Loading...
HomeMy WebLinkAbout1030 FALMOUTH ROAD/RTE 28 (3) iD3 Cl> lyylcl l --R c� S i e- 1 Town of Barnstable BAMSfABM r BARNSTABLE MASS. Regulatory Services 1639 ♦0 �w"n" s°u m ie i xwt 10rEn A Richard V. Scali, Director 1639-2014 57 Building Division Thomas Perry, CBO Building Commissioner 200 Main Street, Hyannis, MA 02601 www.town.barnstable.ma.us January 12, 2015 Strawberry Hill Nominee Trust Mr. David Nunheimer, Trustee c/o Mr. Matthew Eddy, P.E. Baxter Nye Engineering 78 North Street, 3rd Floor Hyannis, MA 02601 RE: Site Plan Review 001-15 Strawberry Hill Nominee Trust 1030 Falmouth Road, Hyannis Map 250, Parcel 065 Proposal: This project involves the removal of an existing building and construction of a new one- story office building with-up to three tenants. The new office building will increase the existing gross floor area with a total of 17,974 gross s.f. proposed. Complete site improvements are proposed including new parking and entrance, improvements to stormwater management, and new public utility connections including removal of an existing septic system and connection to public sewer. Dear Mr. Eddy: Please be advised that subsequent to the formal site plan review meeting held January 8, 2015, revised plans have been administratively approved subject to the following: • Approval is based upon, and must be substantially constructed in accordance with plan entitled "Strawberry Hill Nominee Trust, Site Development Plans"consisting of 18 sheets,prepared for Strawberry Hill Nominee Trust by Baxter Nye Engineering& Surveying dated November 14, 2014 with final revisions December 29, 2015 reflecting site plan review committee comments, including Hyannis Fire Department approval of ladder truck turning, fire hydrant and FDC location and landscape plan; floor plans and elevations, 3 sheets,prepared by Architect Worx Architectural Design, Easton, MA dated December 28, 2015. • Permits to remove the existing septic system will be required from the Health Department. • A photometric plan.depicting zero (0) light spillage onto abutting properties will be required at the building permit stage. • Applicant must obtain all other applicable permits, licenses and approvals required. Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification, made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan (Zoning Section 240-105 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. A copy of the approved site plan will be retained on file. Sincerely, Ellen M. Swiniarski Site Plan Review Coordinator CC: Tom Perry, Building Commissioner Hyannis FD DPW Health Department I �11 �114E Town of Barnstable EMI, BARNS � TABLE . Regulatory Services 039. annsrFa c a nm u c•mnnr•xraxnrs iOIEO Mo+" Richard V.Scali,Director 165514 Building Division Paul Roma Building Commissioner 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us May 5, 2017 Strawberry Hill Nominee Trust Mr. David Nunheimer,Trustee c/o Mr. Matthew Eddy, P.E. Baxter Nye Engineering 78 North Street, P Floor Hyannis,MA 02601 � p RE: Site Plan Review 001-15 -Revised Medical Office Proposal - Strawberry Hill Nominee Trust 1030 Falmouth Road,Hyann�s_]7Map 250, Parcel 065 Proposal: This project involves the removal of an existing building and construction of a new two- story medical office building. A smaller footprint and an approx. 200 s.f, reduction in GFA is proposed from original application and 22 additional parking spaces are provided due to the identification of medical office use. Complete site improvements are proposed including new parking and entrance, improvements to storm water management, and new public utility connections including removal of an existing septic system and connection to public sewer. Dear Mr. Eddy: Please be advised that the above revised previously-approved proposal has been found to be administratively approvable subject to the following: • Approval is based upon, and must be substantially constructed in accordance with plan entitled "Strawberry Hill Nominee Trust, Site Development Plans"consisting of 18 sheets dated November 14,2014 with final revisions April 13, 2017 reflecting revised smaller building footprint and addition of 22 parking spaces and a full second story; also, Stormwater Management Report dated December 30, 2014 revised May 3, 2017 both prepared for Strawberry Hill Nominee Trust by Baxter Nye Engineering& Surveying 3 sheets; and, floor plans&elevations prepared by MedCom Architectural Group, Bourne, MA dated April 14, 2017. I ti • A Conditional Use Special Permit is required from the Zoning Board of Appeals for medical office use in the BB District. • Permits to remove the existing septic system will be required from the Health Department. • A photometric plan depicting zero (0) light spillage onto abutting properties will be required at the building permit stage and approved by DPW. • Applicant must obtain all other applicable permits, licenses and approvals required. Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification,made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan(Zoning Section 240-105 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. A copy of the approved site plan will be retained on file. Sincerely, Ellen M. Swiniarski Site Plan Review Coordinator CC: Paul Roma,Building Commissioner Zoning Board of Appeals Hyannis FD DPW Health Department ' i pf TFIE Town of Barnstable B"R`AM BARNSTABLE � Regulatory Services 9�prED M�A10 wuna�v M i���wm°aan iisu Richard V. Scali,Director 1639-2014 Building Division Thomas Perry, CBO Building Commissioner 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 January 12, 2015 Strawberry Hill Nominee Trust Mr. David Nunheimer, Trustee c/o Mr. Matthew Eddy, P.E. Baxter Nye Engineering 78 North Street, 3rd Floor Hyannis, MA 02601 RE: Site Plan Review 001-15 Strawberry Hill Nominee Trust 1030 Falmouth Road, Hyannis Map 250,Parcel 065 Proposal: This project involves the removal of an existing building and construction of a new one- story office building with up to three tenants. The new office building will increase the existing gross floor area with a total of 17,974 gross s.f.proposed. Complete site improvements are proposed including new parking and entrance, improvements to stormwater management, and new public utility connections including removal of an existing septic system and connection to public sewer. Dear Mr. Eddy: Please be advised that subsequent to the formal site plan review meeting held January 8, 2015, revised plans have been administratively approved subject to the following: • Approval is based upon, and must be substantially constructed in accordance with plan entitled "Strawberry Hill Nominee Trust, Site Development Plans" consisting of 18 sheets,prepared for Strawberry Hill Nominee Trust by Baxter Nye Engineering& Surveying dated November 14, 2014 with final revisions December 29, 2015 reflecting site plan review committee comments, including Hyannis Fire Department approval of ladder truck turning, fire hydrant and FDC location and landscape plan; floor plans and elevations, 3 sheets,prepared by Architect Worx Architectural Design, Easton,MA dated December 28, 2015. • Permits to remove the existing septic system will be required from the Health Department. • A photometric plan depicting zero (0) light spillage onto abutting properties will be required at the building permit stage. • Applicant must obtain all other applicable permits, licenses and approvals required. Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification, made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan (Zoning Section 240-105 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. A copy of the approved site plan will be retained on file. Sincerely, Ellen M. Swiniarski Site Plan Review Coordinator CC: Tom Perry, Building Commissioner Hyannis FD DPW Health Department