HomeMy WebLinkAbout20230110 NOI TOBDPW 720 Main Street_Rev1-Cover thru AppD720 MAIN STREET PUMP STATION
REPLACEMENT PROJECT
CWSRF #6953
Wetland Notice of Intent
MassDEP Transmittal No. X289558
Town of Barnstable, MA
December 27, 2022
December 30, 2022
Darcy Karle, Conservation Agent
Town of Barnstable
230 South Street
Hyannis, MA 02601
RE: 720 Main Street Pump Station Replacement – CWSRF #6953
Wetlands Protection Act Notice of Intent
Town of Barnstable, MA
MassDEP Transmittal No. X289558
Dear Ms. Karle,
On behalf of the Town of Barnstable’s Public Works Department, Environmental Partners (EP) is
submitting this Notice of Intent for the 720 Main Street Pump Station Replacement project in
accordance with Massachusetts Wetlands Protection Act (M.G.L. Chapter 131, Section 40), the
Massachusetts Wetlands Protection Regulations (310 CMR 10.00) and local wetland regulations,
Chapter 237, Wetlands Protection, of the Part I General Ordinances of the Code of the Town of
Barnstable. This submittal includes the following attachments:
• Appendix A – NOI Checklist, WPA Form 3 and Transmittal
• Appendix B – Project Descriptions
• Appendix C – Project Maps
• Appendix D – Design Plans
• Appendix E – Stormwater Report
• Appendix F – Wetland Delineation Report
• Appendix G – Abutter Notifications
Project Description and Background
The Town of Barnstable (the Town) is replacing the existing pump station at 720 Main Street (built in
1972) with a new wet pit/dry pit type pump station located on a Town-owned parcel at 725 Main Street.
The existing pump station, located at 720 Main Street, is undersized and does not have the capacity
to handle projected future flow demands due to physical limitations, equipment age, and inadequate
pumping capacity. Currently, the existing pump station discharges to an 8-inch ductile iron (DI) force
main (installed in 2009) that conveys wastewater to the Hyannis Water Pollution Control Facility
(WPCF).
The new Pump Station will provide expanded capacity to handle current/future peak flows, post-
development flows, and redirected flows. This approach involves redirecting sewer flows from Sea
Street, which will eliminate the need to replace the already over capacity South Street sewers from
Page 2 of 6
envpartners.com
High School Road to Old Colony Road. The gravity sewer piping on Main Street and South Street will
be upsized to accommodate this expansion.
Environmental Partners Group, LLC (EP) was retained by the Town to complete the design and
permitting for the new pump station. The purpose of this letter is to provide a description and
general layout for the new pump station, force mains, and gravity sewers. Full project descriptions
for the demolition of the existing pump station and the new proposed pump stations are included
as Appendix B.
Wetland Resources
The project site is in an environmentally sensitive area that abuts Stewart’s Creek on Main Street and
bordering vegetated wetlands to the south of the proposed pump station site. The new pump
station will be located within a Town-owned easement at 725 Main Street, near the corner of Main
Street and Dumont Drive and within the 100-foot buffer zone of the bordering vegetated wetland
located south of the parcel. The existing pump station decommissioning is located within the 50-ft.
buffer zone, Inland Bank and Riverfront Area.
The project site is located just north of the FEMA 100-year flood zone. However, Dumont Drive is
within the FEMA 500-year flood zone. According to the most recent Massachusetts Natural Heritage
Atlas, the project location is not mapped as estimated and priority habitat for rare wildlife/species
and there are no certified/mapped vernal pools within the project area. Therefore, this project is
exempt from Massachusetts Endangered Species Act (MESA) review. There are no Massachusetts
Historic Commission (MHC) designated buildings affected by the scope of this project. Maps
depicting the USGS Topographic Locus, FEMA Flood Zones, NHESP and MHC areas for the proposed
work activities are included in Appendix C.
Based on our review of 310 CMR 10.00: Wetlands Protection and based on a wetland delineation
performed by Pinebrook Consulting in December 2021, the proposed work activities are subject to
the filing of a Notice of Intent with the Barnstable Conservation Commission and MassDEP. The
proposed work area has been determined to be within three different resource areas: Inland Bank,
land under a waterbody/waterway (intermittent stream), and Bordering Vegetated Wetland (BVW).
These areas, as defined by the Wetland Protection Regulations, are described further herein as they
relate to the proposed project.
• 310 CMR 10.54 defines “Bank” as the “portion of the land surface which normally abuts and
confines a waterbody. It occurs between a water body and a vegetated bordering wetland
and adjacent flood plain, or, in the absence of these, it occurs between a water body and the
upland.” The inland bank within the proposed project area is located on the western side of
720 and 725 Main Street parcels. An intermittent stream flows from the northerly side of
Main Street, near the existing pump station, and are labeled with the following
lettered/numbered series on the design plans: TB-1 and TB-2. The stream flows under Main
Street through a 30-inch diameter culvert, to the southerly side of Main Street onto the 725
Main Street parcel. The Sewer Easement and Access Easement where work is expected is on
the eastern side of the parcel, opposite where the stream flows. The stream was identified in
Page 3 of 6
envpartners.com
this area with flags labeled TBA-1 through TBA-5 as shown on the design plans in Appendix
D.
• 310 CMR 10.55 defines “Bordering Vegetated Wetland” as “freshwater wetlands which
border on creeks, rivers, streams, ponds and lakes.” Portions of the project are located
within the 50-foot and 100-foot buffer zones associated with the Bordering Vegetated
Wetlands areas (see Appendix E for wetland area delineations). The wetland area
delineations are labeled with the following lettered/numbered series on the design plans in
Appendix D: WF-1 thru WF- 17.
• 310 CMR 10.56 defines “Land under Water Bodies and Waterways” as “land beneath any
creek, river, stream, pond or lake.” As work is proposed within the 200-ft. Riverfront Area
buffer only, there is no planned work which would remove, fill, dredge, nor alter any of the
Land under Water Bodies and Waterways. The collection system pipe work will be contained
in the roadway and pump station work will be within the buffer zone only. There will be no
stream crossings as part of this project.
Impacts to Wetland Resource Areas
As part of the proposed improvements, both temporary and permanent impacts are anticipated to
the wetland resource areas adjacent to the project areas. The proposed pump station replacement
project will have impacts on Inland Bank, Bordering Vegetated Wetlands, Bordering Land Subject to
Flooding, and Riverfront Area. The locations of the wetland resource areas and 100-ft wetland buffer
zones in relation to the project area are included on the plans, along with the limits of work, in
Appendix D. The anticipated disturbance to each individual wetland resource area is as follows:
• Decommissioning Existing Pump Station, 720 Main Street – The existing wastewater
pump station is within the 50-foot Buffer Zone of the intermittent stream parallel to Main
Street. The pump station is outdated and undersized. The proposed work involves
decommissioning of the existing pump station and building a new pump station at 725 Main
Street to accommodate wastewater flows. The existing above-grade pump station
equipment will be removed and legally disposed of, and existing underground structures will
be capped and filled with flowable fill. The existing gravity sewer pipe connection to the
station will be removed and legally disposed of. The existing forcemain will be removed and
legally disposed of. Connections will be rerouted to the new pump station.
Due to the nature of the work, the proposed pump station removal will be completed either
within or near the three resource areas identified under this letter and as shown on the
Sheet C-7 in Appendix D. The estimated disturbance of BVW 50-ft. buffer zone is
approximately 700 square feet, with permanent restoration of an impervious surface back to
a pervious surface. According to 310 CMR 10.02 (2)(b) 2.f., the conversion of impervious to
vegetated surfaces, provided erosion and sedimentation controls are implemented during
construction, is considered to be a minor activity. The Barnstable DPW is undertaking this
project to provide an overriding public benefit by improving water quality through increasing
redundancy and resiliency of the existing wastewater collection system. Therefore, we
Page 4 of 6
envpartners.com
request a waiver for the requirement of mitigation under Town of Barnstable Chapter 704-6
A (3).
• Installation of New Gravity Sewer Pipelines – As part of the proposed design approach, all
flows from Sea Street, South Street, and Main Street within the project area will be directed
towards the new 725 Main Street Pump Station. The existing 8-inch and 12-inch PVC gravity
sewers will be removed and replaced with a new 12-inch diameter PVC interceptor. The
proposed plan layout of the new interceptor will generally be in the same location as in the
existing sewer but will have profile modifications to account for the change in flow direction.
The proposed system retains the 18-inch line coming from the west, which will connect into
the low point manhole near the pump station access drive. A common 18-inch PVC pipe will
convey flow from both directions on Main Street towards the new pump station via an
existing easement. The profile of the proposed gravity sewer and its connections are shown
on Sheets C-5 and C-6 of Appendix D. According to 310 CMR 10.02 (2)(b) 2.j Installation and
repair of underground sewer lines within existing paved or unpaved roadways and private
roadways/driveways, provided that all work is conducted within the roadway or driveway
and that all trenches are closed at the end of completion of each workday, is considered to
be a minor activity within the Buffer Zone. The Barnstable DPW is undertaking this project to
provide an overriding public benefit by improving water quality through increasing
redundancy and resiliency of the existing wastewater collection system. Therefore, we
request a waiver for the requirement of mitigation under Town of Barnstable Chapter 704-6
A (3).
• Construction of New Sewer Pump Station, 725 Main Street – The new pump station
consists of a single-story building with cast in place concrete footings and slabs and exterior
insulated concrete masonry walls with cedar shingle shake veneer. The roof consists of a
wood truss framed roof with closed cell spray foam insulation and asphalt shingle roofing.
The building includes an underground drywell to accommodate the pumps and process
equipment. New natural gas service and an indoor, 300 KW standby rated natural gas
generator will provide backup power for the entirety of the pump station. The generator will
be in the generator room on the ground floor of the building.
As part of the proposed improvements, a new Redi-Rock retaining wall will installed along
the southern and eastern edges of the easement, partially within the delineated BVW 50-ft
Buffer Zone as shown on the plans in Appendix D. The estimated disturbance to the 50-ft
Buffer Zone is approximately 350 square feet. Since the new pump station structures need
to be completed prior to the installation of the concrete retaining wall, environmental
protection measures will be taken to mitigate potential impacts to wetland resource areas
during construction activities. The Barnstable DPW is undertaking this project to provide an
overriding public benefit by improving water quality through increasing redundancy and
resiliency of the existing wastewater collection system. Therefore, we request a waiver for
the requirement of mitigation under Town of Barnstable Chapter 704-6 A (3).
Page 5 of 6
envpartners.com
Proposed Environmental Protection Measures
To mitigate potential impacts to wetland resource areas during construction activities, the following
environmental protection measures will be provided in the project work areas:
• Erosion and sedimentation control devices (e.g. filter sock and catch basin silt sacks) will be
installed along the limits of work as shown on the design sheets under Appendix D. This
measure will control sedimentation and erosion in the surrounding wetlands areas and also
will serve to define the limits of work in these areas. Erosion and sedimentation control
devices will be inspected and maintained daily during construction and will be removed from
the site once work is completed.
• A proposed dewatering plan is shown on the design plans under Appendix D. All dewatering
discharge activity will occur within the containment of the downstream erosion controls.
• Stockpiles of cleared and grubbed materials, and any aggregate materials (sand, gravel, and
stone) will not be maintained on-site. Aggregate materials will be delivered on an as-needed
basis. Cleared and grubbed materials will be removed from the site and disposed of legally,
at a location approved by the Engineer.
• Disturbed areas will be restored to original conditions. Wetlands will be replicated in any
areas disturbed by construction activity. Seeding of disturbed areas will be with New England
Conservation Seed Mix, free of fertilizers. Loam will be low nitrogen and native to Cape Cod.
• Any trench dewatering required during construction shall pass through dewatering bags.
• Temporary erosion and sedimentation controls during construction will include Best
Management Practices (BMPs) such as frac tanks, secondary containment, and silt sack
installation in all catch basins abutting the project area to filter out stormwater sediment
that results from trenching. Additionally, filter sock will be installed around the pump station
work areas to prevent migration of construction sediments outside of the project area and
into nearby surface waters during storm events. Trench dewatering operations will include
passage through frac tanks and dewatering bags to filter out sediment prior to discharge.
Discharge of groundwater into the sewer system will not be permitted.
Public Notification
An advertisement for the Conservation Commission hearing will be placed in the local newspaper
(The Barnstable Patriot) by the Conservation Commission. The list of property owner’s abutting the
proposed pump station improvements is included in Appendix G, and proof of mailing and a copy of
the advertisement will be submitted at the time of the hearing. It is our understanding that the Town
shall be responsible for coordinating and paying for this newspaper advertisement and attending
any Conservation Commission hearings as part of this project.
Page 6 of 6
envpartners.com
Summary
The Barnstable Department of Public Works is proposing to implement sewer reliability
improvements along Main Street: 720 Main Street and 725 Main Street. The project will impact
resource areas during construction, but will not result in permanent, detrimental impacts as a result
of these sewer collection system improvements.
If you should have any questions or require additional information, please do not hesitate to contact
me.
Sincerely,
Environmental Partners Group, LLC
Ziad F. Kary
Regional Manager and Senior Principal
O: 617.657.0283
E: zfk@envpartners.com
CC: MassDEP Southeast Regional Office
Griffin Beaudoin, Town of Barnstable
File
APPENDIX A
NOI Checklist, WPA Form 3, and Transmittal
wpaform3.doc • rev. 6/18/2020 Page 1 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
Important:
When filling out
forms on the
computer, use
only the tab key
to move your
cursor - do not
use the return
key.
Note:
Before
completing this
form consult
your local
Conservation
Commission
regarding any
municipal bylaw
or ordinance.
A. General Information
1.Project Location (Note: electronic filers will click on button to locate project site):
720/725 Main Street
a. Street Address
Hyannis
b. City/Town
02601
c. Zip Code
Latitude and Longitude: d. Latitude e. Longitude
308
f. Assessors Map/Plat Number
003/143
g. Parcel /Lot Number
2.Applicant:
Griffin Beaudoin
b. Last Namea.First Name
Town of Barnstable
c.Organization
382 Falmouth Road
d. Street Address
Hyannis
e. City/Town
MA 02601
g. Zip Code
617-657-0200
h. Phone Number i. Fax Number
f.State
griffin.beaudoin@town.barnstable.ma.us
j. Email Address
Check if more than one owner 3.Property owner (required if different from applicant):
a.First Name b. Last Name
Town of Barnstable
c. Organization
367 Main Street
d. Street Address
Hyannis
e. City/Town
MA
f. State
02601
g. Zip Code
508-852-4610
h. Phone Number i. Fax Number j. Email address
4.Representative (if any):
Ziad Kary
b. Last Namea.First Name
Environmental Partners
c.Company
1900 Crown Colony Drive, Suite 402
d. Street Address
Quincy
e.
MA
f. State
02169
g. Zip Code
508-790-6400
h. Phone Number i. Fax Number
zfk@envpartners.com
j. Email address
5.Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
a. Total Fee Paid b. State Fee Paid c. City/Town Fee Paid
41.647818/41.647625 -70.294266/-70.293941
N/A N/A N/A
wpaform3.doc • rev. 6/18/2020 Page 2 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
A. General Information (continued)
6.General Project Description:
The existing wastewater pump station at 720 Main Street will be decommissioned and flow will be
conveyed to a new wastewater pump station at 725 Main Street. The New Pump Station construction
includes new above and underground structures, access road, and stormwater management system.
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. Single Family Home 2. Residential Subdivision
3. Commercial/Industrial 4. Dock/Pier
5. Utilities 6. Coastal engineering Structure
7. Agriculture (e.g., cranberries, forestry) 8. Transportation
9. Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological
Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
2. Limited Project Type
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8.Property recorded at the Registry of Deeds for:
Barnstable
a. County b. Certificate # (if registered land)
575
c. Book
52
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2.Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
N/A
wpaform3.doc • rev. 6/18/2020 Page 3 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
For all projects
affecting other
Resource Areas,
please attach a
narrative
explaining how
the resource
area was
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Bank 1. linear feet 2. linear feet
b. Bordering Vegetated
Wetland
5,700 within 100-ft. Buffer Zone
1. square feet
350 within 50-ft. Buffer Zone
2. square feet
c.Land Under
Waterbodies and
Waterways
1. square feet 2. square feet
3. cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
d. Bordering Land
Subject to Flooding 1. square feet 2. square feet
3. cubic feet of flood storage lost 4. cubic feet replaced
e. Isolated Land
Subject to Flooding 1. square feet
3. cubic feet replaced
f.Riverfront Area
2.cubic feet of flood storage lost
1. Name of Waterway (if available) - specify coastal or inland
2.Width of Riverfront Area (check one):
25 ft. - Designated Densely Developed Areas only
100 ft. - New agricultural projects only
200 ft. - All other projects
3.Total area of Riverfront Area on the site of the proposed project:
6,240 within 200-ft. Buffer Zone
square feet
4.Proposed alteration of the Riverfront Area:
a. total square feet b. square feet within 100 ft.c. square feet between 100 ft. and 200 ft.
5.Has an alternatives analysis been done and is it attached to this NOI? Yes No
6.Was the lot where the activity is proposed created prior to August 1, 1996? Yes No
3. Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
0
wpaform3.doc • rev. 6/18/2020 Page 4 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Designated Port Areas Indicate size under Land Under the Ocean, below
b.Land Under the Ocean 1. square feet
2. cubic yards dredged
c.Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d.Coastal Beaches 1. square feet 2. cubic yards beach nourishment
e.Coastal Dunes 1. square feet 2. cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement (if any)
f.Coastal Banks 1. linear feet
g.Rocky Intertidal
Shores 1. square feet
h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation
i.Land Under Salt
Ponds 1. square feet
2. cubic yards dredged
j. Land Containing
Shellfish 1. square feet
k.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1. cubic yards dredged
l.Land Subject to
Coastal Storm Flowage 1. square feet
4. Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a. square feet of BVW b. square feet of Salt Marsh
5. Project Involves Stream Crossings
a. number of new stream crossings b. number of replacement stream crossings
wpaform3.doc • rev. 6/18/2020 Page 5 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements
This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions
(310 CMR 10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the
Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the
Massachusetts Natural Heritage Atlas or go to
http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm.
a. Yes No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581 b. Date of map
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321
CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR
complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review (unless noted exceptions in Section 2 apply, see below).
c.Submit Supplemental Information for Endangered Species Review∗
1. Percentage/acreage of property to be altered:
(a)within wetland Resource Area percentage/acreage
(b)outside Resource Area percentage/acreage
2. Assessor’s Map or right-of-way plan of site
2. Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work ∗∗
(a) Project description (including description of impacts outside of wetland resource area &
buffer zone)
(b)Photographs representative of the site
∗ Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma-
endangered-species-act-mesa-regulatory-review).
Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act.
∗∗ MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc • rev. 6/18/2020 Page 6 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
(c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for-
a-mesa-project-review).
Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit:
(d) Vegetation cover type map of site
(e) Project plans showing Priority & Estimated Habitat boundaries
(f)OR Check One of the Following
1. Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in-
priority-habitat; the NOI must still be sent to NHESP if the project is within estimated
habitat pursuant to 310 CMR 10.37 and 10.59.)
2. Separate MESA review ongoing. a. NHESP Tracking #b. Date submitted to NHESP
3. Separate MESA review completed.
Include copy of NHESP “no Take” determination or valid Conservation & Management
Permit with approved plan.
3.For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. Not applicable – project is in inland resource area only b. Yes No
If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
South Shore - Cohasset to Rhode Island border, and
the Cape & Islands:
Division of Marine Fisheries -
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 South Rodney French Blvd.
New Bedford, MA 02744
Email: dmf.envreview-south@mass.gov
North Shore - Hull to New Hampshire border:
Division of Marine Fisheries -
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
Email: dmf.envreview-north@mass.gov
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP’s Southeast Regional Office.
c. Is this an aquaculture project? d. Yes No
If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57).
wpaform3.doc • rev. 6/18/2020 Page 7 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Website for ACEC locations). Note: electronic filers click on Website.
b. ACEC
5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a. Yes No
6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. Yes No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1. Applying for Low Impact Development (LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2. A portion of the site constitutes redevelopment
3. Proprietary BMPs are included in the Stormwater Management System.
b. No. Check why the project is exempt:
1. Single-family house
2. Emergency road repair
3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project) with no discharge to Critical Areas.
D. Additional Information
This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of
the following information you submit to the Department.
1. USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
wpaform3.doc • rev. 6/18/2020 Page 8 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
D. Additional Information (cont’d)
3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title
b. Prepared By
c. Signed and Stamped by
d. Final Revision Date
e. Scale
f. Additional Plan or Document Title
g. Date
5. If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Report, if needed.
E. Fees
1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number
3. Check date
4. State Check Number
5. Check date
6. Payor name on check: First Name
7. Payor name on check: Last Name
720 Main Street Pump Station Replacement
CWSRF #6953
Environmental Partners Ziad F. Kary, P.E.
December 2022
December 2022 1" = 20'
wpaform3.doc • rev. 6/18/2020 Page 9 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Barnstable
City/Town
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to
the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by
hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line
of the project location.
1. Signature of Applicant
2. Date
3. Signature of Property Owner (if different)4. Date
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents,
two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the
Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the
MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the “yes” box in any part of Section C, Item 3, above, refer to that
section and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
PGB FOR TOB DPW 12/21/2022
12/27/2022Ziad F. Kary, Environmental Partners
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: When
filling out forms
on the computer,
use only the tab
key to move your
cursor - do not
use the return
key.
A. Applicant Information
1. Location of Project:
a. Street Address
b. City/Town
c. Check number
d. Fee amount
2. Applicant Mailing Address:
a. First Name
b. Last Name
c. Organization
d. Mailing Address
e. City/Town
f. State
g. Zip Code
h. Phone Number
i. Fax Number
j. Email Address
3. Property Owner (if different):
a. First Name
b. Last Name
c. Organization
d. Mailing Address
e. City/Town
f. State
g. Zip Code
h. Phone Number
i. Fax Number
j. Email Address
To calculate
filing fees, refer
to the category
fee list and
examples in the
instructions for
filling out WPA
Form 3 (Notice of
Intent).
B. Fees
Fee should be calculated using the following process & worksheet. Please see Instructions before
filling out worksheet.
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category
(identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in
addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then
added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To
calculate the city/town share of the fee, divide the total fee in half and add $12.50.
720/725 Main Street Hyannis
N/A Fee Exempt
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number
of Activities
Step
3/Individual
Activity Fee
Step 4/Subtotal Activity
Fee
Step 5/Total Project Fee:
Step 6/Fee Payments:
Total Project Fee:
a. Total Fee from Step 5
State share of filing Fee:
b. 1/2 Total Fee less $12.50
City/Town share of filling Fee:
c. 1/2 Total Fee plus $12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of
this form; and the city/town fee payment.
To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of
Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these
electronically.)
N/A N/A N/A N/A
N/A
tr-formw.docx • rev. 2/21 Page 1 of 1
Enter your transmittal number
Transmittal Number
Your unique Transmittal Number can be accessed online:
https://www.mass.gov/service-details/transmittal-form-number-for-massdep-permit-application-payment
Massachusetts Department of Environmental Protection
Transmittal Form for Permit Application and Payment
1.Please type or
print. A separate
Transmittal Form
must be completed
for each permit
application.
2.Make your
check payable to
the Commonwealth
of Massachusetts
and mail it with a
copy of this form to:
MassDEP, P.O.
Box 4062, Boston,
MA 02211.
3.Three copies of
this form will be
needed.
Copy 1 - the
original must
accompany your
permit application.
Copy 2 must
accompany your
fee payment.
Copy 3 should be
retained for your
records
4.Both fee-paying
and exempt
applicants must
mail a copy of this
transmittal form to:
MassDEP
P.O. Box 4062
Boston, MA
02211
* Note:
For BWSC Permits,
enter the LSP.
A. Permit Information
1. Permit Code: 4-to-7-character code from permit instructions 2. Name of Permit Category
3. Type of Project or Activity
B. Applicant Information – Firm or Individual
1. Name of Firm - Or, if party needing this approval is an individual enter name below:
2.Last Name of Individual 3.First Name of Individual 4. MI
5. Street Address
6. City/Town
7. State 8. Zip Code 9. Telephone #10. Ext. #
11. Contact Person 12. e-mail address
C. Facility, Site or Individual Requiring Approval
1. Name of Facility, Site or Individual
2. Street Address
3. City/Town 4. State 5. Zip Code 6. Telephone #7. Ext. #
8. DEP Facility Number (if Known)9. Federal I.D. Number (if Known)10. BWSC Tracking # (if Known)
D. Application Prepared by (if different from Section B)*
1. Name of Firm or Individual
2. Address
3. City/Town
4. State
5. Zip Code 6. Telephone #7. Ext. #
8.Contact Person 9. LSP Number (BWSC Permits only)
E. Permit - Project Coordination
1.Is this project subject to MEPA review? yes no
If yes, enter the project’s EOEA file number - assigned when an
Environmental Notification Form is submitted to the MEPA unit:
EOEA File Number
F. Amount Due
DEP Use Only Special Provisions:
1. Fee Exempt: city, town, county, or district of the Commonwealth; federally recognized Indian tribe housing authority;
municipal housing authority; the MBTA; or state agency if fee is $100 or less. There are no fee exemptions for BWSC
permits, regardless of applicant status.
2. Hardship Request - payment extensions according to 310 CMR 4.04(3)(c).
3. Alternative Schedule Project (according to 310 CMR 4.05 and 4.10).
4. Homeowner (according to 310 CMR 4.02).
Permit No:
Rec’d Date:
Reviewer:
Check Number Dollar Amount Date
X289558
Environmental Partners Group, LLC
1900 Crown Colony Drive, Suite 402
Quincy MA 02169
Town of Barnstable Department of Public Works
Hyannis MA
Griffin Beaudoin, P.E.
Ziad F. Kary, P.E.
WPA Form 3 Wetlands Notice of Intent
Sewer Pump Station Decommissioning and Replacement
382 Falmouth Road
02601 508-790-6400
phillip.beaudoin@town.barnstable.ma.us
720 Main Street Pump Station Replacement
720/725 Main Street
Hyannis MA 02601
APPENDIX B
Project Descriptions
MEMORANDUM
Date: December 27, 2022
To Town of Barnstable Conservation Commission
From Ziad F. Kary, P.E.
CC Griffin Beaudoin, P.E., Town of Barnstable DPW
Subject 720 Main Street Pump Station Replacement Project – CWSRF#6953
Existing Pump Station Decommissioning at 720 Main Street, Hyannis, MA
Wetland Notice of Intent
Project Description
The existing pump station at 720 Main Street, Hyannis, is undersized and outdated. A new pump
station is proposed to be constructed across the street at 725 Main Street, Hyannis. The existing 720
Main Street pump station is located entirely within the 50-foot buffer zone of the nearby
intermittent stream. The existing pump station will be removed from service and all underground
connections will be removed or rerouted to the new station, and all above ground equipment will be
removed. The existing pump station will be restored to pervious ground and wastewater will flow to
the new pump station at 725 Main Street. Construction activities for decommissioning includes:
- Closing existing natural gas and water valves
- Removing and legally disposing of the underground piping and equipment including
asbestos concrete influent piping, forcemain piping, and sewer manhole and valve vault
- Removing and legally disposing of the above ground equipment and service connections
including the generator, electric panels, electrical manhole, gas meter.
- Cleaning, removal and disposal of the existing pump station and wet well to six feet below
grade.
- Abandoning remaining pump station structure and filling with flowable fill.
- Demolishing existing concrete pads and restoring the formerly impervious areas to pervious
areas using loam and seed
The existing tree, retaining wall, and guard rail within the project site will remain in place.
Page 2 of 3
envpartners.com
Figure 1: View across Main Street, looking northeast at Existing Pump Station, 720 Main Street
Figure 2: View looking south at Existing Pump Station, 720 Main Street
Page 3 of 3
envpartners.com
Impacts to Wetland Resource Areas
For this part of the project, the work is located within the 200-foot Riverfront area and the 50-foot
buffer zone. The conversion of impervious surfaces to pervious surfaces in the Buffer Zone and
Riverfront area are exempt under the Wetlands Regulations Act, 310 CMR 10.02(1)(f), provided
erosion and sedimentation controls are implemented during construction and the work does not
take place in a wetland resource area other than the Riverfront Area.
While the construction work will take place within the 50-foot buffer zone, the area will be restored
within the existing Town DPW Sewer Easement.
Proposed Environmental Protection Measures
To mitigate potential impacts to wetland resource areas during construction activities, the following
environmental protection measures will be provided in the project area:
• Erosion and sedimentation control devices (e.g. filter sock and catch basin silt sacks) will be
installed along the limits of work as shown on the design sheets under Appendix D. This
measure will control sedimentation and erosion in the surrounding wetlands areas and also
will serve to define the limits of work in these areas. Erosion and sedimentation control
devices will be inspected and maintained daily during construction and will be removed from
the site once work is completed.
• A proposed dewatering plan is shown on the design plans under Appendix D. All dewatering
discharge activity will occur within the containment of the downstream erosion controls.
• Stockpiles of cleared and grubbed materials, and any aggregate materials (sand, gravel, and
stone) will not be maintained on-site. Aggregate materials will be delivered on an as-needed
basis. Cleared and grubbed materials will be removed from the site and disposed of legally,
at a location approved by the Engineer.
• Disturbed areas will be restored to original conditions. Wetlands will be replicated in any
areas disturbed by construction activity. Seeding of disturbed areas will be with New England
Conservation Seed Mix, free of fertilizers. Loam will be low nitrogen and native to Cape Cod.
• Any trench dewatering required during construction shall pass through dewatering bags.
• Temporary erosion and sedimentation controls during construction will include Best
Management Practices (BMPs) such as frac tanks, secondary containment, and silt sack
installation in all catch basins abutting the project area to filter out stormwater sediment
that results from trenching. Additionally, filter sock will be installed around the pump station
work areas to prevent migration of construction sediments outside of the project area and
into nearby surface waters during storm events. Trench dewatering operations will include
passage through frac tanks and dewatering bags to filter out sediment prior to discharge.
Discharge of groundwater into the sewer system will not be permitted.
Enclosure: Unofficial Deed of Sewer Easement at 720 Main Street
MEMORANDUM
Date: December 27, 2022
To Town of Barnstable Conservation Commission
From Ziad F. Kary, P.E.
CC Griffin Beaudoin, P.E., Town of Barnstable DPW
Subject 720 Main Street Pump Station Replacement Project – CWSRF#6953
New Pump Station at 725 Main Street, Hyannis, MA
Wetland Notice of Intent
Project Description
The existing pump station at 720 Main Street, Hyannis, is undersized and outdated. A new pump
station will be constructed across the street at 725 Main Street, Hyannis, within an existing Town
DPW Sewer Easement. The new Pump Station will include new equipment sized to accommodate
the required flow for the area, and will be compliant with building and wastewater design standard
practices. Complete construction includes:
- Work within the roadway (Main Street and Dumont Drive)
o Rerouting existing gravity sewer to the new station.
o Installing new sewer forcemain connections to the existing sewer forcemain in main
street
o Installing new gravity sewer within Main Street
- Work within the 50-foot and 100-foot BVW Buffer Zones
o Removal of some trees to accommodate new electrical utility connection and
retaining wall (less than 350 sf)
o New underground pipe and structures
o New building, equipment, asphalt pavement, and a concrete walkway
- Work within the 200-foot Riverfront Area
o New stormwater structures
o Access driveway for heavy equipment
o New underground pipe and structures
The new pump station will be constructed within two easements, the Sewer Easement and Access
Easement, a total area of 16,835 square feet within the existing Town-owned parcel. The Sewer
Page 2 of 5
envpartners.com
Easement is for the laying of sewer mains, pipes, shut offs, service boxes, buildings, and any other
equipment necessary for the installation of a wastewater pumping station. The Access Easement is
for the purpose of access and egress to the wastewater pump station. Figure 1 below shows a
sketch of the parcel outline for 725 Main Street (green), the Sewer Easement (red), and the Access
Easement (orange). There is limited space for project work within the easements. Full design
drawings are shown in Appendix D and the Deed showing the easements is attached to the Project
Description.
Figure 1: Highlighted Parcel Lines Showing Sewer and Access Easements
sketched from Sheet C-1 of Appendix D (not to scale)
Page 3 of 5
envpartners.com
Figure 2: View looking south, parallel to Dumont Drive, at New Pump Station site, 725 Main Street
Figure 3: View looking southwest at New Pump Station site, 725 Main Street
Page 4 of 5
envpartners.com
Impacts to Wetland Resource Areas
For this project, the work is located within the 200-foot Riverfront area and the 50-foot and 100-foot
buffer zones. The permanent impact within the 100-foot buffer zone is the addition of new
impervious area (approximately 5,000 sf). The total impact during construction within the 50-foot
buffer zone is 700 sf. The permanent impact within the 50-foot buffer zone includes clearing of
approximately 350 sf of tree line to accommodate the installation of a new electrical transformer for
the pump station and new retaining wall installation, to support driveway vehicle access loading for
pump station operation and maintenance.
There is approximately 6,500 square feet (sf) of new pavement to be added within the Access
Easement and Sewer Easement, which will require capture and diversion of runoff to the existing
property stormwater infrastructure. Two stormwater catch basins will be installed within the Sewer
Easement to capture runoff. A Cultec stormwater infiltration system will capture and infiltrate flows
up to a 10-year, 24-hour storm event. The overflow from the system will be diverted into an existing
drain pipe which flows to the intermittent stream at the southwest side of the property. The
construction project will include provisions for cleaning the drainage pipes.
Asphalt pavement will be used to accommodate safe, accessible, all-season roadway surface for
safety, operations, and maintenance equipment. The equipment that will need to access the pump
station includes but is not limited to:
• DPW Service Vehicles (Pickup Trucks and Crane Trucks; approx. 7,000 lbs.)
• Lull Lifts (i.e. forklift-type crane vehicle; approx. 20,890 lbs.)
• Vactor Trucks (approx. 66,000 lbs.)
• Fire Trucks and Emergency Service Vehicles (approx. 38,000 – 60,000 lbs.)
The existing retaining wall around the southeast corner of the Sewer Easement is left in place from
the former gas station that occupied the property before 2002. A new retaining wall will provide new
reinforcement along the pump station area and connect to the existing ends of the former gas
station retaining wall. Details of the wall and proposed grading is included in the Design Drawings in
Appendix D.
Proposed Environmental Protection Measures
To mitigate potential impacts to wetland resource areas during construction activities, the following
environmental protection measures will be provided in the project work areas:
• Erosion and sedimentation control devices (e.g. filter sock and catch basin silt sacks) will be
installed along the limits of work as shown on the design sheets under Appendix D. This
measure will control sedimentation and erosion in the surrounding wetlands areas and also
will serve to define the limits of work in these areas. Erosion and sedimentation control
devices will be inspected and maintained daily during construction and will be removed from
the site once work is completed.
• A proposed dewatering plan is shown on the design plans under Appendix D. All dewatering
discharge activity will occur within the containment of the downstream erosion controls.
Page 5 of 5
envpartners.com
• Stockpiles of cleared and grubbed materials, and any aggregate materials (sand, gravel, and
stone) will not be maintained on-site. Aggregate materials will be delivered on an as-needed
basis. Cleared and grubbed materials will be removed from the site and disposed of legally,
at a location approved by the Engineer.
• Disturbed areas will be restored to original conditions. Wetlands will be replicated in any
areas disturbed by construction activity. Seeding of disturbed areas will be with New England
Conservation Seed Mix, free of fertilizers. Loam will be low nitrogen and native to Cape Cod.
• Any trench dewatering required during construction shall pass through dewatering bags.
• Temporary erosion and sedimentation controls during construction will include Best
Management Practices (BMPs) such as frac tanks, secondary containment, and silt sack
installation in all catch basins abutting the project area to filter out stormwater sediment
that results from trenching. Additionally, filter sock will be installed around the pump station
work areas to prevent migration of construction sediments outside of the project area and
into nearby surface waters during storm events. Trench dewatering operations will include
passage through frac tanks and dewatering bags to filter out sediment prior to discharge.
Discharge of groundwater into the sewer system will not be permitted.
Enclosure: Recorded Deed and Easement – 725 Main Street, Hyannis, MA
APPENDIX C
Project Maps
Existing 720 Main Street
Pump Station
Proposed 725 Main Street
Pump Station
±
Job #: 271 - 2140
1 in = 300 feet
I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\10 GIS\Figure 1 - USGS Quads Locus Map.mxdDecember 2022 FIGURE1USGS QUADS LOCUS MAP
NOI Application720 MAIN ST PUMP STATION REPLACEMENTBARNSTABLE, MA
Grapevine Roa
d
12/5/22, 11:48 AM NHESP Priority Habitats of Rare Species
https://massgis.maps.arcgis.com/home/webmap/print.html 1/1
MassGIS | MassGIS, NHESP
NHESP Priority Habitats of Rare Species
Areas delineated as Priority Habitats in Massachusetts are protected and can include wetlands, uplands, and marine
habitats. Published as a map service by MassGIS.
NHESP Priority Habitats
of Rare Species
NHESP Priority Habitats of
Rare Species
60ft
+
−
i
100 ft
50 m
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 12/5/2022 at 11:58 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
70°17'59"W 41°39'7"N
70°17'21"W 41°38'41"N
Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020
12/5/22, 11:49 AM NHESP Priority Habitats of Rare Species
https://massgis.maps.arcgis.com/home/webmap/print.html 1/1
MassGIS | MassGIS, NHESP
NHESP Priority Habitats of Rare Species
Areas delineated as Priority Habitats in Massachusetts are protected and can include wetlands, uplands, and marine
habitats. Published as a map service by MassGIS.
NHESP Priority Habitats
of Rare Species
NHESP Priority Habitats of
Rare Species
60ft
+
−
i
100 ft
50 m
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 12/5/2022 at 12:01 PM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
70°17'58"W 41°39'4"N
70°17'21"W 41°38'37"N
Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020
APPENDIX D
Design Plans
720 MAIN STREET
PUMP STATION REPLACEMENT
DEPARTMENT OF PUBLIC WORKS
BARNSTABLE, MASSACHUSETTS
DANIEL W. SANTOS, P.E. - DIRECTOR
PAUL RUSZALA, P.E. - SENIOR PROJECT MANAGER - CWMP CONSTRUCTION
GRIFFIN BEAUDOIN, P.E. - TOWN ENGINEER
ANDREW BOULE - WATER POLLUTION CONTROL SUPERVISOR
NOVEMBER 2022
FOR PERMITTING
N
BARNSTABLE
SOUT
H
ST
R
E
ET
PROJECT AREA
VICINITY MAP
1"= 500'
TOWN OF BARNSTABLE, MA
CWSRF #6953
MAIN STREETNORTH STREETSEA STREET
PROPOSED
PUMP STATION
INDEX OF DRAWINGS
ZFK
DNRP
FJB
FJB
AS NOTED
G-1
INDEX OF DRAWINGS
G-1 INDEX OF DRAWINGS
G-2 GENERAL NOTES AND
SUGGESTED SEQUENCE OF CONSTRUCTION
G-3 LEGEND, ABBREVIATIONS, AND SHEET MAP
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\02 General Notes and Legend.dwg Plot Date: Nov 21,2022-10:39amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
GENERAL NOTES SHEETS
CIVIL SHEETS
C-1 EXISTING CONDITIONS PLAN
725 MAIN STREET PUMP STATION
C-2 EXISTING CONDITIONS PLAN
STA 0+00 TO STA 5+60
C-3 EXISTING CONDITIONS PLAN
STA 5+60 TO STA 11+26
C-4 PROPOSED CONDITIONS PLAN
725 MAIN STREET PUMP STATION
C-5 PROPOSED CONDITIONS PLAN
STA 0+00 TO STA 5+60
C-6 PROPOSED CONDITIONS PLAN
STA 5+60 TO STA 11+26
C-7 EXISTING PUMP STATION DEMOLITION PLAN
CD-1 CIVIL DETAILS I
CD-2 CIVIL DETAILS II
CD-3 CIVIL DETAILS III
CD-4 CIVIL DETAILS IV
CD-5 CIVIL DETAILS V
ARCHITECTURAL SHEETS
STRUCTURAL SHEETS
A-1 CODE REVIEW
A-2 FLOOR PLANS
A-3 ROOF PLAN
A-4 REFLECTED CEILING PLANS
A-5 BUILDING SECTIONS
A-6 BUILDING SECTIONS
A-7 EXTERIOR ELEVATIONS
A-8 PERSPECTIVES
S-1 GENERAL NOTES
S-2 FOUNDATION PLAN AND FLOOR PLAN 1
S-3 ROOF PLAN
S-4 STRUCTURAL FOUNDATION SECTIONS
S-5 STRUCTURAL FOUNDATION SECTIONS
S-6 STRUCTURAL SLAB SECTIONS
S-7 STRUCTURAL CMU SECTIONS
M-1 PUMP STATION LAYOUT
BELOW GRADE AND FLOOR AT GRADE
M-2 PUMP STATION LAYOUT
SECTION VIEW
M-3 PUMP STATION LAYOUT
SECTION VIEW
MECHANICAL SHEETS
H-1 HVAC LEGEND NOTES AND DETAILS
H-2 HVAC SCHEDULES
H-3 HVAC PLANS
HVAC SHEETS
P-1 PLUMBING LEGEND, NOTES AND ABBREVIATIONS
P-2 PLUMBING PLANS
P-3 PLUMBING SCHEDULES AND DETAILS
PLUMBING SHEETS
E-1 ELECTRICAL LEGEND, NOTES, AND DETAILS
E-2 ELECTRICAL SCHEDULES
E-3 ELECTRICAL PLANS
E-4 POWER RISER DIAGRAM
E-5 ELECTRICAL DETAILS
ELECTRICAL SHEETS
INSTRUMENTATION AND CONTROLS SHEETS
TRAFFIC MANAGEMENT PLAN SHEETS
TO BE INCLUDED UNDER NEXT SUBMISSION
TO BE INCLUDED UNDER NEXT SUBMISSION
SUGGESTED SEQUENCE OF CONSTRUCTION
GENERAL NOTES AND
ZFK
DNRP
FJB
FJB
AS NOTED
G-2
1. BASE MAP INFORMATION IS BASED ON EXISTING CONDITION SURVEY PERFORMED BY MERRILL
ENGINEERS AND LAND SURVEYORS (SEPTEMBER 2021 - NOVEMBER 2021) AND RECORD
INFORMATION PROVIDED BY THE TOWN. THE BASIS OF BEARING FOR ALL SURVEYS IS AN
APPROXIMATED NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) AND THE HORIZONTAL
DATUM USED IS THE NORTH AMERICAN VERTICAL DATUM OF 1983 (NAD83). IT IS NOTED THAT
ADDITIONAL UTILITY PIPES AND STRUCTURES MAY EXIST.
2. ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE
LOCATION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY DIG SAFE AT LEAST 72
HOURS IN ADVANCE, EXCLUDING WEEKENDS AND HOLIDAYS, PRIOR TO ANY EXCAVATION. THE
DIG SAFE PROJECT REFERENCE NUMBER(S) SHALL BE GIVEN TO THE OWNER.
3. THE CONTRACTOR IS ADVISED TO TAKE ALL REASONABLE PRECAUTIONS AND MAKE ALL
REASONABLE INVESTIGATIONS NECESSARY TO PERFORM THE WORK. THE OWNER WILL NOT
CONSIDER CONTRACTOR'S UNFAMILIARITY WITH THE PROJECT OR SITE CONDITIONS AT THE
TIME OF BID AS A BASIS FOR ADDITIONAL COMPENSATION.
4. THE CONTRACTOR SHALL NOT STORE ANY APPARATUS, MATERIALS, SUPPLIES, OR EQUIPMENT
ON DRAINAGE STRUCTURES, PRIVATE PROPERTY, OR WITHIN 100 FEET OF WETLANDS.
5. NORTH DIRECTION SHOWN IS APPROXIMATE.
6. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS OF THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
7. THE CONTRACTOR SHALL RESTORE ALL DAMAGED PUBLIC AND PRIVATE PROPERTY TO ITS
PRE-CONSTRUCTION CONDITION AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS TO
TAKE SPECIAL CARE NOT TO DAMAGE TREES, BUSHES, PLANTS, FLOWERS, STONE WALLS, SEA
WALLS, FENCES, ETC. WITHIN THE CONSTRUCTION AREA UNLESS THEY ARE NOTED TO BE
REMOVED. CONTRACTOR SHALL REPLACE AT NO COST TO THE OWNER, ALL DAMAGED ITEMS.
8. ALL EXISTING WATER, SEWER. AND STORM DRAIN LINES ENCOUNTERED DURING
CONSTRUCTION ARE TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED ON THE DRAWINGS
OR DIRECTED BY THE TOWN OR THE ENGINEER. THE CONTRACTOR SHALL REPAIR ANY
EXISTING WATER MAINS, WATER SERVICES, STORM DRAIN LINES, OR CULVERTS DAMAGED BY
THE CONTRACTOR DURING CONSTRUCTION AT THE CONTRACTOR'S EXPENSE.
9. IN THOSE INSTANCES WHERE POWER OR TELEPHONE POLE SUPPORT IS REQUIRED, THE
CONTRACTOR SHALL PROVIDE A MINIMUM 48-HOUR NOTIFICATION TO THE RESPECTIVE UTILITY
COMPANY. PAYMENT FOR TEMPORARY BRACING OF UTILITIES SHALL BE PAID FOR UNDER THE
UTILITY SUPPORT AND COORDINATION ITEM OF THE BID FORM.
10. ALL STRUCTURES AND PIPELINES LOCATED ADJACENT TO THE TRENCH EXCAVATION SHALL BE
PROTECTED AND FIRMLY SUPPORTED BY THE CONTRACTOR UNTIL THE TRENCH IS BACKFILLED.
INJURY TO ANY SUCH STRUCTURE CAUSED BY, OR RESULTING FROM, THE CONTRACTORS
OPERATIONS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. ALL UTILITIES REQUIRING
REPAIR, RELOCATION, OR ADJUSTMENT AS A RESULT OF THE PROJECT SHALL BE
COORDINATED THROUGH THE RESPECTIVE UTILITY AND THE TOWN.
11. BORING LOCATIONS ARE SHOWN ON THE DRAWINGS. LOCATIONS WERE MEASURED FROM
EXISTING SITE FEATURES AND ARE APPROXIMATE. BORING LOGS ARE PROVIDED IN APPENDIX B
OF THE SPECIFICATIONS.
12. CONTRACTOR SHALL REMOVE AND REPLACE, OR REPAIR, ALL CURBS, SIDEWALKS, PAVEMENT,
AND OTHER ITEMS DAMAGED BY THEIR CONSTRUCTION ACTIVITIES TO AT LEAST THEIR
ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE TOWN OF BARNSTABLE DEPARTMENT
OF PUBLIC WORKS AND THE ENGINEER.
13. OPEN TRENCHES MUST BE BACKFILLED AT THE END OF THE WORKDAY IN ACCORDANCE WITH
THE DETAILS AND SPECIFICATIONS OR COVERED AND SECURED WITH STEEL PLATES AND
RAMPED AS APPROVED BY THE TOWN OF BARNSTABLE DEPARTMENT OF PUBLIC WORKS.
14. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH AND MAINTAIN A TELEPHONE NUMBER
WHERE THE CONTRACTOR CAN BE REACHED 24 HOURS A DAY, 7 DAYS A WEEK.
15. THE CONTRACTOR SHALL HANDLE GROUNDWATER, WHERE ENCOUNTERED, IN AN APPROVED
MANNER. DURING ANY DEWATERING, THE CONTRACTOR SHALL USE STONE AROUND THE
SUCTION END TO MINIMIZE DISCHARGE OF TRENCH MATERIALS. THE DISCHARGED WATER
SHALL PASS THROUGH FILTER FABRIC. FLOW FROM DEWATERING ACTIVITIES SHALL NOT BE
DISCHARGED TO SANITARY SEWERS.
16. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR WORK IN ROADWAYS. THE
CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO ALL PERMITS AS AN INTEGRAL PART OF
HIS WORK.
17. IN AREAS WHERE CONSTRUCTION ACTIVITIES ARE ANTICIPATED TO OCCUR WITHIN PRIVATE
PROPERTY, PROPERTY LINE LOCATIONS ARE TO BE REVIEWED WITH THE TOWN PRIOR TO
COMMENCING CONSTRUCTION ACTIVITIES.
18. DO NOT SCALE DRAWINGS UNLESS OTHERWISE NOTED. WRITTEN DIMENSIONS AND
STATIONING SHALL PREVAIL. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
19. ALL ELEVATIONS SHOWN ARE IN NAVD 88. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING ALL ELEVATIONS, DIMENSIONS, ANGLES AND EXISTING CONDITIONS AT THE WORK
SITE PRIOR TO FABRICATION AND/OR INSTALLATION OF ANY WORK IN THE CONTRACT AREA.
20. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE
LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED
WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE ENGINEER
FOR RESOLUTION OF THE CONFLICT.
21. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION AND ELEVATIONS OF ALL EXISTING
SEWER SERVICE CONNECTIONS PRIOR TO CONSTRUCTING REPLACEMENT SERVICE
CONNECTIONS WHEN REQUIRED.
22. THE LOCATION AND LIMITS OF ALL ON-SITE WORK AND STORAGE AREAS SHALL BE
REVIEWED/COORDINATED WITH, AND APPROVED BY THE TOWN AND THE ENGINEER. THE
CONTRACTOR SHALL LIMIT HIS ACTIVITIES TO THESE AREAS.
23. NO EQUIPMENT, VEHICLES, OR CONSTRUCTION MATERIALS SHALL BE STORED OUTSIDE OF
DESIGNATED WORK AREAS DURING EITHER WORKING OR NON-WORKING HOURS. THE
LOCATION FOR ANY STORAGE OF EQUIPMENT BY THE CONTRACTOR DURING NON-WORKING
HOURS SHALL BE AS APPROVED BY THE TOWN.
24. THE CONTRACTOR SHALL SAW CUT ALL PAVEMENT TO ITS TOTAL DEPTH IN THE PROCESS OF
INSTALLING NEW UTILITIES IN ALL PAVED AREAS INCLUDING STREETS, DRIVEWAYS, AND
SIDEWALKS.
25. TEST PITS TO LOCATE EXISTING UTILITIES SHALL BE PERFORMED WHERE SHOWN AND AS
ORDERED BY THE ENGINEER TO CONFIRM LOCATIONS OF UTILITIES AND DETERMINE WHETHER
TO RAISE OR LOWER THE PROPOSED UTILITIES TO CLEAR EXISTING UTILITIES OR MEET
EXISTING PIPE INVERTS.
26. CONSTRUCTION WORK HOURS WILL BE MONDAY THROUGH FRIDAY FROM 7AM TO 5PM.
27. SPOILS SHALL NOT BE STORED WITHIN TOWN RIGHT OF WAY. ALL SPOILS SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF LEGALLY.
28. IF AT ANY TIME THE CONSTRUCTION EXCAVATION REVEALS ANY ARTICLE OF HISTORIC OR
ARCHAEOLOGICAL SIGNIFICANCE, WORK AT THE LOCATION WILL CEASE AND THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ENGINEER.
29. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF MASSACHUSETTS GENERAL
LAW CHAPTER 82A, TRENCH EXCAVATION AND SAFETY REQUIREMENTS, TO PREVENT THE
GENERAL PUBLIC FROM UNAUTHORIZED ACCESS TO UNATTENDED TRENCHES.
GENERAL NOTES:
SOIL EROSION AND SEDIMENTATION CONTROL NOTES
1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE
SPECIFICATIONS.
2. THE CONTRACTOR SHALL PROVIDE ALL EROSION AND SEDIMENT CONTROL DEVICES AS
DIRECTED BY THE ENGINEER. CONSTRUCTION SHALL NOT COMMENCE UNTIL THESE MEASURES
HAVE BEEN APPROVED BY THE ENGINEER.
3. THE CONTRACTOR SHALL STOCKPILE SUFFICIENT SOIL EROSION AND SEDIMENT CONTROL
MATERIALS ON SITE TO REPAIR ANY DAMAGED SOIL EROSION AND SEDIMENT CONTROLS.
4. SILT SACKS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ALL CATCH BASINS WITHIN
THE PROJECT AREA AND WHERE CONSTRUCTION SEDIMENT MAY FLOW TO OUTSIDE THE
PROJECT AREA. DEBRIS COLLECTED IN SILT SACKS SHALL BE REMOVED AND LEGALLY
DISPOSED OF OFF-SITE ON A WEEKLY BASIS THROUGHOUT THE PROJECT DURATION. UPON
COMPLETION OF THE PROJECT AND AS DIRECTED BY THE ENGINEER, THE CONTRACTOR IS
RESPONSIBLE FOR REMOVAL AND LEGALLY DISPOSING OF THE SILT SACKS AND DEBRIS
OFF-SITE, AND REMOVAL OF CONSTRUCTION DEBRIS WITHIN THE DRAINAGE SYSTEM.
SEWER CONSTRUCTION NOTES:
1. SEWER TRENCHES MAY BE EXCAVATED WIDER THAN THE PAY LIMIT PROVIDED THAT THE WIDER
EXCAVATION CONFORMS TO ALL PERMIT REQUIREMENTS. ANY SUCH ADDITIONAL EXCAVATION
AND PAVING/RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE TOWN AND SHALL NOT BE
MEASURED FOR PAYMENT.
2. OPENINGS FOR PIPE IN PRECAST MANHOLE BASES SHALL BE CAST IN THE REQUIRED LOCATIONS
DURING MANHOLE MANUFACTURE. FIELD CUT OPENINGS WILL NOT BE PERMITTED UNLESS PRIOR
APPROVAL IS RECEIVED FROM THE TOWN AND/OR THE ENGINEER.
3. CALCULATION OF PIPE SLOPES IS BASED ON ELEVATION CHANGE DIVIDED BY THE DISTANCE
BETWEEN THE OUTSIDE EDGES OF THE MANHOLE WALLS. FOR FOUR FOOT DIAMETER MANHOLES,
THIS DISTANCE WAS CALCULATED AS THE CENTERLINE STATIONING MINUS FIVE FEET. FOR FIVE
FOOT DIAMETER MANHOLES, THIS DISTANCE WAS CALCULATED AS THE CENTERLINE STATIONING
MINUS SIX FEET.
4. NEW SEWER SERVICE CONNECTIONS SHALL BE INSTALLED SUCH THAT THEIR GRADE ELEVATIONS
ARE BENEATH THE WATER MAIN AND WATER SERVICE CONNECTIONS. NEW SEWERS SHALL BE
INSTALLED A MINIMUM OF 18" BELOW WATER MAIN UNLESS APPROVED BY ENGINEER AND THE
TOWN.
5. SEWER BYPASS SHALL BE SUPERVISED BY CONTRACTOR PERSONNEL CONTINUOUSLY WHILE
OPERATING. REDUNDANT PUMPS OR TRUCKS SHALL BE PROVIDED AT NO ADDITIONAL COST TO
THE OWNER. AT THE END OF EACH WORKING DAY SEWER PIPE SHALL BE CONNECTED TO THE
EXISTING SEWER.
6. ALL EXISTING SEWER SERVICES SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
CONTRACTOR SHALL PREPARE A CONSTRUCTION SEQUENCE PLAN TO ENSURE THAT ALL SEWER
CUSTOMERS HAVE CONTINUOUS SEWER SERVICE DURING CONSTRUCTION.
7. UTILITY CROSSINGS WITHIN 12" OF THE INSTALLED FORCE MAIN SHALL BE CONCRETE ENCASED.
SEE DETAIL SHEET CD-2.
8. FORM BRICK INVERTS IN MANHOLES WITH BRICK ON EDGE TO A DEPTH OF 0.8 INSIDE DIAMETER OF
PIPE AND FORM A 1 INCH SLOPED BENCH WITH BRICK FLAT. INVERT SHALL BE SLOPED UNIFORMLY
BETWEEN INLET AND OUTLET PIPE AS REQUIRED TO DIRECT THE FLOW AS INDICATED AND TO
PREVENT DEPOSITION OF SOLIDS.
9. THE CONTRACTOR SHALL MAINTAIN A MINIMUM COVER OF 4 FEET OVER ALL FORCE MAIN SEWER
PIPE AND GRAVITY SEWER PIPE, UNLESS OTHERWISE INDICATED ON THE DRAWINGS. WHERE
SHALLOWER INSTALLATIONS ARE REQUIRED, INSULATION SHALL BE INSTALLED AS REQUIRED AND
AS SPECIFIED.
10. SEWER CHIMNEY AND HOUSE CONNECTION LOCATIONS ARE APPROXIMATE IN LOCATION. EXACT
LOCATIONS SHALL BE DETERMINED BY THE ENGINEER AND THE TOWN IN THE FIELD.
DRAINAGE CONSTRUCTION NOTES:
1. DRAINAGE TRENCHES MAY BE EXCAVATED WIDER THAN THE PAY LIMIT. ANY SUCH ADDITIONAL
EXCAVATION AND SUBSEQUENT RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE TOWN
AND SHALL NOT BE MEASURED FOR PAYMENT.
2. OPENINGS FOR PIPE IN PRECAST MANHOLE BASES SHALL BE CAST IN THE REQUIRED LOCATIONS
DURING MANHOLE MANUFACTURE. FIELD CUT OPENINGS WILL NOT BE PERMITTED UNLESS PRIOR
APPROVAL IS RECEIVED FROM THE TOWN AND/OR THE ENGINEER.
3. CALCULATION OF PIPE SLOPES IS BASED ON ELEVATION CHANGE DIVIDED BY THE DISTANCE
BETWEEN THE OUTSIDE EDGES OF THE MANHOLE WALLS. FOR FOUR FOOT DIAMETER
MANHOLES, THIS DISTANCE WAS CALCULATED AS THE PIPE LENGTH MINUS FIVE FEET. FOR FIVE
FOOT DIAMETER MANHOLES, THIS DISTANCE WAS CALCULATED AS THE PIPE LENGTH MINUS SIX
FEET.
4. NEW STORM DRAINS SHALL BE INSTALLED AT THE INVERTS SHOWN ON THE DRAWINGS.
5. FORM BRICK INVERTS IN DRAIN MANHOLES WITH BRICK ON EDGE TO A DEPTH OF 0.8 INSIDE
DIAMETER OF PIPE AND FORM A 1 INCH SLOPED BENCH WITH BRICK FLAT. INVERT SHALL BE
SLOPED UNIFORMLY BETWEEN INLET AND OUTLET PIPE AS REQUIRED TO DIRECT THE FLOW AS
INDICATED AND TO PREVENT DEPOSITION OF SOLIDS.
GENERAL NOTES (CONTINUED):
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\02 General Notes and Legend.dwg Plot Date: Nov 21,2022-10:40amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
ASBESTOS CEMENT (AC) PIPE REMOVAL
1. THE FOLLOWING TABLE SUMMARIZES THE LOCATIONS OF WORK WITH ESTIMATED ACP QUANTITIES.
NOTE THE QUANTITIES PROVIDED BELOW ARE ORDER-OF-MAGNITUDE ESTIMATES ONLY AND
SHOULD BE FIELD-VERIFIED BY THE CONTRACTOR.
MATERIAL TYPE LOCATION QUANTITY
ASBESTOS-CEMENT PIPE
NEAR EXISTING 720 MAIN
STREET PUMP STATION
260 LFMAIN STREET BETWEEN
EXISTING PUMP STATION AND
DUMONT DRIVE
NEAR SEA STREET
SUGGESTED SEQUENCE OF CONSTRUCTION:
DEMOLITION NOTES:
1. ALL EQUIPMENT SHALL BE DE-ENERGIZED AND MADE SAFE BEFORE DEMOLITION.
2. REFER TO CIVIL AND ELECTRICAL CONTRACT DOCUMENTS FOR ADDITIONAL DEMOLITION
REQUIREMENTS.
3. CONTRACTOR'S METHODS OF DEMOLITION SHALL BE APPROVED BY ENGINEER/OWNER PRIOR TO
START OF WORK.
4. COORDINATE SCHEDULE OF WORK WITH OWNER/ENGINEER, REFER TO SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
5. THE CONTRACTOR IS ADVISED THAT HAZARDS MAY BE PRESENT IN PROPOSED AREAS OF WORK.
CONTRACTOR SHALL TAKE AL PRECAUTIONS NECESSARY TO ENSURE THE SAFETY OF PERSONNEL
WORKING IN AND AROUND THESE AREAS.
6. DEMOLITION OF EXISTING STRUCTURES, MECHANICAL SYSTEMS, OR PROCESS SYSTEMS IS
GENERALLY SHOWN OR INDICATED ON THE DRAWINGS. UNLESS OTHERWISE INDICATED, THE
DEMOLITION OF A STRUCTURE OR PROCESS SYSTEM MEANS THE DEMOLITION, REMOVAL, PROPER
CLEANING, AND DISPOSAL OF THE ENTIRE UNIT,
7. CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS AND EQUIPMENT.
TO BE INCLUDED UNDER NEXT SUBMISSION
D
OHW
E
O O
X
G
S
00000000W
10
9
BUILDINGS
CONTOURS - MAJOR
CONTOURS - MINOR
CURB - BOTTOM
CURB - TOP
DRAINAGE
ELECTRIC OVERHEAD WIRES
ELECTRIC
EDGE OF PAVEMENT
FENCES - CHAIN LINK OR METAL
FENCES - OTHER
GAS
PROPERTY LINES
PAVEMENT MARKINGS
SEWER FORCE MAIN
GRAVITY SEWER
TELEPHONE/COMMUNICATIONS
VEGETATION
STONE WALL
WATER BODY
WATER SYSTEMS
LIMIT OF WETLANDS
50 FOOT WETLANDS BUFFER ZONE
100 FOOT WETLANDS BUFFER ZONE
200 FOOT RIPARIAN ZONE
FM SEWER FORCE MAIN
GRAVITY SEWER
WATER MAIN/SERVICE
GAS MAIN/SERVICE
DRAINAGE
FILTER SOCK
SEWER MANHOLE
TEST PIT
CATCH BASIN
DRAINAGE MANHOLE
SEWER FORCE MAIN PLUG VALVE
SEWER FORCE MAIN CHECK VALVE
WATER SHUTOFF
WATER/SEWER LINE CAP
SOLID SLEEVE/TRANSITION COUPLINGFM
S
W
D
T
CATCH BASIN
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS VALVE
GAS SHUTOFF
BOUND
SEWER MANHOLE
SIGN
MAILBOX
LIGHT POST
FLAG POLE
CONIFEROUS TREE
DECIDUOUS TREE
SHRUB
UTILITY POLE
UTILITY POLE GUY WIRE
WETLANDS, PONDS, RIVERS FLAG
HYDRANT
WATER GATE VALVE
WATER SHUTOFF
WELL
WATER/SEWER LINE CAP
METER PIT
TELECOMMUNICATIONS MANHOLE
TELEPHONE BOX
UTILITY BOX
BORING
UTILITY CONTINUATION
POST/BOLLARDP
G
WL
50
100
200
EASEEASEMHR=32.55
MHR=32.65
T
T
WL
W
L
WL
WL WLWLWL50
50
50
50 50
5
0
50SYL
SWL
SWL
SWL
SWL SYLSYLSYL
SWLSYLSYL
SYL
MHW200200200200200200200200200200200200200200200INTERMITTENTSTREAMEASE
EASEEASEEASEEA
S
E
EA
S
E
EA
S
E
EA
S
E
EA
S
E
EA
S
E EASEEASEMHW200200200200200200200200200200200100100100100
100 100
100
1
0
0 100100
100 100
10
0
1
0
0
100505050 50
5
0
INTERMITTENTSTREAM19.3819.4519.3319.3019.5119.45
19.41
19.1019.15
19.23
19.4619.3519.4519.3419.3419.2619.46
19.3719.3819.7619.10
19.41
19.62
19.26
18.9318.9018.72
18.5218.84 18.48 19.0919.9819.26
18.05 18.3818.12
17.97
18.97
18.49505050
50 505050501001001001
0
0
100
100 100
100 100100100100100100LEGEND, ABBREVIATIONS, AND SHEET MAP
ZFK
DNRP
FJB
FJB
AS NOTED
G-3
LEGEND
EXISTING PROPOSED
BENCHMARKS
LOCATION DESCRIPTION STREET ELEVATION SHEET
"X"CUT IN BONNET BOLT OF HYDRANT MAIN STREET AT
DUMONT DRIVE 20.36 C-1/C-2/C-4/C-5
RR SPIKE IN UP SOUTH STREET AT
POTTER AVENUE 24.46 C-2/C-5
TOP OF BONNET BOLT OF HYDRANT SOUTH STREET AT
NEWTON STREET 33.42 C-3/C-6
RR SPIKE IN UP SOUTH STREET 33.33 C-3/C-6
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\02 General Notes and Legend.dwg Plot Date: Nov 21,2022-10:45amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
CAST IRON
DUCTILE IRON
PVC POLYVINYL CHLORIDE
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
CPP CORRUGATED PLASTIC PIPE
AC/ACP
AIR RELEASE/VACUUM RELIEF VALVE
W WATER
D DRAIN
CS COATED STEEL
CU COPPER
G GAS
PL PLASTIC
S SEWER
ABBREVIATIONS
CI
DI
VC VITRIFIED CLAY
FORCE MAINFM
INV INVERT
DCB DOUBLE CATCH BASIN
CATCH BASINCB
ABND ABANDONED
ST STEEL
BOTTOM OF STRUCTUREBOS
ELECTRIC MANHOLEEMH
ELECTRICE
U/UNK UNKNOWN
ELEVATIONEL
TCB TRAFFIC CONTROL BOX
TOW TOP OF WATER
TR TROUGH
TOB TOP OF BASIN
SMH SEWER MANHOLE
TMH TELEPHONE MANHOLE
WSO WATER SHUT OFF
GG GAS GATE
MW MONITORING WELL
T TELEPHONE
WG WATER GATE
CLDI CEMENT LINED DUCTILE IRON
CL CEMENT LINED
CONTROLLED DENSITY FILLCDF
SCALE:
SHEET MAP
1" = 80'
EXISTING (CONTINUED)
ARV
ASBESTOS CEMENT/ASBESTOS CEMENT PIPE
IAMH INTERMEDIATE ACCESS POINT MANHOLE
AIR RELEASE/VACUUM RELIEF VALVEA/V
PV PLUG VALVE
BLOW-OFF/CLEANOUTBO-CO
PROP PROPOSED
WS WATER SERVICE
SS SEWER SERVICE
DRIVEWAYDWY
EDGE OF PAVEMENTEOP
BRICK SIDEWALKBSW
VGC VERTICAL GRANITE CURB
CW CROSSWALK
LCB LEACHING CATCH BASIN
BITUMINOUS CONCRETE SIDEWALKBITSW
CEMENT LINED BRUSHED STEELB&SCL
UNI UNIVERSAL STEEL PIPE
N
MAIN S
T
R
E
E
T
DUMONT DRIVESTEVENSSTREETPOTTER AVENUEMAIN ST
REET
SOUTH STREET
SOUT
H
ST
R
E
ETSEA STREETSEASTREETNEWTON STREETC-2 EXISTING CONDITIONS
C-5 PROPOSED CONDITIONS
C-7 DEMOLITION PLAN
C-3 EXISTING CONDITIONS
C-6 PROPOSED CONDITIONS
C-1 EXISTING CONDITIONS
C-4 PROPOSED CONDITIONS
EASEEASEEASEEASEEASEEASE6"
6"6"
6"6"
6"6"
6"6"
6"6"6"
6"
CB/DISC
EBOX/ IRRIGATION
EBOX
EM
EMH
GM
GP
GS
GS
GS
GW
HYD
(2)CV
CV
LAMP
LAMP
LP
MAIL
POST/ELEC
SIGN: DUMONT
SIGN
SLAB=14.79
SLAB=14.77
TH=14.97
TH=14.92
TH=20.14
TH=17.53
TRANT
UP 2
UP 39-25
UP UP UP 39-231/2
WF 1
WF 2
WF 3
WF 4 WF 5 WF 6 WF 7
WF 8 WF 9 WF 10
WF 11
WF 12
WF 13
WF 14
WF 15
WF 16
WG
WG
WG
WG
WG WG
METER PIT
BC BC
BLUEST
O
N
E
WALKCONCPAD
CONC
R
E
T
E
DUMP
S
T
E
R
P
A
D
GRAVEL
GRAVELEEEEETTTEPEP
EP EPEPBIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALK
G G G G G G G G G G G G G G G G G G G G G G G G GGG
LS
CONC RET WALLRET WALLRET WA
L
L
RET WALLHEA
D
W
A
L
L
STONE RET WALL
TREE LINEVCCVGC
VGC
VGC
VGC
VGC VGC
VGC
WLWLWLWLWL WL WL WL
WL WL WL
WL WL
WL WLWLWL5050 50
50 5050
50 50
50 50
50
50
5
0
5050505050W W
W W W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWSWL
SWL
WOOD
R
E
T
W
A
L
L
EP
LAWN
SMH(LATERALS)
EP
LAWN
#707EXISTINGBUILDING
EXISTINGBUILDING
MHWMHW200200200200200200200200200200200200200 20020020020020020020020020020020020020020020030"RCP
I=7.62
TREE LINE
(TYP)
SCULPTURE
BENCHMARK:"X"CUT IN BONNETBOLT OF HYDRANT
EL=20.36 (NAVD88)LIMIT OF INLAND BANKEXISTINGBUILDING
SCULPTURE
PLAQUE
WOODEDAREA
WOODED
AREA
SIGN: BARNSTABLE
OPEN SPACE
STONE RET WALL
T T T T T T T T T T T T T T T T T T T T T T T T
PARCEL ID: 308-143
N/FTOWN OF BARNSTABLE
BOOK: 15451PAGE: 106
PARCEL ID: 308-144
N/F67 SEA ST REALTY TRUST
L.C.C. 161932
PARCEL ID: 308-145
N/F707 MAIN LLC
L.C.C. 224887
PARCEL ID: 308-150
N/FPOTTER AVENUE REALTY LLC
L.C.C. 211905
PARCEL ID: 308-147
N/FANSELMO CALDEIRA& MARIA C SOUZA
L.C.C. 129411
TREE LINE
S S S S S S S S S S S S S S S S
SSSSSSSSSSSSSSSD D D D D D D D D D D
DDDSCULPTURE
CBNFULL OF DEBRIS
R=13.31
SGV
(2)SGV
(2)SGV
SMH
(MONITORING WELL)SMH
(MONITORING WELL)
SMHR=14.11"SAMPLING MH"
ON TIE CARD
BIT CONCPARKING LOT
A
B C
D
A B
C
A
B
C
6" PV
C
8" PVC12"SEWER12"SEWER12"SEWER18" AC18" AC S~SMHR=18.29I(A)=6.13I(B)=14.58
I(C)=6.11I(D)=6.55
SMHR=13.79I(A)=10.63
I(B)=9.64I(C)=9.89
~2"PVCFM8"AC8"PVCA
C B
A
C B
A
B18" CMP12" VC
12" VC12" VCCBNR=17.06I(A)=13.58 (12"VC)
I(B)=14.16 (12"VC)
CBNR=17.61I(A)=9.14 (18"CMP)I(B)=14.02 (12"VC)I(C)=9.06 (24"CMP)D~
20
20
19
18
1918171615141415 16171
7
1818
1
9212
2
2
3
2
42423 222120191817
1819192
0
DDDDDDDDDDDDDDDDDFM FM FM FM FM
FM FM FM FM8"DI
14"DIWW
APPROX. 36" DRAIN (RECORD)F
M
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM
FM FM FM
1"PL (2016)
EMH
8" DI FORCE MAIN
G1"PL (2016)~
2"PL
2"PL
GGGGGGGGG
G
1"PL
G4-FORMERGASOLINEUSTs
4-FORMERGASOLINEUSTs
6-FORMER GASOLINE USTs &4-FORMER GASOLINE/DIESEL USTsREPORTED550-GAL. FUEL OIL& WASTE OIL USTs
REPORTED700-GAL. WASTE
OIL UST
FORMER 275-GAL.
FUEL OIL UST
REPORTED 550-GAL.FUEL OIL UST
SMH(MONITORING WELL)
12"DI
W~
12"DI
8"1"-2"1"-2"8"DI1"-2"W~
~1"CLCBN(RECORD)
CBN(RECORD)
FORMER LOCATION
GASOLINE SERVICE STATION 12"VCDD24"CMPDDDDDDDDDD D D D D D D
APPROX. 18"CMP (RECORD)APPROX. 18"CMP (RECORD)EASE EASE
EASE
EASEEASEEASEEASEEASEEASEEASEEASEE
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E EASEEASEEASEEASEEASEEASEEASESS
SSSSSCAPPED &PLUGGED
7/19/2002
8" AC FM
8" AC FM
B-1 B-2
B-3
B-4
B-5
B-7 B-6/MW-1
MHWMHW100
100
100 100 100
100
100
100
100
10
0
1
0
0
1
0
0
100100100 100
100
100 100 100
100
100
10
0
10
0
1
0
0
1
0
0
1001001001001001001005050505050 50
50
50
50
5
0
505050INTERMITTENTSTREAMLIMIT OF WETLANDS
50' WETLAND BUFFER ZONE
100' WETLAND BUFFER ZONE
100' WETLAND BUFFER ZONE
200' RIPARIAN ZONE
19.38 19.45
19.33 19.30 19.51
19.4519.41
19.10 19.15 19.23 19.46
19.35 19.45
19.34 19.34 19.26 19.46
19.37
19.38
19.76
19.10
19.41
19.62 19.26 18.93 18.90
18.72
18.52
18.84 18.48
19.09
19.98
19.26 18.05
18.38
18.12
17.97
18.97
18.4950505
0
50
50
50 50 50 505050501001001001001
0
0
1
0
0
10
0
100
100
100
100 100 100
100
100 1001001001001001001001000+00
1+00 2+00
725 MAIN STREET PUMP STATION
EXISTING CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-1THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:14amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SCALE:
PLAN
1" = 20'
N
MAIN STREET
DUMONT DRIVE
EASEEASEEASEEASEEASEEASESSSSSVGCCB/CTR
CB/CTRBROKEN
CB/ C
T
R
BROK
E
N
CB/DH
CB/DH
CB/DISC LC
18"
4"
4"
4"
4"
4"
4"
2"
18"
6"
6"6"
6"6"
6"6"
6"6"
6"6"6"
6"
EBOX
EHH
EMH
GG
GG
GG
GG
GG
GG
GM
GP
GS
GS
GS
GS
GS
GS
GS
GW
GW
HH
HH HH
HYD
HYD
(2)CV
(2)CV
CV
LAMPLAMP
LAMP
LAMP
LAMP
LP
LP
LP
LP
LP
(2)MAILMAIL
MW
BLDR
SIGN
SIGN:
1
W
A
Y
N
O
R
I
G
H
T
SIGN: 1WAY
SIGN: STAY RIGHTSIGN: DNE
SIGN: 2HR PARK
SIGN:
N
P
SIGN: DUMONT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SLAB=14.77
TH=14.97
TH=14.92
TH=20.14
TH=17.53
TH=24.89
TH=24.93
TH=23.84
TH=23.87
TH=26.13
TH=28.67
TH=28.64
TH=30.59
TH=31.97
TH=25.87
TH=29.30
TH=31.08
TH=30.61
TH=30.51
TMH
TMH
TRANT
UP 39-23S UP 45-37
UP 39-22
UP 39-21
UP NO#
UP 39-25
UP UP 39-231/2
UP/LP 39-23
UP/LP
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG WG
(2)WS
WS
WS
WS
WS
WS
BC BC
BLUEST
O
N
E
WALK
BRICKBRICK
BRICK
BRICK BRICKTTTTT
CONCPAD
CONC CONCRETE WALK CONC SIDEWALKCONC
R
E
T
E
S
I
D
E
W
A
L
K
CONCRETE SIDEWALKCONC WALKCONCRETE SIDEWALK
CONC
R
E
T
E
CONC
R
E
T
E
CONCRETETREE WELL
CONCRETE
PATIO
GRAV
E
LEEEETTT
EPEP EPBIT C
O
N
C
S
I
D
E
W
A
L
K
BIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALK
EPEPBIT CONC SIDEWALK
BIT CONC SIDEWALK EPEPEPRET W
A
L
L
G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G
G
G
G
GGG
G
G
G
G
G
G
G
G
G
G
G
G
G
G G G
GGGGGGGGGGGGGGGGGGUARD RAILLS
LS
LS
CONC RET WALLRET WALLRET WA
L
L
STON
E
R
E
T
W
A
L
L
STON
E
R
E
T
W
A
L
LCONC RET WALLSTONE RET WALL
WOOD RET WALLRET WALLRET WALLVCCV
C
C
VCCVGCVGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWWWWSWL
SWL
SWL
#712EXISTINGBUILDING
SYLSYLSYL
SYL
SYL
WOOD
R
E
T
W
A
L
L
GENERATORON CONC PAD
CONC BLOCKRET WALL
ELEC PANELON CONC PAD
PUMPING STATION
& WET WELL
SMH(LATERALS)
EP
EP
BIT CONCPARKING LOT
LAWN
#688EXISTINGBUILDING
#707EXISTINGBUILDING
EXISTING
#705EXISTINGBUILDING
#539EXISTINGBUILDING
LS
LS
#700EXISTINGBUILDING
SIGN:STEVENS ST
SIGN: STOP
L
S
KCIR
B
LS
#690EXISTINGBUILDING
CNOCLS
LS
LAWN
BRICK
PATIO
BITCONCDRIVE
200200200 200200200200200200200200200200200200200200200200200200200SCULPTURE
BENCHMARK:"X"CUT IN BONNETBOLT OF HYDRANT
EL=20.36 (NAVD88)
SCULPTURE
PLAQUE
WOODED
AREA
SIGN: BARNSTABLE
OPEN SPACE
STONE RET WALL
SIGN: 2HRPARKING
BENCHMARK:RR SPIKE IN UPEL=24.46 (NAVD88)
R E T WALL
EPSHRUB
S
SIGN: STOP/
POTTER AVE
ELECCONDUIT
WOOD
D
E
C
K
SHRUB
S
LS
RET W
A
L
L
#535EXISTINGBUILDING
LS
LS
STON
E
R
E
T
W
A
L
L
#525EXISTINGBUILDING
LAWN
LAWN
EM (ON UP)
UPLP 39-20
#675EXISTINGBUILDINGSIGN:
CROSSWALK
SIGN:NO LEFT
SIGN:DIRECTORY
SIGN: STOP
SIGN: LANE ENDS
T T T T T T T T T T T T T T T T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
WGGSIGN:
CROS
S
W
A
L
KCONCSIDEWALK EPBIT
CONC
DRIV
E
PARCEL ID: 308-283
N/FBRASS NAIL REALTY TRUST(ARMSTRONG'S COMMERCIAL CONDOMINIUM)
BOOK: 3812
PAGE: 324
PARCEL ID: 308-003
N/FSEVEN TWENTY MAIN STREET
NOMINEE TRUST
BOOK: 30351
PAGE: 192
PARCEL ID: 308-279
N/FM & M REALTYINVESTMENTS LLC
BOOK: 32614
PAGE: 100
PARCEL ID: 308-004-001
N/FDNS REALTY INC
BOOK: 29580PAGE: 48
N/FCAPE COD HOSPITAL
BOOK: 1941PAGE: 210 PARCEL ID: 308-140
N/FCAPE MANAGEMENT INC
BOOK: 31569
PAGE: 148 PARCEL ID: 308-047
N/FBRAZILIAN GRILLREALTY TRUST
BOOK: 17178
PAGE: 86
PARCEL ID: 308-143
N/FTOWN OF BARNSTABLE
BOOK: 15451PAGE: 106
PARCEL ID: 308-152
N/FJANET E COOK
L.C.C. 105211
PARCEL ID: 308-151
N/F701 MAIN REALTY TRUST
L.C.C. 186793
PARCEL ID: 308-145
N/F707 MAIN LLC
L.C.C. 224887
PARCEL ID: 308-162
N/FSOUTH MIX LLC
L.C.C. C376
PARCEL ID: 308-153
N/FLITTLE BEACH REALTY LLC
L.C.C. 193989
PARCEL ID: 308-164
N/FCOLORS OF CAPE COD INC
L.C.C. 163002
PARCEL ID: 308-138
N/F675 MAIN STREALTY TRUST
BOOK: 20728PAGE: 265
TREE LINE
S S S S S S S S S S S S S S S S S
S
S
S
S
S
SSS
SSSSSSSSSS
S
S
S
S
S
S
S
SSSDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D
DDDDGUARD RAIL
SCULPTURE
DMHR=25.47
N.P.V.(FULL OF DEBIES)
DMHR=28.14I(A)=18.74I(B)=18.74
I(C)=23.82
CBNR=25.84
I=22.74 (12"CI)
CBNR=27.61
I(A)=24.11I(B)=24.41
CBNFULL OF DEBRIS
R=13.31
CBNR=14.32I=12.72
SGV
(2)SGV
(2)SGV
SMHR=28.60T.O.L.=21.02
SMH
(MONITORING WELL)SMH
(MONITORING WELL)
SMHR=14.11"SAMPLING MH"
ON TIE CARD
A
B C
D
A B
C
A
B
C
A
B C
D
A
B
C
A
6" PV
C
8" PVC8" PVC8" PVC
8" PVC12"SEWER12"SEWER12"SEWER
12"SEWER
8" PVC8" PVC18" AC18" AC S~SMHR=18.29I(A)=6.13I(B)=14.58
I(C)=6.11I(D)=6.55
SMHR=18.06
I(A)=8.10I(B)=8.16I(C)=8.57
SMHR=13.79I(A)=10.63
I(B)=9.64I(C)=9.89
~2"PVCFM8"AC8"PVCSMHR=19.88
I(A)=9.08I(B)=10.50
I(C)=9.10I(D)=13.30
S
CBNR=19.77I(A)=14.97I(B)=15.29
~~8"DIWSMHR=23.88
I(A)=16.43I(B)=16.43
I(C)=16.76
~
~
~
SMHR=28.32T.O.L.=20.50 #525EXIST
I
N
G
BUILD
I
N
G
8"DI~
CI (DI)~A
C B
A
C B
A
B
A B
A
BC A B
C
D
C B
A
C
BA
B
A
B
A
6
"
PVC18" CMP12" VC 12" VC 12" CMP12" VC
2
4
"
RC
P
24" RCP
12" RCP24" RCP
12" RCP12" CI12" CI12" VC12" VC~CBNR=17.43I=14.12
CBNR=17.60I(A)=14.10
I(B)=11.86I(C)=10.93
CBNR=17.06I(A)=13.58 (12"VC)
I(B)=14.16 (12"VC)
CBNR=17.61I(A)=9.14 (18"CMP)I(B)=14.02 (12"VC)I(C)=9.06 (24"CMP)D~
DMHR=23.73I(A)=19.29I(B)=17.18
I(C)=17.18
~
DMHR=24.94
I(A)=18.16I(B)=17.37I(C)=18.23
SMHR=25.33(FORCE MAIN C/O)
DMHR=25.88I(A)=18.45I(B)=18.47
I(C)=18.43I(D)=18.18
8"SEWER
~
CBNR=28.31
I(A)=25.21I(B)=26.31D~CBNR=24.23I=21.23 ~~~12" VC
DMHR=25.74I=23.45 (LEACHING)6"PVC ~2930
20
20
19
18
19181716151415 16171
7
1818191816
17
17
18181920212223242
5
26272828272625242528
26
28
29
23
2221
192
0
DDDDDDDDDFM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM FMFM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM FMSSSSSSSSS8"DI
14"DI 8"DI14"DIDUAL 8" & 14"CI FORCE MAINS
W W
APPROX. 36" DRAIN (RECORD)CONC. HEADWALL(RECORD LOCATION)INTERMITTENTSTREAMF
M
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM
FM FM FM
1"PL (2016)
EMH
GM
8" DI FORCE MAIN
2"PL
GGGGGGGGG
G
1"PL
GE
P
GGGG4-FORMERGASOLINEUSTs
4-FORMERGASOLINEUSTs
6-FORMER GASOLINE USTs &4-FORMER GASOLINE/DIESEL USTsREPORTED550-GAL. FUEL OIL& WASTE OIL USTs
REPORTED700-GAL. WASTE
OIL UST
FORMER 275-GAL.
FUEL OIL UST
REPORTED 550-GAL.FUEL OIL UST
SMH(MONITORING WELL)
12"DI
12"DI
8"1"-2"8"DI1"-2"WW~
~1"CL12"DICBN(RECORD)
CBN(RECORD)
FORMER LOCATION
GASOLINE SERVICE STATION 12"VC12"DIDD24"CMPDDD D D D D D D
APPROX. 18"CMP (RECORD)APPROX. 18"CMP (RECORD)EASE EASE
EASE
EASEEASEEASEE
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E EASEEASEEASEEASEEASEEASEEASESSSSCAPPED &PLUGGED
7/19/2002
8" AC F
M
8" AC FM
8" AC FM
B-1 B-2
B-3
B-4
B-5
B-7 B-6/MW-1
100
10
0
1
0
0
1
0
0
100100
100 100 100
100
100' WETLAND BUFFER ZONE
200' RIPARIAN ZONE
19.38 19.45
19.33 19.30 19.51
19.4519.41
19.34 19.34 19.26 19.46
19.37
19.38
19.76
19.10
19.41
19.62 19.26 18.93 18.90
18.72
18.52
18.84 18.48
19.09
19.98
19.26 18.05
18.38
18.12
17.97
18.97
18.49505050505
0
50
50
50 50 50 5050505050505050100
100
100
100 100 100
100
100 1001001001001001001001001001001001000+00 1+00 2+00 3+00
4+00
5+00
6+00
STA 0+00 TO STA 5+60
EXISTING CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-2THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:15amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SCALE:
PLAN
1" = 20'
N
MATCH LINESHEET C-3MAIN STREET
DUMONT DRIVESTEVENSSTREETPOTTERAVENUEMAIN STREET
SOU
T
H
S
T
R
E
E
T
CB/ CTRBROKEN
4"
2"
18"
8"TWIN
2"
2"
22"
2"2"
24"
24"
6"
8"
8"
4"
2"
EHH
EHH
EM
(5)EM
EM
GG
GG
GG
GG
GG
(5)GM
GM
GS GS
GW
GW
GW
HH
HH
HH
HH
HYD
CV
LP
LP
LP
LP
LP
LP
LP
LP
MHR=32.55
MHR=32.65MW
SIGN: 1WAY NO RIGHT
SIGN: NP
SIGN: HYANNISANCIENT CEMETERY
SIGN
SIGN SIGN
TH=30.5
1
TH=32.68
TH=33.93
TH=34.00
TLP
TLP
TLP
TLP
TLP
TLP
TLP LIGHT
TLP
TMH
TMH
T
UP 52-50
UP 52-48
UP/LP UP/LP 51
UP/LP 50-1
UP/LP 52-49
SPIGOT
WG
WG
WG
WG
WG
WG
WG
WG
WS
WS
WSBRICK
T
T T T T T
T T T T T T
CCB
CCB CCBBENCHCONCRETE
S
IDEWALK
CONCRETECONCRETEGRAVELDRIVE GRAVEL
EPBIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALKBIT CONC SIDEWALKBIT CONC SIDEWALKBIT CONC SIDE
WALK
EP
BIT CONC SIDEWALK
EP EPEPEP EPPOST & RAIL FENCE POST & RAIL FENCE POST & RAIL FENCE
PO
S
T
&
R
A
I
L
POST & RAIL
POST & RAIL FENCE
VINYL FENCE
G G G G G
G
G
G G G G G G G G G G G G G G G G G G
G
G G G G G G G G G G GGG G G
G
G
G
GGGGGGGGGGGLSRET WALLRET WALL
VGC VGC VGC VGC VGC
VGC VGC VGC VGC VGC
V
G
C
VGCVGCVGCVGCVGCVGCVGCW W W WWW W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
SYL
W W W
W
W
W
WWSWL
SYL
SWL
EM (ON
U
P)
UPLP 39-
2
0
CROSSW
A
L
K
T T T T T T T T T T T T T T T T T T T T T T T T T T T
#667EXISTINGBUILDING
WGGGSIGN:CROSSWALKEPBIT
CONCDRIVE
GRAVELPARKING LOT
BIT CONC SIDEWALK EPBIT CONC
PARKING LOT
LAWN
#488EXISTINGBUILDING
SIGN:NO PARKING
BIT CONCPARKING LOT
BIT CONCPARKING LOT
BIT CONC SIDEWALK
SIGN: ONE WAY
DO NOT ENTER SIGN: BIKES YIELDTO PEDESTRIANSCONCRETE
S
IDEWALK
LAWN
LAWN
BENCHMARK:TOP OF BONNET
BOLT OF HYDRANTEL=33.42 (NAVD88)
SIGN: 2 LANESONE WAYSIGN:NEWTON ST
HEDGEBENCHMARK:RR SPIKE IN UPEL=33.33 (NAV88)
SIGN:
ONE WAY SIGN:
ONE WAY
BIT CONCPARKING LOT
ELECTRICVAULT
SIGN: NORIGHT TURN
SIGN: DONOT ENTER
EUP/LP 6
TRAN
UP/LP 52-46
UP NO#GGGGGGGVGCKLAWEDIS CNOC
CONC SIDEWALKCONC SID
E
W
A
L
K
BIT CONC
PARKING LOT
LAWN
EXISTINGBUILDING
PARCEL I
D:
3
0
8-
1
3
8
N/F
675 MAIN
S
T
REALTY
T
R
U
S
T
BOOK: 2
0
7
2
8
PAGE: 2
6
5
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S
D DDDCBNR=30.08
SMH
R=28.60
T.O.L.=2
1.
0
2
A C
B A B
A
B DC
E
BA
BA
8" PVC8" PVC 8" PVC 8" PVC
8"DISMHR=29.90
I(A)=23.26I(B)=19.32
I(C)=19.44
~CI (DI)~
8" PVC 8" PVC
SMHR=32.50
I(A)=18.40I(B)=18.27
DMHR=31.12I(A)=25.97
I(B)=25.07I(C)=25.4712"HDPE
CBNR=31.07I=28.3712"HDPE
CBN
R=30.93 WATER @ 26.63(HOODED)
DMHR=30.91I=23.82
D DCBNR=31.01I=28.23
CBNR=31.09I(A)=28.04
I(B)=27.9± (HOODED)WATER @ 27.9
CBNR=30.94I(A)=27.89
I(B)=27.74
SIGN:
SEA STREET
CB/DISC
CBNR=30.44I=26.3412"HDPE
CBNR=30.66I(A)=27.56 (12"HDPE)
I(B)=27.50
SMHR=30.90
I(A)=24.90 (TOP FM)I(B)=24.36
SMHR=30.93
I(A)=17.36I(B)=24.28I(C)=17.40
I(D)=17.03I(E)=17.28
SMHR=31.08I(A)=17.03
I(B)=16.93
~
CBN
R=30.81I=27.9412"HDPE TO STORMWATER
INFILTRATION SYSTEM
A
BC
12" PVC~8"SEWER
12" HDPE
A
B
A
B
12" HDPE12" HDPEA
B
~DWWWWWWW3031 32
32
32
31
3
0
3131
31
333333
3332
32
31
31
2930
PARCEL ID: 308-137N/F
HYANNIS SERIES SIX, LLCBOOK: 28924 PAGE: 29 PARCEL ID: 308-136N/F
TOWN OF BARNSTABLEBOOK: 28380 PAGE: 121
PARCEL ID: 308-141N/F
CASEY TRUSTBOOK: 22904 PAGE: 309
PARCEL ID: 308-170
N/F67 SEA STREET REALTY TRUST
L.C.C. 161932
PARCEL ID: 308-142
N/F478 SOUTH STREET REALTY TRUSTBOOK: 24798 PAGE: 204
PARCEL ID: 308-122
N/FJCM REALTY TRUSTL.C.C. 173610
PARCEL ID: 308-198N/F
ALFA GROUP LLCBOOK: 31319 PAGE: 322
PARCEL ID: 308-165
N/FTOWN OF BARNSTABLE
(CEMETERY)
S SSSSSS
S
(SEWER CONNECTS TOSEA STREET)
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMGG12"DI
12"DI
STORMWATER INFILTRATION CHAMBER
(
R
)
STORMWATER
INFILTRATIONCHAMBER (R)
T
T
T
T
T T8" AC FM8" AC FM
8" VC8" VCB-1
11+266+00 7+00 8+00 9+00 10+00
11+00
SCALE:
PLAN
1" = 20'
STA 5+60 TO STA 11+26
EXISTING CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-3THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:16amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
N
MATCH LINESHEET C-2SOUTH STREET
SOUT
H
STRE
ETSEA STREETSEASTREETNEWTONSTREET
EASEEASEEASEEASEEASEEASE6"
6"6"
6"6"
6"6"
6"6"
6"6"6"
6"
CB/DISC
EBOX/ IRRIGATION
EBOX
EM
EMH
GM
GP
GS
GS
GS
GW
HYD
(2)CV
CV
LAMP
LAMP
LP
MAIL
POST/ELEC
SIGN: DUMONT
SIGN
SLAB=14.79
SLAB=14.77
TH=14.97
TH=14.92
TH=20.14
TH=17.53
TRANT
UP 2
UP 39-25
UP UP UP 39-231/2
WF 1
WF 2
WF 3
WF 4 WF 5 WF 6 WF 7
WF 8 WF 9 WF 10
WF 11
WF 12
WF 13
WF 14
WF 15
WF 16
WG
WG
WG
WG
WG WG
METER PIT
BC BC
BLUEST
O
N
E
WALKCONCPAD
CONC
R
E
T
E
DUMP
S
T
E
R
P
A
D
GRAVEL
GRAVELEEEEETTTEPEP
EP EPBIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALK
G G G G G G G G G G G G G G G G G G G G G G G G GGG
LS
CONC RET WALLRET WALLRET WA
L
L
RET WALLHEA
D
W
A
L
L
STONE RET WALL
TREE LINEVCCVGC
VGC
VGC
VGC VGC
VGC
WLWLWLWLWL WL WL WL
WL WL WL
WL WL
WL WLWLWL5050 50
50 5050
50 50
50 50
50
50
5
0
5050505050W W
W W W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWSWL
SWL
WOOD
R
E
T
W
A
L
L
EP
LAWN
SMH(LATERALS)
EP
LAWN
#707EXISTINGBUILDING
EXISTINGBUILDING
MHWMHW200200200200200200200200200200200200200 20020020020020020020020020020020020020020020030"RCP
I=7.62
TREE LINE
(TYP)
SCULPTURE
BENCHMARK:"X"CUT IN BONNETBOLT OF HYDRANT
EL=20.36 (NAVD88)LIMIT OF INLAND BANKEXISTINGBUILDING
SCULPTURE
PLAQUE
WOODEDAREA
WOODED
AREA
SIGN: BARNSTABLE
OPEN SPACE
STONE RET WALL
T T T T T T T T T T T T T T T T T T T T T T T T
PARCEL ID: 308-143
N/FTOWN OF BARNSTABLE
BOOK: 15451PAGE: 106
PARCEL ID: 308-144
N/F67 SEA ST REALTY TRUST
L.C.C. 161932
PARCEL ID: 308-145
N/F707 MAIN LLC
L.C.C. 224887
PARCEL ID: 308-150
N/FPOTTER AVENUE REALTY LLC
L.C.C. 211905
PARCEL ID: 308-147
N/FANSELMO CALDEIRA& MARIA C SOUZA
L.C.C. 129411
TREE LINE
S S S S S S S S S S S S S S S S
SSSSSSSSSSSSSSSD D D D D D D D D D D
DDDSCULPTURE
CBNFULL OF DEBRIS
R=13.31
SGV
(2)SGV
(2)SGV
SMH
(MONITORING WELL)SMH
(MONITORING WELL)
SMHR=14.11"SAMPLING MH"
ON TIE CARD
BIT CONCPARKING LOT
A
B C
D
A B
C
A
B
C
6" PV
C
8" PVC12"SEWER12"SEWER12"SEWER18" AC18" AC S~SMHR=18.29I(A)=6.13I(B)=14.58
I(C)=6.11I(D)=6.55
SMHR=13.79I(A)=10.63
I(B)=9.64I(C)=9.89
~2"PVCFM8"AC8"PVCA
C B
A
C B
A
B18" CMP12" VC
12" VC12" VCCBNR=17.06I(A)=13.58 (12"VC)
I(B)=14.16 (12"VC)
CBNR=17.61I(A)=9.14 (18"CMP)I(B)=14.02 (12"VC)I(C)=9.06 (24"CMP)D~
20
20
19
18
1918171615141415 16171
7
1818
1
9212
2
2
3
2
4 222120191817
1819192
0
DDDDDDDDDDDDDDDDDFM FM FM FM FM
FM FM FM FM8"DI
14"DIWW
APPROX. 36" DRAIN (RECORD)F
M
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM
FM FM FM
1"PL (2016)
EMH
8" DI FORCE MAIN
G1"PL (2016)~
2"PL
2"PL
GGGGGGGGG
G
1"PL
G4-FORMERGASOLINEUSTs
4-FORMERGASOLINEUSTs
6-FORMER GASOLINE USTs &4-FORMER GASOLINE/DIESEL USTsREPORTED550-GAL. FUEL OIL& WASTE OIL USTs
REPORTED700-GAL. WASTE
OIL UST
FORMER 275-GAL.
FUEL OIL UST
REPORTED 550-GAL.FUEL OIL UST
SMH(MONITORING WELL)
12"DI
W~
12"DI
8"1"-2"1"-2"8"DI1"-2"W~
~1"CLCBN(RECORD)
CBN(RECORD)
FORMER LOCATION
GASOLINE SERVICE STATION 12"VCDD24"CMPDDDDDDDDDD D D D D D D
APPROX. 18"CMP (RECORD)APPROX. 18"CMP (RECORD)EASE EASE
EASE
EASEEASEEASEEASEEASEEASEEASEEASEE
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E EASEEASEEASEEASEEASEEASEEASESS
SSSSSCAPPED &PLUGGED
7/19/2002
8" AC FM
8" AC FM
B-1 B-2
B-3
B-4
B-5
B-7 B-6/MW-1
MHWMHW100 100 100
100
100
100
100
10
0
1
0
0
1
0
0
100100100 100
100
100 100 100
100
100
10
0
10
0
1
0
0
1
0
0
10010010010010010010050 50
50
50
50
5
0
505050INTERMITTENTSTREAMLIMIT OF WETLANDS
50' WETLAND BUFFER ZONE
100' WETLAND BUFFER ZONE
100' WETLAND BUFFER ZONE
200' RIPARIAN ZONE
19.38 19.45
19.33 19.30 19.51
19.4519.41
19.10 19.15 19.23 19.46
19.35 19.45
19.34 19.34 19.26 19.46
19.37
19.38
19.76
19.10
19.41
19.62 19.26 18.93 18.90
18.72
18.52
18.84 18.48
19.09
19.98
19.26 18.05
18.38
18.12
17.97
18.97
18.4950505
0
50
50
50 50 50 505050501001001001001
0
0
1
0
0
10
0
100
100
100
100 100 100
100
100 100100100100100100100100S S S
SSSSSSSSSSSSSSSSSSSSEE E E E E
E
0+00
1+00 2+00
DDD
D
LP
DLPEEEEWWWWWWWWWWWGGGGGG
G
GGGGGGGGG GGG G
FMFMFMFM
FM
FM FMFMFMFMFMFMFMFMFMFMFMFM
FM
FM
FM FMFMFMFMFMFMFMFMFMFMFM FM
FM FM
T
T
T
T
T
T
T
T
T
TTT
S
S
6"6"6"6"
CB/DISC
UP 2TREE LINE
50 50 5050
50
50 50 50
50
50
50
50
5
0
5
0
50200200200200200200200200200200200200200200200200 200200200200200DI(A)=10.63
I(B)=9.64
I(C)=9.89
19 6-FORMER GASOLINE USTs &4-FORMER GASOLINE/DIESEL USTsREPORTED550-GAL. FUEL OIL
& WASTE OIL USTs
REPORTED700-GAL. WASTE
OIL UST
FORMER 275-GAL.
FUEL OIL UST
REPORTED 550-GAL.
CBN
(RECORD)
FORMER LOCATION
GASOLINE SERVICE STATION
D D D D D D D
APPROX. 18"CMP (RECORD)
EASE
EASE EASE EASE
EASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEEASEE
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E EASEEASEEASEEASEEASEEASEEASEB-7 B-6/MW-1
100
100
100
100 100 100 100 100 100
100
100
100
100
100
10
0
10
0
200' RIPARIAN ZONE
19.45
19.33 19.30 19.51
19.35 19.45
19.46
19.37
19.38
19.76
19.10
18.93 18.90
18.72
18.52
18.84 18.48
18.97
SSSSSSSSSEEE E E E E E E E E E
E
E
37.4 LF 18" PVC GRAVITY SEWER
3.5 LF 18" DI GRAVITY SEWER
DDDDD
D
LP
DDLP
8.6 LF 18" DI
GRAVITY SEWER
8.4 LF 18" DI
GRAVITY SEWER
3.5 LF 18" DI
GRAVITY SEWERD
EEEEEEE E WWWWWWWWWWWWWWW W W WGG
G
GGGGGGG GGGGGGGGGG GGG G G G GE FMFMFMFMFMFMFMFMFMFMFM
FM
FM
T
T
T
T
T
T
T
T
T
T
TTTTTT
T
S
S
S
S
10.0 LF 18" PVC
GRAVITY SEWER
725 MAIN STREET PUMP STATION
PROPOSED CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-4THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:16amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
1" GAS SERVICE TO PUMP STATION
2" WATER SERVICE TO PUMP STATION
PROVIDE NEW 5'Ø SMH
LIMIT OF PAVING (TYP.)
CAST-IN-PLACE
CONCRETE WET WELL
UNDERGROUND
ELECTRICAL SERVICE
TO PUMP STATION
REDI-ROCK RETAINING WALL
TOP OF WALL EL. = 19.00
2' GRAVEL INFILTRATION
TRENCH ADJACENT TO
ACCESS ROAD (TYP.)
PROVIDE NEW 4'Ø DMH
PROVIDE NEW 4'Ø
CB (TYP. OF 2)
PROVIDE NEW 6'Ø ROOF
LEADER LEACHING PIT
(TYP. OF 2)
7' X 11' CAST-IN-PLACE
CONCRETE VALVE VAULT
725 MAIN STREET PUMP STATION
LIMIT OF CLEARING (TYP.)
PROVIDE SLUICE GATE AND
CHANNEL GRINDER (TYP. OF 2)
PROVIDE 330XLHD
CULTEC CHAMBERS (9)
18" DI 45° BEND (TYP. OF 2)
CONCRETE BOLLARD (TYP.)
SCALE:
PLAN
1"=20'
SCALE:
INSET A
1"=10'
SEE INSET A THIS SHEET.
1" GAS SERVICE TO PUMP STATION
2" WATER SERVICE TO PUMP STATION
DUAL 8" AND 14" SDR18 PVC
SEWER FORCE MAINS (TYP.)
LIMIT OF PAVING (TYP.)
CAST-IN-PLACE
CONCRETE WET WELL
UNDERGROUND
ELECTRICAL SERVICE
TO PUMP STATION
END OF REDI-ROCK RETAINING
WALL. CONNECT TO EXISTING
CONCRETE WALL.
2' GRAVEL INFILTRATION TRENCH
ADJACENT TO ACCESS ROAD (TYP.)
7' X 11' CAST-IN-PLACE
CONCRETE VALVE VAULT
5' WIDE CONCRETE SIDEWALK
725 MAIN STREET
PUMP STATION
LIMIT OF CLEARING (TYP.)
LOAM AND SEED
DISTURBED AREA (TYP.)
PROVIDE 330XLHD
CULTEC CHAMBERS (9)
NOTES:
1. SEE SHEET C-5 FOR DETAILED GRAVITY SEWER PLANS.
TIMBER GUARDRAIL
FILL IN EXISTING AREA TO MEET
TOP OF WALL (EL. -19.00)
12" DIAMETER FILTER SOCK
N
MAIN STREET
DUMONT DRIVEEND OF REDI-ROCK RETAINING
WALL. CONNECT TO EXISTING
CONCRETE WALL.
PAD-MOUNTED TRANSFORMER
DESIGNATED PARKING AREA
STAIRS TO PUMP STATION
TELECOMMUNICATIONS
SERVICE TO PUMP
STATION
DUAL 14" AND 8" SDR18 PVC SEWER
FORCE MAINS INSIDE STEEL CASING
PIPE UNDER RETAINING WALL
TELECOMMUNICATIONS
SERVICE TO PUMP
STATION
PROVIDE NEW 4'Ø DMH
CUT AND CONNECT TO
EXISTING 18"(CMP)D WITH A
SOLID SLEEVE COUPLING (TYP.)
UNDERGROUND ELECTRICAL
SERVICE TO INFLUENT
CHANNEL GRINDER
PROVIDE
NEW 5'Ø SMH
PROVIDE
NEW 5'Ø SMH
12" DIAMETER FILTER SOCK
REDI-ROCK RETAINING WALL
TOP OF WALL EL. = 19.00
5' WIDE CONCRETE SIDEWALK
TIMBER GUARDRAIL
10' (TYP.)
SEWER FORCE
MAIN BENDS
(1) - 14" DI 45°
(1) - 14" DI 22 12°
8" DI 22 12°
BEND
8" DI 45° BEND
8" SDR18
PVC SEWER
FORCE MAIN
14" SDR18
PVC SEWER
FORCE MAIN
14" DI 45° BEND
SEWER FORCE
MAIN BENDS
(1) - 8" DI 45°
(1) - 14" DI 45°
FILL IN EXISTING
AREA TO MEET TOP
OF WALL (EL. -19.00)
END OF REDI-ROCK RETAINING
WALL. CONNECT TO EXISTING
CONCRETE WALL.
5' WIDE CONCRETE SIDEWALK
LOAM AND SEED
DISTURBED AREA (TYP.)
PAD-MOUNTED TRANSFORMER
EASEEASEEASEEASEEASEEASESSSSSVGCCB/CTR
CB/CTR
BROKEN
CB/ CTR
BROKEN
CB/DH
CB/DH
CB/DISC LC
18"
4"
4"
4"
4"
4"
4"
2"
6"
6"6"
6"6"
6"6"
6"6"
6"
6"6"
6"
EBOX/ IRRIGATION
EBOX
EHH
EMH
GG
GG
GG
GG
GG
GM
GP
GS
GS
GS
GS
GS
GS
GSGW
GW
HH
HH HH
HYD
(2)CV
(2)CV
CV
LAMPLAMP
LAMP
LAMP
LAMP
LP
LP
LP
LP
LP
(2)MAILMAIL
MW
BLDR
SIGN
SIGN: 1W
A
Y
N
O
R
I
G
H
T
SIGN: 1WAY
SIGN: STAY RIGHTSIGN: DNE
SIGN: 2HR PARK
SIGN: NP
SIGN: DUMONT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN SIGN
SIGN
TH=20.14
TH=17.53
TH=24.89TH=24.93
TH=23.84
TH=23.87
TH=26.13
TH=28.67
TH=28.64
TH=30.59
TH=31.97
TH=25.87 TH=29.30 TH=31.08
TH=30.61
TH=30.51
TMH
TMH
TRANT
UP 39-23S
UP 45-37
UP 39-22
UP 39-21
UP NO#
UP 39-25
UP
UP 39-231/2
UP/LP 39-23
UP/LP
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG WG
METER PIT
(2)WS
WS
WS
WS
WS
BC
BC BLUESTONE
WALK
BRICK
BRICK
BRICK
BRICK
BRICK
T T T T T
CONC
PAD
CONC CONCRETE WALKCONC SIDEWALKCONCRET
E
S
I
D
E
W
A
L
K
CONCRETE SIDEW
A
L
K
CONC WALKCONCRETE SIDEWALK
CONCRET
E
CONCRET
E
CONCRETETREE WE
L
L
CONCRETE
PATIO
GRAVELEE
E
E
T
T
T
EP EPBIT CONC
S
I
D
E
W
A
L
K
BIT CONC SIDE
W
A
L
K
BIT CONC SIDEW
A
L
K
BIT CONC SIDEWALK
EPEPBIT CONC SIDEWAL
K
BIT CONC SIDEW
A
L
K EPEPEPRET WALL
G G
G
G
G
G
G
G G
G
G
G
G
G
G
G
G G G
G
G
G
G G G G G G G G G G
GGG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G GGGGGGGGGGGGGGGGG
LS
LS
LS
CONC RET WALLRET WALLRET WALL
STONE RE
T
W
A
L
L
STONE RE
T
W
A
L
LCONC RET WALLSTONE RET WALL
WOOD RET WALLRET WALLRET WALL
VCCV
C
C
VCCVGCVGC
VGC
VGC VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGC
VGCW W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWWWWSWL
SWL
SWL
#712
EXISTING
BUILDING SYLSYL
SYL
SYL
WOOD RET
W
A
L
L
GENERATOR
ON CONC PAD
CONC BLOCK
RET WALL
ELEC PANEL
ON CONC PAD
PUMPING STATION
& WET WELL
SMH
(LATERALS)
EP
EPBIT CONC
PARKING LOT
LAWN
#688
EXISTING
BUILDING
#707
EXISTING
BUILDING
#705
EXISTING
BUILDING
#539
EXISTING
BUILDING
LSLS
#700
EXISTING
BUILDING
SIGN:
STEVENS ST
SIGN: STOP
L
S
KCIRB LS
#690
EXISTING
BUILDING
CNOCLS
LS
LAWN
BRICK
PATIOBIT
CONC
DRIVE
200200200200200200200200200200200200200200200200200SCULPTURE
BENCHMARK:
"X"CUT IN BONNET
BOLT OF HYDRANT
EL=20.36 (NAVD88)
SCULPTURE
PLAQUE
SIGN: BARNSTABLE
OPEN SPACE
STONE RET WALL
SIGN: 2HR
PARKING
BENCHMARK:
RR SPIKE IN UP
EL=24.46 (NAVD88)RE T W A L L
EPSHRUBS
SIGN: STOP/
POTTER AVE
ELEC
CONDUIT
WOOD DE
C
K
SHRUBS LS
RET WALL
#535
EXISTING
BUILDING
LS
LS
STONE RE
T
W
A
L
L
#525
EXISTING
BUILDING
LAWN
LAWN
EM (ON UP)UPLP 39-20
#675
EXISTING
BUILDINGSIGN:
CROSSWALK
SIGN:
NO LEFT
SIGN:
DIRECTORY
SIGN: STOP
SIGN: LANE ENDS
T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SIGN:
CROSSW
A
L
KCONCSIDEWALKEP BIT
CONC
DRIVE
PARCEL ID: 308-283
N/F
BRASS NAIL REALTY TR
U
S
T
(ARMSTRONG'S COMME
R
C
I
A
L
C
O
N
D
O
M
I
N
I
U
M
)
BOOK: 3812
PAGE: 324
PARCEL ID: 308-003
N/F
SEVEN TWENTY MAIN ST
R
E
E
T
NOMINEE TRUST
BOOK: 30351
PAGE: 192
PARCEL ID: 308-279
N/F
M & M REALTY
INVESTMENTS LLC
BOOK: 32614
PAGE: 100
PARCEL ID: 308-004-001
N/F
DNS REALTY INC
BOOK: 29580
PAGE: 48
PARCEL ID: 308-152
N/F
JANET E COOK
L.C.C. 105211
PARCEL ID: 308-151
N/F
701 MAIN REALTY TRUS
T
L.C.C. 186793
PARCEL ID: 308-145
N/F
707 MAIN LLC
L.C.C. 224887
PARCEL ID: 308-162
N/F
SOUTH MIX LLC
L.C.C. C376
PARCEL ID: 308-153
N/F
LITTLE BEACH REALTY
L
L
C
L.C.C. 193989 PARCEL ID: 308-164
N/F
COLORS OF CAPE COD I
N
C
L.C.C. 163002
PARCEL ID: 308-138
N/F
675 MAIN ST
REALTY TRUST
BOOK: 20728
PAGE: 265
TREE LINE
S
S S S S S S S S S S S S
S S S S S
S
S
S
S
S
SSSSSSSSSS
S
S
S
S
S
S
S
SSSD
D
D
D
D
D
D
D
D
D
D
D
DDDD D D D D D DD D
D
D D D D D D
D
DDDGUARD RAIL
SCULPTURE
DMH
R=25.47
N.P.V.
(FULL OF DEBIES)
DMH
R=28.14
I(A)=18.74
I(B)=18.74
I(C)=23.82
CBN
R=25.84
I=22.74 (12"CI)
CBN
R=27.61
I(A)=24.11
I(B)=24.41
CBN
R=14.32
I=12.72
SGV
(2)SGV
(2)SGV
SMH
R=28.60
T.O.L.=21.02
SMH
(MONITORING WELL)
SMH
(MONITORING WELL)
A
B C
D
A B
C
A
B C
D
A B
C
6" PVC 8" PVC8" PVC8" PVC
12"SEWER
12"SEWER
12"SEWER
12"SEW
E
R
8" PVC8" PVC18" AC18" AC S~SMH
R=18.29
I(A)=6.13
I(B)=14.58
I(C)=6.11
I(D)=6.55
SMH
R=18.06
I(A)=8.10
I(B)=8.16
I(C)=8.57
SMH
R=13.79
I(A)=10.63
I(B)=9.64
I(C)=9.89 8"PVCSMH
R=19.88
I(A)=9.08
I(B)=10.50
I(C)=9.10
I(D)=13.30
S
CBN
R=19.77
I(A)=14.97
I(B)=15.29
~
~8"DIWSMH
R=23.88
I(A)=16.43
I(B)=16.43
I(C)=16.76
~
~
~
SMH
R=28.32
T.O.L.=20.50 #525EXISTING
BUILDING
8"DI~
A
C
B
A
C B
A
B
A B
A
BC
A B
C
D
C B
A
C
BA
BA
B
A
6
"
P
V
C18" CMP
12" VC
12" VC 12" CMP12" VC
2
4
"
R
C
P
24" RCP
12" RCP24" RCP
12" RCP12" CI12" CI12" VC12" VC~CBN
R=17.43
I=14.12
CBN
R=17.60
I(A)=14.10
I(B)=11.86
I(C)=10.93
CBN
R=17.06
I(A)=13.58 (12"VC)
I(B)=14.16 (12"VC)
CBN
R=17.61
I(A)=9.14 (18"CMP)
I(B)=14.02 (12"VC)
I(C)=9.06 (24"CMP)D~
DMH
R=23.73
I(A)=19.29
I(B)=17.18
I(C)=17.18
~
DMH
R=25.88
I(A)=18.45
I(B)=18.47
I(C)=18.43
I(D)=18.18
8"SEWER
~CBN
R=28.31
I(A)=25.21
I(B)=26.31D~CBN
R=24.23
I=21.23 ~~~12" VC 6"PVC~2920
20
18
15 161717 1818
20191816
1717181819202
1
2223242
5
2627282827262524252826
28
29
23
22
21
1920
DDDDDDDDDFM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FMFM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FMSSSSSSSS8"DI
14"DI 8"DI14"DIDUAL 8" & 14"
CI FORCE MAINS
W W
APPROX. 36" DRAIN (RECORD)CONC. HEADWALL
(RECORD LOCATION)INTERMITTENTSTREAMFM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
FM
1"PL (2016)
EMH
GM
8" DI FORCE MAIN
2"PL
GGGGGGGGG G1"PL
GEP
GGGG4-FORMER
GASOLINE
USTs
4-FORMER
GASOLINE
USTs
6-FORMER GASOLINE USTs &4-FORMER GASOLINE/DIESEL USTsSMH
(MONITORING WELL)
12"DI
12"DI
8"1"-2"1"-2"8"DI1"-2"WW~
~1"CL12"DICBN
(RECORD)
CBN
(RECORD)12"VC12"DI
DD24"CMPDD D D D D D D
APPROX. 18"CMP (REC
O
R
D
)APPROX. 18"CMP (RECORD)EASE
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E EASEEASEEASEEASEEASEEASEEASESSSCAPPED &
PLUGGED
7/19/2002
8" AC FM
8" AC FM
8" AC FM
B-1
B-2
B-3
B-4
B-5
200' RIPARIAN ZONE
19.26
18.93
18.90
18.72
18.52
18.84
18.48 19.09
19.98
19.26
18.05
18.38
18.1217.97
18.97
18.495050505
0
50
50
50 50
50 505050505050505050100
100
100 100 100
100
100 100100100100100100100100100100100100100S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSSSSSSSSSSSSSSSSS213.6 LF 12" PVC GRAVITY SEWER
103.9 LF 12" PVC GRAVITY SEWER
76.0 LF 12" PVC GRAVITY SEWER
165.1 LF 12" PVC GRAVITY SEWER
14.8 LF 18" PVC GRAVITY SEWER
144.2 LF 18" PVC GRAVITY SEWER
0+00
1+00
2+00
3+00
4+00
5+00
D
W
W
W
W
W
W
WGGG
G
G
G
G
G
G
G FMFMFMFMFMFMFMFMFMFM FMFMFMFMFMFMFMFMFMFMFM
FM
FM
FM
T
T
T
T
T
T
T
T
0
10
20
30
0
10
20
30
0+00 1+00 2+00 3+00 4+00 5+00 5+601+00 2+00 3+00 4+00 5+00
213.6 LF 12" PVC GRAVITY SEWER @ 0.0025 FT/FT
MIN. COVER = 7.7
MAX. COVER = 13.2
103.9 LF 12" PVC GRAVITY SEWER @ 0.0233 FT/FT
MIN. COVER = 6.3
MAX. COVER = 7.8
76.0 LF 12" PVC GRAVITY SEWER @ 0.0126 FT/FT
MIN. COVER = 9.0
MAX. COVER = 10.0
PROP. 5' SMH
STA 0+27
RIM EL = 18.30
(SW) 18"Ø INV EL = 6.13
(W) 6"Ø INV EL = 14.58
(E) 18"Ø INV EL = 6.03
PROP. 5' SMH
STA 0+41
RIM EL = 18.03
(NE) 12"Ø INV EL = 5.84
(W) 18"Ø INV EL = 5.94
(SE) 18"Ø INV EL = 5.84
PROP. 4' SMH
STA 2+06
RIM EL = 18.07
(NE) 12"Ø INV EL = 7.98
(S) 8"Ø INV EL = 8.57
(SW) 12"Ø INV EL = 7.88
PROP. 4' SMH
STA 2+82
RIM EL = 19.99
(E) 12"Ø INV EL = 12.65
(NW) 8"Ø INV EL = 10.50
(NE) 12"Ø INV EL = 9.10
(SW) 12"Ø INV EL = 8.94
PROP. 4' SMH
STA 3+86
RIM EL = 23.90
(E) 12"Ø INV EL = 15.17
(S) 8"Ø INV EL = 16.76
(W) 12"Ø INV EL = 15.07
WS
ELEC/TELE
ELEC/TELE
8"W
18"D
GS
8"FM
14"FM
WS WS
12"W
12"D
#705
F.F.E.
23.87
#535
F.F.E.
30.59
#705
#535
#525
F.F.E.
31.97
#525
14.8 LF 18" PVC GRAVITY SEWER @ 0.0061 FT/FT
MIN. COVER = 10.5
MAX. COVER = 10.8
B-1 B-2 B-3
165.1 LF 12" PVC GRAVITY SEWER @ 0.0124 FT/FT
MIN. COVER = 9.1
MAX. COVER = 11.2
STA 0+00 TO STA 5+60
PROPOSED CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-5THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:17amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
N
MATCH LINESHEET C-6SCALE:
PLAN
1"=20'
MAIN STREET
DUMONTDRIVESTEVENSSTREETPOTTERAVENUEMAIN STREET
SOUTH
S
T
R
E
E
T
PROFILE
HORIZONTAL SCALE:
VERTICAL SCALE:
1"=20'
1"=5'
EXISTING GRADE
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 4'Ø SMH
CUT AND CONNECT TO
EXISTING 8"(PVC)S WITH A
SOLID SLEEVE COUPLING
REMOVE AND REPLACE EXISTING GRAVITY SEWER
SERVICE TO THE PROPERTY LINE. PROVIDE SEWER
SERVICE CLEANOUT AND RESTORE PRIVATE
PROPERTY TO PRE-CONSTRUCTION CONDITIONS (TYP.)
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 4'Ø SMH
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 4'Ø SMH
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 5'Ø SMH
PROVIDE NEW 5'Ø SMH
CUT AND CONNECT TO
EXISTING 12"(PVC)S WITH
A SOLID SLEEVE COUPLING
CUT AND CONNECT TO
EXISTING 8"(PVC)S WITH A
SOLID SLEEVE COUPLING
CUT AND CONNECT TO EXISTING 8"(PVC)S
WITH A SOLID SLEEVE COUPLING
CUT AND CONNECT TO
EXISTING 6"(PVC)S WITH A
SOLID SLEEVE COUPLING
CUT AND CONNECT TO
EXISTING 18"(AC)S WITH A
STEEL TRANSITION COUPLING
REMOVE AND LEGALLY DISPOSE OF
EXISTING ABANDONED SEWER SERVICE
REMOVE AND LEGALLY
DISPOSE OF EXISTING 18"(AC)S
CUT AND CONNECT TO
EXISTING 18"(AC)S WITH A
STEEL TRANSITION COUPLING
REMOVE AND LEGALLY
DISPOSE OF EXISTING
14"(DI)FM AND 8"(DI)FM
1" GAS SERVICE TO PUMP STATION
2" WATER SERVICE TO PUMP STATION
CUT AND CONNECT TO EXISTING 8"(AC)FM
WITH A STEEL TRANSITION COUPLING
REMOVE AND LEGALLY
DISPOSE OF EXISTING 8"(AC)FM
SEWER FORCE MAIN PLUG VALVES
(3) - 8" PLUG VALVES
(1) - 14" PLUG VALVE
DUAL 8" AND 14" SDR18 PVC
SEWER FORCE MAINS (TYP.)
SEWER FORCE
MAIN BENDS
(2) - 14" DI 45°
(2) - 8" DI 45°
CHIMNEY SEWER SERVICE
CONNECTION (TYP.)
REMOVE AND LEGALLY
DISPOSE OF 12"S (TYP.)
REMOVE AND LEGALLY
DISPOSE OF 8"(PVC)S
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
SEDIMENTATION CONTROL AT
CATCH BASINS - SILT SACK (TYP.)
IMPERVIOUS
CLAY DAM (TYP.)
IMPERVIOUS
CLAY DAM (TYP.)
NOTES:
1. ALL GRAVITY SEWER MAINS AND SERVICES ARE TO BE INSTALLED WITH EXTERNAL
JOINT WRAP - DOUBLE-WRAPPED, 6" WIDE, 10-MIL PVC PIPE WRAP TAPE.
2. CONTRACTOR SHALL CONFIRM LOCATIONS OF ALL SEWER SERVICE
CONNECTIONS PRIOR TO CONSTRUCTION.
3. SEE SHEET C-4 FOR DETAILED PUMP STATION SITE PLANS.
4. REMOVE AND LEGALLY DISPOSE OF ALL ASBESTOS CEMENT PIPE AND ASBESTOS
CONTAINING MATERIAL.
DROP SEWER CONNECTION
(REFER TO DETAIL SHEET CD-2)
DROP SEWER CONNECTION
(REFER TO DETAIL SHEET CD-2)
DROP SEWER CONNECTION
(REFER TO DETAIL SHEET CD-2)
2' GRAVEL
INFILTRATION
TRENCH ADJACENT
TO ACCESS ROAD
CUT AND CONNECT TO
EXISTING 18"(CMP)D WITH A
SOLID SLEEVE COUPLING (TYP.)
PROVIDE NEW 4'Ø DMH
TEST PIT TO VERIFY
LOCATION AND ELEVATION
OF EXISTING FORCE MAINS
SEE SHEET C-4 FOR
CONTINUATION
SEE SHEET C-7 FOR
EXISTING PUMP STATION
DEMOLITION PLAN
CUT AND CONNECT TO EXISTING 8"(DI)FM AND
14"(DI)FM WITH SOLID SLEEVE COUPLINGS
SEWER FORCE
MAIN BENDS
(1) - 14" DI 11 14°
(1) - 8" DI 11 14°
12" DIAMETER FILTER SOCK
CB/ CTRBROKEN
4"
2"
18"
8"TWIN
2"
2"
22"
2"2"
24"
24"
6"
8"
8"
4"
2"
EHH
EHH
EM
(5)EM
EM
GG
GG
GG
GG
GG
(5)GM
GM
GS GS
GW
GW
GW
HH
HH
HH
HH
HYD
CV
LP
LP
LP
LP
LP
LP
LP
LP
MHR=32.55
MHR=32.65MW
SIGN: 1WAY NO RIGHT
SIGN: NP
SIGN: HYANNISANCIENT CEMETERY
SIGN
SIGN SIGN
TH=30.5
1
TH=32.68
TH=33.93
TH=34.00
TLP
TLP
TLP
TLP
TLP
TLP
TLP LIGHT
TLP
TMH
TMH
T
UP 52-50
UP 52-48
UP/LP UP/LP 51
UP/LP 50-1
UP/LP 52-49
SPIGOT
WG
WG
WG
WG
WG
WG
WG
WG
WS
WS
WSBRICK
T
T T T T T
T T T T T T
CCB
CCB CCBBENCHCONCRETE
S
IDEWALK
CONCRETECONCRETEGRAVELDRIVE GRAVEL
EPBIT CONC SIDEWALK
BIT CONC SIDEWALK
BIT CONC SIDEWALKBIT CONC SIDEWALKBIT CONC SIDEWALKBIT CONC SIDE
WALK
EP
BIT CONC SIDEWALK
EP EPEPEP EPPOST & RAIL FENCE POST & RAIL FENCE POST & RAIL FENCE
PO
S
T
&
R
A
I
L
POST & RAIL
POST & RAIL FENCE
VINYL FENCE
G G G G G
G
G
G G G G G G G G G G G G G G G G G G
G
G G G G G G G G G G GGG G G
G
G
G
GGGGGGGGGGGLSRET WALLRET WALL
VGC VGC VGC VGC VGC
VGC VGC VGC VGC VGC
V
G
C
VGCVGCVGCVGCVGCVGCVGCW W W WWW W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
SYL
W W W
W
W
W
WWSWL
SYL
SWL
EM (ON
U
P)
UPLP 39-
2
0
CROSSW
A
L
K
T T T T T T T T T T T T T T T T T T T T T T T T T T T
#667EXISTINGBUILDING
WGGGSIGN:CROSSWALKEPBIT
CONCDRIVE
GRAVELPARKING LOT
BIT CONC SIDEWALK EPBIT CONC
PARKING LOT
LAWN
#488EXISTINGBUILDING
SIGN:NO PARKING
BIT CONCPARKING LOT
BIT CONCPARKING LOT
BIT CONC SIDEWALK
SIGN: ONE WAY
DO NOT ENTER SIGN: BIKES YIELDTO PEDESTRIANSCONCRETE
S
IDEWALK
LAWN
LAWN
BENCHMARK:TOP OF BONNET
BOLT OF HYDRANTEL=33.42 (NAVD88)
SIGN: 2 LANES
ONE WAYSIGN:NEWTON ST
HEDGEBENCHMARK:
RR SPIKE IN UPEL=33.33 (NAV88)
SIGN:ONE WAY SIGN:
ONE WAY
BIT CONCPARKING LOT
ELECTRICVAULT
SIGN: NO
RIGHT TURN
SIGN: DO
NOT ENTER
EUP/LP 6
TRAN
UP/LP 52-46
UP NO#GGGGGGGVGCKLAWEDIS CNOC
CONC SIDEWALKCONC S
ID
E
W
A
L
K
BIT CONCPARKING LOT
LAWN
EXISTINGBUILDING
PARCEL I
D:
3
0
8-
1
3
8
N/F
675 MAIN
S
T
REALTY
T
R
U
S
T
BOOK: 2
0
7
2
8
PAGE: 26
5
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S
D DDDCBNR=30.08
SMH
R=28.60
T.O.L.=2
1.
0
2
A C
B A B
A
B DC
E
BA
BA
8" PVC8" PVC 8" PVC 8" PVC
8"DISMHR=29.90
I(A)=23.26I(B)=19.32
I(C)=19.44
~CI (DI)~
8" PVC 8" PVC
SMHR=32.50I(A)=18.40
I(B)=18.27
DMHR=31.12I(A)=25.97
I(B)=25.07I(C)=25.4712"HDPE
CBNR=31.07I=28.37
12"HDPE
CBNR=30.93
WATER @ 26.63(HOODED)
DMHR=30.91I=23.82
D DCBNR=31.01I=28.23
CBNR=31.09I(A)=28.04
I(B)=27.9± (HOODED)WATER @ 27.9
CBNR=30.94
I(A)=27.89I(B)=27.74
SIGN:SEA STREET
CB/DISC
CBN
R=30.44I=26.3412"HDPE
CBNR=30.66I(A)=27.56 (12"HDPE)
I(B)=27.50
SMHR=30.90
I(A)=24.90 (TOP FM)I(B)=24.36
SMHR=30.93I(A)=17.36
I(B)=24.28I(C)=17.40
I(D)=17.03I(E)=17.28
SMH
R=31.08I(A)=17.03I(B)=16.93
~
CBNR=30.81I=27.94
12"HDPE TO STORMWATERINFILTRATION SYSTEM
A
BC
12" PVC~8"SEWER
12" HDPE
A
B
A
B
12" HDPE12" HDPEA
B
~DWWWWWWW3031 32
32
32
31
3
0
3131
31
333333
3332
32
31
31
2930
PARCEL ID: 308-137N/F
HYANNIS SERIES SIX, LLCBOOK: 28924 PAGE: 29 PARCEL ID: 308-136N/F
TOWN OF BARNSTABLEBOOK: 28380 PAGE: 121
PARCEL ID: 308-141N/F CASEY TRUST
BOOK: 22904 PAGE: 309
PARCEL ID: 308-170N/F
67 SEA STREET REALTY TRUSTL.C.C. 161932
PARCEL ID: 308-142
N/F478 SOUTH STREET REALTY TRUSTBOOK: 24798 PAGE: 204
PARCEL ID: 308-122
N/FJCM REALTY TRUSTL.C.C. 173610
PARCEL ID: 308-198N/FALFA GROUP LLC
BOOK: 31319 PAGE: 322
PARCEL ID: 308-165
N/FTOWN OF BARNSTABLE(CEMETERY)
S SSSSSS
S
(SEWER CONNECTS TOSEA STREET)
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMGG12"DI
12"DI
STORMWATER INFILTRATION CHAMBER
(
R
)
STORMWATERINFILTRATION
CHAMBER (R)
T
T
T
T
T T8" AC FM8" AC FM
8" VC8" VCB-1
S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSS
264.4 LF 12" PVC GRAVITY SEWER
246.5 LF 12" PVC GRAVITY SEWER
11+266+00 7+00 8+00 9+00 10+00
11+00
FM
FM
FM
5
10
20
30
40
5
10
20
30
40
5+60 6+00 7+00 8+00 9+00 10+00 11+00 11+246+00 7+00 8+00 9+00 10+00 11+00
264.4 LF 12" PVC GRAVITY SEWER @ 0.0025 FT/FT
MIN. COVER = 12.7
MAX. COVER = 15.5
246.5 LF 12" PVC GRAVITY SEWER @ 0.0025 FT/FT
MIN. COVER = 13.1
MAX. COVER = 15.6
PROP. 5' SMH
STA 6+00
RIM EL = 29.88
(E) 12"Ø INV EL = 15.80
(SW) 8"Ø INV EL = 19.44
(S) 8"Ø INV EL = 19.44
(W) 12"Ø INV EL = 15.70
PROP. 5' SMH
STA 8+47
RIM EL = 33.00
(E) 12"Ø INV EL = 16.52
(W) 12"Ø INV EL = 16.42
PROP. 5' SMH
STA 11+11
RIM EL = 30.95
(S) 8"Ø INV EL = 17.28
(N) 8"Ø INV EL = 17.40
(W) 12"Ø INV EL = 17.18
WS
GS
GS
12"W
12"D
12"W
12"D
12"W
#675
F.F.E.
30.51
#667
F.F.E.
UNKNOWN
#675
#667
#488
#488
F.F.E.
34.00
SCALE:
PLAN
1" = 20'
STA 5+60 TO STA 11+26
PROPOSED CONDITIONS PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-6THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:17amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
N
MATCH LINESHEET C-5SOUTH STREET
SOUT
H
STRE
ETSEASTREET
SEASTREETPROFILE
HORIZONTAL SCALE:
VERTICAL SCALE:
1"=20'
1"=5'
CUT AND CONNECT TO EXISTING 8"(VC)S
WITH A SOLID SLEEVE COUPLING
REMOVE AND LEGALLY
DISPOSE OF EXISTING 8"(PVC)S
CUT AND CONNECT TO
EXISTING 8"(VC)S WITH A
SOLID SLEEVE COUPLING
CONNECT NEW 8" SDR18 PVC FORCE
MAIN TO TO EXISTING GRAVITY SMH
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 5'Ø SMH
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 5'Ø SMH
REMOVE AND LEGALLY DISPOSE
OF EXISTING GRAVITY SMH.
PROVIDE NEW 5'Ø SMH
CUT AND CONNECT TO
EXISTING 8"(PVC)S WITH A
SOLID SLEEVE COUPLING
REMOVE AND REPLACE EXISTING GRAVITY SEWER
SERVICE TO THE PROPERTY LINE. PROVIDE SEWER
SERVICE CLEANOUT AND RESTORE PRIVATE
PROPERTY TO PRE-CONSTRUCTION CONDITIONS (TYP.)
EXISTING GRADE
CHIMNEY SEWER SERVICE
CONNECTION (TYP.)
CUT AND CONNECT TO EXISTING 8"(AC)FM
WITH A STEEL TRANSITION COUPLING
8" DI 22 12° BENDS
REMOVE AND LEGALLY DISPOSE OF
EXISTING FORCE MAIN SMH.
REMOVE AND LEGALLY
DISPOSE OF 8"(PVC)S
SEDIMENTATION CONTROL AT
CATCH BASINS - SILT SACK (TYP.)
IMPERVIOUS
CLAY DAM (TYP.)
IMPERVIOUS
CLAY DAM (TYP.)
DROP SEWER CONNECTION
(REFER TO DETAIL SHEET CD-2)NEWTONSTREETNOTES:
1. ALL GRAVITY SEWER MAINS AND SERVICES ARE TO BE INSTALLED WITH EXTERNAL
JOINT WRAP - DOUBLE-WRAPPED, 6" WIDE, 10-MIL PVC PIPE WRAP TAPE.
2. CONTRACTOR SHALL CONFIRM LOCATIONS OF ALL SEWER SERVICE
CONNECTIONS PRIOR TO CONSTRUCTION.
3. REMOVE AND LEGALLY DISPOSE OF ALL ASBESTOS CEMENT PIPE AND ASBESTOS
CONTAINING MATERIAL.
18"
EMH
LAMP
MW
TRANT
UP 39-25
UP
WG
WG
WG
BC
E
EEEEEEEET
T
T
T
T
TTBIT CONC SIDEWALK
BIT CONC SIDEWALK
G G G G G G G G G G G G G G G G G G G G G GVCC
VGC
VGC
VGC
W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWGENERATOR
ON CONC PAD
CONC BLOCK
RET WALL
ELEC PANEL
ON CONC PAD
PUMPING STATION
& WET WELL
SMH
(LATERALS)
EP
SCULPTURE
T T T T T T T T T T T T T T T T T T T T T T
PARCEL ID: 308-283
N/FBRASS NAIL REALTY TRUST(ARMSTRONG'S COMMERCIAL CONDOMINIUM)
BOOK: 3812
PAGE: 324
PARCEL ID: 308-003
N/FSEVEN TWENTY MAIN STREET
NOMINEE TRUST
BOOK: 30351
PAGE: 192
TREE LINE
GGS S S S S S S S S S S S S S SSSSSDD
DDDGUARD RAIL
CBN
R=14.32
I=12.72
SGV
(2)SGV
SMH
A
B C
D
6" PV
C
12"SEWER18" AC18" AC SS~SMH
R=18.29
I(A)=6.13
I(B)=14.58
I(C)=6.11
I(D)=6.55
A
C B
A
C B
A
B18" CMP12" VC12" VC~CBN
R=17.43
I=14.12
CBN
R=17.60
I(A)=14.10
I(B)=11.86
I(C)=10.93
CBN
R=17.06
I(A)=13.58 (12"VC)
I(B)=14.16 (12"VC)
CBNR=17.61I(A)=9.14 (18"CMP)DD~191816
17
DDDDDDDDDDDDDW
W W W
CONC. HEADWALL(RECORD LOCATION)INTERMITTENTSTREAMFMF
M
FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM
1"PL (2016)
EMH
GM
T8" DI FORCE MAIN
2"PL
4-FORMER
12"DI 8"DI1"-2"DDDD24"CMPE
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
E
E
A
S
EEASEEASESSSSCAPPED &
PLUGGED
7/19/2002
8" AC FM
B-1505050505050
5
0
5
0
50
50
50
50
50 50 50 50
50 50505050505050505050505050505050100100100100100100100100100100100100100SSSSSSSSSSS
SSSSSS14.8 LF 18" PVC GRAVITY SEWER
0+00
1+00
WWWWWGGGGG
GGGGT T
T
T
T
EXISTING PUMP STATION DEMOLITION PLAN
ZFK
DNRP
FJB
FJB
AS NOTED
C-7THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\03 Civil Sheets.dwg Plot Date: Nov 21,2022-11:21amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SCALE:
PLAN
1" = 10'
N
MAIN STREET
DEMOLISH EXISTING CONCRETE
PAD. REMOVE AND LEGALLY
DISPOSE OF EXISTING GENERATOR
(SEE NOTE 1)
DEMOLISH EXISTING CONCRETE PAD.
REMOVE AND LEGALLY DISPOSE OF
EXISTING ELECTRIC PANEL
(SEE NOTE 2)
EXISTING GUARD RAIL TO REMAIN
REMOVE AND LEGALLY DISPOSE
OF EXISTING GAS METER
(SEE NOTE 1)
REMOVE AND LEGALLY DISPOSE OF EXISTING
PUMP STATION AND WET WELL TO 6' BELOW
GRADE. ABANDON REMAINDER OF PUMP
STATION AND WET WELL WITH FLOWABLE FILL
EXISTING TREE TO REMAIN
REMOVE AND LEGALLY DISPOSE
OF EXISTING ELECTRIC MANHOLE
(SEE NOTE 2)
CLOSE EXISTING GAS VALVE
REMOVE AND LEGALLY
DISPOSE OF EXISTING 18"(AC)S
REMOVE AND LEGALLY
DISPOSE OF EXISTING 8"(AC)FM
REMOVE AND LEGALLY DISPOSE
OF EXISTING 8"(DI)FM
REMOVE AND LEGALLY DISPOSE OF EXISTING
SEWER FORCE MAIN PIPING, MANHOLE, AND VALVES
NOTES:
1. COORDINATE WITH GAS COMPANY REGARDING SHUT OFF AND ABANDONMENT OF
EXISTING GAS SERVICE TO THE EXISTING PUMP STATION SITE.
2. COORDINATE WITH ELECTRIC COMPANY REGARDING DISCONNECTION AND
ABANDONMENT OF EXISTING ELECTRIC SERVICE TO THE EXISTING PUMP STATION SITE.
CLOSE EXISTING WATER VALVE
LOAM AND SEED DISTURBED AREA
12" DIAMETER FILTER SOCK
CIVIL DETAILS I
ZFK
DNRP
FJB
FJB
AS NOTED
CD-1THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\04 Civil Details.dwg Plot Date: Nov 21,2022-11:28amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SCALE:
TYPICAL SEWER TRENCH
N.T.S.
TOPSOIL
7'
12 - 20'
5'UP TO 24"
0 - 12'
TRENCH DEPTH
TRENCH WIDTH PAYMENT SCHEDULE
D+5'D+3'> 24"
> 20'
10'
D+8'
NOTES:
1. TRENCH PAYMENT WIDTH FOR MULTIPLE PIPES IN THE SAME TRENCH
WILL BE INCREASED BY LARGER PIPE DIAMETER PLUS A MAXIMUM OF
1'-0" HORIZONTAL SEPARATION AS MEASURED BETWEEN EACH PIPE.
2. D = PIPE DIAMETER (IN FEET). FOR EXAMPLE, IF PIPE IS 30"Ø AND LESS
THAN 12' DEEP, THEN TRENCH WIDTH IS 2.5'+3'=5.5'
PIPE
DIAMETER
4" MIN.
TRENCH WIDTH
SEE TABLE
HALF OF
TRENCH WIDTH
6" MIN.12" MIN.RESURFACING AS REQUIRED
SECTION UNDER PAVEMENT
PIPE
DIAMETER
GRAVEL SUB-BASE
SCALE: N.T.S.
PVC/DI FITTINGS AND RESTRAINTS (SEWER FORCE MAIN)
MIN. 60'
RESTRAINED LENGTH
MIN. 60'
RESTRAINED LENGTH
NOTES:
1. CONCRETE FITTING ENCASEMENT SHALL BE DESIGNED BY THE
CONTRACTOR. THE FITTING ENCASEMENT SHALL BE CAST-IN-PLACE WITH A
MINIMUM 3' EXTENSION FROM THE FACE OF EACH FITTING.
RESTRAINT HARNESS (TYP.)
PROTECTO 401 EPOXY
LINED DI FITTING (TYP.)
DR18 PVC PIPE (TYP.)
CONCRETE FITTING ENCASEMENT SHALL BE
A MINIMUM OF 3'L X 3'W X 3'H (TYP.)
PUSH ON JOINT (TYP.)
SCALE:
SEWER FORCE MAIN PLUG VALVE AND VALVE BOX
N.T.S.
SEWER
NOTES:
1. ALL SEWER PLUG VALVES SHALL OPEN LEFT.
2. PROVIDE CUSTOM WRENCHES REQUIRED FOR
VALVES WITH RISING STEMS TO THE TOWN.
2-NOTCH OPENINGS REQUIRED
COVER
FINISHED GRADE
VALVE BOX TOP SECTION VALVE BOX
VALVE BOX BOTTOM SECTION
DR18 PVC SEWER FORCE MAIN
MECHANICAL JOINT
ECCENTRIC PLUG VALVE
DR18 PVC SEWER
FORCE MAIN
CONCRETE SUPPORT BLOCK
FIRM UNDISTURBED
MATERIAL
PVC MECHANICAL JOINT
ADAPTER RESTRAINTS
UNDISTURBED
EARTH (TYP.)
GREEN SEWER
MARKING TAPE WITH
METAL CORE APPROX. 18"
ABOVE SEWER PIPE
CROSS COUNTRY SECTION
(WHERE NO GRASS OCCURS,
OMIT TOPSOIL AND PLACE
MIN. 6" OF SELECT GRAVEL)
CRUSHED STONE BACKFILL
FOR SEWER FORCE
MAIN/GRAVITY SEWER.
THOROUGHLY COMPACT.
COMPACTED BACKFILL
(EXCAVATED MATERIAL OR
GRAVEL AS SPECIFIED BY
ENGINEER)
12" MIN.
SCALE:
CONCRETE ENCASEMENT FOR
SEWER FORCE MAIN CROSSING
N.T.S.
D + 2'
MI
N.
D
VARIE
S
1'-0"1/2D121'-0
"
2D
1
D +
2
'
M
I
N
.21/2
D
1
EXISTING UTILITY
SEWER FORCE MAIN
NOTES:
1. ALL UTILITY CROSSINGS WITHIN 12" OF THE INSTALLED FORCE MAIN SHALL BE CONCRETE ENCASED.
2. ENCASEMENT SHALL BE EXCAVATABLE FLOWABLE FILL.
SCALE:
PIPE TRENCH DAM DETAIL
N.T.S.
2" MIN KEY WAY
UNDISTURBED MATERIAL
IMPERVIOUS DAM
NEW SEWER
12"MIN
1"MIN
2" MIN KEY WAY
UNDISTURBED MATERIAL
NEW SEWER
SPRINGLINE PIPE
SECTION
PLAN
CLAY DAM FOR PVC PIPE
CONCRETE DAM FOR DI
AND RC PIPE
EXCAVATED TRENCH
(SEE DETAIL THIS SHEET)
NOTES:
FOR PIPES OTHER THAN PVC, TOP OF DAM TO BE AT
MID-DIAMETER OF PIPE.
12"
2% SLOPE (MIN)
6% SLOPE (MAX)
6" MIN. OF 34" CRUSHED STONE
OVER PIPE IN SERVICE TRENCH
6" MIN. OF 34" CRUSHED STONEOR GRAVEL FILL IN NATIVE SOIL
(12" MIN. IN LEDGE UNDER PIPE)
SCALE:
TYPICAL SEWER SERVICE CONNECTION
N.T.S.
FLOW
NOTES:
1. CLEAN OUT SHALL BE ACCESSIBLE AT ALL TIMES.
2. 6" MIN. LAYER OF
3 4" CRUSHED STONE 12" IN LEDGE.
SCALE:
SEWER LATERAL CLEANOUT
N.T.S.
TO SEWER MAIN
6"
6"
MIN.
CAST IRON OR TRAFFIC TYPE
METER BOX, U.S. FOUNDRY MODEL
7621 OR APPROVED EQUAL
RIM AND COVER SET IN
CEMENT CONCRETE
6" MIN. SDR35 PVC
3 4" CRUSHED STONE 6" MIN. SDR35 PVC GRAVITY
SEWER SERVICE
PVC TEE-WYE
SEWER CLEAN-OUT RIM AND
COVER FLUSH OR RAISED IN
LANDSCAPED AREAS
LANDSCAPED AREAS PAVED AREAS
REMOVABLE PVC THREADED PLUG
REMOVE RUBBER FROM
CLEAN OUT CAP
SEWER CLEAN-OUT RIM
AND COVER FLUSH IN
PAVEMENT AREAS
EPR (PIPE AND TAP CONNECTION) NOTES:
1. TEE OR WYE SHALL BE INSTALLED BETWEEN 0 TO 60 DEGREES AS NEEDED TO MEET THE EXISTING
PRIVATE SANITARY LATERAL. WYES SHALL BE ORIENTED TO POINT TOWARDS THE DIRECTION OF
MAIN LINE FLOW.
2. THE DIMENSIONS SHOWN ON THIS DRAWING ARE ONLY INTENDED TO DEFINE THE LIMITS FOR
BACKFILL MATERIAL. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO "LAY BACK" THE TRENCH
WALLS TO WHATEVER FLATNESS OF SLOPE IS NECESSARY TO PROVIDE SAFE WORKING CONDITIONS.
3. SEE TRENCH DETAILS FOR BEDDING AND BACKFILL REQUIREMENTS.
4. FLEXIBLE PIPE COUPLINGS SHALL BE STRONGBACK COUPLINGS.
5. ALL SEWER SERVICES SHALL BE REPLACED TO THE PROPERTY LINE AND CONNECTED TO THE
EXISTING SEWER SERVICE.
6. ALL SEWER SERVICES SHALL HAVE CLEANOUTS REPLACED IN THE EXISTING LOCATIONS.
6" FACTORY TEE OR WYE
8" MIN. SDR35 PVC GRAVITY
SEWER MAIN (SIZE VARIES)
STRONGBACK
COUPLING
CONNECT LATERAL TO SOUND
PIPE, LENGTH MAY VARY STRONGBACK
COUPLING
8" MIN. SDR35 PVC
GRAVITY SEWER MAIN
(SIZE VARIES)PLAN
PROFILE
6" MIN. SDR35 PVC SERVICE
6" MIN. SDR35 PVC SERVICE
CONNECT LATERAL TO SOUND
PIPE, LENGTH MAY VARY
6" FACTORY TEE OR WYE
1 FT. OF 3 4" CRUSHEDSTONE OVER PIPE
2% SLOPE (MIN)
6% SLOPE (MAX)
6" MIN. 3 4" COMPACTED
CRUSHED STONE
GREEN SEWER MARKING
TAPE WITH METAL CORE
12"
SECTION
CRUSHED STONE BEDDING
UNDISTURBED EARTH
6" C900 PVC PIPE
TRENCH BACKFILL SEE
DETAIL SHEET CD-5
6" C900 PVC BEND
INVERT TO BE SUCH THAT
HOUSE CONNECTION WILL
HAVE A MIN 2% SLOPE
6" SDR35 PVC SERVICE PIPE
6" C900 PVC STUB
8"
SCALE:
PVC CHIMNEY DETAIL
N.T.S.
401 EPOXY LINED MJ
DUCTILE IRON TEE
6" C900 PVC TO SDR35
PVC TRANSITION
CIVIL DETAILS II
ZFK
DNRP
FJB
FJB
AS NOTED
CD-2THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\04 Civil Details.dwg Plot Date: Nov 21,2022-11:29amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SCALE:
VERTICAL SEPARATION LESS THAN
18" BETWEEN WATER AND SEWER
N.T.S.SCALE:
GRAVITY SEWER MANHOLE FRAME AND COVER
N.T.S.
NOTES:
1. FRAME AND COVER SHALL BE HEAVY DUTY, 24 INCH
DIAMETER, MARBLEHEAD PATTERN AS MANUFACTURED BY ej
OR APPROVED EQUAL.
2. EACH COVER SHALL READ SEWER IN 3" LETTERING.
3. FRAME AND COVER SHALL BE SET IN FULL BED OF MORTAR.
4. FRAME HEIGHT TO BE DETERMINED BY CONTRACTOR.
5. EACH FRAME AND COVER SHALL HAVE A MINIMUM WEIGHT
OF 450 POUNDS.
24"
34"
26"
1 1/8"
TBD
SCALE:
VERTICAL SEPARATION GREATER
THAN 18" BETWEEN PIPES
N.T.S.
1
112
12" MIN AT CROSSINGS
NEW PVC
GRAVITY SEWER
EXIST OR NEW PIPE
18" MIN AT WATER/SEWER CROSSINGS,
12" MIN AT OTHER CROSSINGS
SEWER
GRAVITY SEWER
EXCAVATABLE FLOWABLE FILL AS
APPROVED BY THE UTILITY FOR
SEPARATION IN UNDISTURBED
EARTH OR COMPACTED 3/4-INCH
(NO. 67) STONE.
EXIST OR NEW PIPE
NEW PVC GRAVITY SEWER
EXCAVATABLE FLOWABLE FILL AS
APPROVED BY THE UTILITY FOR
SEPARATION IN UNDISTURBED EARTH
OR COMPACTED 3/4-INCH (NO. 67)
STONE.
LC
LC
18' (NO
JOINTS)
6" MIN
(TYP)SPRING LINE
LESS THAN 18"
WATER/SEWER
CROSSING
EXCAVATABLE FLOWABLE FILL FOR
SEWER/WATER SEPARATION IN
UNDISTURBED EARTH
EXIST OR NEW WATER PIPE
FLEXIBLE PIPE COUPLINGS FOR
CONNECTING DISSIMILAR PIPE
MATERIAL SHALL BE RESISTANT
TO SEWER GAS. (DOUBLE BAND
304 STAINLESS STEEL CLAMPS)
9' MIN DICL 9' MIN DICL
LCSEWERSEWER
1
112
NEW PVC GRAVITY SEWER
NOTES:
1. TYPICAL SANITARY MANHOLE TO BE 4 FEET IN DIAMETER.
2. 5'-0" DIAMETER FOR ALL MANHOLE DEPTHS GREATER THAN 12 FEET OR WHEN ORDERED BY THE
ENGINEER.
3. INNER EDGE OF BRICK TABLE TO BE AT ELEVATION OF CROWN OF TOP OF PIPE.
4. DESIGN LOAD - HS20.
5. ALL INVERTS SHALL BE 4,000 PSI CEMENT CONCRETE IN VOID AREAS AND RED SEWER BRICK
CONSTRUCTION.
6. INVERTS SHALL NOT BE BUILT ABOVE GRADE. ALL INVERTS SHALL BE BUILT IN PLACE AFTER ALL PIPES
HAVE BEEN INSTALLED.
SCALE:
TYPICAL GRAVITY SEWER MANHOLE SECTION
N.T.S.
PRE CAST REINFORCED
CONCRETE MONOLITHIC
M.H. BASE SECTION & SLAB
STANDARD PRECAST
ECCENTRIC OR CONCENTRIC
CONE SECTION (AS REQUIRED)
COAT MANHOLE EXTERIOR
WITH TWO COATS OF
BITUMASTIC COATING OR
APPROVED EQUAL
8"26"8"
FLOW
CHANNEL
MANHOLE FRAME
AND COVER (SEE
DETAIL THIS SHEET)
RUBBER GRADE RING
AS REQUIRED
MANHOLE STEPS AT 12" OC
BRICK AND MORTAR
FLOW CHANNEL BENCHSLOPE 1/2" PER FOOT
CLASS "B" CONCRETE FILL
MINIMUM 4000 PSI
COMPACTED
CRUSHED STONE
FLEXIBLE RUBBER BOOT
(SEE DETAIL THIS SHEET)
12"SST CLAMP
EXTERIOR JOINT
WRAP, TYP
PRECAST REINFORCED
CONCRETE MANHOLE
SECTIONS
(COMBINATION OF 1, 2,
3, OR 4' LENGTHS)
BUTYL RUBBER
GASKET,TYP
12" BEDDING ZONE
4'-0" DIA. MIN.
5'-0" DIA. WHERE
OVER 12' DEEP
UNDISTURBED EARTH
7" MIN.
PLAN
FLEXIBLE RUBBER BOOT
WITH SST STRAP, TYPPRECAST MANHOLE
MANHOLE STEPS
AT 12" OC
FLOW CHANNEL BENCH SLOPE UP
FROM CHANNEL 1/2" PER FOOT
BITUMINOUS
DAMP PROOFING
ALL MANHOLES SHALL
BE SIZED AS NOTED ON
THE PLANS
MANHOLE SCHEDULE
INTERIOR
DIAMETER
MANHOLE WALL THICKNESS
MIN. WALL
THICKNESS
4-FEET 5-INCHES
5-FEET 6-INCHES
SCALE:
TYPICAL GRAVITY SEWER MANHOLE PLAN
N.T.S.
FINISHED GRADE
8" MIN.
24"
SCALE:
PIPE TO MANHOLE CONNECTION
N.T.S.
PRECAST CONCRETE MANHOLE
FLEXIBLE "SEAL BOOT"
RESILIENT CONNECTOR IN
ACCORDANCE WITH ASTM
C923.
PIPE
TAKE UP CLAMPS. (ACID
RESISTANT-STAINLESS STEEL TYPE 302)
(1 CLAMP ON 12" PIPE AND SMALLER)
(2 CLAMPS ON 15" PIPE AND LARGER)
POWER SEAL INTERLOCKED
INSIDE OF GASKET. (ACID
RESISTANT-STAINLESS
STEEL TYPE 304)
NON-SHRINK HYDRAULIC
CEMENT GROUT
SCALE:
PIPE TO MANHOLE CONNECTION
N.T.S.
PRECAST CONCRETE MANHOLE
FLEXIBLE "SEAL BOOT"
RESILIENT CONNECTOR IN
ACCORDANCE WITH ASTM
C923.
PIPE
TAKE UP CLAMPS. (ACID
RESISTANT-STAINLESS STEEL TYPE 302)
(1 CLAMP ON 12" PIPE AND SMALLER)
(2 CLAMPS ON 15" PIPE AND LARGER)
POWER SEAL INTERLOCKED
INSIDE OF GASKET. (ACID
RESISTANT-STAINLESS
STEEL TYPE 304)
NON-SHRINK HYDRAULIC
CEMENT GROUT
SEWER MAIN
45° WYE BRANCH MANHOLE WALL
45° BEND
95% SUBGRADE COMPACTED
GRAVEL INSTALLED IN 6" LIFTS
SECURE TO STRUCTURE WALL WITH
ANCHOR STRAPS (MIN. OF 2 STRAPS)
STAINLESS STEEL ANCHOR STRAPS 24"
ON CENTER
PIPE TO MANHOLE CONNECTION
(SEE DETAIL THIS SHEET) (TYP.)
SEWER MAIN
INLET TO MATCH INVERT
SEWER BRICK INVERT
BED MORTAR
UNDISTURBED SOIL
CONCRETE THRUST BLOCK
90° BEND
POLYWRAP PIPE
WITHIN LIMITS OF
MORTAR
DROP PIPE
DIAMETER SAME AS
MAIN LINE (8" MIN.)
SCALE:
DROP SEWER MANHOLE DETAIL
N.T.S.
NOTES:
1. DROP CONNECTION REQUIRED WHERE INLET PIPE IS 2 VERTICAL FEET ABOVE
THE MANHOLE CHANNEL.
MASONRY WEIR BUILT TO PIPE
SPRINGLINE (H=D/2)
18" (MIN.) TO CENTER OF PIPE
CIVIL DETAILS III
ZFK
DNRP
FJB
FJB
AS NOTED
CD-3THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\04 Civil Details.dwg Plot Date: Nov 21,2022-11:29amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
MIN. 1 FT
SCALE:
CONNECTION OF EXISTING PIPE TO NEW MANHOLE
N.T.S.SCALE:
CONNECTION OF NEW PIPE TO EXISTING MANHOLE
N.T.S.
NEW MANHOLE
NEW PIPE
BRICK CHANNEL
STRONGBACK PIPE
COUPLING OR
EQUAL, TYP.
EXIST.
PIPE
NEW SDR 35, ASTM
D3034 PVC PIPING
SIZE TO MATCH
EXISTING, TYP.
MANHOLE BEDDING PER TYPICAL
GRAVITY SEWER MANHOLE DETAIL
EXISTING MANHOLE
BEDDING
EXISTING PRECAST
CONCRETE MANHOLE
NEW PIPE
CONTRACTOR TO REBUILD
INVERT OF EXISTING
MANHOLE
EXIST.
PIPE
FLEXIBLE RUBBER
BOOT (SEE DETAIL
SHEET CD-2)(TYP.)
NOTES:
1. FLEXIBLE PIPE COUPLINGS FOR CONNECTING DISSIMILAR PIPE MATERIALS
SHALL BE RESISTANT TO SEWER GAS.
FLEXIBLE RUBBER
BOOT (SEE DETAIL
SHEET CD-2)(TYP.)5'-0" MIN COVERD.I.
WATER
MAIN
1"-0" MIN
SCALE:
TYPICAL WATER SERVICE CONNECTION
N.T.S.
NOTES:
1. ALL WATER SERVICES SHALL BE REPLACED TO THE PROPERTY LINE AND CONNECTED
TO THE EXISTING WATER SERVICE WITH A SLEEVE TYPE COUPLING.
2. PROVIDE SADDLE CONNECTION FOR ALL 1.5" OR LARGER SERVICES. SADDLE SHALL
HAVE STAINLESS STEEL BANDS.
3" WIDE PRINTED
UNDERGROUND
WARNING TAPE
WITH METAL
CORE. APPROX. 1'
BELOW BOTTOM
OF PAVEMENT
ERIE TYPE BOX WITH 24"
ROD CENTERED OVER
CURB STOP TELESCOPING
WITH PAVEMENT TOP
PE SERVICE TUBING
BASE OF CURB BOX
SET ON RED BRICK
LEAD FREE CURB SHUT-OFF
PE SERVICE TUBING
TEE HEAD
CORPORATION STOP
DIRECT TAP
(SEE NOTE 2)
CURB STONE STREET SURFACE
STREET BASE
SIDEWALK
WRAP TUBING WITH
#12 TRACER WIRE
SEE NOTE 1
SCALE:
TYPICAL WATER MAIN/SERVICE TRENCH
N.T.S.
TOPSOIL
3" WIDE PRINTED
UNDERGROUND WARNING
TAPE WITH METAL CORE.
APPROX. 1' BELOW
BOTTOM OF PAVEMENT
4" MIN.
TRENCH WIDTH
SEE NOTES
12" MIN.RESURFACING AS REQUIRED
SECTION UNDER PAVEMENT
GRAVEL SUB-BASE
NOTES:
1. TRENCH WIDTH PAY LIMIT FOR WATER MAIN/SERVICE INSTALLATION AND
TEMPORARY PAVEMENT=4.0-FT
2. FOR LOCATIONS WHERE LEDGE IS NOT ENCOUNTERED IN TRENCH, PIPE CAN LAY ON
UNDISTURBED EARTH, OR ON SAND BEDDING CONSISTENT WITH AWWA GUIDELINES.
3. FOR LOCATIONS WHERE LEDGE IS ENCOUNTERED, SAND BEDDING SHALL BE
MINIMUM OF 12" THICK UNDER PIPE.
BEDDING, SEE
NOTES BELOW
NOTE: 5'-0" MIN. COVER
UNDISTURBED
EARTH (TYP.)
12" MIN.
COMPACTED BACKFILL
(EXCAVATED MATERIAL OR
GRAVEL AS SPECIFIED BY
ENGINEER)
PIPE BEDDING (TYPE C
GRAVEL BORROW OR
CRUSHED STONE WHERE
DEWATERING IS
REQUIRED)
NEW WATER
MAIN/SERVICE
CROSS COUNTRY SECTION
(WHERE NO GRASS OCCURS, OMIT TOPSOIL
AND PLACE MIN. 6" OF SELECT GRAVEL)
TOPSOIL4" MIN.
TRENCH WIDTH
SEE TABLE
4" MIN.6" MIN.RESURFACING AS REQUIRED
SECTION UNDER PAVEMENT
SCALE:
TYPICAL DRAIN TRENCH
N.T.S.
PIPE
DIAMETER
GRAVEL SUB-BASE
UNDISTURBED
EARTH (TYP.)
HALF OF
TRENCH WIDTH
GEOTEXTILE FABRIC
SECTION A-AFLOWAFLOWPLAN
A
6'
5'
4'
MH DIA.
TABLE 1
SIDE WALL MIN.
THICKNESS
BOTTOM WALL
MIN. THICKNESS
6"
6"
5"
8"
8"
6"
SET CASTING IN GROUT AND GROUT
ALL AROUND TO 4" ABOVE FLANGE
(UNLESS NOTED OTHERWISE)
26" STANDARD MANHOLE FRAME &
COVER (UNLESS NOTED OTHERWISE)
TO BE MARKED "DRAIN"
SET RIM AT FINISHED GRADE
FINISH GRADE
STANDARD PRECAST CONCENTRIC
CONE SECTION, ECCENTRIC CONE
SECTION, OR FLAT TOP (AS REQUIRED)
SEAL ALL INTERIOR AND
EXTERIOR JOINTS WITH
HYDRAULIC CEMENT
USE NON SHRINK GROUT FOR RCP
AND HDPE CONNECTIONS. CAST
OPENING IN STRUCTURE. (TYP.)
UNDISTURBED MATERIALFOR BOTTOM SLAB
THICKNESS SEE TABLE 1
BRICK MASONRY
TABLE AND INVERT
STANDARD PRECAST
BASE IN 3' LENGTHS (MIN)
BUTYL RUBBER
JOINT (TYP.)
SEAL ALL HOLES WITH
HYDRAULIC CEMENT
3,000 PSI CEMENT CONCRETE
GRAVITY DRAIN (SIZES VARY)
PLACE JOINT OR COUPLING
WITHIN 3' OF WALL ON ALL PIPES
26" STANDARD MANHOLE
FRAME & COVER (UNLESS
OTHERWISE NOTED)
24" Ø
8"
MIN.
MANHOLE
DIAMETER
SEE TABLE 1
18" MAX
PLAN
SECTION A-A
GAS & OIL
TRAP HOOD
A
4'-0"FLOW
A
GRANITE CURB SHALL BE CUT AS
REQUIRED TO SET CATCH BASIN
26" SLAB OPENING WITH STANDARD
GRATE (OR CASCADE AS SPECIFIED)
HOOD OR INSERT
OUTLET PIPE
STANDARD GRATE (OR
CASCADE GRATE AS SPECIFIED)
GRANITE CURB SHALL BE CUT AS
REQUIRED TO SET CATCH BASIN
TOP OF CURB
FINISHED ROAD GRADE
SET CASTING IN GROUT AND GROUT
ALL AROUND TO 4" ABOVE FLANGE
(UNLESS OTHERWISE NOTED)
STANDARD PRECAST BARREL
SECTION COMBINATIONS OF
1', 2' 3' OR 4' LENGTHS AS NEEDED
TO BRING CATCH BASIN RIM TO
REQUIRED ELEVATION
BUTYL RUBBER JOINT
(TYP.)
USE NON SHRINK GROUT FOR RCP
AND HDPE CONNECTIONS. CAST
OPENING IN STRUCTURE (TYP)
MINIMUM ONE-FOOT DIAMETER
HOLE IN CENTER OF BASE
STANDARD PRECAST
BASE IN 3' LENGTHS (MIN)
SEAL ALL HOLES WITH
HYDRAULIC CEMENT
12" (MIN) OF 3/4" CRUSHED
STONE BEDDING UNLESS
OTHERWISE NOTED
UNDISTURBED EARTH
24" Ø
4'-0"
5" MINIMUM WALL THICKNESS6" MINIMUM
THICKNESS
4' MINIMUM SUMP
DEPTH UNLESS
OTHERWISE NOTED
8" MINIMUM
THICKNESS (H20
LOADING)
SCALE:
TYPICAL CATCH BASIN
N.T.S.SCALE:
TYPICAL DRAIN MANHOLE
N.T.S.
12" (MIN.) OF 3/4" CRUSHED STONE
12" MIN.
COMPACTED BACKFILL
(EXCAVATED MATERIAL OR
GRAVEL AS SPECIFIED BY
ENGINEER)
CRUSHED STONE BACKFILL
FOR GRAVITY SEWER MAIN.
THOROUGHLY COMPACT.
SCALE:
TYPICAL LEACHING CATCH BASIN
N.T.S.
NOTES:
1. LEACHING CATCH BASINS SHALL HAVE NO BOTTOM.
2. CONCRETE MINIMUM STRENGTH: 4,000 PSI @ 28 DAYS
3. STEEL REINFORCEMENT: ASTM A-615 GRADE 60, 1" MIN. COVER.
4. DESIGN LOADING AASHTO HS20-44.
5. DETAILS SHOWN ARE GENERAL. REFER TO DRAWINGS FOR DETAILED DESIGN.
3/4" WASHED
CRUSHED STONE
(2.0' ALL SIDES)
2.0' (TYP.)
US 120NW FILTER
FABRIC AROUND ALL
3/4" CRUSHED STONE
6.0'
24"
8" X 16" CONCRETE SUPPORT
BLOCKS ALL AROUND
12"
6.0'
USE NON SHRINK GROUT FOR RCP
AND HDPE CONNECTIONS. CAST
OPENING IN STRUCTURE (TYP)
BUTYL RUBBER
JOINT (TYP.)
LEACHING CATCH BASIN
INTERCONNECTION 12" DI,
L=VARIES, S=0.00
STANDARD GRATE (OR
CASCADE GRATE AS SPECIFIED)
GRANITE CURB SHALL BE CUT AS
REQUIRED TO SET CATCH BASIN
TOP OF CURB
FINISHED ROAD GRADE
SET CASTING IN GROUT AND GROUT
ALL AROUND TO 4" ABOVE FLANGE
(UNLESS OTHERWISE NOTED)
DRAINAGE
OPENING (TYP.)
5" MIN.
COAT CATCH BASIN EXTERIOR
WITH TWO COATS OF BITUMASTIC
COATING OR APPROVED EQUAL
MANHOLE STEPS
AT 12" OC
MANHOLE STEPS
AT 12" OC7'
12 - 20'
5'UP TO 24"
0 - 12'
TRENCH DEPTH
TRENCH WIDTH PAYMENT SCHEDULE
D+5'D+3'> 24"
> 20'
10'
D+8'NOTES:
1. TRENCH PAYMENT WIDTH FOR MULTIPLE PIPES IN THE SAME TRENCH
WILL BE INCREASED BY LARGER PIPE DIAMETER PLUS A MAXIMUM OF
1'-0" HORIZONTAL SEPARATION AS MEASURED BETWEEN EACH PIPE.
2. D = PIPE DIAMETER (IN FEET). FOR EXAMPLE, IF PIPE IS 30"Ø AND LESS
THAN 12' DEEP, THEN TRENCH WIDTH IS 2.5'+3'=5.5'
PIPE
DIAMETER
CROSS COUNTRY SECTION
(WHERE NO GRASS OCCURS, OMIT TOPSOIL
AND PLACE MIN. 6" OF SELECT GRAVEL)
RUBBER GRADE RING
AS REQUIRED
RUBBER GRADE RING
AS REQUIRED
RUBBER GRADE RING
AS REQUIRED
CIVIL DETAILS IV
ZFK
DNRP
FJB
FJB
AS NOTED
CD-4THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\04 Civil Details.dwg Plot Date: Nov 21,2022-11:30amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
NOTES:
1. FRAME AND GRATE SHALL BE EJ, OR APPROVED EQUAL.
2. FRAME AND GRATE SHALL BE SET IN FULL BED OF MORTAR ON A
MINIMUM OF TWO COURSES OF BRICK.
3. FRAME HEIGHT TO BE DETERMINED BY CONTRACTOR.
24"2"
22"
30" X 33 1/2"
SCALE:
CATCH BASIN FRAME AND GRATE
N.T.S.
NOTES:
1. FRAME AND COVER SHALL BE EJ, OR APPROVED EQUAL.
2. EACH COVER SHALL READ DRAIN IN 3" LETTERING.
3. FRAME AND COVER SHALL BE SET IN FULL BED OF MORTAR.
4. FRAME HEIGHT TO BE DETERMINED BY CONTRACTOR.
5. EACH FRAME AND COVER SHALL HAVE A MINIMUM WEIGHT OF 480 POUNDS
24"
34"
26"
1 1/8"
TBD
SCALE:
DRAIN MANHOLE FRAME AND COVER
N.T.S.
PLACE, COMPACT, AND
GRADE SUB-BASE AS
REQUIRED OR AS DIRECTED
NOTES:
1. ALL SAW CUT EDGES SHALL BE CLEAN EDGES.
TACK COAT ALL EDGES AND
EXISTING PAVEMENT WITH
ASPHALT EMULSION (TYP.)
UNDISTURBED
EXISTING PAVEMENT
TRENCH FILL AND SUB-BASE
PLACED DURING TEMPORARY
(DAILY) PAVEMENT RESTORATION
UNDISTURBED EARTH
SEE PIPE TRENCH DETAIL, BACK
FILL TO BE COMPACTED IN 8" LIFTS
MAX TO 95% MAX DRY DENSITY
UNDISTURBED
EXISTING PAVEMENT
UNDISTURBED EARTH
SCALE:
TEMPORARY TRENCH RESTORATION PAVEMENT
N.T.S.
TEMPORARY (WEEKLY) TRENCH PAVEMENT RESTORATION
TEMPORARY (DAILY) TRENCH RESTORATION
COMPACT TRENCH BACKFILL, INSTALL
17.5" PROCESSED GRAVEL TO GRADE
REMOVE TEMPORARY GRAVEL,
RESHAPE AND COMPACT GRAVEL
SUB-BASE, INSTALL 3" BINDER COURSE.
TRENCH CENTER LINE
SAW CUT ALL EDGES (TYP.)
TRENCH WIDTH
TRENCH WIDTH
SCALE:
PERMANENT TRENCH RESTORATION PAVEMENT
N.T.S.
TRENCH FILL AND SUB-BASE
PLACED DURING TEMPORARY
(DAILY) PAVEMENT RESTORATION
UNDISTURBED EARTH
SAW CUT AND TACK COAT ALL
EDGES AND EXISTING PAVEMENT
WITH ASPHALT EMULSION (TYP.)
UNDISTURBED
EXISTING PAVEMENT
REMOVE, REPLACE, COMPACT,
AND GRADE SUB-BASE AS
REQUIRED OR AS DIRECTED
REMOVE TEMPORARY SURFACE COURSE
AND GRAVEL AS REQUIRED. RESHAPE
AND COMPACT GRAVEL SUB-BASE,
INSTALL 2" BASE COURSE, 2" BINDER
COURSE, AND 1.5" TOP WEARING COURSE
TRENCH CENTER LINE
12" MIN.
12" MIN.
TRENCH WIDTH
PERMANENT TRENCH PAVEMENT RESTORATION
SCALE:
MILL AND OVERLAY DETAIL
N.T.S.
1.5" HOT MIX ASPHALT SURFACE COURSE
(FLUSH WITH EXISTING PAVEMENT) OVER ASPHALT
EMULSION TACK COAT OVER 1.5" OF PAVEMENT
MILLING WITH A RATE OF 0.06 TO 0.09 GAL/SY.
LIMITS SHALL BE TO THE CURB ON EACH SIDE OF
THE HMA PERMANENT TRENCH PAVEMENT OR TO
THE EDGE OF EXISTING ROADWAY.
VERTICAL CURB
EDGE OF ROADWAY
12" MIN.12" MIN.
PERMANENT TRENCH RESTORATION
PAVEMENT (PREVIOUSLY PLACED)
PIPE TRENCH LIMITS AND FILL
AS SPECIFIED AND NOTED
NOTES:
1. RESTORE AND MATCH CROSS SLOPE.
2. ALL HMA JOINTS SHALL BE SEALED WITH JOINT SEALANT.
NOTES:
1. SEED MIX SHALL BE NEW ENGLAND CONSERVATION SEED MIX, FREE OF FERTILIZERS.
2. LOAM SHALL BE NATIVE TO LOCAL AREA AND OF LOW NITROGEN CONTENT.
3. INSTALL CURLEX CL EROSION CONTROL BLANKET AS MANUFACTURED BY AMERICAN
EXCELSIOR COMPANY (OR APPROVED EQUAL) ON ALL LOAM AND SEEDED SLOPES 3:1 OR
STEEPER.
FINISH GRADE
FINISH SUB-GRADE
COMPACTED SUB-GRADE
SCALE:
LOAM AND SEED (DISTURBED AREAS)
N.T.S.
12" COMPACTED PROCESSED GRAVEL
(MASSDOT M1.03.1)
COMPACTED SUBBASE
MATERIAL, AS APPROVED
BY ENGINEER
SCALE:
GRAVEL DRIVEWAY
N.T.S.
4"8"NOTES:
1. MATCH EXISTING SLOPE (MIN 3/16"/FT)
2. SEE VERTICAL CURB DETAIL FOR METHODS OF SETTING CURBS.
3. MATCH EXISTING SIDEWALK WIDTH. THE ENTIRE WIDTH OF ANY
DISTURBED SIDEWALK SHALL BE RESTORED.
SCALE:
BITUMINOUS CONCRETE SIDEWALK SECTION
N.T.S.
FINISH
GRADE
3" BITUMINOUS
CONCRETE INSTALLED IN
TWO (2) 1.5" LIFTS
BITUMINOUS CONCRETE
SURFACE COURSE
GRAVEL BORROW
(TYPE B)
PREPARED
SUBGRADE
3.0"
3.0"
CIVIL DETAILS V
ZFK
DNRP
FJB
FJB
AS NOTED
CD-5THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\04 Civil Details.dwg Plot Date: Nov 21,2022-11:31amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
NOTES:
1. THE MAXIMUM ALLOWABLE SIDEWALK AND CURB RAMP CROSS SLOPES SHALL BE 2.0%.
2. MAINTAIN A MINUMUM OF 30" CLEAR AT ANY PERMANENT OBSTACLE IN ACCESS ROUTE
(I.E., HYDRANTS, UTILITY POLES, TREE WELLS, SIGNS, ETC.). REPORT ALL CONFLICTS TO
THE ENGINEER IMMEDIATELY.
3. EXISTING CURBING THAT IS 8-INCHES IN DEPTH SHALL HAVE CEMENT CONCRETE ONLY ON
THE BACK SIDE OF CURB. EXISTING CURBING THAT IS 12-INCHES IN DEPTH SHALL HAVE
CEMENT CONCRETE ON BOTH THE FRONT AND BACK SIDES OF CURB, AS SHOWN ABOVE.
HEIGHT OF THE CEMENT CONCRETE SHALL BE ADJUSTED AS NECESSARY IN THE FIELD.
TRENCH
OPENNING
NOTES:
1. USE OF STEEL PLATES ALLOWED ON A CASE BY CASE BASIS, PENDING WRITTEN APPROVAL
BY TOWN.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES OR CLAIMS RESULTING FROM THE
USE OF STEEL PLATES.
3. MUTCD COMPLIANT RETROREFLECTIVE ORANGE CONSTRUCTION WARNING SIGNS (48"X48")
WITH WORDING
"STEEL PLATE AHEAD" SHALL BE INSTALLED IN ADVANCE OF STEEL PLATE INSTALLATION.
4. THE CONTRACTOR SHALL DESIGN AND UTILIZE STEEL PLATES OF ADEQUATE DIMENSIONS
AND THICKNESS FOR INTENDED USE AND VEHICLE LOADING. MAXIMUM ALLOWABLE
DEFLECTION SHALL BE 0.025". IRON SPIKE FASTENERS SHALL BE INSTALLED AROUND THE
PERIMETER OF THE STEEL PLATE.
SCALE:
STEEL PLATE INSTALLATION
N.T.S.
STEEL
PLATE
ASPHALT FILLET
EXISTING PAVEMENT
IRON SPIKE
18" MIN.6" MIN.
SCALE:
SIDEWALK AND VERTICAL GRANITE CURB
N.T.S.
SIDEWALK WIDTH VARIES
NEW (SPLIT FACED, EASED EDGE)
OR RESET GRANITE CURB
6" X 6" HIGH EARLY STRENGTH
CEMENT CONCRETE
6" MIN. DENSE GRADED
STONE (M2.01.7)
6" X 6" HIGH EARLY STRENGTH
CEMENT CONCRETE
8" GRAVEL BORROW
(TYPE B)
COMPACTED SUBBASE
CURB REVEAL VARIES
(SEE TABLE ABOVE)
1.5" SURFACE COURSE
4" BINDER COURSE
VARIES
4"
PROCESSED
GRAVEL SUBBASE
FINISHED GRADE
VARIES (SEE PLAN)
COMPACTED SUBBASE
5'-6" (MIN.)
DRIVEWAY APRON CONSTRUCTION
SURFACE:
SUBBASE:
4" HOT MIX ASPHALT (2" TOP COURSE MATERIAL OVER
2" BINDER COURSE MATERIAL)
8" GRAVEL BORROW (TYPE "B")
WC = WHEELCHAIR (PATHWAY)
R.O.W. = RIGHT OF WAY
SIDEWALK
CROSSING
(VARIES)
2'-0"
4%*GUTTER LINEROADWAY
DRIVEWAY
2.0%
FOR GRADE BREAKS OVER
5% USE 10' VERTICAL
CURVE
VARIES TO MEET EXISTING
FOR TREATMENT OUTSIDE
R.O.W. COORDINATE WITH
ENGINEER & OBTAIN RIGHTS
OF ENTRY
R.O.W.MEET EXISTING:
SAWCUT, TACK &
BACKSAND
3'-0"
(MIN.)
WC
2'-6"
(TYP.)
FOR DRIVEWAY
APRON
CONSTRUCTION, SEE
TABLE BELOW
* - DRIVEWAY APRON SLOPE TOWARDS ROADWAY MAY VARY TO MEET FIELD CONDITIONS
DRIVEWAY APRONS SHALL BE CONSTRUCTED OF HOT MIX ASPHALT UNLESS PRIOR
WRITTEN APPROVAL IS GRANTED BY DPW.
SCALE:
DRIVEWAY APRON DETAIL
N.T.S.
CURB REVEAL
DESCRIPTION REVEAL (IN)
NEW VERTICAL GRANITE CURB 6
REMOVE AND RESET VERTICAL GRANITE CURB 6
ISOLATED AREA/SERVICE TRENCH MATCH EXISTING/
ADJACENT REVEAL
3" BITUMINOUS
CONCRETE INSTALLED IN
TWO (2) 1.5" LIFTS
BLOWN/PLACED FILTER MEDIA
(MULCH, COMPOST, OR OTHER)
2" X 2" X 36" WOODEN STAKES PLACED 10' O.C.
12" DIAMETER FILTER SOCK
2" X 2" X 36" WOODEN STAKES PLACED 10' O.C.
12" DIAMETER FILTER SOCK
AREA TO BE
PROTECTED
SCALE:
12" DIAMETER FILTER SOCK (AS REQURIED)
N.T.S.
WATER FLOW
WORK AREA
WORK AREA
AREA TO BE
PROTECTED
NOTES:
1. DEWATERING BAG SIZE AND QUANTITY SHALL BE AS NEEDED TO ADEQUATELY FILTER ALL
PUMP EFFLUENT FROM DEWATERING ACTIVITIES. CONTRACTOR SHALL PROVIDE A
REDUNDANT BAG ON SITE AT ALL TIMES.
2. EACH BAG SHALL HANDLE A 2", 3", OR 4" DISCHARGE HOSE.
3. DISCHARGE HOSES CAN BE PLACED ALONG ANY EDGE BY MAKING A SMALL INCISION INTO
THE FABRIC, INSERTING THE HOSE, AND THEN CLAMPING THE FABRIC TO THE HOSE VIA WIRE,
TIES, CLAMP, ROPE OR SIMILAR TO CREATE A GOOD SEAL.
4. CONTRACTOR SHALL AVOID DISCHARGING MULTIPLE PIPES INTO ONE BAG.
TOP VIEW
PROFILE VIEW
WATER DISCHARGE
WATER DISCHARGE
DISCHARGE
CONNECTION SEAL
DISCHARGE
CONNECTION SEAL
DISCHARGE PIPE
DISCHARGE PIPE
PUMP
PUMP
12" DIAMETER
FILTER SOCK
12" DIAMETER
FILTER SOCK
NON-WOVEN GEOTEXTILE
FABRIC
12" DIAMETER
FILTER SOCK
NON-WOVEN GEOTEXTILE
FABRIC
DEWATERING BAG
DEWATERING BAG
SCALE:
DEWATERING BAGS
N.T.S.
NOTES:
1. SILT SACKS SHALL BE INSPECTED WEEKLY AND AFTER A STORM. ACCUMULATED
SILT REMOVED TO ALLOW CATCH BASIN TO FUNCTION PROPERLY.
2. SILT SACK HIGH FLOW MODEL AS MANUFACTURED BY ACF ENVIRONMENTAL
(800-448-3636) OR APPROVED EQUAL.
EXISTING PAVEMENT
PLACE SILT SACK UNDER
EXISTING CATCH BASIN GRATEFRAME AND GRATE
SCALE:
SEDIMENTATION CONTROL AT CATCH BASINS
N.T.S.
CATCHBASIN OR OTHER
STORM DRAINAGE INLET
BURLAP BAG FILLED WITH
CHLORINE REDUCING AGENT
(SODIUM THIOSULFITE OR
METABISULFATE)
FROM CHLORINATED PIPE
CHLORINATED WATER DISCHARGE
HAYBALES
SCALE:
DECHLORINATION AND DISCHARGE
N.T.S.
12" MIN.
2
3
4
FIRST
FLOOR
101
GENERATOR
ROOM
102
UTILITY
ROOM
104
ODOR
CONTROL
ROOM
105
1
3
4
A B C
102
104
105
101A
2
D
DN
101B
SCALE:
OVERALL PLAN - BELOW GRADE
1/4"=1'SCALE:
OVERALL PLAN - FLOOR AT GRADE
1/4"=1'
A A
PUMP (TYP. OF 3)
DUAL CARBON DRUM
ODOR CONTROL SYSTEMN
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\05 Mechanical Sheets.dwg Plot Date: Nov 21,2022-11:40amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
BELOW GRADE AND FLOOR AT GRADE
PUMP STATION LAYOUT
ZFK
DNRP
FJB
FJB
AS NOTED
M-1
OPEN TO BELOW
ACCESS HATCH
SLUICE GATE FOR WET
WELL SECTION ISOLATION
B B
C C
10" X 4" DI REDUCER (TYP. OF 3)
10" FLEXIBLE RUBBER
COUPLING (TYP. OF 3)
12" DI BLIND FLANGE
10" DI 90° BEND
(TYP. OF 4)
12" X 10" DI REDUCING
TEE (TYP. OF 3)
12" DI 90° BEND
12" PLUG VALVE
(TYP. OF 4)
12" X 12" DI TEE
(TYP. OF 2)
12" MAGNETIC
FLOW METER
12" DI SEWER FORCE MAIN
12" DI 90° BEND
10" DI 90° BEND
10" DI 90° BEND
PUMP (TYP. OF 3)
10" X 4" DI REDUCER
(TYP. OF 3)
12" DI DISCHARGE
12" DI SUCTION
5 PIPE
DIAM.
3 PIPE
DIAM.
2.0'
18" DI INFLUENT
18" FLEXIBLE
SLEEVE COUPLING
2.0'
18" DI INFLUENT
18" FLEXIBLE
SLEEVE COUPLING
18" MJ X FL WALL PIPE
18" MJ X FL WALL PIPE
14" FLEXIBLE
SLEEVE COUPLING
12" FL X FL WALL PIPE
2.0'
10" FL X FL WALL PIPE
(TYP. OF 4)
12" DI DRAIN
12" DI 90° BEND
12" DI 90° BEND
12" FL X FL WALL PIPE
CONCRETE PUMP
PEDESTAL (TYP. OF 3)
CONCRETE PUMP
PEDESTAL (TYP. OF 3)
SLUICE GATE FOR WET
WELL SECTION ISOLATION
BOX FOR SLUICE
GATE ACCESS
BOX FOR SLUICE
GATE ACCESS
SLUICE GATE FOR WET
WELL SECTION ISOLATION
ACCESS HATCH
14" MJ X FL WALL PIPE
14" X 12" DI REDUCER
14" X 14" DI TEE
14" PLUG VALVE
14" PLUG VALVE
14" X 8" DI REDUCING TEE
14" DI PUMP STATION
BYPASS CONNECTION
14" DI SEWER FORCE MAIN
8" DI SEWER FORCE MAIN
8" MJ X FL WALL PIPE
8" FLEXIBLE
SLEEVE COUPLING
2.0'
8" PLUG VALVE
ACCESS HATCH
MAIN CONTROL PANEL
CHANNEL GRINDER
CONTROL PANEL
12" DI DRAIN
BOX FOR SLUICE
GATE ACCESS
AIR RELEASE/VACUUM
RELIEF VALVE
INFLUENT CHANNEL
GRINDER (TYP.)
INFLUENT CHANNEL
GRINDER (TYP.)N
A B C D
FLOOR 10' - 0"
ROOF18' - 2"
DRY PIT-24' - 8"
EAVE10' - 6"
BC
VALVE VAULT-9' - 0"
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\05 Mechanical Sheets.dwg Plot Date: Nov 21,2022-11:45amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SECTION VEW
PUMP STATION LAYOUT
ZFK
DNRP
FJB
FJB
AS NOTED
M-2
10.0'
18" DI INFLUENT
PUMP (TYP. OF 3)
EL. 19.5'
EL. 5.1' (INVERT IN)
EL. -4.65' (BOTTOM OF WETWELL)
ACCESS HATCH
EL. -3.65' (SUCTION INTAKE ELEVATION)
EL. 4.6' (HIGH-HIGH LEVEL ALARM)EL. 4.1' (HIGH LEVEL ALARM/EMERGENCY PUMP START)EL. 3.6' (LAG PUMP START)
EL. 2.6' (LEAD PUMP START)
EL. 1.6' (LAG PUMP STOP)
EL. 0.35' (LEAD PUMP STOP)EL. -0.15' (LOW LEVEL ALARM)
SCALE:1/4"=1'
ASECTION
SCALE:1/4"=1'
BSECTION
12" DI 90° BEND
12" PLUG VALVE
(TYP. OF 4)
12" X 12" DI TEE
(TYP. OF 2)
12" MAGNETIC
FLOW METER
12" DI 90° BEND 12" DI 90° BEND
12" DI 90° BEND
12" DI 90° BEND
12" DI FLOW
METER BYPASS
10" CHECK VALVE (TYP. OF 3)
10" PLUG VALVE (TYP. OF 4)
10" PLUG VALVE WITH CHAIN
OPERATOR (TYP. OF 3)
10" X 4" DI REDUCER
(TYP. OF 3)
10" FLEXIBLE RUBBER
COUPLING (TYP. OF 3)
10" DI 90° BEND
(TYP. OF 4)
10" FLEXIBLE RUBBER
COUPLING (TYP. OF 3)
5 PIPE
DIAM.
3 PIPE
DIAM.
12" DI DISCHARGE12" DI DISCHARGE
18" FLEXIBLE SLEEVE COUPLING
2.0'
18" MJ X FL WALL PIPE
10" FL X FL WALL PIPE
(TYP. OF 4)
12" FL X FL WALL PIPE
12" DI 90° BEND
12" DI DRAIN
10" DI SUCTION
12" DI DRAIN
CONCRETE PUMP
PEDESTAL (TYP. OF 3)
SLUICE GATE FOR WET
WELL SECTION ISOLATION
(TYP. OF 2)
16.6'
AIR RELEASE/VACUUM
RELIEF VALVE
AIR RELEASE/VACUUM
RELIEF VALVE
INFLUENT CHANNEL
GRINDER (TYP.)
FLOOR 10' - 0"
ROOF18' - 2"
DRY PIT-24' - 8"
EAVE10' - 6"
1342
VALVE VAULT-9' - 0"
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.Drawing file: I:\Barnstable.271\271-2104 720 Main Street PS Replacement\02 Design\02 Drawings\05 Mechanical Sheets.dwg Plot Date: Nov 21,2022-11:45amDATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
FOR PERMITTING
271-2104
NOVEMBER 2022 TOWN OF BARNSTABLE, MA720 MAIN STREET PUMP STATION REPLACEMENT
SECTION VEW
PUMP STATION LAYOUT
ZFK
DNRP
FJB
FJB
AS NOTED
M-3
SCALE:1/4"=1'
CSECTION
DUAL CARBON
DRUM ODOR
CONTROL SYSTEM
12" X 10" DI REDUCING
TEE (TYP. OF 3)
12" PLUG VALVE
12" X 12" DI TEE
(TYP. OF 2)
12" DI 90° BEND
PUMP (TYP. OF 3)
10" CHECK
VALVE
(TYP. OF 3)12" DI 90° BEND
12" DI 90° BEND
12" DI 90° BEND
12" DI DISCHARGE
10" DI DISCHARGE
2.0'
12" PLUG VALVE
12" DI 90° BEND
12" DI DRAIN
12" DI 90° BEND
12" X 12" DI TEE
12" DI 90° BEND
5.0'
5.0'
CONCRETE PUMP
PEDESTAL (TYP. OF 3)
10" PLUG VALVE WITH CHAIN
OPERATOR (TYP. OF 3)
12" DI SEWER FORCE MAIN
14" FLEXIBLE
SLEEVE COUPLING
14" MJ X FL WALL PIPE
14" X 12" DI REDUCER
14" X 14" DI TEE
14" PLUG VALVE
14" PLUG VALVE
14" X 8" DI REDUCING TEE
14" DI SEWER FORCE MAIN
AIR RELEASE/VACUUM
RELIEF VALVE
14" PLUG VALVE
14" DI BLIND FLANGE FOR PUMP