Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2631 MAIN STREET
(03 _j am • • .w. A j .L - ., to 4 .• < ,j • A TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Tro•tMap a e Parcel 095— , r rt` "" `n r" Application # 201502 tp I V Health Division " ' ; ` - Date Issued c'/g (S Pie Conservation Division Application Feed ✓V 'O7 Planning Dept. T --�- ,r» - � Permit Feet_3!V -o Date Definitive Plan Approved by Planning Board Historic - OKH _ Preservation / Hyannis Project Street Address 02 (31 /ft-/IU sT Village ZA.2us7AN- Owner igeito%r7741,Aysew Address 51q Telephone ro' -.not 5 9 7 Permit Request /ivV7/d- -a-zgoDIA i o7-4_,c it/o• /3,26 kw oiv Foot /teoP-so2P-1 GTst/� S md-I-L w- f N R442y4-4-b Co 0-ad 9 is bS aaUcecu t. /°2 /t�1jOs,rp r.-4 r,_ h r f pKN AL /N-ch4-ae$ rcz4icBL cooIZ To (�2i,b i�� WreeLaUW6GT // // Square feet: 1st floor: existing proposed 2nd floor: existing proposed Total new Zoning District Flood Plain Groundwater Overlay Project Valuation Gsepe-0 Construction Type Lot Size Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family(# units) Age of Existing Structure Historic House: ❑Yes ❑ No On Old King's Highway: VYes ❑ No Basement Type: ❑ Full ❑ Crawl ❑ Walkout ❑ Other Basement Finished Area (sq.ft.) Basement Unfinished Area (sq.ft) Number of Baths: Full: existing new Half: existing new Number of Bedrooms: existing _new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑ Oil ❑ Electric ❑ Other Central Air: ❑Yes ❑ No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: ❑ existing ❑ new size_Pool: ❑ existing ❑ new size Barn: ❑ existing ❑ new size_ Attached garage: Cl existing ❑ new size _Shed: ❑ existing ❑ new size Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes ❑ No If yes, site plan review# Current Use /0/0 Proposed Use /0/0 APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name R0h ovsa.3 Telephone Number 7g7 9 9 Address /Y/ L L Sf vl W,c,#A License # (T S-d /06,0 9 /4fsea / 4- 4902360 Home Improvement Contractor# l6 92 z'A' Email k�OBlNso,v0/0E-U-V4-y-EP r term-- Worker's Compensation #Aue-Ya0-?®4119M-2 '/V4 ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO SIGNATURE `` (LL_ DATE vl"///�� FOR OFFICIAL USE ONLY APPLICATION# DATE ISSUED MAP/PARCEL NO. ADDRESS VILLAGE OWNER DATE OF INSPECTION: FOUNDATION FRAME INSULATION FIREPLACE ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH FINAL GAS: ROUGH FINAL FINAL BUILDING DATE CLOSED OUT ASSOCIATION PLAN NO. , , ir{I 7),) -2,vi 5 . APP� APR 222015 ? ble Z!/, Town of Barnsta Id G�omel em • /3 • k/T4./e-/ ,.e/Q . JD ROA/AL_S . . ,. . , , . . . . . ' - . .. RQ " E® , • ' . • , , . , . . . . • . . . . APR 2 2 2015 Town of Barnstable • Old Kmg's;Hig Y . Committee • a.6 , • J: �, �� . izI • • • • //// 4t A:EJ [ To FAMIL/ 7Ba Al APR 2 2, • • 2015 Town°f •Barnstable 0\d King m%Kee G9m r , • _ . . , , • ' , . - . . . , I . AppRO VE.C) . . . . , APR 2 2 2015 — . Town of Barnstable ; , Old King's 1-lighway . Committee 5'9i , . . , , • —I 1 < , t 6 ( - . , . • , , . . . ......., . . . . . . , . . . /.3 A itttxs . • R V APR 2 2 2015 Town®fi Beeng40606 Old dimes 0401„yygty • 4.4.6v.4.2. NIOUNr ReAt 44.02.D /S P4iC4� \) -.. qj �f d yL� ref* ENERGIZING LIFEuTOGETHER_t ,,,.-:Ii:*-;v4:,', „,,,,,,,„,,," , ? t rt 3',.e h l.s� rf t 4 W�� f. HIGH PERFORMANCE ". F" -, t4 SOLAR MODULES � _ � Arm REC PEAK tY ENERGY .-„,..,,,,,,k, , „„,,,,,i ,, , , " EOEE , A..„,--,-,i,--,-7-,--4-,.:1 . , . ._ , , , ._ _ _ _ , ... , . _ , „ . .: . . ... ,_. REC Peak Energy Series modules are the _ :,..., . ,_ .._ ., perfect choice for building solar systems that combine long lasting product quality ram- �E with reliable power output. REC a, combines high quality design and manufacturing standards to produce high-performance solar modules with uncompromising quality. 4 I 1l11HIJI� 61 am MORE POWER ROBUST AND -"~ PERM' DURABLE DESIGN z ..0 � I ENERGY PAYBACK OPTIMIZED FOR ALL TIME OF ONE YEAR SUNLIGHiCONDITi0N5 .'z x a � y g "- K 4 ., _ ... . _ ,, . • ;, k . V 51 _ \ -+r ` 'sf ai ti\,4 _ ? } 4 }.. . ,, . . REC PEAK ENERGY SERIES 1665t2,5 r_`28 900 382,5 ' •I ;.r• �-_ o EFFICIENCY . ` D YEAR PRODUCT WARRANTY 25 y� YEAR LINEAR POWER OUTPUT WARRANTY go «, 11±0,2-I sa N Mounting holes 0-= 1 TEMPERATURE RATINGS t 1. i,i Nominal operating cell temperature(NOCT) 45.7°C(±2°C) ° �, __-___.__ --�`__ Temperature coefficient ofPMPP -0.40%/°C !45 Temperature coefficient ofVoc -0.27%/°C I i___m Temperature coefficient of lsc 0.024 VC 4.Measmrvrts mmm 1 ELECTRICAL DATA @ STC REC240PE REC245PE REC250PE REC255PE REC260PE REC265PE GENERAL DATA NominalPower-PMPP(Wp) 240 245 250 255 260 265 Cell type: 60 REC PE multi-crystalline Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 0/+5 3 strings of 20 cells with bypass diodes NominalPower Voltage-VMPP(V) 29.7 30.1 30.2 30.5 30.7 30.9 Glass: 3.2 mm solar glass with anti-reflection reflection surface treatment Nominal Power Current-IMPP(A) 8.17 8.23 8.30 8.42 8.50 8.58 Back sheet: Double layer highly resistant polyester OpenCircuit Voltage-Vac(V) 36.8 37.1 37.4 37.6 37.8 38.1 Frame: Anodized aluminum(silver) Short Circuit Current-Isc(A) 8.75 8.80 8.86 8.95 9.01 9-08 Junction box: IP67rated Module Efficiency(°%) 14.5 14.8 15.1 15.5 15.8 16.1 4 mm2 solar cable,0.9 m+1.2 m Analysed data demonstrates that 99.7%of modules produced have current and voltage tolerance of.13%from nominal values. Connectors: Multi-Contact MC4(4mm2) Values at standard test conditions STC(airmassAM 15,irradiance1000 W/m',cell temperature 25°C). Origin Made in Singapore At low irradiance of 200 W/m'(AM 15 and cell temperature 25°C)at least 97%of the STC module efficiency will be achieved. ELECTRICAL DATA @ NOCT REC240PE REC245PE REC25OPE REC255PE REC26OPE REC265PE MAXIMUM RATINGS NominalPower-Pvw(Wp) 183 187 189 193 197 202 Operational temperature: -40...+85°C Nominal Power Voltage-VMPP(V) 27.7 28.1 28.3 28.5 29.0 29.4 Maximum system voltage: 1000 V ii Nominal Power Current-IMpp(A) 6.58 6.64 6.68 6.77 6.81 6.90 Maximum snow load: 550 kg/m2(5400 Pa) o Open Circuit Voltage-Voc(V) 34.4 34.7 35.0 35.3 35.7 36.0 Maximum wind load: 244kg/m2(2400Pa) n Short Circuit Current-I,(A) 7.03 7.08 7.12 7.21 7.24 7.30 Max series fuse rating: 25A Nominal o eratNg cell tem erature NOCT(800W/ma,AM95.winds eed 1 m s,ambienttemperature 20*C). Max reverse current: 25 A F CERTIFICATIONS WARRANTY MECHANICAL DATA C E ❑ M'� l0yearproductwarranty Dimensions: 1665x991x38mm ti 25 year linear power output warranty Area: 1.65m2 ,i (max.degression in performance of 0.7%p.a.) Weight: 18kg o IEC61215&IEC61730,IEC62716(ammonia resistance)& See warranty conditions for further details. A IEC 61701(salt mist-severity level6). o -n c NotelSpecifications subject to change without notice. z ce REC is a leading global provider of solar energy solutions.With more than 15 years of experience,we offer sustainable,high performing ® R r C products,services and investments for the so.ar industry.Together with our partners,we create value by providing solutions that better meettheworld'sgrowingenergy needs.Founded in Norway,REC is listed on the Oslo Stock Exchange(ticker:RECSOL)and headquartered in Singapore.Our 1,500 employees worldwidegenerated revenues of NOK 4.1 billion in 2012. www.recgroup.com Enphase®Microinverters En p hase® M250 ji] MO • �1 p t4 ' The Enphase® M250 Microinverter delivers increased energy harvest and reduces design and installation complexity with its all-AC approach. With the M250, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor(GEC) is required for the microinverter.This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M250 integrates seamlessly with the Engage®Cable, the Envoy®Communications Gateway', and Enlighten®, Enphase's monitoring and analysis software. PRODUCTIVE SIMPLE RELIABLE -Optimized for higher-power -No GEC needed for microinverter -4th-generation product modules -No DC design or string calculation - More than 1 million hours of testing - Maximizes energy production required and millions of units shipped - Minimizes impact of shading, - Easy installation with Engage - Industry-leading warranty, up to 25 dust, and debris Cable years [e] enNphaseERGY® $�® E C US Enphase®M250 Microinverter II DATA INPUT DATA(DC) M250-60-2LL-S22/S23/S24 Recommended input power(STC) 210-300 W Maximum input DC voltage 48 V Peak power tracking voltage 27 V-39 V Operating range 16 V-48 V Min/Max start voltage 22 V/48 V Max DC short circuit current 15 A Max input current 10 A OUTPUT DATA(AC) @208 VAC @240 VAC Peak output power 250 W 250 W Rated(continuous)output power 240 W 240 W Nominal output current 1.15 A(A rms at nominal duration) 1.0 A(A rms at nominal duration) Nominal voltage/range 208 V/183-229 V 240 V/211-264 V Nominal frequency/range 60.0/57-61 Hz 60.0/57-61 Hz • Extended frequency range* 57-62.5 Hz 57-62.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 24(three phase) 16(single phase) Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency,240 VAC 96.5% • CEC weighted efficiency,208 VAC 96.0% Peak inverter efficiency 96.5% Static MPPT efficiency(weighted,reference EN50530) 99.4% Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range -40°C to+65°C Operating temperature range(internal) -40°C to+85°C Dimensions(WxHxD) 171 mm x 173 mm x 30 mm(without mounting bracket) Weight 2.0 kg Cooling Natural convection-No fans Enclosure environmental rating Outdoor-NEMA 6 FEATURES Compatibility Compatible with 60-cell PV modules. Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35. Equipment ground is provided in the Engage Cable.No additional GEC or ground is required.Ground fault protection(GFP)is integrated into the microinverter. Monitoring Free lifetime monitoring via Enlighten software Compliance UL1741/lEEE1547, FCC Part 15 Class B,CAN/CSA-C22.2 NO.0-M91, 0.4-04,and 107.1-01 *Frequency ranges can be extended beyond nominal if required by the utility To learn more about Enphase Microinverter technology, rel enphase® . visit enphase.Com L J ENERG Y ©2013 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. ti CSA Group Cerrtifkate ©f Complium©e Certificate: 2395707 Master Contract: 240080 Project: 2657873 Date Issued: October 4,2013 Issued to: Enphase Energy,Inc. 1420 N McDowell Blvd Petaluma,CA 94954-6515 USA The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. CIO® Sarah,uo ; Issued by: Sarah Ugolini C US PRODUCTS CLASS 5311 09 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 5311 89 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S. Standards Utility Interactive Micro Inverters,Models M215-60-2LL-S2x,M215-60-2LL-S2x-NA,M215-60-SIE- S2x,M215-60-SIE-S2x-NA,M215-60-2LL-S2x-ZC,M215-60-2LL-S2x-ZC-NA,M215-60-2LL-S2x-IG, M215-60-2LL-S2x-.IG-NA,M215-60-2LL-S2x-IG-ZC,M215-60-2LL-S2x-IG-ZC-NA,M240-60-2LL- S2x,M240-60-2LL-S2x-NA,M250-60-2LL-S2x,M250-60-2LL-S2x-NA,M250-60-2LL-S2x-ZC and M250-60-2LL-S2x-ZC-NA. For details related to rating,,size, configuration, etc.reference should be made to the CSA Certification Record, the Descriptive Report, or Attachment 1 -Ratings. Notes: -AC and DC connectors evaluated for disconnecting under load(for this application only). • DQD 507 Rev.2012-05-22 Page:1 coCSI0. Group Certificate: 2395707 Master Contract: 240080 Project: 2657873 Date Issued: October 4,2013 APPLICABLE REQUIREMENTS CAN/CSA-C22.2 No. 107.1-01 -General Use Power Supplies UL Std No. 1741-Second Edition-Inverters,Converters,Controllers and Interconnection System Equipment for Use With Distributed Energy Resources Note:Conformity to UL 1741-Second Edition(January 28,2010)includes compliance with applicable requirements of IEEE 1547 and IEEE 1547.1. DQD 507 Rev.2012-05-22 Page_2 • 4E© 4 o©aL BRIEF EF Q lC 'o hase NEC 2014 — Enphase System Code Compliance Overview This technical brief discusses new NEC 2014 requirements that apply to Enphase Microinverter Systems. It is useful for installers, electricians, and electrical inspectors or authorities having jurisdiction (AHJs)in understanding how code-compliance is handled where NEC 2014 is adopted. Main topics discussed in this document are: • NEC 2014 Section 690.12 Rapid Shutdown of PV Systems on Buildings • NEC 2014 Section 705.12 Point of Connection • NEC 2014 Section 690.11 DC Arc-Fault Circuit Protection NEC 2014 Section 690.12 Rapid Shutdown of PV Systems on Buildings Enphase Microinverter Systems fully meet the rapid shutdown requirement,without the need to install additional electrical equipment. Properly labeling the PV system power source and rapid shutdown ability is required per NEC Section 690.56(B)and (C). Solar electric PV systems with Enphase Microinverters have one utility-interactive inverter directly underneath each solar module, converting low voltage DC to utility grid-compliant AC. When the utility grid is available and the sun is shining, each microinverter verifies that the utility grid is operating within the IEEE 1547 requirements. Only then does it export AC power into the electric service for use by loads onsite or export power to the utility grid for others to use. When the utility grid has a failure, or the PV system AC circuits are disconnected from the utility service via an AC breaker, AC disconnect, or removal of the solar or main utility service meter, the microinverters stop producing AC power in fewer than six AC cycles. Enphase Microinverters are not capable of operating as an AC voltage source. This means that without an AC utility source, Enphase Microinverters are not able to energize connected wiring, and no AC voltage or current can be injected into the PV system AC circuits or the grid. When the AC utility source is removed from the PV system AC circuits via any means, such as an AC breaker, AC disconnect, or removal of the solar or main utility service meter,this equipment performs the rapid shutdown function per 690.12. With an Enphase Microinverter System this shutdown occurs well within the 690.12 required 10 seconds, and there are no other conductors energized more than 1.5 m (5 ft)in length inside a building or more than 3 m (10 ft)from a PV array. Code Reference 690.12 Rapid Shutdown of PV Systems on Buildings. PV system circuits installed on or in buildings shall include a rapid shutdown function that controls specific conductors in accordance with 690.12(1)through (5)as follows. (1) Requirements for controlled conductors shall apply only to PV system conductors of more than 1.5 m (5 ft)in length inside a building, or more than 3 m (10 ft)from a PV array. (2)Controlled conductors shall be limited to not more than 30 volts and 240 volt-amperes within 10 seconds of rapid shutdown initiation. (3)Voltage and power shall be measured between any two conductors and between any conductor and ground. (4)The rapid shutdown initiation methods shall be labeled in accordance with 690.56(B). (5) Equipment that performs the rapid shutdown shall be listed and identified. 1 ©2014 Enphase Energy Inc.All rights reserved. August 2014 • NEC 2014-Enphase System Code Compliance NEC 2014 Section 705.12 Point of Connection (AC Arc-Fault Protection) In this section we explain how to comply with NEC 2014 Section 705.12 Point of Connection when installing Enphase Energy Systems with: • Supply Side Connection • Load-Side Connection to Single-Phase 120/240 Volt Services • Three-Phase 208/120 Volt Services Supply Side Connection Solution: No AC AFCI (Arc-Fault Circuit Interrupter) protection is required. Code Reference 705.12 Point of Connection The output of an interconnected electric power source shall be connected as specified in 705.12(A), (B), (C)or(D). Since the operator"OR"is used to define connection types, the code seems to intend that if one criteria is met, for example (A), the other criteria are not applicable. Code Reference 705.12(A)Supply Side.An electric power production source shall be permitted to be connected to the supply side of the service disconnecting means as permitted in 230.82(6). The sum of the ratings of all overcurrent devices connected to power production sources shall not exceed the rating of the service. 705.12(B) Integrated Electrical Systems. ... 705.12(C) Greater Than 100 kW. ... 705.12(D) Utility-Interactive Inverters. ... 230.82(6)lists solar photovoltaic systems as eligible for equipment permitted to be connected to the supply side of the service disconnecting means. Since Enphase Energy Systems are solar photovoltaic systems, a supply side connection of an Enphase System may be accepted by AHJs to fully meet Code section 705.12. Since 705.12(A) requirements are met, it seems logical that the 705.12(D)requirements for connections to the load-side of the service disconnect means are not applicable. Load-Side Connection to Single-Phase 120/240 Volt Services Solution: Refer to section 90.4 and the previous code edition, NEC 2011. Until AC AFCI backfeed capable product is generally available from manufacturers,when making load side connections, complying with NEC 2014 Section 705.12 (D) (6)is achieved by discretionary guidance per NEC 2014 Section 90.4. This means to refer to NEC 2011 Section 705.12,where AC Arc-Fault Circuit Protection is not a requirement for utility-interactive inverters. Code Reference 705.12(D) Utility Interactive Inverters. The output of a utility-interactive inverter shall be permitted to be connected to the load side of the service disconnecting means of the other source(s)at any distribution equipment on the premises. Where distribution equipment, including switchgear, switchboards, or panelboards, is fed simultaneously by a primary source(s)of electricity and one or more utility-interactive inverters, and where this distribution equipment is capable of supplying multiple branch circuits or feeders, or both, the interconnecting provisions for the utility-interactive inverter(s)shall comply with 705.12(D)(1)through (D)(6). 2 ©2014 Enphase EnergyInc.All rights reserved. PAugust 2014 IL - NEC 2014-Enphase System Code Compliance 705.12(D)(4)Suitable for Backfeed.Circuit breakers, if backfed, shall be suitable for such operation. 705.12(D)(6)Wire Harness and Exposed Cable Arc-Fault Protection.A utility-interactive inverter(s)that has a wire harness or cable output circuit rated 240 V, 30 amperes, or less, that is not installed within an enclosed raceway, shall be provided with listed ac AFCI protection. This NEC 2014 code section allows connection of an electric power source to the load side of service disconnect means and requires that the"interconnecting provisions for the utility-interactive inverter(s) shall comply with 705.12(D)(1)through (D)(6)". Since the Enphase system contains one or more microinverters, which are the utility-interactive inverter(s), this section applies when connecting a system to the load side of a service disconnecting means. Section 705.12(D)(6)specifically requires that exposed AC cable systems, such as the Enphase Engage Cable,which is not feasibly run in enclosed raceway,to be protected by AC Arc-Fault Circuit Interrupter(AC AFCI)functionality. Given that utility-interactive inverters cannot operate without a utility service source, the location of the AC AFCI protecting the cable must logically be applied at the utility source side of the circuit. AC AFCI circuit breakers are the commonly available devices for single-phase branch circuits. Since Enphase Microinverters are utility-interactive inverters that backfeed into the electrical service through the overcurrent protection device, any AC AFCI circuit breakers must be specifically backfeed capable, per 705.12(D)(4). If terminals of circuit breaker AFCIs are marked "Line"and "Load,"then the AFCI product is not backfeed capable. Until backfeed capable AC AFCI circuit breakers become generally available, an AHJ is permitted to refer to 90.4, i.e. the previous code edition, NEC 2011. Code Reference 90.4 Enforcement. This Code may require new products, constructions, or materials that may not yet be available at the time the Code is adopted. In such event,the authority having jurisdiction may permit the use of the products, constructions, or materials that comply with the most recent previous edition of this Code adopted by the jurisdiction. Three-Phase 208/120 Volt Services Solution:The compliance solution for systems interconnected to three-phase systems is to defer to NEC 90.4. There are no three-phase AC AFCI detection devices in existence. Until backfeed capable three- phase AC AFCI circuit breakers become generally available, an AHJ is permitted to refer to 90.4, i.e., the previous code edition, NEC 2011. Additionally, the NEC code intention for any AC AFCI protection is for single-phase applications in dwellings or dormitory units and not meant for three-phase applications, example: Code Reference 210.12 Arc-Fault Circuit-Interrupter Protection. ... 210.12(A) Dwelling Units.All 120-volt, single-phase, 15-and 20-ampere branch circuits 210.12(B) Branch Circuit Extensions or Modifications—Dwelling Units. ... 210.12(C) Dormitory Units.All 120-volt, single-phase, 15-and 20-ampere branch circuits Although Chapter 7 applies to"Special Conditions,"the industry must be able to supply generally available equipment that is safe to use and meets the requirements for these special applications. For 705.12(D)(6)this is not the case for three-phase applications as there are no three-phase AC AFCI detection devices available. 3 ©2014 Enphase Energy Inc.All rights reserved. August 2014 NEC 2014-Enphase System Code Compliance NEC 2014 Section 690.11 DC Arc-Fault Circuit Protection This requirement is for direct current(DC)Arc-Fault Circuit protection and only applies to systems with DC voltages above 80 VDC. Enphase Microinverter systems are exempted from this requirement as they always operate well below 80 VDC. The requirement is basically unchanged from the NEC 2011, and it is unnecessary to add DC AFCI to an Enphase Microinverter System installation. Code Reference 690.11 Arc-Fault Circuit Protection(Direct Current). Photovoltaic systems with dc source circuits, dc output circuits, or both, operating at a PV system maximum system voltage of 80 volts or greater, shall be protected by a listed (dc)arc-fault circuit interrupter, PV type,or other system components listed to provide equivalent protection. 4 ©2014 Enphase Energy Inc.All rights reserved. August 2014 cr . R * * F M • UNT SYSTEM SnapNrack Residential pV9 Mounting Sys'tem•s The SnapNrack line of solar mounting systems is designed to reduce total installation costs. The system features technical innovations proven on more than 300MW of solar projects to simplify the 1 ' - -� installation and reduce costs._. Pitched Roof Arrays Simplified The SnapNrack Series 100 UL Roof Mount System r S is an efficient,visually appealing, photovoltaic (PV) r} module installation system.Series 100 UL is listed to sue_ . the UL 2703 Standard for Bonding, meaning that all system components have been certified by UL for Roof System in 4 Simple Steps: electrical continuity, eliminating the need for additional grounding hardware. The System's components provide 1) Go to the online Series 100 Configuration an adequate bonding path which has eliminated the Tool (configure.snapnrack.com) and select need for grounding lugs and washers at each module, "Yes" for UL 2703 Listed and bonding jumpers between splices. The UL 2703 2) Identify Site Conditions (Array Tilt, Building Certification ensures that SnapNrack partners can Height, Roof Ty pe,ype, Wind and Snow Loads) provide the best in class installations in quality, safety, and efficiency. 3) Build array in the online Configuration Tool and automatically generate a Bill of • All bonding hardware is fully integrated into the Materials. • components 4) Place order with your distributor. Purchase • No grounding lugs required for modules material for a single project or order in bulk for additional savings • Rail splices bond rails together, no rail jumpers - Rail & Module Clamps required • - Roof Attachments • Proprietary SnapNrack grounding lug snaps in the rail - Array Accessories channel, no drilling of rail or reaching for other tools required • • Patent Pending o LISTED PV Mounting System 2703 r ` /—Bondging Splice Insert Bonding Adjustable X- ? ry Splice Base NOEnd Clamp Top �—Bonding Mid Clamp:e 1 hpn' Bondingi. Adjustable X- ' 1 ab 1 Ad End Clamp Bottom -Bonding Channel AO' Nut AAP SnapNrack Bonding SnapNrack Bonding SnapNrack Bonding Adjustable X-End Clamp Mid Clamp Standard Rail Splice • Bonding Channel Nut • 0 li: Bonding -iR : g � Standoffrie i IIIJJJ Clamp _ �j L, L Foot Ili i ? j .i 44111 \—Metal Roof Base Rubber Rain Collar 1 Bonding Channel Nut .SnapNrack Metal Mill Finish Roof Base with . Standoff------•-• :R L Foot Bonding L Foot - Mill Finish v ' Standoff Base —Bonding Universal End Clamp (1 Hole Base (UEC)Wave Shown) ity. - 44:4 ,—UEC Pull Strap 1fteet Mill Finish �L Foot L Foot Base l Flashing _ _ SnapNrack Bonding l l UEC Wedge Standoff Assembly SnapNrack Bonding L Foot Base with Flashing SnapNrack Bonding Universal End Clamp SnapNrack 3100 Data Patent Pending Materials • 6000 Series aluminum • Stainless steel • Galvanized Steel Flashing Material Finish •Clear and black anodized aluminum •Mill Finish on select components • Installation •Quick and efficient mounting •Adjustable hardware to ensure clean and level finish •All components bonded to ground with integrated bonding features Calcs. & Certifications • UL 2703 Certification • • Stamped Structural Engineering Reports for all 50 States Grounding • SnapNrack Grounding Lug Warranty - • 10 Year material and worksmanship (download full details at snapnrack.com). ' SnapNracklu . PV Mounting Systems (877) 732-2860 www.SnapNrack.com - 0 Printed on recycled paper using soy based inks• ©2014 by SnapNrack PV Mounting System.All rights reserved. 1 a .., r r - uh r +'^,}r:. y,,,, its.: y �-"` i.Sa s , 7 '2 # 2,,�ra �' ^'�br 1 a a c z~-'Y sue°# a s7 ' tat-'4,,,'4 ;ftv,, -�4I "` �. n A'tC # ` d`r. r ks! { q J '' CO � o GROUND MOUNT SnapNrack Resi • e O GA? Mounting Sy sit e.ms • The SnapNrack line of solar mounting ti,1 , Fp { 4.. F �r" »systems is designed to reduce total 2.: r ,-'"` f` .r: ` installation costs. The system features f4 ,- . c 'rt,}/ technical innovations proven on more : � . �g2fi'° than 300+MW of solar projects to y' ` ., - °''1. t - simplify installation and reduce costs. ft t� ,.jai- iiii-444''- --_ . \ ;fi >.iv-., ,. Residential Ground Arrays Simplified i The SnapNrack Series 200 UL Ground Mount System is . ' r , �' 'f, an efficient and visually appeEling PV module instal- „- lation system for small to mecium size ground mount projects. Series 200 UL is designed to attach easily to a '°" ' .t : standard galvanized pipe structure using structural pipe — fittings. .. fittings. Complete engineerinc tables are available for most site conditions with stamped engineering letters Designing a Ground System in in all 50 states. Using a standard four-module assembly, 3 Simple Steps: the system is efficient and flexible while optimizing 1) Go to the online Series 200 Configuration materials and minimizing system footprint. Industry Tool (configure.snapnrack.com) leading installation times are achieved with unique 2) Identify Site Parameters: Ground Pitch, Wind snap-in fasteners. Speed, and Snow Load • Assembles easilyusing snap-in bondingpipe clamps that feature channel nuts witi integrated bonding pins 3) Build array in the online Configuration Tool and automatically generate a Bill of Materials. • • Integrates with Schedule 4or g 0 80 galvanized 1.5" pipe • Configures easily to desired tilt(0-45 degrees) 4) Place order with your distributor. Purchase material fora single project or order in bulk • Ultra-adjustable for precise a ignment on any surface for additional savings • • Rail channels provide excellent wire management LISTED Patent Pending PV Mounting System 2703 • I I �� / / ��, / GROUND RAIL -.... / ,, / tr't r POST / t' /l o �J�4 / -// /",! >,i \ i 1 `BRACE F \ .,,,,,,,,,,...----r----7,-4 �\ N-SNAPNRACK liif; GROUND RAIL BRACE A SN.APNRAIX UNIVERSAL- . END CLAMP(SHOWN) \ SNAPNRACK r OR SNAPNRACK TOP y CHANNEL NUTS A. BRACE E MOUNT END CLAMP \ ; 1`` 1%-SCHEDULE 40 11 (MIN)STEEL PIPE SNAPNRACK—) /� � 1 RAIL END CAP 1 \ / / 1t / / XISSHIXBOLTS I /� WITH SS SPLIT LOCK WASHERS 4,_______ PIPE TO RAIL CONNECTION EXPLODED / SnapNrack 5261133 200 01,T0201:111C0 Data Patent Pending Tilt Angle • 0-45 Degrees Wind Speed • Up to 120 MPH Snow Loads • Up 50 PSF Foundation Options • Concrete Encased Piers • Grade Beams • Driven Piles • Ballast Blocks Materials • 6000 Series Aluminum • Stainless Steel . • Galvanized Steel Material Finish •Black & Clear Anodized Aluminum Installation •Quick & Efficient Mounting •Adjustable Hardware to Ensure Clean & Level Finish •Multiple Foundation Options Grounding • SnapNrack Grounding Lug (One Lug per individual row of modules) Warranty • 10 Year material and worksmanship (download full details at snapnrack.com) SnapNracic . • Solar Mounting Solutions (877) 732-2860 www.SnapNrack.com 0 Printed on recycled paper using soy based inks. ©2014 by SnapNrack PV Mounting System.All rights reserved. lti Town of Barnstable / Regulatory Services . �nex y Richard V.Scali,Director 4a�, Building Division Tom Perry,Building Commissioner 200 Main Street,Hyannis,MA 02601 www.town.b arnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must - Complete and Sign This Section If Using A Builder iI�I I, ..4 ic,k 744.41y sdti ,as Owner of the subject property hereby authorize t ?..21.c—1 a .to act on my behalf, in all matters relative to work authorized by this building permit application for. / . 't S7 st Q,2(3 0 (Address of Job) Pool fences and alarms are the responsibility of the applicant. Pools are not to be filled or utilized before fence is installed and all final inspections are performed and accepted. Signature o Owner Signature of Applicant Print Name Print Name Da Q:FORMS:O WNERPERMISS IONPOOLS Town of Barnstable Regulatory Services P�°pTHE rots, Richard V.Sca1i,Director . ,fl• °* Building Division * saaxsrABLE. ' Tom Perry,Building Commissioner brass. 9$ z63q. ��y - 200 Main Street, Hyannis,MA 02601 p TED �a www.town.barnstable.ma.us . 1 Office: 508-862-4038 Fax: 508-790-6230 HOMEOWNER LICENSE EXEMPTION Please Print DATE: JOB LOCATION: • number sheet village "HOMEOWNER": • name - home phone# work phone# CURRENT MAILING ADDRESS: city/town state zip code The current exemption for"homeowners"was extended to include owner-occupied dwellings of six units or less and to allow homeowners to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor. DEFINITION OF HOMEOWNER Person(s)who owns a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two- family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner" shall submit to the Building Official on a form acceptable to the Building Official,that he/she shall be responsible for all such workperformed under the building permit. (Section 109.1.1) The undersigned"homeowner"assumes responsibility for compliance with the State Building Code and other applicable codes, bylaws,rules and regulations. - The undersigned"homeowner"certifies that he/she understands the Town of Barnstable Building Department minimum inspection procedures and requirements and that he/she will comply with said procedures and requirements. Signature of Homeowner Approval of Building Official Note: Three-family dwellings containing 35,000 cubic feet or larger will be required to comply with the State Building Code Section 127.0 Construction Control. HOMEOWNER'S EXEMPTION The Code states that: "Any homeowner performing work for which a building permit is required shall be exempt from the provisions of this section(Section 109.1.1-Licensing of construction Supervisors);provided that if the homeowner engages a person(s)for hire to do such work,that such Homeowner shall act as supervisor." Many homeowners who use this exemption are unaware that they are assuming the responsibilities of a supervisor (see Appendix Q,Rules&Regulations for Licensing Construction Supervisors,Section 2.15) This lack of awareness often results in serious problems,particularly when the homeowner hires unlicensed persons. In this case,our Board cannot proceed against the unlicensed person as it would with a licensed Supervisor. The homeowner acting as Supervisor is ultimately responsible. To ensure that the homeowner is fully aware of his/her responsibilities,many communities require,as part of the permit application,that the homeowner certify that he/she understands the responsibilities of a Supervisor. On the last page of this issue is a form currently used by several towns. You may care t amend and adopt such a form/certification for use in your community. Q:\WPFILES\FORMS\building permit forms\EXPRESS.doc Revised 061313 Town of Barnstable Geographic Information System '%---,,,,,,,,,,..i , . , May 10,2015 35 v #26448006 . v 258005 Q�� , #5 s041 #2624 C� �, //.; �... -O it / -/ /' ------ ir- -,---- i 'r r. ----- _ - I-----' c:; .,-',' .., , - /...„,, - /�..�/ ' ---'-- �--1 `i r tf/ 258038003 GN lb -''— 30 !i'`c- �, 0 -- t G. 258047001 #2615 _` 258038002 #20 0 20 Feet 258D47oo2 #15 � o DISCLAIMERS:Thisg map is for planning purposes only. It is not adequate for legal Map:258 Parcel:045 boundary determination or regulatory interpretation. Enlargements beyond a scale of Owner:THOMPSON,NICHOLAS TR Total Assessed Value:$363400 Selected Parcel 1"=100'may not meet established map accuracy standards. The parcel lines on this map are only graphic representations of Assessor's tax parcels. They are not true property Co-Owner:NICHOLAS THOMPSON TRUST Acreage:0.75 acres Abutters INN,-•E boundaries and do not represent accurate relationships to physical features on the map BARN.Location:2631 MAIN ST./RTE 6A such as building locations. ( ) Buffer 6- • t 111 ii I ,l Filh _1 • } 1 t // / H 4 II I,/ / I 1 1 ------ / - 1' i i fl i• fs / 11 fi li • 1s 1 it ii 7` It ____.___>---- . 41 1-\________,....._i! . .`-'—r---1 U fE 1 \ — L ,! f i i s A i ......... (it a s n( i j } V__ ! '� / j! _ 1 t f . \i' ______..../----.1 --: - It r— s„,... _ ) . �_e . . / - , � , ___ =_}Y _ _ 3t2.g7 oFTME r° ti The Town of Barnstable ' 'f'' �'" Department of Health, Safety and Environmental Services Building Division Na? ;I. �0�' 367 Main Street,Hyannis MA 02601 reo mot, Office: 508-790-6227 Ralph M.Crossen Fax: 508-790-6230 Building Commissioner Home Occupation Registration Date: j r,,,.e /9 60 7 'z 9 ( S Name: A ,S 7, ' 0 , ' � ,,rote✓ 5 Phone#: r)0 j 6 2. 2,C Address: e / it!/v �'/ Village: 12.. ritpf%%y A�e . Type of Business: Pet/441 S/' (-/-..„ ,,,- Map/Lot: g ( e-/..c--- INTENT: It is the intent of this section to allow the residents of the Town of Barnstable to operate a home occupation within single family dwellings,subject to the provisions of Section 4-1.4 of the Zoning ordinance,provided that the activity shall not be discernible from outside the dwelling there shall be no increase in noise or odor,no visual alteration to the premises which would suggest anything other than a residential use;no increase in traffic above normal residential volumes;and no increase in air or groundwater pollution. After registration with the Building Inspector,a customary home occupation shall be permitted as of right subject to the following conditions: • The activity is carried on by the permanent resident of a single family residential dwelling unit,located within that dwelling unit. • Such use occupies no more than 400 square feet of space. • There are no external alterations to the dwelling which are not customary in residential buildings,and there is no outside evidence of such use. • No traffic will be generated in excess of normal residential volumes. • The use does not involve the production of offensive noise,vibration,smoke,dust or other particular matter,odors,electrical disturbance,heat,glare,humidity or other objectionable effects. • There is no storage or use of toxic or hazardous materials,or flammable or explosive materials,in excess of normal household quantities. • Any need for parking generated by such use shall be met on the same lot containing the Customary Home Occupation,and not within the required front yard. • There is no exterior storage or display of materials or equipment. • There is no commercial vehicles related to the Customary Home Occupation,other than one van or one pick-up truck not to exceed one ton capacity,and one trailer not to exceed 20 feet in length and not to exceed 4 tires,parked on the same lot containing the Customary Home Occupation. • No sign shall be displayed indicating the Customary Home Occupation. • If the Customary Home Occupation is listed or advertised as a business,the street address shall not be included. • No person shall be employed in the Customary Home Occupation who is not a permanent resident of the dwelling unit. I,the undersigned,have read and agree with the above restrictions for my home occupation I am registering. Date�]�s'L P ig.c�(�' Applicant: kit/4 C.-P-2 /f 1 17117 Homeoc.doc