HomeMy WebLinkAbout0014 GENERAL PATTON DRIVE i
ter . Town of Barnstable Build
Ing
ennn-stwut e
Post This Card So That rt is Visible From,the Street Approved Plans Mu Retained on Job a st be nd.this Card Must xbe Kept
Posted Until Final:lnspection Has Been.Made Permit
Wfiere a Certificate . Occu anc is-Re, u fired,such Buildin shall Not be Occu ied.uhtil a Final Ins ection has been made
Permit No. B-19-4124 Applicant Name: Michael McMahon Approvals
Date Issued: 12/12/2019 Current Use: Structure
Permit Type: Building-Insulation - Residential Expiration Date: 06/12/2020 Foundation:
Location: 14 GENERAL PATTON DRIVE, HYANNIS Map/Lot: 292-127 Zoning.District: RB Sheathing:
Owner on Record: KNAPP,THOMAS W TR Contractor`Narn ` .MICHAEL T MCMAHON Framing: 1
Address: 96 SEANS CIRCLE Contractor License: CS-068111 2
CENTERVILLE, MA 02655 Est'Project Cost: $3,000.00 Chimney:
Description: Weatherization, Air Sealing, Weather Stripping, Blown Cellulose, Permit Fee: $85.00
R-38 Fiberglass, Insulation:
Fee Paid"l' 585.00
Project Review Req: Date 12/12/2019 Final:
�—J Plumbing/Gas
14
Rough Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after ssuan2. iaa Final Plumbing:
All work authorized by this permit shall conform to the approved application and the,;approved construction documents for whicKihis permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or goad and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. Final Gas
x ,
The Certificate of Occupancy will not be issued until all applicable signatures by he Building and Fire Officials are,provided on this permit. Electrical
Minimum of Five Call Inspections Required for All Construction Work
1.Foundation or Footing Service:
2.Sheathing Inspection '
3.All Fireplaces must be inspected at the throat level before firest fluelin ng is installed,` Roug h
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Final:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Rough:
."
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final:
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Pe ons contrac ' with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
TV-
i� All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
J
Building plans are to be available on site Fire Department