HomeMy WebLinkAbout0045 HEMEON ROAD yS Ife Meon -Rd.
ass - ace$ �
: ►. Town of Barnstable Building
Post�This Card SogThat it�is Visible From the Street�;Approved Plans^Must be Retained on'Job and'th�s Card�Must be Kept,�` w
K ya9 ? +;+ v r3-y:.,,, ,. e R s,.,�'`w".+r^• ~'i -, 3 fi W n'., 5 „'ark^`+4 Y*' "I"'"M
lOsp ♦ " c>a ..N. t x z a.W ,. $. "0. x �aaP r Permit
�' Where arGertificete of�Occu ,ancy�s,Requ�red such�Bu�Idmg sahalLNot.be Occupieduntil aFinal Inspection_has been,made.
3
Permit NO. B-18-2842 Applicant Name: Jonathan Whipple Approvals
Date Issued: .09/07/2018 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 03/07/2019 Foundation:
Location: 45 HEMEON ROAD,HYANNIS Map/Lot: 268-268 Zoning District: RB Sheathing:
17
Owner on Record: BYRNE, MARILYN A �� Contractor Name_ JONATHAN N WHIPPLE Framing: 1
Address: 45 HEMEON ROAD e m' Contractor License C-S-078683 2
HYANNIS, MA 02601 ` " :,,Est?iProject Cost: $3,056.00 Chimney:
Description: Insulate attic and air sea ling/weatherization 'Permit Fee: $85.00
Insulation:
Project Review Req:
;= Fee Paid; $85.00
h kDate 9/7/2018 Final:
F �
,6?
r ..g Plumbing/Gas
Rough Plumbing:
°Building Official Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six'moorths after issuance. Rough Gas:
All work authorized by this permit shall conform to the approved application and the approved construction documents for which`tthiis permit has been granted.
All construction,alterations and changes of use of any building and structures shall tie in compliance with the local zoning, y7 laws and codes. Final Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for4public inspection for the entire duration of the
work until the completion of the same. Electrical
r
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officals are provided on this permit. Service:
Minimum of Five Call Inspections Required for All Construction Work .
1.Foundation or Footing 75
- Rough:
:.
2.Sheathing Inspection "
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation Q�
7.Final Inspection before Occupancy Low Voltage Final:
V
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. 0 � Health
Work shall not proceed until the Inspector has approved the various stages of construction. S Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department
Building plans are to be available on site Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT