED DESCRIPTIONS
923 Rout* SA
OR ESTABLISHING PROPERTY LINES, Yorrmuthport, MA. 02875
(508) 362-8132
Ag%w (508) 432-6333
THIS PLAN IS VOID IF NOT
STAMPED AND SIGNED IN RED, 0 20 40. 60
PROJECT NO. 00-I00
E
- I
i
_ I
I I I
• �o' �/.fir /c.•o" �. io'°' o i �".. I I
tS - - .6. —— — — — — — — —— — — — - — — — — — -- — — —— —-- — -f I - / 4,cao -w/�•rc•af�, tdW..r
1 I
L
� z I
i
� �/g :.table (Gi,RrMcjc� 1 e
Lo
71
i 1
ppe w ar6 �k'. on•tep. -I I I
.�:. � �'4 I •.�.tYr25�, / OG' L.—.— — - , _.. — I �'�O� G�a.lr' 1t4�y�{• /•° �i -!�O�S• I
I
906 .a — — 4 Z_o
w' s
feR Wa 30, os
Z
_O
I
U
Z
O
- U
W
_ O
w
fD
EE
' Doi
E3
FRONT ELEVATION
SCALE, I/4" I'-0"
w
V
w
� z
IMF
O
� w Q
i (0 w
I O LU
w
z
Q
1
C—W/C S+IiNGLE9� n�'-
i
SHEE
T
REAR ELEVATION I
SCALE: 1/4"
JOS: 0055
DRAWN B": KW
DATE: 101210C
I
7 .
\ RIDGE VEhT
• - 2,12 RIDGE BOARD
5/B-COX SHEATHING
ASP14AL7 5HING_.ES
12 7
yp. 4a P
ep i ,i jC
AT IG
i R30 F G.1\Sl:'-ATION
�__-• r(�
C'M,VE'rTiNG DRIP EDGE V
rD.ASUA Z
Ix3 STRAPPII:.^. b<SECOND ME"ElER
I/2'GAP.BOARD A_U'^.INJT GL-TERS AND rO"S'W-S 5�TS O
FRIEZE BOARD AND MOJ._LX NGS
PLASTER FIN. "' =1
m� U
1 1/2"G-rp.BOAR?
SECOND FLOOR PLASTER FIN. T"P. Lu
6/B' PST SU.9.FLOOR
TO
2x10'e P Ib'O.C. .1.
Ix3 STRAPPING
2x<OCT
S7UD5
I/1'-GYP. BOARD RG F.G. INSU:ATION ,^
'— - PLASTER FIN.TTP. 1/2' K.WOOD SIEATNING U J
. (v T: ES WRAP(OR EWAL)
CEDAR CAPBOARDS IN FRONT W
. 1/2'GYP..BOARD W.C.SHINGL3 SIDE,F REAR 1
FIRST FLOOR PLASTER FIN.TTP. lQl
.5/D'pLT SJ,�ELOOR ni RW F.G. INSUJ.TION
�W/C SHINGLES
200'e P Ib'O.C. - PT.2X6 SILL� 51"SEAL co
AN4iK1R AT I'O.G.
W12x3O STEEL BEAM
�`� •- 3 I/2"STEEL CA_U' S
Q
I SasEMENT
I
3 1/2' GONG. SJ+6 DAMP PROOF EWOWLGRADE
r------ II_y --—— ---- ';�
. - za'-o•
L----------------- -
CROSS SECTION
L EFT ELEVATION _ ecALe•V<' I'-a .
SCALE+ 1/4'
RIDGE VENT
2,12 RIDGE BOARD
SIB'COX SHEATHING Z •Fl
.,AP�lA LT 5NINGLES W V 1
12 Q
7
+ O
W r pG of ZZ _
O W O• CC Q r
�W/C SHINGLES < \
STORAGE LLl
LLl
l 2x8's•Ib O.G. CCAT.VEN`.ING DRIP EDGE
MD FASCIA Q
WIOx30 B EEL T'BEA Ix<5ECONC MEMBER
ALUMINUM GUTTERS AND DOWN SPOUTS
'FRIEZE BOARD AND MOULDINGS
r—t
L 5/8•FIRE RATED—
�' Gl'E•.BOARD 214 EXT.STUDS P Ii'O.C.
ARAGE
C BETWEEN G
CEDAR CLAPBOARDS IN FRONT
L 1
� AND LIVING SPACE W.C.SNINGlES SIDED l REAR
ARA `
i _
4'CONC.SLAB - FIRST FLOCR�
�s�a `F LL = _' SHEET COMPACT -
- A:2..1
HT ELEVATION COa: ooss
RIG
SCALE v4° r-o' 2 G�,RAGE SECTION DRAWN sr: Kw
SCALE!1/I'a I'-O'
DATE: 10/2/00
s -
. 5,-0" 6.,_b� �.q'_2. P'_0• 4'-4'
I I
AND. 2 10-2 AND. 2042 AND.I 20210 AND. 2042-2
5PA � - Z
of __ _ O
It
7FLrj-'
Iv5 308' 2'_a' I". ,/2'
( n I
o MASTER�BA-H sates s 6ATN I 3,EpROOM
Q GP.T4E7RAL- ! -
=5]
i CEILING
9'-10" b'-0' 6'-b I/2' I
• I C o
2� ZE •� / 2� RI
I
H 26 21
-I
o m,
a O
aQ I z
BI-FLD I .
os-=r)R60rl =2
b rlASTESSEDRooll n oI W
z i j Ll
IIA'-O' Q �I
SECOND FLOOR PLAN
1 SCALE: 1/4' a 1'-O'
AND.i2042 AND.j 2042 AND. 1842 AND. 2042 AND.�2042
I
I
8'_O' 6'-6' 73'-9' b'-4" 17'_2. �_11• 5•_�-b' 23'-O' 6�-6'
I
I I i I AND. 2042
iI I O,I tt 28 I
f I I Q 9 LIT
�I N UP
p !-
cl
Q
O
AND. 2042 AND. 2042 ANDI 2042-2 AND. 202t0-2 AND. 2 2
i 0 0
i 28
N 9 LITE
A I W
w SKY. SKY NO WALL VNDER
LICIT. LIGHT: 0 STAIR STR INGER5
2Q ABOVE.. ABOVE' I `1 w
-
GREAT ROOM
o —
I. 0 I GARAGE I o
o Q r tU LL MUD ROOM COW
PIT -RETEOWARD LADQORS I W ^
3-O" SQ -10' _ 0 0 _-� -_ 2 I (/1
a IU1
I. 15LAND $ a a I A/
BI-FED Y dL FIRE L I i I N lL z
[ I,- IT (•I N RATED a O J 1 K G E
r BI WI
I CATHEDRAL CEILING
m ; O
Q
lY 2� 3-9i/a LVL'a F ABOVE I 2� z I c°DN O iV 9 LITE _�I _b I O i Q
Po
lr I S I 31 W
AND. 20A2 IAN D. 2042 I i
Q 01
Qi 8'.9'O.H.0M B"r9' OM
OAH.AIR 849'O.H. DOOR
W/TRANSDc W/TRANSO"I W/TRM"'
IN wIN g 8
" �z
UP
89
A, T F ILOOR PILAV
5CA I/4'
SHEET
• I'-0' I
�3
AND. 2042 AND. 2042 4ND.I 2042 AND. 2042 i
I t
S'_O' 3'-8" :2'-0 1._0+ y-b^ 9'-0'
JOB: 0055
I DATE N B71012100