RESCOMTel(508)759-9828 Fax(508)759-9802
Architectural, Inc. P.O. Box 157 Bourne,MA 02553
December 23, 2008
Town of Barnstable
Building Department
200 Main Street
Hyannis, MA 02601
Attn: Tom Perry
Re: Cape Codder Resort and Spa
1225 lyannough Road
Dear Mr. Perry,
Enclosed please copies of the following for the above referenced project:
1. Architect Final Construction Control Affidavits.
2. Engineer Final Construction Control Affidavits.
3. Site Engineer Compliance Letter.
Should you have any questions or comments, please do not hesitate to contact me.
Thank You
Sincerely,
Gregory B. Sir ni
RESCOM Arc itectural, Inc.
Encl.
Copy.- East Coast Commercial Construction
Catania Hospitality Group
RESCOM
ARCHITECTS CONSTRUCTION Architectural, Inc.
M CONTROL AFFIDAVIT Residential& Commercial Architecture
P.O. Box 157, 118F Waterhouse Road
Project:Cape Codder Resort and Spa Monument Beach,MA 02553
1225 lyannough Road (508) 159-9828
Hyannis, MA 02601
In accordance with paragraph 116.0 780 CMR, the Massachusetts State Building
Code, I, Gregory B. Siroonian, a representative of RESCOM Architectural, Inc,
Massachusetts Registration Number 9748 being a registered professional Architect
hereby certify that a inspection of the project determined, in general, that the
substantially complete work for the 600 Building Wing was performed in a manner
consistent with the construction documents and that the building is ready for
occupancy.
I2 'ZS U
ArchitecV Date:
SEAL
.,9748
e � MA
aou .
RESCOM Architectural, Inc.
e
• BUILDING ENGINEERING RESOURCES. INC.
}
FIRE ALARM FINAL AFFIDA VIT
Date: December 17, 2008
Project: Cape Codder Resort& Spa - 600 Wing
1225Iyannough Road
Hyannis, Massachusetts
In accordance with Section 110 and 116.0 of the Massachusetts State Building Code,I,Marc R.Plante,
PE, Reg.#38119,being a registered professional Engineer hereby certify that I have directly supervised
the preparation of all design plans and construction administration for the above named project and that to
the best of my knowledge,such plans,and the construction work meet the applicable provisions of the
Massachusetts State Building Code,all acceptable engineering practices and applicable laws and ordinances
for the proposed use and occupancy.
I further certify that I have performed the necessary professional services on the construction site to
determine that the work is in accordance with the documents submitted and approved for the building
permit.
Engineers Name: Marc R. Plante, PE
Company Name: Building Engineering Resources, Inc.
Company Address: 28 Main Street-North Easton,MA
State Registration No.: MA#38119 ZNOFMq
Telephone Number: (508) 230-0260
M R. R,
ELE E
N
• �GI
AL
Engineering Seal&Signature
On this date December 17,2008, before me,the undersigned Notary Public,personally appeared the
above named Marc R.Plante..,PE, proved to me through satisfactory evidence of identification,which was
personal knowledge to be the person(s)whose name(s)is signed on the preceding or attached document in
my presence,and who swore to me that t e 0 is of the document are truthful and accurate to the best of
his/her knowledge.
Notary Publi Commission Expires: April 6,2012
•
28 Main Street,Building 3A North Easton,Massachusetts 02356 T 508.230.0260 1 F 508.230.0265 BER@BER-engineering.com
B R
BUILDING ENGINEERING RESOURCES, INC.
MECHANICAL FINAL AFFIDAVIT
Date: December 17, 2008
Project: Cape Codder Resort& Spa - 600 Wing
1225Iyannough Road
Hyannis,Massachusetts
In accordance with Section 110 and 116.0 of the Massachusetts State Building Code,I,Steven A.Karan.
PE,LEED. Reg.#34989,being a registered professional Engineer hereby certify that I have directly
supervised the preparation of all design plans and construction administration for the above named project
and that to the best of my knowledge, such plans,and the construction work meet the applicable provisions
of the Massachusetts State Building Code,all acceptable engineering practices and applicable laws and
ordinances for the proposed use and occupancy.
I further certify that I have performed the necessary professional services on the construction site to
determine that the work is in accordance with the documents submitted and approved for the building
permit.
Engineers Name: Steven A. Karan, PE, LEED
Company Name: Building Engineering Resources, Inc.
Company Address: 28 Main Street-North Easton, MA
State Registration No.: MA#34989
Telephone Number: (508) 230-0260 jH aFN'gss9c
STEVEN A. �G
KARAN m
MECHANICAL vim,
A .34989 O
STEPS
gineering Seal&Signature
On this date December 17,2008, before me,the undersigned Notary Public,personally appeared the
above named Steven A.Karan,PE,LEED, proved to me through satisfactory evidence of identification,
which was personal knowledge to be the person(s)whose name(s)is signed on the preceding or attached
document in my presence,and who swore to me that contents of the document are truthful and accurate
to the best of his/her knowledge.
" Notary Pub ssion Expires: April 6i2012
.il
i x .
28 Main Street,Building 3A North Easton,Massachusetts 02356 T 508.230.0260 F 508.230.0265 BER@BER-engineering.com
4
B E R
BUILDING ENGINEERING RESOURCES, INC..
ELECTRICAL FINAL AFFIDAVIT
Date: December 17, 2008
Project: Cape Codder Resort& Spa - 600 Wing
12251yannough Road
Hyannis,Massachusetts
In accordance with Section 110 and 116.0 of the Massachusetts State Building Code,I,Marc R.Plante,
PE, Reg.#38119,being a registered professional Engineer hereby certify that I have directly supervised
the preparation of all design plans and construction administration for the above named project and that to
the best of my knowledge,such plans,and the construction work meet the applicable provisions of the
Massachusetts State Building Code,all acceptable engineering practices and applicable laws and ordinances
for the proposed use and occupancy.
I further certify that I have performed the necessary professional services on the construction site to
determine that the work is in accordance with the documents submitted and approved for the building '
permit.
Engineers Name: Marc R. Plante, PE
Company Name:. Building Engineering Resources, Inc.
Company Address: 28 Main Street -North Easton, MA
State Registration No.: MA#38119
Telephone Number: (508) 230-0260 �-t1AOFi�Ss9�yG
M R. N
o EL TE
n C u.
8
O
�ONAL�'
Engineering Seal&Signature
I
On this date December 17,2008, before me,the undersigned Notary Public,personally appeared the
above named Marc R.Plante.PE, proved to me through satisfactory evidence of identification,which was
personal knowledge to be the person(s)whose name(s)is signed on the preceding or attached document in
my presence,and who swore to me that a tents of the document are truthful and accurate to the best of
his/her knowledge.
C i -
Notary y Commission Expires: Apri16.2012
'
`L $.
28 Main Street,Building3A I North Easton,Massachusetts 02356 T 508.230.0260(F 508.230.0265 1 BER@BER-engineering.com
B R
nUILDINC ENGINEERING REso UACEs. INC.
PLUMBING FINAL AFFIDA VIT
Date: December 17, 2008
Project. Cape Codder Resort& Spa - 600 Wing
1225Iyannough Road
Hyannis, Massachusetts
In accordance with Section 110 and 116.0 of the Massachusetts State Building Code,I,Steven A.Karan,
PE,LEED, Reg.#34989,being a registered professional Engineer hereby certify that I have directly
supervised the preparation of all design plans and construction administration for the above named project
and that to the best of my knowledge,such plans,and the construction work meet the applicable provisions
of the Massachusetts State Building Code,all acceptable engineering practices and applicable laws and
ordinances for the proposed use and occupancy.
I further certify that I have performed the necessary professional services on the construction site to
determine that the work is in accordance with the documents submitted and approved for the building
permit.
Engineers Name: Steven A. Karan, PE, LEED
Company Name: Building Engineering Resources, Inc.
Company Address: 28 Main Street -North Easton, MA
State Registration No.: MA#34989 ASH OFNj40
Telephone Number: (508) 230-0260 �o� STEVEN A. cy�
o KARAN N^,
U MECHANICAL n
No.34989
O
TEP� �`vQ
S/p
Engineering Seal&Signature
On this date December 17,2008, before me,the undersigned Notary Public,personally appeared the
above named Steven A.Karan,PE,LEED, proved to me through satisfactory evidence of identification,
which was personal knowledge to be the person(s)whose name(s)is signed on the preceding or attached
document in my presence,and who swore to e t the contents of the document are truthful and accurate
to the best of his/her knowledge.
Notary ssion Expires: April 6,-2012
28 Main Street,Building 3A I North Easton,Massachusetts 02356 1 T 508.230.0260 F 508.230.0265 BER@BER-engineering.com
BUILDING ENGINEERING RESOURCES, TNC.
FIRE PROTECTION FINAL AFFIDA VIT
Date: December 17, 2008
Project: Cape Codder Resort& Spa - 600 Wing
1225Iyannough Road
Hyannis, Massachusetts
In accordance with Section 110 and 116.0 of the Massachusetts State Building Code,1,Steven A.Karan.
PE,LEED, Reg.#34M,being a registered professional Engineer hereby certify that I have directly
supervised the preparation of all design plans and construction administration for the above named project
and that to the best of my knowledge,such plans,and the construction work meet the applicable provisions
of the Massachusetts State Building Code,all acceptable engineering practices and applicable laws and
ordinances for the proposed use and occupancy.
I further certify that I have performed the necessary professional services on the construction site to
determine that the work is in accordance with the documents submitted and approved for the building
permit.
Engineers Name: Steven A. Karan, PE, LEED
Company Name: Building Engineering Resources, Inc.
Company Address: 28 Main Street -North Easton, MA
State Registration No.: MA#34989
Telephone Number: (508) 230-0260 "OF Mgss9
STEVEN A. tiG
KARAN m
MECHANICAL
NO.34989
NAL E
Engineerin eal&Signature
On this date December 17,2008, before me,the undersigned Notary Public,personally appeared the
above named Steven A.Karan,PE,LEED, proved to me through satisfactory evidence of identification,
which was personal knowledge to be the person(s)whose name(s)is signed on the preceding or attached
document in my presence,and who swore to at the contents of the document are truthful and accurate
to the best of his/her knowledge.
Notary y Commission Expires: _Auril 66,2012
ti
28 Main Street,Building 3A North Easton,Massachusetts 02356 T 508.230.0260 F 508.230.0265 1 BER@BER-engineering.com
RESCOM Tel(508)759-9828 Fax (508)759-9802
Architectural, Inc. P.O. Box 157 Bourne, MA 02553
July 28, 2008
Town of Barnstable
Building Department
200 Main Street
Hyannis, MA 02601
Attn: Tom Perry
Re: Cape Codder Resort and Spa /
1225 lyannough Road 17 3plo�
Dear Mr. Perry,
Enclosed please copies of the following for the above referenced project:
1. Architect Field Reports 5-21-08, 5-28-08, 6-6-08, 6-11-08, 7-9-08.
2. Structural Engineers Field Reports 5-6-08 7-9-08.
3. Independent Testing Agency Field testing Reports for Concrete, Masonry and
Compaction. Dated 5-23-08 through 7-18-08.
Should you have an questions or comments, please do not hesitate to contact me.
Thank You
Sincerely,
Gregory B. Siroonian
RESCOM Architectural, Inc.
4
Encl. z e.
Copy. East Coast Commercial Construction
Flood Consulting PQ
Catania Hospitality Group `
�J �
xESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential & Commercial Architecture
Date: May 21, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Excavation for Connector between 500/600 buildings
2. 500 Building Floor Framing in Progress.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
No exceptions taken.
i
4
. RE
V M
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: May 28, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Drainage work in courtyard in progress.
2. Footings, Wall Forms, and Reinforcing for Connector between 500/600
buildings in progress.
3. 500 Building Wall Framing in Progress.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
No exceptions taken.
A
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential & Commercial Architecture
' Date: June 6, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Masonry has started at the connector between 500 & 600 buildings.
2. 500 Building Roof Framing in Progress.
3. 600 Building shear walls on floors 1 & 2 are in progress.
4. 500 Building Roofing and Siding in progress.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
No exceptions taken.
a i
4
a
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc
Residential & Commercial Architecture
Date: June 11, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Masonry work at the 500/600 connector is 45% complete.
2. 500 Building Interior Wall Framing in Progress.
3. 600 Building shear walls on floors 1 & 2 are complete.
4. 500 Building Roofing and Siding are complete.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
No exceptions taken.
W
A
i
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential & Commercial Architecture
Date: July 9, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Parking Lot Work in Progress.
2. Masonry work at the 500/600 connector is 75%.complete.
3. 600 Building Roof Framing in Progress.
4. 500 Building Plumbing, Electrical, Mechanical Rough ins in progress.
Items For Attention:
1. The Posts supporting the 600 roof girder trusses were reviewed. The
structural engineer will provide a detail on how to make the connection
stronger.
2. Roof Draws over the existing loft suites were reviewed.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
No exceptions taken.
A
0
Structural Engineering
STRUCTURAL FIELD REPORT
Project: Cape Codder Resort Date: May 6, 2008
Additions & Renovations
Hyannis, MA
Project No.: FC# 0769 Weather: Rain, 65 Deg.
Report No.: 0769-01
Project Status:
1. Foundation installation has been completed for the link structure located between
building 500 & 600.
2. Masonry installation has not begun for the stair and elevator shafts within the link
area.
3. The third floor framing was complete for the 500 building with the roof framing in
progress. The exterior wall sheathing installation was in progress at floor to existing
structure interface.
4. The lower level shear wall modifications were in progress within the 600 building.
The existing gypsum wallboard has been removed with new blocking installation in
progress.
The work completed appeared to have been done in conformance with the construction
documents.
Signed by:
Stacy Vlood, PE
56 Laurel Drive Hudson, MA 01749 • TEL: (978) 562-6499 FAX: (978) 562-6246
i
- -- .000
Structural Engineering
STRUCTURAL FIELD REPORT
Project: Cape Codder Resort Date: July 9, 2008
Additions & Renovations
Hyannis, MA
Project No.:. FC# 0769 Weather: Sunny, 85 Deg.
Report No.: 0769-02
Project Status:
1. For the link area,the masonry installation was in progress for the stair and elevator
shafts. The second floor wood framing has been installed for the link walkway.
2. For the 500 Building, the third floor framing, roof framing, roof and exterior wall
sheathing installation has been completed. The gypsum wallboard for the interior
shear walls has not been installed.
3. For the 600 Building,the lower level shear wall modifications have been completed.
The new third floor framing has been installed with the roof framing installation in
progress. The exterior wall sheathing was in progress.
The work completed appeared to have been one in conformance with the construction
documents.
Signed by: �'`
Stacy Vood, PE
56 Laurel Drive .• Hudson, MA 01749 • TEL: (978) 562-6499 FAX: (978) 562-6246
=454h,
In,formation
To Budd On
Engineering.Consulting•Testing
REPORT OF FIELD TESTING OF CONCRETE
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: May 23, 2008 PSI REPORT NO.: 446-80042-1
FIELD DATA: Concrete was a 4000 psi mix delivered by Falmouth Ready Mix,
mix number 64038.
NO OF CONCRETE CUBIC TEMPERATURE,"F
SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP,in. CONTENT,% AIR CONCRETE
1 4 77619 07 :04 am 09:15 am 11.0 5 3/4 5.5 63
LOCATION: Motel connector slabs
1 Motel connector slabs
NOTE:APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED:MAKING SPECIMENS:C31(EXC.SEC.10.1.2);SLUMP:C143;AIR CONTENT:C231(EXC.SEC.6):TEMPERATURE:C1064:SAMPLING C172
REMARKS:
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INOICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSIA-200.1(61F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/B21-2355•Fax 781/821-6276
D~�li Infolr mfion
w .To Build On
Engineering•Consulting•Testing
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: May 23, 2008 PSI REPORTNO.: 446-80042-2
FIELD DATA:
LOCATION OF PLACEMENT Motel connector slabs
Motel connector slabs
DATE PLACED May 23, 2008 SUPPLIER Falmouth Ready Mix
TIME 08:4 8 am DELIVERY TICKET NO./TRUCK NO. 77 619
SLUMP,IN. 5 3/4 MIX NUMBER AND PROPORTIONS 64 038
AIR CONTENT,% 5.5 CEMENT ---
AIR TEMPERATURE,OF --- WATER ---
CONCRETE TEMPERATURE OF 63 FINE AGGREGATE ---
DATERECEIVEDINLAB May 26, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE ---
MIX DATA SUBMITTED BY Falmouth Ready Mix
NOM APPLICABLE ASTM STANDARDS U o a
COMPRESSION TEST RESULTS
ASTM C39;C1231
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE TYPE OF BREAK,
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH AS SHDWN 1N
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) ASTM C39
1 A 7 05/30/08 105280 5.99 28.18 3740 Type 2
1 13 28 06/20/08 142730 6.00 28.27 5050 Type 5
1 C 28 06/20/08 154540 6.00 28.27 5470 Type 2
1 D 28 06/20/08 149290 6.00 28.27 5280 Type 5
SPECIFICATIONS
28 4000
Cylinders picked up by PSI Test results comply with applicable
REMARKS: X Cylinders made by PSI representative. X representative. X specifications.
Cylinders made by Archltecrs or Test results do not comply with
Contractor's representative. _ Cylinders delivered to PSI laboratory. _ applicable specifications.
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSIA-2DO4NF Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
9%AMIN Information
/r sTbBuild On
Engineering•Consulting•resting
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: May 27, 2008 PSI REPORTNO.: 446-80042-3
WEATHER: OVERCAST / HAZY
TEMPERATURE RANGE: 65 TO: 70
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS X CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
X CYLINDER PICKUP
ASPHALT OTHER
BATCH PLANT
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving concrete test specimens and transporting them to the PSI
labortory for curing and further testing.
Respectfully submitted,
Professional Service Industries, Inc.
I
REPORTS MAY NOT 8E REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A 3M2(2)F Professional Service Industries,Inc.*905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355-Fax 781/821-6276
r%�� Information
r •ToBurld On
Englnee►fng•Consulting•TbsHng
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CORDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 02, 2008 PSI REPORT NO.: 446-80042-4'
WEATHER: CLEAR
TEMPERATURE RANGE: 65 TO: 70
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
X CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
I
X CANCELLATION
ASPHALT OTHER
BATCH PLANT
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
As requested a PSI technician traveled to the above mentioned project for
the purpose of performing soil compaction tests and to obtain a soil sample.
Upon arrival PSI was informed that work was cancelled for this date.
Respectfully submitted,
Professional Service Industries, Inc.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-300-2 J2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 7811821-2355•Fax 781/821-6276
M nformation
r�� To BuidOn o Engineering a Consulting• Testing
REPORT OF FIELD COMPACTION TESTS
(NUCLEAR METHOD)
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 06, 2008 PSI REPORT NO.: 446-80042-5
TESTDATA: (6) Sandy Gravel-slight silt stairwell2 Connector 601-611 Bottom of footing OP
(7) M-F sand w/Gravel PooL Courtyard 571 -581 OPT. MOIST. = 7.0%
MAXIMUM COMMENTS'
TEST TEST SOIL ID LAB DRY * WATER WET DRY PERCENT
NO. MODEIDEPTH ELEVATION NUMBER UNIT WEIGHT CONTENT UNIT WEIGHT UNIT WEIGHT COMPACTION
1 1211 61, 6 123 .0 10.2 122.0 110 .7 90.0 4 - B
2 1211 611 6 123.0 15.0 129.0 112.2 91.2 4 - B
3 121, 581 7 132.0 4.9 125.7 119.8 90.8 4 - B
TEST LOCATION:
1 Pool side connector bottom of footing
2 Stairwell #2 connector bottom of footing
3 Pool courtyard bottom of removed manhole
i
NOTES: TESTS PERFORMED PER ASTM D2922&ASTM 03017 'COMMENTS: 1.FILL MATERIAL A. TEST RESULTS COMPLY WITH SPECIFICATIONS
UNIT WEIGHTS SHOWN:Lbs.per cubic foot(pco 2.BACKFILL B. PERCENT COMPACTION DOES NOT COMPLY
WATER CONTENT:Percent of dry weight 3.BA E COURSE WITH SPECIFICATIONS
PERCENT COMPACTION:Based on maximum dry unit weight 4.SUBBASE C. RETEST OF PREVIOUS TEST
obtained on sample indicated by soil ID number. 5.SOIL CEMENT D. MOISTURE IN EXCESS OF SPECIFICATIONS
6.OTHER E. MOISTURE BELOW SPECIFICATIONS
* (6) ASTM D1557 METHOD C (7) ASTM D1557 METHOD C
TESTINSTRUMENT: Troxler, 3430, 32278 STANDAROCOUNT M: 637 0: 2394
REMARKS: Elevation are approximate. ADJUSTMENT DATA M: D:
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC LOCATIONS NOTED AND MAY NOT REPRESENT ANY OTHER LOCATIONS OR ELEVATIONS.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A•fM2(S)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 -Phone 781/821-2355•Fax 7811821-6276
Particle Size Distribution Report
100
90
80
70 1
Z 60
Z 50
cW ! I ! i l
— � I I I I I I I I I I I I
W 40 NI l
ra IA
! ! I
30 I I I I I ! ! I I ! f
C
i I I I I I I I I ! I •. I I
20
Z ! I ! I I
to I I I ! I 1 1
C 10
N 0 I �
N 100 10 1 0.1 0.01 0.001
O
a GRAIN SIZE- mm.
> °/,+3" %Gravel %Sand %Fines
Co coarse Fine Coarse Medium Flne Slit clay__
N 0 9 10 6 45 26 4
E SIEVE PERCENT SPEC." PASS?
m Material Description
`
SIZE FINER PERCENT (X=NO) Sandy Gravel with slight Silt
a) 2 100 Bottom of Footing Stairwell#2 Connector
1.5 97
1 94
o .75 91 Atterberg Limits
r 50 88 PL= LL= PI=
3 .375 86 Coefficients
#4 81 D85= 8.6183 D60=0.8795 D50= 0.6736
#10 75 D30= 0.4196 D15=0.2575 D10= 0.1955
}, #20 59 CU= 4.50 Cc= 1.02
#40 30
0 #50 19 Classification
#80 9 USCS= SP AASHTO=
#200 4.2 Remarks
Our Report No.:446-80042-6
0
ar
(no specification provided)
A
5 Sample Number: Lab#79A
C Source of Sample: On-Site Depth: 60'-61' Date: 06/06/08
E PROFESSIONAL SERVICE INDUSTRIES Client: Catania Hospitality
tC Project: Cape Codder Resort&Spa
1225Iyannough Road
sr Canton, Massachusetts
Project No: 446-80042 Figure
Tested By: G.B.
COMPACTION TEST REPORT
Project No.: 446-80042 Date: 06/06/08
Project: Cape Codder Resort&Spa
1225 lyannough Road
Location:
Elev./Depot: 60'.61' Sample No. Lab#79A
Remarks: Our Report No.:446-80042-6
MATERIAL DESCRIPTION
Description: Sandy Gravel with slight Silt
Bottom of Footing Stairwell #2 Connector
Classifications- USCS: SP AASWTO:
Nat. Moist.- Sp.G.=
Liquid Limit= Plasticity Index=
%>3/4 in. = 9.0% %<No.200= 4.2%
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry.density= 123.0 pcf 120.0 pcf
Optimum moisture=8.5 % 9.5 %
140 Test specification:
ASTM D 1557-00 Method C Modified
Oversize correction applied to each point
130
I NJ 120 100%SATURATION CURVES
FOR SPEC.GRAV. EQUAL TO:
2.8
2.7
110 2.ti
.N
c
a�
p 100
90
80
70
0 5 10 15 20 25 30 35 40
Water content, %
Figure
Professional Service Industries
Particle Size Distribution Report
t C O O O
{Q Q �Op O
' fo Oi N � r e :C ITf � ik is at � it ii ii iL
100
I I I 1 1 I I I I ! !
90
I I I I I I I E ! I I I I
I I I I I I I I I l l l i
80
! I I I I I f H
111 I70 I
I I I l l I I I I I l l !
ul 60
Z
u.
cif 50 I 1 I I I I I I I I I I E
w 40
a I I I I I 1 N
I 1 ! I I I
c 30 I I I I
20
(0 10
o
N0 I 100 10 1 0.1 0.01 0.001
O
a` GRAIN SIZE-mm.
> %+3„ %Gravel %Sand %Fines
Coarse I Fine lcoarsel Medium I Fine Silt Clay
5 18 13 7 37 17 3
SIEVE PERCENT SPEC.' PASS? Material Description
SIZE FINER PERCENT (X=NO) Sandy Gravel with slight Silt
4 100 Pool Courtyard
3 3 95
0 1 5 89 A erberg Limits
0 1 82 PL= LL= PI=
3 .75 77 Coefficlents
.50 73 D85= 30.4030 D60= 2.6300 D50= 1,2678
.375 70 D30= 0.5962 D15= 0.3405 D10= 0.2511
#4 64 Cu= 10.47 Cc= 0.54
#10 57 Classification
x #20 41 USCS= SP AASHTO=
a� 440 20
a #50 13 Remarks
c� 480 7 Our Report No.: 446-80042-7
#200 3.4
0
(no specification provided)
.n
»� Sample Number:Lab#79B
c° Source of Sample:On-Site Depth: 57-58' Date: 06//06/08
E PROFESSIONAL SERVICE INDUSTRIES Client: Catania Hospitality
U Project: Cape Codder Resort&Spa
1225Iyannough Road
tY Canton, Massachussetts Project No: 446-80042 Figure
Tested By: G.B.
r
COMPACTION TEST REPORT
Project No.: 446-80042 Date: 06/06/08
Project: Cape Codder Resort&Spa
1225 lyannough Road
Location:
Elev./Depth: 57'-58' Sample No. Lab#79B
Remarks: Our Report No.:446-80042-7
MATERIAL DESCRIPTION
Description: Sandy Gravel with slight Silt
Pool Courtyard
Classifications- USCS: SP AASHTO:
Nat. Moist. = Sp.G.
Liquid Limit= Plasticity Index=
%> 314 In.= 23.0% %<No.200= 3.4%
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density=132.0 pcf 124.0 pcf
Optimum moisture=7.0% 9.0%
140 Test specification:
ASTM D 1557-00 Method C Modified
Oversize correction applied to each point
130
120 100%SATURATION CURVES
NL FOR SPEC.GRAY. EQUAL TO:
2.8
2.7
a 110 NIL 2.6
.N
C
N
p 100
90
80
i
70
I -J--L- A
0 5 10 15 20 25 30 35 40
Water content, %
Figure
Professional Service Industries
3
Particle Size Distribution Report
6 c c S _ QQ`-00 aa o (Ncam 0 a ca lo1pp
1D N � r w :� l� # # 4[ it 7! •7L � 7! it
100
I I I I I I I I I I I I
80
70
I l i l l l I
Z 80
F-
50
ciw
W 40
Nn- I i I i l I l I I I I I I
3
30 I I
! I I I I I I I I ! 11 1
20
.0
o I I I I ! ! ! ! I ! I I I
0
100 10 1 0.1 0.01 0.001
O
In GRAIN SIZE-mm.
G %+3„ %Grave! %Sand %Fines
o Coarse Fine Coarse Medium Fine Slit clay
•2 0 9 8 5 36 32 10
SIEVE PERCENT SPEC! PASS? Material Description
SIZE FINER PERCENT (X=NO) Silty Sandy Gravel Backfill
3 100 Poolside Connector
3 2 95
5 95
0 11 93 Atterbera Limits
Z .75 91 PL= LL= PI=
3 .50 87 Coefficients
.375 85 D85= 8.9011 D60=0.7149 D50= 0.5324
#4 83 D30= 0.2837 D15= 0.1313 D10=
J, #10 78 CUE Cc=
#20 65 Classification
cx #40 42 USCS= AASHTO=
aa) #50 32
(D #80 20 Remarks
#200 10 Our Report No.:446-80042-8
at
N (no specification provided)
o Sample Number:Lab#79C
c Source of Sample:On-Site Depth: 61'-64' Date: 06/06/08
to
E PROFESSIONAL SERVICE INDUSTRIES Client: Catania Hospitality
o Project: Cape Codder Resort&Spa
7
1225Iyannough Road
Canton, Massachussetts Project No: 446-80042 Figure
Tested By: G.B.
COMPACTION TEST REPORT
Project No.: 446-80042 Date: 006/06/08
Project: Cape Codder Resort&Spa
1225 Iyannough Road
Location:
ElevdDepth: 61'-65' Sample No. Lab 1i79C
Remarks: Our Report No.:446-80042-8
MATERIAL DESCRIPTION
Description: Silty Sandy Gravel Backfill
Poolside Connector
Classifications- USCS: AASHTO:
Nat. Moist.= Sp.G.
Liquid Limit= Plasticity Index
%>3/4 In.= 9.0% % < No.200= 10%
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density= 130.0 pcf 127.0 pcf
Optimum moisture=7.0% 8.0%
140 1 1 1 17= Test specification:
ASTM D 1557-00 Method C Modified
Oversize correction applied to each point
130
120 100% SATURATION CURVES
FOR SPEC. GRAY. EQUAL TO:
2.8
2.7
a 110 2.6
,N
c
d
v
p 100
90
80
70
0 5 10 15 20 25 30 35 40
Water content, %
Figure
Professional Service Industries
f
IL
rp �� Information
Aw •ToBuild On
Engineering•Consulting•7L-sfing
MASONRY INSPECTION REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 10, 2008 PSIREPORTNO.: 446-80042-9
REMARKS: PROJECT INFORMATION
Weather: Clear/Sunny Temperature: 88 to 90 degrees F.
General Contractor: Bast Coast Masonry Contractors Guillotte & Sons
Grout Supplier: Guillotte & Sons Mortar Supplier: Guillotte & Sons
Grout Required Strength: Mortar Type & Required Strengths
2000 psi at 28 days Type S 1800 psi at 28 days
CONSTRUCTION INFORMATION
LOCATION AND ELEVATIONS CONSTRUCTED THIS DATE:
Stairwell #2 east wall course 7-11
VERTICAL REINFORCING & SPACING: HORIZONTAL REINFORCING & SPACING:
#7 Q 48f1 OC Durawall Truss Wire every course
LOCATIONS AND ELEVATIONS GROUTED THIS DATE:
Bolt on course #7 interior wall (5 east cells) and east wall north of
center wall
uuu
TEST SPECIMEN INFORMATION
Set No. Specimen Size No. of Specimens Time Air Temp. Storage
I 4x4x8 3 11 :10am 88 Adjacent patio
II 2x2x2 3 11 :20am 88 Adjacent patio
REMARKS: Mortar Temperature - 91 F
Grout Temperature �- 90 F
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
REPORTS MAY NOT HE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A•300AN(1)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 7811821-6276
r�7� Information
Ir -ToBuild On
Engineering•Consulting- 7bsting
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 10, 2008 PSI REPORT NO.: 446-80042-10
FIELD DATA:
LOCATION OF PLACEMENT Course #7 bolt on course center and east wall
DATE PLACED June 10, 2008 SUPPLIER Guillotte & Sons
TIME 11:10 am DELIVERY TICKET NO.rrRUCK NO. ---
SLUMP,IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag Types I & II
AIR TEMPERATURE,OF B 8 WATER 10 gal
MIX TEMPERATURE,OF 90 FINE AGGREGATE 35 shovels
DATE RECEIVED IN LAB June 11, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE 1/4 bag lime Type S
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
2 A 7 06/17/08 27190 4.03 x 3.74 x 6 .78 15.07 1800 Cone & Split
2 B 28 07/08/08 51340 4.14 x 3.75 x 7 .00 15.53 3310 Cone & Shear
2 C 28 07/08/08 56400 4.11 x 3.79 x 6 .76 15.58 3620 Cone & Shear
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Specimens made by PSI representative. X representative. X specifications.
Specimens made by Architect's or Test results do not comply with
Contractors representative. _ Specimens delivered to PSI laboratory. _ ,applicable specifications.
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE WDUSTRIES,INC.
PSI A•200-29(37 Professlonal Service Industries,Inc,-905 Turnpike Street,Suite H-Canton,MA 02021 -Phone 7811821-2355-Fax 781/821-6276
7%0� Information
r .ToBuild On
Engineering a Consulting•7bsting
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 10, 2008 PSI REPORT NO.: 446-80042-11
FIELD DATA:
LOCATION OF PLACEMENT East wail course 7-11
DATE PLACED June 10, 2008 SUPPLIER Guillotte & Sons
TIME 11:20 am PROPORTIONS
FLOW,SEC, --- CEMENT 1 Bag Type I & II
AIR CONTENT,% --- WATER 5 gal
AIR TEMPERATURE,OF 88 FINE AGGREGATE 25 shovels
MORTAR TEMPERATURE,OF 91 ADMIXTURE 1/2 Bag Lime Type S
DATE RECEIVED IN LAB June 11, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
ASTM C109
SPECIMEN TEST TOTAL CUBE CUBE COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) TYPE OF BREAK
3 A 7 06/17/08 7900 2.02 x 2.02 4 .08 1940 Cone & Split
3 B 28 07/08/08 12190 2.04 x 2.01 4 .10 2970 Cone & Shear
3 C 28 07/08/08 10900 2.03 x 2.02 4.10 2660 Cone & Shear
SPECIFICATIONS
28 1800
Test results comply with applicable
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. X specifications.
Cubes made by Architect's or Test results do not comply with
Contractors representative. _ Cubes delivered to PSI laboratory. _ applicable specifications.
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-200-28(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H 0 Canton,MA 02021 o Phone 781/821-2355•Fax 781/821-6276
~�� Information
/r .To Build On
Engineedng•Consulting•Testing
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 11, 2008 PSI REPORT NO.: 446-80042-12
WEATHER: Clear
TEMPERATURE RANGE: 70 TO: 25
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS X CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
X CYLINDER PICKUP
ASPHALT OTHER
BATCH PLANT
PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving concrete test specimens and transporting them to the PSI
labortory for curing and further testing.
Respectfully submitted,
Professional Service industries, Inc.
REPORTS WY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC
PSI A-3M2(2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821.6276
~t0hi Information
r .To Budd On
Engineering•Consulting•7bsting
MASONRY INSPECTION REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CORDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 18, 2008 PSI REPORT NO.: 446-80042-13
REMARKS: PROJECT INFORMATION
Weather: Sunny Temperature: 75 to 80 degrees F.
General Contractors East Coast Masonry Contractor: Guillotte & Sons
Grout Suppliers Guillotte & Sons Mortar Supplier: Guilotte & Sons
Grout Required Strengths Mortar Type & Required Strength:
2000 psi at 28 days Type N 1800 psi at 28 days
MIX INFORMATION
MATERIAL-cf or lbs CEMENT LIME FINE AGG WATER OTHER
Mortar AMOUNT 1 bag 1/2 bag 32 shovels 5 gal
SOURCE St.Lawrence Super Limoid Hyannis city
Type I/II
Grout AMOUNT 1 bag 1/4 bag 35 shovels 10 gal
SOURCE St.Lawrence Super Limoid Hyannis city
Type I/II
CONSTRUCTION INFORMATION
LOCATION AND ELEVATIONS CONSTRUCTED THIS DATES
Course 8-13 south wall stairwell #2 connector
VERTICAL REINFORCING & SPACING: HORIZONTAL REINFORCING & SPACING:
#7 rebar @ 481I0.c . Duro-wall truss every other course
2 #5 rebar at bond beam
LOCATIONS AND ELEVATIONS GROUTED THIS DATES
Course 13 south wall bond beam stairwell #2 connector
TEST SPECIMEN INFORMATION
SET NO. SPECIMEN SIZE NO. OF SPECIMENS -TIME AIR TEMP. STORED
I 4X4X8 3 12:11pm 77 Adj. patio
II 2X2X2 3 12:22pm 77 Adj. patio
REMARKS:
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A•300.1N(1)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 7811821-6276 -
. .s
r%�� Information
e .ToBulld On
Engineering•Consulting•Testing
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 18, 2008 PSI REPORT NO.: 446-80042-14
FIELD DATA:
LOCATION OF PLACEMENT Bond beam course 13; south wall stairwell #2 connector
DATE PLACED June 18, 2008 SUPPLIER Guillotte & Sons
TIME 12 :00 pm DELIVERY TICKET NO./TRUCK NO. ---
SLUMP, IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag
AIR TEMPERATURE,°F 77 WATER 10 gal
MIX TEMPERATURE, OF --- FINE AGGREGATE 35 shovels
DATE RECEIVED IN LAB June 19, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE Lime = 1/4 bag
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATEOF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
4 A 7 06/25/08 16800 3.90 x 3. 92 x 7 .34 15.29 1100 Cone & Shear
4 B 28 07/16/08
4 C 28 07/16/08
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Specimens made by PSI representative. X representative. _ specifications.
8p%Irn ns made by Architects or Test results do not comply with
Contractors representative. _ Specimens delivered to PSI laboratory. _ applicable speaficallDns.
Low 7 day result indicates potential for low 28 day
results.
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-2M24(3)F Professional Service Industries,Inc.6 905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
rjA �� Information•To Build On
Engineering•ConsuRing a resfhing
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CORDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 18, 2008 REVISION #1
PSI REPORT NO.: 44 6-80 042-15
FIELD DATA:
LOCATION OF PLACEMENT South wall courses 8-13; stairwell #2 connector
DATE PLACED June 18, 2008 SUPPLIER Guillotte & Sons
TIME 11:22 am PROPORTIONS
FLOW, SEC. --- CEMENT 1 bag
AIR CONTENT,% - WATER 15 gal
AIR TEMPERATURE,OF 77 FINE AGGREGATE 32 shovels
MORTAR TEMPERATURE,OF --- ADMIXTURE Lime = 1/2 bag
DATE RECEIVED IN LAB June 19, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
ASTM C109
SPECIMEN TEST TOTAL CUBE CUBE LABORATORY AREA STRENGTH
RATORY IDENTIFICATION AGE DATE OF LOAD COMPRESSIVE
SIZE NUMBER OR SET NO. (DAYS) TEST (t BS.) (IN
(S0.IN.) (PSI) TYPE OF BREAK
5 A 7 06/25/08 4380 2.04 x 2.01 4.10 1070 Cone
5 B 28 07/16/08
5 C 28 07/16/08
SPECIFICATIONS
28 1800
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. _ Test results
C mplywith applicable
specifs.
Cubes made by Architect's or Test results do net comply with
Contractces representative. _Cubes delivered to PSI laboratory. _ Testappli results
able spo not ompi
Low 7 day result indicates potential for low 28 day
results.
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-200.28(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
r�% Information
/r •ToBuald On
Engineering•Consulting• 7bsting
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA,
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: June 19, 2008 PSIREPORTNO.: 446-80042-16
WEATHER: CLEAR
TEMPERATURE RANGE: 70 TO: 75
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL (COMPACTION) PLACEMENT(JOB SITE)
ASPHALT X OTHER
BATCH PLANT X MASONRY SAMP. PICKUP
PLACEMENT(JOB SITE)
BRIEF RESUME:OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned. project for the purpose
of retrieving masonry samples. These were transporting them to the PSI
laboratory for curing and further testing.
Respectfully submitted,
Professional Service Industries,Inc.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERNSSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-300-2(2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
_ ry
• -w
rM�: Information
r eTo Build On
Engineering e Consuffing a 7bstfng
MASONRY INSPECTION REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 30, 2008 PSI REPORT NO.: 446-80042-17
REMARKS: PROJECT INFORMATION
Weather: Overcast Temperature: 75 to 80 degrees F.
General Contractor: East Coast Masonry Contractor= Guillotte & Sons
Grout Supplier: Guillotte & Sons Mortar Supplier: Guillotte & Sons
Grout Required Strength: Mortar Type & Required Strength:
2000 psi at 28 days Type S 1800 psi at 28 days
MIX INFORMATION
MATERIAL-cf or The CEMENT LIME FINE AGG WATER OTHER
Mortar AMOUNT 1 bacr 5 baa 32 shovels 65
SOURCE Type I/II Type S Hyannis
Grout AMOUNT 1 bag 1 shovel 43 shovels 7.5 q
SOURCE type I/II
CONSTRUCTION INFORMATION
LOCATION AND ELEVATIONS CONSTRUCTED THIS DATE:
South wall courses 26-27 stairwell #2 connector
VERTICAL REINFORCING & SPACING: HORIZONTAL REINFORCING & SPACING:
#7 @ 48" OC durawall truss every course
LOCATIONS AND ELEVATIONS GROUTED THIS DATE:
South wall vertical cells courses 13-26 east end
TEST SPECIMEN INFORMATION
SET NO. SPECIMEN SIZE NO. OF SPECIMENS TIME AIR TEMP. STORED
I 211x21Ix2I' 3 09:20am 82 onsite
II 411x41Ix81I 3 10:40am 82 onsite
REMARKS:
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
REPORTS MAY NOT BE REPRODUCED,EXCEPT W FULL,WrrROUT WRITTEN PERMISSION eY PROFESSIONAL SERVICE INDUSTRIES.WC.
PSI A-3WIN(I)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
~�iTo Burld 4n Information
Z •
Englneepfng o Consult/ng•7bsHng
f
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION ##1
DATE: June 30, 2008 PSI REPORT NO.: 446-80042-18
FIELD DATA:
LOCATION OF PLACEMENT South wall course 26
DATE PLACED June 30, 2008 SUPPLIER Guillotte & Sons
TIME 09:20 am PROPORTIONS
FLOW,SEC. --- CEMENT 1 bag
AIR CONTENT,% --- WATER 6.5 g
AIR TEMPERATURE,OF 82 FINE AGGREGATE 33 shovels
MORTAR TEMPERATURE,OF --- ADMIXTURE .5 bag lime
DATE RECEIVED IN LAB July 01, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
ASTM CIOB
SPECIMEN TEST TOTAL CUBE CUBE COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LOS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
6 A 7 07/07/08 5220 2.01 x 2 .01 4.04 1290 Cone & Split
6 B 28 07/28/08
6 C 28 07/28/08
SPECIFICATIONS
28 1800
Test results comply with applicable
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. specifications.
Cubes made by Architects or Test results do not comply with
Contractor's representative. _Cubes delivered to PSI laboratory. _ applicable specifications.
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A•200-28(311' Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 7811821-6276
Information
1 r .To Build On
Engineering•Consulting• Testing
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #1
DATE: June 30, 2008 PSI REPORT NO.: 446-80042-19
FIELD DATA:
LOCATION OF PLACEMENT South wall east end courses 13-26
DATE PLACED June 30, 2008 SUPPLIER Guillotte & Sons
TIME 10:40 am DELIVERY TICKET NO.ItRUCK NO. ---
SLLW, IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag
AIR TEMPERATURE,OF 82 WATER 7.5 gallons
MIX TEMPERATURE, OF 82 FINE AGGREGATE 43 shove 1 s
DATE RECEIVED IN LAB July 02, 2008 COARSE AGGREGATE 1 shovel lime
FIELD DATA SUBMITTED BY PSI ADMIXTURE ---
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATEOF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
7 A 7 07/07/08 12220 3 . 96 x 3 .91 x 7.98 15.48 790 Cone
7 8 28 07/28/08
7 C 28 07/28/08
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Speclmensmadeby PSI representative. X representative. specifications.
Specimens made by Archileces or Test results do not comply with
Contractor's representative. Specimens delivered to PSI laboratory. applicable specifications.
Low 7 day result (A) , indicates the potential for a low
28 day compressive strength test.
Respectfully submitted,
Professional Service Industries,Inc.
THESE TEST RESULTS APPLY ONLY 70 THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATNE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAYNOT eE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC,
PSI A-200.2P(3)F Professional Service Industries,Inc.•905 Turnpike Street, Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
AM�i Information
eTo Build On
Engineering•Consulting• Testfng
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 01, 2008 PSI REPORT NO.: 446-80042-20
WEATHER: Overcast
TEMPERATURE RANGE: 70 TO: 75
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS X CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
X CYLINDER PICKUP
ASPHALT OTHER
BATCH PLANT
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving concrete test specimens and transporting them to the PSI
laboratory for curing and further testing.
Respectfully submitted,
Professional Service Industries,Inc.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WPJrMN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-900.2(2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
rM01 �� Information.To Build On
Engineeifng•ConsuRfng•Tbsting
MASONRY INSPECTION REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 11, 2008 PSI REPORT NO.: 446-80042-21
REMARKS: PROJECT INFORMATION
Weather: Sunny Temperatures 80 to 85 degrees F.
General Contractor: East Coast Masonry Contractor: Guillotte & Sons
Grout Supplier: Guillotte & Sons Mortar Supplier: Guillotte & Sons
Grout Required Strength: Mortar Type & Required Strength:
2000 psi at 28 days Type S 1800 psi at 28 days
MIX INFORMATION
MATERIAL-cf or lbs CEMENT LIME FINS AGO WATER OTHER
Mortar AMOUNT 1 bag .5 bag 30 shovels
SOURCE Type I/II Tyne S Hyannis
Grout AMOUNT 1 bag 3 trowels 36 shovels 12 g
SOURCE type I/II
CONSTRUCTION INFORMATION
LOCATION AND ELEVATIONS CONSTRUCTED THIS DATE:
West wall courses 41 & 42 stairwell #2 connector
VERTICAL REINFORCING & SPACING: HORIZONTAL REINFORCING & SPACING..
#7 @ 48" OC 2 #5 course 42, truss each course
LOCATIONS AND ELEVATIONS GROUTED THIS DATE:
Course 39-42 reinforced cells & door frame cells, bond beam course 42
stairwell #2 connector
TEST SPECIMEN INFORMATION
SET NO. SPECIMEN SIZE NO. OF SPECIMENS TIME AIR TEMP. STORED
I 2'Ix2IIx2'I 3 08:58am 84 onsite
II 411x4I'x8" 3 08:40am 84 onsite
REMARKS:
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,MRTHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-3MIN(1)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
r��� Information
r .To Build On
Engineering-Consulting-resting
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 11, 2008 PSIREPORTNO.: 446-80042-22
FIELD DATA:
LOCATION OF PLACEMENT Stairwell #2 connector West wall course 41 & 42
DATE PLACED July 11, 2008 SUPPLIER Guilotte & Sons
TIME 08:58 am PROPORTIONS
FLOW, SEC. --- CEMENT 1 bag
AIR CONTENT,% --- WATER 8 gal
AIR TEMPERATURE,OF 84 FINE AGGREGATE 30 shovels sand
MORTAR TEMPERATURE,OF 77 ADMIXTURE .5 bag lime
DATE RECEIVED IN LAB July 14, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guilotte & sons
COMPRESSION TEST RESULTS
ASTM CTo9
SPECIMEN TEST TOTAL CUBE CUBE COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST LBS.( ) (IN.) (SO.IN-) (P31) TYPE OF BREAK
9 A 7 07/18/08 10060 2.05 x 2.02 4.14 2430 Cone & Split
9 B 28 08/08/08
9 C 28 08/08/08
SPECIFICATIONS
28 1800
Test results comply with applicable
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. specifications.
Cubes made by Architect's or Test results do not comply with
Contractors representative. _Cubes delivered to PSI laboratory. _ applicable specifications.
Respectfully submitted,
Professions!Service Industries,Inc.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC-
PSI A-200-28(3)F
Professional Service Industries,Inc.-905 Turnpike Street,Suite H•Canton,MA 02021 -Phone 781/821-2355•Fax 781/821-6276
rV%A71ir
Information
•To Build On
Engine►ding•Consulting* Testing
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 11, 2008 PSI REPORT NO.: 446-80042-23
FIELD DATA:
LOCATION OF PLACEMENT Course 39-42 reinforced cells, door frame & bond beam course 42
DATE PLACED July 11, 2008 SUPPLIER Guilotte & Sons
TIME 08:40 am DELIVERY TICKET NO.fTRUCK NO. ---
SLUMP, IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag
AIR TEMPERATURE,OF B4 WATER 12 gal
MIX TEMPERATURE, OF 73 FINE AGGREGATE 36 shovels
DATE RECEIVED IN LAB July 14, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE 3 trowels lime
MIX DATA SUBMITTED BY Guilotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST "S.) (IN.) (SQ.IN.) (PSI) TYPE OF BREAK
B A 7 07/18/08 18300 3.99 x 3.66 x 7.22 14 .60 1250 Cone & Split
8 B 28 08/08/08
8 C 28 08/08/08
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Specimens made by PSI representative. X representative. specifications.
Specimens made by ArcNtecrs or Test results do not comply With
Contractor's representative. _ Specimens delivered to PSI laboratory. _ applicable specifications.
Low 7 day result (A) , indicates the potential for a low
28 day compressive strength test.
Respectfully submitted,
Professional Service industries,Inc.
cc: billcatania@hospitalitygroup.com; gbs®rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT,
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A-200.29(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821.2355•Fax 781/821.6276
In ormation
f
Ir .ToBuild On
Engineering•Consafting. Tbsting
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CORDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 14, 2008 PSI REPORT NO,: 446-80042-24
WEATHER: Sunny
TEMPERATURE RANGE: 80 TO: 85
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
ASPHALT X OTHER
BATCH PLANT X Sample pick-up
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving masonry test specimens and transporting them to the PSI
laboratory for curing and further testing.
Respectfully submitted,
Professional Service Industries,Inc.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY N07 BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERNIISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-300-2(2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
1AO%% ffInformation
®To Build On
Engineering•ConsWting•7bsUng
MASONRY INSPECTION REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 16, 2008 PSI REPORT NO.: 446-80042-25
REMARKS: PROJECT INFORMATION
Weathers Sunny Temperature: 80 to 85 degrees F.
general Contractor: East Coast Masonry Contractor: Guillotte & Sons
Grout Supplier: Guillotte & Sons Mortar Supplier: Guillotte & Sons
Grout Required Strength: Mortar Type & Required Strength:
2000 psi at 28 days Type S 1800 psi at 28 days
MIX INFORMATION
MATERIAL-cf or lbs CEMENT LIME FINE AGG WATER OTHER
Mortar AMOUNT 1 bag .5 baa 32 shovels 10 a
SOURCE Type I/II Type S Hyannis -�
Grout AMOUNT 1 bag 36 shovels 14q
SOURCE type I/II
CONSTRUCTION INFORMATION
LOCATION AND ELEVATIONS CONSTRUCTED THIS DATE:
Elevator shaft course 18-25.
VERTICAL REINFORCING & SPACING: HORIZONTAL REINFORCING & SPACING:
#7 9) 4811 OC & door iamb. Duratruss each course.
LOCATIONS AND ELEVATIONS GROUTED THIS DATE:
Elevator shaft 2nd floor door iamb.
TEST SPECIMEN INFORMATION
SET NO. SPECIMEN SIZE NO. OF SPECIMENS TIME AIR TEMP. STORED
I 211x2"x21'- 3 01:30pm 85 onsite
II 411x4IIx8" 3 02:47pm 85 onsite
REMARKS: Grout placement cancelled; Mortar temp 92 F; Grout temp 87 F.
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC-
PSI A-3041N(1)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 t Phone 7 81182 1-2 3 55•Fax 781/821-6276
ffiWAAi Information
®To Build On
Eng►needng.Consulting•Testing
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 16, 2008 PSI REPORT NO.: 446-80 042-26
FIELD DATA:
LOCATION OF PLACEMENT Elevator shaft course 18-25
DATE PLACED July 16, 2008 SUPPLIER Guillotte & Sons
TIME 01 :3 0 pm PROPORTIONS
FLOW,SEC. --- CEMENT 1 bag
AIR CONTENT,% - - WATER 10 gal
AIR TEMPERATURE,OF 85 FINE AGGREGATE 30 shovels
MORTAR TEMPERATURE,OF 92 ADMIXTURE 1/2 bag lime
DATE RECEIVED IN LAB July 17, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
ASTM C109
SPECIMEN TEST TOTAL CUBE CUBE COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) TYPE OF BREAK
10 A 7 07/23/08 10250 2.04 x 2.01 4.10 2500 Cone & Split
10 B 28 08/13/08
10 C 28 08/13/08
SPECIFICATIONS
28 1800
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. Test results comply with applicablespecifications.
Cubes made by Architect's or Test results do not comply with
Contractor's representative. _ Cubes delivered to PSI laboratory. applicable specificalions.
Respectfully submitted,
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-200.2e(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276
h�i Infonnution
� .ToBuild On
Engineering.ConsuRing•Testing
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT &. SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 16, 2008 PSI REPORTNO.: 446-80042-27
FIELD DATA:
LOCATION OF PLACEMENT Elevator shaft 2nd floor door jamb
DATE PLACED June 16, 2008 SUPPLIER Guillotte & Sons
TIME 02:47 pm DELIVERY TICKET NOJ RUCK NO. ---
SLUMP,IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag
AIR TEMPERATURE,OF 85 WATER 14 gal
MIX TEMPERATURE,OF 87 FINE AGGREGATE 36 shovels
DATE RECEIVED IN LAB July 17, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE ---
MIXDATASUBMITTEDBY Guillotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
11 A 7 07/23/08 24780 3.97 x 3 .88 x 7.86 15.40 1610 Cone & Split
11 B 28 08/13/08
11 C 28 . 08/13/08
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Specimens made by PSI representative. X representative. specilicauons.
Specimens made by Archltecrs or Test results do not comply with
4 Contractors representative. _ Specimens delivered to PSI laboratory. applicable specifications.
Respectfully submitted,
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com Processional Service Industries, Inc.
I
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSIA-2M29(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
—_ I
P
~��.ToInformation
/r Build On
Engineeilfng•Consulting•7bsting
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: July 17, 2008 PSI REPORT NO.: 446-80042-28
WEATHER: Sunny
TEMPERATURE RANGE: 80 TO: 85
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL (COMPACTION) PLACEMENT(JOB SITE)
ASPHALT X OTHER
BATCH PLANT X Sample pick-up
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving masonry test specimens and transporting them to the PSI
laboratory for curing and further testing.
Respectfully submitted,
Professional Service Industries, Inc.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FILL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL.SERVICE INDUSTRIES.INC.
PSI"0a212fF Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
11 r4111,�� Information
r ®To Buzld On
Engineering•Consulting• Testing
REPORT OF PRISM COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #2
DATE: June 18, 2008 PSI REPORT NO.: 446-80042-14
FIELD DATA:
LOCATION OF PLACEMENT Bond beam course 13; south wall stairwell #2 connector
DATE PLACED June 18, 2008 SUPPLIER Guillotte & Sons
TIME 12:0 0 pm DELIVERY TICKET NO./TRUCK NO. ---
SLUMP,IN. --- MIX NUMBER AND PROPORTIONS ---
AIR CONTENT,% --- CEMENT 1 bag
AIR TEMPERATURE,OF 77 WATER 10 gal
MIX TEMPERATURE,0 F --- FINE AGGREGATE 35 shovels
DATE RECEIVED IN LAB June 19, 2008 COARSE AGGREGATE ---
FIELD DATA SUBMITTED BY PSI ADMIXTURE Lime = 1/4 bag
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
SPECIMEN TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIMENSIONS AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (So.IN.) (PSI) TYPE OF BREAK
4 A 7 06/25/08 16800 3.90 x 3.92 x 7.34 15.29 1100 Cone & Shear
4 B 28 07/16/08 32220 3.89 x 3.85 x 6.98 14.98 2150 Cone & Split
4 C 28 07/16/08 32410 3.99 x 3.73 x 2.18 14.88 2180 Cone & Split
SPECIFICATIONS 28 2000
Specimens picked up by PSI Test results comply with applicable
REMARKS: X Specimens made by PSI representative. X representative. X specKcationa.
Specimens made by Architect's or Test results do not complyv lh
_ Contractor's representative. _ Specimens delivered to PSI laboratory. applicable specifications.
Respectfully submitted,
Professional Service Industries, Inc.
cc: billcatania@)hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-200-29(3)F professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
fi .W.
P7W4Information
oTo Build On
6ngilfeerfng•consulting• Testing
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION #2
DATE: June 18, 2008 PSI REPORT NO.: 446-80042-15
FIELD DATA:
LOCATION OF PLACEMENT South wall courses 8-13; stairwell #2 connector
DATE PLACED June 18, 200B SUPPLIER Guillotte & Sons
TIME 11:22 am PROPORTIONS
FLOW,SEC. --- CEMENT 1 bag
AIR CONTENT,% --- WATER 15 gal
AIR TEMPERATURE,OF 77 FINE AGGREGATE 32 shovels
MORTAR TEMPERATURE,OF --- ADMIXTURE Lime = 1/2 bag
DATE RECEIVED IN LAB June 19, 2008
FIELD DATA SUBMITTED BY PSI
MIX DATA SUBMITTED BY Guillotte & Sons
COMPRESSION TEST RESULTS
ASTM C109
SPECIMEN TEST TOTAL CUBE CUBE COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
5 A 7 06/25/08 4380 2 .04 x 2 .01 4 .10 1070 Cone
5 B 28 07/16/08 i 7650 2 .04 x 2 .01 4.10 1870 Cone & Split
5 C 28 07/16/08 8430 2.04 x 2.02 4 .12 2050 Cone & Shear
SPECIFICATIONS
28 1800
Test results comply with applicable
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI representative. X specifications.
Cubes made by Architect's or Test results do not comply with
Contractaes representative. _ Cubes delivered to PSI laboratory. _ applicable specifications.
Respectfully submitted,
Professional Service Industries, Inc.
cc: billcatania@hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTEDAND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A-200.28(3)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276 - -
RESCOM Tel(508)759-9828 Fax (508)759-9802
Architectural, Inc. P.O.Box 157 Bourne, MA 02553
September 26, 2008
Town of Barnstable
Building Department
200 Main Street
Hyannis, MA 02601
Attn: Tom Perry
Re: Cape Codder Resort and Spa
1225 lyannough Road
Dear Mr. Perry,
Enclosed please copies of the following for the above referenced project:
1. Architect Field Reports 7-16-08 through 9-25-08.
2. Structural Engineers Field Reports 8-20-08,
3. Independent Testing Agency Field testing Reports for Concrete, Masonry and
Compaction. Dated 7-25-08 through 9-16-08.
Should you have any questions or comments, please do not hesitate to contact me.
Thank You
Sincerely,
4an
3.
Gregory o
C" v JJ
RESCOM Architectural, Inc. + `O
CD
,Encl.
CD
Copy. East Coast Commercial Construction
Flood.Consulting w '
Catania Hospitality Group
w M
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: July 16, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. Masonry work at the 500/600 connector is 100% complete.
2. 500 Building Interior Wall Framing 95% Complete.
3. Exterior Wall and Roof Insulation in Progress.
3. 600 Building Exterior Walls and Roof Framing in Progress.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
Items Reviewed:
1. Roof Framing changes at the 500/600 Connector where reviewed.
2. Interior Level changes were reviewed at the 500/600 Connector.
I
En j mewing a Conwiffng a'msffj'P''
..._ .; _ REPORT:-OF.•U0RT•AWC0MPMSS109'°TE=.;,
TESTED FOR:. WILLIAM-CATANIA PROJECT CAPE CODDER RESORT & SPA
_ CAfiA-HOS`F1TAErrT--
141. FALMOUTH ROAD
DATE: July 11, 2008 PSI REPORT NO.: 446-80042-22 _ ....
VELM-DATA;
LOCATION OF-PLACEMENT Sta-irwell' #2 connector West wall course 41
-DATE PLACED - July 11-1 zaaa SUPPLIER Cuilotte &`Sons
PROP.ORT'ION$ `-
FLOW..SEC. --- CEMENT -1 bag
.:AIR CONTENT,o/G -_- WATER 8:-gal s
AIR TEMPERATURE,OF 84 FINE AGGREGATE 30 shovels-sand-
' 'MORYAWTEMPC E1R .OF-- .77_..: ADMWURE..r...;
DATE RECEIVED IN LAB July 14,- 2-008-
FIE D MTA 8U1BA 4TTEE?BY P&F
MIX DATA SUBMITTED BY Guilotte & sons• ~
COMPRESSION TEST RESULTS -
ASTAA C108
SPECIMEN TEST TOTAL_, CUBE CUBE COWRESSWE
y LABORATORY IDENTIFICATION AGE DATE OF LOAD SIZE AREA -STRENGTH
NUMBER OR SET N0 _ .(DAYS),.,. TEST. _ 114. .(IN-)- (SQ_IN) 4PS1 TYPE.OF BREAK
y 9. : -A A . 7 07/18/08 ;. 10060 __2_.05 x ,-2 .02- -_-4.14 _ 2430 _. _ Cone & Split
__9 B 28 08/08/_08- 12390 2_05 x 2.0L 4.12 3010 Cone.& Shear
9 C. 28 08/08/08 14.005 2.04 x. 2.03 4:14- 3380 Cone & "Split
SPECIFICATIONS '
- 28 _ 1800
Test results corptywRh:ePplicable
REMARKS: X Cubes made by PSI representative. X Cubes picked up by PSI represereative. X specifications. -
Cubesmadeby ArcmImM or, - Testresulls 42W
Conuadoes representative. _ _Cubes delivered to PSI laboratory. applicable,specificetiorfs
-
Professional Service Industries,lnc,,;.
- -cc: .w ll iamcatan-ia@hospital- tygrGup •com, --gbs@rescomarch,.com__'_
. THESE TEST-RESULTS APPLY ONLY TOTW SPECIFIC SAMPLES TESTEDANDMAIVAOTBEJNUMATWOF"THE'ENTIRE MATER!ALPLAACEMENT.
'.EPC,',TS MAY NOT?E REPRODUCED,ET;,,EP?M PULL,MIITT!.,Uf WP.!T?EPi PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A.200-28(9)F Proiessional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 7811821-2355•Fax 781/821-6276
;�c►� In 0' action
eoBuffid
REPORT OF PRISM COMPRESSION. TEST }
TESTF.3EQR:'s.: RILhIAM- CATANIA PROJECT CAPE CODDER. RESORT'& SPA
CATAi/TIA HOSPITALITY 122`5 I-YANNOUGH- RD HYANNIS, nA
141_ FALMOUT 1.ROAD --
HYANNIS, MA - 02601
-REVISION_#1
DATE: July. 11, 2008 PSI REPORT NO,:. 446-80042-23
FIELD DATA.
LOCATION'OFPLACEMENT Course- 39-.42 reinforced:cells, ., door flrame & bond..beam course 4�
DXT PLACED - July_1L,.._;2,00.8 -_:-. SUPP_LIER:_... . Guilotte & Sons
TIME 08:4 0 am DELIVERY TICKET NO:/TRUCK NO:
SLUMP;IN:, --- MIX NUMBER AND PROPORTIONS ---
_AIR CONTENT,%o --- CEMENT l bag -4
AIR TEMPERATURE.OF 8.4 - --- WATER-- -- T--12 gal
-
WX TEMPERATURE,a F 73 FINE AGGREGATE— 16 shovelm � Y
- DATE-RECOVED IN-LAB July-14 2008:. COARSE AGGREGATE::. ---.
FELUDATA.SUBMI TED-,BY PSI _. _fiDWXTURE -3 :-trow tlq,els Tit . :
MIX DATA SUBMITTED_BY. Guilotte & Sons _ - _
COMPRESSION-TEST RESULT'S -"
SPECIMEN - TEST TOTAL SPECIMEN SPECIMEN COMPRESSIVE
LABORATORY MENTIFICATION AGE- DATE OF - LOAD- . - DIMENSIONS - __A� 3T
.__ RENGM 7_
NUMBER OR-3E f NQ' '(DAY - TEST (i 8S.)- ON, tSO.IN.) (PSI) TYPE OF BREAK
B A - 7 .074-18-[" ---"301D 3:�9 x - :fib x- '7:�'l 14:60 1250 Cone & Sprit
1
8 B 28 08,/08/08 33495 . 3.91 x . 4.05 x 7.46- 15.84 . 2110 Cone & 'Sprit
B,. C-. 28_. -..0.8./_0.8./,-0.8_ .,.-32.80.5-1._3.-.,71. x_ 3.93 x.. 7.-18 14.58 2250 Cone & Shear"'
SPECIFICATIONS 2 8- 2 0 00
Spadm mpidcedupbyPSI------ Test results comply AU►opIca fey
REMARKS:_ X Spedmers—de by PSI represmintive: X-NtpresenWtive. _ X _ spedrWouons
"_f Spedmens made'by:AmNtecrsor Test results-do WO ccmoy'*Itk
_ Caa+Oaetcx§eve: _Spedmensdr9lvee&tnPSHabamWr..-- applicablespeaficatleft. j,.
s
- Respectful y,subrnttte
_- - Professional Service Industries,lne
cc: willi-amcatania@hospitalitygroup-.-com.; gbsft-escomarch com�
THESE TEST RESULTS d-PLY-ONLYTOTNE-SPECIFIC-SAMPLESTESTED AND M kY NW13E INDICATIVE OFIHE VMRE MATERIAL PLACEMj
REPORTS MAY NOT BE REPRODUCED;EXCEFF IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC, - -
PSI A,200,29 lslr Professional Service Industries,Inc.•905 Turnpike Street,Suite H-P Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276
REPORT OF MORTAR COMPRESSION TEST_
TESTED FOR: WILLIAM CATANIA PROJECT` CAPE CODDER RESORT & SPA:
CATANIA HOSPITALITY 1225 IYANNOUGH RD.---HYAW-M;11M,
141 FALMOUTH ROAD
HYANNIS, MA 02601
- REVISION,91.
DATE: July 16, 2008 PSI REPORT NO.: L
FIEi:D
`-LOCApONOF PLACEMENT- Elevator- -shaft course-18-25,"
DATE PLACED ..".JuTy"1"""6;" .200:8" SUPPtt€RirrllEe b� S
y
'-TIME 01:30 pm-- PROPORTIONS
FLOW.SEC. --- CEMENT
` AIR--CONTENT,-.%: - - - - WATER _ 10-_- ,-. gal. '
AIR-TEMPERATURE,_°F 85 •FINEAGGR€GATE 3.0;-°s3�ovrrl
MORTAR TEMPERATURE,OF 92 ADMIXTURE 1/2 bag lime `
DATf'RFCIFIVEifW July 17.-i 2r00-
FIELD.DATA.SUBMITTED By. PSI -
-- 1610f 1-1crt-t --&-SETrtst _-. .
_ COMPRESSION TEST-RESULTS• r
ASTM`C109
SPECIMEN- .TEST TOTAL - CUBE CUBE COMPRESSIVE r r
LABORATORY IDENTIFICATION. 'AGE DATE OF LOAD. SIZE AREA STRENGTH
NUMBER OR SET NO. (DAYS} TEST. (LBS,)_ (IN.). (SC IN.) (PSI) TYPE OF BREAK
10 A 7 07/23/0.8 1.025b . -.2.04 x 2.0-1 4..10 250:0 •Cone _& Split
B 2.8._.08/13/08_. 1.2765- . 2.-03 x . 2.01 . . 4.08 3130 _ Cone &. Split
10. C 28 08/13/08 .11.855_. .2.02 x 2.01 4.06 2920 Cone & S Sit
_ P
.t
SPECIFICATIONS —
28. 1800
r
Test results comply v ith applicable
REMARKS:` X Cubes Made by PSI representative- X Cubes picked up by PSI representative. X spectlicaltons.
Cubesmade by Architep'sor — Test results dD not Comply with,
_Contractor's representative. Curies delivered to PSI laboratory;" applicable.specifieations. `
Respectfully submitted,
} Professional Service Industries, Inc.
Cc: Williamcatania®hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACENANT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN PULL,WITHOUT WRITTEN PERAASSiON BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A•2W-28 tslF Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276
f
-In oration-
/r ®To�uitd On '
REPORT OF PRISM COMPRESSION TEST
TESTES) FOR. WILLIAM CATANIA PROJECT CAPE CODDER RESORT & SPA -
--- - -- ----------_CATANIA HOSPITALITY 1225 TYANNOUGH RD. HYANNTS, MA
- _ -
1-41 FALMOUTH ROAD -
HYANNIS, MA 02601
REVISION #1
Ju1y -16,- -2008- - - -PSI REPORT NO.: 446-80042-27
a 4ELD-DATA: -
- 4.1
.;-LOCATION OF PLACEMENT..., Elevator.shaft--2nd-floor._door jamb_:
DATE PLACED June 16,- -200.8 SUPPLIER Guillotte &.Sony •.,
'- TIMES 02 :47 pm DELIVERY TICKET NOJTRUCK NO. ---
SLt31V MD(NUMBER-AND PROPOR-TIt)NS
AIR CONTENT,% --- CEMENT 1 bag_
MIX TEMPERATURE, OF 87 FINE AGGREGATE-4 36 shovel,' :'
-DA F�ECEt�f i�a��.� :<:----Jul 1 T; 2 f1f1$ _- - t GA AC €€,tk� •--=-- '
FIELD DATA SUBMITTED BY PSI ADMIXTURE
WXTDATASIlBR BY----- Fail Ilette--&--Sons
... - ----ClMPREM ON-TfST-RESUi.TS
SPECIMEN TEST 108/13/08
TOTAL SPECIMEN SPECIMEN COMPRESSIVE
'LABORATORY IDENTIFICATION AGE DATE OF LOAD DIMENSIONS AREA STRENGTH
- NtA71E�-- =�t�[sEFI�_..: _,.—._ :,.,:_.-;�.:�t35rI'_ _.:.___-: - Qld-}-_° . _ - °• �p�.p=_ 1P3�_ .ei ;;=;T1�E9F.gE�G•-.;.� . : .
p
11 B 28 , 28275. 3_9a-x-- -3•._59_.-.__ 8,22..__-2-4.-25 1980 Cone & Spy-it
.C--_ _ .. .29__ .0Z«�a-: _ 1_S ;_._ax 3�sx 8_ 15.2E sso :cone;& _ski:t
'SPECIFICATIONS 28 2000
Specimens pickedup by PSI Test resultscomply H+I1h applR�-
- REMARKS: X Specimens made by PSI representative. X rMesentative. specircatlons.
Specimens made by Anhitecls.m Test remftdo no[_comply�v Ali `
Contractors representative. Specimens delivered to PSI laboratory- X applicable spe ifications '
Low 28 day results $+C wDt 1�!
._ : . . .. .
Respectf0y.,submitted__--=•--
_. .. . _. Proiessionai Service industries,
- cc: Twill alnca>ran a@hosp -talitygraup.._com; gbE;@rescomarch=.coat
THESE;TEST.RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE MATERIAL PLACEMENT. _
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERNISSIM BY PROFESSIONAL SERVICE INDUSTRIES.INC. _
.es,A-zoo-2e I31F .Professional Service Industries,Inc,*_905 Turnpike Street,Suite.M j Canton,MA02021!.Phone 781L821.2355!Fax 761482176276 k'
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: July 30, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. 500 Building Interior Wall Framing 100% Complete.
2. 500 Building Interior Drywall in Progress.
3. 600 Building Exterior Walls and Roof Framing 65% Complete.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
Items Reviewed:
1. As interior Drywall Part ions are being installed, all penetrations in Fire
Walls shall be Fire Caulked.
2. Stair Framing and Railing configurations were reviewed.
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: August 20, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. 500 Building Interior Drywall in 95% Complete.
2. Connector Framing between 500/600 is complete.
2. 600 Building Exterior Walls and Roof Framing 100% Complete.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
Items Reviewed:
1. Refer to Structural Engineers Report dated 8-20-08 for structural
Revisions required.
i
CONSULTING -0000
FLOOD
Structural Engineering
STRUCTURAL FIELD REPORT
Project: Cape Codder Resort Date: August 20, 2008
Additions & Renovations
Hyannis, MA
Project No.: FC# 0769 Weather: Sunny, 75 Deg.
Report No.: 0769-03
Project Status:
1. For the link area,the masonry installation has been completed. The floor and roof
framing has been installed. The TJI roof framing over the stair shaft and adjacent
floor area needs to be modified. Along the exterior wall line, the TJI roof joists were
bevel cut which is not allowed. The joists need to be reinforced with 11/4"
Timberstrand members each side. A field sketch will be issued on this matter.
2. For the 500 Building,the gypsum wallboard for the interior shear walls has been
installed.
3. For the 600 Building,the third floor framing, roof framing, roof and exterior wall
sheathing installation has been completed. The gypsum wallboard for the interior
shear walls has not been installed.
The work completed appeared to have been do in conformance with the construction
documents.
Signed by:
Stacy R. od, PE
I
56 Laurel Drive Hudson, MA 01749 • TEL: (978) 562-6499 FAX: (978) 562-6246
REPORT OF CONCRETE COMPRESSION TEST--- _
T`CTE.n G/IU• WILT T tj,4 PT T]�T.TTT (�1 /�'7' nTA''�7''�
V 1 LV VI\, tV LLLIY' I-A1C NTIA I ROjEC • 4C-AP J LODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141' -
- - HYANNIS, MA 02601
REVISION #1
DATA August -15, . 2008 PSIAEPORT NO.. 446-80042-31 ,
FtEtD-DATA:_..__
<.;
LOGATIONOF_PLACEMENT See Reinforcing Steel Report #446-80042-29
- - E.4/3.1 y,
_ _ GATEPLACEIS = ---August-15, 2008__ ._ _ . _..__.___:SUPPLIER Falmouth Readymix ,.
DELIVERY TICKET NU.n VJCK NQ._ '7-9-7-t3,V--, ," -
A
SLUMP;IN. . -- - -- 5 MIX NUMBER AND PROPORTIONS- 64 034 'Al.'
-AIR,TEMPERATURE oE._ 69 _ WATER
_G TEMPERATURE.'OF 79 - -.,FINE AGGREGATE
DATE RECEIVED IN LAB August 18, 2008 COARSE AGGREGATE
EIEMDATASummirEnw. PsL-- AONXTURE
MIX DATA SUBMITTED BY Falmouth Readymix '
.
N�DEAPPLICABLE ASTM NDARDeitlL£8S OHR WSE'INDIC�TEO- 4'CYLINDERS:C37(EXCLm PLING CI72
ASTM C39;C7231 r�a c• _.-
S�M@k: :ft ..-' j�}M— CntMX:P- `r_ftMDER``�i€'-= TVE OG @ ,.
L LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH AS SHOW IN
NUMBER OR SET NO. (DAYS) TEST (LBs.) (IN.) ?(SO.W.) (PSI) ASTM C39 f
---7- 0812-2/08 - -99395.:- 6.00 28.27 3520 . . . Type _2, . .,
15-2279.,., ._ _. 57 9.9 ,._-: ' 2-8:Y8-'-..5400.. Type__5
_. .�1I C 28 09/12/08 149180 5:99 --28 .18 5320 _Type--2
11 Il ..,28. ,,09/12/_08. 14570.0 5..99 28,.18' .. 51-70`- Type' 2
SPECIFICATIONS
28. T40.00 r
Cylinders picked up by PSI Test results comply with applicable
- WAARK&,--X Cylinders madezi,,PSI representative.--- X representative X. specifications. -
Cylinders made by Arotdtect's or- Test results do not comply vdt
- .- - —Contractofs representative. _Cylinders dalivered.to PSI laboratory. P applicable specifications.
Respectfully submitted,
- Professional Service Industries,Inc.
cc: williamcatania@hospitalitygroup.com; gbsOrescomarch.co0','_'yv`;
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-20"NF Professional Service Industries,Inc.•905 Turnpike Street,Suite`H-Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276 'N,
ToBuild Ors
EWneedM-Consuffing•.Testier
REINFORCING STEEL REPORT
—TESTED FOR: WILLIAM CATANIA PROJEC,i; CAPE CODDER RESORT & SPA..
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
- 14-1 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 15, 2008 PSI' REPORT NO.: 446-80042-29
REMARKS: Results of reinforcing steel inspection on-this date are as.- follows:
LOCATIONS INSPECTED: Wall: 1(B-B_3) B.3.(0.6.-1)_ : 0_6 (B._3--B-._8_).,_
B.8(0-0) . 0 (B.8-C.5) , C.5 (0-0.8) . 0.B (C.5-E) ,
K(0.8.-3:.1h. 3..11E.- T
INSPECTION RESULTS:
Quantity, as per approved drawings: X
Rebar size, as per approved drawings: X-
,... Spacing :within--tolerance
_Splice length satisfactory _ X '
Clearance, specified: - X _
Clean:
_ -Tied: X ._
REMARKSt. All reinforcing steel at the above referenced location- was-
inspected per drawing S3 .1 Detail #4,#6,#7,#8 (7/31/08) .
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: willi-amca-tania@hospitalitygroup.-com,. gbsCrescomarch...com.___\
REPORTSMAYNOTBE.REPRODUCED.EXCEPT IN-FULL.WrniOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC
PSI A-SWIk(nF Processional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone781/82{-2355•Fax_781/821-6276 1 x,
MENUPoforma
REP.DRT._OF_FIELD-TESTING__OF..CQNCRETE...._
TESTED.FOR: WILLIAM CATANIA _ PROJECT: CAPE CODDER RESORT & SPA ^
1225 IYANiQf3UCH RD.,:H YA
141 FALMOUTH ROAD -.c=-
HYANNIS-, MA 02601
:DATE: August 15, _2066 081 REPORT NO.: 446-80042-30
FIELD DATA: Concrete was a 4000 psi mix delivered:by,-_-Falmouth Readymix,.
mix -number. 640348.
NO.O4TICKETNUMBER
CONCRETE CUBIC TEMPERATURE,•F
3PEeiME SUPPLIEfA-. TIME-R#U6K TMA&fRilk-.--. YARdSOE=- =-- _ - AIR•-_
_ «,- - -
SET NO. MADE DISPATCHED UNLOADED CONCRETE SLUMP,in. CONTENT. AIR% -CONCREn:
I_. .. 4- 78-731.- 07:.55- am -eg:-07-amr Y-I.0 5 3..g _ 65 19-,
_ 7873.2_. 08cfT6--atrr -:09-:22` _
4.
- 78734" 08':T4-am- 1IT:02=-am-.: 10--.5
�E$E&FI01 - Seer-Reinforei.-rrg-=St•eel---Report:--#446-80f}�-2•-2-g.-- t._
NOTE:APPLICABLE ASTM STANDARDS. UNLESS OTHERWISE INDICATED:MAKING SPECIMENS:C31(EXC.SEC.16.1.2);SLUMP:C143:AIR CONTENT:C231(M SEC 6);TEMPERATURE:C1664;SAMPLING:C172
REMARKS: >
Respectfully submitted,
Professfona!Serv�ce_brd s, d
cc:- williamcatania®hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS'APPLY ONLY'TO-THE SPECIFIC SAMPLES"T'ESTED•ANDdMAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. "
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,VATHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A.2WI(8)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
N�f Touid On .
u.
IPA ,,remfty
_�{ .
REPORT OF CONCRETE COMPRESSIO(+t TEST___..
TESTED FOR: WILLIAM. CATANIA. PROJECT:_ CAPE CODDER RESORT & SPA
CA7AIt1IA_ HOSPITALITY- 122-r IYANNOUGH RD.. HYANI3IS;;_MA
141 FALMOUTH ROAD
HYAMN-IS;`MA`- O'2G01 .,:.e .......
rye -
DATE: August 15,. 200.8. PSI REPORT NO.: 446-80042-31
FIELD DATA:
LOCATIONOFPLACEMENT See Reinforcing.Steel Report #446-80042-29
- E.4/3.1
DATE PLACED August 15, 2008 SUPPLIER Falmouth Readymix`
TIME- 08:52 am DELIVERY TICKET NOJTRUCK NO. 7 8731SLUMP.IN. 5 MIX NUMBER AND PROPORTIONS 640348--'
°-AIR CONTENT-.%- -3.-8 CEMENT - =
AIR TEMPERATURE,°F 69 WATER
CONCRETE TEMPERATURE, OF 7 9 FINE-AGGREGATE ---
._DATE RECEIVED IN LAB August 18, 2008 COARSE AGGREGATE- - -
F-IEL.41 "Y PSI-• �DMN(TURE __._ _--- —
_MIX_DATA'SUBM?1T-ED-BY
NOTE,APPI rCAI LE ASTM STANDARDS IRILE$S CTNERWI3EINDICATED•SLUMP C143-AIR CONTENT-C 231 IEXCL�UDDINC�EEG eI•TEAEERATURE-CIM.CYLINDERS'C31 IEXCLIIOING-SEC 101 21 SAMPLU4D-C172
ASTM C39:C1231
SPECIME - TEST-- TOTRL" CnINDEFT CYLINDER' "COMPRESSIVE TYPE OF BREAit e--
LABORATORY IDENTIFICATION AGE• DATE OF LOAD DIAMETER AREA. STRENGTH AS SHOWNJN
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) ASTM C39
it - ._ A -�-^ - -..--7 08/22/08 99395 6.00 28.27 3520 Type 2 "
11 C 28 09/12/08 - ✓ `
i.1 D. 28 09/12/08
SPECIFICATIONS 28 40DO
Cylinders pickeaup by PSI, Test results comply with apprlcabte-
REMARKS: X-Cylinders made by PSI representative: X representative. speclricakris.
Cylinders made by ArcNtkt's or Test results do not comply with
—CdMraclorarepresentative. —.Cylinders delivered to PSI laboratgry — _,_2pplicable�spwlications.,
y
RespectfuN siibmi[ted,
Professional Service Industries, Inc.
cc: williamcatan' @hospitaliiygroup.com; gbs�"r`escomarcli.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.. '
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A•2004N F
Professional Service Industries,Inc-4 905 Turnpike Street,Suite H"•Canton,MA 02021 4 Phone 7811821-2355*Fax 781/821�6278
Cc
rNt>e6AF :Infor Lion
Engineering•Conar ig is.TesEiIT
F
�.
DAILY-FIELD-:fl4EP0ft.__AP
- -
TESTED FOR: -- wiLiiM CATANIA PROJECT: CAPE CODDER RESORT' & SPA
CATANIA HOSPITALITY '1225 IYANNOUGH_Ra. -HYANNIS; =ft;,
141 FALMOUTH ROAD .....
HYANNIS; MA 02601
DATEt August,' 18, 20.0.8 PSI-REPORT NO..:. 44.6.-8.0.042=3.2. -
_ Sunny---- -
TEMPERATURE RANGE: 65 TO: 80
INSPECTOR: PSI
TYPE OF INSPECTION`BEING PERFORMED
SOtLS_- CONCRETE
FOUNDAT ONS,:-' BATCH-PLANT:-
CONTROLLED-FItL(COMPACTION)` ' PLACEMENT(JOB SITE) '
�� . .�_�•CY�i-fir PEi�-up._:,,T. -
ASPHALT- - OTHER-
B4TC�PLAN'T
PI A£EMENT-(J0B SIT-E)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project- for the purpose
�f retri.wring:ba YPts_.r.es�..spsc;,,,P�+G..and: ranspnrting..�m:_-to.-the__PM
laboratory for curing and further testing. - Z.
Respectfully submitted;
Professional Service Industries,Inc.
b cc---w:il1 tal jcgroup.Com: gbsUrescomarch-com.. _
_r
REPORTS MAY NOT SE REPRODUCED:EXCEPT IN FULL WRHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES:INC.
PSI A•3M2(2)F
Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 181/821-2355•Fax 781/821-6276 1
�v
RESCOM
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: August 27, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. 500 Building Interior Drywall in 100% Complete.
2. 500 Building Interior Trim in Progress.
3. 600 Building Exterior siding and roofing in progress.
4. 600 Building Interior Wall Framing 55% Complete.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
r t> E 1nfqmiat0n
TQBuda L _
rim
REPORI CONGK11Z I t TEST_
TESTED F011: WITLT,IAM CATA.NIA PROJECT: CAPE CODDER RESORT SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
REVISION, #1 -
DATE.-- August. 2.5;. 200.,8 PSI REPORT-NO.: 446-80042-35
FIELD DATA:
LOCATION OF PLACEMENT
Foundation wall footing (B3 to A3 to A2 to B3)
DATE PLACED - August 25, 200-8 SUPPLIER Cape Cod Ready Mix ,,,,
TIME 03:10 pm DELNERY TICKET NO./TRUCK NO. 47.878 1
SLUMP,IN. 5 1/4 MIX NUMBER AND PROPORTIONS 40DB -
AIR,CE?NEENT;"/° 4.5. CEMENT ---
AIR TEMPERATURE,OF 88 - WATER --
CONCRETE TEMPERATURE OF 82 FINE AGGREGATE
DATE RECEIVED ITVLAB A:agust 26, 2GG$ COARSE AGGREGAT E''FIELD DA1ASliE)MITTED:BY_. •-PSI. ADMIXTURE ---
/MIX DATA SUBMITTED-8-Y- Cape Cod Ready Mix
T"APPL ABLE- TANDARDS IMLE^+�CiHERWMSEhdDIGATED L PC�r43 AIRCONTENj•Q23t i£ CLUDING SEC 81-TEMPER ATirRE C78E4`CYLiNOERS-QI(EXCLUDING SEC'ID 12_);_$F — -
F.. COMPRESSION TEST RESULTS_-__ —_---------.----.-----_-._--
-
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE TYPE OF BREAK
LABORkTORY. IDEWWMAT AGE - -DATEOF LOAD -DIAMETER AREA- STRENGTH- ASSHOMIN
Nf11WBEft mt 3ETNVi _ {Q/IS,51 T€sr kmr .e„ , ,.= T-_ (ffiE j_ v:... aSlp_- # e ''t,
r� - - >rs s� -- - �: r �t> — -
__ 12 B . 28 09/22/08
12 . .D 28 09/22/08
SPECIFICATIONS ;
Cylinders picked up by PST Test results campy with appbcaBl r
REMARKS: X.Cylinders.made,try PSI represemative._ X..representative. . _ Specifications.
Cylinders made by Archlteers or Test results do nOl campy wlRt'
Contractor's representative. Cylinders delivered to PSI laboratory. applicable Speclricaliorts
ReSpec#utiy SUbcnitted,
Professional Service lndusfiries, Ir_t. '
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRrrrEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC '
Professional Service Industries,Inc.•905Turnpike Street,Suite H•Canton,MA 02021•Phone 781(821-2355•Fax 761/821-6276
----- AMNIF- - .�oBuild=Q�
F�91firee►►,g'i�onsultFi►g_• s -: I. .
- - REPORT OF CONCRETE COMPRESSION TEST
Tc5Tc7 Fva: t^TIL,T T P, CATAATIP. PROJECT: CAPE Cn?tDER RESORT' SPA
- CA'TAN.IA:-HOSPITALITY 1225 IYANNOUGH RD. HYANNi i;"1 , '
_ -- 142 -PALMOUTH-ROAD
HYANNIS, MA 02601
" DATE:. August 25, 20,08 PSI REPORT NO.: 446..-80042-36 .
FIELD DATA: t
LOCATION OFPLACEMENT- _f
Linder=pzanzngs -
-_
DATE PLACED August 25; 200-8• SUPPLIER Cape Cod Ready M1x
- TIME 03:g0`pm DEL_msRY-TcxET N0-. FRuCKw) 4?8 T9f y
SLUMP;IN: 5 1/2 MIX NUMBER AND PROPORTIONS 40DRY
CIEMENT
AIR`TEMPERATURE,-wF —WA I ER
CONCRETE TEMPERATURE OF 82- FIWAGGR€GAT€
DATE-RECEIVED:IN.LAB.. August 26, 2008 COARSE AGGREGATE -
FIELD.DATA SUBMITTED$Y_ PSI ._.. ___ ADMIXTURE ---
MIX DATA SUBMITTED BY Cape Cod Ready Mix
NOTE'APPLICABLE ASTUfiLANDAT IL I 083 1 I .te2)-SAMPLiNG C172
COMPRESSIOI�ITEST RESULTS
ASTM C39:C1231
SPECIMEN TEST -TOTAL CYLINDER .-CYLINDER....COMP•RESSNE. TYPEDFIRREASC
_ - LABORATORY DENTIFICATION AGE - DATE CF _.;LOAD - - DIAMETER -AREA -.STRENGTH - AS_SHOWN IN '
NUMBER OR SET NO. (DAYS) TEST (iBS.) (IN.) (sa IN.) (PSI) ASTR9 C39
1:3 — A - 8 09/02/08 11.3965 5.99 28.18 4040 Type 2 - -
_ 13 B 28 Q1/22/08 -
13. C 28 09/22/08
SPECIFICATIONS
2 4 00.(1
Cylinders picked up by PSI Test results comply vNth applicable
I EQIWARl1CS: X-cylinders made by PSI representative. X,representatlVe. sperifications :
CyBndOrs.made by Ardiilecrs or Test results do not comply with
Contraoto'S represenbhve. _ ._... ._-_--__Cyfindemsd&venKttD-PSHabM1ory; s:
- Respectfully submitted,
_ +.. Professional Service Industries,Inc.
cc: williamcatania®hospitalitygroup.cam; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSJONAL SERVICE MIDUSTRIES,INC
PSIA-200.4NF Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 7811821-2355•Fax 781/821-6276 '_"s
Ei�g1»esr>;rrgensruIff#W Tn9
REPORT OF CONCRETE COMPRESSION TEST -
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDE;R RESORT & SPA -
- -- -- - CATANIA_.HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
- - 141--EA1M0UTH ROAD
HYANNIS, MA 02601 - -
REVISION'#1'
Augusa.'27., 2008 PSIREPORI`NO.: 446=80042;-40
FIELD.DATA:
LOCATION OF PLACEMENT .See Reinforcing Steel Report: 446-80042--38
Elevator pit -wall
DATEPLACED August 27, 2008 SUPPLIER Cape=Cod Ready Mix'
-T1ME. 03•.30 pm pIUKSLUMP,IN. 5 1/2 MIX NUMBER AND PROPORTIONS 64030.
AIR CONTENT;% _ 4 .7_ CEMENT" ---�
AIR TEMPERATURE,OF 77 WATER
CONCRETETEMPERATURE OF 80 FINE AGGREGATE
DATE-RECEIVED IN LAB`,_ August 281- 2,008 COARSE AGGREGATE
L-EELD.DATA SUBMITTED BY PSI _ _ ADMIXTURE --
MIX DATA-SUBMITTED BY -Cape-Cod-Ready-Mix- -
UM-AP ND 48-A1R E _
ASTM C39;-C1231
SPECIMEN TEST CYUNt7ER- f1fPE8F8REAlE, -
-LABORATaRY IDENTIFICATION 'AGE -DATE OF —LOAD 13 AMETER -AREA _STRENGTH__ AS SHOWN-IN
NUMBER OR SET NO. (DAYS) TEST (Los.) (IN.) (SO"IN_) (PSI) ASTM C39
•... 1.4.. .. A. 7 09/03J08 93680 6.00 28.27 3310 Type 5
C- --- -- -28 09J�4J08 ------ ------------ --_ -----
- 14 D 28 09/24/08
_ SPECIFICATIONS
Cylindeis'pickced up by PSI Test results comply with applicable
REMARKS:. X cyiindem made by PSt representative. X represeniatwe. f specifications.
Cylinders made by.ArchitecPs or _ Test results do not coimply wish
Contractofs represerdaGre. _ cylinders delivered to PSI laboratory. applicable specifications
Respectfully submitted,
- Professional Service Industries,Inc.
cc: -wi lliamcatari�ia@hosp`ital:itygroup.eom; gbs@rescoinarch.com.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAN PLES TESTED AND 41AY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. -
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT"MITTEN PERMIS5IDNBY PROFESSIONAL SERVICE INDUSTMES.INC.
PSI A-2004N.F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821.6276
e
Information
I r •TO Bulld 4n
Engineering•Consulting•7irsfing
REINFORCING STEEL REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 25, 2008 PSI REPORT NO.: 446-80042-33
REMARKS: Results of reinforcing steel inspection on this date are as follows:
LOCATIONS INSPECTEDe Foundation Wall Footing B3-A3-A2-B-3
INSPECTION RESULTS: YES NO
Quantity, as per approved drawings: %
Rebar size, as per approved drawings: X
Spacing within tolerance: X
Splice length satisfactory: X _
Clearance as specified: X
Clean: X
Tied:
REMARKS: * Vertical dowels "wet stuck" . PSI was unable to verify
reinforcing steel for wall under-pinning, 1 (D.2-D.8) ; D.8( .1-1) .
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,aNC- -
PSIA•30o-1N(,)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276
~�� Info�on
r .TO Buald On.
Engineering•Consuiting•7iesting
REPORT OF FIELD TESTING OF CONCRETE
TESTED FOR: WIL,LIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 25, 2008 PSI REPORT NO.: 446-80042-34
FIELD DATA: Concrete was a 4000 psi mix delivered by Cape Cod Ready Mix,
mix number 40DBY.
NO.OF CONCRETE CUBIC TEMPERATURE,'F
SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP,in. CONTENT,% AIR CONCRETE
I 4 47878 02:25 pm 03 :20 pm 8.0 5 1/4 4.5 88 82
II 4 47879 02:32 pm 04:00 pm 8.0 5 1/2 4.6 76 82
LOCATION:
I Foundation wall footing (B3 to A3 to A2 to E13)
II Under-pinnings .1 (D.2-D.8) ; D8( .1-1)
J
NOTE:APPLICABLE ASTM STANDARDS. UNLESS OTHERWISE INDICATED,MAKING SPECIMENS:C31(EXC.SEC.10.1.2);SLUMP C143;AIR CONTENT:C231(EXC.SEC-6);TEMPERATURE:C1064;SAMPLING:C172
REMARKS:
Two sets of cylinders fabricated as requested by Mr. Dave Wilson. ,
l
Respectfully submitted,
Professional Service Industries,Inc.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. ,
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC. -
PSIA-200-1(8)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276
3
r��� Information
Ir sT0Budd On
Engineering•Consulting• Tbsting
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 26, 2008 PSI REPORT NO.: 446-80042-37
WEATHER: Sunny
TEMPERATURE RANGE: 70 TO: ---
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS X CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL(COMPACTION) X PLACEMENT(JOB SITE)
X Cancellation
ASPHALT OTHER
BATCH PLANT
PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of performing a concrete field inspection. Upon arrival, PSI was notified
that the concrete placement was cancelled for this date.
Respectfully submitted,
Professional Service Industries,Inc.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT HE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A•300.2(21F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 7811821.2355•Fax 781/821-6276
r��� Infor►nation
l r .To Buald On
Enginesifng• Consulting•Tbst/ng
REINFORCING STEEL REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 27, 2008 PSI REPORT NO.: 446-80042-38
REMARKS: Results of reinforcing steel inspection on this date are as follows:
LOCATIONS INSPECTED: Wall: 3 .1(A-B) ; A(3.1-2) ; 2 (A-A.9) ; A.9(2-1) •
1_(B.3-A.9) ; B.3 (1-0.9)
Elevator Pit Walls: E(1.5-0.5) ; D(1.5-0.5) •
1.5 (E-D) ; 0.5(E-D)
INSPECTION RESULTS: YES NO
Quantity, as per approved drawings: X
Rebar size, as per approved drawings: X
Spacing within tolerance: X
Splice length satisfactory: X
Clearance as specified: X
Clean: %
Tied: g
REMARKS: All reinforcing steel at the above referenced location was
inspected per drawing S3.2 Detail #3 Detail #6 (7/16/08) .
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITI4OUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A3041N(1)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276 -
t fo LionI ]In
ToBu 1d On
Engineering•Consulting•Testing
REPORT OF FIELD TESTING OF CONCRETE
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02601
DATE: August 27, 2008 PSI REPORTNO.: 446-80042-39
FIELD DATA: Concrete was a 4000 psi mix delivered by Cape Cod Ready Mix,
mix number 640348 .
NO.OF CONCRETE CUBIC TEMPERATURE,°F
SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP,in. CONTENT,% AIR CONCRETE
I 4 47920 02 :39 pm 03 :42 pm 10.0 5 1/2 4.7 77 80
47922 02 :53 pm 03:54 pm 10.0
47925 03 :11 pm 04:12 pm 10.0
47926 03 :20 pm 04:41 pm 9.0
LOCATION: See Reinforcing Steel Report: 446-80042-38
I Elevator pit wall a 1.5/E
NOTE:APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED:MAKING SPECIMENS:C3I(EXC.SEC.10.1.2);SLUMP:C143;AIR CONTENT:C231(EXC.SEC.6):TEMPERATURE:CIO64:SAMPLING:C1T2
REMARKS:
d
Respectfully Submitted,
Professional Service Industries, Inc.
cc: williamcataniaghospitalitygroup.com; gbs®rescomarch.com
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A-200-1(B)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/621-6276
Information
BU.; On
EngJneering• Consulting •TbsBng
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALMOUTH ROAD
HYANNIS, MA 02602
DATE: August 28, 2008 PSI REPORTNO.: 446-80042-41
WEATHER: P. Sunny
TEMPERATURE RANGE: 55 TO: 80
INSPECTOR: PSI
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL (COMPACTION) PLACEMENT(JOB SITE)
X Cylinder Pick-up
ASPHALT OTHER
BATCH PLANT
PLACEMENT(JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
A PSI representative traveled to the above mentioned project for the purpose
of retrieving concrete test specimens and transporting them to the PSI
laboratory for curing and further testing.
Respectfully submitted,
Professional Service Industries, Inc.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL,WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI A•I042(2)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276
113\1:7�scom
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: September 10, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach, MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. 500 Building Interior Trim in Progress.
2. 500 Building Hallway Ceilings in Progress.
4. 600 Building Interior Wall Framing 100% Complete.
5. Spa Connector Foundations in place.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
Items Reviewed:
1. Carpet and padding Specifications were reviewed. The Carpet installer
Will submit the required documentation for review on the Fire
Classification.
R- -E S C 0 M
ARCHITECTS FIELD REPORT Architectural, Inc.
Residential& Commercial Architecture
Date: September 25, 2008
P.O. Box 157, 118F Waterhouse Road
Monument Beach,MA 02553
To: Barnstable Building Department (508) 759-9828
From: RESCOM Architectural, Inc.
Project: Cape Codder Resort and Spa
1225 lyanough Road
Haynnis, MA
Work in Place:
1. 500 Building Interior Trim in Progress.
2. 500 Building Hallway Ceilings in Progress.
4. 600 Building Interior Wall Framing 100% Complete.
5. Masonry at the Spa Connector Stairwell.25% Complete.
All work was found to be in compliance with the Construction Documents and
780 CMR, Massachusetts State Building Code.
Items Reviewed:
1. Slopes at the interior hallway ramps were reviewed. The ramps need
To be extened approximetly V-0" to meet the required 1:10 slope.
2. As ceilings and walls are being closed up, all penetrations in the
Fire walls need to be fire caulked.
3. Details of the required drywall, Fire Damper and non-combustable
conduits where reviewed at the 2 hour wall.
S
F� In ornation
®Todd On..
" __ _. Eytgfneerleq=��Consu,�ng•T�sipng
MASONRY INSPECTION REPORT
TESTED FOR:-- WILLIAM CATANIA PROJECT: CAPE_CODDER _RESORT_&_SPA _
CATANIA HOSPITALITY 1225 IYANNOUGH RD. .HYANNIS;--.
1Y1 1<,AL,"•40CTH ROAD :.
HYANNIS, MA 02601
DATE: --- September 12-,-- 2008 -- - PSI-REPORT-WO.: 446---&0"042-4-2-- - -"
REMARKS: PRO&TTE T XNF0111ATX0.?:
Weather-t._ S_ unnY_ Temperature c -4.0 to-5.0 degrees F.
Genera. onftactor- East Coast__= Masonry Z'CIr r8C1~Oi':-Gizirlotte & Sons"
Grout Supplier: Guillotte & Sons Mortar Supplier.: Guillotte =&..Son$; , .
Grout RIG(ra.red Strength: Xor Lar Type & Required Stsengtkii
3000 psi at 28 days Type S 1800 psi at 28 days
- -- --- " - - - MIX-SNFORMATXVN
MATERIAL-cf or lbs CEMENT LIMB FINS"AGG WAT$$ . _DER
....-
Morr2arr AHOt-INT 94 !be 25 lbs 26' shovels 10 C
SOURCE Type I/II Graymont sand
- - Grout--" AMOUNT-- " 94 "lbs - 36 shovels 15 S
SOURCE Type I/II sand
CONSTRUCTION rNFORMATXON
-LOCATION AIM
__ELEVATLONg CONSTRICTED THIS DATES
Elevator shaft - courses .27-37. -- -_
VBRTICWj REINFORCING& SPACINGr_ HORIZONTAL .REINFORCING & SPACING:
-- #7 -4a" OC .__ ..__ Truss_Reinfcxcement 4-8_1.:_ OC
LOCATIONS AND ELEVATIONS GROUTED THIS W.TE.
Bond beam at first to second floor elevator shaft.
- TEST-SPSCrMEN XNF0Ri+A3?01T -
SET NO. SPECIMEN SIZE NO. OF SPECIMENS TIME AIR TEMP. STORED
S 211x2IIx2II 3 12:40Am 64- onsite
II 4"x4!1x811_.__--. S _ 09:45am . 64 onsite
locations.
Respectfully--submitted;
PROFESSIONAL SERVICE INDUSTRIES, 'INC.
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
-REPORTS MAY NOT BE"REPROOUCED..EXCEPT IN FULL..WITNOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC.
PSI A-300-IN illy Professional Service industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821.6276 iT
F,t��l
•ToBuila�Sir—
Engiieetirg nndMV• .;
REINFORCING STEEL REPORT
_ - - - _ _ —` .✓fir �' -,,.
TESTED FOR: WILLIAM CATANIA PROJECT: CAPER CODDER RESORT & SPA
-_..CATANIA HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
V 141'_FA
HYANNIS, MA 02601
DATE: September 12, 2008 PSI REPORT NO.: 446-80042-45 _
REMARKS'.- Results- of reinforcing steel -inspection orr-this date- are as-follows:
LOCATIONS INSPECTED: Slab on Grade (A-B/2-3)
1125MECTION, RESULTS--
Quantity, -as-- per approved-drawings:
Rebar_size, as per approved drawings:
Spacing within tolerance:
Splice length satisfactory:
s .
Clean: X
Tied:
REMARKS: No drawing provided for this location. PSI noted the installation
of the-following.. 6.1iXV welded.wire fabric with 1211 splice, lifted
with--hooks during placement-.-
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
cc: williamcatania@hospitalitygroup.com; gbs@rescornarch.com
REPORTS MAY NOT BE FEPROOUCEO.EXCEPT IN FULL.VVITMOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE 1NVUSTFRES.INC.
PSI A•300•IN 413F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021•Phone 781/821-2355•Fax 781/821-6276 1
11'.
mT_Build 4n
Engineeifag!Consulting:•,Ta J
- -- -REPORT OE FIELD-TESTING-OP-CONCRETE-
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE COWER RESORT- & SPA S;
CATANIA-HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA =
141_FALMOUTH-RCAU
HYANNIS, MA 02601
IOATE: Sep ember 12, 2008 PSI REPORT NO.: 446.-80042-46.-
4ELD DATA -., Conc-rete_wa-s-a-4000-psi-_a�ix adelivered.:by Cag�_'God IFeidl zx�
mix number 40GRY.
NO,OF•- CONCRETE^ _,. CUBIC--- - -. _ TEMPERATURE 9F �
- SPECIMENS _SUPPLIER- TIME TRUCK TIME TRUCK YARDSOF AIR
SET NO" MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP,in. CONTENT,% AIR _ CONCRE
-4-.. 48132.. ._- 1d:12." am 11:44 am _ ..._4.0 3 -1/2 -5.5 64 72 -•
LOCArow__. Slab-,on Grade:.
- _ NOTE.APPUCABLEASTM STANDARDS..UNLESS-OTNERWISEWDICATED=MAKING SPECIMENS:C31(EXC.SEC 10.1.2),SLUMP;C143;AIR CONTENT.C231(EXC.SEC.e):TEMPERATURE:CiOO4:SAMPLING C172
REMARKS:
Respectfully-submitted,
-Professional Service Industriiag,106
cc: williamcatania@hospitalitygroup.com; gbs@rescomarch.com
THESE.TEST RESULTS APPLY WAY TO UW_SPEGFIC SAMPLES-TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT
REPORTS MAY NOT BE REPRODUCED.EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES,INC.
Ps(a z T(e>F. Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781182i-2355•Fax 78V821-o278 r
rAPIMEM, Info
i.
F.. .To Build On
DAILY FIELD REPORT
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CORDER RESORT & SPA 'z
CATANTA-HOSPITALITY 1225 IYANNOUGS RD. HYANNIS, MA
_.. 19 LEBLMOUTEE. ROAD'
HYANNIS, MA 02611
DATE . ___. September 15, 2008 _ _ _ PSI REPORT NO..: 446-80042-48
WEATHER`_..-.. Clear
TEMPERATURE RANGE: TO TO,
INSPECTOR: "PST
— - — _TYPE OF INSPECTION BEING PERFORMED
- SOILS X CONCRETE .
FOUNDATIONS - - -- - - BATCH PLANT ...
CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE)
X Cylinder Pick-up
ASPHALT X OTHER.
--BATCH-PLANT X Grout Prisms '✓
PLACEMENT (JOB SITE) X Mortar-Cubes =
BRfEf'-RESUME-OF-WORK ACC-OMPLFSHED=T+iIS DATE: >-
A PSI:-representative, :travele&to the above= mentioned pralect -for the.. purpose-
of retrieving concrete test specimens and transporting them to the PSI
laboratory: far curing.and-further-testinq.
_ - -- Respeetfuuy sutpnitted,
- Professional Service Industries,4nc':_�. -
cc will`iamcatan a@hospitalitygrdup.com; ' gbs@rescomarch-♦com
REPMS KAr Nor BE REPRMUCM.EXGEPr IN RJU_W"10Ur'SARBTTEN PERNSSION BY PROFESSIMAC SERVCE- iNOUSTAlES:lNC
•_ P51,"00-2 V Professional Service Industries,Inc.•905 TurnpiKe Street,Suite H•Canton,MA 02021 •Phone 781,1821-2355•Fax 781/821-6276
I
_ - litw`FYF .
To Buald�n
_ Engkiee faW•ConsuAng.•Testing.
TESTED-FOR: WILLIAM CATANIA. PROJECT: CAPE CODDER RESORT & SPA
CATANIA HOSPITALITY.... 1225 IYANNOUGH RD. HYANNIS, MA-.''
141 FALMOUTH ROAD.
HYANNIS, .:MA 0; 60
DATE: September 16, 2008 PSI REPORT NO:: 446-80042-49
--- _REMARKS: Results of reinforcing. .steel inspection on this date are as follows:.
LOCATIONS INSPSCTBD: Footing F/3 C Line Stairs_._-_.__..__
--- I•NSPECTION YES,_ NO
Quantity, as per approved drawings:' X
Reber size, as per approved drawings: - X
Spacing within tolerance:
�0. Splice length-satisfactory: X _
.-Clearance,as .specif ied.:
_-Clecm: — W X
Tied: X
REMARKS: All reinforcing steel at the above referenced location was
inspected per drawing S1.0 (7/15/08) .
Respectfully--submitt-ed,_
PROFESSIONAL, SERVICE INDUSTRIES, INC.
LREP-ORMTS
lliamcatania@hospitalitygroup.com; gbs@rescomarch.com
OT BE REPRODUCED.EXCEPT IN FULL.%MTHOUT WRITTEN PERMISSION BY PROPESSIaNAL SERVICE INDUSTRIES.INC.Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821.2355•Fax 781/821.6276
I
formation
.ice s 'o Build On.
REPORT OF FIELD TESTING OF CONCRETE
TESTED FOR: WILLIAM CATANIA PROJECT: CAPE CODDER RESORT & SPA
C,.ATANIA.HOSPITALITY 1225 IYANNOUGH RD. HYANNIS, MA
141 FALM0IIT1T`•R0)
HYANNIS, MA 02601
DATE: September 16, 2008 PSI REPORT NO.: 446-130042-50 - --
FIE3LW0A7A:' ConcTeVewwrr a 4 fTf? :mix E ry erl Fsy Cape Er iar; _—
mix number 40SY"
NO.OF CONCRETE CUBIC TEMPERATURE.-F -
SPECIMENS SUPRLIM .._ TIME TRUCK- TIM TRUCK-. YARDS OF AIR-.
SET NO. MADE TICKET NUMBER DISPATCHED 'UNLOADED CONCRETE SLUMP,in. CONTENT,% AIR CONCRETE
._e
I 4 4 818.7 02.15 pm. 03-20- pm- 7.0• 4 1:8- 74 76`
p>tr -04:;Fys,_pm_`_ 7=0 _
' - I
F
LOCANIOW Footings--.- F{3---16-c- line_@�:&Eairs
I Footing,:F/3..
11:' C. line w-stairs - - -
'=x
-NOTE APPLICABLE ASTM STANDARDS. UNLESS OTHERWISE INDICATED:MAKING SPECIMENS:C31(EXC.SEC.10.1.2):SLUMP:C143:AIR CONTENT:C231(EXC.SEC.61:TEMPERATURE:610U.SAMPLING:C172
REMARKS: �
- Professional Service Industries, lr1c:
-wil-11-amcat=d—aVhosgit -1-itygroup.-can, ghsorescomarch.com
THESE_TEST-RESULLSead Y ONLY TQTHESEEMIC.SAMPLESSESTED.AND ULY.MaT-BEMI LYECIE THEENrIRE.COM:RETEPLACEMENT -
REPORTS MAY NOT BE REPRODUCED,EXCEPT IN FULL.WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES.INC. -
P.A•7004(b)F Professional Service Industries,Inc.•905 Turnpike Street,Suite H•Canton,MA 02021 •Phone 781/821-2355•Fax 781/821-6276