Loading...
HomeMy WebLinkAbout0790 FALMOUTH ROAD/RTE 28 (9) 10-P i �I ! a r � TOWN OF BARNSTABLE CERTIFICATE OF OCCUPANCY I PARCEL ID 271 �001 GEOBASE ID 17954 ADDRESS 790 FALMOUTH ROAD (ROUTE PHONE HYANNIS ZIP - LOT BLOCK LOT SIZE DBA DEVELOPMENT DISTRICT HY I PERMIT 39233 DESCRIPTION ASSISTED LIVING CENTER (BUILDING PMT 429178)" PERMIT TYPE BCOO TITLE CERTIFICATE OF OCCUPANCY CONTRACTORS: Department of Health, Safety ARCHITECTS: and Environmental Services TOTAL FEES: + BOND $.00 Ox Tt1E � CONSTRUCTION COSTS $.©0 753 MISC. NOT CODED ELSEWHERE `T * BARNSTABLE. 1639. I BUILDIl I BY DATE ISSUED 06/21/1999 EXPIRATION DATE +P -' 'TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION it Map Parcel oo _ EPermit# 7 � Health�Divisioni 3 3l2L1�03 TOWN Of EAR i ABL Date Issued 3 a2 G Conservation Division 2 21 N3 MAR 24 PM ) ' 2�pplication Fee Tax Collector (��oZ (� �G — �- 3/11 �gIo3 Permit Fee ga Treasurer 1� U `jyIS pM o�__ _�_ Planning Dept. 0A'MWOBT MASEWER CONNECTION PERMIT FROM THE Date Definitive Plan Approved by Planning Board �NWMUING DIMONPRIORTo Historic-OKH Preservation/Hyannis Project Street Address dV tt Gtwvl,cS {�J IIR Village_ t d 3A. Owner t ���� Sev'( r L�(� Address ���«-�a Fa Telephone S06 7�U 7 G Ce Permit RequestVR�901 c cl go Square feet: 1 st floor: existing proposed 2nd floor: existing proposed Total new Zoning District Flood Plain Groundwater Overlay Project Valuation o 90C> Construction Type Lot Size Grandfathered: Cl Yes ❑No If yes, attach supporting documentation. *` welling Type: Single Family ❑ Two Family ❑ Multi-Family(#units) *ge of Existing Structure Historic House: ❑Yes WNo On Old King's Highway: 0 Yes �Phlo Basement Type: ❑Full ❑Crawl O Walkout 0 Other Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft) _ Number of Baths: Full: existing new Half: existing new Number of Bedrooms: existing new Total Room Count(not including baths):existing new First Floor Room Count Heat Type and Fuel: ❑Gas ❑Oil ❑Electric ❑Other Central Air: ❑Yes ❑ No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑No Detached garage:❑existing ❑new size Pool: ❑existing ❑new size Barn:0 existing 0 new size ` Attached garage:❑existing ❑new size Shed:❑existing ❑new size Other: Zoning Board of Appeals Authorization ❑ Appeal# Recorded❑ Commercial ❑Yes ❑No If yes, site plan review# Current Use Proposed Use BUILDER INFORMATION Name LA CcsV. _ .,�� Telephone Number Address (2<< License# 0-7-72:7 t � Home Improvement Contractor# Y 10 �IA Worker's Compensation# W c,c OC>i 2,6`�o r ZotS ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO SIGNATURE _ DATE ZLf(E) - r FOR OFFICIAL USE ONLY - + PERMIT NO..: DATE ISSUED MAP/PARCEL NO. I • 1. . y ' i ADDRESS- VILLAGE, ;t OWNER ` DATE OF INSPECTION: FOUNDATION y FRAME • , INSULATION FIREPLACE r� ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH FINAL GAS: ROUGH FINAL FINAL BUILDING DATE CLOSED OUT ASSOCIATION PLAN NO. f i . RESIDENTIAL BUILDING PERMIT FEES APPLICATION FEE New Buildings,Additions $50.00 CO/1 Alterations/Renovations s"o .0 Building Permit Amendment $25.00 FEE VALUE WORKSHEET NEW LIVING SPACE square feet x$96/sq.foot= ol G 0O O• x. l 00 plus from below(if applicable) ALTERATIONS/RENOVATIONS OF EXISTING SPACE square feet x$64/sq.foot= x.0031= plus from below(if applicable) GARAGES(attached&detached) square feet x$32/sq. ft.= x.0031= ACCESSORY STRUCTURE>120 sq.ft. >120 sf-'500 sf $ 35.00 >500 sf-750 sf 50.00 >750 sf- 1000 sf 75.00 >1000 sf- 1500 sf 100.00 >1500 sf-Same as new building permit: square feet x$96/sq.foot= x.0031= STAND ALONE PERMITS Open Porch x$30.00= (number) Deck x$30.00= (number) Fireplace/Chimney x$25.00= (number) Inground Swimming Pool $60.00 Above Ground Swimming Pool $25.00 Relocation/Moving $150.00 (plus above if applicable) Permit Fee -Z-;z, G 0 projcost Qa :tx,;Y.. � •.}� •Ez�yr? ... is .:.,.:�z: ::: 'L...: <:fy tJ .� O '4'Qt?`v, r.{:.: i' •..J.. �'J,$?v'n: lu'1 .':. (^�v.),... :{•::;:•;F"1 M F'1 •':;y,;. ::fl�'y',%j '' i. �:h:;fF,.': qi'r�% g ��Ftib•. , ''i••'4� M:.}:'•:: r:�i;:;i:; gs •� �. �, A � ccgg >::. :,.: '� ;{ s.�;': s >.�. i�;'s::,�...:<t roe q •bi''.%' � {::v � � � 4'"" i I .o �1pQf'� p ` 'c•-. �:`�i.,.. �:•, >! f.. ' 'a,; :Y6'i•: %''`9r vL.;,. I• I. �• b t� Y (�:' ,yf,.; •. }! .,ff,: ?F;: 9' f:' ',r:, >'..:i {11 {17 i �.I I i�• �f>.'4 oi;S•:. +: :il`,y'+.• � ! 3x�'' :''w CJ r;:>?i� � yiw} ::r::;:r r.•. •,4N.: �• p�:•k;y:E A :}« :..r.. j ':x. :Mr./f: '4•F: .C,p: '?' S.,•r.:yi H f� {•'. ;:ir• :.e:y' fA .I '/` Z o ;}%8:: s2:h:F•: ;r. {>.*i }� ;s i' �y/, /�z�xER ;i {$ >:: z::?2}: ►.. I i {i.}:: :Fj}''•f: n•cOy; :{�'?:� .'•{•}. ';t$ � :i�-•, rJ.:'.; "•"S•ifi +'%.ii. :t:.�j}. ::%::?%i; ..•.�. :i«�: �j�74 'S: .{.}$Y LS•},;/ :✓''<} .\:."4� '• I i �. :,ii:{ ::44::., :::::}�:`::. ��i ,�;. ,.#....: ':f•�::�: . ::C s .t:'4:: ,:.�}'s: ;�::A:i� � � � it I� pn'�. 'rfi: ;%.i :•"7>. : .. �y E(.• :i,6��:F ..:%•}` :::�> :.•�•.•:{::: 1 I I .I � Q ��� �..} •'.S•''•c'•''" Eli is•: •{''':'•" :':'�'• ^.^:s to • :•i4i•;>a'�r, ::?,:`•'• ::.9.,%; Y,r,.:• : F :' x F:x;+x: ;:;, :i% .Y:>ti: op b .. ' ry .O � % Y��S, }.L.�.xY: t:`:: •: ��'a{.�: '� f t:r•"''"'•:�;;gY %{N;ji >.. s'"l4.yg�'. "�• 1:4�,�.��,•' .£: ,yy% }�"'Y:'. (��7 .e v'F• '>'.�i'rk2r. : Y. vkf: W % ;t{F3 .�y.....t }.,iLk.; .¢,.;<F�,:i �t 'Si• `5;:: :: 'ir,�G >.'::$ jS 6i,��.: 'i.'L'4<1' '/' �:•xXU• Y:;:.Q,. .}.:}.:j }}tiZ;'• .},:ai�€ p7� 6S•:� '$�tiy ::.,r.,r qf�'f .4�'•• Y%:,x, S P 4Si: '�S� '� }!�'�{• '+ } jxl. .r�� :}m. }•,i�C: 'Sf :.i.r.:i '} ••:S � � � .V� { k.a `yz4,.Y ?.� s c '�''`:�•;:.iy.�' `•'ti :�,'•: '•!.�:� :?<: o Cj f0 O � i'�'t$ }Z?�: :N:�<F��. � :3:;:fu`:.tiV}y � � x-:.. .'�• ,>;a'f,; .� tO ti�►� :f:>�.r.<�{� :•F'?;':''.'t. }SY. �; ..4,� :: .?;r:;2',,':. %,�:�•. •fyM. ;•S:.:i''!•.;:•:': :•;s'4#'^: :i O: of r: ;;,>>• t. :•s,.:>}" Y'r{.. :'i' .5:•3,a"o '.c;'i Lvc f..>L•. .? .ii•. >o�.:.,. .�3b �+ tj'' >. :�34! $' `9' Fri. '.1t •o.,`' ... Q� 9 O P-4 if . � `�' :��`a�'k'' t iq{v;,iy,: .:''f:� ::2".r K"•2:' ::.:Y4•:: 0 ��;� 'c';t�i.•n: :�f 4t s: �y1:`�i:.2 .. � f�.��: :Y'.i:S,V. '•�'�;�. .?':Y�:Y • � •`^,.i•F Aga: AN EIEIUUU .� M i�f': :��{. �C ,f .f 1 'S 'i:rt;': ;;•` ft,� F!<'31`'._F :. « - >/E 4;•'x / w,�v.. <F.i• Fq':',:G`f;(3:} 'it i.i:.•.. i}:f, .: _ A N :,i+j ) :`i;i�"i0:,: ,�. ;E f••7?,. .£'t:{..; '�3:>::.:# r� rn � d :3F}i. S's:r<.t>i. •r."yf+:% �•r. y.� f f ,� �.•�. : y. ??I:€: ?'�'� .i n .}�3::.,. •r,.j.:s::w o... ,y'. •��� jfi'rs: ',�•':':• !• :S '4:>': !'•'' t•:: :>>`.:; :S{ff• '�''+. a�i': .%P� ��•x� Sl: :y w•. .,f;y4; y:;}''. 9 u. [a`'•: 4• �:` 7t. :.jv`y' ��M1yf•t ,;.L.:.. :�3'.`'J:;3 o::.y ti;• it:%:iSi,�3: z "�,�} '�9•: '••y:� J,.4w4. :i:f{� f. ,j.%:? ' 3'a4 ;.Miy7x S:�S�•ic ,a 'J:. '�.oc:;r.F;y y�£`{i:{, :fh':x� :y-x,•,3• S?f •'i•; ` i' ?:4.i h%: •}a: a. /:». +L.s; v.� ,y 2`R'� ^F:S,}.}, � Li:t'':'••' ` 4 ?r.<. tt S >wf >fx}y. ;: •%;+i:� .i .t y:xr� �.>.; r,:: ::}%::%i i:3 i..• i.:x..;E::;•. ?r'.��•z>g 2v:>L: �'"� 4 a:;R: .i y 9� �C ::y.: E� :•S+'�� i}rR • "n�::f:.S,3: .3 f1< i:.�,' •<� : ..;riZYr:r��;:<:::: •'i � r..::.. .���:$.;} r.:.};r, ji�y+t;%; F F:..••.}x�:::k:.::j4: R;>:; a:S•, .:•L^..ao.b.. :,•t•y} :: :�%:: � "':�:4;•.:y:.:;.. .�,:'}'} F :•:2:}}•::F:.::•:} >..�;: �,.?F:t.,F: :2...fii•..r,.:^1 �%'•: o L o. �1 } .2•i�S: y{j! L• ` Information and Instructions r- Massachusetts General Laws chapter 152 section 25 requires all employers to provide workers' compensation for th.rs emplovees. As quoted from the."law", an employee is defined as every person in the service of another warier any co=-r- of hire, express or implied,of-al or written. An emplover is defined as an individual,partnership, association, corporation or other legal entity, or any two or more of the.foregoing engaged in a joint enterprise, and including the legal reprt:smtzd=of a deceased employer, or the rec.-'er Or truster of an individual,partnership, association or other legal eadty, employing employees. However the owner of a resides or occupant of the dwelling house of not mare than three a artmeats and who therein, carp dwelling house having p use or an the armmds c..- another who employs persons to do m ;rrre�nan � � , eonstcuctic'n or repair woz3c an Such dwelling house building appurtenant thereto shall not because of such employment be deemed to be as employer. MGL chapter 152 section 25 also states that every state or local.licensing agency'shall withhold.the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required. Additionally,ae�rthe commonwealth nor any of its political subdivisions shall carter into any camr=for the performance of public work uadl acceptable evidence of compliance with the insure rtquirmTft ofthis chapter have been presented to the grin v authority. - FINUMMEN -Applicants Please fill in the wotis=, comp=.ation affidavit completely,by checl®g the.box that applies to Your and supplying company-amneT+address and phone numbers along with a catificata-af i as all affidavits may be submitted to the Departmctzt of Industrial Accidents for mnffmatiem ofmsuraace coverage. Also be sure to sign and date the affidavit The affidavit should in hould be.retained to the city or tow a that the applicatica for the permit - liccuse is being-requested,not the Departaseat of IndusLtial A,ccideazts. Should 9aaave h my questions regarding the"law"or ifou arc required to obtain a workers'compensation Policy,please call the Departmeat.at the mmrber listed below. . /%i/�:, City or Towns - — artmcathaz provided a space at the batmen of the Please be sure that the affidavit is complete and printed legibly. The Dep provr � hran�. Please affidavit for you to fill out in the eveaat the Office of has to contact You regarding aPP be sure to fill in the peimrtlIicease mmzbcc which wall be usod as a reference n�aber. The affidavits may be retain t" the Department by mail or FAX unless other aaaa=caft have been made. 'the Of�cc of Investigations would like to thank you in advance for you cooperation and should you have nay questions. please do not hesitate to give us a caIL M=Deparunert's address,telephone and fax number. The Commonwealth Of Massachusetts Department of Industrial Accidents GMCC of lavesucatlous 600 Washington street Boston,Ma. 02111 fax#: (617) 727-7749 phone #: (617) 7274900 exL 406, 409 or 375 l 1 Town of Barnstable Regulatory Services M s�ie� Thomas F.Geiler,Director o;p. Building Division Tom Perry, Building Commissioner 200 Main Street, Hyannis,MA 02601 Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder as Owner of the subject property hereby authorize C,;W- l o",Bfd✓eu,eZr to act on my behalf, in all matters relative to work authorized by this building permit application for(address of job) 2 )at:ure7o ( er ate Print Name - I fie l�oarvinauaea�l�o���ucaedta ROAaRD�OF BUILDIN&REGULgiTiONS License C,A\NSTRU'CTION SUPE-,KVj'OR Nyrtaber GS 077271 Birtl�da'te�07L0�7/1962 zpires"0 /OTl2004 Tr.no: 77271 Restricted THOMAS 70 HA W,fT RN STREi_T NEW BEDFORD, MA 0274.0 AdmEmistrato� r 03/19/03 11:09 FAX 7813441425 _ _ MALCOLM & .PARSON 0001 ACQR-A CERTIFICATE OF LIABILITY INSURANCE 03/.U/20 3 'RODUCFR (781)344-3200 FAX (781)344-1425 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Mal Cole & Pars*ns Ins. Agcy. Inc, TEN ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND.EXTEND OR 6 Freeman St. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 527 Stoughton, MIA 02072 INSURERS AFFORDING~COVERAGE NSURED South Coast Improvement Co., Inc. wsuREaa Safety Insurance 70 Hawthorn Street muRERB: Associated Employers Ins Co New Bedford. 14A 02747 INSURER Q INSURER O: INsuaElt E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED,NOTWIT WrANDING ANY REOUI REMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH' POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. SR TYPE OF INSURANCE POLICY NUM�t PDOUC7 MYLE PDATE EMI�IRAT1 LIMITS GENERAL UABILITY TBI 03/13/2003 03/13/2004 EACH occurumNcE S 1100010011 x COWAMCIAL GENERAL LIABILTY FIRE DAMAGE(Any one tire) S IQO CLAIMS MADE Q OCCUR MED E ILP(Ara one Pam) $ 5.0001 A PERSONAL&ADVINJURY $ 1,080.0001 GENERAL AGGREGATE S Z,000,000 GERL AGGREGATE UIJIT APPUES PER PRODUCTS-COMPIOP AGG S 2,OOO POLICY ECT LOC AUTOMOB11.ELIABLITY 1607474 09/29/2002 09/29/2003 COMBINED SINGLE UMIT ANY AUTO (Ea aw4'h $ ALL OWNED AUTOS BODILY INJURY X =HEDULmAuros (Perpemo") $ 250,00 A HIRED AUTOS BODILY INJURY (Per ee>�0ent) $ NON-OWNED AUTOS S00,000 PROPERTY DAMAGE $ (Per ecdaenO 100 .000 GARAGE LIABILITY AUTO ONLY-EA ACCIDS►/'r S ANY AUTO OTHER THAN FA ACC S AUTO ONLY: AGG $ FICESS LIABILITY EACH OCCURRENCE S OCCUR CLAIMS MADE AGGREGATE S S DEDUCTIBLE $ RETENTION $ 5 WORKERs COMPENSATION AND WCC500IL209012003 02/04/2003 02/04/2004 TORY LIMITS ER EMPLOYERS'LIABILITY E.L.EACH ACCIDENT S SOO'.0001 B E.L.DISEASE-EA EMPLO $ 500.00 E.L.DISEASE-POLICY LIMIT $ Soo,000 OTHER DESCRIPTWm OF OPERA-naKSILOCATIONSNMCLEGIF(CLUSIOM ADDED BY ENDORSEMENi1SPECIAL PROVISIONS CERTIFICATE HOLDER ADDITIONAL INSURED;INtTIl1RER Lim CANCELLATION SHOULD ANY OF THE ABOVE DESCWBID POLICIES BE CANCELLED WFORE THE EMRATION DATE THEREOF,THE ISSUING COMPANY WILL ENDEAVOR TO MAIL DAYS WRITIFlI NOTICE TO THE CERTIFICATE HOLDER MAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL.IMPOSE NO OBLIGATION OR LIABILITY White Hall Estates OF ANY IGM UPON THE COMPANY,ITS AGENTS OR REPRESENTATIVES. Don Cunningham AWHONZIMREPRESWWAIM JDavid Parsons ACORD 2"(7197) FAX- (508)790-7667 OACORD CORPORA ON 1981 r ZN {_ 0 �j r i i i C 1 1 t t ��� li ' +- t �_ . _ _1 � _ _ .�_ r � � I � 'I _ � �- - ti s G d -cif cations mpliance Certificate must be on file. er of Permission. OR Homeowner's license exemption of license(s). f 250 sq. ft. (18' diameter for round),needs a building TH A 4' IHGH NON-CLIMBABLE FENCE I*T BE FENCED WITH A MINIMUM 4' NON- ATE t 10 191U4 TUE 11:35 Aj U° l 1� ' _n � HOI.NiGRPN, dr07ZET% & MT?RPH1' 11`l� A•x rORN 717S AT LAW /1 812 MAIN STIED- ! V 0STENVILLF,ARA 02655 i© 1 TEL. (508)420-8899 f3'rfC'VYCl\L.MUR.PIIY AD1JI`.I'1.ONAL 01 l�'I(%l�fi: U'.i` bfIc fi►;a1C1.P. KORB= Koiu7.8r;MURPHY .7()jjN L.HOLMOREN.JR. 71 LEV I( N PARICIVA.1' RICKA RD F.HCAR AINQ TEE.( 0F30 N.-6100NfA *3u1 n ' TEL. ,rOSI t34..7 1UU FJt`l�'crio81:J84.7aUR R VT13 E.M R. f3TA _. Ft.i(.;1'[AI:D R.f3TAPTI U i FAX TRANSMISSION SHEET FAX NO: r DATE: � j 4� 0 ~ RE: L �'• � � a< Z CZ In �.'�I _., �� TOTAL NUMBIR OF PAGES INCLUDING CO`7LR: t J. (r - < (..�v r �L . ,,, '? 1. ,' PLXASE CONTACT US AT TU2 ABOVE NUMI37CR IF YOU ARIL EXPERIM-, CING; DxIrI+'1Cr)j= W'ITR THIS TRANSMISSION OR FAIL TO Fc2CEIVE THE NUNMER ON, PAGES LIt3IMI)ABOVE. TF INr'ORMA7,10W AND IAOCYTM:ENTS TRANS),R T+D BY THIS FACSIMILF ARE A7ro R,.%jg '-PRrvTL7c,QS.Ti AND CONITAIN (7QrNIr'I'DENwTIAL INI'ORMATION INTE DM ONLY FOR TM USE OF TIM IN ]rVMITAL OR ENTITY NAUSM ABOVE, ANY OTFINK DISTRIBUTION, COPYINCI OR DISOLOSURE IS STRICTLY PROHIBITED- IF YOU RECEIVED THIIS FA-X IN MMOn, PLEASIC N•OTH'Y US IM2vMMJAWEL-y By TR741CPUONE AND R.SC MTRN THE ORIOINAL TO US WITIiOUT MAKING A COPY. .• N 07/08/98 12418 W617 884 4329 ARCHITECTURAL TH 1a 001''005 `7 9 8 Fa, oxzrL THE ARCHITECTURAL TEAM, INC_ 5C Commandant's Wky at Admirals Hill Chelsea,MA 02150 Phone: (617), 889-4402 Fax: (617)884 4329 FAX TRANSMIT TAL Sent By: . ane Project Name: to I state Number: 9704 Date: 07/08/98 Time: X 2:22 PIVI Number of pages. (incl. cover) Contact: GMK Sent To: Ralph Crossen j Company: Town Of Bamstable Inspectional Services Department Number: (508) 790,6230 Message Body RE: CONSTRUCTION CONTROL AFFIDAVIT: Mr. Crossen: Attached please find copies of the four affidavits for the above mentioned project. Unless you have a standard Town form, will use a similar format for the Construction Completion Affidavits at the end of the project. Let me know if we need to speak further on the affidavits. Hard copies will by mail. 07/08/98 12:19 '0617 884 4329 ARCHITECTURAL TM 10002/005 Vf+'® BF�UTENIS L.VEITAS VEITAS & VEITAS ENGINEERS INC. AoN1uALOAS M, VEITAS RIMANTAS M.VEITAS REOA 0. VEII RE: CONSTRUCTION CONTROL AFFIDAVIT ; Project: Whitehall Estate Assisted Living Facility Location: 798 Falmouth road,Hyannis,Massachusetts Owner: Parkside Senior Services L.L.C. u Arehiteet/Engineer: The Architectural Team,Inc. In accordance with Section 116.0 of the Massachusetts State Building Code, 1, Rimantas Veitas, Registration No. 34028, being a registered professional Engineer/Architect hereby certify that i have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Fire Protection Structural Mechanical Other(specify) Electrical for the above named project and that, to the best of my knowledge: such plans computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. I further certify that I shall perform the necessary professional services and be present on the construction site at intervals appropriate to the stage of construction to determine that the work is proceeding in accordance with the documents approved for the Building Permit and shall be responsible for the following as specified in Section 1 1&2.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code required controlled materials. UPON C0MMPLETION OF THE WORK, I SHALL SUBMIT A FINA:, P.CgPOR S O THE SATISFACTORY COMPLETION AND READINESS O PRO.IECT FOR O PA Y. i S' nature ot Subscribed and sworn to before me this—au day of 19 �boo Iv ary Public My Comm' Sion xpir�s J S39 GRANITE ST. 6RAIN7REE MASSACHUSETTS 02184 - Tel:7g1/S43-RE35:3 Fax:751/1549-20E5 07/08/98 12:19 '0617 884 4329 ARCHITECTURAL TM 0 003/005 t� SAM ZAX ASSOCIATES Phone 617-479-7415 CONSULTING ELECTRICAL ENGINEERS Fax 770-1423 1440 Hancock Street- P.O. Sox 353 E-Mail: zaxl400@ix.netcom.com Quincy,MA 02269.0353 CONSTRUCTION CONTROL, AFFIDAVIT PROJECT: Whitehall Estates Assisted Living Facility LOCATION: 798 Falmouth Road, Hyannis, Massachusetts OWNER; Parkside Senior Services L.L.C. ENGINEER: Samuel Zax Associates In accordance with Section 116,0 of the Massachusetts State Building Code, I, Samuel Zax, Registration No. 9253 being a registered professional Engineer, that I have prepared or directly supervised the preparation of all design plans, computations, and specifications concerning: Architectural Fire Protection Structural Mechanical Other (specify) Electrical X for the above-named project and that, to the best of my knowledge, such plans, computations, and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. that I shall perform the necessary professional services and be present on the construction site at intervals appropriate to the stage of construction to determine that the work is proceeding in accordance with the documents approved for the Building Permit and shall be responsible for the following as specified in Section 116.2.2: 1. Review of shop drawings, samples, and other submittals of the Contractor, as required by the construction contract documents, as submitted for building permit and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all Code-required controlled materials. UPON COMPLETION OF THE WORK, I SHALL SUBMIT Aj FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF T PROJE F CCUPANCY. ignature Subs d and sworn to before this _twenty-second day of June , 19 98 o ary Public My Commission Expires 07/08/98 12:20 '0617 884 4329 ARCHITECTURAL Tilt �004i005 A.R.H. ENGINEERING, INC,. FACILITY SYSTEMS ENGINEEF2iNG 180 STATE ROAD, P.O. BOX 328 SAGAMORE REACH, MA 02552 (508)888.5461 FAX(508)88B•4059 RE: CONSTRUCTION CONTROL AFFIDA1flr Project: Whitehall Estate Assisted Livinc Facility Location: 798 Falmouth Road,Hyannis, Massachusetts Owrner. Parkside Senior Services L.L.C. Arch ltecVEngineer; The Architectural Team,Inc. In accordance with Section 116.0 of the Massachusetts State Swiding Code, I, Denni s A. Gaudreau Registration No. 38067 being a registered professional Engineer/Architeet hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Fire Protection X Structural Mechanical � Other(specify) Electrical for the above named project and that, to the best of my acknowledge, such plates computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. I further certify that t shall perform the necessary professional services and be present on the construction site at intervals appropriate to the stage of construction to determine that the work is proceeding in accordance with the documents approved for the Building Permit and shall be responsible for the following as specified in Section 116.2-2: 1, Review of shop drawings,samples and other submittals of the contractor as required by the . construction contract documents as submitted for building permit and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code required controlled materials. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF TIME PROJECT FOR OCCUPANCY. Signa. re Subscribed and sworn to before me this 22 day of June - 11998 APri,1_ 8, 2005 Notary Public F10 My Commission Expires Richard A. Servis, Jr. r�doamirMDto�xulo7�Mdtanw•le�dPaw ' 07/08/98 12:20 '0617 884 4329 ARCHITECTURAL TH 1j005i005 The Architectural Team, Inc. Wiy At Adm;nd% Hill Chr-kc.I,NIA(!-')151) ielt-phowel 1,17 con) RE: CONSTRUCTION CONTROL AFFIDAVIT Project: Whitehall Estate Assisted Living Facility Location; 798 Falmouth Road, Hyannis, Massachusetts Owner: Pafks;de Senior Services L.L.C. Architect/Engineer, The Architectural Team, Inc, In accordance with Section 116.0 of the Massachusetts State Building Code, 1, Michael E. Liu, Registration No. 6721 being a registered professional Engineer/Architect hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning'. Architectural Fire Protection Structural Mechanical Other(specify) Electrical for the above named project and that, to the best of my acknowledge, such plans computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. I further certify that I shall perform the necessary professional services and be present on the construction site at intervals appropriate to the stage of construction to determine that the work is proceeding in accordance with the documents approved for the Building Permit and shall be responsible for the following as specified in Section 116.2.2: 1 Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code required controlled materials. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS To THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. Signature 100F Subscribed and sworn to before me this day of Notary Public My Commission Expires - r .7gq r.ln- ,)qW, /CM THE ARCHITECTURAL TEAM, INC. c- . ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph Crossen/Barnstable B1dg.Dept. ARCHITECT ® Michael Liu,AIA/TAT&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C & C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 01 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 14 July 1998 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 85°F. EST. % OF COMPLETION: (+,-) CONFORMANCE WITH SCHEDULE (+,-): On Schedule PRESENT AT SITE: John Feeney,Jeff Albert. R.J. Rogone Co. &Cape Foundations WORK IN PROGRESS Continuing digging at perimeter of last wings on South side. Forming foundation wall at Wing'B'(North side) OBSERVATIONS • Congress Super's trailer on site. • Footings formed for Wing'C'. • 3/4 of the perimeter has been dug. ■ 1/4 of the footings in place. • Steel reinforcing for walls on site. • Foundation insulation on site. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS ■ Building footprint sketch--ASK-15 REPORT BY: Gabriela Li Choy/TAT s:\document\projects\9704\reports\afr l.sam page 1 of 1 pages i I I 43 W 'A' Wing ,C, in g I I iL-L-Fi i --------- ------------- ------ -------------------- 'Core' • i i i Wing 'B' Wing 'D' Whitehall Estate Hyannis, MA The Architectural Team, Inc. ASK-15 50 Commandant's Way +; Chelsea, MA 02150 NO SCALE (T)e17.889.4402_ DATE: July 24, 1998 IL71A11 996 A119 THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER N Jan Turner/Parkside Senior Services OTHER: N Ralph CrossenBarnstable Bldg.Dept. ARCHITECT N Michael Binette,AIA&File/TAT N Vincent Chiricosta/MHFA CONTRACTORN Jeff Albert/Congress Construction Co. N Tony Casendino/C &C Co. FIELD N John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 02 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 28 July 1998 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 85° F EST. % OF COMPLETION: (+;) CONFORMANCE WITH SCHEDULE (+,-): On Schedule PRESENT AT SITE: John Feeney,Jeff Albert R.J. Rogone Co. &Cape Foundations WORK IN PROGRESS • Installing gravel for trench on North side of site. • Installing water main off Whitehall Drive. _. • Insulating interior of Wing'B' foundation with 2" rigid insulation. • Pouring foundation wall for Wing'C' and footings for Wing'D' OBSERVATIONS • Catch basins installed and marked out. • Concrete greasetrap installed approximately at the planned location. • 3/4 of the perimeter has been dug. • Footings for right wall of Wing'D'and front area of Core remaining to be trenched and formed. • Steel reinforcing for walls on site. ■ Taps(water and sewer)have been completed at the location requested by Barnstable Water Department. • Hydrant has been delivered on site. Water Dept. has also requested to remove the 90 degree turn for the hydrant and have the hydrant be located closer to curb. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS • Building footprint sketch with location of pours REPORT BY: Gabriela Li Choy/TAT s:\document\projectsN9704\reports\afr2.sam page 1 of 1 pages Ek ; F—X c '�AT►otJ POK fOOTIMCAS JINN ,� � - - — fo tr1� F M crc' �o � i A-� I 1 I i W L �•D 'Po I I ' I j I �- - .; jF- { ;1 07/30/98 07:55 %Y617 884 4329 ARCHITECTURAL TM Z 001/006 THE ARCHITECTURAL TEAM, INC. 50 Commandant's Way at Admiral's Hill Chelsea,MA 02150 Phone: (617) 899-4402 Fax: (617)884-4329 F A X T R A, N S M I T T A. L Sent By: Gary M. Kane Project Name: Whitehall Estate Number: 9704 Date: 07/30/98 Time: 6:30 AM Number of pages: 6 (incl. cover) Contact: GMK Sent To: CC: Richard pizzi Ian Tumer Company: Geotechnical Consultants Parkside Senior Services Number: 1(508)229.2279 1(847)965.0000 Message Body RE: OFF-SITE STRUCTURAL FILL Attached is the analysis of the material proposed by Congress to use immediately beneath the slab. 07/30/98 07:55 $617 884 4329 ARCHITECTURAL TM 16002/006 1—E17-571-7952 BRIGGS ENGINEERING 875 P02 JUL 29198 11 : 20 BRIGGS Briggs Engineering & Testing ~r A D/w my ov PX ALTOm7m.&C. July 29, 1998 Briggs# 82592 Parkside Senior Services,LJL_C. 5215 Old Orchard Road/Suite 700 Skokie, IL. 60077-1045 Attn: Ms_ Jan Turner RE: Analysis of Soil samples for proposed use at the 'Whitehall Estates / Hyannis Ms. Turner Laboratory analysis of your samples has been conducted and the results are as follows,please see enclosed If you have any questions,please reel free to call me at your convenience. Very truly yours, BRIGGS ENGINEERING & TESTING A Division of PK Ass fates, Inc. Sc� Mark Liebert Materials Laboratory Supervisor Construction Technology Division Enclosures: 100 Weymouth Street-Unit B-1 100 Pound Road Rockland, MA 02370 timberland,RI 02864 Phone(781) 871-6040*Fax (781)871-7982 Phnnr!Anil Kc4_,5oon_v__...,,.leeo c� 07/30/98 07:55 $617 884 4329 ARCHITECTURAL TM 16 003/006 1--617—G71-790-2 BR I GGS ENGINEERING 875 P03 JUL 29199 11 : 20 .' 13RIGG8 I Briggs Engineering & Testing A DMSIOP of PX Assoa srm,&c Whitehall Estates Briggs# 82706 Tested: 7-29-98 1. Sample No. Description Source M-3437 Gravelly Sand Rte, Bourne Scenic Pit (Green Bucket) 2. Sieve Analysis {ASTM C 136, and ASTM C 117) Sieve Size Results Specs_ {% Passing by Wt.) Structural Fill 4 100 3„ 100 10 2-1/?" 100 2" 100 1-1l2" 95 l" 87 3/4" 83 1/2" 73 3/8" 63 #4 59 4075 #8 53 016 46 #30 30 #50 11 8-28 #100 7 #200 5.3 0-8 3. Sample tested conforms to the required specifications for "Structural Fill". 100 Weymouth Street-Unit 13-1 100 Pound Road Rockland, MA 02370 Cumberland, RI 02864 Phone(781)871-6040■ Pax(781)871-7982 Phhn,mni,% -,0'-7 07/30/98 07:56 $617 884 4329 ARCHITECTURAL TM 2 004/006 1-61r7-9?l—?962 ZIRI335 ENGINEERING 675 PO4 JUL 29' 99 11 : 21 Briggs Engineering & Testing A Dlvlslon of PKAssoclates,lnc. P 0•e ct: Whitehall Estates Sample no. M-3437 Date: 7/29/98 Sieve Analysis #�200 #50 #8 #4 3" 100 :::::a:.-:r'j:::;:i:t^-:: .-i::::.•. ,.��:, .........-. _ 3/4.. . ., ..-.....-...._.~. .. ... •.i......,r.....t.• ...�•,• .y'._ ..._.-..... :.,.i.J.. _I ::�::"•.�..:e...,--,..�i�ne- :j.. .f•..'..e::{:g:l•f:. .. •,m.. '•�....�:. �•��7 r:e.i:::..�:::.: -...j...y..S�,t• •i 80 -.i i.41•':... ^S.. . :. 2 1. 1. ..y...6.�..a• 1 . ._ •«}«..M...i :.1 d}}� i.. �-1-a :'.I.....j. :6.s ....._ :.i... •:.ate •.....;... - •y.��.,',,.::"•. ..Y...•.'...r.. .i 70 . ....... .emu. .lu•,u�, T y...i )Yy� ........ ,. ,.,.. j.Q,�1.1_ ^p.. -r9•. `� .t....•w..�..1.,•»•,rI tT¢71p .1.. -Y..Y.O.•r•wlW_r•' ..,,..y.. -•.....,.• A.e.a 1.,... '•)uw«:.r.4..�„1Pr�. .[.. .....�.. ..�......!d:6Z.: •.J... ....4..a..a.a a.t-.: ._.......b• ......a.. 1 ...... ......:.P.: ElKa.. ..1.. ....a..s. :�J ._ ..s.. l... -.a.}.�.l. ,:.j.....t...tr.....6. .1-1•e.............•'1....... .q..:p�.......,.•..,.'• ••!«.•i,. il: ....iru.•:...�rri..}.:. ..lu yy ..1..4�1-F.1.a.. ..—.�-: ..,.. ..dr ..1.....iu.*..p.s•i ti ►,'1 ... ...1•• r4.....1• «)«I q.p,�•. ,.. ... .q.:..,..9.q,4.1-f-.-...... ` Y'9q'f -,In.ry...p..)u4.t• .t �'M • • ..d....S..1_.i..,.i•a0__........1...._. .1._.h.r..1.9.1.1- ......0 o.. .,1•n .*!. .:�:�oH�• ..r....... p..1..6'1. .r � � ....•«...a•1 -' '•`� _.,.......'.....' .-a.J•1.1...-... ..1... O.iyq•Rru ,.. . ...-.I...p..Y.i-1 .1 0 ..y.. -..i•-�.- ^• •'•�•� :.a.:.t.... .7......... .,a.:�.rr.'•1hr............,..r.. ..y...�,...}..p •i 'y ... .: .. ..4.::—'_ ?-4�.. - ..� ....y..^.4';•�'. .:.. ...i....,T.,. w�.i.y.i........ •• 1.. ,:T.... .•Y.. ..a....b.uh--1 .1.00 _.._ _..•1.. _ ..1...IUJ.a _ _ 1......r 4.4.+.Ir1,.........._ �.N...-]_9•• - --:. ..b.. ..i. ..1•- •.•.4 uAnlr rr, :. e.Y-/-h.........Z—'....l..u-►_(..1••Y.f -1 ..1 -5-... -l..J«I .1:I.::.....r....J.. .j....l.. .i.6S.t............. _).....4••L--14-1V .1 C 30 ._'�_ .::4::.}_.�:::i•-:, ...... w.i..::i.. •).T: ...:..::::...«. :.......:.. '.=.-.�s.l.....-....... .,.. ,:$.. ,..j ::... ... .".,�.::.i� �,.,.j............:..b.. Ji....j.. :4+4.,......... y i::: ;W:: . t •i 8 ..4..: .......... ... ..Y.:;. ..0.......1.-1-•eo...........::iu..•. •9.I.......... :..1... . : y.,.. .:.}.....I.--f-4 -1 /� .•lu... 0....a...1.../..1.f-6¢......•......f....... .•..I,. u•1.•1 S•l.bu,u.r,..�J.. u.l....,l.0 'O.O•O•I:�. ..y.....I .Y.O•t .[ 20 - ..p.... ._....1..1.7_S �.. .............. ..s.....1 a.b}.1. y .. ..... ..e...,,.:{:.� }o:. -:.je.. •y.... ...p.. .i.. ..?.}.*e.:............. _ �..:....-..1..�... 10 -• i.: •:: . .......«I.I.Yo.. ... .......r ::i: �w:i e.........p:^� ..1..::j.. ..O4-4.4.1.1•-•-....... �:i.....j...�..:�.;*,�• •j •:: ..6, .l,L4:: ..1..•>•.1 .......�a. ••i... a.66 1-1...........__ ...1....._.1../..a.l .t ^:: : -1::. �:�•" :...! ! 'i:�:::......��• ..1......... ..b.O.p-1-1............. ..t....�.-.-.:p.4.{- SILT FINE MEDIUM CRtS FINE C�AF 0.010 0.100 1.000 10.000 100.000 Sieve Size (xiam) ? 07/30/98 07:56 $617 884 4329 ARCHITECTURAL TM U 005/006 1-517—B71-7982 BRICGS ENGINEERING G75 P05 JUL 29198 11 : 21 BRIGGS Briggs Engineering & Testing A D1vwcx ofPK Asso=7Rs, Nc. Whitehall,Estates Briggs:# 82706 Tested: 7-29-98 I. Sample No. Description Source �M-3438 Gravelly Sand Rte_ Bourne Scenic Pit (White Bucket) 2. Sieve Analysis {ASTM C 136, and ASTM C 1171 Sieve Size Results Specs. 4" {%Passing oy Wt.) Structural Fill 3„ 100 100 2-1/2" 10 2" 100 1-1/2 ' 97 i" 94 3/4" 90 1/211 78 50-85 3/8" 72 #4 b3 40-75 57 #16 49 #30 37 #50 12 #100 8- 8-28 #200 5A 0-8 3. Sample tested conforms to the requited specifications for "Structural Fill". 100 Weymouth Street-Unit B-1 100 Pound Road Rockland, MA 02370 Cumberland,R102864 Pbone(781)871.6040-Fax(781)871-7982 vt,.,,,e��r►,���o _T ._ ,.., _- . _---- _07/30/98 07:56 %Y617 884 4329 ARCHITECTURAL TM Z 006/006 1-617-371-790-2 BR I GGS ENGINEERING G75 POE JUL 29198 11 : 21 BRIG S Briggs Engineering &'resting A Division of PKAssocjateB,117c, (P-roiect: Whitehall Estates Sample ha, M-3438 Date,, 7129/98 Sieve Analysis 100 ..... _ #200 #SO #S #4 ..........._. 3.. ..r;�.l•y:ii::' ,a r.l..:.•{... �:'�:f.:.:..:.....:::.. �a..." ..a..e..•.• .. .•...I..•.�.•�u:.q'..H•.•1.Y•�W. _-. .' ,.T...7..'.p."{:9•,_j•.. - i" .r1•rw.irn .1M•'.y.•5.�.._. ., a'..�._T....•S.'- .. tt•1 44••. ....: :..5•._,_.1-4-.7 •1'• —•::: .•n •l.r. .rn. :.t.....:-•-P.y..p.(. ...r..:.._.q._..,y...l...l.•1•poP-._..«. ..1.... «.p...,...l..f 1•L/. _....80 .. ..1•:.:n, ,F'�'1- :.y._.y_.s«a.�..1t. :•::..... _I..:.rlr. ;'4•'r:.I.Iw:::: ..;...r.1...0.-a•e'f. ..,.. - ... ...yq.. �- '�'4.1`•{•1• .P rr•ryr.._...ee•.p.t. ..1...»d♦...,Tr.... •1 .............1•. u(_..:I•�j.'/••Tq.j.p.. _.-�:: "�::"'1••• ...7r.•li•..ry.Mr.. 70 rl..'...d.._a,�t..rj.N y.�+: ---.1., ui_._I_.-/..1.4.I.D....�_—.1.. ..I...ul... w6. .,,,.•...,.•, ..7.....7."�.i..:.L a �» 60 _ '-:.1..7.-.r .-.qq.. .'?';'•1•l,rrr...rr.r. j...rr,r.... -'• a ..,.. ..q....Qr•.a.i",.,..y — _:...y qqw�s� a`_�•q« ",... —•�f.` ',..�...:�.r.�..j«p.;. .; rb4.. _,.1. ..+...Q..pM.3..-1-.......» •:�..mil- w�......_.. . .. bD -:... .:: t..» •�, 50 :_._.... a .. ¢::....1 �:'1:'{'�s:. -_ i• --r- ........ Vl .......1..«rgrr.S..:{:.q..l•/:aqo::' .... .i::::j.'y->y•1-o:�.... ..q;+.. ^��---1': i e•'ti.'1 w:.:..:::: ••'•'•i..n:�:i.: p:;' Y 40 ....•, 11 ::::Jr:ga.r,..I..t 1.ti-. . ...•1. ».� ^M_I. J.1-M.. _.5.. ..-{._..1— ..L.•1.a.1.1............. ,.h....l.r.i../..a.� — •d.W•_ -.-.a. ..r^...r -a_madd........r... ..a....a.n6.1 eW .•;.,. ::l..;.'.,�...._•_.. T............_..._. _ :... � r.rr.�.-. 30 ..)....M...O.rowL 20 4...�._._.. "._.....{...,•'Fy.�..-:.{..•'r"PT•• ..s..u u{u.y N.j» - - ..... w_ _••__ - �T,1, »P....,r.•;..•,..j.i.o '`•• ,. : :: - ir.�.rt•..:.:.w_...—.• a},•w.;_uL.'-(y_I. 4 .... ::j,: '?"::y:r.b:a�J'.e:a _ ..Y. $.1 ..q.. ..b_.•Iw ..�-3-i`-7-I-.-..•...... ..1.....1-..O..a.a. -t ........e.. :.{.. 0 - - SILT FINE MEDIUM FINE Qa4FGE 01010 0.100 1.000 10.000 100.000 Sieve Size (mm) f / THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph Crossen/Barnstable B1dg.Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 03 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 12 August, 1998 TIME: 2:00 pm WEATHER: Rain/Cloudy TEMP.RANGE: 72°F EST. % OF COMPLETION: (+/-)4% CONFORMANCE WITH SCHEDULE(+1-): On Schedule PRESENT AT SITE: Nick,Jeff Albert from Congress Construction Co. R.J.Rogone Co. &Cape Foundations WORK IN PROGRESS • -Formed and poured front foundation wall of Core and left"bump out" from entry • Formed and poured footings at gable end of Wing'A' • Formed and poured sonotubes at rear porch,Core. • Fill and compacting begun today at Wings'C' &'D' • Excavating for elevator pits. Location verified today. OBSERVATIONS • Added catch basin installed at Rt.28 entry. Added per Mass Highway. • Foundation walls for Wings'C' &'D' have rigid insulation installed on interior of wall. They have begun to install insulation at Core fnd.wall at rear of building. • Exterior wall(Boiler and Electrical Room side)of Wing'A'has not been excavated. • Steel reinforcing for walls on site. • Water and sewer piping has been installed up to building. Gate valves and cleanouts not installed. • Sewer manhole installed. • Whitehall Way has been patched where water and sewer taps have been completed. • Hydrant has been installed as directed by Barnstable Water Dept. • Temporary power has been installed and turned on. Pole not relocated. • Compaction Test done at Wing'C' &'D'. ITEMS TO VERIFY • Verify that waterstop at the elevator is required. INFORMATION OR ACTION REQUIRED ATTACHMENTS • Building footprint sketch with location of pours REPORT BY: Gabriela Li Choy/TAT t 1 s:\document\projects\9704\reports\afr3.sam page 1 of 1 pages sa �o R �oDT i tJ GS N\l F o cry 11J fro F Mf--v 4 I I I ' � � i � I I t-► I j i i ---------------- -- -- - - - -.Go I� • - - ---- - ;-� �- --------------- THE ARCHITECTURAL TEAM, INC. _..K. ARCHITECT'S FIELD REPORT OWNER N Jan Turner/Parkside Senior Services OTHER: N Ralph CrossenBarnstable B1dg.Dept. ARCHITECT N Michael Binette,AIA&File/TAT N Vincent Chiricosta/MHFA CONTRACTORN Jeff Albert/Congress Construction Co. N Tony Casendino/C & C Co. FIELD N John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 02 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 28 July 1998 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 85°F EST. % OF COMPLETION: (+,-) CONFORMANCE WITH SCHEDULE (+;); On Schedule PRESENT AT SITE: John Feeney, Jeff Albert R.J.Rogone Co. & Cape Foundations WORK IN PROGRESS • Installing gravel for trench on North side of site. • Installing water main off Whitehall Drive. • Insulating interior of Wing'B'foundation with 2"rigid insulation. • Pouring foundation wall for Wing'C' and footings for Wing'D' OBSERVATIONS • Catch basins installed and marked out. • Concrete greasetrap installed approximately at the planned location. • 3/4 of the perimeter has been dug. • Footings for right wall of Wing'D' and front area of Core remaining to be trenched and formed. • Steel reinforcing for walls on site. • Taps(water and sewer)have been completed at the location requested by Barnstable Water Department. • Hydrant has been delivered on site. Water Dept. has also requested to remove the 90 degree turn for the hydrant and have the hydrant be located closer to curb. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS • Building footprint sketch with location of pours REPORT BY: Gabriela Li Choy/TAT s:\document\projects\9704\reports\afr2.sam ' page 1 of 1 pages PoR fooTIM&15 ouf-s-17 ►NS�tl.�b j � I � j ' � I j I � --------------- --- -_ — — — — G� — — --- - — t �— --------------- i � I I •� � �•S� i i �� � NU THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: N:R410ffCfossen/Barristable-Bldg_Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 04 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 25 August, 1998 TIME: 1:30 pm WEATHER: Hot/Hazy TEMP.RANGE: 90°F EST. % OF COMPLETION: (+/-)6% CONFORMANCE WITH SCHEDULE(+/-): On Schedule PRESENT AT SITE: GC/John Feeney-Site Super, 1 laborer/Congress Construction Co. Excavation/ 1 foreman,3 laborers/ R.J.Rogone Co. Plumbing/2 plumbers/Sagamore Plumbing WORK IN PROGRESS • Miscellaneous site roadway prep. • Interior plumbing trenching. • Underground plumbing installation. OBSERVATIONS • Perimeter foundation walls are completed. Certified plot plan stating building located as per Civil Engineers Plan is in hand and the official Building Permit is also in hand. • Concrete work at both elevator pits is complete. • All exterior sonotubes piers have been poured and backfilled. ■ All foundation rigid insulation is installed. • Interior of building footprint has been backfilled to within a foot and half of the underside of the slab with on site material. • Exterior of building has been backfilled and near finish graded. Area outside boiler room has not been graded above tops of sewer structures. • Water connection at Guy Lane has not yet been made made. • Storm sewer tie-ins are complete. • Contractor has temporarily graded over foundation wall at the end of Wing D for equipment access to the interior. • Interior plumbing trenching has started at the Core and Wings B, C and D. Cast Iron piping started at the commercial kitchen area. • Underground PVC main line installed at the Core and Wing C. ITEMS TO VERIFY • None. INFORMATION OR ACTION REQUIRED • None. ATTACHMENTS • None. REPORT BY: Gary M. Kane/The Architectural Team,Inc. f\document\projects\9704\reports\afr4.sam page 1 of 1 pages THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph Crossen/Barnstable Bldg. Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 05 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 8 September, 1998 TIME: 1:30 pm WEATHER: Partly Cloudy TEMP.RANGE: 78°F EST. % OF COMPLETION: (+/-)8% CONFORMANCE WITH SCHEDULE(+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Construction Co. Excavation/ 1 foreman, 3 laborers/ R.J. Rogone Co. WORK IN PROGRESS ■ Miscellaneous site roadway prep. • Infilling and compacting soil in Wing'D' • Installing vapor barrier and reinf.wire mesh in Wing'B'(for conc. slab floor) OBSERVATIONS • Soil compacted at all wings except Wing'A'where all underslab soil stacks offshooting from main have been placed. • Interior of building footprint has been backfilled to within a foot and half of the underside of the slab with on site material. • Left side rear porch slab formed; reinf. bars are in place. • Trenching for bearing wall footing in Wing'B' complete. Vapor barrier will be under footing. Reinf. bars installed as required for footings. • Footing poured with penetrating elec. conduits at Wing'A'. 2' deep trench at rear of courtyard done to extend electrical system to other half. • Electrical conduits are Sched.40 PVC. • All anchor bolts capped. • Main underslab soil stacks in at all wings. Offshoots installed on left half. • Water connection at Guy Lane has not yet been made. • Cast Iron piping started at the commercial kitchen area. ITEMS TO VERIFY • None. INFORMATION OR ACTION REQUIRED • None. ATTACHMENTS • None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\reports\afr5.sam page 1 of 1 pages THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT _ _ OWNER ® Jan Turner/Parkside Senior Services OTHER: ®ERalph Crosse-n%Barnstable B_I_'d— Dept 'ARCHITECT ® Michael Binette,AIA&File/TAT hiriost ® Vincent Cca/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 06 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 22 September, 1998 TIME: 1:30 pm WEATHER: Rain TEMP.RANGE: 75°F EST. % OF COMPLETION: (+/-)10% CONFORMANCE WITH SCHEDULE(+/-); On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, I laborer/Congress Construction Co. Fill &Compacting/ 1 foreman, 1 laborer/ R.J. Rogone Co. Plumbing/ 1 foreman, I laborer Electrical/ 1 foreman,3 laborers WORK IN PROGRESS • Installing cast iron piping for Comm. kitchen in Wing'A' • Installing underslab electrical conduit in Wing 'A' • Installing vapor barrier and reinf.wire mesh in Wings'C'&'D'(for conc. slab floor) ■ Installing temporary electrical panel OBSERVATIONS • Compressive filler installed as indicated. • Reinf. bars have been installed and tied together at transition points. They have been raised up by a 2" conc. block. • Concrete slab poured and cured in Wing'B'and Core • Reinforcing mesh and bars are installed for rear porch slab. • Main underslab soil stacks in at all wings. All feeds installed. • CMU for elevator shaft on site. • Trusses for Second floor Wing'B'on site. ITEMS TO VERIFY • None. INFORMATION OR ACTION REQUIRED ~ • None. ATTACHMENTS r None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f:\d=ment\projeM\9704Vepods\efr5.s= page 1 of I pages h, THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph CrossenBamstable Bldg.Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C &C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 07 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 6 October, 1998 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 70°F EST. % OF COMPLETION: (+/-)13% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Construction Co. Framers/ 1 foreman, 12 laborers/Brown WORK IN PROGRESS ■ Installing subfloor for Second floor,Wing'B' • Installing strongbacks for Second floor trusses at wing'A' • Installing First floor wall panels at'Core' OBSERVATIONS • Concrete slab complete. 4" step down has been done for Main Kitchen freezer and cooler. • CMU walls for elevators erected through Second floor ceiling(up to roof). • CMU firewall erected. Does not extend to exterior sheathing. • First floor wall panels installed in Wings'A'and 'B'. Shear wall panels correctly located,to be anchored. ■ Second floor trusses laid in at Wings'A'and'B'. (2)2x10 floor joists @ 24" O.C. in at Wing'B'. • Double trusses installed at kitchen hood duct opening. • Minor framing modification at intersection between Wings'A', 'B', Core. • Post base at elevators(#1 and#2)embedded in concrete slab. Post base at Elev. #1 into CMU wall by 1". • Steel columns in place. ■ 5'window for First floor lounge @ Wing'B' from ASK-17, not framed. • Windows @ living room of Apt. 123 is framed smaller than in plans. ITEMS TO VERIFY • Veitas&Veitas: Verify anchoring of shear walls. INFORMATION OR ACTION REQUIRED • Extend firewall to exterior sheathing-block and grout. ■ Enlarge windows at living room of Apt. 123 to specified windows on elevation 30/A4.01 ATTACHMENTS • None. REPORT BY: Gabriela Li Choy/The Architectural Team, Inc. E\document\projects\9704\reports\afr5.sam page 1 of 1 pages THE ARCHITECTURAL TEAM, INC. ARCHITECT'S FIELD REPORT OWNER N Jan Turner/Parkside Senior Services OTHER: N Ralph CrossenBarnstable Bldg.Dept. ;ARCHITECT N Michael Binette,AIA&File/TAT N Vincent Chiricosta/MHFA CONTRACTORN Jeff Albert/Congress Construction Co. N Tony Casendino/C &C Co. FIELD N John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 07 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 27 October, 1998 TIME: 1:30 pm WEATHER: Partly Sunny TEMP.RANGE: 60°F EST. % OF COMPLETION: (+/-)16% CONFORMANCE WITH SCHEDULE(+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Construction Co. Framers/ 1 foreman, 14 laborers/Brown; Steel studs/ 1 foreman,4 laborers/J&D Drywall Sheet metal/2 laborers/Phoenix; Plumbing/2 pipe fitters and 2 plumbers/RAC WORK IN PROGRESS • Reframing F-6" extending "bump outs"to adjusted plate height, and framing their roofs. • Installing wood egress stair frames at all locations ■ Installing subfloor on Wing'5'floor trusses • Installing Second floor wall panels in Wing'3' • Installing mtl.tracks for walls at Wings'P and'3' • Installing sheet metal ducts in Wing'2' • Installing soil and vent stacks on First floor, Wing'2' • Installing pipe hangers at Wings'F and'3' OBSERVATIONS ■ CMU firewall completed up to roof • All First floor wall panels installed. A shear wall panel in Wing'5' sheathed in OSB in lieu of plywd.To be corrected. • Second floor panels installed in Wings'l'and'2'. • Second floor trusses laid in at Wings'l','2','3', &'4'. (2)2x10 floor joists @ 24" O.C. in at corridors. • Grand central stairs framed. • At Den/Living Room#025, plate height lowered/corrected. • Storage Rm.#T02a at Wing'l'not framed. • Typical roof trusses on site. • Windows on site. • TYVEK installed on Wings'l'and'2'. • Resilient channel installed in Wing'2' corridor. Channel is to be eliminated on other corridor walls. ■ Demising walls in at Wing'2; mtl.tracks installed for interior apt.walls. • Gypsum board loaded on First floor Wing'T and'l'. • Gyp. bd. installed in ceiling plenum, corridor side of Wing'2'. ITEMS TO VERIFY • Veitas&Veitas: Verify anchoring of shear walls. INFORMATION OR ACTION REQUIRED ■ Storage Room#T02a in Wing'1'to be framed per ASK-14 • Windows to be installed with TYVEK under fin and continuous sealant. • Window rough openings at Apt.223 to be corrected per elevation 30/A4.01 ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team, Inc. f:\document\projects\9704\reports\dr8.sam page 1 of 1 pages ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph Crossen/Barnstable Bldg. Dept(ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MBFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 12 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 22 December, 1998 TIME: 1:30 pm WEATHER: Rainy TEMP.RANGE: 42°F EST. % OF COMPLETION: (+/-)34% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Framers/ 1 foreman, 5 carpenters/Brown; Sprinklers/2 laborers/Mass.Fire Protection Sheet metal/ 1 foreman, 3 laborers/Phoenix; HVAC/ 1 foreman,2 laborers/RAC Plumbing/ 1 foreman,2 plumbers/Sagamore; Drywall/ 1 foreman,3 laborers/J&D Drywall Electrical/ 1 foreman, 1 laborer/Stalco; Cable/Tel./ 1 foreman,2 laborers/Quality Satellite WORK IN PROGRESS ■ Installing fireblocking at ceiling height on exterior wallston First floor, Wing'5' • Installing GWB at ceiling plenum in corridor and apartments on First floor,Wings'3','2' • Installing copper piping for domestic water in First floor, Wing'1' • Installing piping(heating lines)on first floor, Wing'1' • Cutting hole in floor for toilet drain pipe. • Installing sprinkler feeds • Pulling electrical lines through corridor and apartments on Second floor,Wings'3','2' • Pulling cable/tel. lines on Second floor,Wing'5' OBSERVATIONS • Roof structure complete. • Roofing installed on Wings'1', '2','3',half of'4', and a third of'5'. • All wings have TYVEK on exterior of walls. • Windows installed on Wings'1','2',and'3', and most of'4' and'5'. • Plywood underlayment installed in kitchens and bathrooms on Second floor. • All mtl. stud demising walls in. Mtl. stud walls installed in corridors for trash,elec. and TV/tel rooms. • GWB draft-wall installed in attic in Wing'l'. • Kitchen hood duct in and insulated from second floor up to roof. Duct extends through roof and is temp. capped. ■ Boiler flue installed from Mechanical room through roof. flue is temporarily capped. • Bathroom exhaust mtl. ducts installed on all Wings capped at bottom of duct and connecting in attic and extending through roof in Wings'1', '2','3','4', and'5'. • Sprinkler main has been installed on First floor and attic.' Feeds off main have been installed. • Water supply lines installed in corridor of all Wings. Feeds, into apt. units are in First floor, Wing'2', '4','5'. • Typical showers have been delivered. They have been put in place on Second floor, Wing'2'. • Heating lines installed in all Wings. • Water supply and heating lines insulating begun at First floor Wings'1', '2'. • Temporary heat equip. delivered.It has not been hooked up to gas line. ITEMS TO VERIFY • Verify use of Kraft vapor barrier faced roof insulation on Second floor ceiling. INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f:\docu m en t\p roj ects\9704\reports\afr 12.sam page 1 of 1 pages ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph_Crossen/Barnstable,Bldg..DeptPARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 11 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 8 December, 1998 TIME: 1:30 pm WEATHER: Cloudy TEMP.RANGE: 50°F EST. % OF COMPLETION: (+/-)30% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/Jeff Albert-Project Manager,John Feeney- Site Super, 1 laborer/Congress Const. Co. Framers/ 1 foreman, 9 carpenters/Brown; Sprinklers/2 laborers/Mass. Fire Protection Sheet metal/ 1 foreman,3 laborers/Phoenix; HVAC/ 1 foreman,2 laborers/RAC Plumbing/ 1 foreman,3 plumbers/Sagamore; Drywall/ 1 foreman,6 laborers/J&D Drywall WORK IN PROGRESS • Installing 4'extensions of roof trusses at rear portion of core roof. • Installing roof sheathing on Wing'5' • Installing roofing on Wings'F and'2' • Installing Second floor windows at Wing'3' • Installing sheet metal ducts in corridor of Second floor/Attic ■ Installing copper piping for domestic water in First floor, Wing'4' • Installing piping for mechanical equipment in Boiler Room • Installing sprinkler piping on First floor,Wing'5'. • Installing mtl. stud walls on Second floor, Wing'4' • Installing mtl stud tracks on Second floor, Wing'5' OBSERVATIONS • All typical roof trusses in. Infill/valley sets and roof framing at elevators not completed. • Trusses sheathed on Wings'1', '2', '3', and'4'. • All wings have TYVEK on exterior of walls. • Windows installed on First floor,Wings'l','2', and'3'; installed on Second floor,Wings'1'and'2'. ■ All structural posts installed. ■ Elevator#1 and#2 has 3" conc. slab poured on top of elev. shaft. • All mtl. stud demising walls in on First wall. Tracks down for interior apt. partitions on First floor Wings'2','4','5'. Demising walls and interior apt. partitions installed on Second floor, Wings'l','2', and'3'. • Resilient channel installed for ceiling/roof assembly at all Wings. • Gyp.bd. installed in ceiling plenum, corridor side of all wings on First floor. • Bathroom exhaust mtl. ducts installed on all Wings capped at bottom of duct and connecting in attic and extending through roof in Wings'I' and'2'. • Duct in Lobby for return air, installed. • t Sprinkler main has been installed on First floor and attic. Feeds off main have been installed in Wings'l', '2',and'3 . Upward heads have been installed for ceiling/floor plenum. • Sprinklers to rear porch installed. • Water supply lines installed in corridor of all Wings. Feeds, into apt. units are in Wing'2'. • Heating lines installed in Wings'2', '3',and'5'. Feeds, into apt. units have are in Wing'2'. ITEMS TO VERIFY • Verify with ARH,Engineering re: sprinkler piping in Living Rm. #025,may it be a dry system? INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\repom\afrl Lsam page 1 of 1 pages 12-21/98 11:04 '0617 884 4329 ARCHITECTURAL TH �UU1,UU3 TIM ARCHITECTURAL TEAM, INC. 50 Con u wdant's Way at Admiral's Hill Chelsea,ARIA 02150 Phone: (617) 9894402 Fax: (617)884-4329 FAX TRANTS MIT TAL Sent By: Crary M. Dane Project Name: Whitehall Estate Number: 9704 Date: 12/21/98 Time: 10:59 AN1 Number of pages: 3 (inch. cover) Contact: GMK Sent To: Eli Ulshoeffer Company: Town Of Barnstable Inspectional Services Department Number: (508) 790,6230 (Message Body RE: EXTERIOR WALLS: Hard copies will follow by mail. 12/21,198 11:05 '0617 884 4329 ARCHITECTURAL TH 0 002i003 The Architectural Team, Inc. AzAdmiral'S Hill. Clwkv. ,11A G2150 tcl�:,ihcvi;,fit?,8i 9.44if2 17ax:617.884.4329 F_i;ri.il;archtram( ao1._om December21, 1998 Mr. El Ulshoeffer The Town of Barnstable Building Division 367 Main Street Hyannis, MA 02601 RE: Whitehall Estates-Assisted Living Facility Hyannis, Massachusetts Exterior Wall-UL Designation Dear Mr. Ulshoeffer. The site superintendent from Congress Construction Company has informed me that you are looking for back-up documentation on the exterior wall sheathing. Please be informed that we are no longer using the UL U348 exterior wall assembly. That particular wall assembly has been dropped by the 1998 UL catalogues and we no longer allow here in this office. The new catalogue was published after we had submitted plans for the building permit for this project. The new exterior wall assembly reference n m, ber is UL U356. Yo,�)will note that this assembly no longer requires a 0.060 inch thick laminate face Also note that;this reference tested assembly is good for both the OSB walls as well as the plywood`shearwails. If you have any further questions regarding this matter, please feet free to contact me at any time. Sincerely, THE ARCHITECTURAL TEAM, INC. Ovw� o ray M. Kane, Project Manger 1 cc_ Ralph Crossen l Building Division-Town of Barnstable Janis Turner 0 ParWde Senior services Michael Blnette,TAT File The Architectural Teams,Ina e�eooumanilpwjac�slod�gmwau+baadptl a.ro 12/21/98 11:05 V617 884 4329 ARCHITECTURAL TH 0 003/003 b92 FIRE RESISTANCE DIRECTOWr(BARN) FIRE RESISTANCE DIRECTORY(BXRH) FIRE RESISTANCE4XIN-G5 -ANS� IAL263(BXUV}-W ontinued FIRE RESISTANCE RATINGS • ANSX/U1263 (BXUV)—Con Design No.U356 coated nails, 2-3/8 in.long,0.113 in. shank diam with 1/4 (Fred aEi.reTrSti t1t3r Faee Clnly) aped 8 in OC.All joints staggered 2 ft with joint,•,an vPp Bearing Wall Rating--1 Hr See Wallboard Gypsum(CKNX) category for names of ma' Finish Rating-23 Min 3, Spray-Applied Fire Resistive Material—Applied in acco application instructions to completely fill the stud cavity(d nenbearing assembly and at a thickness of 2 in. for the I assembly. Min avg and min ind densities of 13 and 11 5 pd 6 for Types DC/F and II.loin avg and min ind densities of 22,eV respectively far Type HP.for method of density determinatiq" Design Information Section. Isolatek International.--Type DC/F, 11, or Hp. Type..' adhesive/sealer optional. 4.Joints and Naitheads—When tapered edge wallboard is u (1` 4 FIRE SIDE covered with joint compound and paper tape.As an alternate, 2 `' in, thick.gypsum veneer plaster may be applied to the entire HORIZONTAL SECTION wallboard. When square-edge wallboard is used, treatment of optional. Naitheads covered with joint compound. 1. Wood Studs—Nora 2 by 4 in,spaced 16 in. OC with two 2 by 4 in.top Bearing the UL Classification Markng and one 2 by 4 in,, bottom plates. Studs laterallybraced by wood ° structural panel sheathing (Item 5) and effectively fire Stopped at top and bottom of wall. 2. Wallboard, Gypsum*—Any Classified 5/8 in. thick, 4 ft wide, applied vertically and nailed to studs and bearing plates 7 in. OC with 6d Design No, U358 cement-coated nails, 1.7/8 in.tong with 1,14 in,diam head. Bearing Wall Rating-1 Hr See Wallboard, Gypsum (CKNX) Category for names of Classified Companies. 3-30ints and Naitheads—(Not Shown)—Wallboard ,points covered with tape and joint compound, Nail heads covered with 4oint compound. 4, Batts and?Blankets—Unfaced mineral fiber insulation,3-1/2 in.thick, min 3 pef density,pressure:fit in watt cavities between studs and plates. See Batts and Blankets (624) Category for names of Classified Companies. 5• Wood Structural lane[Sheathing—Min 7J16 in. thick, 4 ft wide APA Rated Sheathing Exposure 1,pp�wwood or oriented strand board fOSB)per •,..' ' PS 1, PS 2 or APA Standard PRP-108 Installed with long diminsion of - sheet(strength axis)or face grain of plywood parallel with or perpen- dicular to studs, Vertical joints centered on studs. Horironta� joints backed with r,om 2 by 4 in.wood blocking.Attached to studs on exterior side of wall with 6d cement coated box nails spaced 6 in,OC at perimeter of panels and 12 in,OC along interior studs. J 6. Exterior Facings—Installed in accordance with the manufacturer's installation instructions. One of the following exterior facings is to be applied ever the sheathing:, j Z A.Vinyl Siding"—UL Classified exterior plastic siding(molded plastic). g B.Particle Board Sidlrrg—Hardboard exterior sidings including patterned panel or lap siding. 1. Wood Studs—Nom 2 by 4 in. spaced 24 in, OC, laterally b C.Wood Structural Panel it lap Siding APA Rated siding, Exterior, effectively fitd at top and bottom, plywood. OSB or composite panels withh vey resoppe veneer faces and structural t wood core, per PS 1 or APA Standard PRP-108, includingtextured, 2• Wallboard,Gypsum"--5/8 in,thick, 4 ft wide,applied horiio rough sawn,medium density overlay,brushed,grooved and Lapsiding. ' vertically.Attached to studs with 6d cement coated nails 0.Cementitious Stucco—Portland cement or synthetic stucco systems 0.0915 in-shank diam and 2/4 in. diam head spaced 6 in-OC.i with self-furring metal lath or adhesive base coat.Thickness from 3/6 exposed or covered with tape and compound. r to 3/4 in.,depending on system. See NlaRboard Gypsum (CKNX) category for names of -Bearing the UL Classification Marking Companies. 3, furring Channels-7/8 in.deep formed of 25 MSG galy steel,s ' in,OC perpendicular to the studs.Channels overlap 1/2 in.and Design No. U3S7 to the studs with 1-1/4 in,tong screws, Bearing Wall Rating-1 Hr 4, Precast Autoclaved Aerated Conemte—Min 3 in, thick and m Nonbearing Wall Rating-2 Hr wide panels fastened to the furring channels with 2-1/2 in.to 14.10 hex head type self-drilling., self-tapping screws when from the inside of building and with 4 in.long No.14-10 hex h self-drilling, self-tapping screws when fastened from the 1 building, Min 4 fasteners per panel per furring channel equal starting 4 in.from each panel edge. Contec:Mexican—Type PAAC Board cam,, so ;•_ ,rt:,�;.�;,•;+apu: Texas Contec—Type PAAC Board ��„ , r 5.thin Bed Plortar—Applied to the joints of each panel. s Contec Mexicana—Types Contec Thin Bed Mortar, Contee Mortar 4 I Texas Contec—Types Ccntec Thin Bed Mortar,Contec Repair' °Bearing the UL Classification Marking 1.Wood Studs—Nom 2 by 4 in, spaced 26 in.,effective)y firestapped. I A 2.Wallboard,Gypsum,—Any S/8 in.thick wallboard,with beveled,square 1 or tapered edges. Classified for Fire Resistance, Wallboard installed horizontally or vertically.Wallboard secured to studs and plates with 8d LOOK FoRr MARK ON PRODUCT' 1 ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph CrossenBarnstable Bldg. Dept.J ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 10 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 24 November, 1998 TIME: 9:30 am WEATHER: Partly Sunny TEMP.RANGE: 55°F EST. % OF COMPLETION: (+/-)22% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/Jeff Albert-Project Manager, John Feeney- Site Super, 1 laborer/Congress Const. Co. Framers/ 1 foreman, 14 carpenters/Brown; Sprinklers/2 laborers/Mass. Fire Protection Sheet metal/ 1 foreman, 3 laborers/Phoenix; HVAC/ 1 foreman, 3 laborers/RAC Plumbing/ 1 foreman,2 plumbers/Sagamore WORK IN PROGRESS • Installing roof trusses at intersection of Wing'5' and Wing T ■ Sheathing rear portion of roof of Wing'3' • Installing wall sheathing at'tower' roof in Wing'5' • Installing sheet metal ducts in corridor of First floor, Wing'4' • Installing copper piping for domestic water in First floor, Wing'4' • Installing main heating water line in First floor, Wing'4' • Installing piping for pumps in Boiler Room • Piping for temporary heat ■ Installing vent stacks through ceiling of Second floor, Wing'3' OBSERVATIONS • All Second floor panels installed. • All typical roof trusses in. Infill/valley sets and roof framing at elevators not completed. • Hurricane clips installed where roof trusses are in place. • Trusses sheathed on Wing'1', '2' and rear portion of Wing'3'. • TYVEK installed on Wings'l', '2' and most of'4' ■ Windows installed on First floor, Wing'2'. • Elevator#2 has mtl. decking fastened for 3" conc. slab on top of elev. shaft. • All mtl.stud demising walls in on First wall. Tracks down for interior apt. partitions on First floor Wings'2','4', '5'. Demising walls and interior apt.partitions installed on Second floor, Wings'F and'2'. • Resilient channel installed for ceiling/roof assembly at Wings'I' and'2'. • Gyp. bd. installed in ceiling plenum, corridor side of all wings on First floor. • Sheet mtl. ducts installed on First floor Wings '2', '4', '5' and Second floor(above corridor joists)Wings'F and 'T. ■ Vent stacks installed on Second floor through ceiling in Wings'1', '2', and'3'. ■ Sprinkler main has been installed on First floor, Wings'1','2', '3'. Feeds off main have been installed in Wing'2'. • Water supply lines installed in Wings'2','3',and'5'. Feeds, into apt. units have begun in Wing'2'. • Heating lines installed in Wings'2', '3', and'5'. Feeds, into apt. units have begun in Wing'2'. • Sprinkler stand pipe installed on Second floor of Stairs in Wings'1' and'2'. • Roofing materials on site. • Hot water boilers on site. ITEMS TO VERIFY • Verify with Veitas &Veitas re: through bolts for shear anchors at exterior corners. INFORMATION OR ACTION REQUIRED • Windows to be installed with TYVEK under fin and continuous sealant. ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\repom\afr9.sam page 1 of 1 pages r THE ARCHITECTURAL TEAM, INC. ARCHITECT'S/ FIELD REPORT OWNER N Jan Turner/Parkside Senior Services OTHER: 'N Ralph CrossenBarnstable Bldg.Dept.2ARCHITECT N Michael Binette,AIA&File/TAT N Vincent Chiricosta/MHFA CONTRACTORN Jeff Albert/Congress Construction Co. N Tony Casendino/C&C Co. FIELD N John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 09 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 18November, 1998 TIME: 1:30 pm WEATHER: Partly Sunny TEMP.RANGE: 60°F EST. % OF COMPLETION: (+/-)17% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Construction Co. Framers/ 1 foreman, 14 laborers/Brown; Sheet metal/2 laborers/Phoenix; Plumbing/5 pipe fitters/RAC and 3 plumbers/Sagamore WORK IN PROGRESS Framing Living Rm. 025 roof ■ Installing prefab.wall panels on Second floor, Wing'5' • Installing roof sheathing at'tower'roof in Wing'2' • Installing ceiling firestopping at corridor walls. • Installing sheet metal ducts in Wings'4' and'5' • Installing copper piping for domestic water in Wing'5' • Installing main heating water line in Wings'3'and'5' OBSERVATIONS • The OSB shear wall panel in Wing'5' corrected with plywood sheathing. • Second floor panels installed in Wings'l','2','3', and'5'. • All Second floor trusses and corridor floor joists laid in. ■ Roof trusses in at Wing'l' and'2'. Trusses completely sheathed on Wing'l'. ■ Fascia bd. and fascia trim installed at Wing'2'. • TYVEK installed on Wings'l'and'2'. • Mtl. stud walls in at Wings'1','2',and'3'; mtl. tracks installed on Second floor demising walls at Wing'2' • Resilient channel installed for ceiling/roof assembly at Wing'2' ■ Interior side of Maintenance Rm. and Boiler Rm. sheetrocked. • Gyp. bd. installed in ceiling plenum, corridor side of Wing'2'. • Sleeves installed at pipe penetrations through CMU firewall. • Cast iron vent stacks installed through Second floor framing in Kitchen and Business Use Groups. ■ Ductwork installed in Kitchen/Wait station. A/C units installed. • Boilers installed. ■ Pumps on site. • Gas meter installed. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED • Windows to be installed with TYVEK under fin and continuous sealant. • Window rough openings at Apt. 223 to be corrected per elevation 30/A4.01 ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f:\document\projects\9704\repom\afr9.sam page 1 of 1 pages i ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® Ralph Crossen/Bamstable Bldg. Dept., ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C &C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 15 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 8 February, 1999 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 35'F EST. % OF COMPLETION: (+/-)48% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Sheet metal/ 1 foreman,2 laborers/Phoenix;Plumbing/ 1 foreman, 1 plumbers/Sagamore Drywall/ 1 foreman, 12 laborers/J&D Drywall;Vinyl Siding/ 1 foreman, 2 laborers/Sprinkle Electrical/ 1 foreman, 3 electricians/Stalco; Fire Alarm/ 1 laborer/Associated Alarm Cable/ 1 foreman, 3 laborer/Quality Satellite WORK IN PROGRESS • Installing vinyl siding on north side of Wing'1' • Installing GWB on interior of apt. on Second flr., Wings'l' &'2', and at c1g. plenum of corridor on First flr., Wing'4' ■ Taping and sealing GWB joints on Second flr., Wings'2' • Insulating c1g. plenum at corridor and exterior walls on First floor, Wing'5' ■ Connecting duct work in Multipurpose Room ■ Installing plumbing rough-in for finish fixtures in unit kitchens and bathrooms on First floor, Wing'4' ■ Pulling elec. wire in units on First floor, Wing'2' • Pulling telephone line on Second floor, Wing'5' • Pulling cable line on First floor OBSERVATIONS • Roofing 99%.complete. EPDM to be completed at flat roof transitions and shingles at valleys near front "towers". • Interior unit partitions installed on First floor, Wing'2'. • Clg. plenum insulated and vapor barrier installed on First floor, Wings'1','2', '3', '4'. • Building insulation installed at Second floor exterior walls, Wings'1' &'2'. • Second floor ceiling insulated with R-30 fiberglass insul. faced with Kraft vapor barrier. • Water finish piping insulated on Second floor, Wing'1','2', '3'. • Ductwork insulation completed on First floor and attic. ■ Shower fixtures attached to wall and valves plumbed in on Second floor, Wings'l', '2','3', '5'. • Fire alarm(red)wire pulled to boxes on Second floor. ■ Units rough wired on Second floor,and'begun in Wing'2' units. ■ Electrical junction boxes installed and wired in units at Second floor. • Unit electrical panels wired on Second floor, Wings'1', '2'. • Conductors pulled to unit panels on First floor, Wing'2' ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED • All PVC piping,2" or greater, penetrating through floor and ceiling assemblies shall fire protected with a collar; for PVC less than 2", penetration shall be fire-caulked with intumescent caulking. • All electrical cables/wire penetrating through ceiling and/or floor assemblies shall be fire-caulked. ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\reports\afr 15.sam page 1 of 1 pages ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ®-Ralph Crossen/Barnstable Bldg. Dept. 'ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C& C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 14 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 26 January, 1999 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 35°F EST. % OF COMPLETION: (+/-)44% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Sheet metal/ 1 foreman, 3 laborers/Phoenix; HVAC/ 1 foreman,2 laborer/RAC Plumbing/ 1 foreman, 5 plumbers/Sagamore; Drywall/ 1 foreman, 8 laborers/J&D Drywall Electrical/ 1 foreman,4 electricians/Stalco; Pipe Insulators/3 laborers/Viking Insulation Welding/ 1 laborer/Complete Welding; Vinyl Siding/ 1 foreman, 3 laborers/Sprinkle Kitchen Equip./ 1 laborer/Gallagher WORK IN PROGRESS • Installing vinyl siding on east side of Wing'2' • Installing horizontal wood trim on north side of Wing'l' ■ Installing GWB on demising walls in ceiling plenum on First floor, Wing'2' • Connecting duct work in Comm. Kitchen • Installing refrigeration lines from Kitchen to exterior wall • Installing plumbing rough-in for finish fixtures in unit kitchens and bathrooms on First floor, Wing'5' • Insulating heating and water lines on Second floor • Wiring electrical boxes in units on Second floor in Wing'l' OBSERVATIONS • Louvers installed on exterior wall. • Roofing 99%complete. EPDM to be completed at flat roof transitions and shingles at valleys near front"towers". • Building insulation installed at Second floor exterior walls, Wing'2'. • One inch liner on site-for shaft wall assembly. • Ductwork insulation begun in First floor Wing'2'. ■ Plumbing rough-in for fixtures in unit kit. and bathrm. done on First floor, all Wings except'4', and all Second floor. • Shower fixtures attached to wall and valves plumbed in on Second floor, Wings'F, 121, 131. • All showers delivered. - • Pipes in corridor insulated on First floor. Water finish piping pipes insulated on-Second floor, Wing'l', '2', '3'. • Fire alarm(red)wire pulled to boxes on Second floor,Wings'l', '2', '3'. • Units rough wired on Second floor, and begun in Wing'l'. • Electrical junction boxes installed in units at Second floor. Boxes have been wired in Wing'2'. I • Unit electrical panels wired on Second floor, Wings'1',121. • Conductors pulled to unit panels in Wing'5' ITEMS TO VERIFY ■ Verify with Plumbing engineer connection for attic sprinkler pipes. INFORMATION OR ACTION REQUIRED • All PVC piping, 2"or greater, penetrating through floor and ceiling assemblies shall fire protected with a collar; for PVC less than 2",penetration shall be fire-caulked with intumescent caulking. • All electrical cables/wire penetrating through ceiling and/or floor assemblies shall be fire-caulked. ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f:\document\projects\9704\reports\afr 14.sam page 1 of I pages ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® •Ralph Crossen/Barnstable Bldg. Dept.iARCHITECT ® Michael Binette,AIA&File/TAT ®'Vincent Chiricosta/MHFA CONTRACTOR® Jeff Albert/Congress Construction Co. ® Tony Casendino/C &C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA' FIELD REPORT NO: 13 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 12 January, 1999 TIME: 1:30 pm WEATHER: Cloudy TEMP.RANGE: 20°F EST. % OF COMPLETION: (+/-)40% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Framers/ 1 foreman,3 carpenters/Brown; Sprinklers/3 laborers/Mass.Fire Protection Sheet metal/ 1 foreman, 2 laborers/Phoenix; HVAC/ 1 foreman, 1 laborer/RAC Plumbing/ 1 foreman, 5 plumbers/Sagamore; Drywall/ 1 foreman,5 laborers/J&D Drywall Electrical/ 1 foreman,5 laborer/Stalco;Pipe Insulators/ 1 laborer/Viking Insulation WORK IN PROGRESS • Sheathing roof of Porte-cochere. • Installing GWB on corridor walls(unit side)on Second floor, Wing'5' • Securing interior mtl. studs to tracks on Second floor, Wing'4' • Installing duct in Multipurpose Room • Installing plumbing rough-in for finish fixtures in unit kitchens and bathrooms on Second floor, Wing'l' • Installing piping(sprinklers) in attic, in Wing'1' • Insulating heating and water lines on First floor,Wing'3' • Wiring panels in units on Second floor in Wing'2' • Installing electrical panels in units in Wings'3','4', and'5' OBSERVATIONS • Roofing 98%complete. EPDM to be installed at flat roof transitions and shingles at valleys near front"towers". • Suspended ceiling grid begun in First floor, Wing'2'. • Where sheetrocking ceiling plenum at corridor and demising walls,building insulation put in place as specified. • One inch liner on site-for shaft wall assembly. • Kitchen hood duct in and insulated from second floor up through roof. Duct extends through roof and cap-is on. • Duct through corridor ceiling for HVAC has been installed on Second floor, Wing'P. ■ Plumbing rough-in for fixtures in unit kit. and bathrm. done on First floor, Wing'2' and Second floor, Wing'2'. • HP shower fixtures delivered with hinged seat attached to shower wall. • Gas line installed. • All piping penetrating through floor assembly has been firecaulked as specified,except in Wing'5'. • Pipes insulated,except for elbows on First floor, Wing'!'. Insulated in wing'2'. • Temporary heat equip. working. • Electrical wiring begun to be pulled on First floor,Wing'3' Fire alarm(red)wire pulled to boxes on Second floor, Wings'l', 7. • Cable wire pulled to boxes in all units on Second floor. • Units rough wired on Second floor, Wing'2', and begun in Wing'1' ■ 'Conductors pulled to unit panels in Wing'3' ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED • All PVC piping,2" or greater,penetrating through floor assemblies shall fire protected with a collar; for PVC less than 2",penetration shall be firecaulked with intumescent caulking. • Commercial Kitchen emergency electrical closet is to be relocated across corridor. ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team, Inc. f Adocu m enAproj ects\9704\reports\afr 13.sam page 1 of 1 pages AIc HITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® :Ralph Crossen/Bamstable Bldg. Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MHFA . CONTRACTOR&Tim O'Neil/Congress Construction Co. - . ®:.Tony.Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT:- Whitehall Estate, Hyannis,MA FIELD REPORT NO: 19 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 13 April, 1999 'TIME: 1:30 pm " WEATHER: Cloudy TEMP.RANGE: 50"F EST. % OF COMPLETION: (+/-)66% CONFORMANCE WITH SCHEDULE(+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co.;Building Insp../El Ulshoeffer. Drywall/ 1 foreman, 10 laborers/J&D Drywall; Elevator/ 1 foreman, 1 laborer/Otis Elev. Electric/ 1 foreman, 3 electricians/Stalco; Painting/ 1 foreman,4 laborers/Commonwealth Pt. Vinyl Siding/ 1 foreman, 1 laborers/Sprinkle; Fin. Carp./ 1 foreman, 4 carpenters/Bristol Bld WORK IN PROGRESS • Installing vinyl siding on end tower of Wing'5' • Forming for conc. platform at Receiving Area. • Laying out form of drive and parking on site • Installing ceiling framing at Corridor of First floor, Wing'3' • Installing GWB on interior walls on First floor Wing'T • Installing Elevator#1 cab. ■ Installing MDF wd. window sills with wd. apron in units on Second floor Wings'l' &12' • Installing unit kitchens and bathrooms cabinetry on Second floor,Wing'1' ■ Applying primer on walls in units on First floor, Wing'2' ■ Rough wiring on First floor, Wing'3' OBSERVATIONS • Vinyl siding 80%complete. • Conc. pad for Emergency Generator installed. ■ Manhole for Chiller installed. ■ Earth compacted,ready for base for drive and parking on site. • Conc.platform/sidewalk under"porte-cochere"poured and cured. ■ Site-light conduits(electrical and sonotubes)installed. • Porte-cochere lights-recessed cans- installed. ■ Commercial Kitchen walls primed. Freeze/Cooler installed. ■ Electrical panel box at Comm. Kitchen installed where indicated. Wires pulled to it. • Expansion tank in Boiler.Room installed. • Elevator#1 and#2 equipment in machines rooms installed. • Building insulation and vapor barrier installed throughout. ■ All plumbing fixtures delivered. Stored in units on First floor,Wing'2' • All units sheetrocked.All second floor sheetrocked. First floor, Wings'F,'2', '4', '5' sheetrocked. • Ceilings in Units have textured finish where specified. • Corridor walls primed on Second floor, Wings'1' and'2'. ■ Primer and 1 coat paint applied in units on Second floor Wings'l', and'2'. • Cabinets,vanity and sheet vinyl floor at bathroom installed in units on Second floor Wings'1', and'2'. • Lower drawer in unit kitchen cabinets have lock as specified. ■ Additional cabinets delivered and stored on Second floor, Fitness Center. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\reports\afr 19.sam page 1 of 1 pages P ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: ® JRalph Crossen/Barnstahle Bldg.D ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MBFA CONTRACTOR® Steve King/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 18 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 23 March, 1999 TIME: 1:30 pm WEATHER: Sunny . TEMP.RANGE: 40°F EST. % OF COMPLETION: (+/-)62% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Sheet metal/ 1 foreman, 2 laborers/Phoenix;HVAC/ 1 foreman, 2 laborers/RAC Plumbers/ 1 foreman/Sagamore; Drywall/ 1 foreman, 13 laborers/J&D Drywall Electrical/ 1 foreman, 4 electricians/Stalco;Gyperete/ 1 foreman, 5 laborers/Mallard Co. Vinyl Siding/ 1 foreman, 3 laborers/Sprinkle; Pipe Insulators/ 1 laborer/Viking Insulation WORK IN PROGRESS ■ Installing vinyl siding on south side of Wing'4' • Installing GWB on Second floor,Wing'4' &'5'corridors,and First floor, Wing'2' corridor. • Installing fiberglass insulation at First floor,Wing'2' corridor wall& Wing'3' exterior wall (Business Office);First floor and Second floor Wing'5'exterior walls • Installing connecting sheet metal ductwork on First floor ■ Insulating pipes, i.e. condensate piping,on First Floor • Wiring in units on First floor,Wing'5' • Prepping floors for Gyperete next day. Sealing plywd. seams and applying latex primer (bonding agent)at:Wings'1% '2', and'3',7up,to the firewall., _ OBSERVATIONS" • Vinyl siding 70%'complete;°' ,-,., ,"� ,1 tr.. ..s... ',�. .Y•F ,:.a. ., y s ,, . s • Commercial Kitchen walls sheetrocked. Hood and stainless Al. cover installed. Gas and finish-rough plumbing installed. Electrical junction boxes installed. • Second floor Country Kitchen half wall installed and sheetrocked. Electrical wiring to junction boxes,finish-rough plumbing, and Whalen fancoil unit installed. ■ GWB loaded on First floor Wings'3'and'5'. • Second floor Wing'3' sheetrocked, i.e.. at Grand Stair, columns, and corridor. ■ Units on First and Second floors Wing'4'have been sheetrocked, except in bathrooms. ■ Second floor Fitness Room and Lounge walls sheetrocked. • Diaftwalls'irtattic'ihstalled." ' , ' .. - • Ceilings in Units on Second floor Wings'1' and'2' have textured finish where specified. • Building insulation and vapor barrier installed at Wings'1', 7, '4' & Second floor, '3'. ■ All Whalen units installed(plumbed and wired)on all Second floor and First floor units and Corridor and First floor Wing'3'public spaces. • At Boiler Room,Unistrut system and additional steel structure installed for heating lines and sprinkler lines. Pipes rehung, off wood truss structure and onto new structure. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f:\document\projects\9704\reports\afr 18.sam page 1 of 1 pages ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services OTHER: X-Ralph Crossen/Barnstable Bldg. Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ®`Vincent Chiricosta/MHFA- CONTRACTOR® Steve King/Congress Construction Co. ® Tony Casendino/C & C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 17 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 09 March, 1999 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 27°F EST. % OF COMPLETION: (+/-)57% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Sheet metal/ 1 foreman, 3 laborers/Phoenix; HVAC/ 1 foreman, 3 laborer/RAC Plumbers/ 1 foreman, 2 laborer/Sagamore; Drywall/ 1 foreman, 10 laborers/J&D Drywall Electrical / 1 foreman, 8 electricians/Stalco; Sprinklers/2 laborers/Mass. Fire Protection Fire Alarm/ 1 laborer/Associate Alarm; Vinyl Siding/ 1 foreman, 5 laborers/Sprinkle WORK IN PROGRESS • Installing UniStrut system for piping in Mechanical Room. • Installing vinyl siding on north side of Wing'4' 9 • Installing GWB on exterior wall on First flr., Wing'1' and in Comm. Kitchen. • Building GWB boxes for recessed lights ■ Applying final layer of joint compound on walls on Second floor, Wing'I' • Taping and sealing GWB at Second Floor, intersection between Wings '2' & '3' • Installing Whalen units on First flr. Wing'3' • Installing Corridor Whalen units on First and Second floors • Installing sprinkling drops from attic in Wing'5' • Insulating finish plumbing pipes in Country Kitchen, Second Floor • Wiring in unit elec. boxes on Second floor, Wing'4' • Rough wiring Multipurpose Room, First floor. OBSERVATIONS • Interior mtl stud partitions installed on First floor, Wing'3'. • Wall for Display at Mail Area has been sheathed in plywood. • GWB loaded on First floor Wings '3', '4', & '5'. • Clg. framing installed on First floor apt units. • Units on Second floor Wing'3' have been sheetrocked. ■ Draftwalls in attic installed at Wings'1', '2', & 141 . • Living Room #025 cathedral ceiling insulated and vapor barrier installed. Building insulation and vapor barrier installed at Wings'1', '2', & Second floor,'3'. • Kitchen ducts have been insulated. • Apt. Whalen units installed (plumbed and wired)on all Second floor and First floor, Wing'2'. ■ Piping for sink at Employee Lounge has been installed. ■ All shower fixtures attached to wall and valves plumbed. ■ Whirlpool Tub in place in Tub Room on Second floor. , • Switchgear in place. Wiring begun. • Wing'1', elec. wire has been pulled to all rooms. • Electrical junction boxes installed and wired in units at Second floor, and First floor Wing'2'. • Fire alarm wired to A/C units. • Unit electrical panels wired on Second floor, and First floor Wing'2'. • Conductors pulled to unit panels on First floor, Wing'2' ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team, Inc. f:\document\projects\9704\reports\afr 17.sam page 1 of 1 pages ARCHITECT'S FIELD REPORT OWNER M Jan Turner/Parkside Senior Services OTHER: N Ralph Crossen/Barnstable Bldg. Dept. ARCHITECT N Michael Binette,AIA&File/TAT N Vincent Chiricosta/MHFA CONTRACTORM Jeff Albert/Congress Construction Co. N Tony Casendino/C &C Co. FIELD N John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 16 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 23 February, 1999 TIME: 1:30 pm WEATHER: Sunny TEMP.RANGE: 27°F EST. % OF COMPLETION: (+/-)52% CONFORMANCE WITH SCHEDULE (+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Sheet metal/ 1 foreman, 2 laborers/Phoenix; HVAC/ 1 foreman, 1 laborer/RAC Drywall/ 1 foreman, 16 laborers/J&D Drywall; Vinyl Siding/ 1 foreman, 2 laborers/Sprinkle Electrical/ 1 foreman, 7 electricians/Stalco; Sprinklers/4 laborers/Mass. Fire Protection Pipe Insulators/ 1 laborer/Viking Insulation; Telephone/2 laborer/Claircon WORK IN PROGRESS • Installing vinyl siding on south side of Wing'l' • Framing interior apt. mtl. stud partitions on first flr. Wing'5' ■ Installing GWB on interior of apt. on First flr., Wing'2'and Second flr. Wing'3' ■ Connecting duct work in attic at Wing'5' • Installing Whalen units in apts. on Second flr. Wings'l' &'2' • Installing sprinkling drops from attic in Wings'4' & '5' • Insulating plumbing pipes on First flr. Wing'4' ■ Pulling elec. wire in units on First floor, Wing'2'-HP, and Wing'l' • Pulling business telephone lines on First floor, Wing'3' OBSERVATIONS • Roofing 100%complete. • Make-up air duct running on the exterior of building has been sheathed and roofed. Roof shingles installed. • Interior mtl stud partitions installed on First floor, Wing'l'. • Clg. framing installed on First floor, Wing'5'; clg. plenum at demising walls insulated and GWB on Wing'5' & '4'. ■ Tray clg. framed in Multi-purpose Room. • Clg. plenum insulated and vapor barrier installed on all Wings. • Building insulation and vapor barrier installed at Second floor exterior walls and ceiling. ■ Shower fixtures attached to wall and valves plumbed in on Second floor. • Transformer installed on conc. pad. Electrical junction boxes instaiied and wired in units at Second floor,and First floor Wing'2'. • Unit electrical panels wired on Second floor, and First floor Wing'2'. • Conductors pulled to unit panels on First floor, Wing'2' ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED • All PVC piping, 2" or greater, penetrating through floor and ceiling assemblies shall fire protected with a collar; for PVC less than 2",penetration shall be fire-caulked with intumescent caulking. • All electrical cables/wire penetrating through ceiling and/or floor assemblies shall be fire-caulked. ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. fAdocum ent\proj ects\9704\repoM\afr 16.sam page 1 of 1 pages PROJECT: wiiitehall'Est es Assistin Living Facility REPORT NO. 9 PAGE 1 LOCATION: H annis,MA DATE: January 21, 1999 WEATHER: Sunny,40°F CLIENT: The Architectural Team FIELD REPORT: General Inspection CONTRACTOR: Congress Construction PRESENT AT SITE: John Feeney—Congress Construction OBSERVATIONS: t 9.1 A final inspection of the subject building was made for the right side and the front porch. Two items were noted to require additional work-or is in progress. EXCEPTIONS: 9.2 Replace mid height blocking atone point in wing 5 on-!' ievei. (interior bearing wall'(block was not wide enough) 9.3 The metal clip angles to be installed at the elevator&the fire wall are on order&will be installed at a later date. 9.4 The CMU at the elevator is still in progress. 9.5 The previous exceptions noted in report#7 7.3-7.10 have been resolved. 9.6 In the previous inspection report we reported that we inspected only half of wing#3. However this inspection#7, it covered the left side of the building(from the fire wall on the left side,wing 1,2&3) Blair Budka Rimas Veitas, P.E. FIELD REPRESENTATIVE REVIEWED BY Veitas & Veitas Engineers, Inc. ♦ 639 -Granite Street ♦ Braintree, MA 02184 Phone(781) 843-2863 ♦ Fax(781) 849-2065 ARCHITECT'S FIELD REPORT OWNER ® Jan Turner/Parkside Senior Services s OTHER: ® Ralph Crossen/Barnstable Bldg.Dept. ARCHITECT ® Michael Binette,AIA&File/TAT ® Vincent Chiricosta/MBFA CONTRACTOR® Tim O'Neil/Congress Construction Co. ® Tony Casendino/C&C Co. FIELD ® John Feeney/Congress Construction Co. PROJECT: Whitehall Estate, Hyannis,MA FIELD REPORT NO: 20 CONTRACT: Construction of New 80 Unit Assisted Living Facility ARCHITECT'S PROJECT NO: 9704 DATE: 27 April, 1999 TIME: 1:30 pm WEATHER: Cloudy TEMP.RANGE: 60°F EST. % OF COMPLETION: (+/-)70% CONFORMANCE WITH SCHEDULE(+/-): On Schedule PRESENT AT SITE: GC/John Feeney- Site Super, 1 laborer/Congress Const. Co. Drywall/ 1 foreman,4 laborers/J&D Drywall; Plumbing/ 1 foreman, 1 laborer/Sagamore Pipe insulating/ 1 laborer/Viking Insulation; Sheet metal/ 1 foreman, 2 laborers/Phoenix Sprinklers/ 1 foreman, 1 laborer/Mass Fire Protection; Flooring/ 1 laborer/Palmer Flooring Electric/ 1 foreman, 6 electricians/Stalco; Painting/ 1 foreman,4 laborers/Commonwealth Pt. Fin. Carp./ 1 foreman,4 carpenters/Bristol Bld; Misc./3 laborers/Bristol Builders Vinyl Siding/ 1 foreman, 1 laborers/Sprinkle; Sitework/ 1 laborer/Rogone Co. WORK IN PROGRESS • Installing vinyl siding Wing'3' ■ Forming for conc. platform at Courtyard • Applying last coat of GWB compound at seams at First floor,Wing'5' • Sanding GWB seams at First floor,Wing'4' ■ Installing kitchen sinks in residential kitchenettes on Second floor, Wings'F,'2', and'3' • Insulating pipes at Boiler Room • Wiring electrical panels in corridor electrical closets on Second floor • Wiring electromagnetic hold-opens at Wing'3' • Installing leaning rail blocking on Second floor, Wing'2' • Installing unit kitchen and bathroom cabinets on Second floor, Wing'4' and'5' • Painting corridor closets and door edges on Second floor • Painting window sills and caps in units on Second floor • Installing metal doors for Units on Second floor ■ Installing epoxy floor and base in Main Kitchen OBSERVATIONS • Vinyl siding 85% complete. ■ -FRP on Commercial Kitchen walls installed. Stainless steel angles installed between wall and Freeze/Cooler. • Elevator#1 and#2 cabs installed. • Plywood installed at Grand Stair treads. • - All Second floor sheetrocked.All Firstfloor sheetrocked. Seams taped and sealed at all locations except First floor,Wings'F and'3'. • Soffits installed at Main Dining Room opening to Corridor. • Window sills and half-wall cap and apron installed on Second floor. ■ Corridor walls primed on Second floor. ■ Primer and 1 coat paint applied in units on Second floor, and First floor Wing'2'. • Countertops installed in residential kitchenettes on Second floor Wings'1' and'2'. . ■ Cabinets caulked to wall/ceiling. ■ Additional cabinets delivered and stored on First floor, Wing'4'. M. Fancoil supply grilles installed in units on Second floor, Wing'2' ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS None. REPORT BY: Gabriela Li Choy/The Architectural Team,Inc. f.\document\projects\9704\reports\afr20.sam page 1 of . 1 pages vow ZONING R 'L- QUIREMENTS S THIS PLAN �A 1S FOR PERVITTING PURPOSES ONLY STRU ,` T� � ND NOT TO BE Uc-.--;ED FOR ACTUAL CON (J N RC-1 /RESIDENCE C--1 REQUIRED PROPOSED MINIMUM LOT AREA (S.F.) 4 314,730 SF 4 V_0 MINIMUM LOT FRONTAC)E (FEET) AL.L WAY LOT WIDTH (FEET) 1 7 3, ROUTE 28 V!NiYUM FRONT YARD (FEET) -zo I _1 WHITEHALL WAY MINIMUM SIDE YARD (FEET) 2 MINIMUM REAR YARD (FEET) 115 6 3' MAXIMUM PERCTEN7AGE OF IMPERVIOUS AREA/LOT COVERAGE 5 0% 31% (35.3% WITH SUPPLEMENTAL PARKING) MAXIMUM HEIGHT OF BUILDING ;,FEET) 3 0 21.25 1 _ ` MAXIMUM HE!t,,HT OF BUILDING (STORIES) 2-112 2 '_�4 ; -� JAL PROvIDED PARKING SPACES 30 (50 STANDARD, 4 HANDICAPPED) AREA RESERVED FOR 20 ADDITIONAL SPACES T Ln N.N E LIGHTING SCHEDULE N 14--9, 12 TYPE SYMBOL TOTAL UNITS r--GRAY AND RUSE COLORED CONCRETE PAJT_RS REFER TO ARCHITECHTURAL PLANS FOR PATTERN CAPE C:3D C), N. C' BEPI`a (TYP) 9*08'22' E CONCRETE DUMPSTER PAD WITH 1-2'AU7HOR!ZED VEHICLES 250.81' CHAIN LINK FENCE AND LOCKING ONLY" SIGN i :71! -1-y GATE WITH PVC SCREENING SLATS —--------- 16' MDE GRAVEL SIGN IRE ACCESS LANE , . - % I I I I �Nll', F A* YE 64' NL A4EA CONCRETE PATIO �R=4' ( 7YW) PARCEL 1 L24' /R=16' 24 -R=16' R=29'- AREA = 314,730± S.F. 7.2 3 A.C. R=29'-- P=1 2� g, LjV SEE SHEET3 FOR r,�EE CP � � jt �e NOTES AND LEGEND F E9, RECEIVING 5 TYP) _/ ' a A:E_N - f - -- _ COVERED PORCH _--PROPOSED 16' WIDE EMERGENCY VEHICLE ACCESS A CON,- RETE WALKS -_E3 4— LL E (TYP)- Y P C4,) PROPOSED ASSISTED OD LIVING FACILITY � \• ti �,, -- -__-_ ! � TWO STOsI3S 04, .Opp, CONCRETE WALKS FF EL. .00 C_( MA)N EE 7 ------- TP ANCZ T _ vIRED PORCH O� EE1 i 33' --- I i is a I/ \1 1 2 2 3'� < - __ ?:11 "1 TEMPORARY R=24' CONSTRUCTION SIGN V HANDICAPP D AN P A,VE R S TYP RAMP (TYP) --CONCRETE R 48, "ANDICAPPED— ;7 Zl� 04 C:'ARKING ONLI 117 — - , t -,PL (�Oc. SiGN " (P) TA V> If 9170MINOUC CONCRETE \ r R� / t-- 4 HANDICAPPED 1000� PARKING GAZEBO PARKING AREA (TYP) 134 SPACES S - T \� PAINTED CROSSWALK y BUILDING SETBACK LINE. 5' CONCRETE SIDEWALK AND CURB/, I\__—, - 9) TYPICAL NEXT TO BUILDING 134' PUNTED CROSSWALK (TYP) ST, LIGHT PER LIGHTING STOP" SIGN SCHEDULE (TYP) ""DO N"T ENTER" SIGN PROPOSED "STOP" SIGN R=l'j DECORATIVE PROJECT SIGN AND LIGHT--_ R 50' 1'06'22- W 827.69' =20 LL R 50 ' WIDE PRIVATE SUPPLEMENTAL PARKING PLAN WHITEHALL ESTATE _r T` H IANNi; S, MASSACHUSE I I DECEMBER220, 1996 PREPARED FOR.- PARKSIDE SENIOR SERVICES 13 RIVERSIDE ROAD, SUITE 201 WESTON, MASSACHUSETTS 02193 FILE :1543SYE Sheet of Designed by S-,,ALL Drawn by : - 1 4 i an C DESIGN ENGINEERS, INC. Checked by IG 1 45 P.O. Box 1051 , Sandwich, MA 02563 ( 508 888 9282 Field survey chk. by JKL 2-19-971 MISCELLANEOUS REVIISIONS JOB NUMBER Y DATE REVISION I Approved by 1543.0 AD VO TH VEHICLES I ANLE E 7PA L 4 )TICRETE 0 BAT�Lj pl,aN BOOK 203. PAGE 12q i ' *BARNSTABLE ZONING REGULATIONS* S 14'29'00"W ZONING FOR DISTRICT RESIDENCE C-1 , RC-1 . 466.13, MINIMUM LOT AREA 43,560 S.F. S09'08'10"W MINIMUM LOT FRONTAGE 125 FT. 250.81' MINIMUM FRONT YARD 30 FT. MINIMUM SIDE YARD 15 FT. N MINIMUM REAR YARD 15 FT. tfj N (p � TYPICAL ) t FOOTING TYPICAL FOUNDATION WALL I CERTIFY THAT THIS FOUNDATION CONFORMS WITH THE TOWN OF BARNSTABLE ZONING REQUIREMENTS. FURTHERMORE, `�- I CERTIFY THAT THIS PLAN DEPICTS FOUNDATION ASBUILT CONDITIONS AS THEY EXIST AS OF 8/20/98 ; L U Y A t., EXISTING BUILDING FOOTING AND FOUNDATION FOOTING LINE ON WALL .� NOT Tr' SCALE ,2 ARL � s C) y� P A R Cw eo� 0 Ki V AREA 314, 730 S . F . 7 . 23 ACRES o CO CP/ 1 J N11'06'10"E 827 6`T' . WHITEHALL so' WIDE PRIVATE � � WAY FILE 1759CPP Designed by . SCALE PREPARED FOR CERTIFIED PLOT PLAN Sheet of Drawn by CONGRESS CONSTRUCTION CO. INC. FOR 1 1 ® Checked by SCALE 1 " = 40' - WHITEHALL ESTATE JOB NUMBER a n DESIGN ENGINEERS, INC. 0 t0 20 40 8 WEST PEABODY EXECUTIVE (:ENTER Field surveychk. b HYANNIS, MASSACHUSETTS P. O. Box 1051 , Sandwich , MA 02563 508 Approved by 888 - 9282 A y DATE NO. BY DATE REVISION PEABODY, MASSACHUSE?TS AUGUST 20 1998 1759 ui