HomeMy WebLinkAbout0110 MARBLE ROAD 1 /0 marble ;
f
Z , ...+---=•gym`_P".:.
.".✓.11" -. vo a r -
Town of Barnstable • . tilts °
ng
(. Post This CardPSo That it is Visible Fromfthe Street-Approved•Flans Must be Retained on Job andthisCard MustIbe Kept
ABLE, �. r v ,1
v 1639. , ' Posted Until;Final:Inspection 'as Been Made j f, a
� r� Where a Certificatermit
e,of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made
Permit No. B-19-3740 Applicant Name: Henry Cassidy
Approvals
Date Issued: 11/05/2019 ' Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 05/05/2020 Foundation:
Location: 110 MARBLE ROAD,BARNSTABLE Map/Lot: 316-040 Zoning District: RF-1 Sheathing:
Owner on Record: MORRICE,CHARLES&MARY ANN Contractor Name HENRY E CASSIDY Framing: 1
Address: 110 MARBLE RD Contractor License: CS-100988 2
BARNSTABLE, MA 02630 Est Project Cost: $ 1,680.00 Chimney:
Description: Insulation/Weatherization R, PermitFee: $85.00
1 Insulation:
FeePaid: S 85.00
Project Review Req: - Final:
Date• 11/5/2019
fiz.'7-; '' ..--. Plumbing/Gas
ik 4 F 4" v.,�
• t k - Rough Plumbing:
w ."- - =:Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authonzediby this permit is commenced within six months after issuance. ,
All work authorized by this permit shall conform to the approved applicationandthe approved construction documents,forwhich this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures;hall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access treet or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same.
I . :., t Electrical
The Certificate of Occupancy will not be issued until all applicable signatureslby the Building and FireeOfficials are provided onIthiis permit.
Minimum of Five Call Inspections Required for All Construction Work. 4 4 e -' 1K k. Service: -
1.Foundation or Footing I
2.Sheathing Inspection •
�, I , , ill . t 'F Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health ,
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT U/•11 iE
5mA1, 5t `Y^