Loading...
HomeMy WebLinkAbout0191 STONEY POINT ROAD!T9 I Skov\ -. �� r\A}- ,. ,,/0 s,1)(>4 .. - 0 (-;;;--E., • .iz, Town of BarnstableBuilding z )Post This Card So That it isi Visible From the Street-Approved Plans Must be Retained on Job and this Card'Must be Kept t Posted UntilFinalInspectionHasBeenMade. j ��6+391" c Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. ._.__,�_�_..___.._____ �, ;.v -.,,.. sin _. .__,. .... .,_ Permit No. B-20-1021 Applicant Name: Jeffrey Clancy Approvals Date Issued: 07/14/2020 Current Use: Structure Permit Type: Building-Addition/Alteration- Residential Expiration Date: 01/14/2021 Foundation:swdo5 cz�� 724/Zzr Location: 191 STONEY POINT ROAD, BARNSTABLE r. Map/Lot: 336-028 Zoning District: RF-1 Sheathing: Cog,1/28)?p r Owner on Record: CLANCY,JOHN P&JUDITH A Contractor Name: JEFFREY CLANCY Framing: 1 Address: 8 JASPER LANE Contractor License: 129922 2 FORESTDALE, MA 02644 Est. Project Cost: $225,000.00 Chimney: Description: Renovation of existing three bedroom two bath dwelling dwelling, 3 Permit Fee: $ 1,197.50 on existing footprint, including removal of second story and adding Insulation: Fee Paid: $ 1,197.50 one and one half stories to the structure as per attached plan. Final: Which includes updating electrical with new smokes and CO_ = Date: 7/14/2020 detectors for the total of three bedrooms and three and one half �� Plumbing/Gas baths upon its completion. Removal of existing bulkhead and vent ,.tit�*�[ / flue in rear left corner and replace with screened porch on four Rough Plumbing: bigfoot tubes. Finally, replace all siding,trim and windows as .-- ',Building Official specified on plan dated 2/8/2020. Final Plumbing: Rough Gas: Project Review Req: FIRST FLOOR WALLS MUST REMAIN. This permit shall be deemed abandoned and invalid unless the work authorized'Iby this permit is commenced within six months after.issuance. Final Gas: All work authorized by this permit shall conform to the approved application and the`approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Electrical This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Service: work until the completion of the same. ! i l Rough: until all applicable signatures bythe Buildingand Fire Officials.are provided on this permit. The Certificate of Occupancy will not be issued pp g P Y Minimum of Five Call Inspections Required for All Construction Work: Final: 1.Foundation or Footing 2.Sheathing Inspection Low Voltage Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Health 7.Final Inspection before Occupancy Final: . Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. _ _ Fire Department "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: ,