Tel: 508-398-0398 Fag: 508-398-0399
5/20/19
BtIlLDING D
Brian Florence CBO EPT.
Town of Barnstable MAY 2 8 2019
Building Division TOw
200 Main St. N OF RARNSTA8L
Hyannis,MA 02601
RE: Insulation Permit B-19-1592
Dear Mr. Florence:
This affidavit is to certify that all work completed for 43 Kelley Road, Hyannis has been
inspected by a third party Certified Building Performance Institute(BPI)Inspector.
All work performed meets or exceeds Federal and State Requirements.
Sincerely,
William McCluskey
,. Town of Barnstable ii11d1ri
s= r. So That.it is:Uis�ble-From:the Street A roved plans,Must,be Retained on Joband;this Card Mustbe>Ke t
Post This Cad
MAMIL
osted Until:Finallnspection Has Been�Made �,
R Where aCerti
P ficate of,Occu anc �s,Re wired such Buildm shall Not be:0eeu �ed.:until a,Finallns ect�onhasbe n made Permit
Permit No. B-19-1592 Applicant Name: William McCluskey Approvals
Date Issued: 05/14/2019 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 11/14/2019 Foundation:
Location: 43 KELLEY ROAD, HYANNIS Map/Lot: 292 068 Zoning District: RB Sheathing:
Owner on Record: ORTIZ, EDWIN&MAUREEN E in ractor-Name{ WILLIAM J MCCLUSKEY Framing: 1
Con#�ractor License: CSSL-102776
Address: 43 KELLEY ROAD - , 2
_- x .. .' ... .
HYANNIS, MA 02601 Est Project Cost: $5,000.00 Chimney:
Description: Add R-30 cellulose,and R-38 fiberglass to the attic Add R 19 Permit Fee: $85.00
fiberglass,and R-10 rigid insulation to the basement Alr"seal the Insulation:
,.
Fee Pald. $85.00
attic plane and basement with expanding foamy General% z
D Final:
weatherization. A ate 5/14/2019
a� w
Plumbing/Gas
Project Review Req:
��A Rough Plumbing:
3 '. ....; Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authori ed by this permit is commenced within six,months after issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documerits for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall bye in compliance with the local zoriing,by laws and codes.
if i Final Gas:
This permit shall be displayed in a location clearly visible from access street or roadand shall be maintained open for publ,c inspection for the entire duration of the
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Buildmg and Fire Officials are providedon thif'ermit.
Minimum of Five Call Inspections Required for All Construction Work:` Service:
JVIo u '�1.� sS . �.
1.Foundation or Footing Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
cR Fire Department
- Building plans are to be available on site
�' All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: