Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0094 MAIN STREET (HYANNIS)
! �'���� i J �. t 5 i i �� ;► I, _-- .�_ ._ __ .___ _ _ _ __ f� �: Final Construction Control Document H To be submitted at completion of construction by a R , a Registered Design Professional M JOvey for work per the 91h edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.4 " Project Title: Duffy Health Center Date:7-1-19 Permit No. w �. c Property Address: 94 Main Street,Hyannis Project: Check(x) one or both as applicable: New construction XX Existing Constructiod Project description: Expansion of work room into waiting room I David J Vachon MA Registration Number: 7471 Expiration date: Sept 31,2019 , am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Entire Project XX Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project. I certify that I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. S��AED AR�yi Enter in the space to the right a"wet"or electronic signature and seal: Q DA ,J C H No 1= MAN, Jy PG Phone number: Email: (TH of 0 Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Trial Version 10_09 2012 Town of Barnstable Building Post This CardSoThat'it is pproued;P1�1lans Must be;Retained own fob and this Card Must;.be Kept BARI+SBT68Lt. " tea,. � �`x '. _ _ x ., ^� x C y. s • Posted Until Finallnspection Hasp Been Made �, �.., _ � "�r + Where a`Certificate-of OccupancyisRequtred,suchBuildmg shall Not be Occupied ntl a�F nal�lnspectort ,as�been made Permit _o.. Permit NO. B-19-1883 Applicant Name: Roland Catignani Approvals Date Issued: 06/12/2019 Current Use: Structure Permit Type: Building-Alteration INTERIOR Work Only- Expiration Date: 12/12/2019 Foundation: Commercial Map/Lot 327-195 Zoning District: MS Sheathing: Location: 94 MAIN STREET(HYANNIS), HYANNIS Contractor Name: ROLAND B CATIGNANI Framing: 1 Owner on Record: EAST MAIN STREET DEV LLC Contractor License: CS-005157 2 Address: 4 LICHEN LANE Est Project Cost: $ 15,330.00 Chimney: FORESTDALE, MA 02644 Permit Fee: $239.50 Insulation: Description: Expand the current 1st floor Provider Room into the,Waiting area. Fee Paid', $239.50 Adding approximately 72 SF to the existing root° Thi'szproject _ Final: includes demolition of a non-bearing petition.'waII"' Wuoiking of Date 6/12/2019 qr ceiling grids,and minor electrical work. F :f Plumbing/Gas Project Review Req: { s g Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authonzedby this permit is commenced within six months after issuance. I"K �t All work authorized by this permit shall conform to the approved application and the;approved construction documents for whichthis permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoningyby laws and codes. This permit shall be displayed in a location clearly visible from access street or roadA nd shall be maintained open for public mspectin for the entire duration of the Final Gas: work until the completion of the same. s { Electrical The Certificate of Occupancy will not be issued until all applicable signatures byIhe Bu lid mg and;Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work x Service: 1.Foundation or Footing " 2.Sheathing Inspection vlE Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed priorto Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall n oceed until the Inspector has approved the various stages of construction. Final: "Perso contracting 'th unregistered contractors do not have access to the guaranty fund" (asset forth in MGL c.142A). Building plans are to be available on site Fire Department 1 Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: o Pf Town of Barnstable R�E�EIT " , " 200 Main Street, Hyannis MA 02601 508-862-4038 "� � a Application for Building Permit Application No: TB-18-631 Date Recteved: 3/1/2018 Job Location: 94 MAIN STREET(HYANNIS),HYANNIS b Permit For: Building-Alteration INTERIOR Work Only-Commercial (l Contractor's Name: ROLAND B CATIGNANI State Lic. No: CS-005157 Address: Centerville, MA 02632 Applicant Phone: (508) 888-6555 (Home)Owner's Name: EAST MAIN STREET DEV LLC Phone: (508)45070550 (Home)Owner's Address: 4 LICHEN LANE, FORESTDALE,MA 02644 Work Description: Revisions to interior layout for tenant fit up. Total Value Of Work To Be Performed: $105,000.00 Structure Size: 0.00 0.00 0.00 Width Depth Total Area C I hereby swear and attest that I will require proof of workers'compensation insurance for every contractor,subcontractor,or other worker before he/she engages in work on the above property in accordance with the Workers' Compensation Act(Chapter 568). I understand that pursuant to 31-275 C.G.S.,officers of a corporation and partners in a partnership may elect to be excluded from coverage by filing a waiver with the appropriate District Office;and that a sole proprietor of a business is not required to have coverage unless he files his intent to accept coverage. I hereby certify that I am the owner of the property which is the subject of this application or the authorized agent of the property owner and have been authorized to make this application. I understand that when a permit is issued,it is a permit to proceed and grants no right to violate the Massachusetts State Building Code or any other code,ordinance or statute,regardless of what might be shown or omitted on the submitted plans and specifications. All information contained within is true and accurate to the best of my knowledge and belief. All permits approved are subject to inspections performed by a representative of this office. Requests for inspections must be made at least 24 hours in advance. Signed: Roland Catignani 3/1/2018 (508)888-6555 Applicant Date Telephone No. Estimated Construction Costs/Permit Fees Total Project Cost : $105,000.00 Date Paid Amount Paid Check#or CC# Pay Type Total Permit Fee: $1,130.50 3/6/2018 1 $1 130.50 32556 Check .... .........£ .. ....... _.. Total Permit Fee Paid: $1,130.50 10'-1 a/A' I0._7. / 10'-2 1/4' Y-o 1/e' / T'—o 3/a. 3 3 PER LOCKERS REMOiE PARK SURFACE THIS ROOM ` . _ STAFF AREA OFFICE SGE 1 . 0 O .. 1 ' 01llo 07I I I i MAa MEDICAL SUPPLY I a 2 Oj 0.7 0.6 . ..-... ._ .OFFICE OFFICE MEETING ROOM CORRIDOR_———— VR URFACE015 OISa O18 HANICAL ROOM O6 02 ., PUBUC Y`o. 0 ENV SERVICES PUOMP..05 03 LOBBY .;...OS ..' ,.._ i STAFF '012 I '. '04 2 2. Z.. 07 I 0.2 OFFICE I I D,7 I I MACH RM I. .( CONFERENCE ROOM I a .. OFFICE F09-1 STOR 0.1 018 STORAGE I I-DINING/CONFERENCE 4 Ol 01u f 2 I- 10 5/8 CORRIDOR SUDWG PATIO D79 _ F i DOORS(4)PANEL KITCHEN TEL/DATA OFFICE' 06 ... .. G 020 0T7 F ------------ F WALL TVES: )_ INFlLLTO MATCH ADJACENT CONSTRIICPON z TTf•T- '3 5/8-METALS STUDS 20'GA-,Q 16'O.C.with 5/8' - .,.. tdMLdNd GYPSUM WALLBOARD EA CN.SIDE.EXTEND STUDS TO UNDERSIDE OF FLOOR DECK.EXTEND GYPSUM WAU90ARD TO 6'ABOVE:FINISH CEIUNG.'PROVIDE .. 3'SOUND.'BATT INSULATION'TO 6'ABOVE CLUING ' —1— 3 5/8'METAL STUDS 20 GA®16'O.C.with 5/8. } I GYPSUM WALLBOARD EACH SIDE.EXTEND STUDS.TO - .. UNDERSIDE OFFLOOR-DECK.EXTEND GYPSUM WALLBOARD TO 6'ABOVE FINISH CEIUNG.. � TTT�T� 3 5/6'METAL.STUDS.20 GA O 16'O.G wlth 2 LAYERS - 4 /Ln'/L/ 5/8 GYPSUM WALLBOARD EACH SIDE EXTEND SNDS - 1 a t t a AND WA1180AR0 TO UNDETi510E.�.pECK,PRONOE FIRE RATED SEALANT FILL L CAVITY VATH 'SOUND:BAT IN FILE No.-WP 1502.FILL CAVITY WI7H 3"SOUND:BAIT (fir(J 1L INSULATION. - J § M3 1 - - 0' a MAIL a E� Irv... LEE .:. 131 c . EXISTING-WALL'TOREMAIN.. ------------ EXISTING WALL TO k REMOVED: SHADED:AREA.DENOTES NEW.CEIUNG . 7,7 NEW WALL SEE-WALL TYRES PROVIDER RM 118 (SYSTEM FURNITURE (SYSTEM FURNITURE BY OTHERS) - BY OTHERS) REGISTRATION 117 I EXAM qEX.ND EXAM 119 12017 ��` MAWORK RN128: 5E5NURSE NURSECORR. 'i STATION STATION t REMOVE COUNTERTOP 1'-9 1/8'RF�RN 1 REF. :� L2 O PATEN Mltp - WORK ROOM .., .., 1 I EXAM PUBLIC 'SPECIMEN HOLDING ]� LAB r RECEPTION DESK t EXAM RM SPE09 f: ® SERVICES 111. I t16 ' © 122 26 12 0 "I 1 •� Z o , ❑ A EN CORR. 1t�T I EXAM �13_ �r .. ' CHE.N CHEM IN EXAM . - MED'PREP - h•� 130 131 ROOM - • 112 NEF ... '.. NEW RECEPTION DESK ' - �'- OEEAN CASEWORK SEE ELEV. ' WORK 123 .. NEW BASE'K WALL CABS wAl1 R00M a� NEW BASE h ENV SERVICES 1002 WALL toes 106 EO WORK EXAM EXAM . . -- 103 ® REA LOBBY 132 t ._I A- ' 133 124 .1 J. El [El El :: . W4IEELCHAIR ,. STORAGE Fl VESTIBULE AA = .. CLEAN CLOS .. ' .. 1240 .. WALL TYPES: INFILL TOMATCH ADJACENT�CONSTRUCTION ' TTf-Tl 3 5/8"METALS STUDS 20 CA 16 �0:6:rt 5/8 1Nd111Nd GYPSUM WALLBOARD EACH SIDE EXTEND STUDS TO UNDER WALLBSIDE aF BOOR OECK..EXTFTlDCYPSUM'. .. OARD TO 6"ABOVE.FINISN-CEILING.PROMDE' _ 3"SOUND GATT INSULATOl1.TO 6"ABOVE CETUNG : - - Z 3 5/8"METAL:STUDS 26 GAO O.C.with.5/8" ' GYPSUM.WALLBOARD EACH-SIDE EXTEND STUDS TO UNDERSIDE OF BOOR DECK:EXTEND GYPSUM UWA NDERSIDE F 6"ABOVE .NISHEXTEND CEILING. - 3 5/8"METAL STUDS 20 GA O 16"O.C:with 2 LAYERS5/8'GYPSUM ff -n- �dL1d AND WALLBOARD WA 0 UNDERSIDE OF DECK.PROVIDEOS FIRE RATED SEALANT AT PERIMETER AND PENETRATIONS. GA'FILE N..WP 1502.FILL CAVITY WISH 3"SOUND BATT w x 3_ kQ142 O c al Sm- z x v d II .. EXISTING WALL TO REMAIN .ram ... .. EXISTING WALL TO BE REUOYID - - SHADED.AREA DENOTES NEW CEILING NEW WALLSEEWALL-TYPES - - - c (SYSTE)j OTHERS) BY(SYSTEM FURNITURE BY BY OTHERS) OFFICE OFFICE OFFICE - F2-22-1 F2231 224 - FICE - ri OFFICE.. 229 . WORK AREA NURSE TAMONS 9'-0 5/8" 3 5/8 8'-7 1/4" 3 5/8" 9'-7 1/4" 3 5/8" 9'-3 1/8' r 7 3 2.2 STAFF I -N I CASEYA 210A. EXAMMF��jNFCHBUIL THERAPY CONSULT REGISTRATION REGISTRATION PATIENT LT.T51411DARD: RAPY - I 213 2 -,214 2 2140 2 r.216 �. 226 .222 F(fR LOCAT (18 µ_, CORRIDOR o CORK 2361 ——————.\ �� LOBBI ' 218 R' CONSULT I� HIATRY THERAPY.. THERAPY SNARED OFFICE WAITING 233. 1 220 �. - 209 219 '217 REMOW WALLS}(NO CASEWORK THISARE A .. I GRaQ OM - - I 232 . 3 WORK AREA RR 2.5 1 I. IIATRY" _. I _ �T I. - ENV I ... 235' VICES .. 238 THERAPY THERAPY - 3 � � .. 203 202 I ......: a d I CHECK M NEW .. 201 SEE ELEVATIONS ———— — —— - 'ter SOBFD HOLDING 234. WALL WS: . . - _ .... INFILL TO MATCH.'AD3ACENT CONSTRUCTION - �T--��} 3 5/8"METALS:STUDS 20 GA'6'.16"B.C..wft'5/8". . Z 1Tf1-N. GYPSUM WALLBOARD EACH SEE.EXTEND STUDS TO - .. ILLS UNDERSIDE OF FLOat:DECK.-EXTEND GTPwM ... WAUBOARD TO'.5":ABOVE:FIM51i+CELJNG:.PROVIDE- - - S SOUND:BATT.:IN5NLA710N TO�6"ABOVE CEllING - 3.5/8'METAL STUDS 10 :S 0..16"O.C.STUDS/TO 3 GYPSUM WALLBOARD FLOO EDECK.EX ND GYPSUM STUDS 117 - \ WALLBOUNDERSARD OF FLOOR DECK.FINISH CEILING. GYPSUM V I► . WP1180ARD TO 6.--ABOVE FWISH'CEWNG.. - - 3 5/8"METAL STUDS 20 GA 0:16"O.C.M h 2..LAYERS. ¢ 5/8'.CYPSUM WALLBOARD EACH.SIDE EXTEND STUDS AND.WALiBOARO TO UNDERSIDE.OF DECK:PROVIDE FIRE RATED SEALANT AT.PERIHETER AND PENETRATIONS. FILL - - GA FILE NG.WP:1501 FILL CAVITY WITH r_ SOUND BATT .. - .. INSULATION.- . c)q pip ks+ e N EMSnNG WALL TO REMMN Fn qgg EMSTING WALL TO eE:iENOUEn- - .. - _. - ;. .SHADED.AREA DENOTES:NEW CEILING' ` NEW WAIL SEE WAIL TYPES. A0D r� --------------- o OFFICE ' 2 303 . ... ....... ..... _... .._.. .._ \ ENV SERVICES "3 5/8- 2 I . \ .. 307 Q _ 3.2 TOILET I. UNISEX n / f OFFICE 2 2 302 -5 -- OPEN OFFICE AREA 3 . (SYSTEM FURNITURE 8Y OTHERS) ro 2 / - LOBBY .. _ t / MECHANICAL - MECHANICAL �. '.. -I - BILLING ... .. . m tJ WALL TYPES: - INFILL TO MATCH ADJACENT.CONSTRUCTION T�}'^7't S s/8'METALS STUDS 20:CA 16'O.C. fth 5/8' GYP L 1 / SUM WALLBOARD EACH.SIDE EXTEND STUDS.TO " tBJ.sd UNDERSIDE-OF-FLOOR DECK.EXTEND GYPSUM - .. WALLBOARD TO 6'ABOVE,FINISH.CEIUNC.PROVIDE. 3'SOUND BATT INSULATION TO 6"ABOVE CEILING - 3 5/8-METAL STUDS 20-GA O 16-O.C.with 5/8� - 3 GYPSUM WALLBOARD EACH SIDE EXTEND STUDS T0. .. . 1� UNDERSIDE OF FLOOR DECK.EXTEND GYPSUM . WALIBOARD TO 6'ABOVE FINISH CEILING.. - - - S G METAL STUDS 20 GAO 1SI O.C.w111'2 LAYERS ¢. 5/8'GYPSUM:WALLBOARD uAR0 EACH SIDDE K.PR'IDE ANO WALLBOARD TO UNDERSIDE OF DECK.PROVIDE FIRE RATED SEALANT 150 AT PERIMETERCAVITY AND PENETRATIONS' -INSULACA TION. No.WP 1502'FILL CAY77Y YATN 3"SOUND-BATT INSULATON. 9y vn sT 1 I I'; I --- - --------- � r I L� I J /L"L REMOVE INTERIOR WALLS AS SHOWN INCLCABINETS DOORS.FLOOR FINISHES ANDU T FIXTURE IN ITS ENTIRETYRELOCATE' PATCH WALLS AND CEII.INC(GWB)W3:4REQUIRED FROM DEMOLITION OF \ J I I SEE PROPOSED PLAN FOR NEW LAYOUT — -�'1 r -------- - ---= P r== / MECHANICAL _ - LoJ 3.T RELOCATE - MECHANICAL - I .I 3 y m -sl ----------- -- o � L I I � I I � I I . --- ---- NEW ACOUSTICCEILING ENTIRE FLOOR --o NEW:LED LIGHT FIXTURE - - - SPRINKLER LAYOUT NEW HEAD LOCATIONS 3P-D FL C I�E_tL30 G Town of Barnstable • �F�HE lq�, Building Department Services do Brian Florence, CBO ST" Building Commissioner BARNS TABLE M MASS. ma `os°lxv".ice,"wm'ec 1639. � 200 Main Street, Hyannis,MA 02601 1829-2914 ArED MA'S A www.town.barnstable.maxs Office: 508-862-4038 Fax: 508-790-6230 December 7, 2017 Duffy Health Center, Inc. c/o Andrew L. Singer, Esq. �ti Law Office of Singer& Singer, LLC P. O. Box 67 Dennisport, MA 02639 RE: Site Plan_Review 068-17 Duffy Health Center;Inc. 94 Ma nnaS.treet,-Hyannis Map327,-Parce1i9:95, Proposal: Interior renovations to all levels within the existing building including conversion of two (2) apartments on the upper level to medical office use as part of the existing medical office use of the remainder of the building. A parking analysis showing required parking demand and the existing parking on and off-site was reviewed. Modification of the existing Planning Board Special Permit 2008-02. Dear Attorney Singer: The above proposal was found to be administratively approvable at the November 21, 2017 staff meeting and is subject to the following: • Approval is based upon the existing site plans as cited in the 2008 Special Permit decision, entitled "Mixed Use Development—94 Main Street and 26 Camp Street, Hyannis", 7 Sheets dated June 9, 2008 with final revision August 19, 2008 prepared by BSC Group, West Yarmouth for Consery Group, Inc. Sagamore Beach, MA. • Floor plans depicting the proposed revised uses entitled: "Proposed Tenant Modifications for Duffy Health Center—94 Main Street, Hyannis" consisting of 4 sheets: Basement Plan, First Floor Plan, Second Floor Plan, and Third Floor Plan dated September 15, 2017 prepared by Consery Group Inc., Sagamore Beach, MA for Duffy Health Center.. • "Parking Inventory Plan— Duffy Health Center". (attached) depicting 38 parking spaces located onsite at 94 Main Street and identifying the location of 25 total additional offsite parking spaces: 15 at Seaport, 6 at Camp Street, and 4 at Cedar Street. • The granting of a modification of Planning Board Special Permit 2008-02 will be required to authorize the conversion of the existing two apartments to medical office use. • Applicant must obtain all other applicable permits, licenses and approvals required. A copy of this approval letter will be retained on file in the Building Department. Sincerely, C Ellen M. Swiniarski Site Plan Review Coordinator CC: CBrian Florence, Building Commiss_ i oner-", Health Department Planning Board Attachment: Duffy Health Center— Parking Inventory Duffy Health Center Parking Inventory 1 2 3 4 5 6l 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 HandicapHandicap Buss ace Handicap 26 27 28 29 30 31 32 33 34 5 P P P 3 94 Main Street Plus 35 94 Main Street .15 Seaport 194 Main Street HC 6 Camp Street 38 Total 4 Cedar Street - 25 total Summary 94 Main -38 Offsite 25 xt„ � total 63 t. '> Notes: 14,000 square feet%300=47 parking spaces required by regulation (one parking space per 360 square feet) 11✓0512088 12:20 5088886566 CONSERV GROUP INC PAGE 02/02 August 11,2008 Park Square Professional Building, LLC 110 Main Street Hyannis,MA 02601 To Whom It May Concern'. Please accept this letter on behalf of the owners of Camp Street Professional Building, LLC as notification of use of six(6) parking spots located on the properties of 65-69 Camp Street in Hyannis, MA 02601, Cly, Respectfully,en Owner, Manager Camp Street Professional Building, �LC r Bi-, 23193 Po280 --51486 16 i--O 5.3--21_6bv a 12 = 21 P BARNS�MA CEP 11 f i679 `d prFO MPt► Town of Barnstable Planning Board Decision and Notice Special Permit 2008-02 Special Permit §.240-24.1.4 and §240-24.1.10 Summary: Granted with Conditions Petitioner: Park Square Professional Building, LLC Property Address: 94 Main Street and 26 Camp Street, Hyannis, MA Assessor's Map: 327 Parcels: 192 and 195 Zoning: Medical Services Zoning District and Wellhead Protection Overlay District Deed: Book 7606, Page 076 = 94 Main Street Book 8444, Page 281 = 26 Camp Street Relief Requested & Background: In this Special Permit request#2008-002 under Section 240-24.1.4 MS Zoning District, the applicant requests permission to construct to construct a 16,450 SF building and seeks relief under: Relief requested on the application • § 240-24.1.4.B Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'; § 240.24.1.10.A Site development standards ■ Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer ' bCIVVEEI 11 property lines and parking spaces reduced iv^ a-i i iii iii i iUi i i ^vi 3.2 - ■ Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4'with additional screening in buffer Relief requested through applicant's public hearing testimony • § 240-21.1.1 D.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six- foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. on the subject property subject to issuance of a Special Permit. Applicant is Park Square Professional Building, LLC and shown on Assessor's Map 327 as Parcel 192 and 195 in the MS District and the Wellhead Protection Overlay District. The parcel is located on the north side of Main Street w�th frontage nn Camp Street and Cedar Street. The application site plan entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206 shows existing conditions including four Park Square Professional Building Special Permit 2008-0.2 lNkap 327,Parcels 192 and 195 1 structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and one shared access for 94 Main Street on Main Street and landscaped areas. The plan set also includes a Layout Plan showing a 2.5 story medical office building with two residential units in the half story,.a Grading, Drainage and Utilities Plan, landscape Plan and two Detail sheets showing the structures, impervious and landscaped areas and a single family residence that are the subject of the applicant's proposal. The property gained Site Plan Review approval#031-08 with conditions for removal of residence at 94 Main Street; preserve residence at 26 Camp Street with removal of garage. Construction of new 2.5 story medical office building with 2 apartments. No other site changes are proposed. The approval letter is dated August 22, 2008 and is attached to this decision. Procedural & Hearing Summary: This special permit request was filed at the Town Clerk's Office and at the Office of the Planning Board on July 24, 2008. A public hearing before the Planning Board was duly advertised and notice sent to all abutters in accordance with MGL Chapter 40A. The hearing opened on August 11, 2008, was continued on August 25, 2008. The public hearing was closed on August 25, 2008. Paul Curley, Ray Lang, David Munsell, Felicia Penn, Patrick Princi, and Marlene Weir were the Board Members deciding this special permit request. On August 11, 2008, the public hearing was opened. Roy Catignani of ConSery Group, Inc. appeared before the Board. Brian Yergatian of BSC Group also made presentations on behalf of the application. Public comment was requested. None was given. The Planning Board discussed the application with the applicant. The Planning Board voted to continue the public hearing on August 25, 2008. On August 25, 2008, the Board discussed the proposal with the applicant and the applicant's representatives. Public comment was requested and none was given. The public hearing was closed upon a motion by Felicia Penn, seconded by Ray Lang with a unanimous vote. No public comment was submitted to the Board in writing. During the public hearing the Board heard the comments of those present, discussed the proposed plans, material submitted with the application, the presentation made by the applicant and the applicant's representatives and the application of the MS and WP Zoning and the spirit and intent of the Zoning Code. Findings of Fact At the hearing of September 8, 2008, the Board unanimously made the following findings of fact: 1. Special Permit Request 2007- 012, seeks relief, under Relief requested on the application • § 240-24.1.4.13 Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'; • § 240.24.1.10.A Site development standards Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4'with additional screening in buffer. Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4)Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be 2 provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. 2. Property location is 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels 192 and 195 in the MS District and Wellhead Protection Overlay District. 3. The property that is the subject of this application is located within the Hyannis Growth Incentive Zone and is therefore exempt from Cape Cod Commission jurisdiction. 4. The proposal that,is the subject of this application complies with the certified Comprehensive Plan. 5. The proposal gained site plan approval #031-08 from Site Plan Review. 6. The proposal for 94 Main Street, Hyannis received approval from Hyannis Main Street Waterfront Historic District Commission on April 18, 2008 to demolish the existing 94 Main Street building. The HMSWHDC reserves final review for actual building design and elevation of the building exterior. The 26 Camp Street property is to remain unchanged. 7. The site is a developed site, as shown on the plan "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008", including four structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and two shared driveways for 94 Main Street and an adjoining property 110 Main Street and landscaped areas. 8. The shared driveways are located on Main Street and Cedar Street. An existing driveway on the 110 Main Street property is proposed to be eliminated to improve access through proposed shared driveways as described above and as shown on the plan. 9. This plan also shows the location of the proposed 2.5 story medical office building with two residential units in the half story and a single family residence at 26 Camp Street that are the subject of the applicant's proposal. 10. The 94 Main Street property is currently used as an office building and the 26 Camp Street property is used as a single-family residence. 11. The proposal meets the requirements of§ 240.24.1.2 E. specifically that the proposal complies with the provisions of this zoning ordinance and is consistent with the applicable criteria for granting Special Permits. 12. The requirements of§ 240-24.1.4 MS District are met in that the proposed use presents the mixed use medically oriented development desirable within this district. 13. T he site meets the Wellhead Protection District requirements for 50% or less lot coverage. Proposed lot coverage is 49.7%. Dimensional, Bulk and Other Requirements 14. The proposal as shown on the plans meets the requirements of§ 240.24.1.4.C. with the exception of Subsection (1) (b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'. Site Development Standards 15. Section 240-§ 240.24.1.10.A are met with the exception of: • Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4' with additional screening in buffer. 3 • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations:: 16. Proposed landscaping will enhance the site and provide visual relief from proposed and existing paved areas. Design and Infrastructure Plan 17. § 240.24.11 Design and Infrastructure Plan requirements are met in that the impact on the visual character of surrounding neighborhoods and the community remains unchanged and is in some instances enhanced by the proposed development design; housing opportunities are provided; proposal preserves a shared driveway; allows private investment that supports appropriate economic development. 18. Lighting plan has not been submitted; no finding made as to consistency with the DIP for lighting design. 19. Stormwater management meets DIP standards. 20. Local knowledge of parking for medical office use with associated ancillary uses indicates that existing parking requirements under zoning may not be adequate for client and staff parking. Decision Based on the findings of fact, a motion was duly made by Felicia Penn and seconded by David Munsell to grant a Special Permit pursuant to Sections 240-24.1.4.13, 240.24.1.4.C.(1)(b) and 240.24.1.10.A Subsection (4) (d)[2] and (5)(c) which allows the development of a 16,450 SF buildingfor 2.5 story medical office building with two residential units in the half story at 94 Main �Y 9 �' Street, a .63 acre parcel, and to continue single family residential use at 26 Camp Street, a .28 acre property, only insofar as such relief is necessary to construct the buildings as shown on the above referenced approved plan. Applicant is Park Square Professional building, LLC and the property location is addressed 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels192 and 195 in the MS District and the Wellhead Protection Overlay District. The use is allowed only in strict conformance to the following: Conditions: 1. Applicant shall construct the project in conformance to the plan, sheets 1 through 7, entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA' dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206. 2. This site and any development or redevelopment thereof shall, at all times, comply with the conditions of this special permit. 3. Copies of the final building design elevations as finally approved by HMSWHDC shall be provided to the Planning Board for their record before the issuance of any building permits pursuant to the relief granted herein. Should this approval cause changes to the site design, layout:or require further dimensional relief, an amendment to this special permit shall be obtained prior to the issuance of any building permits pursuant to the relief granted herein. 4. Any change to building use from that permitted herein shall require amendment to this special permit. This includes a change in the percentage of medical office and/or residential use at the 94 Main Street property and any change to the single family residential use at the 26 Camp Street property. 4 5. A detailed site and building lighting plan shall be submitted to the Planning Board for review and approval by the Board or its designee. 6. Applicant has indicated that six parking spaces, in excess of zoning requirements, will be provided off-site. An agreement permitting this use of the off-site property, the location of the off-site property and a plan showing at least six existing spaces on the off-site property shall be submitted to the Building Commissioner before the issuance of a Certificate of Occupancy. One year after the facility is fully leased out the property owner may request the off-site parking requirement to be removed. This request shall be reviewed by the Building Commissioner and the results of the review forwarded to the Planning Board for action by the Board or its designee. 7. Prior to the issuance of any foundation building permit, Developer will provide surety $6200 the form and content of which is acceptable to the Town Attorney, shall be posted with the Town Treasurer to be expended on the replacement of landscape materials if such replacement becomes necessary. Any unexpended portion of said performance bond may be released by the Planning Board to Developer or his successor(s) after three years from the date of the initial landscape plantings, such date to be determined by the Building Commissioner, upon the request of Developer. 8. Any existing sidewalks that may be disturbed, removed, or otherwise disrupted as a result of construction pursuant to this special permit shall be repaired to the satisfaction of the Department of Public Works prior to the issuance of a Certificate of Occupancy for the 94 Main Street building. 9. Conditions of the Site Plan approval letter dated August 22, 2008 are hereby incorporated as conditions of this special permit. 10. Developer and its successors will participate in the Town of Barnstable's Transportation Management Association (TMA) upon its formation. Participation shall include: (a) distribution of materials provided by the Town to all tenants, lessees, and purchasers of condominium units within the development; and (b)the identification of a representative for the development who will serve as the contact between the inhabitants and tenants of the development and the Town's TMA. Ordered: Special Permit 2008-002 is granted with conditions as described herein. T his decision must be recorded at the Registry of Deeds for it to be in effect. The relief authorized by this decision must be exercised in one year. Appeals of this decision, if any, shall be made pursuant to MGL Chap 40A, Seca 17, within twenty (20) days after the date of the filing of this decision, a co f which m st e filed in the office of the Town CIe�. All 2008 r � Felicia Penn, Vice Chairman Date Signed I, Linda Hutchenrider, Clerk of the Town of Barnstable, Barnstable County, Massachusetts, hereby certify that twenty (20) days have elapsed since the Planning Board filed this decision and that no appeal of the decision.has beerL-filed in the office of the Town Clerk. CK/ 1 �._.•.. Signed and sealed this _day of . . , G 1 under the pains and penalties of perjury. - .r Linda Hutchenrider, Town Clerk 5 PROOF OF PUBLICATION TOWN AR OF BNSTABLE PLANNING BOARD NOTICE OF PUBLIC HEARING MONDAY;:AUGUS.T.11 2068;7:06 PM NEW TOWN HALL,SECOND FLOOR HEARING:ROOM . 367 MAIN STREET HYANNIS MA To all persons-deemed interested in the Planning Board acting . under Chapier.40A;Section 9 and all amendments'ther.46of the General Laws ofthe Commorivrealth of Massachusetts and the Tbv n of. BamstabfeZornng Ordinances,•specifically Section 240 24,1.Hyannis Village. H Zoning bistricts;you are Hereby notified ofa P..ublic Hearing to be held on Monday,August 11;2008 at 7.00 PM in the He Room bf the Barnstable Town'Hall,367 Mam Street,. yannis MA to consider Special PermitApplication 20Mt 2 fora nonresidential development greater than 16,006 sf/mixed use development pursii- ant to Section 240-24.1.4 B Special Permits;°Dimensional,Bulk and other.requirements pursuant td,Sectio(240-24 14C;and for Site Developmeni5tandardspursuanttoSection24024.1.10 Applicant:' is Park Square Professional Building,LC and the property location is addressed 94 Main Street and 26 Camp Street,Hyannis;MAand shown on Assessor's Map:327.as Parcels 192&195 in.the Hyannis Medical Services District. ' Copies of,the applications and plans are available for review in the. Office ofthe'Planning Board,200 Main Street,Hyannis.,MAbetween the hours of 8 30 AM to 4:30 PM,Monday through Friday Patrick Prinel,Chairman. Planning Board The Barnstable Patriot July 25 and.Au ist 1, 2008 I XGII.tteT.Report Page 1 of 4 Planning Board Special Permit Abutter List for Map & Parcel(s): '327192','327195' Parties of interest are those directly opposite the subject lot on any public or private street or way and abutters to abutters within 300 feet ring of subject property. Total Count: 78 Close Map &Parcel Ownerl Owner2 Addressl Address 2 Mailing Country De CityStateZip 327175 ARENSTRUP, PARK SQUARE TRUST PO BOX 2248 HYANNIS, MA 54� RICHARD D TRS II 02601 CAREY, CHARLES J THE 146 MAIN W DENNIS, MA 327176 TR STREET REALTY 117 POND ST 02670 21. TRUST PISACANO MARGO HYANNISPORT, 327178 & PISACANO,CHARLES P 0 BOX 126 MA 02647 18 WHARTON CAMP SHELL REALTY 73 HARBOR BLUFFS HYANNIS, MA 327179 PISACANO, MARGO TRUST. RD 02601 201 &CHARLES TRS 327180 VOEGELI, KEVIN 19 CAMP ST HYANNIS, MA 13: LEE&ALICIA 02601 327181 TYLER,30NATHAN 2 LYNXHOLM CT HYANNIS, MA 18: 02601 327182 TYLER,JONATHAN TYLER REALTY TRUST 2 LYNXHOLM CT HYANNIS, MA USA 13: M TR 02601 327183 TYLER,30NATHAN 2 LYNXHOLM COURT HYANNIS, MA USA 22, M 02601 327184 LITTLE,JAMES L 5 LYNXHOLM COURT HYANNIS, MA USA 94: 02601 327185 PRADA, SORAYA 3 LYNXHOLM COURT HYANNIS, MA USA 19' 02601 327186 SHAPIRO,GARY L THE PREPPER REALTY ONE LYNXHOLM HYANNIS, MA USA 51� TRS TRUST COURT 02601 327187 VOEGELI, KEVIN & 19 CAMP ST HYANNIS, MA USA 19, ALICIA 02601 32719000A HOGAN,JOHN F 48 CAMP ST- UNIT HYANNIS, MA. USA 19: 1 02601 ` 32719000B HOGAN,JOHN F 48 CAMP ST- UNIT HY601 ANNIS, MA USA 19: 32719000C HOGAN,JOHN F 48 CAMP ST- UNIT HYANNIS, MA USA 19: 1 02601 32719000D HOGAN,JOHN F 48 CAMP ST- UNIT HYANNIS, MA USA 19: 1 02601 A WOMANS 1855 DORCHESTER DORCHESTER, 32719000E CONCERNINC AVE MA 02124 20. A WOMANS 1855 DORCHESTER DORCHESTER, 32719000E CONCERNINC AVE MA 02122 20. 32719000G SULLIVAN, KELLIE 48 CAMP STREET- HYANNIS, MA 19, M UNIT 7 02601 32719000H SCHAPIRA,JEFFRY 66 WOODLAND DR CONTOOCOOK, USA 18� A ET AL TRS NH 03229 32719000I CONRAD HYANNIS MA, NANCY M 48 CAMP ST UNIT 9 02601 USA 16F b.ttp://ww�u.town.bamstable.ma..us/aTeim.s/appc,eoapp/Abutter]R�eport.aspx?type=pr3sp 7/25/2008 ;1iUutterReport Page 2 of 4 32719000J FLANAGAN, 48 CAMP ST#10 HYANNIS, MA USA 10020U KATHLEEN E 02601 32719000K COX,THOMAS & 48 CAMP ST UNIT HYANNIS, MA 20936/: JANINE M 11 02601 32719000L MUNCHERIAN, 47 PURITAN RD WATERTOWN, USA 16444/: ALFRED MA 02472 32719000M COLLARES, BORIS O 48 CAMP ST, UNIT HYANNIS, MA USA 15226/: &TAELESE 13 02601 32719000N SANTINI, SHERRY A 48 CAMP ST-UNIT HYANNIS, MA 14992/: #14 02601 327190000 HUNTER, DEBORAH 48 CAMP ST, #15 HYANNIS,MA USA 11026/: A 02601 327191 LITTLETON, ROBERT 70 WHITEWOOD RD MILFORD,MA 21004/: FJR 01757 327192 JOHNSTON, GERANIOTIS, LITTLE WOMEN 410 NYES NECK CENTERVILLE, USA 8444/21 WILLIAM G & EVANGELOS,TRS REALTY TRUST RD MA 02632 327193 PARK SQUARE PROF 110 MAIN ST HYANNIS, MA USA 19439/: BLDG, LLC - 02601 327194 PARK SQUARE PROF 110 MAIN ST HYANNIS, MA USA 19439/: BLDG, LLC 02601 PARK SQUARE 327195 PROFESSIONAL 110 MAIN STREET HYANNIS, MA 22463/: BLDG, LLC 02601 327196 DEMAREST, CHAD K THE 1S CEDAR ST 15 CEDAR ST HYANNIS,MA 13589/: TR REALTY TRUST 02601 327197 PISACANO, P O BOX 126 HYANNISPORT, 13432/: CHARLES&MARGO MA 02647 327198 FENNEY, WILLIAM 35 CEDAR ST HYANNIS, MA USA 8721/V N,TRS 02601 327199 CAPE COD MENTAL ASSOCIATION, INC 460 WEST MAIN ST HYANNIS, MA USA 3030/W HEALTH - 02601 327200 AIKEN, STEVEN L TR APB REALTY TRUST 83 MAIN ST HYANNIS, MA USA 3764/31 02601 WHARTON- pISCANO,CHARLES HYANNISPORT, 327201 PISCANO, MARGO PO BOX 126 HYANNIS USA 18279/( TR& TR MA 327202 LAROCHE, GLENN M 15 PARK SQUARE HYANNIS,MA USA 10482/: 02601 327203 DEROSA, PETER G PO BOX 141 CUMMAQUID,MA USA 2853/2( 02637 327204 MACHERAS,YANNIS 84 PARK ST HYANNIS, MA 13545/: R 02601 h.ttp_//www.town.barnstable.ma.us/arcims/appgeoapp/AhutterReport.aspx?type=PBSP 7/25/2008 I AbutterReport Page 3 of 4 327237 BARNSTABLE,TOWN 367 MAIN ST HYANNIS, MA USA OF(REC) 02601 327266 BARNSTABLE,TOWN 367 MAIN ST HYANNIS, MA USA OF(REC) 02601 327267 MCBRIDE, SEAN PO BOX 2448 HYANNIS, M.A. 12471/( 02601 32818400A VANDEMOER, VANDEMOER,J 68 CAMP STREET HYANNIS, MA USA 6047/0� NICHOLAS ET ALS NICHOLAS 02601 32818400B BRAVMAN, DEBRA 208 SCUDDER BAY CENTERVILLE, 21199/: CIRCLE MA 02632 32818400C DIETZ,ABRAHAM P 68 CAMP ST HYANNIS, MA USA 8145/3: 02601 32818400D MATANGKASOMBUT, GOOD PLANET 99 POND-AVE # BROOKLINE, MA 19839/: PONPAN TR REALTY TRUST 806 02445 328188001 CAMP STREET PROF 110 MAIN ST HYANNIS, MA 20471/: BLDG LLC 02601 342016 GOLDEN,WILLIAM A PARKWAY PLACE 187 KEVENEY LANE YARMOUTHPORT, USA 10487/: TR REALTY TRUST MA 02675 342017 GOLDEN, WILLIAM A %B&A REALTY 187 KEVENEY LANE YARMOUTHPORT, USA 3443/2( TRUST MA 02675 342019 RON B LLC 55 PARTRIDGE W YARMOUTH, 21857/: VALLEY RD MA 02673 342021 CORR, EDWARD J JR 42 CEDAR ST HYANNIS, MA USA 1434/6, 02601 DAVENPORT,JOHN & C/O DAVENPORT SOUTH 342022 PALMER REALTY TRUST 20 NORTH MAIN ST YARMOUTH, MA USA 1144/3: 02664 34202300A MISTER II LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 34202300E MERLESENA, VILLAGE REALTY PO BOX 135 OSTERVILLE, MA USA 9273/3( ROSARIA M TR TRUST 02655 34202300C MERLESENA,JOHN P %MERLESENA, 116 EAST 31ST NEW YORK, NY 21643/1 TR STEPHEN W STREET 10016 60 SMOKE VALLEY OSTERVILLE, MA 34202300D MISTER IV LLC RD 02655 21527/. 34202300E REBEIRO, ELISABETE 70 MAIN ST#5 HYANNIS, MA USA 11560/: 02601 3420230OF MERLESENA,JOHN P PO BOX 721 W BARNSTABLE, USA 8881/2! TRUSTEE MA 02668 . 3420230OG MERLESENA, JOHN P PO BOX 721 W BARNSTABLE, USA 8881/2I TRUSTEE MA 02668 http://wwNv.town.bamstable.ma.us/arcims/app-coapp/Abu.tterReport.aspx?type=PBSP 7/25/2008 AbutterRepor,t Page 4 of 4 MERLESENA,JOHN P 0 BOX 721 W BARNSTABLE, USA 8881/2� 34202300H P TRUSTEE MA 02668 34202300I MISTER V LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 34202300J MISTER VI LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 0265S 34202300K GESNER, C VALERIE 70 MAIN ST HYANNIS, MA USA 3680/0. 02601 34202300E MUNCHERIAN, 47 PURITAN RD WATMA ERTO2WN USA 18996/( ALFRED M 34202300M DE OLIVEIRA, 8 ERIN LN HYANNIS, MA 2nl24/: JOANA 02601 34202300N FOSS, DONALD W PO BOX 820 HYANNIS, MA USA 11663/: JR 02601 342023000 SLATER, EST OF 100 SHEEP W BARNSTABLE, USA 19394/: DIANA A ET AL TRS MEADOW RD MA 02668 34202300P SLATER, EST OF 100 SHEEP W BARNSTABLE, USA 19394/: DIANA A ET AL TRS MEADOW LN MA 02668 342025 ZULLO,JOHN 54 MAIN STREET HYANNIS, MA 19743/( (HYANNIS) 02601 342026 CHE LLC 34 SNOWY CREEK HYANNIS, MA 22112/: DR 02601 34203300A FATER, MARC TR C/o CPF REALTY 51 MAIN ST HYANNIS, MA USA 16549/. TRUST 02601 34203300B OATS, MICHAEL F C/O SEASCAPE PO BOX 581 N FALMOUTH, USA 11064/: TR REALTY TRUST MA 02556 34203300C HILL, C EUGENE& 51 MAIN ST HYANNIS, MA USA 4320/01 GAIL P 02601 34203300D LYTLE, ROBERT A 51 MAIN ST- UNIT HYANNIS, MA 14080/: 5 02601 34203300E LYTLE, ROBERT A 51 MAIN ST#5 HYANNIS, MA USA 101672 02601 3420330OF FENNELL, KATHLEEN J R FENNELL REALTY 501 MASS AVE, 2ND CAMBRIDGE, MA USA 11178/( M TR TRUST 1994 FL 02139 This list by itself does NOT constitute a certified list of abutters and is provided only as an aid to the determination of abutters.If a certified list of abutters is required,contact the Assessing Division to have this list certified.The owner and address data on this list is from the Town of Barnstable Assessor's database as of 7/25/2008. http://www.town.bamstable.ma.us/arcims/app-coapp/AbutterReport.aspx?type=PBSP 7/25/2008 Final Construction Control Document d To be submitted at completion of construction by a Spy .0 � T Registered Design Professional /L'0 10�,� for work per the 91h edition of the -4fj,1. Massachusetts State Building Code, 780 CMR, Section 107.6.4 � Project Title: Duffy Health Center Date: 9-6-18 Permit No. .Property Address: 94 Main Street,Hyannis Project: Check(x)one orboth as applicable: New construction XX Existing Construction Project description: Reconfigure area to accommodate proposed procedure room and associated facilities. I David J Vachon MA Registration Number: 7471 Expiration date: 8-31-19 , am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Entire Project XX Architectural Structural .Mechanical Fire Protection Electrical Other: for the above named project. I certify that I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and that I or my designee: l. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. ��,�EPEocy'� Enter in the space to the right a"wet"or electronic signature and seal: V 47 W J' AST 0F MPSe,P Phone number: 508-888-6555 Email: dvachon@conservgrou .com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Trial Version 10_09 2012 49` 4 �/ r Law Office of Singer & Singer, LLG 26 Upper County Road P. O.Box 67 Dennisport,Massachusetts 02639 Andrew.L. Singer Tel: (508)398-2221 Fax:(508)398-1568 Myer R. Singer www.singer-law.com Of Counsel March b,2018 Ms. Mary Barry, Chair Barnstable Planning Boards o 367 Main Street ° c" Hyannis, MA 02601 o Re: Duffy Health Center, 94 Main Street,Hyannis/PB2017-04 Dear Madam Chair: yJ. Enclosed please find a copy of the Planning Board Decision for the above-referenced matter '0 which was recorded.on March 6, 2018 with the Barnstable County Registry of Deeds in Book 31121, Page 165. Thank you: Very truly yours, Lisa Perry f drew L. Singer Enclosure Copy to: Barnstable Building Department r Bk- 311211 F':ol65 �1�t11 - Town of Barnstable ManningBoard -- ` Decbtor and Nofiae Special Permit Application No.2017-04-D f Health Center,Inn_ Mocliflcation of speslal permit No.200&Dx; Section 2413-24.1.4 MS(0)Spetaal Permit(1)(a)Nonreti,dential Development 5urnrnary_ Gritted With Gorxiitiorts Pefil7io�er. [3D�rfey:Heottl�Centex; Inc.-44 Main Street.Hyann�L MA Propwrty.Address: 44 Main Street: Hyannis, ! Ast mes Map/Pcncet 327(195 7aoimg Diarist MS-!Niece Service District Hearing Dote: Jan=Y 8,2018 Ra=,cfing Inform atiorc Geed:Book 24343 rage 170 Specie 'e nit-2MB-02: Book 23193 Page 28 Background �esubject property is a..63 aae parcel with frontage on Main Street and Cedar..Street It is unproved with a 4,680 square foot(16,450-gross sq ft),2-5 story medical office building with,two residential units in the hatf,story,constructed in 2010. On September.11,2008,the Planning Board issue Special Permit No,2008-002 to Park Square Professional Building LLC,William G.Johnston,Jr.,Robert B.Hartnett and Evangelos G_Geraniotis, Managers,for the redevelopment of 94 Main Street and assodated improvements to 26 Camp Street Hyannis,MA The permit alloyed for; • the construction of a,16,4S0 sq.ft.,2 5 story medical offc�e building with two(2)apartments can the 2nd floor on the 0:b3-acre lot addressed 94 main Street and the creation of a d&e%vay off Camp Street;,with added,parking and preservation of the residence on the O.ZS-..acre addressed 26 Camp Street for residential use;(see attached COPY of the landscape/site plain), The Specaal Permit granted relief to permit a mixed-use development greater.than:10,000 SE{§ 240-24.1.4.B),a reduced side yard setback of 2.5 feet{§240.24.14.C.(l)(o)),reduced site development standards(off-street parking,parking lot landscapiq&landscaped buffers to residential),and reduced landscape buffer between building and surface parking area § 240.24.1.10.A)..The Special Permit%-as recorded at the Registry of Deeds in Book 23193 page 2So on October 3,2008. Procedural Hearing Summary The application FvrSpedal Permit No.2017-04,amending Special Permit No.2008-02,allowing for the conversion of two(2)residential.apartments on the 3rd,loon to medical office use,was filed at the Town Clerk's office and office of tfie Planning Board on November 29,2017_ A public hearing before the Planning Board was duly advertised and notice sent to all abutters end interested Parties in accordance.with MIGL Chapter 40A. The hearing was opened on January 8,2018 at which time the Board found to grant the special permit,subject to conditions. Board Members deciding 1 Torn of Bazrr�-tablc Manning Board-Decision and Nodce SpwW. ;~=Ut lNo,2017-04:-94 Win Dully Fat,.th CMtM Erg this application were Mary Barry,Stephen Helman,.Steven Costello, Paul Curley,David Munsell, Fred La5elva,and Jeffrey Swartz. Attorney Andrew Singer represented the:Applicant before the 8oard.. Evan Cohen,representative of property owner East Main Street development,LLC,and'Heidi Romans Nelson,Chief Executive Officer of Duffy Health Center,were also present. Attorney Singer presented a brief history of.the property.and presented the proposal to amend the Special Permit to the Board. The Board and Applicant discussed the orfske parking plan;and Attorney Singer provided details on three offsite parking locations.: Attorney Singer clarified that there is a total of 63 parking spaces provided.(38 parking spaces onsite and 25 oftte),in excess of the 52 required.Public comment was requested and no one spoke. Findings of Fact Att#sg Itearing on January 8,20 8,.the(Board unanimo sly ma a the following fin i ngs of fact for Special Permit Application No.2017-04,a request to amend a special permit,fled by Duffy Health Center,Inc.to allow for the conversion of two(2)residential apartments on the 3rd floor to medical office use: 1. Duffy+ieal'th Center, Inc.is seeking.to modny Special Permit No.2008-02 to alloy for the conversion of twm(2 residential, on the 3rd floor to medical office use. 2. The subject property is addressed,9 V Plain Street, Hyannis, MA and is shown on Assessor's Map 327 as Parcel 195. It is in the MS-Medical Services District,medical/dental clinics as-of right, and nonresidential developments with a total fioor area of greater than 10,000 feet by special permit. 3. The.revised plan has been reviewed and approved by the Site Plan Review Committee under an approval dated iJecember 7J 2.017�afire condi;ions of that decision shall be incorporated by reference as conditions of this Special Permit 4. After an evaluation:of all the evidence presented,the proposal fu)fiits the spirit and intent of the Zoning Ordinance and would not represent a substantial detriment to the:public good or neighborhood affected: 5. line proposal meets See.244-24.1.2 E specifically in that the proposal continues.to comply with the provisions of the zoning ordinance and is consistent with the applicable criteria for granting special permits. The vote to accept the findings was_ AYE:Mary Barry,Stephen Helmari,Steven Costello,Paul Curley,David Murtsell,Fred Laselva,and Jeffrey Swartz - NAY;None Decision Based on the findings of fact, a motion was duly made and seconded to grant Special Permit ivo. 2017-04 subject to the following conditions: 1. This Special Permit shall modify Special Permit No. 2008-02 subject to Condition#4,."Any change to the building use from that perm. fitted herein shall require amendment to this special permit.This includes a change in the percentage of medical.office and/or residential use at the 94 Main Street property and any change to the single family residence at the 26 GFmp Street I Town of B=mi'tabL.('13ISt=&f°ou.G-D x-*kAi[L.and Xa 1C1 Special Ferr at No..2017-04-93 6(ain Duffy Fieahh.C nbm,lar. Property"to allow for the conversion of two(2)residential apartmnts on the 3rd floor to medical office use at 94 Main Street 2_ Ali conditions of the previous Special Permit shall remain in full force and effect 3. The conditions of December 7,2017 Site;Plan Review approval shall be incorporated as conditions of this Special Permit, 4. This permit shall be recorded at the Barnstable County Regis"of Dc-edsand copies submitted to the Planning Board and Building DivWort prior to commencement of the use The vote was. AYE:Hoary Barry,Stephen Heiman,Steven Costello,Paul Curley,David Munsell,Fred LaSelva,and Jef€rey Swartz, NAY,None Ordered Special.Permit.No_2027•04 allowing allow for the c nvlers on of two(2)residential apartments on the.3rd floor to medical office use at 94 Main Street,Hyannis has been granted subject to conditions. This decision must.be recorded at the Barnstable Registry of Deeds for it to be in effect and notice of that recording submitted to.the Planning-Board 0"Fice. The relief autlitorized by this decision must be exercised within two years unless extended.. Appeals of this decision,if any,shall be made lrursuant to MGt Chapter 40A,Sectior:1.7,within twenty(20)days.alter the date of the filing of this decision,a copy of which must.be filed in the office of the Barnstable Town Clerk. Malry, air Dal i5-n 1,Ann Quirk,Clerk of fine Torn Of Barnstable,Barnstable County,Massachusetts,hereby certify that twenty(20)days have elapsed since the:Zoning Board of Appeals filed this decision and that no appeal of the decision has been filed in the office of the.Town Clerk_ AIL � u under the pains and a[ties of Signed and sealed.this /� day of �� p �' penalties perjury- Ann Quirk,Town Clerk , `'�otidrr of , d O Va 3 QPta��da` 7 ,Town of Barnstable r P�anmhgHoard earbee:oE.FublrcN . N , a Monday Jaary 8 s�2017.0�0 p�m r s a� Tow of BamsWblµ`e'P n ngEoard r Spei a 0 PermRr phi allon No=217 04 k Moa�Janua1P8bKt 2018 at 7 p0 � q r +� Duffy Health Center'Inc 94 MaimStreet Hyannis MA NO Duffyea -14 [hcCeFl n grmit Application No 20'7 0 r To alt.persons deemed rrderested m the Rlannmg Board acting un er,.Inc::94,M - x * herahLawsotttie Cammanweath otMassach ih dTawo of am Sheet.Hyannis MAr` =' derthe Ge l all persons deeme _ AS t ter 40A,Sectwd 9;'and all''amendmente?theret Lawsof;fhorn p�wlheP�amm�g Board achngapn,' Barnstaple Zoning Ordinances ynu are eeby notiTied OqTe alpA ,Se""hop Sand=ali'amendm''entsher la; 'al Hearing to conside(Special Permd Apph No 2017piicant.is Duffy Health Center'Inc The suhleit property is addressed ZonmgOrm cnes ynb y�e e ehy tno'_bf edt of aRu61 cf S Zonmg DistncL.•94 Main Street Hyanms'MA and is showo-`on Assessor's Map 327 > 9g to consider Special Permit Apphcabon No;2017 p4 The;ap= as Parcel 195 It is in the Medibaf Services(M _ IG 4 MamsSt eet Hyanntseq anG isashauvne PFdperty�s addressed: as Parcel 195 Ihs m`TBe Medical Services`MS Zo The applicant seeks to modify Special Permd No'2008-02.The on_ sss-esses Map 327 � (y ) nmg Disfict pieposai is to convert two(2)reside the ial apartmen DP cin�seek on s�to rmdld ty The a hcant�seeks tde a1 permd No 2 ' to"medical bifice'use Accordingly RP Proposal rrto convert two"2 residermal ap rtinenrj 006-02G The Special Permit 2008 02 consistent with condltlon Na.:4 which.re tb medical office use gccordingly?the a hca " quires an amendment for any..change to bmld or use',including.a S a on the 3rd-floor PP nt,seeks to modify' change In the percentage of medical office and/or res�derr<ial use at - penal Permit 2008 02 consistent wrt6 condihori No 4 wt'modify S the 94 Main Street property 1 a t n _' Chan seam theenercentaYer fny change`t"bwidlfi use mciud ng,`a ji wQl he,held a[the Barnstablq Town Half;367 �s Oi g P 9 ' medical bffice and/or residential use at ; The Public Hearng Janu- tt x e 94 Main Street property_ $ Th�e�Publ cam . r r aryl 8 Street.018 at 7 00 PM-niA iCopiesgoRtheDe P e r200dareoMam Savallamelm treet, Hearing will he held at ttie B{amstable Sown Hall:367 I review In the.Plamm�g&Develapmen P u q c Main Street Hyannis,MA HearinRoom 2nd Rooi:Monday Jany= i Hyannis MA between the hours of 8 30 AM to 4 3O PM Monday ay_8 2018 at 7 OO Cbpi P oflthe application are available'fa! I through Friday review m the Planning 8 Oeyeio menC Department 200 Mom Street Mary Barry;Chal' �k Hyannis MA hetween sNe hours of8 3QYAM.to 4 30 PM`Monday Barnstable Patriht Barnstable Plannin Bcard � tfirough Friday r _ y _ December 22 an ' ���� arry Chair _December27and 29 2017= / :Barnstable Plannm Board Irl Zo 4 Planning Board Special rermit Abutter List for Map Parcel(s): '327195' Parties of interest are those directly opposite the subject lot on any public or private street or way and abutters to abutters within 300 feet ring of subject property. 5 Total Count: 73 Close Map&Parcel Owneri Owner2 Addressl Address 2 Mailing Country Deed CityStateZip PISACANO,MARGO& P O BOX 126 HYANNIS PORT, 327178 18459/68 CHARLES MA 02647 WHARTON PISACANO, CAMP SHELL REALTY 73 HARBOR BLUFFS HYANNIS,MA 327179 MARGO&CHARLES 20500/289 TRS TRUST RD 02601 327180 VOEGELI, KEVIN LEE 19 CAMP STREET HYANNIS, MA 13546/99 &ALICIA 02601 327181 TYLER,JONATHAN 2 LYNXHOLM CT HYANNIS,.:MA 18294/121 02601 327182 TYLER;JONATHAN.M %BOURGEOIS, RONALD 2 LYNXHOLM COURT HYANNIS,MA 13272/179 TR. 02601 / HYANNIS,MA ,JO 3373 TYLERNATHAN.M 2 LYfjIXHOLM COURT 22496/156 / 02601 327185 SWEKLO,JOHN A 1006 WIMBLE DON DALTON,GA 26720/266- DRIVE 30720 %EDWARD CP CENTERVILLE,MA 327186 SHAPIRO,GARY L TR 951 OLD STAGE ROAD 5192/14 HOLDINGS;LLC 02632 327187 VOEGELI, KEVIN&. 19 CAMP STREET HYANNIS, MA 19411/332. . ALICIA 02601 WEST . :32719000A TRAYWICK,SAMUEL C PO BOX 216 HYANNISPORT,MA 26151/20 02672 CERQUIERA, HYANNIS,MA 327190008 PO BOX 1913 27802/113 MARCELO 02601 32719000C DETOLEDO,DEYSE PO BOX 1913 HYANNIS, MA 26059/178 - 02601 TRAYWICK,MARTIN C SEAGULL RESEARCH WEST 32719000D &MORESHEAD, FOUNDATION REALTY P O BOX 216 HYANNISPORT MA 27924/267 KAREN W TRST 02672 TRAYWICK, RTIN& WEST 3271900 MORE SHE KAREN SEAGULL R EARCH PXB6 . 6 HYANNISPORT MA 29670/67 TRS FOUN RLTY R 02672 TRAY ICK,MARTIN C SEAG i RESEARCH WEST 3 19000E &M RESHEAD,. P HYANNISPORT MA 29670/67 KAR N TR FOU .RLTY TR02672 LINDA FORBUSH LIVING HYANNIS,MA 32719000G FORBUSH,LINDA TR TRUST 48 CAMP STREET.,#7 02601 25506/289 SCHAPIRA,JEFFRY A LESLIE A SCHAPIRA CONTOOCOOK, 32719000H &CAROL L TRS 2003 TRUST 66 WOODLAND DR NH 03229 18926/91 327190001 CONRAD, NANCY M 48 CAMP ST UNIT 9 HYANNIS,MA 16835/323 02601 FLANAGAN,KATHLEEN %FLANAGAN,'KATHLEEN HYANNIS, MA 32719000J 48 CAMP ST#10 10020/10. E E .. 02601 FERGUSON,SUSAN %LEHMAN .ROBERT M& NANTUCKET MA 32719000k P.O.BOX 2396 29177/151 FOYE DIANE T. 02584 32719000E MUNCHERIAN, ALFRED M MUNCHERIAN 48 CAMP STREET #12 HYANNIS,MA 25338/26 ALFRED TR FAMILY L T. 02601 COLLARES,BORIS 0& HYANNIS, MA I 32719000M %COLLARES,TAELESE 48 CAMP ST,UNIT'13, 15226/145 TAELESE 02601 32719000N SANTINI,SHERRY A 48.CAMP ST-UNIT HYANNIS,MA 14992/214 #14 02601 MA 327190000 HUNTER, DE80RAH A 48 CAMP ST,#15 HYANNIS, 11026/288 02601 327191 LECKO,JANUSZ 28 BROUILLARD CHICOPEE, MA 28327/255 DRIVE �013 , 70HNSTON,.WILLIAM GERANIOTIS, LITTLE WOMEN FORESTDALE MA 327192 4 LICHEN LANE 8444/281 G&; EVANGELOS,TRS REALTY TRUST 02644 - PARK SQUARE HYANNIS,MA 327193 PROFESSIONAL BLDG 110 MAIN ST 02601 19439/264 LLC r - a PARK SQU ` HYANNIS, MA 327 4 PROFS ONAL BLDG 110 N ST 19439/262 LLC 02601 EAST MAIN STREET FORESTDALE,.MA 327195 LLC LLC ATTN: EVAN COHEN 4 LICHEN LANE 02644 24343/176 327196 DEMAREST,CHAD K 15 CEDAR ST REALTY 15 CEDAR ST HYANNIS,MA 13589/103 TR TRUST 02601 327197 PISACANO,CHARLES P 0 BOX 126 HYANNIS PORT 13432/115 &MARGO MA 02647 327198 FENNEY,WILLIAM N 35 CEDAR ST HYANNIS,MA 8721/197 TR 02601 327199 CAPE COD MENTAL ASSOCIATION,INC 460 WEST MAIN ST HYANNIS, MA 3.030/98 HEALTH- 02601 327200 AIKEN,STEVEN L TR APB REALTY TRUST 83 MAIN ST HYANNIS,MA 3764/306 02601 PISACANO,MARGO MAINE SEAS REALTY HYANNIS PORT 327201 WHARTON&CHARLES TRUST PO BOX 126 MA 02647 18279/87 TRS 327202 PISACANO,MARGO %CAPE COD RECOVERY 115 MAIN STREET HYANNIS, MA 27249/288 LLC 02601 MA 327203 ENT.REAL ESTATE LLC 30 ALDRIN ROAD PLYMOUTH, 29991/97 02360 327204 MACHERAS,YANNIS R 84 PARK ST HYANNIS,MA 13545/168 02601 BARNSTAB ,TOWN HYANNIS,MA 327237 OF(REC 367 MAI TREET 02601 327 66 BA TABLE,TOWN 36 MAIN STREET HYANNIS,MA O (REC) 02601 32818400A JIYA&AUM LLC 46 EQUESTRIAN LANE EAST FALMOUTH, 30158/208' ...MA 02536 208 SCUDDER BAY CENTERVILLE,MA 328184008 JASRACH LLC 24075/205 CIRCLE 02632 32818400C DIETZ,ABRAHAM.P 68 CAMP ST . HYANNIS,MA 8145/321 02601 32818400D GOOD PLANET LLC C/O RAPIN .1 PICKEREL TERRACE WELLESLEY,MA 29720/247 OSATHANONDH 02482 342016 HOUSING FOR ALL 82 SCHOOL STREET HYANNIS,MA 27331/237 CORPORATION 02601 BOUDREAU,MARK H EASTERN BOX PO BOX 685 TURTLE R CENTERVILLE MA 342017 TR T 02632 27852/305 C/O RONALD WEST DENNIS MA 342019 RON B LLC 150 MAIN STREET 21857/296 BOURGEOIS 02670 342021 CORR, EDWARD I JR& 42 CEDAR STREET HYANNIS,MA 75941/94 MARY] 02601 DAVENPORT,JOHN& C/O:DAVENPORT REALTY SOUTH 342022 20NORTH MAIN ST YARMOUTH,MA 1144/332 PALMER TRUST. . 02664 34202300A MISTER II LLC 60 SMOKE VALLEY RD OSTERVILLE,MA 21527/222 02655 MERLESENA, ROSARIA_ OSTERVILLE,MA 342023008 M TR VILLAGE REALTY.TRUST PO BOX 135 02655 9273/301 MERLESENA,STEPHEN 116 EAST 31ST NEW YORK,NY 34202300C 22579/232 W. . STREET,APT 4R 10016 34202300D MISTER IV'LLC 60 SMOKE VALLEY RD - OSTERVILLE, MA 21527/232 02655. 34202300E REBEIRO,ELISABETE 70 MAIN STREET,#5 11560/328 02601 3420230OF MERLESENA,JOHN P G R REALTY TRUST PO BOX 532 HYANNIS, MA 8881/299 TR 02601 MERLESENA,J HN P HYANNIS MA 342/OOGH TR PO BO 532 02601 8881/299 342 MERLES A,JOHN P G R REALTY TRUST PO OX 532 HYANNIS, MA 8881/299 -. TR 02601 34202300I MISTER V LLC 60 SMOKE VALLEY RD OSTERVILLE,MA 21527/237 02655 3420 00J MISTER VI.LLC 60 SMO VALLEY RD OSTERVILLE,MA 21527/242 02655 MANSF34202300K GESNER,GLYNN P 8 MAVERICK DRIVE 02048- 008 MA 24209/42 02048-1008 WALLING, WALLING,PHILLIP COLTS NECK NJ 34202300L CHRISTOPHERJAMES GARRET 3 HAMPTON CT 07722 28060/246 & 34202300M DE OLIVEIRA,JOANA 8 ERIN LN HYANNIS, MA 02601 20 1 2 4/179 34202300N FOSS HYANNIS,MA DONALD W]R PO BOX;820 11663/167 02601 342023000 MERLESENA,STEPHEN 116 EAST 31ST NEW YORK, NY 25732/301 W STREET,APT 4R 10016 3420 OOP ME SENA,STEPHEN 116 EAS 1ST NEW YORK,NY 25732/301 STRE ,APT 4R 10016 342025 ZULLO,JOHN .54 MAIN STREET HYANNIS, MA 19743/11 (HYANNIS) 02601 342026 CHE LLC 34 SNOWY CREEK DR HYANNIS,MA. 22112/253 02601 34203300A FATER,MARC TR C/O CPF REALTY TRUST 51 MAIN ST HYANNIS,MA 02601 16549/72 C/O SEASCAPE REALTY NORTH 34203300B OATS, MICHAEL F TR TRUST PO BOX 581 FALMOUTH,MA 11064/218 02556 HILL C EUGENE& HYANNIS, MA 34203300C GAIL P 51 MAIN ST 02601 4320/79 34203300D LYTLE,ROBERT A 51 MAIN ST-UNIT 5 HYANNIS, MA 14080/198 02601 34203 O MAN"ST E LYTLE, ERT A` 51 M ST#5 HYANNIS,MA 10167/289 �i 02601 3420330OF FENNELL,-KATHLEEN J R FENNELL REALTY C/O ODYSSEY 880 WINTER ST., WALTHAM,MA 11178/6 M TR TRUST 1994 PARTNERS SUITE 340 02451 This list by itself does NOT constitute a certified list of abutters and is provided only as an aid to the determination of abutters.If a"certified list of abutters is required,contact the Assessing Division to have this list certified.The owner and address data on this list is from the Town of Barnstable Assessor's database as of 11/29/2017 h . Town of Barnstable Geographic Information System November 29;2017 328192 2816 343009 343005 . #91 329181 328165 #74 ' 328196 3#82 #22 3291711 3#553 #65 943010 #106 328191 #20 #30 #64 343011 328197 #85 #14 #54 343002 281 3004 34300 #100 328190 328178 81 8 328179 3#57r ® ®#21 #35 3 #25• > _ 81 R #75 ?':'::. .'!::::: ':• 3z718s.::::: 342020 #52Y 32819E 328184CND-' ':';. 328228• / 328186 #24 � /.'l, ,>{;`:;i' #36- #30 328188002 �,, ;ryj;!l. �/ %' ,,.r, •:•.:(02 r:.. �,, ✓'Y'% ;;•r.,li."`.-.:' `'342021`.•,'':::-}t:i;'. #69 328188001 ,l: Gf•;<. " / ;/ #42 p 328185 #65 r,�.:;•r :// . r,'- Jr:c.r, .�i r/-Y! i �W�rr. #80 /r< r y'•, / ✓/ /. y �27,�Q r /hi i rr . . ,rr:.' i' '4•i' i"�trr r �. Rio,. KEit Sr % ,/,,.''; 342ozs CROC %. ;i%! % %r%r' i �:Ji/li;/yr�, fr36)//ire irG•'/ 5 iJrP�9i% r,'+'',% ``"` 342027CND /,:'•::. : #14 342028 #27B 327267 ..rr.. /Y ; . ;', <,.,! 327.166 #15S ::. :.:ice:.#53:; rf'h//' ' f;:'�i' jr�!?. :l%.r./ ,!a;:� //..irri::.r4.� //i yr' r'r.•:r:>r e r #68 /✓!/< ,/ r> r, r it r �✓/;:? !ry/ / rr, .,/,r/' ;. #22 %/.:fli:� ..;:'%•/.:!'1/r / r% 1327. #27A r•.i % i, / r r err.•r' 327i88 ..�, Ni// /i,; J` rrr ii�� , r j:;i�.,•.:ii/ r. ,, / J'�r50.' '��.r"/�//'/ i i�. // l•: .if /!�''{r,i%%% .✓i%x,,//,i; 'j//' ,�9i.:,li Jy 'yam T .Pl #311#3103 :327185 '�3271 67 '.:Si P%'j9!rf',r fir, .i'/' :!:r:r' i- �. , y r///i „r.>rt• .i Y.r / �s frf:fir/.�r. ' #58 #31A 327.184 ri .� ,,n,,,, r/ >f /r n;r /• 'rra:, 7 8 ri%/�%'+ 1 '1�r ;' r i'.' li/i✓r'r' .. ,j'�' Y j /% / ���r/:r rli%' 'r% r>y7i'r• n.' 32 182%': /r/� y 'Ys �, •.y,n•'/' v �/ .:... �i�'Ox,/,/ ✓•,/;;lr./:��:,: 'i'i'•: rf1�/� �/;il/�1,, .;i%�f. /%• Oda i 327.183 .r.�, ,#, /r / %� �. / 17rir:' %p. %r. ,/, r 'r•;r „/, ;J. �i�ri /,; .Y>%�6/ ,f/i .irr.6/.l�•i:, ry:r�/ / %%y'� rr, j/! /�•%/// ' �'.� ..._j ,yr.:/7,,r.../ �r �; ,.%(���,. ' '%�%: '. ,j��r// / � LJY /:'.:Yi�rr'f�err✓ �,�'i i q � �g rr.%(,.'i%/'.%',%•� ;T;%f'I r;•',.Y, /r. !Lr /,r , ;/li' '`.i,�/�i/ rr / f � #44 327181 [•i y.'l�.�./ i�/+%ii/,'.,,rY'r.r'✓,r. l.*i,'�`!j J> ,,j(lr/�/, /�ii / �i %�..'/f,/��! �' t.. #25 ::.://rrr� ../ i���•f// }��1�;�� sy r,./�f�%4 ;>��ij�//� /,/ •! s //i 342031 E 327170 i•r'r/, r/,./ < /,/ ,;rr3`. r/'7 �•/'-r,'/% '� •�55:. .;�,r/.L%.,:, "j�0�7: / � ' ''#r1�/ :.•�%�;f'. %/i i f r��. � .r0 �•,• r / / ,•'/,`✓r�;ia.' r/%/'• /g �.�.4 #34 r,/l, i J / /� ,rl y:'r:'r•:'l�r. rjr':#:g /,.% 1 r.J r/,'✓ /% ..i,r.YJ, !/t :�rl:r<! .; , / . .. • . 34:-20#3531C:ND.;` l0 .yd.x.. 4#14 -.<i�j.;:i`'f�// !'S:a/s.r;rr�.�'/ !i/, f 7,.�,,}/f�lii ,r, ^ '�,/�/i �%✓ r'/<;?.:,:;:: - rh,.;�4 !;ram/ '.<i•:efrr i.'r / �,/fir rr/ Y;,.•i .,,, J /y,, i 20,1,9;. F rr,.,: L27,171 3'2�/'(+7 /� �•"�y, / '/ / irlF/, /':/'':r: � Zj20�: 'r 327176 //:�/v�" ;,�.lr,��j�r,7,�r,;•�%j.;%��"rr :1!r.;;J/,rr..,,%r✓il<..T.-. ':#27' #s,�;u, 327175 #146 /•:'r.: / /% r I'm y F{ j.•: %fr /,j'il, •F rr .ST �f' j, / /i// ;,,/ Y::r!,li•r�...!1 tc. 342040 ••rf". O •. / ir' •.4/..r.,✓ill l;ry:.. �/d� ..:':i'':::{'`,•'`•'' L�'�i-..}+:ka . 342034 C #156 �� '•i#0',r:. �/ ;'f: it j `itr'✓l%:r, Z 327172 327173 #164 �%':�r`/;'%?t!,..,c:i :!:: •���Y-'�04 m"ry jai F #182 32726� 1ja t #58 rg4;� r.:., 34201r P,q/?/f{y d � y 327165001 342007 #41 QYp a t a (a #200 #135#1 Aq�,� 3272 #62 342013. [ �* CD #74 #47 342012 327230 #3342003CN D0 #53 327231 "27210 342011as327232 #149 32 F #171 #155 0 327229 327209 32720E 3420oa001 #61 r E #91 #20 327207 327206 #52 � l�l - #26 #67 fw irtn11` DISCLAIMERS:This map is for planning purposes onry: Ius not adequate for legal Map:327 Parcel:195 Planning Board Special Permit Selected Parcel 'Np .. boundary determination or regulatory Interpretation. Enlargements beyond a scale of Abutter List Type Parties of interest are those directly opposite the subject lot �1y� 1-100'may not meet established map accuracy standards. The parcel lines on this map - - on an public or private street or way and abutters to abutters within,300 feet rin Abutters *t"; 'E. _CO are only graphic representations of Assessor's tax parcels: They are hot true properly y p p y `''E;: IM 4 boundaries and do not represent accurate relationships to physical features on the map: of subject.property. .11 such as building locations. Buffer �J, Town of Barnstable Building g Post ThisCartl So That etas Vls�ble From the Street-Ap; ,rove�tl Plans Must be Retained onJob and this CartlhMu'st be Ke t , - " P �' ` p 1KA 6 Q. " `eosted Until Final lnspectiofin Has`Been Made �' 'Permit _,,here a Certificate of Occupancy�s Required;such Building hall Not be Occup�ed,unt�l a;'Final Inspection has been�made Permit No. B-18-631 Applicant Name: Roland Catignani Approvals Date Issued: 04/30/2018 Current Use: Structure Permit Type: Building-Alteration INTERIOR Work Only- Expiration Date: 10/30/2018 Foundation: Commercial Map/Lot 327-195 Zoning Distract: MS Sheathing: Location: 94 MAIN STREET(HYANNIS) HYANNIS ) ' Contractor,Name' ROLAND B CATIGNANI Framing: 1 OW/1) �kc Owner on Record: EAST MAIN STREET DEV LLC Contractor License CS-005157 2 Address: 4 LICHEN LANE' Est Project Cost: $ 105,000.00 Chimney: FORESTDALE, MA 02644 Per�m�t Fee: $1,130.50 Description: Revisions to interior layout for tenant fit up. 111 ;. � Insulation: Fee Paid $1,130.50 Project Review Re G: MUST EMPLOY PROPER SAFEGUARDS TO MAIN N' Date� 4/30/2018 Final: z REQUIRED LEVEL OF FIRE PROTECTIONS T Plumbing/Gas �� a Rough Plumbing: Building Official ,s g Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. Rough Gas: All work authorized by this permit shall conform to the approved application and the approved construction documentsifor which this permit has been granted. Final Gas: All construction,alterations and changes of use of any building and structures,s I be in compliance with the local zoriing by laws and codes. " „^ This permit shall be displayed in a location clearly visible from access street ori,,Tad and shall be maintained open for public inspection for the entire duration.of the work until the completion of the same. F Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officialsare provided on this permit. Service: Minimum of Five Call Inspections Required for All Construction Work: ` Rough: 1.Foundation or Footing , 2.Sheathing Inspection Final: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Final: 7.Final Inspection before Occupancy Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT C�►n��. S �.rt' Initial Construction Control Document M ti To be submitted with the building permit application by a d Registered Design Professional �7 for work per the 8t11 edition of the Massachusetts State Building Code, 780 CMR, Section 107 I Project Title: Duffy Health Care Date:4-3-18 i Property Address: 94 Main Street,Hyannis,MA i Project: Check(x)one or both as applicable: New construction x Existing Construction Proj ect description: Minor renovations and expansion into third floor,previously apartments(2) I David Vachon MA Registration Number: 7471 Expiration date: 8-31-18 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerningt: x Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. i When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent , comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the buildin inal Construction Control Document'. Enter in the space to the right a"wet"or QAV'� VAJH. I electronic signature and seal: Phone number: (508)-888-6555 Email: Dva o ervgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen, provide a description. Version 06 11 2013 P.k 3 1 121 F's 165 1 F-15 14 0 3 —2 ID 18 10 ::5 9-a ..7""..1 C.; lv)%;`;i' ., 1 , f. Town of Barnstable Planning Board Decislod and Notice Special Permit Application No.2017-04—Duffy Health Center,Inc. Modification of Special Permit No.2008-02 Section 240-24.1.4 MS(8)Special Permit(1)(a)Nonresidential Development Summary! Granted with Conditions Petitioner. Duffy Heolth Gunter, Inc,-94 Main Street,Hyonnis,WA .Property Address: 94 Main Street,Hyannis,MA Assessor's Map/Parcel: 3271195 Zoning District: MS--Mc-die(il Service Districl Hearing Dote; Jonuoo/8,2018 Rocording information: Deed:Book 24343 Pago 176 S,Wclol Permit 2MI-02:Book 23193 Page 280 Background The subject property is a.63 acre parcel with frontage on Main Street and Cedar Street, It Is Improved with a 4,680 square foot(16,450 gross sq.ft),2.5 story medical office building with two residential units In thc!half story,constructed in 2010. On September 11,2008,the Planning Board issued Special Permit No.2008-002 to Park Square Profes5lonal Building LUC,William G.Johnston,Jr.,Robert B.Hartnett and Evangelos G.Geraniotis, Managers,for the redevelopment of 94 Main Street and associated Improvements to 26 Camp Street Hyannis, MA. The permit allowed for; • the construction Of a 16,450 sq.ft,2.5 story medical office building with two(2)apartments on the 2nd floor on the 0.63-acre lot addressed 94 Main Street and • the creation of a driveway off Camp Street,with added parking and preservation of the residence on the 0.28-acre lot addressed 26 Camp Street for residential use(see attached copy of the landscape/site plan). The Special Permit granted relief to permit a mixed-use development greater than 10,000 SF 240-24.1.4,B),a reduced side yard setback of 2.5 feet(§240.24.1AC.(1)(b)),reduced site development standards(off-street parking„ parking lot landscaping,landscaped buffers to residential),and reduced landscape buffer between building and surface parking area(§ 240.24.1-10-A). The Special Permit was recorded at the Registry of Deeds In Book 23193 page 280 on October 3, 2008. Procedural&Hearing Summary The application for Special Permit No. 2017-04,amending Special Permit No.2008.02,allowing for the conversion of two(2) residential apartments on the 3rd floor to medical office use,was filed at the Town Clerk's office and office of the Planning Board on November 29,2017. A public hearing before the Planning Board was duly advertised and notico sent to all abutters and Interested parties In accordance with MGL Chapter 40A. The hearing was opened on January 8,201s at which time the Board found to grant the special permit subject to conditions. Board Members deciding Tvivo of ilam-cable I'tanning Baal-D..\c m and Nolim- S fwld l Ycrmlt No.2t117.44—94%f.un Vuity llwldt Centcr,Inc. this application were Mary Batty,Stephen Heiman,Steven Costello, Paul Curley,David Munsell, Fred l.aSulva,and Jeffrey Swartz. Attorney Andrew Singer represented the Applicant before the Board, Evan Cohen,representative of property owner East Main Street Development, t.t.C,and Heidi Romans Nelson,Chief Executive Officer of Duffy Health Center,were also present. Attorney Singer presented a brief history of the property and presented the proposal to amend the Special Permit to the Board. The Board and Applicant discussed the offsite parking plan,and Attompy Singer provided details on three offshe parking locations. Attorney Singer clarified that there is a total of 63 parking spaces provided(38 parking spaces onsite and 25 offsite),in excess of the 52 required,Public comment was requested and no one spoke. Findings of Fact At the hearing on January 8,2018,the Board unanimously made the following findings of fact for Special Permit Application No.2017.04,a request to amend a special permit,filed by Duffy Health Center, Inc.to allow for the conversion of two(2)residential apartments on the 3rd floor to medical office use: 1. Duffy Health Center,Inc.is seeking to modify Special Permit No.2008-02 to alloy for the conversion of two(2)residential apartments on the 3rd floor to medical office use. 2. The subject property is addressed 94 Main Street,Hyannis,MA and is shown on Assessor's Map 327 as Parcel 195, it is in the MS—Medical Services District,medical/dental clinics as-of-right, and nonresidential developments with a total floor area of greater than 10,000 feet by special permit. 3. The revised plan has been reviewed and approved by the Site plan Review Committed under an approval dated December 7,2017,the conditions of that decision shall be Incorporated by reference as conditions of this Special Permit 4. After an evaluation of all the evidence presented,the proposal fulfills the spirit and Intent of the Zoning Ordinance and would not represent a substantial detriment to the public good or neighborhood affected. 5. The proposal meets See.240.24.1.2 E specifically it)that the proposal continues to comply with the provisions of tho zoning ordinance and is consistent with the applicable criteria for granting special permits. The vote to accept the findings was: AYE:Mary Batty,Stephen Holman,Steven Costello, Paul Curley, David Munseli,Fred WSelva,and Jeffrey Swartz. NAY:Nona Docislon Based on the findings of fact,a motion was duly made and seconded to grant Special Permit No. 2017-04 subject to the following conditions: 1. This Special Permit shall modify Special Permit No.2008-02 subject to Condition 04,"Any change to the building use from that permitted herein shall rec{uire amendment to this special permit.This includes a change in the percentage of medical office and/or residential use.nt the 94 Main Street property and any change to the single family residence at the 26 Camp Street Tom n:1lirm%labie Maiming Do.)id-Otckslon and 1'o is Spvvial t'unut IMu,?.01741-93 Main IA,fty I Ivalth Center,Inc, Property"to allow for the conversion of two(2)residential apartments on the 3rd floor to medical office use at 94 Main Street. 2. All conditions of the previous Special Permit shall remain in full force and effect. 3. The conditions of December 7, 2017 Site Plan Review approval shall be incorporated as conditions of this Special Permit. 4. 'this permit shall be recorded at the Barnstable County Registry of Deeds and copies submitted to the Planning hoard and Building Division prior to commencement of the use. The vote was: AYE:Mary Barry,Stephen Heiman,Steven Costello, Paul Curley, David Munsell,Fred LaSelva,and Jeffrey Swartz, NAY;None Ordered Special Permit No.2017.04 allowing allow for the conversion of two(2) residential apartments on the 3rd floor to medical office use at 94 Main Street, Hyannis has been granted subject to conditions. This decision must be recorded at the Barnstable Registry of Deeds for it to be in effect . and notice of that recording submitted to the Planning Board Office. The relief authorized by this decision must be exercised within two years unless extended. Appeals of this decision,if any,shall be made pursuant to MGL Chapter 40A,Section 17,within twenty(20)days after the data of the filing of this decision,a copy of which must be filed in the office of the Barnstable Town Clerk. Mary Ba ry, hair l Date' ignu I,Ann Quirk,Clerk of the Town of Barnstable, Barnstable County,Massachusetts,hereby certify that twenty(20)days have elapsed since the Zoning Board of Appeals tiled this decision and that no appeal of the decision has been filed in the office of the Town Clerk. Signed and sealed this�day of / 4f!?� under the pains and penalties of perjury. �� Anti Quirk,Town Clerk a ; 'Sly 4° f • _ :To?rrt b't ea'rris'ta6te Pfali�riv Y, •t_•;t. ;T,gvrri of 0aiis :�' oy: ;y� ' " r do IzD( '. .�'�y�it-+;• :-;:..'Y. % _ ,r.a17,�-�•-1, e.Pf2My7g'BpjiQi?:;'.;; k:", •.t.ifvt. rr— Oq:�j:f��' i •;,' ,,:;'iNdtiie" `µ�; :,�,., .t �f10 10� n,+'n t. .,,: i is MA}r ydanuarye 2018�tT,OpPfn u 7a t.t.DuBYnr.t ,����'4�i; ft et ..,, Rr �S,' �i�e QO�Y lh Cente�m APptl�atanNo 20tT Oq 4(o all parsdns dgei ed.jntere4led r0 1 � �{att'Gg9 y r }r Jnc t.94 Main Street+HYartnts,'f IA . :.; der the Ge(lala[Lavfs otlp 9g�nn!Ml>n •t o �;Ihe Ta.�n-pi :-�sr,40A'SscBad,O,and,I:a'f'9°dmell t„ pit declined interested ktlha Ptaniiki Board u ere ere noti7ted of a pub9c der a.txaneral�ays dl Itte�Trit" "�amstabia tonfnG Ordinar«es;yo - {�, by ter D ! eaHh or M es bn.: _ PermEt pPptitai No:2017 0A:The a A A Sf4bon 9=and 3tI amerM ps5achusettsjyp HeariM to eonsker Special', {ttz a is addrssse Ba .table Zon (neAts;urerelo:3nd.lAe.T ;e9eant is ouffY Heahh Cen4e�r':andTs s0ir — es3oes 1. P 327 m9'.0rd{nariceS`You'are hate' t>tvn or tc ,�.d MaM Street 1lydanis dS1Zonin00tsGiit-Hr f9 ionsider'Syevai PeiM4 Ap4Zri a 2017-04:The ap :L�qrr.;-•_,•.:,4�;55� D t fs Nfly Fteaeh Can er;[ns:Tha 56bfect' ;as Partel195.it is N the :.c ... •<. . . : 4e! 951t_h 1� rsotm on�rso�seA�targ � } ,y 2 oil a¢arUnents on the�d hoar ;:}iiTtie apdxarit ieetca tolrioarN Di1=Pefmt:tto.-20b9 :T� _ ;;, .. t?4...servrces(MS)zoN ots ppttkpasat is to convert h' [1,+ The app`pplicaiit; 11irdias�6 "tta 4 tYfikh r9posdl to �o lowlry':SP"Ia Jiermlf Ito:.21108-02 !<I $DeW Perm[1,2008 02 caie(sient lNe to mins'v. including a pp The se:. t0 rwdioil. - N (21-raslden @Pa!Jments od a'rQ Hoar •?':17;'qutresa the p¢rcantag8 dal rtiedlcat dfHie a or tesWefi)W use at $1?Coia!'.?e( +t 20pg conks, aPpncant'sEeks to.rnod ' ' 44 IAaln Sheet properb/• :;.':;4uhfs:an.amandment for anj� o j .ruse 4�nuudn r a ,.;„< .....::rt, chan0e M Ne percents t`,:i,;; tibia Town 11aH,9&7 walbe Iid et the Barps Jana. tha94A(alnStraetproperty[ k�lbtHceanNorresiQen¢at.yseat r- •iTAePutlGcNearinO may i�aln Street;Hv'annls ptl�'Hedting Nop�t,�!ld.�oo4 A4o 1 8,2018,aE 7:00-Pr t Cdples of the?DDR���q00 I nla8bg the;P btk Hearing inTl pak a ning�DevelopmentAet> ;,::;I.}atn'Sireef'Hyaniig:'A '+ t rr18 Bairiilaw Tam Hail387 1 i leAerr in.to Credn:>t!e'fiovrs:hhf$30�Ahf t0 4 PM,r6londay 6ry 8'2018 at 7,-W'Aj n8 Roprti;2pd Floor,lfondaayy�'J.anu- ! T to revtarr(n the P(annl 4t 1GDikatlon are ava,'1abla;lor n0 R Dave, ;;ji:Through Friday 4!i4 t �Abeh{e�naAet o 83 N 4.3oh 1a jiSandDa6 garhsiat>{ePdUVot:',.r,u,:': ,tif°;ratdn9anY r . _�� _ a 9 20i7 'it, c',MarY8arry,•t:halr -• r' r . r - 'Planning Board Special rermit Abutter List for Map-& Parcel(s): '327195' Parties of Interest are those directly opposite the subject lot on any public or private street or C way and abutters to abutters within 300 feet ring of subject property. Total Count: 73 `�°i Close Map&Parcel Ownerl Owner2 Addressl Address 2 Mailing Country Deed CityStateZip 327178 PISACANO,MARGO& P 0 BOX 126 HYANNIS PORT, 18459/68 CHARLES MA 02647 WHARTON PISACANO, CAMP SHELL REALTY 73 HARBOR BLUFFS HYANNIS MA 327179 MARGO&CHARLES TRUST RD 02601 20500/289 TRS 327180 VOEGELJ,KEVIN LEE 19 CAMP STREET HYANNIS,MA 13546/99 &ALICIA 02601 327181 TYLER,JONATHAN 2 LYNXHOLM CT HYANNIS,MA 18294/121 02601 327182 TYLER,JONATHAN M %BOURGEOIS,RONALD 2 LYNXHOLM COURT HYANNIS,MA 13272/179 TR 02601 327 3 TYLER,] ATHAN M 2 LYVF10'LM COURT HYANNIS,MA 22496/156 02601 327185 SWEKLO,JOHN A 1006 WIMBLEDON DALTON,GA 26720/266 DRIVE 30720 327186 SHAPIRO,GARY L TR %EDWARD CP 951 OLD STAGE ROAD CENTERVILLE,MA 5192114 HOLDINGS,LLC 02632 327187 VOEGELI,KEVIN& 19 CAMP STREET HYANNIS,MA 19411/332 ALICIA 02601 WEST 32719000A TRAYWICK,SAMUEL C PO BOX 216 HYANNISPORT,MA 26151/20 02672 32719000E CERQUIERA, PO BOX 1913 HYANNIS,MA 27802/113 MARCELO 02601 32719000C DETOLEDO,DEYSE PO BOX 1913 HYANNIS,MA 26059/178 02601 TRAYWICK,MARTIN C SEAGULL RESEARCH WEST 32719000D &MORESHEAD, FOUNDATION REALTY P 0 BOX 216 HYANNISPORT,MA 27924/267 KAREN W TRST 02672 L TRAYWICK, RTIN& SEAGULL R EARCH WEST 32Z9OOE MORESHE ,KAREN FOUN RLTY R PO BOX 6 HYANNISPORT,MA 29670/67 TRS 02672 TRA ICK,MARTIN C SEAG L RESEARCH WEST 3 E &Ai RESHEAD, FOU RLTY TR P BOX 216 HYANNISPORT,MA 29670/67 KAR N TR 02672 32719000G FORBUSH,LINDA TR LINDA FORBUSH LIVING 48 CAMP STREET #7 HYANNIS,MA 25506/289 TRUST ' 02601 32719000H SCHAPIRA,JEFFRY A LESLIE A SCHAPIRA 66 WOODLAND DR CONTOOCOOK, 18926/91 &CAROL L TRS 2003 TRUST NH 03229 32719000I CONRAD,NANCY M 48 CAMP ST UNIT 9 HYANNIS,MA 16835/323 02601 32719000J FLANAGAN,KATHLEEN %FLANAGAN,KATHLEEN 48 CAMP ST#10 HYANNIS,MA 10020/10 E E 02601 32719000K FERGUSON,SUSAN %LEHMAN,ROBERT M& P.O.BOX 2396 NANTUCKET,MA 29177/151 FOYE DIANE T 02584 MUNCHERIAN, ALFRED M MUNCHERIAN 48 CAMP STREET HYANNIS MA 32719000E ALFRED TR FAMILY L T ,#12 02601 25338/26 32719000M COLLARES,BORIS 0&o�aCOLLARES,TAELESE 48 CAMP ST,UNIT 13 HYANNIS,MA 1 5 2 2 6/14 5 TAELESE 02601 32719000N SANTINI,SHERRY A 48 CAMP ST-UNIT HYANNIS,MA 14992/214 #14 02601 327190000 HUNTER,DEBORAH A 48 CAMP ST,#15 HYANNIS,MA 11026/288 02601 327191 LECKO,JANUSZ 28 BROUILLARD CHICOPEE,MA 28327/255 i DRIVE �013 327192 JOHNSTON,WILLIAM GERANIOTIS, LITTLE WOMEN 4 LICHEN LANE FORESTDALE,MA 8444/281 G& EVANGELOS,TRS REALTY TRUST 02644 PARK SQUARE HYANNIS,h1A 327193 PROFESSIONAL 6LDG 110 MAIN ST 02601 19439/264 LLC �zr,�f 07w4-y ! PARK SQU HYANNIS MA 327 4 PROFE ONAL BLDG 110 ST 02601 19439/262 LLC 327195 EAST MAIN STREET ATTN: EVAN COHEN 4 LICHEN LANE FORESTDALE,MA 24343/176 DEV LLC 02644 327196 DEMAREST,CHAD K 15 CEDAR ST REALTY 15 CEDAR ST HYANNIS,MA 13589/103 TR TRUST 02601 327197 PISACANO,CHARLES P O BOX 126 HYANNIS PORT, 13432/115 &MARGO MA 02647 327198 FENNEY,WILLIAM N 35 CEDAR ST HYANNIS,MA 8721/197 TR 02601 327199 CAPE COD MENTAL ASSOCIATION,INC 460 WEST MAIN ST HYANNIS,MA 3030/98 HEALTH- 02601 327200 AIKEN,STEVEN L TR APB REALTY TRUST 83 MAIN ST HYANNIS,MA 3764/306 02601 PISACANO,MARGO MAINE SEAS REALTY HYANNIS PORT 327201 WHARTON&CHARLES TRUST PO BOX 126 MA 02647 18279/87 TRS 327202 PISACANO,MARGO %CAPE COD RECOVERY 115 MAIN STREET HYANNIS,MA 27249/288 LLC 02601 327203 ENT REAL ESTATE LLC 30 ALDRIN ROAD PLYMOUTH,MA 29991/97 02360 327204 MACHERAS,YANNIS R 84 PARK ST HYANNIS,MA 1 3 5 4 5/16 8 02601 327237 BARNSTAB ,TOWN 367 MAI TREE? HYANNIS,MA OF(REC 02601 327 66 OA(RET BLE,TOWN 36 MAIN STREET 02601 HYANNIS,MA 32818400A JIYA&AUM LLC 46 EQUESTRIAN LANE EAST FALMOUTH, 30158/208 MA 02536 32818400E JASRACH LLC 208 SCUDDER BAY CENTERVILLE,MA 24075/205 CIRCLE 02632 32818400C DIETZ,ABRAHAM P 68 CAMP ST HYANNIS,MA 8145/321 02601 32818400D GOOD PLANET LLC C/O RAPIN 1 PICKEREL TERRACE WELLESLEY,MA 29720/247 OSATHANONDH 02482 342016 HOUSING FOR ALL 82 SCHOOL STREET HYANNIS,MA 27331/237 CORPORATION 02601 342017 BOUDREAU,MARK H EASTERN BOX TURTLE R PO BOX 685 CENTERVILLE,MA 27852/30S TR T 02632 342019 RON B LLC C/O RONALD 150 MAIN STREET WEST DENNIS,MA 21857/296 BOURGEOIS 02670 342021 CORR,EDWARD J JR& 42 CEDAR STREET HYANNIS,MA 25941/94 MARYJ 02601 342022 DAVENPORT,JOHN& C/O DAVENPORT REALTY SOUTH 20 NORTH MAIN ST YAR OUTH,MA 1144/332 PALMER TRUST 02664 34202300A MISTER II LLC 60 SMOKE VALLEY RD OSTERVILLE,MA 21527/222 02655 34202300B MERLESENA,ROSARIA VILLAGE REALTY TRUST PO BOX 135 OSTERVILLE,MA 9273/301 M TR 02655 34202300C MERLESENA,STEPHEN 116 EAST 31ST NEW YORK,NY 22579/232 W STREET,APT 4R 10016 34202300D MISTER IV LLC 60 SMOKE VALLEY RD OSTERVILLE,MA 21527/232 02655 34202300E REBEIRO,ELISABETE 1 70 MAIN STREET,#5 HYANNIS,MA 11560/328 02601 3420230OF MERLESENA,JOHN P G R REALTY TRUST PO BOX 532 HYANNIS,MA 8881/299 TR 02601 34202300G MERLESENA,J HN P PO:110r32 HYANNIS,MA 8881/299 TR 026013420 OOH MERLES A,JOHN P G R REALTY TRUST POOX 532 HYANNIS,MA 8881/299 TR 02601 34202300I MISTER V LLC 60 SMOKE VALLEY RD OSTERVILLE,MA 21527/237 J 02655 3420 0oJ MIST�t Vi LLC 60 Sh17E VALLEY RD OSTERVILLE,MA 21527/242 02655 34202300K GESNER,GLYNN P 8 MAVERICK DRIVE MANSFIELD,MA 24209/42 02048-1008 WALLING, WALLING,PHILLIP COLTS NECK,NJ 34202300L CHRISTOPHERJAMES GARRET 3 HAMPTON CT 07722 28060/246 34202300M DE OLIVEIRA,JOANA 8 ERIN LN HYANNIS,MA 20124/179 02601 3420230ON FOSS,DONALD W JR PO BOX 820 HYANNIS,MA 11663/167 02601 342023000 MERLESENA,STEPHEN 116 EAST 31ST NEW YORK,NY 25732/301 W STREET,APT 411 10016 34206P ME SENA,STEPHEN 116 EA 1ST NEW YORK,NY 25732/301 STRE ,APT 411 10016 342025 ZULLO,JOHN 54 MAIN STREET HYANNIS,MA 19743/11 (HYANNIS) 02601 342026 CHE LLC 34 SNOWY CREEK DR HYANNIS,MA 22112/253 02601 34203300A FATER,MARC TR C/O CPF REALTY TRUST 51 MAIN ST HYANNIS,MA 16549/72 02601 C/O SEASCAPE REALTY NORTH 342033008 OATS,MICHAEL F TR TRUST PO BOX 581 FALMOUTH,MA 11064/218 02556 34203300C HILL,C EUGENE& 51 MAIN ST HYANNIS,MA 4320/79 GAIL P 02601 34203300D LYTLE,ROBERT A 51 MAIN ST-UNIT 5 HYANNIS,MA 14080/198 02601 3420E LYTLE,�/BERT A 51 MA ST#5 HYANNIS,MA 10167/289 // 02601 FENNELI KATHLEEN J R FENNELL REALTY C/O ODYSSEY 880 WINTER ST., WALTHAM,MA 34203300E M TR TRUST 1994 PARTNERS SUITE 340 02451 11178/6 This list by Itself does NOT constitute a certified list of abutters and is provided only as an aid to the determination of abutters.If a certified list of abutters Is required,contact the Assessing Division to have this list certified.The owner and address data on this list Is from the Town of Barnstable Assessor's database as of 11/29/2017. / y ` � 7� �Zf,, Iwi� 1 vmo� Town of Barnstable Geographic Information System November 29,2017 328i92 32818i 3 �' 328165 #74 328196 # 32817T # 328163 #65 #106 #82 1 37F 30,A #55 343010 328191 #64 343o11 32E119 #85 #fa .:. 32 #54 �343004 343� 34430M gloo 328190 328178 328179 ::�:�':•: :.:... -577 In g #81 ~:+:if 89 :•:•:.;. {:,. 34202I1 t� �3281 _ #52Ah- R #75 �•328184CN • 328198 328187 328186 #24 ...m ::.::•i•% � /� rf ;;::;i:: ft ?:;:;:';:-::l::::•., #3fi 030 328188002 �� n % /�/r iY '';f i 342021'':'•: 328185 #� 885001 •••'�r•r� `,,�/✓�✓•i� �'�'r./,r .,��r 32 r1,� /'��r ;"•�:., 342029 CROG/CERST C✓,,;%1`r ''✓. /r % • /{�F hjr �/�/j/.�' 342027CNO #14 ;C27B 3272671 :' 327,187.d5 /� j /�>✓ ,1f/r v�'rl/r',.....;.i 327.1 #i5g 0l: ://� / ♦ �r ,C�1''^ f /�/f✓. d"', ;;;;-.:.::. 3azozs ./.cam/ %""'r / ..... #22 ,' 2026:; 32 ;*1I#31C3 ?;• N 321 $T 758 #31A 1327.184327168 Will •!t„'YPIJ(14 „r !.� r/ % r' y r / .ri r rr f r` #50 gZ7��./•.!"",'�f � . - � � j� / Ef,r,. ,�`���� ,ter �l,%�� C � 327169 ,.pqer� •• ;;4/ �. ' ,r" /.•i /, ,t �/ .�� /�: .,....,.'.:i;:, m 044 #25 :•y :: r'/ ! /i ; 27/ /•.! / j // / /� T+ 342031 W327170 #34 '!i✓ ✓✓ '� ��.. r % r /fl� 'r��� � � %•/ �,: :342033CND:'. - 327,171 ::`.sv,•T/�J'� � .�� � 7.H` �.r/�r"'",� � r�!� '�.y✓';: 1#26r- 327176 327 342040 i327172 #ice CO ZQ #182 7d -•....: rf/ . / RRk�'.43'ay�zp0d s 3272 422165001 #41 CA #200 #135#S #62 320i3 ) ,:r,,<•:tv,.s,,.342012 .: .. .. 3� *53 . a 327230 #3 342oo3CND0 IX'r. 327231 3z7210 327232 1F 149 Z2 tt� 0171 #155 - 327zzs #105 #91 327208 327207 327206 342004001 r R• tit :;: :t9 tiyrMl #20 7 CO Oug m CD DISCLAIMERS:This map is for planntng purposes onty. Itis not adoquato for logal Map:327 Parcel:195 Planning Board Special Permit a boundary detemdnatlon or roguwn Intorpratatbn. Entargementr beyond a scab of Selected Parcel W+ r=100•may not meet established map accuracy standards.The parcel Lnos on this map Abutter List Type Parties of interest are those directly opposite the subject tot CD -'C am oroy graphlo representations of Assessor's tax parcels.They are not true property on any public or private street or way and abutters to abutters within 300 feet fin Abutters to O boundaries and do not reprosent aomrate mlatlonsNps to physicaf footcuos on the map of subject property. Ca � such as building I=Uons. —c Buffer co / 1J N N m O N H) ' Twnrlta�D o' omm mm� TENANT MODIFICATIONS O o E m m^N for loin 0 DUFFY HEALTH CENTER F 94 MAIN STREET W zl«- Q ? ey HYANNIS MASSACHUSETTS z W x O E z r a < = o -- a a° a - CODE REVIEW: NINTH EDITION 780 CMR and IBC 2015 & IEBC 2015 REVISIONS USE GROUP: 'B'BUSINESS FIRE RESISTANT RATINGS.(TABLE 602)'for 5B CONSTRUCTION ewne nevrsi CONSTRUCTION TYPE:VH(SPRINKLERED) EXTERIOR WALLS: EXISTING SPRINKLER SYSTEM AND FIRE ALARM APPROVED BY AHJ NORTH - 0 HRS • ..non 1 AREA SUMMARY: NON SEPARATED USE GROUPS 313.1.1 SOUTH 0 HRS BASEMENT: EAST 0 HRS r en ' BUSINESS 2.580 S.F. WEST 0 HRS STORAGE 2.100 S.F. FIRE ENCLOSURE EXITS 2 HOURS a new FIRST FLOOR: BUSINESS 4.680 S.F. FIRE ENCLOSURE SHAFT/ELEVATOR'HOISTWAY 2 HOURS - SECOND FLOOR: BUSINESS 4.680 S.F. NUMBER OF DOORS (2)REQUIRED THIRD FLOOR LOAD BEARING PARTITIONS 0 HRS BUSINESS 2.025 S.F.F. FLOOR CONSTRUCTION 0 HRS MECHANICAL 900 S. TOTAL: 16.965 S.F. ROOF CONSTRUCTION: 0 HRS - HEIGHT and AREA LIMITATIONS IEBC 2009 - DWG.INFO. ALLOWABLE LEVEL 2 ALTERATIONS AREA: PER FLOOR USE GROUP R3 4,800 S.F. (LESS THAN 50%BUILDING AREA) —E 9 .7 INCREASE FOR FIRE PROTECTION SCALE NONE 200%INCREASE ,00 S.F. LEVEL 1' DHARTI CADD TOTAL AREA ALLOWED 14,400 S.F. ACCESSIBILTY ENTIRE SPACE WILL BE IN ACCORDANCE WITH NOTE: ALLOWABLE AREA EXCEEDS ACTUAL AREA PER FLOOR 521 CMR ARCHITECTURAL ACCESS BOARD CHKD STRUCTURAL NO STRUCTURAL WORK IS BEING PERFORMED wppRVD ALLOWABLE HEIGHT w/FIRE PROTECTION THREE STORY/55 FEET ENERGY CONSERVATION: NO WORK TO BUILDING ENVELOPE - OCCUPANCY(1008.1.2): LEVEL 2: BASEMENT: VERTICAL OPENINGS: NOT APPLICABLE 2,100 SF/300 SF PER OCCUPANT 7 PEOPLE MEANS OF EGRESS WILL BE ACCORDANCE WITH IBC 2015 2,580 SF 100 SF PER OCCUPANT 26 PEOPLE AND 521 CMR ARCHITECTURAL ACCESS BOARD FIRST FLOOR: STRUCTURAL: NOT APPLICABLE 4,680 SF/100 SF PER OCCUPANT 47 PEOPLE MECHANICAL,ELECTRICAL AND PLUMBING FIT OUT WILL BE IN .., SECOND FLOOR: ACCORDANCE MATH APPLICABLE CODES AND APPROVED BY THE 4,680 SF/100 SF PER OCCUPANT 47 PEOPLE AUTHORITY HAVING JURISDICTION. THIRD FLOOR: 2,025 SF/100 SF PER OCCUPANT 20 PEOPLE �sxEEr TrzLE:-.... 900 SF/300 SF PER OCCUPANT 3 PEOPLE - - TOTAL OCCUPANCY 150 PEOPLE TITLE SHEET PLAN SHEET&l09 N: T-1 ti Bk 23193 Po281_11 -51486 BBB—➢A — A_A A_�$ a 1? e 2 1 A� �tWE qy HAANSTABM SEP ArED MP' Town of Barnstable Planning Board Decision and Notice Special Permit 2008-02 Special Permit § 240-24.1.4 and §240-24.1.10 Summary: Granted with Conditions Petitioner: Park Square Professional Building, LLC Property Address: 94 Main Street and 26 Camp Street, Hyannis, MA Assessor's Map: 327 Parcels: 192 and 195 Zoning: Medical Services Zoning District and Wellhead Protection Overlay District Deed: Book 7606, Page 076 = 94 Main Street Book 8444, Page 281 = 26 Camp Street Relief Requested & Background: In this Special Permit request#2008-002 under Section 240-24.1.4 MS Zoning District, the applicant requests permission to construct to construct a 16,450 SF building and seeks re�ief under: Relief requested on the application • § 240-24.1.4.B Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'; § 240.24.1.10.A Site development standards • Subsection (4) Off-Street Parking Requirements (d) Parking lot - landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2 Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4' with additional screening in buffer Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. on the subject property subject to issuance of a Special Permit. Applicant is Park Square Professional Building, LLC and shown on Assessor's Map 327 as Parcel 192 and 195 in the MS District and the Wellhead Protection Overlay District. The parcel is located on the north side of Main Street wi h,frontage an Camp Street and Cedar Street. The application site plan entitled "Mixed Use Db elopment#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206 shows existing conditions including four Park Square Professional Building Special Permit 2008-92 Map 327,Parcels 192 and 195 1 t structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and one shared access for 94 Main Street on Main Street and landscaped areas. The plan set also includes a Layout Plan showing a 2.5 story medical office building with two residential units in the half story, a Grading, Drainage and Utilities Plan, landscape Plan and two Detail sheets showing the structures, impervious and landscaped areas and a single family residence that are the subject of the applicant's proposal. The property gained Site Plan Review approval #031-08 with conditions for removal of residence at 94 Main Street; preserve residence at 26 Camp Street with removal of garage. Construction of new 2.5 story medical office building with 2 apartments. No other site changes are proposed. The approval letter is dated August 22, 2008 and is attached to this decision, Procedural & Hearing Summary: This special permit request was filed at the Town Clerk's Office and at the Office of the Planning Board on July 24, 2008. A public hearing before the Planning Board was duly advertised and notice sent to all abutters in accordance with MGL Chapter 40A. The hearing opened on August 11, 2008, was continued on August 25, 2008. The public hearing was closed on August 25, 2008. Paul Curley, Ray Lang, David Munsell, Felicia Penn, Patrick Princi, and Marlene Weir were the Board Members deciding this special permit request. On August 11, 2008, the public hearing was opened. Roy Catignani of ConSery Group, Inc. appeared before the Board. Brian Yergatian of BSC Group also made presentations on behalf of the application. Public comment was requested. None was given. The Planning Board discussed the application with the applicant. The Planning Board voted to continue the public hearing on August 25, 2008. On August 25, 2008, the Board discussed the proposal with the applicant and the applicant's representatives. Public comment was requested and none was given. The public hearing was closed upon a motion by Felicia Penn, seconded by Ray Lang with a unanimous vote. No public comment was submitted to the Board in writing. During the public hearing the Board heard the comments of those present, discussed the proposed plans, material submitted with the application, the presentation made by the applicant and the applicant's representatives and the application of the MS and WP Zoning and the spirit and intent of the Zoning Code. Findings of Fact At the hearing of September 8, 2008, the Board unanimously made the following findings of fact: 1, Special Permit.Request 2007- 012, seeks relief, under Relief requested on the application • § 240-24.1.4.13 Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street, • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 25; • § 240.24.1.10.A Site development standards Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [21 Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4'with additional screening in buffer. Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4)Off-street Parking Requirements (d) Parking lot standards [3) A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. 2. Property location is 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels 192 and 195 in the MS District and Wellhead Protection Overlay District. 3. The property that is the subject of this application is located within the Hyannis Growth Incentive Zone and is therefore exempt from Cape Cod Commission jurisdiction. 4. The proposal that is the subject of this application complies with the certified Comprehensive Plan. 5. The proposal gained site plan approval #031-08 from Site Plan Review. 6. The proposal for 94 Main Street, Hyannis received approval from Hyannis Main Street Waterfront Historic District Commission on April 18, 2008 to demolish the existing 94 Main Street building. The HMSWHDC reserves final review for actual building design and elevation of the building exterior. The 26 Camp Street property is to remain unchanged. 7. The site is a developed site, as shown on the plan "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008", including four structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and two shared driveways for 94 Main Street and an adjoining property 110 Main Street and landscaped areas. 8. The shared driveways are located on Main Street and Cedar Street. An existing driveway on the 110 Main Street property is proposed to be eliminated to improve access through proposed shared driveways as described above and as shown on the plan. 9. This plan also shows the location of the proposed 2.5 story medical office building with two residential units in the half story and a single family residence at 26 Camp Street that are the subject of the applicant's proposal. 10. The 94 Main Street property is currently used as an office building and the 26 Camp Street property is used as a single-family residence. 11. The proposal meets the requirements of§ 240.24.1.2 E. specifically that the proposal complies with the provisions of this zoning ordinance and is consistent with the applicable criteria for granting Special Permits. 12. The requirements of§ 240-24.1.4 MS District are met in that the proposed use presents the mixed use medically oriented development desirable within this district. 13. The site meets the Wellhead Protection District requirements for 50% or less lot coverage. Proposed lot coverage is 49.7%. Dimensional, Bulk and Other Requirements 14. The proposal as shown on the plans meets the requirements of§ 240.24.1.4.C. with the exception of Subsection (1) (b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'. Site Development Standards 15. Section 240-§ 240.24.1.10.A are met with the exception of: • Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4' with additional screening in buffer. 3 f • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. 16. Proposed landscaping will enhance the site and provide visual relief from proposed and existing paved areas. Design and Infrastructure Plan 17. § 240.24.11 Design and Infrastructure Plan requirements are met in that the impact on the visual character of surrounding neighborhoods and the community remains unchanged and is in some instances enhanced by the proposed development design; housing opportunities are provided; proposal preserves a shared driveway; allows private investment that supports appropriate economic development. 18. Lighting plan has not been submitted; no finding made as to consistency with the DIP for lighting design. 19. Stormwater management meets DIP standards. 20. Local knowledge of parking for medical office use with associated ancillary uses indicates that existing parking requirements under zoning may not be adequate for client and staff parking. Decision Based on the findings of fact, a motion was duly made by Felicia Penn and seconded by David Munsell to grant a Special Permit pursuant to Sections 240-24.1.4.B, 240.24.1.4.C.(1)(b) and 240.24.1.10.A Subsection (4) (d)[2] and (5)(c)which allows the development of a 16,450 SF building for 2.5 story medical office building with two residential units in the half story at 94 Main Street, a .63 acre parcel, and to continue single family residential use at 26 Camp Street, a .28 acre property, only insofar as such relief is necessary to construct the buildings as shown on the above referenced approved plan. Applicant is Park Square Professional building, LLC and the property location is addressed 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels192 and 195 in the MS District and the Wellhead Protection Overlay District. The use is allowed only in strict conformance to the following: Conditions: 1. Applicant shall construct the project in conformance to the plan, sheets 1 through 7, entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206. 2. This site and any development or redevelopment thereof shall, at all times, comply with the conditions of this special permit. 3. Copies of the final building design elevations as finally approved by HMSWHDC shall be provided to the Planning Board for their record before the issuance of any building permits pursuant to the relief granted herein. Should this approval cause changes to the site design, layout or require further dimensional relief, an amendment to this special permit shall be obtained prior to the issuance of any building permits pursuant to the relief granted herein. 4. Any change to building use from that permitted herein shall require amendment to this special permit. This includes a change in the percentage of medical office and/or residential use at the 94 Main Street property and any change to the single family residential use at the 26 Camp Street property. 4 5. A detailed site and building lighting plan shall be submitted to the Planning Board for review and approval by the Board or its designee. 6. Applicant has indicated that six parking spaces, in excess of zoning requirements, will be provided off-site. An agreement permitting this use of the off-site property, the location of the off-site property and a plan showing at least six existing spaces on the off-site property shall be submitted to the Building Commissioner before the issuance of a Certificate of Occupancy. One year after the facility is fully leased out the property owner may request the off-site parking requirement to be removed. This request shall be reviewed by the Building Commissioner and the results of the review forwarded to the Planning Board for action by the Board or its designee. 7. Prior to the issuance of any foundation building permit, Developer will provide surety $6200 the form and content of which is acceptable to the Town Attorney, shall be posted with the Town Treasurer to be expended on the replacement of landscape materials if such replacement becomes necessary. Any unexpended portion of said performance bond may be released by the Planning Board to Developer or his successor(s) after three years from the date of the initial landscape plantings, such date to be determined by the Building Commissioner, upon the request of Developer. 8. Any existing sidewalks that may be disturbed, removed, or otherwise disrupted as a result of construction pursuant to this special permit shall be repaired to the satisfaction of the Department of Public Works prior to the issuance of a Certificate of Occupancy for the 94 Main Street building. 9. Conditions of the Site Plan approval letter dated August 22, 2008 are hereby incorporated as conditions of this special permit. 10. Developer and its successors will participate in the Town of Barnstable's Transportation Management Association (TMA) upon its formation. Participation shall include: (a) distribution of materials provided by the Town to all tenants, lessees, and purchasers of condominium units within the development; and (b)the identification of a representative for the development who will serve as the contact between the inhabitants and tenants of the development and the Town's TMA. Ordered: Special Permit 2008-002 is granted with conditions as described herein. This decision must be recorded at the Registry of Deeds for it to be in effect. The relief authorized by this decision must be exercised in one year. Appeals of this decision, if any, shall be made pursuant to MGL Chap 40A, Sec t 17, within twenty (20) days after the date of the filing of this decision, a co f which m st e filed in the office of the Town Cle��" 2008 Felicia Penn, Vice Chairman Date Signed I, Linda Hutchenrider, Clerk of the Town of Barnstable, Barnstable County, Massachusetts, hereby certify that twenty (20) days have elapsed since the Planning Board filed this decision and that no appeal of the decision,has been-filed in the office of the Town Clerk. Signed and sealed this day of ,,� "� under the pains and penalties of perjury. i Linda Hutchenrider, Town Clerk 5 MOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map Z _ Parcel Application # 261,%_ 6R Health Division _ Date Issued Conservation Division Application Fee 4 00(OCR Planning Dept. Permit Fee J C26Q� Date Definitive Plan Approved by Planning Board Historic - OKH _Preservation/ Hyannis Project Street Address 1--t MA 1 K-) Village Owner LD C- Address 9A W41AD S_tTL a_&-_r Telephone D$ Permit Request (2-) opymt Co2 c.,20h �i KDa Square feet: 1 st floor: existing&EUbroposed 2nd floor: existing4&95proposed '�fotal new Zoning District HSI) Flood Plain Z4CV--t e-- Groundwater Overlay U)P Project Valuation Construction Type Lot Size Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family (# units) 2— Age of Existing Structure Historic House: ❑Yes Y%No On Old King's Highway: ❑Yes Flo Basement Type: 'R Full ❑ Crawl ❑Walkout ❑ Other Basement Finished Area(sq.ft.) ?,5?0 Basement Unfinished Area (sq.ft) 2-1 bd Number of Baths: Full: existing new Half: existing 3 new { Number of Bedrooms: existing _new Total Room Count (not including baths): existing new First Floor Room_Qount y Heat Type and Fuel: `A Gas ❑ Oil ❑ Electric ❑ Other Central Air: 'KYes ❑ No Fireplaces: Existing New Existing wood/coal:stove: O=Yes ,No Detached garage: ❑ existing ❑ new size Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new s�i;�e_ Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial >(Yes ❑ No If yes, site plan review# Current Use 9'1L�►,4U_- 0F*1t2 Proposed Use MMLG91. C>WICSL_ APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name &D cS ) 602C JD -.LPJC— Telephone Number Address 0 Sf'� - SQ1 License # CS 5167 lwa&a 8 . e s �'lor1y_ 81n:.k M ki" D 2.f ome Improvement Contractor# Worker's Compensation # 6014 2 - (=7q ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO SIGNATUR DATE lI f r- t FOR;OFFICIAL USE ONLY APPLICATION# DATE ISSUED + MAP/PARCEL NO. ADDRESS VILLAGE OWNER.. DATE OF INSPECTION: FOUNDATION y FRAME r c INSULATION z FIREPLACE ti ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH FINAL ` GAS: ROUGH FINAL FINAL BUILDING r DATE CLOSED OUT I f zr ASSOCIATION PLAN NO. } . i r� OME toly t sniuvsr�is. - - 9�, 16,39. ,m� Town of Barnstable prED MA't� Regulatory Services Richard V.Scali,Director Building Division Thomas Perry,CBO Building Commissioner 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 �Y ProP a Owner Must Complete and Sign This Section. If Using A Builder I, 1::Ju Pit—) S . cot-h*3 , as Owner of the subject property hereby authorize &c&mI to act on my behalf, in all matters relative to work authorized by this building permit application for: I eArm , 94 Mihta (Address f( ss o Job) l0 5 o 20 Sign e of Owner Date LI ) Print Name If Property Owner is applying for permit,please complete the Homeowners License Exemption Form on the reverse side. Q:\WPHL.ESTORWbuilding permit fornuEXPRESS.doc Revised 040215 Town of Barnstable �. Regulatory Services oFi rOyr Richard V. Scali,Director Building Division tSTA Tom Perry,Building Commissioner y MASS. 1639 200 Main Street, Hyannis,MA 02601 QED www.town.barnstable.ma.us Office: 508-862-403 8 Fax: 508-790-6230 HOMEOWNER LICENSE EXEMPTION Please Print DATE: JOB LOCATION: number street village "HOMEOWNER": name home phone# work phone# . CURRENT MAILING ADDRESS: city/town ' state zip code The current exemption for"homeowners"was extended to include owner-occupied dwellings of six units or less and to allow homeowners to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor. DEFINITION OF HOMEOWNER Person(s)who owns a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two- family dwelling,attached or detached structures accessory to such use and/or farm structures.'A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. (Section 109.1.1) The undersigned"homeowner"assumes responsibility for compliance with the State Building Code and other applicable codes, bylaws,rules and regulations. The undersigned"homeowner"certifies that he/she understands the Town of Barnstable Building Department minimum inspection procedures and requirements and that he/she will comply with said procedures and requirements. Signature of Homeowner. ** 3 r f Approval of Building Official Note: Three-family dwellings containing 35,000 cubic feet or larger will be required to comply with the State Building Code Section 127.0 Construction Control. HOMEOWNER'S EXEMPTION The Code states that: "Any homeowner performing work for which a building permit is required shall be exempt from the provisions of this section(Section 109.1.1-Licensing of construction Supervisors); provided that if the homeowner engages a person(s)for hire to do such work,that such Homeowner shall act as supervisor." Many homeowners who use this exemption are unaware that they are assuming the responsibilities of a supervisor (see Appendix Q,Rules&Regulations for Licensing Construction Supervisors,Section 2.15) This lack of awareness often results in serious problems,particularly when the homeowner hires unlicensed persons. In this case,our Board cannot proceed against the unlicensed person as it would with a licensed Supervisor. The homeowner acting as Supervisor is ultimately responsible. . To ensure that the homeowner is fully aware of his/her responsibilities,many communities require,as part of the permit application,that the homeowner certify that he/she understands the responsibilities of a Supervisor. On the last page of this issue is a form currently used by several towns. You may care t amend and adopt such a form/certification for use in your community. Q:\WPFILES\FORMS\building permit forms\EXPRESS.doc Revised 040215 Th e Conznzon wealth of Massach usetts f Department of Industrial Accidents Office of Investigations 600 Washington Street . f� Boston NIA 02111 L...4•-- ►vww.mass.gov/dirt Workers' Compensation Insurance Affidavit: Builders/Contractors/I✓lectricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: 0 SO4,- _ City/State/Zip: ie Are you an employer?Check the appropriate box: 1 am a employer with 4• ❑ I am a general contractor and I Type of project(required): employees(full and/or part-time).* have hired the sub-contractors 6• ❑ New construct on 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. Remodeling ship and have no employees These sub-contractors have g• ❑ Demolition working for me in any capacity, employees and have workers' [No workers' comp. insurance comp. insurance.* 9• ❑ Building addition required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doingall work officers have exercised their '11.❑ Plumbing a re ns or additions right of exemption b p myself. [No workers comp. g ption per MGL insurance required.]t c. 152, 51(4), and we have no 12.0 Roof repairs employees. [No workers' 13•0.Other comp. insurance required.] *Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information. Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees;they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information.Insurance Company Name: Crl)Pf :L",5e„»—)C-e_ Co Policy#or Self-ins. Lic. #: G 014?,22 296 1 Expiration Date: Job Site Address: S*zaer, HqCity/State/Zip: 0260' Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby c der the par 4indpelfies of perjury th tl information provided(atove is true and correct. F Signature; Date: -Phone#: S Official use only.. Do not write in this area, to be completed by city or town officiaL City.or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2. Building Department 3. City/Town Clerk 4.Elect71nspector .Plumbing Inspector6. Other Contact Person: Phone# Massachusetts -Department of Public Safety _ Board of Building Regulations and Standards Construction Supervisor License: CS-005157 ROLAND B CATI�1Al 60 GEMINI DR s W BARNSTABLE MA,02668 -Expiration --- - •�— Commissioner 05/23/2016 4 Mass. Corporations,,external master page Page 1 of 2 J Corporations Division Business Entity Summary ID Number: 264834166 Request certificate New search Summary for: EAST MAIN STREET DEVELOPMENT, LLC The exact name of the Domestic Limited Liability Company (LLC): EAST MAIN STREET DEVELOPMENT, LLC Entity type: Domestic Limited Liability Company (LLC) Identification Number: 264834166 Old ID Number: 001001918 Date of Organization in Massachusetts: 05-06-2009 Last date certain: The location or address where the records are maintained (A PO box is not a valid location or address): Address: 110 MAIN STREET City or town, State, Zip code, HYANNIS, MA 02601 USA Country: The name and address of the Resident Agent: Name: EVAN S. COHEN Address: 4 LICHEN LN. City or town, State, Zip code, FORESTDALE, MA 02644 USA Country: z The name and business address of each Manager: Title Individual name Address MANAGER ROBERT R. HARTNETT 110 MAIN ST. HYANNIS, MA 02601 USA MANAGER WILLIAM G. JOHNSTON JR 110 MAIN ST. HYANNIS, MA 02601 USA MANAGER EVAN S. COHEN 110 MAIN ST. HYANNIS, MA 02601 USA MANAGER EVANGELOS G. 110 MAIN ST. HYANNIS, MA 02601 USA GERANIOTIS In addition to the manager(s), the name and business address of the person(s) authorized to execute documents to be filed with the Corporations Division: Title Individual name Address SOC SIGNATORY EVANGELOS G. 110 MAIN ST. HYANNIS, MA 02601 USA GERANIOTIS http://corp.sec.state.ma.us/Cof pWeb/CorpSearch/CorpSummary.aspx?FEIN=264834166&S... 9/8/2015 Mass. Corpo,rations�,external master page Page 2 of 2 SOC SIGNATORY ROBERT R. HARTNETT 110 MAIN ST. HYANNIS, MA 02601 USA SOC SIGNATORY WILLIAM G. JOHNSTON JR 110 MAIN ST. HYANNIS, MA 02601 USA SOC SIGNATORY EVAN S. COHEN 110 MAIN ST. HYANNIS, MA 02601 USA The name and business address of the person(s) authorized to execute, acknowledge, deliver, and record any recordable instrument purporting to affect an interest in real property: Title Individual name Address REAL PROPERTY EVANGELOS G. 110 MAIN ST. HYANNIS, MA 02601 USA GERANIOTIS REAL PROPERTY WILLIAM G. JOHNSTON JR 110 MAIN ST. HYANNIS, MA 02601'USA REAL PROPERTY ROBERT R. HARTNETT 110 MAIN ST. HYANNIS, MA 02601 USA REAL PROPERTY EVAN S. COHEN 110 MAIN ST. HYANNIS, MA 02601 USA ❑ ❑Confidential ❑Merger ❑ Consent Data Allowed Manufacturing View filings for this business entity: ALL FILINGS Annual Report n4 Annual Report - Professional Articles of Entity Conversion Certificate of Amendment y filings___..........`View Comments or notes associated with this business entity: :A .New search http://corp.sec.state.ma.us/CorpWeb/CorpSearch/CorpSummary.aspx?FEIN=264834166&S... 9/8/2015 David Vachon From: Perry, Tom <Tom.Perry@town.barnstable.m a.us> Sent: Monday, August 31, 2015 3:30 PM To: David Vachon Subject: RE: Duffy Medical Looks good to me From: David Vachon [mailto:dvachon@conservgroup.com] L Sent: Thursday, August 20, 2015 10:33 AM To: Perry, Tom Cc: Pieter Van Slyck Subject: Duffy Medical Tom I understand that there has been some discussion on the door swing direction of our new doors at the Duffy center. Attached is a sketch of how I interpreted the code (1008.1.2) and complying with CMR 521 as well. Have a look and let me know if this answers any questions that you may have. If you have questions please call me at 508-888-6555 ext 110 If I don't hear from you I will follow up later on. Thanks r Dave �tTti Town of Barnstable Building Department - 200 Main Street •ARNSTABLE, * Hyannis, MA 02601 9� b� ,�' (508) 862-4038 CFO MA'i A Certificate of Occupancy Temporary Application 200805760 CO Number: 20110084 Parcel ID: 327195 CO Issue Date: 06115/11 Location: 94 MAIN STREET (HYANNIS) Zoning Classification: MEDICAL SERVICES DISTRICT Owner: HEWITT,ROSTOWSKI,GRIFFIN TR Proposed Use: COMMERCIALLY ZONED DEV LAND 21 FELLOWS ST ROXBURY, MA 02119 Village: HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: CTC2 2NO COMM TEMPORARY CO Comments: 60 (SIXTY) DAY TEMP CO TO EXPIRE 8/19/2011 Building Department Signature Date Signed Expiration Date J r ConSery GROUP, INCORPORATED June 9, 2011 Mr. Tom Perry, Building Commissioner Town of Barnstable Regulatory Services, Building Division 200 Main Street Hyannis, MA 02601 Re: Request for Extension Temporary Occupancy Permit#20110012 94 Main Street, Hyannis Dear Tom: Please accept this letter of request to extend the Temporary Occupancy Permit issued in January when the weather was too cold to complete the site improvements. Since then, the owner has completed the required landscaping. ConSery has also met with and addressed the site lighting issues raised by the residential abutter, and in turn reduced the site lighting significantly to conform with Planning and Zoning requirements. In addition, we have met with the Hyannis Main Street Historic District Commission on �. two occasions and have resolved their concerns with regard to screening exterior HVJAE units, reducing the height of the site lighting poles, and the aesthetic treatm_ent of the concrete light pole bases. The site pole and base modifications are underway arid: a should be completed early next week. �,. -- „V . The only remaining items to complete at this time are the installation of the HVAC- - 01) screening fence which is in process, final inspection and approval by Steve Seymotxwith regard to the site lighting levels and a revised letter from the civil engineer:-1ndicatir M compliance with the recent HMSHDC decision and landscaping requirement. We should be able to complete these last items within a few weeks and therefore we hope you will grant our request for a 60-day extension of the permit to provide a margin for error. Thank you for your attention to this matter. Please let.us know if you have any questions. Ve truly s: Roy Ca gnani President ConSery Group, Inc. CC: Mr. Paul Roma, Hyannis BuildingInspector. P _ ll Mr. Steven Seymour, Planning Board Engineer, 2277 State Road,Plymouth,MA 02360—Mail to:PO Box 278, Sagamore Beach,MA 02562 Ph(508)888-6555—F(508)888-6566 www.conservgroup.com � tTti Town of Barnstab le Building Department - 200 Main Street STAe . # Hyanni s6 s MA 02601 (508) 862-4038 MASS 39. p�� FD MP'i Certificate of Occupancy Temporary Application 20080576.0 CO Number: 20110012 Parcel ID: 327195 CO Issue Date 01119/11 Location: 94 MAIN STREET HYANNIS ( ) Zoning n Classification: MEDICAL SERVICES DISTRICT 9 Owner: HEWITT,ROSTOWSKI,GRIFFIN TR Proposed Use: COMMERCIALLY ZONED DEV LAND 21 FELLOWS ST ROXBURY, MA 02119 Village:` HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: CTCO COMM TEMPORARY CO Comments: COMMON AREAS OF BLDG. TEMP.C.O. EXPIRES IN 5 MOS LANDSCAPE FEATURES 06/19/11 Building Department Signature Date Signed Expiration Date Town of Barnstable Building Department - 200 Main Street BAIMSTIE AM . * Hyannis, MA 02601 9 MASS 1639 , (508) 862-4038 CFO MA'i A Certificate of Occupancy Application Number: 200805760 CO Number: 20110133 Parcel ID: 327195 CO Issue Date: 08118111 Location: 9 N STREET'(HYANNIS►� Zoning Classification: MEDICAL SERVICES DISTRICT Proposed Use: COMMERCIALLY ZONED DEV LAND Village: HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: CC00 CERTIFICATE OF OCCUPANCY COMM Comments: Building Department Signature Date Signed -- - -- __ 1 � I �a `,5 0 ; , �� � �'� � c �IINE ti TOWN OF BARNSTABLE Building. Application Ref: 200805760 BARNSTABLE, + Issue Date: 11/20/08 Permit ' y MASS. �A i639• �� Applicant: ROLAND B CATIGNANI rFG MAC A Permit Number: B 20082612 Proposed Use: COMMERCIALLY ZONED DEV LAND Expiration Date: 05/20/09 Location 94 MAIN-STREET (HYANNIS) Zoning.District MS Permit Type: NEW COMMERCIAL Map Parcel 327195 Permit Fee$ 10,947.30 Contractor ROLAND B CATIGNANI Village HYANNIS App Fee$ 150.00 License Num 005157 Est Construction Cost$ 1,203,000 Remarks APPROVED PLANS MUST BE RETAINED ON JOB AND .NEW MEDICAL OFFICE BUILDING WITH 2 APT ABOVE. SITE WORD. THIS CARD MUST BE KEPT POSTED UNTIL FINAL AT 26 CAMP STREET. SEE ATTACHED PLANS. 2ND EXT EXP 5/19/1¢ INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH Owner on Record: HEWITT,ROSTOWSKI,GRIFFIN TR. BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL` Address: 21 FELLOWS ST INSPECTION HAS BEEN MADE. ROXBURY, MA 02119 t 1 Application Entered by: PR, Building Permit Issued By: THIS PERMIT CONVEYS NO RIGHT.:TO OCCUPY ANY STREET,ALLY OR SIDEWALK OR ANY PART THEREOF;,EITHER TEMPORAFhY`OR PERMANENTLY. ENCROACHEMENTS ON PUBLIC,PROPERTY,NOT SPECIFICALLY PERMITTED UNDERTHE BUILDING CODE,MUST BEAPPROVED BY THE JURISDICTION. STREET OR ALLY`GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF'PUBLIC WORKS:: THE ISSUANCF'bP THIS PERMIT'DOES NOT RELEASE THE APPLICANT FROM.THE CONDITIONS OF ANY APPLICABLE SUBDIV!SION RESTRICTIONS... - MINIMUM OF FOUR CALL INSPECTIONS REQUIRED FOR ALL CONTSTRUCTION WORK: 1.FOUNDATION OR FOOTINGS. 2.ALL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED. 3.WIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME INSPECTION. 4.PRIOR TO COVERING STRUCTURAL MEMBERS(READY TO LATH). 3 5.INSULATION. 6.FINAL INSPECTION BEFORE OCCUPANCY. WHERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED ABOVE. PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in'MGL c.142A). '13VA , � ' er BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS �Q ►� D �rES U .9K . of-t U � P - <%- 3 �� ,crc 1 Heating Inspection Approvals Engineering Dept Fire Dept 2 BoPalth 1�19'III oil BS&GROUP. h � TOINN OFF! iI TA LE transforming the human environment 349 Main Street j fE f g oute 28), Unrt D _;August^ 16 2011; Ct Yarmouth °MA 02673. "Mr Thomas Perry, Building Co_mmissioner _ D d� } f: Tel:'Sob 778 8q�q Town of Barnstable 800-288-8123' 200 Main Street. ` Hyannis, MA 02601 Fax:`508-778 8966 �- �. RE -Park Square Professional`Building,'94 Main Street and:26 Camp-Street wwiv.bscgroup com F Hyannis,-MA .' Dear Tom:` East Main:Street Development,^LLC(Applicant) is,se'eking a-final'Certificate of Occupancy for.the_above,referenced.project''Pursuant_-to the-conditions_contained in.the Site Plan approval letter dated_August.`22,,2008;BSC Group; Inc: (BSC) is pleased to. . Apresent thisletter:of cehification;,based•.on our recent site visit on August,12,•2011 Pursuant to the aforementioned_Site Plan approval leiterj_he Hyannis-Main Street s Waterfront Historic District Commission voted on May 18, 2011 to approve a minor, - PP -modification to the Certificate of Appropriateness issued to East Main Street'. Y Development, LLC;.originallyrdated June 8, 2008 and August 20, 2008.(see attached). , Therriodifications;were associated with screening'of the HVAC units and. he design of 4 parkmg`1ot lighting,.and'have been completed iri:accordance witl :a plan prepared by Consery Group; entitled`HVAC Screerimg Light Poles .dated May -0, 2011 and revised May;12,2011 F Irit:addition to,this recent approval,the Applicant has also demonstrated compliance with ,the'.Town!s lighting standards-.-,as witnessed by Steve Seymour P.E.-on June•24; 2011 arid'4 . confirrried'via email correspondence to Tliomas.Perry. . Bqse&oh site'observations and to the!best of our knowledge �iriforination.and belief; BSC -w is pleasedto,report'that all site work`associated,with this project has been completed in :,,substantialecompliance with the approved:plaris. Should you have further.questions or ` concerns;please feel'free to cont ac"t us'at,your convenience. Thank you, F ` Sincerel y,-� BSC GROUP, INC Y Y ���N OF Mgssgc Engineers 'BRIAN G. yG� Environmental�i YERGATIAN Scientists v. CIVIL v' Brian Yer atiai =LEED AP No.46206 ` g ,o q GIS Consultants Project Manager%Associate 90 Fcrs`TeP �� FFSS/OVALLandscape s cc:- t Roy Catignani Conserv`Group,.Inc: Architects -.i Planners Surveyors P:\prj\4931500\_Project Control\Correspondence\Outgoing\Town of Bamstable\2011-08-16 bgy LT affidavit.docx -BSC GROUP. { transforming the human environment `_ r 349 Main Street (Route 28), UnwD August 12,^201]' J West Yarmouth MA 02673 Mr. Thomas Perry,Building Commissioner: `. 'Tel:'Sob 778789t9` Town of Barnstable l Boo z88 8123 •200 Main Street x Fax:'508-778=8966r Hyannis, MA-02601 RE: Park Square Professional Building, 94:Ma n Street and 26 Camp Street www.bscgroup.com Hyannis; MA _ Dear Tom: Easr'Main Street Development; LLC (Applicant) is seekirig-afinal Certificate of. Occupancy.for the above referenced project:'Pursuant to the conditions.contained in the 4 Site'Plan approval•letter dated. ugusf 22; 2008 BSG Group` Inc. (BSC) is pleased:to present-this letter of certification based on our:recent'site visit on August l2, 2011 Pursuant to the aforementioned Site Plan approval letter, ehe Hyannis Main.Street _ . Waterfrone Historic DistricrCo'mmission'recently voted'_to approve a minor modification:', to the Certificatefof'Approp lateness issued to East Main Street Development, LLC w originally dated June 8;2008 'arid-August 20, 2008 (see attached).: `The modifications" ' were associated with screening`of the HVAC units and the`desi ri of' arkin .loCli htiri ;u g_ p g g g _ - �.. In addition to*.this recent approval the,Applicant has also demonstrated.Compliance with the Town's lighting standards; as witnessed by Steve Seymour, P:.E`+on June 24; 201 Land confirmed via email correspondence to Thomas'Perry, - - 'Based on site observation's and to the best of`our knowledge, information,and belief;BSC , is,pleased to report fhat'all site workµassociated with this.project has"been~completed in,, ' substantial compliance with the approved plans:'Should you have further questions.br. a x concerns; please feel"free to contact us at your convemerice.` Thank:you. ,- Sincerely; c BSC GROUP,:INC 'A of Mqs { A� sqC BRIAR OATIAN _ Engineers YER. Brian :Yergatian;P.E., LEED'AP c� CIVIL, n' «..Environmental ' Project.Manager/Associate Iio:16'1�o, ,4Q t ` Olt 9F4,sT�P �4, ,+ Scientists av� r cc Roy Catignarii, Consery Group Inc. : ss/ONA4 EN G1S Consultantsx �. Landscape ' Architects z Planners " P:\prj\49315001 Protect Control\Correspondence\Qutgomg\Town of B,amstable\2011 08 12 bgy LT affidavit dbcx . Surveyors ,3 ConSery GROUP, INCORPORATED June 9, 2011 Mr. Tom Perry, Building Commissioner Town of Barnstable Regulatory Services, Building Division 200 Main Street Hyannis, MA 02601 Re: Request for Extension Temporary Occupancy Permit# 20110012 94 Main Street, Hyannis Dear Tom: Please accept this letter of request to extend the Temporary Occupancy Permit issued in January when the weather was too cold to complete the site improvements. Since then, the owner has completed the required landscaping. ConSery has also met with and addressed the site lighting issues raised by the residential abutter, and in turn reduced the site lighting significantly to conform with Planning and Zoning requirements. In addition, we have met with the Hyannis Main Street Historic District Commission on two occasions and have resolved their concerns with regard to screening the exterior HVAC units, reducing the height of the site lighting poles, and the aesthetic treatment of the concrete light pole bases. The site pole and base modifications are underway and should be completed early next week: The only remaining items tocomplete at this time are the installation of the HVAC screening fence which is`in process, final inspection and approval by Steve Seymour with, regard to the site lighting levels and a revised letter from the civil engineer indicating compliance with the recent HMSHDC decision and landscaping requirement. ? We should be able to complete these last items within a few weeks and therefore we hope you will grant our request for a 60-day extension of the permit to provide a margin for error. Thank you for your attention to this matter. Please let us know if you have any questions. Ver truly , s: Roy Ca gnani President ConSery Group, Inc. P CC: Mr. Paul Roma, Hyannis Building Inspector � C � �� Mr. Steven Seymour, Planning Board Engineer 2277 State Road,Plymouth,MA 02360—Mail to:PO Box 278, Sagamore Beach,MA 02562 Ph(508)888-6555—F(508)888-6566 www.conservgroup.com Town Of Barnstable ,�.. Building Department - 200 Main Street BARMN LE, * Hyannis, MA 02601 6 A. ' ` (508) f362-4038 Certificate Of Occupancy lemflorary Application 200805760 CO Number: 20110012 Parcel ID: 327195 CO Issue Date: 01/19/11 Location: 94 MAIN STREET (HYANNIS) Zoning Classification: MEDICAL SERVICES DISTRICT Owner: HEWITT,ROSTOWSKI,GRIFFIN TR Proposed Use: COMMERCIALLY ZONED DEV LAND 21 FELLOWS ST ROXBURY, MA 02119 _ Village:' HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: CTCO COMM TEMPORARY CO Comments: COMMON AREAS OF BLDG. TEMP,C.O. EXPIRES IN 5 MOS LANDSCAPE FEATURES 06/19/11 ry Building Department Signature Date Signed Expiration Date PROJECT NAME: ADDRESS: 1 Ca" , PERMIT# Q6?(6 C7S---) to PERMIT DATE: 1 I3c� M/P.: 3 -7 LARGE ROLLED PUTS ARE La BOX t ' SLOT Data entered in MAPS program on: d BY: ; 1 THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS } 8 BEAUMONTS POND DRIVE-FOXBORO,MA 02035 (508)543-5499 SECTION 116.0 OF MASSACHUSETTS STATE BUILDING CODE REGISTERED ARCHITECTURAL AND PROFESSIONAL ENGINEERING SERVICES -CONSTRUCTION CONTROL BUILDING NAME: East Main Street Development STREET ADDRESS: 94 Main Street TOWN/STATE: Hyannis,MA - CONSTRUCTION SUPERVISOR'S NAME: Dave Asiaf PROJECT: Three Story Medical/Residential Facility FIELD REPORT NUMBER: 005 DATE: 06/28/10 TIME: 8:30 am WEATHER: Sunny TEMP. RANGE: 84F UPDATE ON PREVIOUS REPORTS: No updates. WORK IN PROGRESS: Framers up to third floor deck. OBSERVATIONS: Foundation walls backfilled;underground plumbing underway; framing up ._._... --to-third--floor- ISSUES DISCUSSED W/SUPERINTENDENT: Discussed cutting back triple 14" beams at all levels that were extended to far beyond columns common to main building and left and right wings; framers to remove BCI joists attached to,butt ends of triple 14"LVL beams at all levels and add two new joists,one to each side of LVL beam. Discussed time frame for casting basement slab prior to-framing basement stair walls. Also,resolved discrepancy between plans and framing in place with Pieter Van Slyck of ConSery(06/29/10 by phone)regarding LVL beam size at third floor connection adjacent to rear stairs. It was agreed that the drawings were correct. Work will proceed in accordance with the plans. INFORMATION OR ACTION REQUIRED: See"Issues Discussed w/Superintendent" above. I,Richard J.Dempsey,P.E.,as the affidavited engineer,hereby certify that I have on this. date,06/28/10,inspected the property located at 94 Main Street,Hyannis,MA and find that the construction complies substantially with the approved plans and specifications and ' appropriate provisions of the Massachusetts State Building Code,7ch edition,except as noted above. ��jH2OF�dgss� �� cy /►� �° RICHARD J. �N V o DEMPSEY Old NAL S TURE AND SEAL STRUCTURAL 06/29/10 � No. 2917 GIST �k 0 DATV J 1 THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS 8 BEAUMONTS POND DRIVE—.FOXBORO,MA 02035 .(508)543-5499 SECTION 116.0 OF MASSACHUSETTS STATE BUILDING CODE REGISTERED ARCHITECTURAL AND PROFESSIONAL ENGINEERING SERVICES -.CONSTRUCTION CONTROL BUILDING NAME: East Main Street Development STREET ADDRESS: 94 Main Street TOWN/STATE: Hyannis, MA CONSTRUCTION SUPERVISOR'S NAME: Dave Asiaf PROJECT: Three Story Medical/Residential Facility FIELD REPORT NUMBER: 006 DATE: 07/21/10 TIME: 8:45 am WEATHER: Sunny TEMP. RANGE: 74F UPDATE ON PREVIOUS REPORTS: Framer to cut back triple 14"LVL beams that were extended too far beyond columns common to main building and left and right wings and also to remove BCI joists attached to butt ends of triple 14"LVL beams at all levels and add two new joists, one to each side of LVL beam as per site visit report#005. WORK IN PROGRESS:Framers installing roof sheathing and front dormers. OBSERVATIONS: Basement slab poured;roof sheathing at 90%complete; front and rear dormer installation underway; slopeable/skewable hangers not installed correctly at the left ands right side hip connections. ISSUES DISCUSSED W/SUPERINTENDENT: Discussed adding nails to all open nail holes in slopeable/skewable hangers. In addition,hangers that are not installed in the correct position are to be removed and installed correctly. INFORMATION OR ACTION REQUIRED: See"Issues Discussed w/Superintendent" above. I,Richard J.Dempsey,P.E.,as the affidavited engineer,hereby certify that I,or a duly authorized agent of this office,have on this date,07/21/10,inspected the property located at 94 Main Street,Hyannis,MA and find that the construction complies substantially with the approved plans and specifications and appropriate provisions of the Massachusetts State Building Code, 7th edition, except as noted above. X�H OF*SS RICHARD ORfVINAn TURF,AND SEAL o DEMPSEY ` 07/21/10 " STRUCTURAL DATE No. 291730 o��S OMAI THE DEMPSEY GROUP, INC. 8 Beaumonts Pond Drive Foxboro, MA 02035 Tel. (508) 543-5499 STRUCTURAL ENGINEERING CONSULTING CIVIL ENGINEERING • INVESTIGATIONS REPORTS October 15,2010 Mr.Thomas Perry Building Commissioner Building Department 200 Main Street Hyannis,MA 02601 Re: East Main Street Development Building-94 Main Street-Hyannis MA. 780CMR-Section 116.0-Professional Engineering Services Building Construction Compliance Affidavit TDG#08283 Dear Mr.Perry, I certify that to the best of my knowledge and belief, the structural work performed at the East Main Street Development Building, 94 Main Street,Hyannis, MA conforms substantially with the approved drawings produced by this office and was completed in compliance with appropriate provisions of the Massachusetts State Building Code,6th edition,and any amendments thereto. Respectfully, THE DEMPSEY GROUP,INC. Ric and J. qme)y,P E. President s RICNARD J. s o DEk. SEY " STRUCTURAL No. 29173 Q: �Drlp G sTEXXO�4� �SS�ONAL LNG ConServ � GROUP, INCORPOR , J aP BASTABLE 207 OCT 28 Pit 12: 28 October 20, 2009 Mr. Tom Perry, Building Commissioner Mr. Paul Roma, Building Inspector.✓ Town of Barnstable Regulatory Services, Building Division 200 Main Street Hyannis, MA 02601 _ Re: Park Square Professional Building, LLC 94 Main Street, Hyannis.- Dear Tom and Paul: With regard to Building Permit 4200805760 at the above referenced site, we have not been able to make construction progress in the recent months. The good news is that the owners of the property seem to have secured an occupant for the building. Pending final paperwork, it is hoped that construction will resume this fall. I thought it advisable to formally request an extension of the current permit prior to its expiration. Please let me know if you need any further information with regard to this request. Thank you in advance for your assistance. er y urs. Roy C tignan President ConSery Group, Inc. 2277 State Road,Plymouth,MA 02360—Mail to:PO Box 278, Sagamore Beach,MA 02562 Ph(508)888-6555—F(508)888-6566 www.conservgroup.com B stable ��r+�roti o Town of Barnstable "edcaft Hyannis Main Street Waterfront • BARNSI'ABL& • �e 0 9. Historic District Commission a63 2007 George A. Jessop,jr.AIA,Chair Theresa Santos,Commission Assistant.,~, Minor Modification Decision Applicant: East Main Street Development, LLC Property: 94 Main Stre`ef Map/Parcel: —327195 On May 18, 2011 the Hyannis Main Street Waterfront Historic District Commission voted to approve a` minor modification to the Certificate of Appropriateness issued to East Main Street Development, LLC, originally dated June 8, 2008 and August 20, 2008, for screening of HVAC units and design of parking lot lighting. Minor modifications are approved as follows: 1. Screening around the HVAC units on the''Main Street side of the building is approved as shown on the plan entitled "Proposed Office Building for.Park Square Professional, 94 Main Street, Hyannis", . originally drawn 5110/11 and last revised;541.2/11, except as stated herein. The screening shall consist of- a. A 3' 4"fence with top and bottom rail (1 ''/2"rails,top sloped)and 1"x4" fence rails,with vertical slats(3/4"by 4")and 4"x4" posts with "Cape Cod"caps. ®ate b. The fence shall be made of Azek or similar composite. Vinyl is not approved. �Q V c. A total of ten shrubs (Japanese Barberry)shall be planted in front of the fences, as shown.�Y, Existing boxwood hedge to remain (24" high). i � Present and voting in the affirmative to grant the minor modification to HVAC screening were: Aye: George Jessop, Joe Cotellessa, William Cronin,Marina Atsalis, David Colombo, Paul.Arnold Nay: None Absent: Meaghann Kenney, Barbara Flinn 2. Parking lot lighting shall be modified as shown on the plan entitled"Proposed Office Building for Park Square Professional, 94 Main Street,Hyannis", originally drawn 5/10/11 and last revised 5/12/11, except as stated herein: a. Existing light poles shall be cut down 42". Total height of the light fixtures shall be 15' 6". b. Existing 2 foot concrete bases shall be modified as follows: i. Concrete bases shall have a transitional beveled edge ii. Bases shall be ground to remove any trace markings from the form. iii. A smooth cement hand-rubbed finish shall be applied to each base. iv. Bases shall be painted black. I 200 Main Street,Hyannis,MA 62601 (o)508-862-4665(f 508-862-4784 Present and voting in the affirmative to grant the minor modification to parking lot lighting were: Aye: George Jessop, Joe Cotellessa, David.Colombo, Paul Arnold Nay: William Cronin, Marina Atsalis Absent: Meaghann Kenney, Barbara Flinn C . George A. ss ,j . AIA, Chair Date Hyannis Main a ont Historic Distri Commission cc: ConServ, Town of Barnstable Tom Perry, Building Commissioner File 200 Main Street,Hyannis,MA 02601 (o)508-862-4665(fl 508-862-4784 u IWO Hyannis Main Street Waterfroi t � : Historic District CommissionPi� ' Growth Management 200 Main Street Hyannis,Massachusetts 02601 GROWTH MANAGEMENT Phone:508-862-4665 Fax 508-862-4784 www.town.bamstable.ma.us -Minor Modification to Prior Approved Plan Statement of Understanding ' Only minor changes may be approved by the Committee without a new application and a hearing. Minor changes include such items as moving a single window or door or a minor change of color. All changes by amendment require the Committee's written approval. A request for change must be submitted to the Committee in writing. Approval must be obtained before incorporating the change into the project. For more than one revision to approved plans, a new application for a Certificate of Appropriateness must be applied for. Failure to comply with approved plans may result in the Building Department issuing a stop work order or denying an Occupancy Permit. ----- ----------------------------------------------------------------------------------------------- A minor modification to a prior approved plan has been approved by the Hyannis Main Street Waterfront Historic District Commission for the applicant(s)named below. l Applicant: i�rS'C' f AJ L LC Assessors Map: 3 Z•7 Parcel: 115 Address of proposed work: *1 5`f.' s�L L*t14 'muw. RYA�Y tilA- Minor Modification Requested) , 5 V d S i o 'DGc S ST"►tv ti o� a kk�Go P2 SAD i ��tt ,Poles' i�f aPt.�c�' or VWvVSo4- MAW Sr. fACAS9 tur�� e ty Signatur� ✓ l.�er�; D e J Signature: Chairman,HHDC Date ,. ...................---- — - _ : ��.... .._w_.ter.)-r-+�._.ni.. _•-_ __ .-......_-_ _ ..._-.-. +ram • k _ ' � , ..(�' ..-.. •,.nn-t . •ate,-'e� . �� ;� � ��h� � • :� Yam` - ,•t��...... ARI let r l ,. � a.:� � �"f�' •:' -. �. �„'"'"..fin, - � f,�'�t't^'�'t'.F�•=-J_..__ � ' � �, � `„�' '' -- _ q;r':.x''�s3�,�^.e==,mot•_:—_ f s i : u.. I � _ �• -'Y, i,*rya..��,:t , 1 � 1 . sit _ •�� ��,.m...n-"-°`�� ,.,ate �� � -•-,..+,.: I .I 4•r ISSUED FOR PERMITTING NOT FOR CONSTRUCTION ti mt ,T• - - e I _ (I 1 a A oNAL ENGI16Oi 1 1, i. �) •a ' - e- sx `'.. r L ni a I, E. ' : Pe"X m,'�°1so, "d Pne, tm.1 �. .o PARK SQUA RE iLT PROFESSIONAL BUILDING #94 MAIN STREET 1 • .-.�_ °c '�. �\ o AND #26 CAMP STREET IN ` n- L Tmvomora t \.. r A I E NI HYANNIS •�� ' } I •.\ \ '�' MASSACHUSEFTS ,r 1 ;1• - F — (BARNSEABLE COUNTY) I. r"' — i t \ �•�,� �`` f GRADING,DRAINAGE& �, ( '.. - ��' 1 }_.Il r • r ., w� eJ"' UTILITIES PLAN JUNE 9,2008 V. - ( x B 2{08 SPR STAR CONNENT9 T-07-08 —E AccEss owNE \`'_ - - - r''� 1':-..y �• �,,'�''. /r'� •�% - s 8-H9-oe PER PLANNING BOARD th CONSER GROU278 P, INMCA./ P.O.YYY-/� SACMORE BEACH, 1. EASING sEYrtR M-CE—ENTLY CONNECTED TO EXISTING OETCE TO BE RE VSW TO THE EXTENT FCA BM / „ - 2 EASTNG WATS SERMCE AT 94%N STNEET SHALL BE ABANDONED.A NEW BSC GROUP NEW OI.OING EERMCE AND!'NRE EPRINRLEN SERMLE TO BE PNOMGED FOR ] GAS ELECTPLG TELEPHONE,CABLE BERMGES TO BE COORDINATED—LOCAL um co-m— 349 Mah,street ,•,1 r,-_ / �'' ♦. ALL CATON—NS SHALL BE EORPPEG WITN DEEP SUMP AND OIL NOODS Route 28,Unit D W.YDMOUth,Massachusetts 02673 5087788919 \• N "rJ S► SCALE FNE:v are w..•. :WlNam soo\aw�D�N.r.._ �9 r mw.ND:sen-oD SHEEP 4 OF I _ Independence (V1503) Specification Sheet Project Name: Location: MFG:Philips Hadco Fixture Type: Catalog No.: . qty. Ordering Guide Example:V1503 A 133 N D 70S E Product Code V1503 Independence Finish A Black J B White f G Verde . H Bronze ti J Green Optics B3 Type III Refractive Panels t, 65 Type V Refractive Panels ti� ti Photo Control N None Socket D Medium !, G Mogul Wattage 70S 70W HPS 1005 10OW HPS U 70H 70W MH *1 I 100H 10OW MH .1 Voltage E 120V a F 208V G 240V H 277V. a ,;B -.;� K 347V 20 ' = - `1 Available with Medium base(D)socket only. SlAinles_.Sl +i 3'h,9ET:4 r3 U. r S5'vC`car/:;i l;;r c::rT1j Specifications HOUSING: 356 HM high-strength,low-copper,proprietary cast aluminum alloy. Hinged roof with stainless steel thumb screw. A weatherproof ballast assembly isolates the ballast from water and heat for longer life. Easy access to lamp. All non-ferrous fasteners prevent corrosion and ensure longer life. Slip Fitter Dimensions:3"I.D.x 3"deep. FINISH: Thermoset polyester powdercoat is electrostatically applied after a five-stage conversion cleaning process and bonded by heat fusion thermosetting. Laboratory tested for superior weatherability and fade resistance in accordance with ASTM B-117-64 and ANSI/ASTM G53-77 specifications. For larger projects where a custom color is required, contact the factory for more information. OPTICAL ASSEMBLY: Type III Refractive Panels. Type V Refractive Panels. Optically designed,U.V.stabilized,injection molded,acrylic refractive panels. Tookless removal panels for ease of cleaning. LAMPING: HPS Mogul base:E23.5. MH and HPS Medium base:E17. ELECTRICAL ASSEMBLY: Ballast assemblies are mounted to an aluminum plate or spinning,which is mounted inside the ballast pod. 4kv rated medium base porcelain socket.Nickel-plated screw shell with center contact. 4kv rated mogul base porcelain socket.Nickel-plated screw shell with center contact. BALLAST: All HID ballasts are core and coil and regulated with power factors better than 90%(HPF).Ballast provides+/-5%lamp power regulation with+/-10%input voltage regulation. Ballasts are factory pre-wired and tested.Metal halide ballasts are capable of starting at-20°F or-30°C and HPS at-40oF or-40°C.NOTE:All ballasts are EISA/Title 20/Title 24 compliant where applicable. CERTIFICATIONS: UL Listed to U.S.safety standards for wet locations. cUL Listed to Canadian safety standards for wet locations. Manufactured to ISO 9001:2000 Standards. WARRANTY: Three-year limited warranty. Height: 21 1/4'(54cm) ISO 9001:2000 Registered Page 1 of 2 PHILIPS Note:Hadco reserves the right to modify the above details to reflect changes in the cost of materials and/or production and/or design without prior notice. �� 100 Craftway Littlestown,PA 17340 tel(717)359-7131 fax(717)359-9289 www.hadco.com Copyright 2008 Philips P2540 Specification Sheet Project Name: Location: MFG:Philips Hadco Fixture Type: Catalog No.: Qty: Ordering Guide 0Example: P2540 10 A 4 Product Code P2540 `:atllch( Pole Height 10 10' i I Ia fltt(t:^ 12 12"t —'° lE®✓I�1� >0 1�� ®A��� 1Vl.S -ftlit 4 14'm* r 1 16 16' Finish A Black B White G Verde 43 W4 H Bronze J Green I 0. JJt i•':.i:111.1:.I r'r l:.at 11111 B,4f; - u Specifications HOUSING: 356 HM high-strength,low-copper,proprietary cast aluminum alloy. 319 Permanent mold aluminum. 6005-T5 extruded aluminum. Anchor rods are hot dipped galvanized steel . Tenon is 356 HM sand cast aluminum. FINISH: A durable polyurethane enamel finish is applied afterassemblies are shot blasted to create a surface profile which allows for the highest level of paint adhesion. Laboratory tested for superior weatherability and fade resistance in accordance with ASTM B-117-64 and ANSI/ASTM G53-77 specifications. For larger projects where a custom color is required, contact the factory for more information. WARRANTY: Three-year limited warranty. Tenon/Top: 3"OD Bolt Circle: 11"-14" Anchor Rods: (4)3/4"dia.x 19" Base Dimensions: 12 314 sq.x 43 3/4" Base Cover: (Included)14"sq.x 4 3/4" Hand Hole: 4 3/8"x 5 3/4" Shaft: 4"Straight Flat Fluted ISO 9001:2000 Registered Page 1 of 2 PHILIPS Note:Hadco reserves the right to modify the above details to reflect changes in the cost of materials and/or production and/or design without prior notice. ���®100 Craftway Littlestown,PA 17340 tel(717)359-7131 fax(717)359-9289 www.hadco.com Copyright 2008 Philips New London Large (V8911) Specification Sheet ,Project Name: Location: MFG:Philips Hadco Fixture Type: Catalog No.: Qty: Ordering Guide 'I. til Example:V8911 A 63 N D 70S E S Product Code V8911 New London Large Finish A Black B White :<. .; G Verde H Bronze j J Green I Optics 83 Type III Refractive Panels II B5 Type V Refractive Panels T3 Type III Cutoff *1 T5 Type V Cutoff *1 Photo Control N None II' B Button Eye Photo Control !. R Twist-lock Receptacle *5 Socket D Medium G Mogul Wattage 70S 70W HPS 100S 10OW HPS ✓" 150S 150W HPS 250S 25OW HPS *2,4 70H 70W MH *3 �. 100H 10OW MH *3 150H 150W PMH �) 1f4-c(C -_...: 2': iax. O.C. 250H 250W PMH *2 Stair-::ems_'eE) Voltage E 120V ✓=t Screw,= i F 208V G 240V H 277V K 347V Options S Spikes *1 Cutoff optics available with Medium base(D)socket only. *2 Available with Mogul base(G)socket only. *3 Available with Medium base(D)socket only. *4 Not available in 347V(K). *5 Twistlock receptacle(R)not available with 25OW PMH(250H). Specifications HOUSING: 360 low-copper die-cast aluminum alloy. Tool-less lamp access. Hinged roof with stainless steel thumb screw. Tool-less ballast access. Twistlock ballast assembly with quick disconnects for easy maintenance. A weatherproof ballast assembly isolates the ballast from water and heat for longer life. The optional photo control eye or twist-lock receptacle is located in the ballast enclosure for easy access via a removable door. All non-ferrous fasteners prevent corrosion and ensure longer life. Optional cast aluminum spikes available. Slip Fitter Dimensions:Y I.D.x 3"deep. FINISH: Thermoset polyester powdercoat is electrostatically applied after a five-stage conversion cleaning process and bonded by heat fusion thermosetting. Laboratory tested for superior weatherability and fade resistance in accordance with ASTM B-117-64 and ANSI/ASTM G53-77 specifications. For larger projects where a custom color is required, contact the factory for more information. OPTICAL ASSEMBLY: Type III Refractive Panels. Type V Refractive Panels. Optically designed,U.V.stabilized,injection molded,acrylic refractive panels. Type III Cutoff. Type V Cutoff. Precision formed,segmented specular aluminum internal cutoff reflector with horizontal lamp mounting. U.V.stabilized,injection molded,clear acrylic panels. Tool-less removal panels for ease of cleaning. LAMPING: MH and HPS Medium base:E17. MH and 250W HPS Mogul base:ED28. 70W-15OW HPS Mogul base:ED23.5. ELECTRICAL ASSEMBLY: Twistlock Ballast Assembly with Quick Disconnects for easy maintenance.Ballasts are HPF core and coil. 4kv rated medium base porcelain socket.Nickel-plated screw shell with center contact. 4kv rated mogul base porcelain socket.Nickel-plated screw shell with center contact. ISO 9001:2000 Registered Page 1 of 2 PHILIPS Note:Hadco reserves the right to modify the above details to reflect changes in the cost of materials and/or production and/or design without prior notice. HAl�®100 Craftway Littlestown,PA 17340 tel(717)359-7131 fax(717)359-9289 www.hadco.com Copyright 2008 Philips f:5"-Y,'TVAA.E *X X W 4 as New London Small (V8915) specification Sheet Project Name: Location: MFG:Philips Hadco Fixture Type: Catalog No.: Qty: Ordering Guide 1 liy Example: V8915 A B4 N D 70S E S Product Code V8915 New London Small Finish A Black B White G Verde H Bronze l) J Green Optics B4 Type IV Refractive Panels �. B5 Type V Refractive Panels 11 T3 Type III Cutoff '1 T5 Type Cutoff '1 I I Photo Control N None I B Button Eye Photo Control I R Twist-lock Receptacle Socket D Medium G Mogul Wattage 70S 70W HPS 100S 10OW HPS 150S 150W HPS 70H 70W MH '2 _ 1 00H 100W MH '2 y 'r "°1 150H 150W PMH 9; 1�d ;Y} f•:.:: 9 }.ir�r, f� Voltage E 120V t� F 208V :lair: s seal f — /;?CTrf G 240V H 277V K 347V Options S Spikes '1 Cutoff optics available with Medium base(D)socket only. '2 Available with Medium base(D)socket only. '3 Avaialable with Mogul base(G)socket only. '4 Not available in 347V(K). Specifications HOUSING: 360 low-copper die-cast aluminum alloy. Tool-less lamp access. Hinged roof with stainless steel thumb screw. Tool-less ballast access. Twistlock ballast assembly with quick disconnects for easy maintenance. A weatherproof ballast assembly isolates the ballast from water and heat for longer life. The optional photo control eye or twist-lock receptacle is located in the ballast enclosure for easy access via a removable door. All non-ferrous fasteners prevent corrosion and ensure longer life. Slip Fitter Dimensions:3"I.D.x 3" deep. Optional cast aluminum spikes available. FINISH: Thermoset polyester powdercoat is electrostatically applied after a five-stage conversion cleaning process and bonded by heat fusion thermosetting. Laboratory tested for superior weatherability and fade resistance in accordance with ASTM B-117-64 and ANSI/ASTM G53-77 specifications. For larger projects where a custom color is required, ' contact the factory.for more information. OPTICAL ASSEMBLY: Type IV Refractive Panels(Includes internal House Side Shield). Type V Refractive Panels. Optically designed,U.V.stabilized,injection molded,acrylic refractive panels. Type III Cutoff. Type V Cutoff. Precision formed,segmented specular aluminum internal cutoff reflector with horizontal lamp mounting. U.V.stabilized,injection molded,clear acrylic panels. Tool-less removal panels for ease of cleaning. LAMPING: MH and HPS Medium base:El7. MH Mogul base:ED28. HPS Mogul base:E23.5. ELECTRICAL ASSEMBLY: Twistlock Ballast Assembly with Quick Disconnects for easy maintenance.Ballasts are HPF core and coil. 4kv rated medium base porcelain socket.Nickel-plated screw shell with center contact. 4kv rated mogul base porcelain socket.Nickel-plated screw shell with center contact. BALLAST: All HID ballasts are core and coil and regulated with power factors better than 90%(HPF).Ballast provides 4-5%lamp power regulation with+/-10%input voltage regulation. Ballasts are factory pre-wired and tested.Metal halide ballasts are capable of starting at-20°F or-30°C and HPS at-40°F or-40'C.NOTE:All ballasts are EISA/Title 20/Title ISO 9001:2000 Registered Page 1 of 2 PHILIPS Note:Hadco reserves the right to modify the above details to reflect changes in the cost of materials and/or production and/or design without prior notice. 100 Craftway Littlestown,PA 17340 tel(717)359-7131 fax(717)359-9289 www.hadco.com Copyright 2008 Philips SU jS'f l Tv�b� , 1=1�TV C,e�Istn �9T1 c� 3L'�14 14�> I APPROVAL OF SITE POLE& LIGHT FIXTURE Page 1 of 1 Roy Catignani From: Fair, Marylou [Marylou.Fair@town.barnstable.ma:us] Sent: Thursday, November 06, 2008 9:12 AM To: Roy Catignani Subject: APPROVAL OF SITE POLE & LIGHT FIXTURE Hi Roy, The Hyannis Main Street Historic Commission voted to approve the following pole and fixture at Wednesday's meeting, November 05, 2008 -- Hadco V8911- - — ,. . - . . ,They liked both the Pole and the fixture on this model Have a great day! Marylou Fair Growth Mgmt Dept 200 Main Street Hyannis, MA 02601 508-862-4665 • I 1 1/6/200R i wl s }Ir � I LO 0 I j o - I N PLANNING BOARD HYAI4NIS MAIN STREET APPROVED HISTORIC DISTRICT COM. AS INSTALLED (Existing condition APPROVED 0 110 Mains Street) BSC Group thoughtfully transforming our environments 349 Main Street,Unit.D West Yarmouth, MA 02673 Felal'ual} 17, 2011 Tel: 508-778-8919 800-288-8123 1\4r. Pieter Van Slyck Fax:508-778-5966 ConSery Group, Inc. P.O. Box 278 www1scgroup.com Sagamore Beach, MA 02562 ; r RE: Light Pole Fixtures, 94 Main Street and 26 Camp Street, Hyannis, bU Dear Pieter.- During the construction of the recent improvements for the Park Square Professional at 3 the above address,a question was raised by the Contractor with respect to the proposed light pole fixtures around the parking lot. The light fixtures were originally clesigned to be lnountecl on 144001. high light poles. The adjacent cttrbing.at the edge of the ¢� ? parking areas is a bituminous"Cape Cod"stele curb. However, this does not provide adequate protection from vehicles. Therefore, in the interest of protecting people and n property, a clecision was made to inclucle 2-foot high concrete light pole bases, thereby increasing the overall height of the'ntounted fixtures to 16 feet above grade. , If you have further concerns or questions, please fee] free. to coniact uS at your convenience. Thank you. Sincerely, BSC GROUP, INC. . T Brian G. Yei-gadan, P.E., LEED AP Project Manager/Associate cc: File Engineers Environmental Scientists GIS Consultants Landscape Architects Planners Surveyors P:\prJA49315001_Projeci Conlrot\Cnn-espondence\i�utgoing\Cunscn,Group\Pieter Vain Slyck1201 1-02-171201 1-02-17 bgy Lr light polcs.do x � -_, „�' y.�°��t���;-sc�''x'`�":t�fy'�i`r;��,� «"" �'4^��9' ���:�.�r �"�s `y, a n �?• - � - .- ::�''k .�' � ^. .,Y�' �.:� ' •,,.F ice" 1 i "-.``�.; �y .�"''�, x - ?k .�, � ,� �av'a <r�•.;3.^ w 2t fiat s�;i -d�fy�'�, � t .:` - F'7 '•.. -` ry .r .3¢ �,..*� s£�,,,T ��. r ,l!+s'-"• .� ^'x�sr,3 •>y��? '.''a. n �x .-,vim'. >'�i .4fi �'`i '.+�fi: �'7, �r� :.. � � ,-: ...:r- •: .r: �,r < bx'td '�x� a�' $t+:'�'n. 4.��. � t+T" a� r � f i r , L ��,3 ..,f _=ix r_ 3.-,7s k '.'�� �� w.• s• "yr .( y.�� �-'< .'.�. y'.,F + p .3i $,4'�= �'} � - ;� ., �" '••'~'`�"1'.3 "�R• T �,•�-;q�,�T3' 4 4� '•-k` 1�.-��1.x�_r.--�.�i�`�r;F ...�'�,J_..�;.5.,. .t `tw � +Y 'r _ F� Y1s'1`'•:.'' � A;L{',-'�.•� - «�+ N, *"�A'`,� 7r! ' y-, _.:e: Eq S&�'";"i�ata"��'�,�$"'�`�}.Ti•r�a -�#',�`'=�`�� i�„y�":w'��'� '��G.i?..* ti" �� �L � �r�.,5.;; o-a a.r ?"'. - .` .'L �y* ..25 ,?:' �' y5..x _ '�-'jy+1r�- % .•'�LLuY ..E� � i ,G C �:1 = ffe a: i,:. '^y,'r�' ,c_C3 ' ¢•y"�.�`E'y�`' - - -e'. I "k 's `tom' '�`�-.;�J• "hs-¢sc �§";.i y. fi'tit; �.s, y '' yS°:G•-• br''CatiS 4 _ _ _ ,4''j, `` -� ;4 '� i-"'�—• �r �.� n•,! � �,'`�r `ar5 ^\ a ( ` 1 ,. ,., .� � . '. •, .� �— L 5 i ``11�� _- ..__ �CIF - ����,�, j ' r '� r iit F,Sd z {, :•>i. �. f ,r�. ,,.x 1r_ta .y- :;.•r,.; �i°',�. .-i:.�'�? ?.ram' �hr, ,, ,6 v 's .'' m•, SINE Sign ti 0' TOWN OF BARNSTABLE Permit MASS. 1639. Permit Number. Application Ref: 201101224 20070570 Issue Date: 03/11/11 Applicant: PARK SQUARE PROFESSIONAL BLDG, LLC Proposed Use: COMMERCIALLY ZONED DEV LAND Permit Type: SIGN PERMIT Permit Fee $ 50.00 Location 94 MAIN STREET (HYANNIS) Map Parcel 327195 Town HYANNIS Zoning District MS Contractor PROPERTY OWNER Remarks NEW 12 SQ FREESTAND SIGN DUFFY HEALTH CENTER Owner: PARK SQUARE PROFESSIONAL BLDG, LLC Address: 110 MAIN STREET HYANNIS, MA 02601 Issued By: PC POST THIS CARD SO THAT IS VISIBLE FROM THE S ;REET aka 'down" of Barnstable Regulatory Services 8AP?WA8 e nUss Thomas F. Geiler,Director 1639. ♦0 ;Building Dhision- Tom Perry, Building Commissioner . 200.Main Street; Hyannis;MA 02601 . www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 Permit# Application for Sign Permit Applicant: �bo —_Assessors No._��J�b Doing Business As:�)Q —_-Telephone No. 50(8— �^ Sign Location (� p StreeVRoad:-- ` N�•`.am Zoning District: Old Kings Highway? Yes hlo)I-Iyannis Historic District? 9s � Property Owner Name:—A�S i AAA\N Z7d -- —c4pjy\X-Tj —Telephone:__ ------ Address: L `FCSZ¢�LG �P !,, ------ --------------------Village: Sign Contractor, C ��`�C1c� J-J�j �.Q-----Telephone:_ Mailing Address: `_ k � Description---- -- — Please draw a diagram of lot showin9.location of buildings and existing sigrL with dimensions, location and size of the new sign. This should be drawn on the reverse side of this application. Is the sign to be electrified? Yes/No (Note: if yes, a wiring permit is required) Width of building face ft.x 10 x.10= I hereby certify that I am.the owner or that I have the authority of the owner to make this application, that the information is correct and that the use and construction shall conform to the provisions of§240,59 through§240-89 of the Town of Barnstable Zoning Ordinance. - Signature of Ov7ier/Authorized Agent: Date: 3 . Size: Fee: Sign.Permit was approved:_ ----- -- Disapproved: SIGNS/SIGNREQU : i h ).1111; IS 56"w x 7"h now r - � m! , --__ 56"w x 24"h Health Center �s y oil � M IN 10 NO ....4T till `I` i ii 8� '� � ��` !�-• ?. _ ""r—. �—+gym"-.+(a jjj i ijjj IF I ,u 30"w x 6"h Match column detail from porch structure. 2" thick gable top Elevation center board Sign at Main Street rr i 1" thick sign panel Icon and "Duffy" are 3/4" painted PVC. "Health Center," "Parking" and "94" are applied vinyl. Section Presented on Duffy Health Center n 0 carol mcleod design Sign Type K 1 094 •GM g January 25, 2011 94 Main Street•Hyannis,MA .� i r Barnstable -- / � Hyannis Main Street Waterfront bl-nedeaCRY (/1*( gl� Historic District Commission ' \y MAW ED MIA M 2007 George A. Jessop,Jr.AIA, Chair Marylou Fair,Administrative Assistant Elizabeth Jenkins,Principal Planner DECISION Certificate of Appropriateness Linda Hutchenrider, Town Clerk Town Hall 367 Main Street Hyalmis, UA n26n1 Re: Certificate of Appropriateness for Duffy Health Center,94 Main Street,Hyannis,Business Signage The Hyannis Main Street Waterfront Historic District Commission, pursuant to the Code of the Town of Barnstable Chapter 112,,Historic Properties,Article III,Hyannis Main Street Waterfront Historic District, hereby grants a Certificate of Appropriateness for the following property: Property Address: 94 Main Street,Hyannis Assessor's Map/Parcel: 327195 The Hyannis Main Street Waterfront Historic District Commission considered the above referenced application on February 16, 2011. A public hearing before the Commission was duly posted and notice sent to all abutters and interested parties in accordance with MGL Chapter 40C. At the hearing, after consideration of the testimony given and materials submitted by the applicant and members of the public,the Commission found the proposed business signage appropriately contributes to the historic character of the Hyannis Main Street Waterfront Historic District. The Commission considered the shape,material, color, design, composition, and placement of the proposed freestanding business identification sign and found it to be appropriate for the protection and preservation of the district. Based on these findings,the Commission voted to grant the certificate of appropriateness subject to the following condition(s): 1. The freestanding sign displayed by the applicant shall be consistent in color, design, and material with the signage presented to the Commission in the application dated February 4,2011,with the following conditions of the Board: a. The accessory"parking"sign with arrow shall be eliminated from the design and shall not displayed. b. The purple color on the sign shall be Pantone#525, darker than the color presented in the application. 2. The sign shall be located in conformance with all visibility triangle requirements. 3. A permit from the Building Division is required prior to displaying the sign . Present and voting in the affirmative to grant the certificate of appropriateness were: George Jessop, Chair, Joe Cote]lessa,.Marina Atsalis, David Colombo,Meaghann Kenney, Bill Cronin Absent: Paul Arnold 200 Main Street,Hyannis,MA.02601 (o)508-862-4665(0 508-8624784 t Geor A. Jessop, r, AIA, Chair Date Signed Y H annis ain'Str et W te'rfront HiAic DiLtric Commission cc: Duffy ea i-Center;Applicant Tom Perry, Building Commissioner File I, Linda Hutchenrider, Clerk of the Town of Barnstable, Barnstable County, Massachusetts, hereby certify that twenty(20)days have elapsed since the Hyannis Main Street Waterfront Historic District Commission filed this decision and that no appeal of the decision has been filed in the office of the Town Clerk. Signed and sealed this day of under the pains and penalties of perjury. Linda Hutchenrider, Town Clerk 200 Main Street,Hyannis, MA 02601 (o)508-862-4665(f)508-862-4784 Sr FEB. e.20 11 l 1�aPr�1 Tf'+W;I OFBtiRN GR�,I-.ITH P1Gh1T NO 551 F',2i5 54 Barnstable Hyannis Main Street Waterfront Historic District Commissioll Marks� � 200 Main Street y $ AB 91 Rvamnis,MassachnBat'ts 02601 KAN. Phone: 508-862-4665 / Fax: 508-862=4784 a�°� www,CgK�arrtstable.rna.us/growthmanagamert � 2007 George A,7essop,Jr,MA,Chair Wrylm Fair,Admini3trative Assistant CERTIFICATE OF APPROPRIATENESS FOR SIGNAGE Application ie hereby nude for the issuance of a Certificate of Appropriatamss under?VIM,Chapter 40C,The Historic Dfstricts Act, for proposed signa,ge as described bellow and on drawirga or photographs acoornpauying this application, CHECK ALL TT'A.T.APPLY* 1. OpenlC,losed Sign' _ 2. Trade Flag ED 3. Trade Figure or Symbol _ _ 4, Location,Hardship Sign 5. Business Sign *Application materials must be submitted for each sign requested Date ASSESSOR'S MAP## 3�( ASSESSOR'S PARCEL# APPLICANT t � G'�+�.� �t'1 ��v�F��f' TE #V 0 b - Z� �— Z J I� � k o .A. XCANiT MlAXI.F,`M AX)DUSS <. 5~� vl-t 01 WIS A,PPUCANTF MArLADDRESS Nell 50rJ _ -_-�-- C�v ��' �1er�i�hC,--,AkaL, ADDRESS OF PROPOSED WORK v\✓��S PROPERTY O VINTER TEL# OWNER ltiI ITING ADDRESS NOTIFICATION TO ABUTTERS; Please eotitaot Gro%th Managemsnt Staff fot abutters list and assistiince with notifications to abutters. Applicants will be responsible for providing the postage stamps for abutter nolafication at the time of submission of this 0 application. ACENT OR CONTRACTOR ��5� , TEL# z�` -_� -`'��U`l .---- ADDRPSS q LA 0- SIGNATURE of APPLdCAI'�T DAJ$ Yh kv.e.d P�`t S�`3'`'C'. uxp<. C ock For JpSA og H rdg iWp Si n&,-aostmdirg.TTrr cue Fi ure tar§ to be loazted Ura private propery: Check box if property owner has granted permission to locate.Sign or Npre on their property abutting the b;iilding,�o�t, p 19 [R a W 2 Received by Mv1SWHUC; FEB - 4, 2011 Page 1 of 4 TOWN OF,BARNSTABLE HISTORIC PRESERVATION IO.�51 P. FEB. 8.2019. ic. 14FM TOWN OF BARN GROWTH MCr'1T h Open/Closed Size ofOpen/Closed Sign: x Sign: Material of ape-/Closed Sign.; Color(circle one option)Red/Red&.,Blue Trade Flag: Size of Trade Flag; x Material of Trade Flag; Trade Figure Dimension of Trade Figure or Symbol: x x Or Symbols Material of Trade Figure,or Symbol; Location Size of Hardship Sign: x Hardship Sign; Material of 1 irardsp-ip Sign, Lettering Color and Material: Av%PR tt suslaess si$rss Size of Sign:���x Materials) of sign L \Ql)Q— Material of Lettering(if different) �'��`���c�✓.1b` C� `� —��� The Sign will be(circle one); Carved Wood/painted Wood!Alumuaum Other,(explain)s�i4 v1"t-2 c.0 Exterior Light Fixtures(circle on Yes A o If yes,what type of light fixtare Location of Fixture @ �: � UL o. : D FEB -4 2011 7 TOWN OF BARNSTABLON HISTORIC PRESS. Page 2 of 4 5611w x 7"h ' � I • Health Center _i a 56"w x 24"h Jim y • „ Cons" VDIffyi men 30"w x 6"h m Match column detail ' from porch structure. , 2" thick gable top Elevation center board Sign at Main Street (% 1" thick sign panel /`V 1ud Icon and "Duffy" are 3/4" painted D D PVC. "Health Center," "Parking" and "94" are applied vinyl. FEB — 4 2011 Section TOWN OF BARNSTABLE HISTORIC PRESERVATION Presented on Duffy Health Center Sign Type K carol mcleod design g yp g January 25, 2011 94 Main Street•Hyannis,MA 1094 r;. ra r r n' I 3� !q� Santos, Theresa From: Seymour, Steve Sent: Friday, August 05, 2011 3:37 PM To: Roy Catignani (rcatignani@conservgroup.com) Cc: Santos, Theresa Subject: FW: 94 Main Street-Site Lighting Stephen Seymour, P.E. Special Projects Manager Growth Management Department 367 Main Street Hyannis, MA steve.seymou r@town.barn stable.ma.us Office: 508-862-4086 Fax: 508-862-4782 Roy, See my report to Tom Perry regarding the lighting. I found no spill over behind the poles along the northern property line. In my opinion the lighting is acceptable and meets requirements. Steve -----Original Message----- From: Seymour, Steve Sent: Friday, June 24, 2011 11:53 AM To: Perry, Tom Subject: FW: 94 Main Street- Site Lighting Tom, I went to the 94 Main Street site last night about 9:15 and took light meter readings on the 94 Main Street side of the fence along the northern property line. The light meter read 0.00 foot candles between the light pole and the fence. There is no spillover of light onto the northerly abutter at this time. Work has been done on the lights including extensive shielding on the northerly and easterly and westerly sides of the fixtures closest to the property line. Let me know if you need any further information. Steve Stephen Seymour, P.E. Special Projects Manager Growth Management Department 367 Main Street Hyannis, MA steve.seymour@town.barnstable.ma.us Office: 508-862-4086 Fax: 508-862-4782 -----Original Message----- From: Pieter Van Slyck[mailto:pvanslyck@conservgroup.com] LTo: ednesday, June 22, 2011 9:41 AM mour, Steve 1 Subject: 94 Main Street- Site Lighting Steve: Just touching base with you to see if you have had a chance to visit 94 Main Street yet. As Roy and I have mentioned, we stand ready to meet you at any time to help you complete your evaluation. As you probably know, we were granted another extension of our Temporary Occupancy Permit to allow us time to complete several items requested by the Historical Commission as well as give you time to complete your review. However, we are hoping that we can put the matter of the lights and lighting to bed as quickly as possible so that we are not.pressed to the wall for time if it is necessary to make any last minute adjustments. Please keep us posted on your schedule so that we can be sure that the lights are all on during your visit. Thank you in advance for your attention to this. Regards, Pieter Van Slyck ConSery Group, Inc. Tel: ( 508) 888-6555 x109 Fax: ( 508) 888-6566 Cell: ( 508) 400-0174 i 2 I j Barnstable Town of Barnstable aCRY Hyannis Main Street Waterfront I DAMSTAHM 1639. Historic District Commission 2007 . George A.Jessop,jr.AIA,Chair Theresa Santos,Commission Assistant Minor Modification Decision vj . Applicant: East Main Street Development,LLC Property: 94 Main Street Map/Parcel: 327 195 On May 18, 2011 the Hyannis Main Street Waterfront Historic District Commission voted to approve a minor modification to the Certificate of Appropriateness issued to East Main Street DevelopmeW, LLC X r originally dated June 8, 2008 and August 20,2008, for screening of HVAC units and design oftparking lot lighting. Minor modifications are approved as follows: l. Screening around the HVAC units on the-Main Street side of the building is approved as shown on the plan entitled "Proposed Office Building for Park Square Professional, 94 Main Street; Hyannis", originally drawn 5110/11 and last revised;5./12/11, except as stated herein. The screening shall consist of: n a. A 3' 4"fence with top and bottom rail (1 '/2"rails,top sloped) and 1"x4"fence rails,with vertical slats (3/4"by 4")and 4"x4"posts with "Cape Cod" caps. Q� D b. The fence shall be made of Azek or similar composite. Vinyl is not approved. c. A total of ten shrubs (Japanese Barberry) shall be planted in front of the fences, as shov�n. Existing boxwood hedge to remain(24" high). Present and.voting in the affirmative to grant the minor modification to HVAC screening were: Aye: George Jessop, Joe Cotellessa, William Cronin, Marina Atsalis, David Colombo, Paul Arnold Nay:None Absent: Meaghann Kenney,Barbara Flinn 2. Parking lot lighting shall be modified as shown on the plan entitled "Proposed Office Building for Park Square Professional, 94 Main Street, Hyannis", originally drawn 5/10/11 and last revised 5/12/11, except as stated herein: Existing light poles shall'be cut down 42" Total height of the light fixtures shallbe 1�5'6'� rb:Ex`isting216ot concrete bases shall Abe modified as follows: ri.—Conerete base h have_a_transitional`beveled°edge ii�Base`s shall-be,ground'ttoo remove-an-y-tr-ace.marking rom the form. ii�Asinooth cementhand-rubbed finish shall be,applied to each b sa e. ----------------- iv Bases shall"be painted-black.- 200 Main Street,Hyannis,MA 02601 (o)508-862-4665 (f)508-862-4784 Present and voting in the affirmative to grant the minor modification to parking lot lighting were: Aye: George Jessop, Joe Cotellessa, David.Colombo, Paul Arnold Nay: William Cronin,Marina Atsalis. Absent: Meaghann Kenney, Barbara Flinn , t l/ , 010l George A. ss ,j . AIA, Chair Date Hyannis Main a ont Historic Distri Commission cc: ConServ, Town of Barnstable Tom Perry, Building Commissioner File . 200 Main Street,Hyannis,MA 02601 (o)508-862-4665(f)508-862-4784 Barnstable 'THE Hyannis Main Street Waterfront Ap aCRY Historic District Commission i.MMSTABIX : MASS. �- s63q. TfD MA'S A 2007 George A.Jessop,Jr. AIA,Chair Marylou Fair,Administrative Assistant April 13, 2011 Tom Perry Building Commissioner -: 4 Town of Barnstable 200 Main.Street Hyannis, MA 02601 Dear Mr. Perry, Is It has come to the attention of the Main Street Hyannis Waterfront Historic District Commission that the newly constructed Park Square Professional Building, to be occupied by Duffy Health Center, may not be in compliance with the Certificate of Appropriateness issued by this Commission on July 16, 2008. Specifically, the Commission has noted the following inconsistencies between the approved plans and the redeveloped site: • The HVAC units located in front of the building's Main Street fagade. After review of the building and landscape plans approved by the Commission, I have concluded that these units were not presented to the Commission for approval. • The location of the primary business identification sign at the corner of Main Street and Cedar Street. The Commission's approval of the sign, issued February 16, 2011, required an increased setback from Main Street to prevent the sign from obstructing the view of drivers turning onto Main St.and Cedar St. My understanding is that permits for this sign have not yet issued; please assist us in ensuring compliance with all applicable visibility requirements. • The parking lot lighting. The light poles installed on site do not appear to be in compliance with the maximum height approved by the Commission. Please reference the attached sheet showing the base, pole and fixture approved by the Commission on November 15, 2008. The Commission did not approve elevation of the base. • Tree removal. The approved landscape plan indicates that several mature 18 inch maple tree were to be preserved. It appears that one of these trees was cut down. The Commission suggests that the owner plant a new tree in the general location of the one that was removed. 200 Main Street,Hyannis,MA 02601 (o)508-862-4665(f)508-862-4784 41- t The Commission appreciates your assistance in working with the contractor and property owner to resolve these outstanding issues. We support the investment the Park Square Professional Group has made in downtown Hyannis and the Commission is open to working with them to bring the site into compliance with the objectives of the Hyannis Main Street Waterfront Historic District. Sincerely, George A. o r.tAlair 200 Main Street,Hyannis,MA 02601 (o)508-862-4665(0 508-862-4784 i Roma, Paul From: Roy Catignani [ratignani@conservgroup.com] Sent: Wednesday,April 27, 2011 8:35 PM To: Roma, Paul Cc: Perry, Tom; Pieter Van Slyck Subject: 94 Main Street, East Main Street Development, LLC. r, 94 Main St. BSC lemo.pdf(147 .. Paul, Thank you for sending a copy of the April 13, 2011 letter addressed to Tom Perry by the Hyannis Main Street Waterfront Historic District Commission. We were not copied on this letter previously and have not had other official contact from HMSWHDC or these matters. I have had weekly counter conversations with Mary Lou Fair, and ongoing follow-up with Steve Seymour and Elizabeth Jenkins to resolve the issues we were aware of. Back in February, shortly after the temporary occupancy was granted for the common areas .and site work to allow time for landscaping, we heard from HMSWHDC staff that an abutter had contacted them with a number of complaints about the project. Evidently, these issues have largely been resolved with the Boards that he has visited except for his concerns over site lighting visible from his property. We met shortly after hearing about the abutter with Steve Seymour and Tom Perry to discuss site lighting levels. It was suggested that we meet with him to try to address his concerns. We did so and orally agreed to a few items he requested to make the lighting more acceptable to him. In the meantime, we have made most of the agreed changes. Today I spoke with Mr. Littleton .(abutter) and he indicated that he would be happy to let to your department know that he saw marked improvement in the lighting as a result of our effort and yet he asked for a couple of additional things to be done. We will attempt to be a good neighbor and accommodate his further requests. Going forward our primary focus will be to satisfy Steve Seymour with respect to any residual light levels at the property line. At the same time, we have had an 'Application for Minor Modification' on hold with the HMSWHDC (while we addressed the light levels) with regard to compliance with their 2008 approval in regard to the actual light poles/fixtures selected for the project. This application has now .been activated for their next meeting on May 4th. The other three items within the letter you sent today are known to us only from conversation with the HMSWHDC staff. At the meeting next Wednesday, we will address additional screening of the HVAC condensing units by way of a sketch showing a proposed picket fence and fence plantings . The sign permits mentioned were requested by the tenants (Duffy) , not the Owner and they have now been granted from my understanding. The removal of one Maple tree was approved by your department during construction (see copy of engineers letter attached) . I gave a copy of the same letter to Elizabeth Jenkins last week to share with the HMSWHDC and it is now resolved. Today I asked Elizabeth if she would let you know that we have been in continuous communications with HMSWHDC staff regarding the outstanding issues we were aware of and we will attempt to resolve all remaining issues in the next couple of weeks. Roy Catignani ConSery Group, Inc. P.O. Box 278 Sagamore Beach, MA 02562 Office: 508-888-6555 Fax: 508-888-6566 1 vr�...ro�,wcn-,ao.-.a�m,.Mrmrvmrn-..�-Mrra�.m,w•..r..r.�.-,».�.rrw�.va�.,...,»�. -r. ..,.,.,,fa,.-,,,:.*w.,,.,.�s...«,., f...e�,,....,�,+,..,,n.,.,,x.,.,.4„m,....:.,..,,..wrv,.....,,.....,.m��..M.„�.....-..,...,,,.,...Mn.m....,..,.-,.....,..._-,.....m....�..-.,..,»,..�-......_.<.Y ......-...,.,,.. ..�,,.,._.,...._, BSC GROUP MEMORANDUM To: Thomas Perry Date: July 21,2010 nit D From: Brian G.Yergatian,P.E. Proj. No. 49315.00 -2673 Re: Park Square Professional Building 94 Main Street,26 Camp Street,Hyannis,MA 3919 3123 3966 i Based on our site meeting this morning,ConSery Group will proceed with the removal and replacement of the existing 18"maple tree that is located in the upper parking lot,adjacent to the proposed catch basin. Per our verbal agreement,the Applicant will replace the existing tree with a maple tree that is a minimum 3-inch caliper, 12 feet in height,and will plant the tree in the same location as the current tree. The removal and replacement of this tree will ensure that a healthy tree will remain in this location,and wi'l also avert potential future drainage problems in this parking area due to the significant root structure of the existing tree. Cc: Pieter Van Slyck,ConSery Group Evan Cohen,Urology Associates of Cape Cod P:\prj\4931500LProject Control\Correspondence\Outgoing\Town of Bamstable\Thomas Perry\2010-07-21 bgy ME tree replacement.docx Page 1 of 1 04/19/2011 11:14 5088886566 CONSERV GROUP INC PAGE 02/02 BSC GROUP MEMORANDUM To: Thomas Perry Date: July 21,2010 nit D From: Brian G. Ycrgatian,P.E. Proj. No. 49315.00 -2673 Re: Park Square Professional Building 94 Main Street,26 Camp Street,FIyannis,,MA 3919 3123 3966 Based on our site meeting this morning,ConSery Group will proceed with the removal.and replacement of the existing 18"maple tree that is located in the upper parking lot,adjacent to the proposed catch basin. Per our verbal agreement,the Applicant will replace the existing tree with a maple tree that is a minimum 3-in.cb caliper, 12 feet in height, and will plant the tree in the same location as the current tree. The removal and replacement of this tree will ensure that a healthy tree will remain in this l,oca.tion.and will also avert potential future drainage problems in this parking area due to the significant root structure of the existing tree. S�sc : yieter Van Slyck,ConSery Group c "Evan Cohen,Urology Associates of Cape Cod rAprJ\493.1.50C2Projed Conlrot\Cortcspondencc%Outgoing\Town of Oamstablc\Thomas Pcrry\2010-07-21 bRy ME Lice mplaccmuu..dnex r Page 1 of 1 TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map .-3 7 <- Parr•�l l5 Application # [ (20 Health'Division 2-3147 Date Issued 1 d Conservation.Division Application Fee b Planning Dept. ermit Fee D 9 -? Date Definitive Plan Approved by Planning Board P �� 5• Historic OKH Preservation/Hyannis v� 6 Project Street Address q� /7�'/�✓ ST���T �J /o LiG fee Village Owner LQK F,90RE )09oFrSSIodA-L- 804VW ddress 110 MR-/4I 5�. g1"� f�}r Al Telephone sob 7q0-93as ' e o E✓•d�/d'61,aS Er •4�//oTis 7.¢vJ� Q?.6o j --U7 Pct.. MT Permit Request /YEl✓ A&,01CAL Qf:Piji� ;60 1AM NWint- PA9_V_141 a l-er 9Z IV A- A 6#6 b Pl- Square feet: 1st floor: existing - proposed 4490 2nd floor: existing proposed 1d�Total new Zoning District Msp Flood Plain SO4'G Groundwater Overlay AM Project Valuation -1 ?-o3}a oo•—Construction Type Lot Size_ A7,G 70 Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family(# units) aZ Age of Existing Structure 7'5"t Historic House: ❑Yes NQ _-On Old King's Highway: ❑Yes A Basement Type: M"F'ull ❑ Crawl ❑Walkout ❑ Other Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft) a I o 0 Number of Baths: Full: existing new Too —to Half: existing new T'Bn Number of Bedrooms: existing I new Total Room Count (not including baths): existing new First Floor Room Count WF fIA4S Heat Type and Fuel: Uil6 as ❑Oil ❑ Electric ❑ Other Central Air: O'Kes ❑ No Fireplaces: Existing New Existing wood/coa stove: 4Yes-'U No I C_*6 t.'. Detached garage: ❑existing ❑ new size_Pool: ❑existing ❑ new size _ Barn: ❑emoting Lv'iiew size_ Attached garage: ❑existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: �J Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial 2'�es ❑ No If yes, site plan review# 031—o$ Current Use OBI GE Proposed Use /yic19LC,4 L D�P!!.� APPLICANT INFORMATION (BUILDER OR HOMEOWNER) �on/ it✓��vp -- Name � Telephone Number -- Address _P 0 2 71 License# CS 575 414AA/4 8• oe,*047 A1AA 6iA7KOK $f�G � ,G/� DAS"la Home Improvement Contractor# Worker's Compensation # AIC ?•Z•'t 3 7�4 1 ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO (?A1* ,4- k,�4sTS SIGNATURE iZ&AJDATE lG— lS-,�0'08 x FOR OFFICIAL USE ONLY APPLICATION# DATE ISSUED MAP/PARCEL N0. .�: ' - � - ,. .. .. _ �` � • -- ADDRESS i e � � - VILLAGE ^5 DATE OE INSPECTION: FOUNDATION k FRAME fA INSULATION FIREPLACE ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH '.: FINAL -GAS: ROUGH FINAL FINAL BUILDING DATE CLOSED OUT ASSOCIATION PLAN NO. I � G]j I Board of Building Re ulaGConst 'S - s"dStu upefyisor r I License ,I iIf Licens�- CS .5159 I �xpiraGon jj 5%23/2010 -Tr# 23121 I, MOM;00� RGLAfYD B`CATif f ¢ I GNANi: r j I I 60 GEMINI DR r W BARNSTABLE,ARA "0268L Commissioper �tNE ,� Town of Barnstable Building Department - 200 Main Street BARNSTABLE, * Hyannis, MA 02601 MASS 1639. (508) 862-4038 rFo�,�s Certificate of Occupancy Temporary Application 200805760 CO Number: 20110012 Parcel ID: 327195 CO Issue Dater 01119/11 Location: 94 MAIN STREET (HYANNIS) w Zoning Classification: MEDICAL SERVICES DISTRICT Owner: HEWITT,ROSTOWSKI,GRIFFIN TR Proposed Use: COMMERCIALLY ZONED DEV LAND 21 FELLOWS ST ROXBURY, MA 02119 Village: HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: ' CTCO COMM TEMPORARY CO Comments: COMMON AREAS OF BLDG. TEMP C.O. EXPIRES IN 5 MOS LANDSCAPE FEATURES — — I 06/19/11 Building Department Signature. Date Signed Expiration Date TOWN OF BARNSTABLE &Uillding � Application Ref: 200805760 `l BARNSTABLE, Q r y MASS. Issue Date: 11/20/08 m I t �p i639. ��� Applicant: ROLAND B CATIGNANI. rfp Mp`l s Permit Number: 'B '20082612 Proposed Use: COMMERCIALLY ZONED DEV LAND Expiration Date: 05/20/09 nation 94 MAIN STREET (HYANNIS) Zoning District MS Permit Type: NEW COMMERCIAL ip Parcel` 327195 Permit Fee$ 10,947.30 Contractor ROLAND B CATIGNANI. llage , HYANNIS App Fee$ 150.00 '.License Num 005157 Est Construction Cost$ 1,203,000 'marks -- --- --- ------ APPROVED PLANS MUST BE RETAINED ON JOB AND EW MEDICAL OFFICE BUILDING WITH 2 APT ABOVE. SITE WORD THIS CARD MUST BE KEPT POSTED UNTIL FINAL T 26 CAMP STREET_ SEE ATTACHED PLANS_2ND EXT EXP 5/19/10 INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH Ire ss: 21 FELLOWS on Record: HE OSTOWSKI,GRIFFIN TR BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL reWS ST INSPECTION HAS BEEN MADE. ROXBURY, MA 02119 ' r )lication Entered by: PR Building Permit Issued By: S PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLY OR SIDEWALK OR ANY PART THEREOF;EITHER TEMPORARILY-bR PERMANENTLY. -ROACHEMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION. 2EET OR ALLY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC'W,ORKS:(. r SUANCE OF THIS PERMIT DOES NOT RELEASE"THE.APPLICANT FROM THE CONDITIONS OF ANY.APPLICABLE SUBDIVISION RES?WCTIONS. 41MUM OF FOUR CALL INSPECTIONS REQUIRED FOR ALL CONTSTRUCTION WORK: OUNDATION OR FOOTINGS. ,LL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED. VIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME INSPECTION. RIOR TO COVERING STRUCTURAL MEMBERS(READY TO LATH). vSULATION. INAL INSPECTION BEFORE OCCUPANCY. (ERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. )RK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. RMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF NE THE PERMIT IS ISSUED AS NOTED ABOVE: tSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in'MGL a142A). UILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS Ih I G—� ��L� � 1 G— ►�— ! 6 Q �1N.. 1 Heating Inspection Approvals Engineering Dept , `6_�nS at- 1 �. 'ire Dept 2 BoPLIt;h 111%'II � --'b � - { 1 � �� ,� � C �� � � � � ' � � � � � = �� g�� ��. P�11►\`���' c • '*\rab����@`\� ��1 ��rM e�/ ��` _Ltjsfr � �� \i l�ii�\ �2grl ia°' �\Crt�+7��71� 1/,�. ���x. ♦]� � .'/I�' � �:�ylE'_'C1�,��I�� ���r�i�+ .,e .,r '+Y:i • ��► `-R�1 '� aJl�3iy,'\ � � o .g NX mw .� i.. •tea +,.v_�":7iL1� `1 tM 1 1+�•_- .�' `'t\ 4 u.�°� ! ♦.y ! ,gyp..a .. � a�Q ♦4D1 ✓1' ( oaYi ��F'" ylCt°ice c`"a .������` t�`� 6r s�'►- l\ �vt ��_� �► a� ,;Als oAr �� '�vti'��- 1���� ,Irs>�l�s c. +•� � •�� r �_� �4�� . iJ1`�,�r7' ��. Y R. 9 r ` ✓ `e��_%I�� W� Y.A`R�Ci 1.—ISM .. = �'.�i�,7 �!►.i> I�p�d# i 4\+ `�u `p *' J� at�r-,� : Ar w e� EN � .`,1►�'z �,.�4�",:..y. /j ' shy �,.•r,�j�. S>> A,' ,e '..�� „ts` ;� 4. S costfI/fir,-pl" \ f \ 911 rt r-t:tea:. •r�' ems. i 'a 1v�I i\+ram .ttFls � >Al �..a '•fl` ,t' , �t } v1�Y ,,,°iir'+c "! 1 it a k3•_ R.'` -.i Val nil 01 ,, 4 ,' ,.;. �a'a+� :-.., 4 � _. ,r• d ram„-' r r r - r r �. ��Y 1`I��1c'll'+\ Py•iT� :,ts�tj � � /+`.t'+. 4� t �c� ��x yi�� ))�� � , I -tf••.�f�,�'�rr � ��� ���Tf ���e� r fi�7 _'p�roro v Wit+ �,lCG'L°i ¢'4� axi Ij �: y�aft "i: ,�fsse; r _�I •, N 4��fttpy�� I,+.y! }^ a,c♦o6a.,"�'` . 4�v �`° } 7 I,- "—,'FR a i '� +,� �'�f�r�s,,v fr f` �'1 J` \�,�`"a``y4`�4,11 �I�P,Y�,; +� p + �° � :..4t., 7►t�< ,jr t f iFw',.�yr' =` j 19 S�,t ! �1 d � tlNE" •t.... 'i y�"Rae>t. tL1� f `�M.rs. M ; '* ��� .,.\ .,,� a�•.� 1` Rom,. ''�., �h �t ®�rv��1}11�'��c,�r`�d�'GH r` �a.� '��'�y D \vi � � �.�r /� 1 r r ip �• �(� ( 1 '�� � II l !)I�Q ��_� .ice 1 ♦\ ,� A� 4,1 zii�' 6 a�l',�'?i, `�'t�i �� '. ' %:a.. q��r_•1y�1 I / r ,6s• :; >€r 1 ss Mitrz Rif�`� , S +w Elaway •� � '•� T •T M �"� � � � r i W _4q � /s k. - - — r -- All Ow M F-- It 14, tP # ''� "fix O s. ,.r.,w F y i.�-r F,� .�, (t,}•� `�t r! l V! `�. i f ';,'t;�r 1. - s► . , �✓e�9�i►.,,y�� � � .� � �. ► ��\(i� ►I , / ,�"'{�`+�a.,.g ,, 44 , M. \' ,Al Air *44-�,61 soio� , NUN,� P-51.1 w fir. ,�lt:�•.► .r_ ..:!! .. /J' �.� - !►_ jql s �� • N Y Y _ I { *4 t ..tse• <":. f. _ -.fir.+. v� t J "' • VV ,p r Amp lie NWm O =� 'e AMA 7 We y�,..�.:.�V .its""" °,�,.rt•ei� /�� ,��' /�' ���r"�,.�"'" ��+=��� �*fir s�►�'� _.,�.-,. ��� '.s Town of Barnstable oF'THE Regulatory Services 2 v Thomas F.Geiler,Director'" B" ' ` MASS. Building Division y nss, � 1659. �jOrEb MPS a Tom Perry Building Commissioner _y 200 Main Street, Hyannis,MA 02601 Office: 508-862-4038 Fax: 508-790-6230 COMPLAINVINQUIRY-REPORT Date: '7 (9& VqjV •04%� Rec'd by� 0-,C-rd U S Complaint Name: Map/Parcel Location 1 dtV�l� S Address: Originator Name: �t�y Street: 6aNti Village: State: Zip: Telephone: Complaint Description: OJ-DZJ ab�Lw _ 1 o of -mil . FOR OFFICE USE ONLY Inspector's Action/Comments Date: Inspector: OA c y- z" Additional Info.Attached " m-u2 d�'�-�C 1 I� ✓�"�✓l.�!I "/ Q:forms:complaint �= co V7 ticr- C)P6" a Message Page 1 of 1 Roma, Paul From: Roma, Paul Sent: Friday, December 10, 2010 8:21 AM To: 'LITTLETONR@aol.com'; Perry, Tom; laura.shufelt@town.barnstable.ma.us Cc: awenkozma@aol.com Subject: RE: Complaint regarding Medical Office Building, Main Street, Hyannis Dear Mr.. Littleton' This e- mail will confirm the voice mail previously left on your phone (Thursday a.m. due to a conference on Wednesday). The contractor for the project at 94 Main St. has been contacted about the lighting concerns and has been advised of the appropriate ordinances covering this situation. Full cooperation is anticipated. . Please feel free to contact this office if you have any questions. Sincerely, Paul Roma -----Original Message----- From: LITTLETONR@aol.com [mai Ito:LITTLETON R@aol.com] Sent: Thursday, December 09, 2010 2:25 PM To: Perry, Tom; Roma, Paul; laura.shufelt@town.barnstable.ma.us Cc: LITTLETONR@aol.com; awenkozma@aol.com Subject: Complaint regarding Medical Office Building, Main Street, Hyannis Dear Barnstable Officials, I have attached a complaint in relation to the above named construction project. I am a 35 year resident of Hyannis and this is my first complaint to the town on any issue. I would appreciate any assistance you may provide.Thank you for consideration. Respectfully, Robert Littleton 1/27/2011 Roma; Paul From: System Administrator To: laura.shufelt@town.barnstable.ma.us Sent: Friday, December 10, 2010 8:21 AM Subject: Undeliverable: RE: Complaint regarding Medical Office Building, Main Street; Hyannis Your message did not reach some or all of the intended recipients. Subject: RE:Complaint regarding Medical Office Building,Main Street, Hyannis Sent: 12/10/2010 8:21 AM The following recipient(s)could not be reached: laura.shufelt@town.barnstable.ma.us on 12/10/2010 8:21 AM The e-mail account does not exist at the organization this message was sent to. Check the e-mail address,or contact the recipient directly to find out the correct address. <itmail.town.barnstable.ma.us#5.1.1> 1 c H 1p z-64 r m !r vv�0. S-�- ��,,-i LS _ TOF Tom Perry, Building Commissioner(by email) €' DEC 13 Paul Roma,Building Inspector(by email) DEC Laura Shufelt, Chair, Zoning Board of Appeals (by email) 200 Main Street Hyannis,MA 02601L Dear Town of Barnstable Officials, December 9, 2010: I write you today as a resident of Hyannis for over.35 years to file a formal complaint regarding, the construction project in progress that abuts my property at 34 Camp St, Hyannis. Before I begin I would like to point out that I have no concern about the existence of the,project itself, only its execution. The building is in character with that of our community and neighborhood, however.the.infrastructure associated with the structure is blighting the residential nature of Camp Street., In particular, I am concerned about the project's impact on the aesthetics of the neighboring community. My concerns are as follows: 1. The light shadow cast by the towers on the abutting property line illuminates my entire lot, severely compromising my privacy and the quite enjoyment of.iny property. a. The towers are set on very large concrete bases that elevate the light structures a full 24 to 36 inches above ground level. This method of installation is not seen in other circumstances.such as the roadway lights being installed by the new youth center, etc. This elevation creates an ominous feeling akin to that of a correctional facility and:detracts from the colonial design influences apparent in the construction of the lights. - b. The deflectors placed on the inside of.the lighting pod are inadequate and permit a vast amount of light to spill onto my property. A better idea would be to replace the 3-4 glass panels facing my property with a dense, opaque material that would fully prevent the projection of light in our direction. c. Two light towers are clustered very close together at the lot corner nearest the main entrance to my home (which is off the rear,deck). Two, tightly space, fight towers at this location seem redundant and excessive. d. While on a timer, all of the lights remain on until after midnight. Surely it is not necessary for security or other reasons to have all lights remain on this = long,or for that matter., any of the lights remain lit late into the evening. 2. I appreciate the attempts of the Zoning Board to preserve the residential nature of Camp Street by requiring that the home abutting my property be preserved rather than razed to create more parking for the professional office project.Unfortunately, the. spirit of this requirement has been ignored by the developers. a. It is positively inhumane to expect the current occupants of the preserved residence to live with no side or read yard setback, this while being required to exist under the direct glare of light towers that surround the residence! I am aware that the physician-developers of the project under construction also own and rent this residence and I.assume it is for this reason they believe they are within their legal rights to pave over the setbacks in favor of the office project. I have reason to believe this may not be the case and would like to file.a- formal complaint on the grounds that the properties in question are separate entities, each with its own Bt configuration and associated permitted uses and building limitations/requirements: If this is the case, I question whether paving over the setback is permitted at all and if permitted under limited circumstances, whether such action is subject to separate site plan review by the Zoning Board of Appeals. I would appreciate the opportunity so speak with you to discuss what could be done to address. these inadequacies at your earliest convenience. Please feel free to contact me on my cell at 508- 596-3641. Robert F. Littleton 34 Camp Street Hyannis, Ma. c) i 10 FT POLE 10 FT POLE 12 FT POLE 12 FT POLE with 36'LAMP with 4P'LAMP with 36'LAMP with 42'LAMP 14 FT POLE 14 FT POLE HADCO V8915 HADCO VB9�1 with 36'LAMP with 42'LAMP - HADCO V8915 HADCO V8911 'HADCO V8915 HADCO,V8911 (RECOMMENDED) (RECOMMENDED) ._ - (RECOMMENDED) APPRuVEU �Jc ry «!!!! VVVVVV I . Fair, Marylou From: Roy Catignani[rcatignani@conservgroup.com] Sent: Thursday, October 16, 2008 5:01 PM To: Fair,Marylou Cc: Evan Cohen; David Vachon Subject: Park Square Professional Building, LLC- 94 Main Street Hadcol-ighting Alt (1).pdf(30... Mary Lou, Attached please find a study sketch of various site pole assemblies of HADCO site pole and light combinations preferred by the HMSHDC for the, Park Square Professional Bu-.�.ding at 94 Main St. These different 'assemblies are provided to demonstrate the scale of various possible pole heights matched with the smaller and the. larger versions of the preferred light fixture choice. If the Board could indicate it 's preference for each of the 3 pole heights shown (10 ' , 12 ' and 14 ' ) then we can engineer the optimum spacing and size of poles to achieve the desired lighting levels. Maybe you will be able to email this to members? Plea-se let .me know what they decide. Thanks. Roy Catignani` 1 Fair, Marylou From: Fair, Marylou Sent: Thursday, Novembet'06, 2008 9:12 AM To: 'Roy Catignani' Subject: APPROVAL OF.SITE POLE& LIGHT FIXTURE Hi Roy, The Hyannis Main Street Historic Commission voted to approve the.#ollowing pole and fixture at Wednesday's meeting, November 05, 2008 12 Ft Pole with 42" lamp Hadco V8911 They liked both the Pole and the fixture on this model Have a great day! Marylou Fair Growth Mgmt Dept 200 Main Street Hyannis, MA 02601 508-862-4665 1 PROJECT NAME ��fj `T- 0 u 7`` q 7T ADDRESS: ?,-/�/W�d 17— PERMIT# 0/D PERMIT DATE: M/P: LARGE ROLLED PLANS ARE IN: BOX SLOT Data entered in MAPS program on: � BY: .,.:�..� ` n/wnfiles/archive Town of Barnstable Building Department - 200 Main Street sAxx �* sTAs , Hyannis, MA 02601 MASS (508) 862-4038 RFD MA'i A Certificate of Occupancy Application Number: 201002573 CO Number: 20110013 Parcel ID: 327195 CO Issue Date: 01119/11 Location: 94 MAIN STREET (HYANNIS) Zoning Classification: . MEDICAL SERVICES DISTRICT Proposed Use: COMMERCIALLY ZONED DEV LAND Village: HYANNIS Gen Contractor: ROLAND B CATIGNANI Permit Type: CC00 CERTIFICATE OF OCCUPANCY COMM Comments: C.O. FOR DUFFY HEALTH CENTER Building Department Signature Date Signed r =, IME TOWN OF BARNSTABLE Rulldihg Application Ref: 201002573 • • Permlt BARNSTASLE, * Issue Date: 06/10/10 y MASS. �A i639• Applicant: ROLAND B CATIGNANI Permit Number:'B 20101117 rFD Proposed Use: COMMERCIALLY ZONED DEV LAND Expiration Date: 12/08/10 Location 94 MAIN STREET (HYANNIS) Zoning District MS Permit Type: COMMERCIAL ADDITION ALTERATION Map Parcel 327195 Permit Fee$ 4,777.50 Contractor ROLAND B CATIGNANI Village HYANNIS App Fee$ 100.00 License Num 005157 Est Construction Cost$ 525,000 Remarks Y APPROVED PLANS MUST BE RETAINED ON JOB AND TENANT FIT-OUT FOR DUFFY HEALTH CENTER BASEMENT, 1 ST& THIS CARD MUST BE KEPT POSTED UNTIL FINAL 2ND FL ONLY INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH Owner on Record: PARK SQUARE PROFESSIONAL BLDG,LLC BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL Address: 1 10 MAIN STREET INSPECTION HA BEEN MADE. AdNIS;MA--02601— Application Entered by: PR Building Permit Issued By: THIS PERMIT:CONVEYS:NO.RIGHT TO.00CUPY ANYSTREET;ALLY'.:OR'SIDEWALK OR ANY,PART THEREOF,EITHER TEMPORARILY OR•PERMANENTLY. ENCROACHENIENTS ON PUBLIC PROPERTY,NOT SPECIFI,CALLY:PERMITTED'UNDER THE BUILDING CODE;.MUST BE APPROVED BY THE.JURISDICTION. STREET OR ALLY GRADES AS WELL AS DEPT.H;AND LOCATION,OF PUBLIC SEWERS;mXY,4 6BTAINEUFROM THE DEPARTMENT OF PUBLIC.WORKS. THE ISSUANCE OF THIS PERMIT DOE$NOT:RELEASE.THE APPLICANT FROM THE CONDITIONS OF ANY APPL.ICABLE'SUBDIVISION RESTRICTIONS. .` MINIMUM OF FOUR'CALL INSPECTIONS REQUIRED FOR ALL CONTSTRUCTION WORK: 1.FOUNDATION OR FOOTINGS. 2.ALL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED: 3.WIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME INSPECTION. 4.PRIOR TO COVERING STRUCTURAL MEMBERS(READY TO LATH). ` 5.INSULATION. 6.FINAL INSPECTION BEFORE OCCUPANCY. WHERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED ABOVE. PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in MGL c.142A). BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS m K j a ► � . plc 2 � ( Q'E s v r�� 2 CIA 21� 3 /r C� 1 Heating Inspection Approvals Engineering Dept I► c Fire Dept 3 2 �^ Ge>A S Bo d o He lth 1 `r /r Robert F. Littleton, Jr. 34 Camp Street :'' 3:4 g 22 Hyannis,MA 02601 February 18, 2011 . QVJSl() Ms. Felicia Penn, Chair Planning Board 200 Main Street Hyannis,MA 02601 Dear Ms. Penn, I am a 35 year resident of Hyannis, residing at 34 Camp Street. Please accept this letter as a formal complaint regarding the Duffy Health Center construction project located at 94 Main Street, Hyannis,MA. Map 327,Parcel 195. I am respectfully requesting the opportunity to speak with the board at its' next scheduled meeting concerning construction in progress at this site and 26 Camp Street, Hyannis and violations of the permit conditions for construction of the physicians' offices located at the corner of Main Street and Cape Street. I also request that any occupancy permits for these and related projects be held in abeyance until I have the opportunity for my concerns to be addressed. Please forward all notifications to abutters and public meeting notices concerning construction,development, real estate or business operations matters for the Duffy Health Center project, 26 Camp Street and/or the physicians offices located at the corner of Camp and Main Streets to my off cape address: Robert F. Littleton Jr.,40 Godfrey Lane, Milford,MA 01757. Please feel free to call my cell phone(508-596-3641) if you would like to speak with me directly. s pec F Robert F. eton Jr. Cc: Tom Perry, Building Commissioner Mr. George Jessop, HHDC, Chairperson + Y i �W c (-to THE FOLLOWING IS/ARE THE BEST IMAGES FROM POOR QUALITY ORIGINALS) I M ^C&L DATA w w�k �( ro LLI 04 Ca yr . . � by •,.q r Nunn an aw an ION THY• � � a+r -.,:.i. v. a r r- i� • �. �.';b rr+- 9 :"ate i �' - 'r'� . z. ' F. .•r.t t t ` i+ n + ". e a,•^ '"'s" � .. .ut` `;�r'���� � lrF,. 'k ^yea. a ,.: � r,�q��y �h:. .i {'"�_' y�� ..�t�q � �'`y• •F, a." � �y :��w u��'' �":•W y ���^4- .�j,. r�-' �,�'n•~ � 8.~ � `fix �, �-,� a"• ��' '�;�,`, b - r ..a:. � �3y ci``T t7�' J,. '. A����� ,t+? ?., � �a �4 jw. a•* -94 Mein . tree H annsiSr.. �r _. �. �M11 • :1. a' ;,'.«` ? �. •l'', l' S - A - `, ,fir- ." 4��' .1 'FI ^�yi' s.0'�x� ta A �' ., .+ _• 3 fi •;4i, t^ � �,,.' �"�St rt',ij �,µ1..� ! '+:i "" ea:`.�'ty^'r_',��.ti �, .v �� � � ��� � � . , i a � i :� �i �' i _ J� � 4 # q, 4M�r '.;���q►.T ��� y� v r ��`.1"4'r/► it 1 � +�' � V- � s' !,p 4 • i7 ` T Qi7. "a i ._ s r,� � �' `,P,. M "� _ ' ) 4 '!��`^yaA!e • / pf 04"Jo,, � �E,�:/•��`r d�.`�I/-,Cs",""�ir� s+ "�..+>��t,fy F � }� �'•'+ isAi /�..�.��;�.it,',w, :' �. .4 ` ij \ 4Sfp '.. ,,.ta7_sw+ sra ' .•n'yi.�`/ r • i+"ra"'v,..,s• 7 '♦ ki ,4p. .,ay" -'�'� +:,.� 4e�.1 jy- .l�.a. �� }� .•� ��•..' " MA Ron t. p_ �' '&ta .► IS •. i' x Y4 �.� 1L"�Sr'4 q �Y A'? ? �+ `'" �+15'>M• t •" q '1. y P i .. � ��.^1���.` .. , -s + • J -. �� � '/.� V7 � ✓ f a-.'ri!(, " ..rye�•Hi /,. ,yl'. f ��-A-^ / r� t 'S:� a4♦ rp �, � •. ,\�iF`�i�, vs t .�lrt �"�y ,� `�' ,;,,r-�^ '�. x alA'�• ' r.r"� r = '►i V �r`��;. 7�aj +°�}� !' 4`00"MM, 173 �F ` tu+ *�„�y ,ti,�`2MIr�,ti,-' ty��' � � �I e-ig}+j�"YM'.i+•• _ �' _r,,,� sy ;;a, t. .�j��l ;�' •�. .�•,{ �, •�,v ..��Y�(��E ./®" �. � '^f� i� �e�3�?y �'..%E ��y,� ti ,'<s�+'• r.- ,�� �.aSi' ,r,�.. ,�r,���y¢' J` , r" 5� `• z 7 .. a,r,7.'. sFr� ++ /• +-t°� .s �..>*�'�V ,.,�y ,,r :'°.ti.ti try_ :� r, ' s .�.�ay�'�"6�i,���� 1' •r ,k''��{�� ",'��+r''F�"'.�'Qi'w..'� .«�`�" � r � }} �sy kF••r +1' '� - rw� 8;t a B w +`.r�� �� ;a'�yY.•'%�ir� _tir+ +;:f. � .if<t%a, rt .�. Il� � �4i 'Q� ` •i� �r ,~ I � �� �.f• �,f�'%i �'�� �4� +�' _ A ram. 'l`"-^- ;`- i� ,; ' ky :•/)ti tV1 0ii' •� -x.4; •fit< � .� e`►'W ..x4 4 >l�►,�', ,,1. '' `�°y .::,,.y +i a7„"'r�%'h4 5. :..r.r .�MFi�"`", Ito- j ,," 'R,.' �' #•.. t"�,a�w.,1 s tr. - ����, A �� � ' /� „`�""I{ e��'`c i.f'` � .ram..;: &. +?. � .,ems � ,•¢-. 1 4;n.�, Y .q *��•> .. -{��1 .��+s,zryw�r-a`+J. �h��: - � � i �1b1hTr r a" s � n ^ ° ' '' y ,K�• '�< +���� _ •�� �l4'�7''.`��i-> �.� f `.7�+• "4r3:�1 ,►, ,2z -yam •� .y�����t.+ z } l,, 'vim �q��--'�'•' [ �5,� %F_ �i ', ,g � a ' � 'it,:.J �•II,(1�`/•..+�,•e�q ya -.r�\�-� � %� '�"�•�i ,'r�f^�a £ - ��X ►_.ae!yr y.� " 'r.,`� '""F' y.� �. - t I��'. �' ',�`?y��` 4 lfs<Y. I-Vt '.i" $ 1 q��•T('y �A � -^+��. y� r �` • �r ��!! pp,\`ti 3 k`^i.�•3 �. 9 �� 1 �i, o ab��►,#�!#�l"'�� -�-rt? Pam- 1 .0 �.'�C`?�. -.. �. . 'I .. eq►�.+•_. '16 1' "�,'qc C'•e J� M Tt �'" Pi I.�r.'FM.i1- ktR•/.' •ti"! ,; .. S. +�,E^ •. •�yo'tr n, ;�� � �( -�:.:<xC1D�y'��;� ti 'it?t»V�a'T""�'+•'.4 :� ����� �`•`ct� r� �k...' .��v r�o - �,�,,�� I�. i•i � • Y � j'' " ,Jl.r sa// ¢ 1���,.F•YI � �� �. 'n'�.�yryxj,,,� .�-"'t—<!- r°•Tq'` .+a6a� f ._ + �+ x '"_' ,j".,x''k,.,•�ri 't•1 ,,.� r'�•F ,,tP'"t q i•4e.,•-�1*�°.� •5' "` r' "� ',il. _yS �'` "�• M•�r ,� .3a t►�`y, ..3�!ry�2r�W�r A,,p�` ' �a � '--� 6 - -- v•� � d Vic' rs� .� :* Nr Tt ,_ .. �. --P��`+'„ 3y� � ."��ii l"• T ,�X'' ' +-.T ,�. .! 7�.� �,.��� +Y :��?r'�.�l t W� � .sue -r- "°: l f � h �v,' �i i•:i _� N R j .� x�6s�.'�'iFif��`• � � ., *S.''L, JS.,r t t - � -'�,,I�trry�4'. ��►''_°6 �� a,., Y•C'�i�'',��-d... �„.:'��,, � �„C^ t,`.,k^+1�t-.�,w� � 1,.. .j�4- b,��„�.. �M.xvt�. 4 'f��,ji�.. , ..�� .d` ' .. . t ,. •.,� I Y�• N w,i ; •! "✓s r } '4 V °• ukr .}S\ °, :,^�,"�a •teas . v x VT 5 K- �• �y �, � ��"� u'7� t'. ` ^�T�'..e�.,e �a�} b.. •yis,..A > ( `4 y.(iq`+ '�' 'aM' ,•4'M1:tX � � F.. '•Yw. „�.. "fi�yM..,.."���i �.�99'`�'� .'� ��• e� �,r/ � - -,"� ,;; < \`S! +�3Ka�'Q r.�/2-."rLr,��� •_-�� 'i•�tM+�..; �,�� $ .ft.f �`�.+s w, '^ y p?,.�"1„�/' �{�'{r ;�> �� reds' �1 ;�i„ �:'+.'`• -'�"� �•yr .: '« T fq��.+�'s � � ���. •+„�"�'.f ��7• r t.,�` p•1 a.,�'•� ✓?W`�'� '�' ".. 7�• *'�"�s.� .re! •r.,,3 ("' 1� y t 6 A • ':£ a� -4s��R' R�= [ `�, .lo-. ..,•*r16., `R � y 4? } �.• •` 1 �<�`.`� irv. y'ws;.... t ,� f°{,:}� .A ,-z .r�,,_ a. '� .:,_ a:r`�+�i �'t'�' -� �3+• C3,iw.c•�'Y�i}t-�!g°? «,�{� �c`;�' ,`'iati., ` i 4 '\ r 1 t � ® tv e , F, 1 rx IANiA�'dby► f ti.. ►Y. .�mL _ �'. 5� ro c�� i,;.. a� ! y����, Ftf� j,�}°iy '�y� s _ ' w� � y:1�R'14 wv��"!`'4 (¢� �� �yr¢yy�,,� � '�'�Iy�.'�,'T,//��_�, r-. r•+ .... y ... .. ._. i�f ^� � � `yam: �r !l1 �� � kit;4 � �7�����"u-f�('� r�" 4�: � 'fl�s�!�yi�`.K���'�,.` f. •'"t fl��'_ ., � ; -... i �: ,�`�.`;r�'•_.-, �'S,��' y`1. � � r�'. f'i8 y 'Y t�' _ -:'�} �ir't' � i .n+l:�� �'-= .� VVV `` .� n �.S' _• i�vr 1^'iA 4.n �jn '4$ � / {`' - 'Cf �--,r. T -... �� '+4. ,� '.Y�a.t4 �'yJ"�w �r r 4'"'v' X fir.4 ��J 1.•� 1 1•t4• 4'J�fM .... _. ,j�\ `.a hg�^'ll x..., �t J:. r J��-•�•. r t".a +A"* ..4{-.,. i�i .d'4 ' ►. Hs.,rt, .. � 2 f do i; 8r• ' ♦. t.'� �7QP.. � Ct�!„! '`F�`�,4 °F. ,, ', 7�ii',^�.� ,, .. ... �...+. � 4 �J `s`., .��, 'j.'f! "�- i y.� �f«. �..:,.•,aa,:, •J}r .. au �—s.<� <L}. • '� i� Y� :n L 1'�. dr\�� ; 1l`i;�� �'f'�d+ Ji C Wit, s1 r � ` ^rfv�.� 1. 1 � 4 � + �• �7> ,i. .4� � 1• 'WIl P ;may,[ 6 4k.� • � . �� p � , i S � - .. •� It V..M � 1 1 } W •-.,� +e ��: �°a � �t`�'+t"h., ��$yfiu, »�a s��.'^� i{, `J:ter��,n ,�, �d,�i�+�": �k*` �� / ;7^;" T N-a ��� � i�' R� i '�'ta`t'° •.�'R ¢r't— Q` �'��'!• 10, 1t <, - �- �.�,rty►yy��� ., t� .,a�•i} - <d.. — J�, •, �•`�,y,�`:`.•5����1 �a � ��jRt.� �t a \`br7J"z ,�yY, �' {�°'�°�}�4 ,�" +i4�:1 ��i• 'Fi'�� " ' i 1� ,-^y`' Y •.' st. - '_ ,. :`:�'�.. :r31p ,d t`�`� '�''�i�^a`�ir�'t��'.�- I'���5���'��� .���. �''ih,.s�/* +R da'� `'v. � ~• �` '� � .tom c�'yP� _ .� ,,sr •s, ,1 r � v''��f� ��,..,. ,� 1��J?C+,.`.�,� �+:�y'^!T � i 1/� �t ,� �,j�, ... t 3 ^\ A, ?, r ,�.>�--'"•f ..� �a�,` r rJy ,►ilia-, �� Y• rJe�` �. i-� .. "s' '': �� y �+, ,K •ter � .�� ♦„ � � : l� bi_. ° �!. �,fri .# ti-l.i ��' � �ry. J R7R qYr-''� 1 J J•� i s�a „es • a v J e�n .l • � -et, Hyann ,,.M►' � tea.►, i _tis 3 aa l i, r .i i vc `f o 57 i 94 Main Street, Hyannis 2/15/11 1 1 _ _ I 4vimi ...■... EMS R UBE if 33►L11 t`•, I u. mIq $' s -- _w c ♦♦♦ .♦t �♦�' � ���' _ a,�,+ Rk '"+�,�-.sue,,, i 4 h �'� i •.671er'ar { r. ., r r s � `- _.� �� � � � i � r � � � r1 -� , �� � � 1 \^�`' V J �1 ___ - ;. J , r J Fl - it .: ` fs " CM, 1 .F� T_ �r h alr s� a l ,+. ��"_. :,..,*� '•- ., `.��. "i �{ ��,, +r �a �" ___.ems ,� `1 ...,,,4, ^�'•` - �,�� x�� �t.i. i S w : , J � r - .5. ,.�...iy..t�. dj''y�'K" •. :�•+:i r��. :v�"��'�'R` A.. .�' rJ.i�l}d1M1e:Ydifl1� �{t,ti3�EdEA]�a]�E��II�'+,. � a'millr ++��.,,,, _Y Y9� .'s. ,�j•,,w^'t� ' E* v a» �, yLa¢ ]rlC�ls yWS49g1Y i1�6amndr6W1Y� 1Y. �Gls�t' S .v .E �h Ir , rmsv #s , � ,. r �_ .. y,a.atltl ru+iwr iUtuy��� FYI 6tK tildd.Ji.ddsT`]6�.L41 §�itlfili�ii]�,.w Vbw►�',��kYi } i•4 i ..� .. � � ...,...._• � �ridEesl�u .du4i ;CYmss3s�',E'W�W��iaWo�irrWiTiu��t�,,. .- .��r,�-• - ..'� - -. •. �Jr .� r rncrx. �' aY.msaala�a3 �4iYYm31a�t6�l�ila.YYzfT�ili.Y,W@AI.ilY7lifialW�.,. ��� � >Y��F'�' ♦., �]� ,n1„ Y - � • Wsr'"wWR Y�aIru !�^� ex*+z� aarm®n --^-•""-w,••+�•I Eltdl�ihriillp'�i:[ilfl�l�.4,'.1xdYYliu __ y ✓i aT'".�. ;p)'��ma\ s[ i.. ► •Jj' �]t1aEllWai�Nli16+ 196SW+>iEft-�ar;I&SION._>:.e. l - g �--� War -rlinLtY11YYWi119l�itlllfil Y�aW7Y'YWIa3ldaxaaarixeYiNlE�YdwiE�!dYaWlm®Yzea®sur O #♦j' nali�3�flYW6sYea,arMClrii,�Ir4Y ?.�& .riWtawJl..rar�uti�,. ImtYarmcYsffi:+4tfmnsiL:91 Wt�" ! t ��j,••��,. • + ,.. t f fora _ � A°,y a-'�e',�,WllisaaJ rerIaYlar�4i�calnl;ip�T✓ dEF•m� It:tu..>aY�al�r�i _ .il 'fl a;:* Y t� �r�Y� � — + '.' T t3aldWc i le faahrwr.tt �.W �,- .aan, r] ,••", i�lY�rt p�pSpyYeatlf�llglpYYaaalt� '� �WLd I�ula�4�illui I )*�i�per� xt y � ,�1 ' -" .. '' ..r - • - SIW"M WuY,•WrYan[daYiWs€U" * 'df�r '� f r. j� aY'«n h--• _„�,�. « I �•""* tom`' °�'"''� a' titlwwisti WawlWov'�,tr't�dnu�t��, ,{a►adVWl w.,1a{sad�+ r' iaAdaw r]t �a 1oY�smtllrr "?nk.an,eu�m ■■ w w� ►hart ur� wtamwi tatrtsw dr 1t c1, J ^ A.: `x t ,• iYlfC�ifq (r$a�xet4Yuk+i:,t_tasai 14 ,YWstiYCYI iitl iS ■■ twxScrEOYtaail 1� i � aa: r wAwobad °:+^rWridlet:;,al.:�tr )) �; ulaWra.rd �•^"n! &Wl�ata.a.«a�Yrdke.4Ya. uatw¢;�.e.Iv';rat2StYi .d€rr ur.�e..�"ww3ttrms .Wsntttlli'tll 4il+tll�:iLii3VIYkd a 'tl r "" 9 'I:+.,J�ttJ3aiW4Writ �• �' ti .�. ✓�_.�, _� x `�`...... .-.�` , ..:: >-.�..... u9aYllWiia alt]d.�lBxoY>i �ni��^�.erw x�.i<•rax..�:lae]ati+r6lrWlaer ►lewwi';ntde .M 1 L• �nz)srss'tiestlaara3r.. ,, r YE� - �� .v., ._ waa .�3:a�ad�Is•c: era:�'t6dt', nrtfaa� ao�]]]]!!!! p } a n`:.�tjy°^ y," e: w +tt..z¢.. t t 9tiHYYi YBd44Y�awWWiav11 y' p _4'.w«rew66i5ualiiis� lodt�l.7E4161.+13iYY6atY4Ntt ,f�'tm�'i #h)FI,.Je4h�3�Yut +:. �:,, "w}�h .:`�•' BWWEIA]A dlYaLLrrllr.aY1M ,.�d� r t br ,.. .' .:-- '�- `�`.... { Mtl� iWalltatP(li..• � "x311itlYrYilYaY�i:li�bdAlhkaFY VI{ GlYttrL.WEvYtit6.1 E4dlll�.:f, tt)Y I'E• �'Ott� IIYn . .. 'e.. .• ,- ' Yt YEtrYY� aY _"°"i�e�alaaVllJla��t�,.rti�` ��,i]YtulYnxL d�lE>y.ktll�.T}�.1�C.�tf�ui u ', �,p „ : s " _'��r ^.,..,��c J � �.. _"• W�ae � � - , .ausY661]um .i� �. i6�rfi .. '' a. t rra i"ti.{ W: ,y 'Vu,dY2aYs , a ��.. .� JYill ��+.ict 3 '9�✓ taWu"ir.11a�t 's ,f11�. ,I M" �� R ,s- "� " � � � �I aaat�_ }� Ar°'`r n� WfBi�:.11Ea1i ■ � 9k - . Y .^ t,s �'� �.'•E � $YG iirtr-' �y� ®® ■ lSuYililitai � � W F"a .d '3,• - � ill i�l'sNo, t 4�! � d ..�mlm � ■ w Y•. . 1 a"'"'�• �q- ., a _�� - _;. v3�r ;`��« ' �s:S:�s!'rs+ YSI G ;�rr+lud /1,:�� t:a Ms o '* �, "°i .ti.?! * ,.c.,-,"�e^" ""`•�'�-- .-E r'v Nr' 9 - w tV. r�,`•.r• •,n ':+1.1r'3•. It i�'"`..4#''d'a.{arr z t .z% r•q I I N.Y .� `:. � � i •,, r`"t+; ��•y;,t' �s��� r'�E"�it� � ,�`�'V �� s�, ,4a� I.1 �r:" K - Y�„x ✓ i��'y�t�'.,Y�;. .+,,,.p+ti�y. r �EE• "1�,$� fSa'C +.'yy\ ,.,; �"•t � _ ,y '� -� •^tee- _ .. rt a. a .�. � R��°t«r�.�'.,v'+..4'i ._:,,.. �. ,.,�,. 1* �Y'k:.sF'.k� �. ?�^r � �•� _ Y#fit. #,s�+ a`.., ,�' � "'. `� >txk• r<*,,.w;»:� ._„: / .� `tL'..T"'i r - �6°1 v!' ...ia�F •-'C 4 }� i'F* �., - h - _ y, r " :.- y r�5�"�k`�`,w. � -Fyr'^a... ». �r,. �!':'�_.�`"'• Y:�,wi.`�,',, •a� �^`�.':j�^TL`•� 'y, <i.:,. k` n^r yr+ '�°�;�, c*..,.�^y,�,F,�,"$W`�_: �' ,�..., -:.^,err. r .�` g-,a.�-,�-.1..� -r.;.;+y(-+ �.sE%'7',ae�. .,•,.�cl.. ;r, +,,-. r '�� j`�,..�_a..,. �4�w.c urt�,; '.<.•.r .i - `�,'�"""�. �s, ..,3yKy a •:.,, •�fiKM .- u• y=m .. '4v �]E.�y��.y'tx x.,'Z'"- �"��,,, �-•._. . .:.r s �� -�:. },;4!yA. � ��^"'a ,, Y'�:F•`. rf��:s.' ""�#'�:•!'�., S-� �y�t jkg�. ...o�r;�,'� ;ate �ri�' .np, x „"r_'. '�i,�:�"�ro^:. ._ .3;'.-r.,,. .s� '• ,.wa`.,'a��'W^"zi0� � 'd�'i�"��T:,;.,.+Y�'] u..:.._ ��'7�;{ � � e�•-- ..'+�. '-{.•. .•� : ..�-,. ,�„�;. c ���� .,.sue. x r�,��9'w's% ,►,x ><�� �`,.w:b•. .^'.,. ..�°°"mrv. „•: ,y- _ r„ Y a 'oa'' ".'��E�„ '"".� yif'3'- '>. ^���.w�; 'rsdn,t". �-�6-+ :�� s• �+°' ,,�b 1lar.i��'%"`y'�i9i�" . +ar •t- Y _ ., � ��a ,�,r :.. 'i `,': x _ 4u..Y. `1+A - � 'r� ''ew a� t "sfs.�" ,::: -�•- c��axre„ �"ys , ,,, ,.. - : ,w .x,,.;-.� ..•.,..;r, w,r,..,.,... ,• ,x*, � s::- Ce ROOM » -'»� a+ mi`it:m,,,�,�"h ,.si°;'?='3•*' .,.. .'w„ .k;z. .-��, .M,. _,x�.;a= .f", ,�„�' w, r• L-0 Roma, Paul From: Roy Catignani [ratignani@conservgroup.com] Sent: Monday, February 14, 2011 6:16 PM To: Roma, Paul Cc: Perry, Tom; 'Pieter Van Slyck'; Dave Asiaf Subject: Concerns of a neighbor with regard to 94 Main Street, Hyannis, MA Mr. Paul Roma Hyannis Building Inspector Inspectional Services 200 Main St, Hyannis., MA 02601 Re: 94 East Main Street, Hyannis, MA Dear Paul: In response to your request, please accept the following .as a summary of our activities with respect to completion of the site lighting installation at the above referenced address. All lights have been installed in locations approved by the Planning Board and Hyannis Main Street Historic District Commission. We are now in the process of making additional modifications to the four site poles nearest to our residential abutter on the north side of the property. Consistent with the discussion in public meetings at the time of permit, these lights were furnished with a factory installed shield to cutoff all light exiting to the north of the these fixtures. Following a telephone call from you to alert us to the concerns of a neighbor, we have made the additional effort today of completely blocking all lenses (not just the bulb) of these lights for the full 180 degrees of each fixture toward the north. This was done with sheet metal and metal tape to provide complete cutoff of all light emanating from those fixtures in that direction. Consistent with our permit; we have submitted photometric drawings of the lights as installed, which are now under review by the Growth Management engineer. We will also have a site meeting after dark, this week to verify the results of our effort. We also want you to know that since the date that you made us aware of the neighbor's concern, we have turned off the power to all the site lights. The only time they have been energized since then was one or two brief occasions during which time we were testing. Once we have completed this process with Growth Management, we will then have a meeting with the Hyannis Main Street Historic Commission to review the final light and pole selections to verify compliance with their design intent. Thank you for your assistance, as we continue to make progress towards completion of this project. Roy Catignani President ConSery Group, Inc. P.O. Box 278 Sagamore Beach, MA 02562 Office: 508-888-6555 Fax: 508-888-6566 P.S. If it would be of any value, we would be more than happy to meet with the neighbor in. .an effort to better understand their concerns. At one point, prior to the start of this project, I did meet with the abutter to the north at his request in my office, during which time we reviewed all the approved building and site plans. 1 � 7-0 � 1 I g t r Page l of l Roma, Paul From: LITTLETONR@aol.com Sent: Friday, February 11, 2011 10:58 AM To: Perry,Tom; Roma, Paul Subject: Pictures to support formal complaint Dear Mr. Perry and Mr. Roma, During my recent visit to your office to file a complaint regarding the building under construction that abuts my property at 34 Camp Street, it was suggested that I submit photographs illustrating my concerns. The attached photos clearly show that an unreasonable light shadow is coming on to my property from light poles placed in unreasonable numbers, unreasonably close to the property line along the entire length of my/our side yard. Further, the attached photos also show that the light , towers have been elevated by placing them on concrete towers. This modification amplifies the ominous feeling created by the towers and detracts from their appearance in a manner that should not be tolerated in a residential district. I have included a photo that shows no such elevation on the same light towers that abut the main street. This modification has not been allowed in other projects in the immediate area including the newly constructed dental office that abuts my property as well. I would appreciate it if you would confirm that the lighting plan for this project received all reviews and approvals required by town ordinances. Please note that night-time photos were take, late evening,' after the contractor made an inadequate attempt to modify the lights in place. Finally, I question the ,legality of the encroachment of the driveway entering,the property from Camp Street into the side yard setback of my neighbor. The location of the driveway has severely affect the aesthetics of this home and as a result diminished the character and appearance of the entire neighborhood. This project can be completed without the negative impact on the neighborhood it has created. It is not to late to correct the deficiencies noted and honor the concerns of the community. I look forward to hearing from you regarding my complaint. Respectfully, Robert'F. Littleton.Jr. Ed.D, 34 Camp St. Hyannis, Mass. Please direct all email to this email address and any formal correspondence or legal notices to my off-office cape, part-time residence at 40.Godfrey Lane Milford, MA 01757 Copies of photos are attached. v 2/14/2011 t ' ', l =`rt�*.��1t'# ♦q.A is 1. L r - .�?`�, �— e. i'Myr'�t*'� r.. ,� �. i'�.3 age�''•.�6 t �` � sa ' ' .;� . 77777 �t 1 f s �.y Ali '9 )4 ■i�'.j^�' G1� -l4�A�' ly if f � ��.I • � -��' I �•, �.. i ,,, � �� �f�R�n'Fwf4p* a''4�fa� B� �1rs�' r , !' _: f b� 1. .a. I �.• _ � � 'ti r i � ar ;! z� r ou y � �: �. x R to✓r - 7?1 N #F N at'ry i 1 �` rf ��f THE FOLLOWING IS/ARE THE BEST IMAGES FROM POOR QUALITY ORIGINALS) I M ^C&L DATA Alor, L13 V IV, `� NX �' mom, � �`J'�'✓����.� "�,�,� � �,>r!!.' v o r �• t�" xrr es 4P / , 1 / -Nwv wbe v Arlo ,lit r . s 4 a,- apt a' � ,ON Y,`':?'�'.7 ' `•; fir, -��t �v ��� 3 t'yy; .p,• . .. J �� '�, `4 ��l t^\�. �` g \ �1 f p t a� � � . r _ .�,� , �. .� . >, 2��1 - 2�\ ` � _\` .� - % CGROUP, INCORPORATED Y• i• CONSTRUCTION CONTROL AFFIDAVIT AT.PROJECT.COMPLETION " Parcel Number ProjectName: = Project Owner: East Main StreetDevelopmerit Inc Project Location: 94 Main Street Scope'of.Project: New medical office building In:accordance with-paragraph:11.6.0 of 780 CMR,the 1VMssachusetts,State`Buildi'ng Code,.1, David Vachon Massachusetts Registration Number 74`71 being;a Registered Professional Architecthereby certify that all architectural plans, computations, and specifications;and`changes;thereto, involving the subjectproject have' been prepared_by or.under,the-direct supervision of'a Massachusetts Registered Professionals Architect and bear,his.or her original signature and,seal as defined by ; y Massachusetts Genera 1,L aw',(lVLG L:) e 112; 81R. . I certify that Have inspected the work associated with 94 Maifi Street:and that to the best of my knowledge,"information;'aridbelief-the work has been done,in'conformance with. r. .. . 1'. the permit and plans approved by the,Inspectional Services`Department aid with'the = provisions of the,Massachusetts State Building Code and ali,other.perfinent'laws and ordinances: CW�� VA CKON Tan 1 R, 2011 Architect (On al sgnature;and Mo.7471' Date ` , 1'10 State:Road o•(Swte#9) • P.O.Box'278 •.Sagamore Beach • MA,• 02562 Phone "508,888 `6555 o Fax 508.,'888`-6566 � kui THE DEMPSEY GROUP, INC. 8 Beaumonts Pond Drive Foxboro, MA 02035 Tel. (508) 543-5499 STRUCTURAL ENGINEERING CONSULTING CIVIL ENGINEERING • INVESTIGATIONS REPORTS October 15,2010 Mr.Thomas Perry Building Commissioner Building Department 200 Main Street Hyannis,MA 02601 Re: East Main Street Development Buildiny--94 Main Street-Hyannis.MA 780CMR-Section 116.0-Professional Engineering Services Building Construction Compliance Affidavit TDG#08283 Dear Mr.Perry, I certify that to the best of my knowledge and belief, the structural work performed at the East Main Street Development Building, 94 Main Street,Hyannis, MA conforms substantially with the approved drawings produced by this office and was completed in compliance with appropriate provisions of the Massachusetts State Building Code,6th edition,and any amendments thereto. Respectfully, THE DEMPSEY GROUP,INC. Ric and J. m ey,P E. President a�01' H OF MASs9cti $° RICHARD J. o DEMPSEY " STRUCTURAL No.29173 FclSTE��O��� Fus/ONAI ECG I F BAR'nQ,Tfjo,Tr L4- Robert F. Littleton Jr. r 34 Camp Street p,4 1' 1 Hyannis, MA 02601 April 8, 201.1 :I1j1^WN Mr. George Jessop, Chair Hyannis Main Street Waterfront Historic District Commission(HHDC) 200 Main Street Hyannis, MA 02601 Dear Mr. Jessop, I am Robert F. Littleton Jr., a 37 year resident of Hyannis, living at 34 Camp St. As you are aware at the April 6 meeting of the Historical Commission, I raised a question regarding construction in progress on the Duffy Healthcare Construction Project located at 94 Main St and 26 Camp St., Hyannis. More specifically I pointed out that a large tree, located at the street lot corner of 26 Camp Street abutting 34 Camp St. and specified in the construction/landscape plan as "existing 18" tree to remain" and had been cut down, leaving a large, above ground stump. This tree provided a significant visual screen and aesthetic feature on the stretch of street that is now largely barren due to the Duffy construction. I would like to know if a mature, replacement planting will be installed to comply with landscaping plan appearing on the plans which are the basis for project permitting. Please direct all inquiries and notices to my off-cape address listed below. Thank you for your attention to this matter. Off-cape address On-cane address Robert F. Littleton Jr. Robert F. Littleton Jr. 40 Godfrey Lane 34 Camp Street Milford, Ma. 01757 Hyannis, MA 02601 Mobile (508) 596-3641 Respectfully, Robert F. Littleton Jr. Cc: Tom Perry, Building Commissioner Felicia Penn, Planning Board, Chairperson Town of Barnstable, Massachusetts Department of Regulatory Services Building Division CONSTRUCTION CONTROL AFFIDAVIT—(CIVIL) PROJECT NUMBER: 4-9315.00 PROJECT TITLE: Park Square Professional Building PROJECT LOCATION: 94 Main Street and 26 Camp Street, Hyannis, MA NATURE OF PROJECT: Medical Office In accordance with section 116.0 of 780 CMR,the Massachusetts State Building Code, I, Brian G. Yergatian, P.E., Massachusetts Registration Number 46206,being a Registered Professional Engineer, hereby certify that all Site Plans, computations, specifications, and changes thereto, involving the civil engineering elements of the above project have been prepared by or under the direct supervision of a Massachusetts Registered Professional Engineer. I further certify that I, or designated agent, have visited the site, as needed,to observe the general progress of the work and respond to contractor requests for information. Based on our site observations and to the best of our knowledge, information and belief, the portion of the work indicated above has been completed in conformance with the plans approved by the Barnstable Planning Board, acceptable engineering practices, and all other pertinent laws and ordinances, with the exception of the proposed landscaping, which will be completed in the spring of 2011 when the weather is more favorable. jN OF Mgss� f �� BRIAN G. YERGATIAN -4 CIVIL Cn i .0 9c N 46206 Q G � Brian G. Yergatian, P.E. Civil Subscribed and sworn to before me this Seventh day of January, 2011. ti: _ Not ublic KIERAN J. HEALY - Notary Public My commission expires COMMONWEALTH OF MASSACHUSET7S �nw My Cero on RX011"I May Hyannis Main Street Waterfront Historic District Commission t BARNSTABLE. MASS Growth Management µctR 200 Main Street c Hyannis, Massachusetts 02601 I Phone:508-862-4665 / Fax: 508-862-4784 .. r.: Application to Growth Management Hyannis Main Street Waterfront Historic District Commission in the Town of Barnstable for a CERTIFICATE OF APPROPRIATENESS Application is hereby made, in triplicate, for the issuance of a Certificate of Appropriateness under M. G. L. Chapter 40C, The Historic Districts Act for proposed work as described below and on plans, drawings or photographs accompanying this application for: o PLEASE CHECK ALL CATEGORIES THAT APPLY: I. Exterior Building Construction: RNew Building ❑ Addition ❑ Alteration N Indicate type of building: {yp g: ❑ House ❑ .Garage []Commercial ❑ Other 2. Exterior Painting: ❑ '.u' 3. Signs or Billboards: [ New sign ❑ Existing sign El Repainting existing sign 4. Structure: ❑ Fence ❑. Wall ❑ Flagpole ❑ Other 5. Parking Lot: RNew Building ❑ Addition ❑ Alteration w (Please see the guidelines for explanation and requirements) TYPE OR PRINT LEGIBLY DATE �•'�L "Zd 0 8 ASSESSOR'S MAP NO. (�3 Z� ASSESSOR'S PARCEL NO. �gS APPLICANT 1.0A/J01t✓421 , TEL.-NO. APPLICANT MAILING ADDRESS P• 4 • 6424 276' .54'ef,40mmee ADDRESS OF PROPOSED WORK TV Al-41- � � ��i4.t/.✓/.p PROPERTYOWNERI7QX S4✓.4tsW ;''L.NO.(su)790-1&S- OWNER MAILING ADDRESS 116 X&POV S�TiQE�T .AJ-11--(// T T i FULL NAMES AND MAILING ADDRESSES OF ABUTTING OWNERS.Include name of adjacent property owners across any public street or way. This information is best obtained at the Town Assessor's Office. (Attach additional sheet if necessary). AGENT OR CONTRACT TEL.NO. � p 'w ADDRESS 91�c✓ 1wG . dA5tA 1/14/00 Draft Copy-Commission Use Only Page 1 I F W 200811 RNSTABLE DETAILED DESCRIPTION OF PROPOSED WORK: HISTORIC PRESERVATION Give all particulars of work to be done, including detailed data on such architectural features as: foundation, chimney, siding, roofing, roof pitch, sash and doors, window and door frames, trim,gutters- leaders, roofing and paint color, including materials to be used, if specifications do not accompany plans. In the case of signs, give locations of existing signs and proposed locations of new signs. (Attach additional sheet,if necessary). Signe Owner Contract -Agen SPACE BELOW LINE FOR COMMISSION USE Received by HMSWHDC Date Time This Certificate is hereby-,W t` IA By Date. Si IMPORTANT:If this;Certificate is approved,approval is subject to the 20-day a e peri Apr vled i the Ordinance. CONDITIONS OF APPROVAL: Aa-Ak od +b(., v 1/14/00 Draft Copy-Commission Use Only Page 2 HYANNIS MAIN STREET WATERFRONT HISTORIC DISTRICT COMMISSION *** SPECIFICATION SHEET *** ADDRESS OF PROPOSED WORK 9�V .klofl✓ SzZsrr . g?6 CAx1P aA6rr hl�l,4.✓.✓rs . FOUNDATION eCi0%CCA 7 40W40 776' SIDING TYPE 01.4 P64AX P s COLOR CHIMNEY TYPE A- COLOR. ROOF MATERIAL .4j&-0#1 nC 444C �4$f t,r COLOR PITCH_ .9pz/2- WINDOW 1.,6 �e2 �� COLOR WHI ru- TRIM COLOR Ahf llr DOORS6tZ�G14$S(tirvw �1.4�5 COLOR S4W44 SHUTTERS Q , GUTTERS A41AMAZ IA,&Y 172F DECK GARAGE DOORS COLOR NOTES: Fill out completely, including measurements and materials/colors to be used. Three copies of this form are required for submittal of an application,along with three copies each of the plot plan, landscape plan and elevation plans,when applicable. The Plot plan need not be"Certified",but should show all structures on the lot to scale. E C W E APR 2 2 2008 TOWN OF BARNSTABLE HISTORIC PRESERVATION �� • ". ;;,;ail lllllllllllllllllllll ;mC"uzr • I,,';`'llllll IIIIIIIIIIIIIIIIIIII I �:�� ,I, IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII :::� , , m IIII, .,,, ::: N�{iNl'al ••.: . : • I "L III' gI 4 ulllll� �� lilllll' I � III1.• : ::::illl�lllil IIIIIIIIII I ,.. IINf�, •• � I IIIIIIIIIIII i _,. � . : �Il u�� 1 III •::: =• IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII ��il�+Hlb'�E,�a� IIIIiIIIIIIIIIIIIIIIII Illlllllllullllllll 11.���a+�.l'611t'.,�� • L.. .. :::: 'D ' III, :.., illlllllllllllllllllllll IIIIIIIIIIIIIIIIIII � °'°;,�" I, ' �"`'llllll IIIIIIIIIIIIIIIIIIII ' "';,�'' ', • III, : ::::I � ���� IIII`'';':.' . :I I���I,��I I � . � �� � ► """""""""""' IIIIIIIIIIIIIIIIIIII I�.,, ►I' �'ol'�'�°�'�IIIIIII IIIIIIIIIIIIIIIIIII I IIII'';"" ,IIIIIII IIIIIIIIIIIIIIIIIII 1' � uiiiiiimiiiiiiilu IIIIIIIIIIIIIIIIIIII ,J„I`�', ' r II I, , II IIII III11 I II I u iii iiniuLiiiui iiiiiii I���L:�� I✓l. Illllri,L. iliuliiiillulllull lullllllluuullll �+i "'IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII � � Sul ::� •li�u�,..,�,..i ii�� \ rk I nnIPl,illlpi4,ui.. u . IIl'll�la''''!IIIIII Illlllllilllllllllll � ;;;; ►� � � �� "IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII , ;,,: i���llllllllllllllllllll Ili:° ���� 11I'�lill{�}��� ii llli�llllllllllll�lll LIIII�I,I�Inllll= �II'I�,N�l��� , IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII I � i, ���'�m�l�\II ',�,°:� ::;.� Illlllu � IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII � IIII'°:I����dllllll IIIIIIIIIIIIIIIIIIII IIIIII„I I) � ��I::::I .::I IIIIIIII ' • I : I ;;,, II,,� IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII Ilil�illl III IIIlillllllllllllllllllll IIIIIIIIIIIIIIIIIIII 11°IIII II � '�� �� "'�� IIp' • III • IIj1'I� IIh 1;'':!IIIIII IIIIIIIIIIIIIIIIIIII lillilli III IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII —' •::i :°::I Jill IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII III ' I i MENNENPARK for Group IncorporatedPROPOSED OFFICE WILDING vi = - UARE PROFESSIONAL ronSer 94 MAIN STREET 2277 State Road Sufte H 0::::. OF THE Tp� Town of Barnstable BABNSTABLE, ; 200 Main Street Hyannis,Massachusetts 02601 y MASS. g �A i639. ♦0 rFD MA'S A Growth Management Department Patricia Daley, Interim Director 367 Main Street,Hyannis,Massachusetts 02601 Phone(508)862-4785 Fax(508)862-4725 www.town.barnstable.ma.us August 22, 2008 Park Square Professional Building, LLC C/O Roy Catignani Consery Group, Inc. P. O. Box 278 Sagamore Beach, MA 02562 Reference: Site Plan Review#031-08 - Park Square Professional Building 94 Main Street and 26 Camp Street, Hyannis Map 327, Parcels 192 & 193 Proposal: Removal of residence at 94 Main Street, Hyannis; preserve residence at 26 Camp Street but remove garage on same lot. Build new 2.5 story medical office building with two (2) apartments on the 2"d floor. Dear Mr. Catignani: Please be advised that the above proposal has beer. found to be administratively approvabie subject to the following: ® Approval is based upon plans entitled, "Mixed Use Development#94, #102, #110 Main Street  Camp Street, Hyannis, MA, Sheets 1-7",prepared by BSC Group, W. Yarmouth, MA dated June 9, 2008 revised June 12, 2008 for lot coverage calculations. Sheets 3 and 4 revised June 24, 2008, July 7 and August 5 per SPR Staff comments to depict access drive,turning radii, and utilities, with a final revisions per Planning Board dated August 19, 2008 • All outside lighting, fencing and like amenities must receive final approval from the Hyannis Main Street Waterfront Historic District Commission. Y Landscape Plan, lighting, and fencing must received final approval for compliance with the Design Infrastructure Plan. i Applicant must obtain all other applicable permits, licenses and approvals required, including, but not limited to, the granting of Planning Board Special Permit relief. • If plans should change due to the Planning Board Special Permit decision, the applicant must submit final plans to the Site Plan Review Committee which reflect the decision of the Planning Board. • Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification,made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan (Zoning Section 240-104(G). This document shall be submitted prior to the issuance of the final certificate of occupancy. Sincerely, Ellen M. Swiniarski Site Plan/Regulatory Review Coordinator CC: SPR File Tom Perry,Building Commissioner Planning Board Special Permit 2008-02 File I MIXED USE DEVELOPMENT #94 MATN STREET #26 CAMP STREET HYANNIS, MA TUNE 9, 2008 LAST RLMSED:.AUGUST 19,2008 LEGEND issueorr)ePeRMirriNc INDEX OF DRAWINGS -0FSCRIPTION PROPOSED 111nCIG /� `� /'• i�' C ���/(_ I�. 1 - TITLE SHEET 2 EXISTING CONDITIONS PLAN 3 LAYOUT PLAN 4 GRADING, DRAINAGE& ollq" ? ,., � r1 1: UTILITIES PLAN 5 LANDSCAPE PLAN a y :'�'%3� 4 T ➢ s �we°s s 6 CIVIL DETAILS —.- a} /(/Y, and th,�` 7 CIVIL DETAILS II 5 S E t F LbMvv Na m >aa LOCUS MAP PREPARED FOR: - - PREPARED BY: CONSERV GROUP,INC. P.O.BOX B - t BSC GROUP SAGAMORE BEACH,MASS - � �� - R ]R U i W.Y D W. mouth.MassachuzelK 016Ti 508 778 8919 - - ,oe xa a-ams.ro owc xn—tt- SHEET 1 OF 7 q �._ \ �i� \\ ) \\ / � '\�� � 6 �I �aw � vamcsporw uao slm.+-m+ te SITE PLAN REVIEW Lu #94 MAIN Sf AND #26 CAMP ST HYANNIS MASSAC COW S RARN\ � ` ` \ I •�• \ ISEABU LE CDUNTry 1 / EXISTING CONDITIONS LOCUS INFORMATION \ fy��l / ,CC]C/ \l WNSflN CROUP,INC. Ee.wf.2 fe o acmau vux�' P.O.BOX 278 LEGEND SAGAMORE REACH.`AU BSC GROUP �NRNE�NN�E am 349 M.i.28.U,..I .aF/.uw raoxT n W.Y.28 ,h.D W Yamrou[h.M.f50$fi e[n016J3 G \ —J.- 4, salfl.a acw [a SOB TI88YIY 11 7J U °S ISSUED FOR PERMITTING rp NOT FOR CONSTRUCTION w �I 0II \ I A. . I ® � Q( :_p vPoaEsSgxAi OtcwnA w .. PARK SQUARE aai or PROFESSIONAL BUILDING .. #94 MAIN STREET AND #26 CAMP STREET a IN HYANNIS � \ � MASSACHUSETiS (BA8 ABU COUNM 72 n \ - i C P.. t I. _ LAYOUT PLAN y 8 \.V ) e cWP I � I �„ Buznwo v c - { 1 l '"` 1,./ '' �nWu Br�itcuRBIBaE9uFNwlOuL(z vats) b9 i¢vsE KY6S 0xra[ . - - `j �1 -� 6, / ' �. �svEro u ¢w c�amBcws gBEwuusmrcr ro ec ocuwiwm . .. �{t �!h, �.' µworo.¢oewm1oBAso.Ni�r t'm[to uo vm aooas z wolarm r�u�arvs PxwosEn N. k - , j/ / % z �ca,u Pmwr Eo ulmrAtm xEu[s B anion �� { 4, - ♦.1 wC(I)(B)6�Mwa sttBAIX i0 xEO. 9cE278 vAep SE1BAq:2]'nOrE SECrrox CONSEIN CROUP,INC. C(V1Me A¢6 'NSi¢w¢taut Awo 9KEiu0¢taAtx]ro ACLmaDA.— 51GP...BEACN,MA. -" iNEb DA(�r)ros)Pra uama:o moo P m screAac r0��asttx��nNu d 16Bo6mltt Ila�ixPnoNom M/sa¢fJ1wG BSC GROUP �,�• 3 9 Man ar- i � In':°tBAOE�A.=..vx - Bom.2B.uwto }J•`' / - s W Yannot th Maasadvs 112671 / % v�vFrt xisiO Si. - 908 1788919 ECT .4•• x - �. - ]CUE _ _ ISSUED FOR PERMITTING NOT FOR CONSTRUCTION N STRU N as t _ t 1 .rDRwnw b PARK SQUARE PROFESSIONAL BUILDING c y -a • -:>••" ` _._.. #94 MAIN STREET - C P AND J i t #26 CAMP STREET HYANNIS - '"'° MASSACHUSETTS mJ IRNWSTARlE COUNTY) to GRADIN G,DRAINAGE& UTILITIES PLAN 'JUNE 9.2o } 5 / � \ t f CO—GROUP.INC. P.O.BOX 276 \ � % e SMANORE BFACAI,MA Vm= { / x ro 1 \ i �l 1 �RU"" xB:•"RxRE ."°�[°�Rm,om rxR t BSC GROUP i R 2R Ulil D \ i t _ •. .ui u[m BAsw az[anppm wm o[rs as ly,l armooth Massa[hoseen 02673 / ��Is _ 508 T188919 Mn•Lp+— ISSUED FOR PERMITTING NOT FOR CONSTRUCTION OQQO N s s Of 4,1 r.wc 1 Q ! �rw„mroilmJxRu,maxtt S; f L�•w PARKS SQ UARE PLAN Hew PROFESSIONAL _ ' \ BUILDING 1 epi`,c`nnv°°xm""Pem:","'ro #94 MAN STREET AND an•'�•e "•i,'�a'rz _ ,}` \ �.... _ #2E CAMP STREET i Y IN u HYANNIS MASSACHUSEITS TM=m•�•••a `4§ .y r.-� V "'" 1 a - " e:�%" (PnXnsrnoU eauN'M SQL��`M $ •� .= F ': �, t 5 ,� _ j— sP..�Pxame LANDSCAPE PLAN TUNE 9.2008 TREE STAKING DETAIL - _ 1.PuwT x.,En�w s,u.mronxx ro,xE curoEunEs m..euwm BY wE• �µ srPJm.xo rya wao�,.w� - x . .N Pax 6 xw[gR.xER uTm Emma. =MW NOT P_E, E B r TEXB.. Px axa� rz Maur ' - cME�Ks rv.r�oxi _ ��nw,¢r ro wtmv a P�y,m Prr Pme xm m a wenu¢ �RR.xTm EPRUS 9UI Ta,m�rzx 0E,M,PEIRFNBr T(aJ CONSQN CROUP.INC. B ,P[9 _ ¢ - _ ..9oe,e BFD NiGS A.LL 15CErE 1Y WN,wC SaR xuaulul TwmUaM. - P.O.PDX 278 w¢a aw nr¢ru®aam a � ��u�.�, suu cot�x�T[Pux BOxc SOOPMOPE BE1LN.MA ' .,mrx w:m wm1�i/Y ri¢a xw,exv` RA1nFD Paac 1Wtnl- Y xxx avw awu 6 I.RFA A.LL PEtaK 3•xvl xENloex 2.71:1 Puny.,» evvam 1 W �®row �DP n � BSC GROUP N Puw v vuxv rmr(Pm..,eO ' ®� (n az P nr U 1.—ENGINEER u�T Pux )99 Man Sneer - XPH B C18UPEA A—.OEfuE_v - RGu[e 2BIlmED ��we.nuc EprnNG I.wG9GPaEIro BE PRO.,O G w.Y.—.,..m..d„Isertx 02818 - 5081188919 rux¢ry m x,vI uao 0 am s umm,�o nm F ,nm ® SCNE® .EXISTING TREE PROTECTION SHRUB PLANTING BED P�..�w..umna oaa names PE�.�s�w,x.w,wa.IR.� t ISSUED �;:• .,_' �. s _ °+- k C NOT FOROCONESTRUCPION VERi1CAL GRANITE CURB r HOT�MIX ASPHALT PAVEMENT JOINTS - x�[ °a wN - 11 `t ,a w n wa l,wa m.m uo w�m as F.�.a�xmm� TRANSFORMER PAD REINFORCED CONCRETE PAD MODIFIED CAPE COD BERM- 6' SINGLE—SIDED WOOD FENCE F K- xaW °°- PARK SQUARE PROFESSIONAL mmn,aAe BARS BUILDING ...uroraaaa r N.�,ro W,maAa,a.a x-m m oxa a eNm m oNl — S - s,aM..a ,•,T,+x ��= #94 MAIN STREET eti _ u e.R as.'m vua xn°` AND p�p$ � .c°.a®ma°.,ax - I ,u cr- awmu.mna u1 ro�Maa axu #26 CAMP STREET i6 rraxOmmA.ari py ° i'm�a�°Rmamw IN _$ �.,: �' HYANNIS MASSACHUSETTS IBARNSTAeIt couNTT V —baam.a�„ ixxi aN,.xaa CIVIL DETAILS JUNE 9.2009 �)C m v eW oWa.m:,aa CAST—IN—PLACE LIGHT STANDARD ° � [ ����'II �` - �� � • �� r "'" ����� FOOTING — FLUSH SURFACE CONCRETE WALKWAY PRECAST CONCRETE CATCH BASIN raaa.� PRECAST^'CONCRETE DMH .vx �u WELL GWOmxcRANUUR BACKFW.wHP:H Lb . CLEANOIR WRN CAS-C. SC-)b FND CPP I—I O�srP®YIION OF PMft I00 4�Yf�C—H NO MO - SCREW�N CAP CONCREEE MINIMUM OF 85ft Of TfE/SfNiOW°PROCIDR DEN— - FLOOR BO%FRMIE AND lJD W/5.5 SC-)b CILu18FP SEE THE TAB,E Of aCCEPEA&E FILL MATFIB.LLB IN. STORIrtECH'8 DESIOn NaNU.14 INSTaWTrtIN MANWI, _ GP SCREW 11D CLONRE PAVDAENT _ - t 21NLH WASHm OP.WMN.SmPuaCH.tOM. C11BSHm,ANOUTAR SEDNE NOR°OWWE�IIBGEOiIX IE PAVEMENE - s. t 9' i(I rK"-:-.,~ t�r<-v r s �.s NfONar,o°rcNP o wN6Tacics wr omnL;�=J e_96x coNSEtry cRouP.we c e'i4. P.O BD%27B r msrnm wWl ean°• AA o M288 - 6'M N. M SAGNAORE REACH,MA CUSS 2 O44-WXIILE '° _ BSC GROUP SC-740 CHAMB - lC9 Maln Snee, _F' _ VARIES Route 28.Um,D .8778W9 , B96TJ JIT--E-1 mil i.�-.It=•1L r'% .�T' �-L r'll L� ®.® roa .e - r 6' 51' 12'MIN.TP. _ STORMTECH SC-740 CHAMBER SYSTEM STORMTECH SC-740 CHAMBER SYSTEM uw. : PERVIOUS PAVER — VEHICULAR INSPECT70N PORT DETAIL TYPICAL CROSS SECTION muE00u.oc HANDICAPPED. ISSUED FOR PERMITTING �^� PARKING NOT FOR CONSTRUCTION 4 Co �T . x•I H�—�4 n >.uw arm miaws r°mxw PAVEMENT MARKINGS - ACCESSIBLE CURB RAMP TYPE 'F'-- NARROW SIDEWALK ° - ACCESSIBLE PARKING SPACE PAINTED PAVEMENT MARKINGS ACCESSIBLE - PARKING SYMBOL & ACCESSIBLE PARKING SIGN PARK SQUARE PROFESSIONAL BUILDING #94 MAIN STREET - -AND #26 CAMP STREET ��4 m�z.,° HYANNIS - MASSACHUSETTS PLA F UO BEuO 'p� �rs IBARNSfA01L COUNTY) ® 4 .�ate' CIVIL DETAILS II TUNE 9,e008 Y .ro+w°.°m.a . e.°wow.w°ww wm.� a wa<ww n w�W -• ACCESSIBLE PARKING SIGN CONCRETE.THRUST BLOCK FOR PRESSURE PIPE WATER SERVICE CONNECTION 11M ,I— Hess. I _ .mv CONGER.CROUP,WC. ' rws.xx m.ncno°..rwwn P.O.BOX Z)e - wam mn a a¢ X mxs wov e f uum ua wwa. S+LV.fORE BEACH.IM W-i e • w � �].,' _® nrm TRENCH°w[H PA � rvc ewxc wnuuma - m.xc s ra �' s xiw.mv wCa.wrt - ' x ® r wm� BSC GROUP T - =iW' E wwnw w : w. y me ra o�. - : ]49 MR n SNee[ ..5.3`EX.J h> .1 1(]s.'.'aT-."J�-•. 0.ou[e 38 llni[D M°s Gn a�vO4w� —v wxwH W.\'asmo tK GW Ild G919 r ifns w mww ro mpuwi.v _ r.c wi wr_ •�`` camH wxaC2 nLL ® : J.TYPICAL PIPE TRENCH SECTION - -SEWER LINE CLEANOUT SANITARY SEWER MANHOLE TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION _73 Parcel # 00 57 06 Health bivision YI Date Issued 11_�d V Conservation Division Applicationee, F Planning Dept, Permit Fee Date Definitive l.Plan 'Y ILI' Approved b Planning Board Historic OKH Preservation Hyannis Project Street Address Village 14YA,404) S Owner ICA ST_MfiUA ITA-916-WEtuI004ENT, LL6 Address 110 A-4A 1+ 1 JrAn'_r )(4,41134 qA; d:a"I Telephone p 14.4 1-441 C��4j? Ild .1305 Permit Request id-re4io4. 4-CALV a"rW_ Square feet: 1 st floor: existing proposed4q.1A 2 d floor: existing proposed Total i cow new Flood Plain Zo'ning District. *;"�Ewater Overlay We Project Valuation S2s On Construction Type Lot Size to 70 55-10- Grandfathered: U Yes Ll No If yes, attach supporting documentation. Dwelling Type: Single Family L J Two Family Ll Multi-Family (# units)— A Age of Existing Structure Historic House: L11 Yes W/No On Old King's Highway: Ll Yes E(No Basement Type: &Full LJ Crawl L3 Walkout L] Other Basement Finished Area (sq.ft.) Basement Unfinished Area(sq.ft) Number of Baths: Full: existing new 1 Half: existing new 6 Number of Bedrooms: existing —new Total Room Count(not ot iZAqS ncluding baths): existing new First Floor Room Count 5W i Heat Type and Fuel: was LJ Oil LJ Electric LJ Other Central Air: 8*16's L3 No Fireplaces: Existing New Existing wood/coal stove: Ll Yes LJ No Detached garage: L11 existing L11 new size—Pool: LJ existing LJ new size Barn: L3 existing LJ new size Attached garage: Q existing LJ new size —Shed: ❑LJ existing ❑LJ new size Other: AZA WIVIV167 '04r*94 'Jft Iq I-Y*XM A"p-'g Zoning Board of Appeals Authorization LJ Appeal # Recorded LJ Commercial u,Y6s LJ No if yes, site plan review# 031- d-P Current Use Go Proposed Use APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name L44.4 �11/44W, Telephone Number Address License#- CS' - !!rlS'*7 .141) 4,+ .4 sr-1 Home Improvement Contracto'�',C# Worker's Compensation # dArr- ti 64 Sri,I ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO -0 2A SIGNATURE Win— DATE FOR.-OFFICIAL USE ONLY ; "APPLICATION# t .:DATE ISSUED MAP/PARCEL NO. ADDRESS - -' VILLAGE*"; OWNER DATE OF INSPECTION: ,J FOUNDATION — _FRAME , ' s ;<< , �y�• . �,�; -. . INSULATION 1 ; FIREPLACE ELECTRICAL: ROUGH FINAL - - PLUMBING: ROUGH =f ' _R Y. .. FINAL.. GAS: ROUGH FINAL FINAL BUILDING ACT DATE CLOSED OUT - T `Y. r, 47 `_ • ; ` 1 ASSOCIATION PLAN NO. ^�' The Commonwealth of Massachusetts Department of Industrial Accidents 600 Washington Street / Roston,Mass. 02111 Workers' Coffi ensation Insurance Affidavit city Rhone# I am a homeowner performing all work myself ❑ I am a sole Proprietor and have no one worldn in anv ca=tv o NOW WE ff"ZI I am an employer rovidin workers'conipensataon for my employees working on this job.:;:;?::} ;: :?::;::<L.::: :::;<;::<::<:»:<:................... tOmDan v rsanse.. i a dire SS :` iiii ci tw X. yi: yy ,,�� � }� Insurance cb: ❑ I (circle one)and have hired the contractors listed below who am a sole proprietor,general conftwwr,Or homeowner have fell0 win workers' ensation olices: P :::::.:::.:::.:..::::..:<.:;:;.;:.>:;.;}>.:::;:.>:.;:.:«.;»:::;;;:.:::::<.;:.}::.;»::-::. <>;>::::>:>::::.:>«;:«>:;:: ::>:<::<;?„>< >:> the gP.............:..:..:::::::::..:::r--.....:...::..:::::.........:::.::: ::.::.:....::.::..::.::.:.: ::. ::..:::..:::.:.:.........::..::::.::: common :v »=> '= ': address::::.:.:;},.;<:;>:::::::?>:<:: . . . :,:::;.::...............,. . ::...... r..........:...:.{. .... :.:..................::::.......,.....:r..................::. .:::..:..:::.::::: ':•:4':• ilkt ilk '�`: ::::::::.................... ,: n:.vu}:.;, r•}';fir:^- .....:::......:.:............. ::••....:.....:.......is ..:..:............................{-?}}i'i?}}:•}.... ail^:•:-:i:;•}:W:v::v<i4}.v::::::::.::.v.:': :.v:::::............ .........:::.�::.�:::::::.v{{;:•}:v::::::::iv{{{•}:•}}}nv::??nr:::::v:•x;}:•;'r•:n:i�k?::•r.rr.,: ,:.v.{•:.x .....x... .. .... ... ...... .. .. .. :::•.:.............:::::::........:.,•.krr.: ... r}.rx•...rr:..r:......4{-::{i•{:!}?t...r.,.... ..... �1cV�.....:::::::::.:...::::::::::::: i....... :...... . ..f:>.... }';i�f;{•i?:•??S}}:{vi:{:a$:<ti{x>:{:.:tv:::::•::::v.,..:,.\::>.•:4i:i•:•T'::}v{:?i::.y:;.}jYii}:•Y:+'.`. �i:::Y>\Ji::•,:'$is i{;: :;:4<::•i i`•i:!::•-i•'ii::{:;iiiii:ii% ?T:•{i:;:} i;:isS:i: iji>i}:i ifriiiiii: } ::r i >i i ii>i :i.+viiii::iii:i:Ji}:•?:vv:i'r.:!:ii:v::C•::; v}:d......:•:::::::. . ....... ......... .... .f.. ...:. :r::::::•::.gin.:....:....:............ .... .. ........ ...:.......r. ...v..--L.. y.{?{%:;:•}:{<;{�:;:::{.'.:;:}UYSii:•Xv:'`j}}�:}::i•:;:;�::ti;:{:'v}?i:�:;v:•:•:;i:tYi:'^i::L:::::, ...... ......... -.. .. camoanv name:..... ... ,.... :.. ....... . .... ad dress. ,:;:;:;:;.....>::: :>::<:<::;;:'•:::i:k:::>:«:-:':>>: <:«::::> >:::;:::>::::..:;.?:::.: :}:.;;::;:.:::; }:.:>:<><::;;::??:.::.;:::?.. `ea - i•:1:•:vi:::4:i MM��L .................................. }:•F:n• .+ak:rS::•r.'?F.to'.k:�'Sr::;: :;:;::::?;::�=�i:?:f:`:;�::; ::i:i:%::;:;:;.: :i::;:�'•:::::�iri::� ::�3i:�< � :: :is�ii:::::;:::::i::::::;%�::;};::: : i::::i:::}:�S:i: }?:4}:•:•?:{•?:J... ,..:�,w:r..::•::'•?}•'?'w::::::•rv:::.•v.•::::.:.�•: .gin::......::::::..:.�...�::::::v... iasnrance�ca > <:> o::.:.??::::.::::,,,.<.x:.::.::..:,_.}:<:.:: Failure to secure coverage as regdred muter section 2SA of MGL 152 can lead to the imposition of erfminaf penalties of a fine up to 51.500.00 and/or one years'imprisonment as well as eivR penalties in the forms of a STOP WORK ORDER and a fine of S100.00 a day against me. I tmderstand thast s copy of this statement maybe forwarded to the Office of Iavestiom of the DIA for coverage verification. I do hereb erh under the p ' and p aJties of pe jriry the infor►nadon provided above is true and correct Date Signature Print name AW0 r A &,g'; 'VAJ Phone# " Mallow- official use only do not write in this area to be completed by city or town official city or town: permit/license# ❑Building Department ❑Licensing Board El check if immediate response is required ❑Selectmen's Ofldce ❑Health Department phone contact person: - tf; — ❑Other (rrmw 9/95 PIA) EIG Fax Server 5/25/2010 9: 13 : 50 AM PAGE 4/005 Fax Server ACORP, 'CERTIFICATE OF LIABILITY INSURANCE (MIVUDDIYYYY PRODUCER (800)782-0251 FAX 791-261-2099 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Eastern Insurance Group LLC ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 77 Accord Park Drive, Unit Bl HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Norwell , MA 02061 INSURERS AFFORDING COVERAGE NAIC# INSURED Consery Group Inc. INSURERA: Peerless Insurance Company P.O. BOX 278 INSURER B: Hanover Insurance Co. 22292 Sagamore Beach, MA 02562 INSURER c: TPA Insurance Agency INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR kDD'L TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS LTR NSR DATE MMIDDIYY DATE MMIDDIYY GENERAL LIABILITY BK01053511978 07/07/2009 07/07/2010 EACH OCCURRENCE $ 100000 J( COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 10000 CLAIMSMADE OCCUR MED EX.P(Any one person) $ 1000 A PERSONAL&ADVINJURY $ 100000 GENERAL AGGREGATE $ 200000 GENL AGGREGATE LIMIT APPLIES PER: - _ PRODUCTS-COMP/OP AGG $ 200000 X POLICY PRO- LOC JEGT AUTOMOBILE LIABILITY ADN841150203 08/27/2009 08/27/2010 COMBINED SINGLELIMIT ANY AUTO - (Ea accident) $ 100000 ALL OWNED AUTOS BODILY INJURY $ ' X SCHEDULED AUTOS - - (Per person) - B X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) NXComp Ded $500 - PROPERTY DAMAGE X Coll Ded $500 (Per accident) $ GARAGE LIABILITY AUTO ONLY-EAACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESSIUMBRELLA LIABILITY US01053511978 07/07/2009 07/07/2010 EACH OCCURRENCE 5 2.000,00 X OCCUR D CLAIMS MADE AGGREGATES" $ - 2,000,000 A $ DEDUCTIBLE X RETENTION $. 1000 - $ WORKERS COMPENSATION AND - "WC003730404 11/09/2009 11/09/2010 X we LAM ITSHR EMPLOYERS'LIABILITY TORE.L.EACH ACCIDENT $ 10000 C ANY PROPRIETOR/PARTNER/EXECUTIVE _ OFFICER/MEMBEREXCLUDED? E.L.DISEASE-EA EMPLOYEE $: 10000 If yes,describe under - SPECIAL PROVISIONS below - - E.L.DISEASE-POLICYLIMIT 1$ 50000 OTHER BPP $126,000 A �roperty BKO1053511978 07/07/2009 07/07/2010 Leased/Rented Equip. $40,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS ast'Main-Street Development, LLC, 94 Main St. , Hyannis, MA CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 3O _DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, Town of Barnstable BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY 200 Main St. OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Hyannis, MA 02601 AUTHORIZED REPRESENTATIVE Ronald Cl eaves/MDF �� Cam"` ACORD 25(2001/08) ©ACORD CORPORATION 1988 i QpIMF TO Town of Barnstable Regulatory Services BAMS ULE, MASS. Thomas F.Geiler,Director ArEa �� Building Division Tom Perry, wilding Commissioner 200 Main Street, Hyannis,Na 02601 Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section ' If Using A Builder )qA441972- , as Owner of the sub �t'3T MAJ J property hereby authorize _�,��' ►� �iLdtJ,o, to act on my behalf, in all matters relative to work authorized by this building permit application for: (Address of Job) k S-zc. /d Signature of Own Date Print Name . t Q:FORMS:0 W NERPERMIS S ION Massachusetts - Dcpm-tmcnt of Public SafctN 1 Board of Building Regulations and Standards Construction Supervisor License License: CS 5157 Restricted to: 00 - - ROLAND B CATIGNANI 60 GEMINI DR rl- W BARNSTABLE, MA 02668 1 Expiration: 5/23/2012 ( uuniissi nrr Tr#: 24301 r onS�ery _., GROUP„INCORPORATED CONSTRUCTION CONTROL AFFIDAVIT.AT PROJECT INCEPTION Parcel.,Number. 32'T.� 5 Project Name:, Proj ect Owner East Main Street Development LLC Project Location: 941VIain Street' Y Scope of Project: InteriorTit Up In accordance with ara _a h l�16 0 of 780 CNIR the Massachusetts:State' p p Building. Code, I, Y David.I'Vnchnn Mdssachuse' tts:Registr.ation Number 7471 a being a Registered Professional�Arclitect hereby certify'that all architectural plans; `computations, and specifications, and an thereto, involving'the.,subject pmject-will', . be prepared by or under the direct supervision of a.Massachusetts Registered Professional` Architect aril bear his'or her original signature and seal as defined 1Vlassaehusetts ..A General Law (M.G.L)c 112, $81 R. I further'certifytliat I will be present,on the construction.site atinterva'ls appropriate to the stage`of construction to beeoine,generally familiar with the'progress and quality of the` work.to determine;m"general, if the architectural work-is being performed in-a manner -,consistent•with the construction documents. P I y 24, 2040 „Architect; (Ongina signature;and Se`` ��:°6.�'A`�ti A=r Date a _ r .. - 11.0 State Road_o'.(Suits#,9 P.O Box 278 • .Sa amore Beach MA 02562`• Phone 508•888 .6555 • Fax'508 888 q 6566 Apt o m �a N PARK SQUAD PROFESSIONAL, BUILDING a 94MAIN STREET w z s HYANNIS MASSACHUSETTS � as 9 FW„ wwzz A Aa� K TENANT FIT UP P. F, fC W 0 REVISIONS DUFFY HEALTH CENTER . DWG.INFO. . - - DATE 1-19-10 - - SCALE 114-1-- DMN\ CADD RRD - - C APPRVD °`SHEET TITLE: _ - TITLE SHEET - - - - SHEET&JOB#: TI 446 a o F� mE= N WORK ROOM - STORAGE - 010 U11 3 J t 2'-11' /a• I5•-B.. '].-i•. - W-4]/t' B'-8' ♦3/{' 1B'-B I/2' H1 SUPPLY ROW.1' ® CORRIDOR .. REFQFol-51 BRLNOOSRtES 6'-10 Ve O v I hl y _ O6 PATIENT w /—� NSKP - - OISO j O - . F MECHAMCAL/IIECTWCAL '.Ir 04 O T-B' ].. O 02 - - ]/{' t J/t' LOBBY - _ - O W C STAFF 0 I O W O W z ® P® Fo7l - 43/4' ® ® ] w0 9 BIWNGol7l FC41)i o 0 MACH RN - - CONFTAENCE ROON � O .ACCWNIING P4 �"'I ® 01B F 9P.G POtf t 1�1 STORM£ - m - o O1 I lOORRS BY REVISIONS - zW-21/4' 14'-01/4• 43/4' ly_y �{1,In x[�Islon IT OFFlCE 1 s 3-I240 STAFF LOUNGE ATA 021 C { OB p TEF0 _ 2 I u[n toa rexMrt 3-19-10 3'-1 ... ',...:..:... _ .... :. .: .. .. O STORAGE • 014 4 - - DWG.INFO. - DATE 1-29-10 SCALE 114-1.4" . DRAWN CADD BASEMENT PLAN _ - - `'SHEETTITLE: .. - BASEMENT . PLAN _ - - SHEET&JOB#: Al 446 �— o S. s¢o _m m - ® m t in a'- PfBVACY CURTA01 MC r-B" O'-B 1/3' B'-0 1//' 6-0' PR"CY-TN MC n NORKBTADWB MC - D®C D®C NUB<STAIMNS MC N e^sE use a C m ! .� uAKO uO ExAu- wAu I ,o.-o• V oo �jL� O ' ,-1J _p• OPBo\,oE oPwmc s* m .._ b b _wE awuro s b Q E^+ W >? PASS wn-r wwuEo (]i O O - _ 'O- 1NFU � P , J n y EKAY c ExA>w - F YANA4£R b 5_0. O 6_°. P EMT _S 6 LIB OO L (n ! s Y P iw ine PAnwT a a• aE.3. m � O * _p0 m ,o-a' ! s'-°• ,.s•-n,/z•! B•-s: r-r m'-o,/z• A 4 4 ' b � q m " 0 a k - Y srAET a-a• , 7 0 C O Iz CIO MOZ m >; 0 i O - REVISIONS 1W _ n� wAtnxcOBaau m � ExAu 1 � J-,3-10 .Au ® _ Q •L" 3 U,.O,vBvuu,rt 5-,9-10 - ,pa LOBBY O s- OD o O m YES RULE - . - - DWG.INFO. DATE I ,-39-w - SCALE 1 1/4••=t'4" CADD FIRST FLOOR PLAN CHKD r� -. SHEET TITLE: - - FIRST FLOOR PLAN SHEET&JOB#: A2 446 9 O Ll O NIA O lW9 N D O . �a OfF10E CAg YAYARA DSC IS9T ® o b o , wN,w r2-2fl a o ,. -24 omcc O. sTur am¢ omca urummim I F2 7; 1 1 o W 4 w'_o• - s•-„,n• _ ,9'-0• ,s•-a.. e'-o• - e•-a• � -e,/a• �. F vi L `o Q o i c y F2U1 o am¢ 921 m aoaar ,a'-r;n• om¢ ; _ ' ® ® ® a b m 0 m � ® ® - F REVISIONS 2. i 1 iYOnB —40 3 Y¢nnc aaou zoz xm u o u-o a 1/2'77 . - DWG.INFO. • [DMN" ATE- 1-29-10 - - _ ZE 1/4"=1'4- SECOND FLOOR PLAN CARD F PPRVD J. d SECOND FLOOR " - - PLAN SHEET&JOB M: A3 446 a m oa R m O a O� ® N ' . N o_ N U W a z r �Wa O W 4"11 A A¢ W O W REVISIONS C O � C 1 ueu tox rciu�D 5-19-10 O DWG.INFO. DATE 1-25-10 SCALE 114-1.4- DRAWN CADD BASEMENT PLAN C.K. SHEET TITLE: . - - - - BASEMENT CEILING PLAN - - SHEET&JOB#: A4 446 a 0 O<O �m _oL �N O O Na N Nl F�Yll 1�1 e H w P 0�4 a5 AwA4� o a a E, w REVISIONS Q � ! � �rsions 3-12-10 ® - � = u�u enn etxnirt 5-19-10 - - DWG.INFO. DATE 1 1- 40 - - SCALE 114--t-4" .. - - - DRAWN CADD FIRST FLOOR PLAN CHKD IY - .. .. FIRST FLOOR CEILING PLAN . SHEET&JOB#: A5 440 tea° 4,=Ns' � �m �t Na~ U a a a �y H w s z L �Z= " o ZZ cn .--I Ut 0 a H 1---fl F LIJ w REVISIONS � n S19-la - DWG.INFO. DATE 1-2i10 SCALE SECOND FLOOR PLAN D—" CADD _ - CHKD 'CEILING SECOND FLOOR CEILING PLAN SHEET&JOB#: _ A6 446 was LAcoDPDa aDDNG � o y� ,,/2'OAK NALF PPDIG EDGE j �m . J/K'OAK VENEER 0.TWOW �C} O«D7 o v? . S LNG GLASS WNDOW MiX ® T� - nsscY�r IWAPE k var in a - - - VK'TEMP dAss srknaARr a DETAIL 2 /.• ENP G Ass BTADONARY ,a XAHdGP AGa elc - NAxwcw Ac¢s SWK k CABDIET b A.BOIRD XIC SINK k CA&NETO NTTgA 1PAGK HUSN Fy-� - WOOD TOP PL LAN CWN1FR10P ' zi ixN _ w coanc oAK NAIf KouNo P. - - / - :REL£PDOX OESN Z _ r-0• x._o. x._o• - FW.y w W Z.7 z.a PUTS A A 4 t Elevation A Staff Lounge Elevation 8 Staff lounge - Elevation C Exam Rms.. Elevation D Exam Rms. -,/r cWa PwsN W v x SCALE Vz--I'-D' - SCALE.,/x'-1'-O' SCNE /z'-1'-O" SCAL£1/x•-I'-0' U!I d` . DETAIL I a _ a a H M SNELVES MDI - rA ' _ / \ YID STANDARDS - ' Fri, —1 t/3 XAIf PWND. —__— ADkI5TABIF W $IIDIN GLAss WNDOW \ / L/ a AssEYBLr _ _ _ REVISIONS wGT vBRzzc. SIxNLµ ./R LOP(. SMK k CAP HEi BLE Y TAP(BDARD NIC T 4NN 1 dl EOn 'S J-IS-10 :11PL LAY CdPDFDTW W,1H—s BRAdiET - 1 3 D 5-19-10 171 Elevation G Soiled Utility - Elevation L. Reception Elevation E Exam Rms. Elevation F Exam Rms. - Elevation L Laboratory DWG.INFO. SCALE 1R'-,'-0' SCAT£1/Y-1'-D'_ SCAI£I/Y-,'-0' - - %AtE I/3'-4-0'. SCAE 1/x•-1'-O' - DATE 1 1-25-10 - - SCALE - - D—wN cADD II x �N Alf ND - / \ CHKD APPR\D I I I I I I I I sLdN l/SS WND01Y. � I - I I I • ELIPNG 0.A55 NOOW \ / „ � �•- .�'. LX92ZC � I I E k VOLT PP832C 0.LAN CWNIFRICP y ./RACHET PI I.RN dNOEPs 9XK �9 F `' C I I / �d'.SHEET TITLE: I INTERIOR ,,_^. r-P• - ELEVATIONS SHEET&JOB#: Elevation H Reception - Elevation I Reception Elevation J Reception Elevation K Meds A7 uAlle,/z'.r-r -- - scA¢1/z•-f-D• scA,E Vz'-r-D• .. .. � scA,c,/z•-r-O• 446 . a a Y mm•r�®avo�ov�®�v�ma�� KEM mm�rca•�raravo�ov� m��rci�aravvsv�mays��m�� o�oerr�maroovsv�m�s���� om�rca•mar�vvvv�ma�s��� a•�ao��rc��ra�avvsv�mas���� mo��r�swam�v�sv m��s��o m swamavo�sv�mas���� me��rsa®avos©MEQM maMM� mmirca•®avos®�®��s�© - m��rca®�vosv�m��s—�© �.:... memii-�ma��vvsv�ma9s��m�� m�ir�mar�vvsv�®s���� m��rca•�novvsv�®�s��� me��fra•�avvsv�®�s�m�� mm�rc•��avvvv�mas���� - m��rc��avvsv�ma��s�o mm�rci�raravvsv�m��s��� mm�rcima�avvov�®�s��� mm�fca�aovvv�mm�s�m�� E •• . ®m�rca•ma�aovsv�ma��s�© .®emire��m�av�sv�®s���� � • .®m•rc��avv©v�m��s��© ®rra_�maiavosv�®s��m�� m�m�rormaravvvv�m�s���� ®pairorma�avosv�®�s��� m�mirc�ma�avvs��®�s��� m�m�ror�avvsv�ma�s��� m�mirr��rar�vvsv�®�s��� I � ®rm�rc�Qraoavvvv�ma��©�© m��rca�rnavmmm �m �s�mm� ®e,m�rcamn�vvsv�ma®��m�� ®�oirc�ma��vvs©�ma�s��� • ®m�f-�ma�avvsv�ma�s��� ®�sa�m�maravvo©�®�s�ma�� m� maos�mr�� • m��rc+r�raravvov�®s���� � mer�romar��vvov�®®���� mr+m�rcmmai�vvvo©�mas��m�� ®F+oircrmai�vvsv�®����� om�rca�avvsv�®so��� mErircim��mazmm m��r�ma�avvsv�mas���� .®e>9�rcasma»vvsv�mas��ggmo� ®m•r avvsv�me��s�© ��WMavvvv�mes���� � mcm�rcam�avvov�mes���� „ .®em�rca•�raiavvsv�m�s���� rlrm r vvsv�mes�=�� m�a�rcrmaiavvsv�mes���= mm�fci�rai�:�vvsv�ma0��mc�� ®Ecircai�avvsv�mas��9� m�ircama��vvav�ma��smMA© m�oircama��vvsv�ma��s�© mm_r�cama���vvov�mas���� m�C1i rC•i mal�!O D O 0�and©��®� mE rit'a�Ta10M ®��rG`i�Ta��.�O mm m �rca•m mmmaravvvv�m�s���� m��r�urmaiavvvv�®s���� � O: a FINISH SCHEDULE O xan= R Q WALL 7'RES -�m x vow - Q �wcsaccEYP ww"eo�um°xR0 i0 o 5 ' = A �nxo.cw n LLmN�Wi� ry T1� _ � ��/fro•char.w.ueo.xo. �a ® S'ano0 F NTD a 1!-PC PICD9EIIN vAON 5'S—DEBAR waunwl' © M./�D%oWnw U = a oWw Wxiw r®snwi emar W,weDwm xu WEr - - F u+us IN=—,o�x 5 MD xaa�wD xDws z I Ml oW _ = Ew4.I-M Wiz A A < - O L p c - = w - - - - - REVISIONS - _ _ T r.uxm xnusrons s-TzaD IM Ing 1-17 M. DWG.INFO. -1-21 DATE las-ID . SCALE 114-1.4" Ym DRAWN CADD - - - - CHKD 29, —41 dWy{NNE SPEtlFlCATON: am s/a ww cmvu ruteoum u xoRD a Wuc m¢ tsAr rmc DPozm vt xcr 1 uxstxah;xmtsnw Rm wan: sun ar wlmu+cc xnw D\¢wav y t! V-C �. \r; m ADD sxDs+a<Ds TIPFII,um RsxRD wTDmnrs wD vanm ssq wane DOTax ms Rsscan zr.b'.sro'R[s annw leurm Ilaswc c h wRROR M1S1Y pD SLN01!@ ISIYI@0M1W 10 QIIOE �1Cf L,195DNIG xWU511L1L aINC/DS WDL GtlP0911w TDF D bII D bII ire•STW- Q1f1Km blY wli iM RSJ.IaD N'.21'.s/x•9S EI IA5IRDIG Mt4➢('gKi1R3lP IPPRDWp f➢IN � lr • ilg R91TM12 ASIY DID - - .(. - aux um mTt m a sunm ..7"ET.TITLE: ..-FINISH .. SCHEDULE SHEET&JOH#: A9 446 ConSery GROUP. INCORPORATED f B R ASTABLE 7104 OCT 28 PM :12- 28 DIVISION October 20, 2009 Mr. Tom Perry, Building Commissioner ✓ Mr. Paul Roma, Building Inspector Town of Barnstable Regulatory Services, Building Division 200 Main Street Hyannis, MA 02601 Re: Park Square Professional Building, LLC 94 Main Street, Hyannis Dear Tom and Paul: With regard to Building Permit#200805760 at the above referenced site, we have not been able to make construction progress in the recent months. The good news is that the owners of the property seem to have secured an occupant for the building. Pending final paperwork, it is hoped that construction will resume this fall. Q2f � o I thought it advisable to formally request an extension of the current permit prior to its Dl�(�,� expiration. Please let me know if you need any further information with regard to this request. Thank you in advance for your assistance. y ours: Roy Catilpiani President k ConSery Group, Inc. �a u� 2277 State Road,Plymouth,MA 02360—Mail to::PO Box 278, Sagamore Beach,MA 02562 Ph(508)888-6555—F(508)888-6566 www.conservgroup.com Orr OP t O ConSery GROUP, INCORPORATED ' "f09°��1q {.1�- 1;ARNv€AI;LE 209 APR 15 Ply 2: 4 April 10, 2009 Mr. Paul Roma, Building Inspector Town of Barnstable Regulatory Services, Building Division 200 Main Street Hyannis, MA 02601 Re: Park Square Professional Building, LLC 94 Main Street, Hyannis Dear Paul: With regard to Building Permit#200805760 at the above referenced site, we have not been able to make too much construction progress in the past few months. In part due to weather but also because of the current financial situation, the processing of bank loans has been extremely slow. We hope to increase progress towards completion in the near future. In part because of a brief conversation you and I had with regard to the project, I thought it advisable to let you know formally of our unplanned delay and request a formal extension of the permit to be safe. As the permit was dated 11-20-08, 1 would assume that my request for extension should be for 6 months beginning 5-20-2009. Please let me know if you need any further information with regard to this request. Thank you in advance for your assistance. _ F pnani President + ConSery Group, Inc. ��dr 2277 State Road,Plymouth,MA 02360—Mail to:PO Box 278,Sagamore Beach, MA 02562 Ph(508)888-6555—F(508)888-6566 www.conservgroup.com Imo— - - - - LUC, TOWN OF BARNSTABLE Building Department - Foundation Permit Date 1 0 Permit # " L t6 9 r ► 14 -Pa:�J krvA--,L— Ins , of Bldgs. V G � +' ,I _^__.__. ------ - I TOWN OF BARNSTABLE �gTHETp Building Application Ref: 200805760 Permit BARNSTABLE, Issue Date: 05/21/09 9 MASS. �p i639• Applicant: ROLAND B CATIGNANI Permit Number: B 20090986 Proposed Use: GENERAL OFFICE BUILDING Expiration Date; 11/18/09 Location 94 MAIN STREET (HYANNIS) Zoning District MS Permit Type: NEW COMMERCIAL Map Parcel 327195 Permit Fee$ 50.00 Contractor ROLAND B CATIGNANI Village HYANNIS App Fee$. 150.00 License Num Est Construction Cost$ 1,203,000 I Remarks APPROVED PLANS MUST BE RETAINED ON JOB AND NEW MEDICAL OFFICE BUILDING WITH 2 APT ABOVE. SITE WO ' THIS CARD MUST BE KEPT POSTED UNTIL FINAL AT 26 CAMP STREET. SEE ATTACHED PLANS. 1ST EXT EXP 11/18/09 INSPECTION HAS BEEN MADE. WHERE A CERTIF[ CUPANCY IS REQUIRED,SUCH Owner on Record: HEWITT,ROSTOWSKI,GRIFFIN TR BUI G SHALL NO OCCUPIED UNTIL A FINAL Address: 21.FELLOWS ST IN TI N HAS BEEN DE. ROXBURY,MA 02119 Application Entered by: PC, Building Permit Issued y. THIS PERMIT-CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLY OR SIDEWALK OR ANV Y 'RT THE. ,EITHE EMPORARILY OR PERMANENTLY: ENCROACHEMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLYPE T UNDEILDING CO E,:MU E:APPROVED BY THE JURISDICTION. STREET,OR AL(Y,GRADESAS WELti AS DEPTH AND LOCATION-OF P; LIC WEROBTAINED F " THE DEPARTMENT OF.PUBLIC WORKS.THE ISSUANCE=OF,THIS PERMIT DOES NOT`RELEASE THE APPLICANT RO HECS OF PLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF FOUR CALL INSPECTIONS REQUI ALL CONVO N 1.FOUNDATION OR FOOTINGS. 2.ALL FIREPLACES MUST BE INSPE TED AT T E THR T LE ELRST FLUE LINING IS INSTALLED. 3.WIRING&PLUMBING%PECTIO TO BE MPLE D PRI R NSPECTION. 4.PRIOR TO COVERING STRUCTURA MEMBE S(RE Y TO L T 5.INSULATION. 6.FINAL INSPECTI BEFORE OCCUP NCY. WHERE APPLIC LE,SEPARATE PE TS ARE UIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. WORK SHAL. OT PROCEE T INSPECT AS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. PERMI LL BEC E NULL D IF ONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE T PERMI IS ISSUED AS OTED ABOVE. PERSONS C NTR ING IT REGI EKED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in MGL c.142A). MIRA BUILDING PEC ON APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2, 2 2 3 1 Heating Inspection Approvals Engineering Dept . Fire Dept 2 Board of Health TOWN OF BARNSTABLE,BUILDING PERMIT APPLICATION,, Map Parcel Application # w Health'�Division Jam-&' 4-/, f Date Issued Conservation Division 1 Z / Application Fee cl. Planning Dept.__ ( Permit Fee Date Definitive Plan Approved by Planning Board Historic - OKH Preservation/HyannisAWSCAOK �944WIr - L cz j �] Project Street Address AIAI yl bqs r Village /r A/A//.f Owner ARRK S�P✓A �R•�SSiaJat 1SUIL9.44, ).LC Addr s //o MAIA1sr.', 11YA.-/VIX MA QAta/ Telephoy4S 3 ` ) 740- `!3 o S Permit Request �E7�-lo L t T/a o!c &W BT/o/dl 81/m.01- 'Gj . t� T' FF;0. rimatTRd-X/ fades/ fh/.t;Iwls MA1A./ Smarr A1A7W¢kv,.,T #0/S'TdX,c. D/ST.dtcr �ra1/sP/c�✓ Square feet: 1st floor: existing proposed 2n6l floor: existing proposed Total new Zoning District PIS Flood Plain -ao fE G Groundwater Overlay 110 eject Valuationv'j,.� Construction Type Lot Size All L 7o Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family (# units) Age of Existing Structure T5 + Historic House: ❑Yes ❑ No On Old King's Highway: ❑Yes URIN"o Basement Type: ❑ Full ❑Crawl ❑Walkout 3"O"ther IPAOLTIOL Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft) Number of Baths: Full: existing new Half: existing new Number of Bedrooms: existing _new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: C(Gas ❑ Oil ❑ Electric ❑ Other Central Air: ❑Yes ❑ No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: ❑existing ❑ new size_Pool: ❑existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: GYexisting ❑ new- size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Rj to "D �S:� Commercial dYes El If yes, site plan review# ,> Ci Current Use aI"64C Proposed Use E5 co rn _ APPLICANT INFORMATION (BUILDER OR HOMEOWNER) ,. 5 - 7�73 Name G Telephone Number .o . 2Z -47 Address A n License# GS S7�� �3 . 4 <-;k ;;pw�� o Home Improvement Contractor# Worker's Compensation # ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BETAKEN TO C.AJOU.dI �i tf-Ml SIGNATURE DATE FOR OFFICIAL USE ONLY APPLICATION# _ ` DATE ISSUED MAP/PARCEL NO. s ADDRESS VILLAGE: OWNER-iL _ = DATE OF INSPECTION: FOUNDATION : FRAME , S INSULATION FIREPLACE ' p' ELECTRICAL: ROUGH FINAL f PLUMBING: ROUGH FINAL `} 'r GAS: ROUGH = FINAL ''ry FINAL BUILDING DATE CLOSED OUT ASSOCIATION PLAN'NO. r ` .y + Oct -29 2008 3: 51PM HP LRSERJET FAX p. 2 r • `�' 5 Caspian Way .� Dorchester,MA 02125 Phone: 617-265-0004 0 f� Fax:617-265-0224 Email: veal@nealcotoo.com October 28, 2008 Roland B. Katignani PO Box 278 Sagarnore Beach, MA 02562 Re: Asbestos survey @ 94 Main Street, Hyannis, MA Nealco Too, Inc. Conduct a survey of the above listed property. The purpose of the enclosed survey is to thoroughly inspect the property where demolition or renovation operations will occur for the presence of asbestos, including Category I and Category Il non-friable ACM in accordance with the EPA National Emission Standards for Hazardous Air Pollutants (NESHAP) Standard for Demolition and Renovation as described in 40 CFR Part 61 .145 (a). All samples were analyzed at AmeriSci by Polarized Light Microscopy (PLM) Bulk Asbestos Analysis in accordance with ERA 600/M4-82-020 per CFR763 (NVLAP 102079-0). There was asbestos containing material found In the Den area floor file, on the second floor bathroom linoleum and the front entrance telling skim. Analytical resurit are attached. Please call the office with any questions or concerns. Best re arils, Neal Cass President Oct 29 2008 3: 51PM HP LRSERJET FAX p. 4 8 SCHOOL ST. r �+t WEYMOUTH,MA02189 AmE VA TEL:(781)337-QW4•FAX:(781)337-7642 PLM ft1k Asbestos Report Nealco Too Environmental Date Received 10/27/08 AmeriSci Job# 506101328 Attn: Neal Cass Date Examined 10/28/08 P.O.# 5 Caspian Way . Page 1 of 5 RE:ConSery Group: 94 Main Street, Hyannis, MA bordiester, MA 02125 Client No.I HGA Lab No. Asbestos Present Total % Asbestos CS-1 .508101328-01 No NAD Location. Living Room Areas (by CVE9) by Sophetra Ken on 10/MN Analyst Description: Brown/OfILWhIs,Homogeneous,Fibrous,Plaster Asbestos Types: Other Material: Callulosa 1.6.%, Non fibrous 0% Comment: Sample Appear To Be Sheet Rock CS-2. 508101328-02. NO NAD .Location: Living Room Areas (by EVES) . by Sophetra Ken an 10128/08 Analyst Description: Off-White,Homogeneous,Nan-Fibrous,.faint Compound Asbestos Types: Other Material: Plop fibrous 100% CS-3 508101328-03 NO -NAD !ocatfon: Attic (by cv>= ) by Sophatra Ken on 10/28/0B Analyst Description,Off-White,Homogeneous,Fibrous,Insulation. . Asbestos Types: Other Material: Fibrous glass 90%, Non-fibrous 10% 508101328-04 Ko NAD C Locatlan: Windows (by CVES) by Sopheba Ken on 1012WOB 1 Analyst DescMptlon: Off-Whits,Homogeneous,Non-Fibrous,Caulk Asbestos Types: i Other Material: Non-llbrous 100% See-Reportingncteson-fast page - . . ..----- : ..., . . Oct 29 2008 3: 51PM HP LRSERJET FAX P- 5 ---•--- ... .- Page-2 Hof 5 _::- ,. Ame�rl.�rd..lta�;t��9�1�6��'•.-- --------_:_.'..----..".',:'.. ..... .. . - .. .,...._ ..... Ghent Name: Nealoo Too Environmental -_--- PLM Bulk Asbestos Report ConSery Group; 94 Main Street, Hyannis, IuIA Client No.1 HGA Lab No. Asbestos Present Total % Asbestos CS-5 508101328-05 No NAD Location: Bade Hallway (by CVES) by Sophetra Ken on 10MI06 Analyst Description; Brownfdff-Whlte,Homogeneous,Fibrous,Drop- ne AsbestoeTypes: Other Material: Cellulose 90%, Non-fibrous 10% C$-6 50810132"6 No NAD LocaUw,. Back Hallway •` (by CVES) by Sophstra Ken ' on I W28108 Analyst Description: Brown,Homogeneous,Non-Fibrous,Glue Daub Asbestos Types: other Material: Non-tlbrDus 100% CS-TA 508101328-D7 llfo NAD LocaOon: let Floor Bathroom (by CUES) by Sophetre Ken on i0/28/08 Analyst Description: Blue-Grey;Homogeneous,Non-Fibrous, Linoleum Asbestos Types: Other Material: Cellulose:30%, Non-fibrous 7.0% CS-7B 508101328-08 No NAD .Location: 1st Floor Bathroom (by CVES) bySophetra Ken ' on 10/28/08 Analyst Descripttion:'Browwn,Homogeneous,Non-Fibrous,Llnolaum Glue Asbestos Types: Other Ma6dal: Non-fibrous 100.'k CS-SA 508101328-09 Yes 5% Location: Den Area Floor (by CUES) by Sophetra Ken. on 10128/08 Analyst Description:Ten,Homogeneous,Non-Fibrous,9`x9'Floor Tile Asbestos Types:Chrysotile 5.0% ONWIVIsterial: Non fibrous 95% CS-6S 508101328-10 .. _ .... No NAD (bY CUES by Sopheb Ken an 10/28mo Amaiyrat Dworlption: Black;Homogeneous,Non-Flbreua,9W FtoorTile Glue Asbestos Types: Clther:Meterisi; Rion-fbrous 1100 9'0 See Reporting notes on last ME-- . . __... . .. .... . . Oct 29 2008 3: 51PM HP LRSERJET FAX P, g -Page• �f Client Name: Nealca Too Environmental PLM .Bulk.Mbestos Report ConSery Group; 94 Main Street, Hyannis, MA Client No.!HGA Lab Nl q.. Asbestos Present 'Total %Asbestos CS-9 508101328-11 No NAD Location: Back Bathroom Floor (by CVES) by 8op1hetra Ken on 10128/OS Analyst Description: Brown,Homogeneous,Fibrous, Linoleum Asbestos Types: Other Material- Cellulose 30%, Non-fibrous 70'/o CS-1 DA 508101329-12 No NAD Location: Back Den Floor - (by CVE8) by Sophetra Ken on 10128/08 Analyst-Description: Brown,Homogeneous,Non-Fibrous,Tile-Wood Asbestos Types: other Material: Non fibrous 100 CS-10B 508101328-13 No MAD Location: Back Den Floor (byCVES) by Sophetre Ken on 1a/28108 Analyst Description: Brown,Homogeneous,Fibrous,Paper i Asbestos Types: other Material:Cellulose 85%, Non-fibrous 16% CS-11 A 508101328-1 4 No MAD Location. Back Den Floor Closets (by CVES) by Sophefra Ken on I0128108 Analyst Description: Brown,Homogeneous,Fibrous,Linoleum Asbestos Types: Other Msjeriai: Cellulose 30% Non-fibrous 70NA y C3-11 g 508101328-15 - Location: Back Dan Floor Closets Analyst Descrlptlon: Linoleum Glue - Asbestos Types: OOter Material: Comment: No Sample Present , Y } y 38e-�eportfig^notes-on-last•page •..-._. _._. . Oct 29 2008 3: 51PM HP LRSERJET FAX p, 7 .i T- r._._. _....:-. - ..� ; �Al 10-1UZ$i----. t.:..: _--- ....._ Page 4 of b Client Name: Nealco Too Environmental PLM Bulk ASbesto3 Report ConSery Group; 94 Main Street, Hyannis, MA Client•No. I HGA Lab No. Asbestos Present Total %Asbestos CS-12 508101328-16 No NAD Location: Back Entrance Way (by CUES) by Sophetra Ken on 101=8 Analyst Description: Off-White,Homogeneous,Fibrous,Linoleum Asbestos Types: Other Material: Cellulose 30%, Fibrous glass 10%, Non-Varous 60% CS-13A 508101328-17 No NAD Location: 2nd Floor Closet (by GVES) by Sophetra Ken on 10128/08 Analyst oeseription:Blue,Homogeneous,Non-Fibrous,Linoleum Asbestos Types: Other Material: Non-fibrous 100% CS-13$ 508101328-18 Afo NAD Location: 2nd Floor Closet (by CUES) by Sophia ken on 10/28108 Analyst Description,Brown,Homogeneous,Nora-Fibrous,Linoleum Glue Asbestos Types: Other Material:Non-fibrous 100% CS-14 509101328-19 Yes 30 % LoGatiori: 2nd Floor Bathroom (by CVES) by Sophefra Ken on 10/28108 Analyst DescdptlionrBlue,Homogeneous,Fibrous,Linoleum Asbestos.Types.Chrysotne 30.0% Other Material: Non-fibrous70% 1 CS-1 y' 508101328-20 No NAD l Location: Slider Reborn Wald CUES) i by Sophstra Ken on 10128/08 Analyst Description:Black,Hornogsneaus, Fibrous,Paper . Asbestos Types: ` Other Material:Cellulose 85°k, Non-fibrous 16% i1 CS-16 '506..101328-21 Yes 2 % •• -----------t;�eatlon: Ft+onfFn-ttanee� --_..... {by CVES) by SophWm Ken on 1012810 Analyst Description:Belge,homogeneous,Fibrous,Calling Skim Asbestos Types:Chrysotlle 2.0°!o Ot}tgr, a rial:_l`ian-ltbrous.9B°{o... • Ort 29 2008 3: 51PM HP LASERJET FAX p. 8 -PagoS_of5 Client Name: Nealco Too Environmental PLM Bulk Asbestos Report ConSery Group; 94 Main Street, Hyannis, MA i t i ( i. Rcperftg Notes: Analyzed W.Sophsb'e Ken Date Analyzed: dF �I J f7rm asbastio>t�dete dam- =Sallbrated VisuaFEsllmame ist[+ rrestainal NAtPS a not analyzeii!.positive atop; "Pneeere or N VA='No Visible Asbestos"are observations made during a qualltadve anaiysls; PLM WkAsbestoa Analysis by EPA OWN14-82-020 per 40 CPR 783(I MP Lab#102078.0)or NY ELAP PLM Analysis Prot000l 108.1 for New York friable samples(198.6 far NOB samples)(NY ELAP Lab#10982); Note:PLM is not consistently reliable in datading asbasbos in door coverings and simiharnon-friable olpatticatty bound materials, NADarT1raoerp4u1shyPL1l inconclusive,TEM is currently the only method that can be used to determine H this material can be considered or treated as non•asbestog-cor,talging In New Yank State(also see EPA Advisory for floor tie,FIR 69,146,38970,811194). NI ST Accreditation regtdraments mandate that this report must not be reproduced,except In full without the aEroval of the laboratory. This PLM reportretates ONLY 10 the Karns tested - Owed �_.r..,._....—_tom-.z—..r---•.--._..�.._. ...... . . ... .. _._ . .__;;..._._... ..-----._._.._:_.....- �QktHE Tp�y ,r a� Hyannis Main Street Waterfront SARDFSTAIILE, Historic District Commission 6 9 200 Main Street ! ATFb �� Hyannis, Massachusetts 02601 Phone: 508-862-4665 /Fax: 508-862-4725 CERTIFICATE FOR DEMOLITION OR REMOVAL Application is hereby made, in triplicate, for the issuance of a Permit for Demolition or Removal of a building b'r°a structure or part thereof, under M.G.L. Chapter 40C, The Historic Districts Act, for proposed work s described below and on plans,drawings or photographs accompanying this application. 4 TYPE OR PRINT LEGIBLY DATE_ —� ADDRESS OR PROPOSED WORK 97 1-/A4f✓ ASSESSORS MAP NO. 3;7 OWNER Jq-gx -5,211 >-C lz"1414t— /L,b���, GLC ASSESSORS LOT NO. HOME ADDRESS 110 dIg1A41 Sr, d)&A?!04S,rt t 0 24 6 l TEL. NO. 67t- -7Y - ?5657 0 co NAMES AND ADDRESSES OF ABUTTING OWNERS: Include names of adjacent property owners across any public-stmrPt or way. (Attach additional sheet, if necessary). q - N t � lJi N AGENT OR CONTRACTOR �6 ✓s62✓tF�O✓�4, ��C TEL.NO. Sr7 7 ADDRESS 0, eZ7 SA6-** eV- V,* 6 ZZA DESCRIPTION OF PROPOSED WORK: If building is to be removed, give new location. Snap shots showing all views of building must accompany application. (Attach additional sheet, if necessary). / GZ1 Stf XIST.JG�, . 8OYCO/A/A ?d o+` 4 A:, G- Xa7$4 1::7;C. s/FZcJ Note: If approval is granted for relocation, a separate Certificate of Appropriateness is require or w location if within the Hyannis Main Street Waterfront Historic District. SIGN Owner on ract Age -111 Space below line for Committee use. Received by H.D.C. The Certificate is hereby Date ✓ 2-t 0, Date Time By � �b��� Approved ❑ IMPORTANT: If Certificate is approved,approval is ubje to the�20 day a�pp al period provided in the Ordinance. Disapproved ❑ .... ....... ttt "k am qw W -al ........ r. "RM Jl .. ...... <a �> ti ._...... , v x Tm- ONE VIA 10, R .`,5<Y`,:< .. ,.. ON— ,.. _ �« -.». ,.. «: _r... ..>. .. ., �€E,:.,.. -fix::.-..x . ., a... :::. ......,• .... >`t ., ._ _ ..<. � •'.�• :•fir IT �- Wsk my <,x _ _..E .. - ,.. - „a „• «._.\ ,,,.,. \ x. ::;.. .. ?ram-1-w+ x*��.�•--.» , Y... ; s.x.«,.>x ,... «,.S "' :..v...aF:.'Di,',g, .... ,. ., �` �< ,,, ,. 4, • ..:�'.. ,.. :iy V j� ,£„-.. LY "sox'c<:;:_ cata {{ y t .b a i TO W a3; Bfl�v 3 "k Y , zf > f, >:'r=.� ' Jtag s 71 Ow r } , a ,< #<„` >vs t't! �,'.,. > �? <, ��': t a:!:may 'x' �. v� ?� a �'•;r ,<.� � �` � � ,� I a� w I r' ^: g t � � Chy � `f•3� € 3 < - j ' flS =C6, i aka - �•' .' ..mow \ m � � � \ M � - a s' a, ay. S F3 4 t a Z k Rh.a h<,C �.v i 4"T va S.C 8^b` vx �r, s Ke E x,vim 2 S S 4 7 \ r � n F- x Lc,.\Sx , ,.. .. ,> ,, \,.,r. - \l 1..v.. a'•:a_. M;. a .� .� h > , �- ,...� - .<, dY. ,+...,.�a'3', \ �";xy:< y<. > > \w\ Y\x: dwk a s ; :., ,..Rom. _ a,.... ,.. ,.. - < <,e_� „, a '� .?•i .\\>.... , ,,: 'e>,. .. A& i .:, aw to ww US HOW MINA 1 AMAElf Y �```, x All , v ,�v �`�„'�,,3 � �,�' � � }•,-�'" ��, e_:, a '%�� �}'"¢ '`'" i`� ¢may'} Y :\ i } .:b. _ _ t � wrt. F d w y t3f ry.Q , ` w x' j \ n x '.w N �,., ,. ,. � < '` .xr .'.,t:1' � `.� �.. � Sv,:., •,F?.• i>r £", la. Uw.i�„ g i. a 3 a e C� s ��. - t ,fir• y 1 F aw r , 'I n Z w � a < E 3 4 ,l w n•\ ti� ti3 k��\ � r i # •ter ��• � � a4 ,\. .,•��,`.a c� :? U, �C \�: ..... ......... ,u., .... < `"�. ".l:..x. a.Hv���,esaut>:.5•s alb..�:, �:w.. ..£ » �+�`'�. '� u - : .,, w w. .. ,,.. �',,'� r - "� / � :- m �.: ..�� ; -1, r�vy �. �� � � �, :�. 3 � .. i ,. �z � �. s� 4 x, ..� t r ; �� �: �� .T r ,ry. `,� ,.; .. :... <, -.. s y c .. ,.�� .:.. t ,-S'_:, ... ...... _ r r..� .—+� i �°� �,�r . l�f ill .,. � r �a. — � Per x` .,a n�`� _ �' v c s . ., - �� � 5: k � � � �- .a �v Y � .. -- � ..__ �ljx y �. t { ?x P X t; R � �s �f' .��j. �� �:._- k. e.�A.. ��. .A �, � � L� �i- t � aft` �� , a � g�' �',��R �. 1�` � �,.,ti � � '�' ��, r � \ ��4�* iw sa. P� �� - �. �� � �. r � S"4 C. �. '. � } k � .. _ � ��-' t� �.. h. 3 •h�* k � ` �. � °FZHE Toy, Town of Barnstable Regulatory Services snxxsrnet.E, v MASS. g Thomas F.Geiler,Director Building Division Tom Perry, Building Commissioner 200 Main Street, Hyannis,MA 02601 Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section if Using .A. ]Builder I, jFVA4 S C'r�i>V7r S , as Owner of the subject property hereby authorize �o�SE�e/ CAP, I Ale' to act on my behalf, . in all matters relative to work authorized by this building permit application for: �Ewt o�t r't a�/ aF E�lis7i�/6r l3vrc.4��16t (Address of Job) Signature of Own Date Print Name y QT6RM&OWNERPERMISSION '`'�,�"� ✓fie -Pom�nreo�uuea� a�✓Gla.Qac�c�ic�aetta f , .. % Board of Building Regulati s and Standards Construction Supervisor License License. CS 5157 . I a Expiration:: 5/23/2010 Tr# 23121 _ i 'Restriction: 00=% { ROLAND B CATIGNANI' L �` ! 60 GEMINI DR W ti � r Ci W BARNSTABLE,MA 02668c Commissioner �. The Commonwealth ofMassachusetts — " -= Department of Industrial Accidents - 600 Washington Street l} Boston,Mass. 02111 Workers'rrCom ensation Insurance Affidavit name: location city phone# ❑ I am a homeowner performing all work myself. ® I am a sole r rietor and have no one worku in aa capacity I am an employer providing workers' compensation for my employees working on this job. Ix :......:::.. :...5 +<F "> >`; .:`?"%'•<2�>C'?>>>''>'"+(I<ja ?' TT{f} ?{ >I jj...%%.....> s <! as' }j'i fftJt `[! •'c}{?r> l'vt��'•+{'? <>j hone#.....,'...::... . ...... ,. . ,:.:, y. .. ❑ I am a sole proprietor,general contractor, or homeowner(circle one)and have hired the contractors listed below who have the following workers' compensation polices: :camp v ..... .... . '8 t€r S3 `y s>` ?} !>'?!"% jY ......''.... ij" i i<?..... <E ' r S i S 3'2` r %'`'>a <"<`i.. S% of?'' '`i#^?' iy in 'fi?'i' .............. slant an ::..;:::..:;:;:.;.;.:;:;;;:.:>::s:> xomrnV�:YlaeQe3 :: <: :>:; is::: :::iYi�%;i�i;i ::!:>. X. aciclres e". ttS> M. Failure to secure coverage as required under Section 25A of MGL 152 can lead to the imposition of criminal penalties of a tine up to S1,500.00 and/or one years'imprisonment as well as civil penalties in the form of a STOP WORK ORDER and a tine of$100.00 a day against me. I understand that a copy of this statement may be forwarded to the OMce of Investigations of the DIA for coverage verification I do hereby certi the pains and p alti of perjury that the information provided above is true and correct Signature Date ld fig'—Gt� Print name Phone# rofficial use only do not write in this area to be completed by city or town official or town: permit/license# :(031[eiidth B ulding Department check if immediate response is required Licensing Board Selectmen's Office contact person: hone# Deparhnent p Other (fevised 9/95 PJA) f-rom:Rose Gillard At:MF&T FaAD:781-261-1111 To:Jane Date:10l15l2008 C3:26 PM Page:2 of 2 CORD CEFTY1 F1 CATE OF LIABILITY INSURANCE GP ID RG DATE(MMiDO1YYYY) IN- acIntyre RODUCER 1ONSE-1 10/15/08 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFOaPAATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Fay & Thayer Ins _gy HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 77 Accord Park Drive Unit B-1 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Norwell nA 02061 Phore: 781-261-2000 Fax:781-261-2099 INSURERS AFFORDING COVERAGE INSURED NP,IC n INSURER A'. Ohio casualty insurance co. INSURER B: Hanover Insurance Company 22292 ConSery Group Inc. wsuRERU: American International Co. P.O. Box 278 Sagamore Beach NS9 02562 INSURERD: National Casualty fPJSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW i.AVE SEEN ISSUED Tv THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHS TANDi,NG ANY RE I IIREMENT,TERM OR CONDITION OF:aVl'CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR --MAY PER-Ai -THE INSURANCE AFFORDEE,ey-THE•POL;CiES i)E:,i_-R0E_D HEREIN IS SUBJECT TO ALL THE TERMS,E)CLUSONS a,:D CONDITIONS OF SUCH POLCIES AGGPEGATE LIMITS SHOWN MAY H=F PEEN Rc4 k D-Y PAID CLAIMS LTR NSR0 TYPE OF INSURANCE POLICY NUMBER I DATE MMIDD/YY D/Y ( ) DATE{Mlvi;3D/Wl LIMITS GENERAL LIABILITY EACH OCCURRENCE S1,O O G,0 0 0 A ;� CQM,MF,.CIALSEi,ERALUAS:.i Y � ?{0 p 53' 11978 I 07/07/08 07/07/09 PREMISES(Ea ccc:rence) $• 100,000 CLAIMS MA.,E I 10,-^ I LIR MED EX?(Any ona;:erson) $ 10,000 PERSONAL cADV INJURY r,. T 1000'CIO 0 —i GENERAL AGGREGATE -,*2,0 0 0,0 0 0 G9V'L AGGREGATE LIMIT A?PLiES PE.R: _ PRODUCTS-COMP/OP AGO I+ ,0 0 0,0 0 O �I POLICY JtCT j�L�IC AUTOMOBILE LIABILITY B ANY AUTO �,• COMBINED SINGLE LIMIT DN 8411502-02 1 08/27/08 08/27/09 (Ea accident) $ ,000000 ALL OWNED AUTOS } SCHEDULED A BODILY INJURY AUTOS BODILY� (Per person) $ HIREDAUTOS X. NUN-OWNED AUTOS I I BODILY INJURY (Per accident) $ I I I PROPERTY DAMAGE l (Per accideni) TG,-AGE LITY AU70 OfdLY-EA ACCIDENTOTHER MITE THAEAACC :¢AGG $ ELLA LIABILITYEACH OCCURRENCE $5000000 CLAIMSMADE USO (09) 53 51 19 78 07/07/08 07/07/09 AGGREGATE $5000000 LE $ X 1 RETENTION ti10000 I WORKERS COf7PENSATIONI AND i J L U- EMPLOYERS'LIABILITY I TORY LIMITS ER C AIJYPF'OPRIETOR/PAR?JER!EXECLiTiVE I WC 722-37-47 11/09/07 11/09/08 E.L.EACH ACCIDENT $ 100000 OFFICER/MEA,IBEP•EXCLUDED'? If Ves,deScriba under i E.L.DISEASE-EA EMPLOYEE $.1 C 000 0 SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT OTHER I $500000 A Property BKO 0853511978 07/07/08 07/07/09 BPP $126,000 D Professional x,iab AscG 000�a48 07/20/08 07/20/09 Pro€ iiab S2,000;000 GESCRIPTIUN OF OPERATIONS 1 LOCATIONS/VEHICLES i EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIOIJS PROD-ECT: Park Square Prosession-al Building, I:LC 94 Main Street Hyannis, YA 02601. CERTIFICATE HOLDER CANCELLATION TOBARNS SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION Town Of Bans table DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN A ttn: *tn: Buil�iir,g vision Regulatory Services NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO$0 SHALL :,i 200 Main_ Street IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR Hyannis AZx 02601 REPRESENTATIVES. AUTF•13812ED REP E^-ATI`.!'ry� ACORD 25(2001/08} •!!�- Gr*�- G ACORD CORPOR"TIC N 1988 Massachusetts Department of Environmental Protection i Bureau of Waste Prevention . Air Quality 100080206 ;.. BWP AQ 06 Decal Number Notification Prior to Construction or Demolition Important: A. Applicability When filling out hP y forms on the computer,use only the tab key A Construction or Demolition operation of an industrial, commercial, or institutional building, or to move your residential building with 20 or more units is regulated by the Department of Environmental Protection cursor-do not use the return (DEP), Bureau of Waste Prevention -Air Quality Control Regulations 310 CMR 7.09. Notification of key. Construction or Demolition operations is required under 310 CMR 7.09 (2)ten (10) days prior to any work being performed. The following information is required pursuant to 310 CMR 7.09. B. General.Project Description 1. a. Is this facility fee exempt-city, town, district, municipal housing authority, owner-occupied Instructions residence of four units or less? [] Yes tZ✓_. No 1.All sections of b. Provide blanket decal number if applicable: this form must be Blanket Decal Number completed in order to comply with the 2. Facility Information: Department of WOOD FRAME OFFICE BUILDING (FORMER RESIDENCE) Environmental Protection a.Name notification 194 MAIN STREET requirements of b.Address 310 CMR 7.09 H annis _ � � 1MA 02601 c.City/Town d.State oZip Code 5087909305 f.Telephone Number area code and extension 9 E-mail Address o tional h.Size of Facility in Square Feet i.Number of Floors j. Was the facility built prior to 1980? Z✓ Yes ❑ No k. Describe the current or prior use of the facility: OFFICE, PREVIOUSLY SINGLE FAMILY RESIDENCE 1. Is the facility a residential facility? 0 Yes Z No e� 9--0 m. If yes, how many units? Number of Units 0 �c' 3. Facility Owner: �N PARK SQUARE PROFESSIONAL BUILDING, LLC ��� �0 a.Name 0 110 MAIN STREET b.Address HYANNIS MA _ LOO2601 __co Q.City/Tow Sate .Zi Co e �0 15087909305 f.Telephone Number area code and extension) g E mailil Address�optional� _ �O EVAN COHEN ...... Q h.Onsite Manager Name �� ■ ag06.doc•10/02 BWP AQ 06•Page 1 of 3 Massachusetts Department of Environmental Protection , Bureau of Waste Prevention • Air Quality 100080206 BWP AQ 06 Decal Number Notification Prior to Construction or Demolition General Statement: If B. General Projectp Description (cont.) asbestos is found during a 4. General Contractor: Construction or Demolition CROWELL CONSTRUCTION, INC. operation,all responsible parties a.Name must comply with 1226 GREAT WESTERN ROAD 310 CMR 7.00, b.Address _ 7.09,7.15,and Chapter 21 E of the SOUTH DENNIS MA 102660 General Laws of C.Cit /Town •_,_ d.State e.Zip Code the Commonwealth. 5083988334 This would include, f.Telephone Number area code and extension) q.E-mail Address(o tional but would not be ..�__-___ �al) limited to,filing an KEITH MUCHA asbestos removal h.On-site Manager Name notification with the Department and/or a notice of release/threat of C. General Construction or Demolition Description release of a hazardous substance to the 1. Construction or demolition contractor: Department,if applicable. CROWELL CONSTRUCTION, INC. a.Name 226 GREAT WESTERN ROAD b.Address [SOUTH DENNIS MI A� � 02 660 c.Cit /Town d.State _ e.Zip Code 5083988334 f.Telephone Number(area code and extension) g.E-mail Address(optional) KEITH MOCHA h.On-site Manager Name 2. On-Site Supervisor: KEITH MUCHA On-Site Supervisor Name 3. Is the entire facility to be demolished? ✓Z Yes :1 No N =0 4. Describe the area(s)to be demolished: -0 ENTIRE BUILDING AND FOUNDATION. N -0 0 0 5. If this is a construction project, describe the building(s)or addition(s)to be constructed: NEW MEDICAL OFFICE BUILDING. g_0 ag06.doc•10/02 BWP AQ 06•Page 2 of 3 ' t Massachusetts Department of Environmental Protection ■ Bureau of Waste Prevention . Air Quality 100080206 N Decal Number €4= BWP ACC 06 Notification Prior to Construction or Demolition C. General Construction or Demolition Description (cont.) 6. a. If this is a demolition project, were the structure(s) surveyed for the presence of asbestos containing material (ACM)? F—I Yes �IDV No If yes,who conducted the survey? b.Survevor Name c.Division of Occupational Safety Certification Number 7. Construction or Demolition: 11/3/2008 11/7/2008 � a.Start Date(mm/dd/yyyy) b.End Date(mm/dd/yyyy) 8. a. For demolition and construction projects, indicate dust suppression techniques to be used: seeding E] paving wetting E] shrouding b. If other, please specify: covering other 9. For Emergency Demolition Operations, who is the DEP official who evaluated the emergency? a.Name of DEP Official b.Title C.. Date mm_/dd )of Authorization d.DEP Waiver Number 0 D. Certification I certify that I have examined the ROLAND B. CATIGNANI _� =o above and that to the best of my a.Print Name _o knowledge it is true and complete. Roland B. Catignani The signature below subjects the b.Authorized Signature N signer to the general statutes PRESIDENT =o regarding a false and misleading c.Posi ion/ e _o statement(s). CONSERV GROUP, INC. d.Re resentin � 10/21/2008 (o - e.Date(mm/dd/yyyy) �o d , �Q ■ ag06.doc•10/02 BWP AQ 06•Page 3 of 3 I78144187211 NSTAR SLAM SW3 0_4 03:57;58 p.m. 10-15-2008 2!2 One NSTAR Way,SW33() EL EC Y RIC WcStwcud,MA 02090.9230 GASPiumc '-AX 781-AM-3334 jt;5?in.rihiir;'!?stal.rom October 15, 2008 Park Square Professional Building, LLC 110 Main St. Hyannis MA 62601 RE: 94 Main Street WO# 01677273 To Whom It May Concern: At NSTRP, we're cOri mitted to delivering great service. This letter serves as confirmation that, as of 10/14/08, the electric service to 94 Main Street in Hyannis, has been removed. Eased on this information, there is no electric power at this address and you may proceed with the demolition, If you have any questions, please contact me at (781) 441-3334. Sincerely, Justin Reihl New Customer Connects OCT-23-2008 08:23 NATIONAL GRID 508 394 5019 P.001/001 national rya 1.27 Whites 'Path South Yarmoutli, MA 02664 October 23, 2008 FAX, 508-888-6566 RE: 94 Main Street., Hyannis This is to confirm that the natural gas line.to the above address has been out and capped as requested. This was done on October 22, 2008. If you have any questions please call me at 508-760-7481. t Susan l cMullin. Field Coordinator nationalgrid TOTAL P.001 IKE t 47 Old Yarmouth Rd. F Department of Public Works vO '{� P.O. Box 326 Water Supply Division Hyannis, Ma. * BARNSTABLE, * 02601-0326 9 MASS. $ TEL:508-775-0063 �p 039. h Hyannis Water System Operations FAX:508-790-1313 10/9/08 Town of Barnstable Building Inspector Town Hall Hyannis, MA 02601 , RE: 94 Main Street Hyannis, MA Dear Sir: Please be advised that the above water service was shut off and the meter removed on. The owner has informed us of plans to demolish the building. Sincerely, tyBent Hyannis Water System WW;0 WhiteWater-Pennichuck Operated and Maintained by WhiteWater,Inc.and Pennichuck Water Services Corp. f 10/10/2008 12:07 FAX 508 790 6325 WATER POLLUTION CONTROL 2003 'own ®f Barnstable Department of Public Works .� 230 Soutb Street, Hyannis MA 02601 w�,rx.engineering@town.barnstable.ma.us Mark S. Ells , Director Office : 508—862-4090 R, W. "Bud"Breault,Jr, Assistant Director Fax : 508—862-4711 j I October 10 , 2008 i ConSery Group Sagarnore Beach , Kass 02562 Attn : Dike Quirk Crowell Constr Inc So Dennis . bass Attn : Keith Mucha Subject : Disconnection from municipal sewer of 94 Main Street , Hyannis ; M&P 327-195 [dear Sirs ; This is to notifyproperty at 94 Main Street Ma & Parcel 327 - you that the ( P 195 ) , in Hyannis, Mass was disconnected from municipal sewer on October 9" , 2008_ The disconnection was inspected and accepted by the Construction Projects Inspector from the Town of Barnstable DPW Admin & Tech Support. A field sketch of the disconnection was completed at the time of the work. A sewer compliance record and a record drawing will be completed and filed in the Admin &Tech Support office. If you have any questions, or need additional information, please call Dave Anderson at 508 790 - 6244. :i Sincerely ; i i David derson Construction Projects Inspector Town of Barnstable DPI _ Admin & Tech Support a r '.ter THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS 8 RGAUNIONTS POND DRIVE—FOXBORO,M-A 02035 (508)_543-5499 SECTION 1.16.0 OF MASSACH:USET1'S STATE BUILDING CODE REGISTERED ARCHITECTURAL E AND PROFESSIONAL ENGINEERING SERVICE' -CONSTRUCTION CONTROL BLIILDIN.C; NAME: Fast Main Street:Development STREET ADDRESS: -94 Main Street TOWN/STATE: l[yannis, Mn CONSTRUCTION SUPERVISOR'S NAME: Dave As:iaf PROJECT: 'I`hree Story Medical/Residential.Facility FIELD REPORT NUMBER: 004 DATE: 06/01/1.0 TIME: 8:30 am WEATHER: Sunny TEMP. RANGE: 64F UPDATE ON PREVIOUS REPORTS: No updates. WORK IN PROGRESS: Recessed wall tie cones being;filled with hydraulic cement prior to installing foundation waterproofing;-, framers installing interior steel columns and first floor joists. OBSERVATIONS: Foundation walls being;prepped for waterpruot'ing, nstallation of ltrsf floor joists at 20%complete. ISSUES DISCUSSED W/SUPERINTEN'DENT:Discussed time frame for installing remaining.first floor deck.framing: INFORMATION OR ACTION REQUIRED: None at this time -all work proceeding in. accordance with approved plans and recommendations.. 1,Richard J. Dempsey,P. E.,as the affidavited engineer, hereby certify that I have'on this date,06/01/10,inspected the property located at 94 Main Street,Hyannis, MA and find that mplies substantially with the approved plans and speeifi the construction co cations and assachusetts State Building Code,Ith edition,except as appropriate provisions of the M noted above. ATURE AND SEAL OR INA 'Fict �r) f . { T RUC URA 0.6/03/16 NO 29173 DAT E u f THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS 8 BEAUMONTS POND DRIVE-FOXBORO, MA 02035 (SU8)54M499 SECTION 116.0 OF MASSACHUSETTS STATE BUILDING CODE REGISTERED ARCHITECTURAL AND PROFESSIONAL ENGINEERING SERVICES CONSi'RUCT(ON CONTROL BUILDING NAME: East Main Street Development STREET ADDRESS: 94 Main Street TOWN/STATE: Hyannis, MA CONSTRUCTION SUPERVISOR'S NAME: Dave Asiaf PROJECT: Three Story Medical/Residential Facility FIELD REPORT NUMBER: 003 DATE: 05/24/10 TIME: 5:30 am WEATHER: Sunny TEMP. RANGE: 75F UPDATE ON PREVIOUS REPORTS: No updates: WORK IN PROGRESS: Foundation contractor'removingstaeked foundation wall forms from site;framers installing pressure treated sill plates on concrete shelf.. OBSERVATIONS: Perimeter foundation wall at 1.00%complete;concrete,shelf epoxy anchors installed; sill plate installation,underway. ISSUES DISCUSSED W/SUPERINTENDENT: Discussed time frame for installing foundation waterproofing and first:loos deck framing prior to backfi ling the foundation in twelve(;12)inch compacted lifts. INFORMATION OR ACT[ON REQUIRED:None at this time- all work proceeding in. accordance with approved plans and.recommend ations. I, Richard ,).Dempsey, P.E.,as the affidavited engineer,hereby certify that?have on this. date;05/24/10,inspected the property located at.94 Main Street,Hyannis, MA and find that the construction complies substantially with the approved plans and specifications and appropriate provisions of the Massachusetts State Building Code, 7 edition; except as noted above. OC ORI �GYA TURE A:N.D SEAL 06/03110 `..�,\No 29173 DATE a� QISTiP1v<�' r THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS 8 BEAUMONTS POND DRIVE-FOXBORO,MA 02035 (508)543-5499 SECTION 116.0 OF MASSACHUSETTS STATE BUILDING CODE REGISTERED ARCHITECTURAL AND PROFESSIONAL ENGINEERING SERVICES -CONSTRUCTION CONTROL BUILDING NAME: East Main Street Development STREET ADDRESS: 94 Main Street TOWN/STATE: Hyannis, MA CONSTRUCTION SUPERVISOR'S NAME: Dave Asiaf PROJECT: Three Story Medical/Residential Facility FIELD REPORT NUMBER: 001 DATE: 05/07/09 TIME: 4:15 pm WEATHER: Sunny TEMP. RANGE: 57F UPDATE ON PREVIOUS REPORTS:No updates—this is the first report. WORK IN PROGRESS: No one on site at time of site inspection. OBSERVATIONS:Exterior continuous wall footings and reinforcing at 100%o complete; all interior footings including elevator pit pad and reinforcing at 100%complete. ISSUES DISCUSSED W/SUPERINTENDENT: Met with Dave Asiaf on Monday 05/10/10 to discuss footing form placement and pouring elevator walls and pier on 05111/10. Discussed installing ''/s"diameter epoxy anchors having 3"minimum embedment into concrete in lieu of standard anchor bolts at perimeter concrete shelf only. Discussed installing 3/4"diameter expansion bolts having 3 '/4"minimum embedment into concrete in lieu of standard anchor bolts at interior footings only. Discussed framing first floor joists or installing support bracing at interior face of foundation walls prior to backfilling. INFORMATION OR ACTION REQUIRED: Dave Asiaf to provide this office with photos of formed elevator shaft walls and pier with reinforcing. All work proceeding in accordance with approved plans and recommendations. I,Richard J.Dempsey,P. E.,as the affidavited engineer,hereby certify that I have on this date,05/07/09,inspected the property located at 94 Main Street,Hyannis,MA and find that the construction complies substantially with the approved plans and specifications and appropriate provisions of the Massachusetts State Building Code,7"'edition,except as notedd�above. RICHARD J. G� ORI AL I A URE AND SEAL o DEMPSEY " STRUCTURAL 05/11/10 .o No.29173 DATE �O�AFc �STE� a �sS��NAL ENS'\ I THE DEMPSEY GROUP, INC. STRUCTURAL ENGINEERS 8 BEAUMONTS POND DRIVE—FOXBORO,MA 02035 (508)543-5499 SECTION 116.0 OF MASSACHUSETTS STATE BUILDING CODE REGISTERED ARCHITECTURAL AND PROFESSIONAL ENGINEERING SERVICES -CONSTRUCTION CONTROL BUILDING NAME: East Main Street Development STREET ADDRESS: 94 Main Street TOWN/STATE: Hyannis,MA CONSTRUCTION SUPERVISOR'S NAME: Dave Asiaf PROJECT: Three Story MedicaUResidential Facility FIELD REPORT NUMBER: 002 DATE: 05/18/09 TIME: 6:45 pm WEATHER: Cloudy TEMP. RANGE: 55F UPDATE ON PREVIOUS REPORTS: Dave Asiaf provided this office with photos of formed elevator shaft walls and pier with reinforcing as requested in site visit report#001. WORK IN PROGRESS:No one on site at time of site inspection. OBSERVATIONS: Exterior continuous wall foundations and reinforcing at 100%complete; elevator shaft walls at 100%complete. ISSUES DISCUSSED W/SUPERINTENDENT: Discussed drilling and epoxying zinc plated %"diameter threaded rod having 3"minimum embedment into concrete in lieu of epoxy anchors at perimeter concrete shelf only. INFORMATION OR ACTION REQUIRED: All work proceeding in accordance with approved plans and recommendations. I,Richard J.Dempsey,P. E.,as the affidavited engineer,hereby certify that I have on this date,05/18/09, inspected the property located at 94 Main Street,Hyannis,MA and find that the construction complies substantially with the approved plans and specifications and appropriate provisions of the Massachusetts State Building Code,7`h edition,except as noted above. 0F MA3�P O AA ATUREND SEAL RI HA J. DEMPSEY , 05/20/10M " STRUCTURAL DATE . P ,N o.29173 °x Fa►sT�a� ��S��NAI ENG\ Permits Page 1 of 1 s Shea, Sally From: Lt. Don Chase [dchase@hyannisfire.org] Sent: Thursday, October 16, 2008 10:27 AM To: Shea, Sally Cc: Perry, Tom Subject: Permits A_IlTs it-for:,9_4_Main_St,,HY Sunglass Hut - Cape Cod Mall Golf Maint. building - Marchant Mill, HyPort - 1471 Iyannough Rd -Nutter- tenant fit out Don 10/17/2008 on erv , _ 'GROUP,INCORPORATED z CONSTRUCTION CONTROL AFFIDAVIT AT PROJECT INCEPTION Parcel Number: 192/05. Project Name: Park Square,Professional Building Project Owner: Park Square Medical Building L'LC Project Location: 94,Main Street, Hyannis, MA M ` Scope of Project: New medical-office-building with(2) residential units m'attic , In accordance with paragraph 116.0.of 780 CMR, the.Massachusetts'State Building Code; I,, _David 7 Vachon Massachusetts Registration Number' 7471 being a Registered Professional`Architect hereby certify that all architecturalplans', ;computations,,.and specifications,,and changes thereto, involving the subj ect project will . be preparedby or under the direct supervision of a.Massachusetts Registered Professional>. Architect and bear his or her original.signaiure,and seal as defined by Massachusetts ' General Law (M'.G.L.) c 1`12; $81R•` I further certify that I-will be present-on' the construction.site at intervals appropriateA ' the stage 'f construction to-become generally'familiar with the progress and quality of the. work to determine,m enera1,•if the architectural work is being performed in a manner g consistent With-the construction documents: R . 14 of Architect (Origina tuft aond Se. 1) Date MA Home Office: Hedges,P6nd Crossing, 2277 State Rd., Suite H • PLymouth,.MA 02360 Mailing Address: P':O.,Box 278 • Sagarnore�Beach, MA 02562 Phone: 508:888.6555, :Fax: 508.888.6566 10/15/2008 14:23 5085430289 THE DEMPSEY GROUP PAGE 01/01 CONSTRUCTION CONTROL AFFIDAVIT Parcel Number: 192/.195 Project Name: Park Square Professional Building Project Owner: Park Square Medical Building LLC Project Location: 94 Main Street, Hyannis, MA Scope of Project: New medical office building w/attic residential units(2) In accordance with paragraph 116.0 of 780 CMR,the Massachusetts State Building Code,I, Pf Massachusetts Registration Number IM1.3 being a Registered Profes ional Engineer hereby certify that all structural plans, computations, and specifications, and changes thereto,involving the subject project will be prepared by, or under the direct supervision of, a Massachusetts Registered Professional Engineer and bear his or her original signature and seal as defined by Massachusetts General Law(M.G.L.) c 112, $81R. I further certify that I will be present on the construction site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work to determine,in general, if the structural work is being performed in a manner consistent with the construction documents. tk OF Mgss�cti RICHARD J. a` DEMPSEY " STRUCTURAL Engi r (Orig no sin e�a o �� Date �sS�ONAL �NG� From:Rose Gillard At:MF&T FaAD:781-261-1111 To:Jane Date:10/15/2008 03:26 PM Page:2 of 2 ACORD CERTIFICATE OF LIABILITY INSURANCE OP ID R DATE(MM/DD/YYYY) CONSE-1 10/15/08 PRODUCER , r THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE MacIntyre Fay & Thayer Ins Agy HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 77 Accord Park Drive Unit B-1 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Norwell MA 02061 Phone: 781-261-2000 Fax:781-261-2099 INSURERS AFFORDING COVERAGE NAIL INSURED INSURER A: Ohio Casualty Insurance Co. INSURER8: Hanover Insurance Company 22292 ConSery Group Inc. INSURERC: American International Co. P.O. Box 278 INSURERD: National Casualty Sagamore Beach MA 02562 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR NSR TYPE OF INSURANCE POLICY NUMBER DATE(MMIDDIYY) DATE(MMIDD/YY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $1,000,000 A X COMMERCIAL GENERAL LIABILITY BKO 0853511978 07/07/08 07/07/09 PREMISES(Eaoccurence) $100,000 CLAIMS MADE FX OCCUR MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE s2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,0 00 17 POLICY PR ECT O LOC J AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $100QQQQ B ANY AUTO ADN 8411502-02 08/27/08 08/27/09 (Ea accident) ALL OWNED AUTOS BODILY INJURY $ X SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESSNMBRELLALIABILITY EACH OCCURRENCE $5000000 A X OCCUR CLAIMSMADE USO (09) 53 51 19 78 07/07/08 07/07/09 AGGREGATE $5000000 DEDUCTIBLE $ X RETENTION $1000Q WC - $ WORKERS COMPENSATION AND TORY LIMITS ER EMPLOYERS'LIABILITY C ANY PROPRIETOR/PARTNER/EXECUTIVE WC 722-37-47 11/09/07 11/09/08 E.L.EACH ACCIDENT $100000 OFFICER/MEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYEE $1'00000 It yes,describe under ' SPECIAL PROVISIONS below E,L.DISEASE-POLICY LIMIT $500000 OTHER A Property BKO 0853511978 07/07/08 07/07/09 BPP $126,000 D Professional Liab JARO 0002848 07/20/08 07/20/09 Prof Liab $2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS PROJECT: Park Square Professional Building, LLC 94 Main Street Hyannis, MA 02601. CERTIFICATE HOLDER CANCELLATION TOBARNS SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION Town of Barnstable DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN Regulatory Services NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL Attn: Building Division IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR 200 Main Street Hyannis MA 02601 REPRESENTATIVES. AU DREP E ATIyXwv, ACORD 25(2001108) �` ©ACORD CORPORATION 1988 The Commonwealth of Massachusetts .Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Build ers/Contractors/Electrieians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: . o, )6 X78 City/State/Zip: �14**AM9 &Ae,41AIif hone-#: 5d8— �S�✓ Al l Axe an employer? Check the appropriate bog: Type Zew roject(required): 1.[ a m a employer with 0 4. ❑ l am a general contractor and I 6. construction . employees(full and/or part-time).*. have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet 7. Remodeling ship and have no employees These sub-contractors have g. ❑Demolition workingfor me in an capacity. employees and have workers' Y P tY. 9. ❑ Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 1.011 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself, [No workers' comp. right of exemption per MGL 12 ❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.❑ Other comp.insurance requited] *Any applicant that checks box#1 must also fill out the section below showing thcir workers'compensation poiicy-inforrnation. t Homeowners who submit this affidavit indicating they are doing all work and then-hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attachod an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: 1AV 14SWOlC67 Co. -W-7$' W47C aF 4W/* Policy#or Sclf-ins. Lic. #: WC 79A 37V7 Expiration Date: Job Site Address: g�A141,✓57— 4 A4 a,,e 527 City/State/Zip: &9 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby under the ai a d penalties of p ury that the information provided above is true and correct. Si afore: Date: Phone#: Official.use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): J.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: * �O PD 4-Bk 22463 P:S217 `6 755V 11-09-2007 Quitclaim Deed We,Earl T. Grue acid Jane Hewitt,as Trustees of The Hospital Workers Realty Trust H u/d/t dated July 9, 1991 and recorded in the Barnstable County Regsitry of Deeds in Book 7606, Page 72 Having an address of 150 Mount Vernon Street, Suite 300, Boston, Massachusetts 02125 in consideration ofrour Hundred Thirty Five Thousand and 00/100 ($435,00.0.00) Dollars hereby grant to Park Square Professional Building LLC of I10 Main Street,Hyannis,Massachusetts 02601,with QUITCLAIM COVENANTS A certain parcel of land, together with the buildings thereon, situated at 94 Main Street in Barnstable, (Hyannis) County of Barnstable, Massachusetts bounded and described as follows: Commencing at a point in range of the northerly line of said Main Street and the Westerly line of Cedar Street, so-called; Thence NORTHERLY in said range of the westerly line of Cedar Street, about one hundred twenty-five (125) feet, snore or less, to the southeast corner of land now or formerly of one Bowen; Thence WESTERLY in range of the southerly line of said Bowen, about one hundred forty-one(141)feet,more or less,to the southwest comer of said Bowen land; Thence NORTHERLY in range of the westerly line of said Bowen land,about seventy- seven and one-half(77'!z)feet,more or less,to the corner in range of land of said Bowen and also in range of land now or formerly of one Balser; Thence WESTERLY in range of the southerly line of said Balser,about one hundred and three (103) feet, more or less, to a corner in range of land of now or formerly of one Lyons; Thence SOUTHERLY in range of the easterly line of said Lyons,about seventy-six and one-half(76 %) feet,more or less, to the northwest corner of land formerly of Edward Walter Maher and now or formerly of one Martin; Thence EASTERLY in range of the northerly line of said Martin laud,about forty-nine (49)feet, seven(7)inches,More or less,to the northeast corner of said Martin land; Bk 22463 Pg 218 #64755 o Thence SOUTHERLY in range of the easterly line of said Martin, about one hunded forty-nine and one-half(149 %z)feet,more or less, to a corner in range of said northerly line of Main Street; Thence EASTERLY in said range of the northerly line of Main Street,about one hundred twenty-two (122)feet,more or less,to the point of beginning. The above described premises are conveyed subject to and with the benefit of all rights, rights ofway, easements,appurtenances,reservations and restrictions ofrecord,insofar as the same are in force and applicable. For title see Deed recorded in the Barnstable County Registry of Deeds in Book 7606, Page 076. Property Address: 94 East Main Street,Barnstable(Hyannis),MA. Executed as a sealed instrument this t of , 2007. art T. Grue,Trustee ` Ian Hewitt,Trustee COMMONWEALTH OF MASSACHUSETTS Barnstable County On this 7 day of NO) ,2007,before me,the undersigned notary public,personally appeared Earl T. Grue,Trustee proved to me through satisfactory evidence of identification, which were driver's license,to be the person whose name is signed on the preceding,or attached document, and aclmowledged to me that he signed it voluntarily for its stated purpose as an authorized Trustee of The Hospital Workers Realty Trust,H. 1 Notary Pub Coniniissi n E iratioui: JAB 0 No UVy Waft OF COMMdWSAM My cmainion F.)� ApN 4,2014top-- a pWILIk 4 ��. A C H d id\����r� Nflllllll// .r Z Bk 22463 P g 219 #64755 COMMONWEALTH OF MASSACHUSETTS Barnstable County 1-1 On this j-day of ,2007,before me,the ii nidersigned notary public,personally appeared Jane Hewitt,Trustee proved to me tluough satisfactory evidence of identification, which were driver's license,to be the person whose name is signed on the preceding or attached document, and acknowledged to ine that she signed it voluntarily for its stated purpose as an authorized Tnistee,of The Hospital Workers Realty Trust,II. Notary Pub c: CommissionE piration: V. a�`fl4•�}Q�9t4 ; ��� Notary Pu c OF W� •�v My Commis m Expires ? .,�o, ►.-<�a ,44 VARRSJABEETJOUffYTLURE OFXDEMS Date: 11-09-2007 0 10:15am Ctl7: 326 Doc4: 64755 Fee: $1r487.70 Cons: $435rOOO.10 BARNSTABLE COUNTY EXCISE TAX BARNSTABLE COUNTY REGISTRY OF DEEDS Date: 11-0?-2007 00 10:15an 326 Doct: 64755 Fee: $991.81j Cons: $435ifJ00.01) SARNSTAOLE REGISTRY OF DEEDS r 0 Libe The Ohio Casualty Insurance Company �mutuil.r Bond# 5036678 BOND KNOW ALL MEN BY THESE PRESENTS: That we ConSery Group,Inc. P.O.Box 278,Sagamore Beach,MA 02562 (Full Name[top line]and Address[bottom line]of Principal) (hereinafter called the Principal) as Principal, and , The Ohio Casualty Insurance Company with principal offices at Hamilton, Ohio(hereinafter called the Surety)as Surety,are held and firmly bound unto Town of Barnstable Regulatory Services,Building Division,200 Main Street,Hyannis,MA 02601 (Full Name[top line]and Address(bottom line)of Obligee) (hereinafter called the Obligee),in the penal sum of One Thousand Three Hundred Forty Fight and---------------------------00/100 (Dollars)$ 1.348.000 for the payment of which well and truly to made, we do hereby bind ourselves, our heirs. executors, administrators, successors and assigns,jointly and severally,firmly by these presents. WHEREAS,the Principal has made or is about to make application to the Obligee for a Permit for Street Opening at 94 Main Street and 26 Camp Street for a term beginning on October 15,2008 _ and ending on* October 15,2009 (*strike out if license or permit is for an indefinite term) NOW,THEREFORE,if the Principal shall indemnify the Obligee against any loss directly arising by reason of failure of said Principal to comply with the:laws or ordinances under which said license or permit is granted, or any lawful rules or regulations pertaining thereto, then this obligation shall be void;otherwise to remain in full force and effect. PROVIDED,HOWEVER,AND UPON THE FOLLOWING EXPRESS CONDITIONS: 1. This bond shall be and remain in full force during the term of said license or permit unless canceled in accordance with paragraph 2 below; but if said license or permit was issued for a specific term, and is renewed for one or more specific terms, this bond will be extended to cover such additional term(s) upon the execution by the Surety of a Continuation Certificate, provided such:certificate is acceptable to the Obligee. In no event , however, shall the liability of the Surety be cumulative from year to year or from period to period,nor exceed the penal sum written in this first paragraph of this bond. 2. The Surety shall have the right to terminate its liability by notifying the Obligee in writing ten(10)days in advance of its intention to do so. SIGNED,SEALED AND DATED October 15,2008 1 ConSe ,Inc. By: Principal The Ohio Casualty Insurance Company u By: — C Cy`c-wi n, Sandra J.Connors Atforney-in-Fact S-3853 License or Permit Bond (Unnumbered) Principal: ConSery Group,Inc. POWER OF ATTORNEY POA Number: 40-569 THE OHIO CASUALTY INSURANCE COMPANY Obligee: Town of Bamstable Regulatory Services, WEST AMERICAN INSURANCE COMPANY Bond Number: 5036678 Building Division,200 Main Street,Hyannis, Know All Men by These Presents:THE OHIO CASUALTY INSURANCE COMPANY,an Ohio Corporation,and WEST AMERICAN INSURANCE COMPANY,an Indiana Corporation pursuant to the authority granted by Article III,Section 9 of the Code of Regulations and By-Laws of The Ohio Casualty Insurance Company and West American Insurance Company do hereby nominate,constitute and appoint: Ronald M. Cleaves,Martin L.Donovan, Sandra J. Connors or George G. Powers of Norwell, Massachusetts its true and lawful agent(s)and attorney(s}in-fact,to make,execute,seal and deliver for and on its behalf as surety,and as its act and deed any and all BONDS, UNDERTAKINGS, and RECOGNIZANCES, not exceeding in any single instance TEN MILLION ($10,000,000.00) DOLLARS, excluding, however, any bond(s) or undertaking(s)guaranteeing the payment of notes and interest thereon. And the execution of such bonds or undertakings in pursuance of these presents,shall be as binding upon said Companies,as fully and amply,to all intents and purposes,as if they had been duly executed and acknowledged by the regularly elected officers of the Companies at their administrative offices in Fairfield,Ohio,in their own proper persons. The authority granted hereunder supersedes any previous authority heretofore granted the above named attomey(s)-in-fact. In WITNESS WHEREOF,the undersigned officer of the said The Ohio Casualty Insurance Company and West American Insurance Company has hereunto subscribed his name and affixed the Corporate Seal of each Company this 31 st day of January,2008 Y INS& y1NSV VP nF �IVQ,. P� �v✓� 'O SEAL c SEAL !n� a Sam Lawrence Assistant Secretary �'i•• ,r 3•• i t r• .•t STATE OF OHIO, COUNTY OF BUTLER On this 31st day of January,2008 before the subscriber,a Notary Public of the State of Ohio, in and for the County of Butler,duly commissioned and qualified,came Sam Lawrence,Assistant Secretary of The Ohio Casualty Insurance Company and West American Insurance Company,to me personally known to be the individual and officer described in,and who executed the preceding instrument,and he acknowledged the execution of the same,and being by me duly sworn deposes and says that he is the officer of the Companies aforesaid,and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies,and the said Corporate Seals and his signature as officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed my Official Seal at the City of Hamilton,State of Ohio,the day and year first above written. `,`,�giull '\\�I m * * 3 Notary Public in and for County of Butler,State of Ohio My Commission expires August 5,2012 /��///INIYNIIV►��`a This power of attomey is granted under and by authority of Article III,Section 9 of the Code of Regulations and By-Laws of The Ohio Casualty Insurance Company and West American Insurance Company,extracts from which read: Article III,Section 9. Appointment of Attomys-in-Fact. The Chairman of the Board,the President,any Vice-President,the Secretary or any Assistant Secretary of the corporation shall be and is hereby vested with full power and authority to appoint attorneys-in-fact for the purpose of signing the name of the corporation as surety to,and to execute,attach the seal.of the corporation to,acknowledge.and deliver Pdiy and a!l bonds,recognizances,stipulations,undertakings or other instruments of suretyship and policies of insurance to be given in favor of any individual,firm,corporation,partnership,limited liability company or other entity,or the official representative thereof,or to any county or state,or any official board or boards of any county or state,or the United States of America or any agency thereof,or to any other political subdivision thereof This instrument is signed and sealed as authorized by the following resolution adopted by the Boards of Directors ofthe Companies on October 21,2004: RESOLVED,That the signature of any officer of the Company authorized under Article II1,Section 9 of its Code of Regulations and By-laws and the Company seal may be affixed by facsimile to any power of attorney or copy thereof issued on behalf of the Company to make,execute,seal and deliver for and on its behalf as surety any and all bonds,undertakings or other written obligations in the nature thereof,to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment. Such signatures and seal are hereby adopted by the Company as original signatures and seal and shall,with respect to any bond, undertaking or other written obligations in the nature thereof to which it is attached,be valid and binding upon the Company with the same force and effect as though manually affixed. I,the undersigned Assistant Secretary of The Ohio Casualty Insurance Company,American Fire and Casualty Company and West American Insurance Company,do hereby certify that the foregoing power of attorney,the referenced By-Laws of the Companies and the above resolution of their Boards of Directors:are true and"correct copies and are in full force and effect on this date. IN WITNESS WHEREOF,I have hereunto set my hand and the seals of the Companies this 15th day of October 20Q8 P`,jY INSU PN INSU,, oP,. •yOF �'� ' •o� F, o o SEAL b �! SEAL ,s Mark E.Schmidt Assistant Secreta ��r tr 3•. �� ry I CONSTRUCTION CONTROL AFFIDAVIT PROJECT NUMBER: 08283 PROJECT TITLE: Park Square Professional Building PROJECT LOCATION: 94 Main Street Hyannis, Massachusetts NAME OF BUILDING: Park Square Professional Building SCOPE OF PROJECT: New Three Story Medical/Residential Building In accordance with Section 116.0 of the Massachusetts State Building Code,I,Richard J.Dempsey,P.E., Massachusetts Registration Number 29173,being a registered professional engineer hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: ( ) ENTIRE PROJECT ( ) ARCHITECTURAL ( X ) STRUCTURAL ( ) MECHANICAL ( ) FIRE PROTECTION ( ) ELECTRICAL ( ) OTHER(specify): for the above named project and that,to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. I further certify that I shall perform the necessary professional services and shall be responsible for the following as specified in Section 116.2.2: 1. Review,for conformance to the design concept,shop drawings,samples and other submittals,which are submitted by the contractor in accordance with the requirements of , the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become,generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. I shall periodically submit progress reports following site inspections together with pertinent comments as a record for the Barnstable Building Department. Upon completion of the work,I shall submit a final report as to the satisfactory completion and readiness of the project for occupancy. ORIGINAL SIGNATURE AND SEAL Subscribedand-sworn to before me this 1 s 7 day of �C�'nF{E2. 2008 SGPT�msE2 3 � 2C> NOTARY PUBLIC My Commission Expires On P Bk 23193 Ps 28 -yy c p 466 SAMSTABM Town of Barnstable Planning Board Decision and Notice Special Permit 2008-02 Special Permit § 240-24.1.4 and §240-24.1.10 Summary: Granted with Conditions Petitioner: Park Square Professional Building, LLC Property Address: 94 Main Street and 26 Camp Street, Hyannis, MA Assessor's Map: 327 Parcels: 192 and 195 Zoning: Medical Services Zoning District and Wellhead Protection Overlay District Deed: Book 7606, Page 076 = 94 Main Street Book 8444, Page 281 = 26 Camp Street Relief Requested & Background: In this Special Permit request#2008-002 under Section 240-24.1.4 MS Zoning District, the applicant requests permission to construct to construct a 16,450 SF building and seeks relief under: Relief requested on the application • § 240-24.1.4.13 Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5; • § 240.24.1.10.A Site development standards ■ Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' ■ Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4'with additional screening in buffer Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. on the subject property subject to issuance of a Special Permit. Applicant is Park Square Professional Building, LLC and shown on Assessor's Map 327 as Parcel 192 and 195 in the MS District and the Wellhead Protection Overlay District. The parcel is located on the north side of Main Street with frontage on Camp Street and Cedar Street. The application site plan entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206 shows existing conditions including four Park Square Professional Building Special Permit 2008-02 Map 327,Parcels 192 and 195 1 - BIKE A KAMr, PUS �prfD MP'�1 ` Town of Barnstable Planning Board Decision and Notice Special Permit 2008-02 Special Permit § 240-24.1.4 and §240-24.1.10 Summary: Granted with Conditions Petitioner: Park Square Professional Building, LLC Property Address: 94 P-.Aain Street and 26 ramp Street, Hyannis, MA Assessor's Map: 327 Parcels: 192 and 195 Zoning: Medical Services Zoning District and Wellhead Protection Overlay District Deed: Book 7606, Page 076 = 94 Main Street Book 8444, Page 281 = 26 Camp Street Relief Requested & Background: In this Special Permit request# 2008-002 under Section 240-24.1.4 MS Zoning District, the applicant requests permission to construct to construct a 16,450 SF building and seeks relief under: Relief requested on the application • § 240-24.1.4.13 Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 25; • § 240.24.1.10.A Site development standards ■ Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' z Subsection (5) ianascaping (c) 20' landscaped setback to residential district reduced to 10.4' with additional screening in buffer Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. on the subject property subject to issuance of a Special Permit. Applicant is Park Square Professional Building, LLC and shown on Assessor's Map 327 as Parcel 192 and 195 in the MS District and the Wellhead Protection Overlay District. The parcel is located on the north side of Main Street with frontage on Camp Street and Cedar Street. The application site plan entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206 shows existing conditions including four Park Square Professional Building Special Permit 2008-02 Map 327,Parcels 192 and 195 1 f structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and one shared access for 94 Main Street on Main Street and landscaped areas. The plan set also includes a Layout Plan showing a 2.5 story medical office building with two residential units in the half story, a Grading, Drainage and Utilities Plan, landscape Plan and two Detail sheets showing the structures, impervious and landscaped areas and a single family residence that are the subject of the applicant's proposal. The property gained Site Plan Review approval#031-08 with conditions for removal of residence at 94 Main Street; preserve residence at 26 Camp Street with removal of garage. Construction of new 2.5 story medical office building with 2 apartments. No other site changes are proposed. The approval letter is dated August 22, 2008 and is attached to this decision. Procedural & Hearing Summary: This special permit request was filed at the Town Clerk's Office and at the Office of the Planning Board on July 24, 2008. A public hearing before the Planning Board was duly advertised and notice sent to all abutters in accordance with MGL Chapter 40A. The hearing opened on August 11, 2008, was continued on August 25, 2008. The public hearing was closed on August 25, 2008. Paul Curley, Ray Lang, David Munsell, Felicia Penn, Patrick Princi, and Marlene Weir were the Board Members deciding this special permit request. On August 11, 2008, the public hearing was opened. Roy Catignani of ConSery Group, Inc. appeared before the Board. Brian Yergatian of BSC Group also made presentations on behalf of the application. Public comment was requested. None was given. The Planning Board discussed the application with the applicant. The Planning Board voted to continue the public hearing on August 25, 2008. On August 25, 2008, the Board discussed the proposal with the applicant and the applicant's representatives. Public comment was requested and none was given. The public hearing was closed upon a motion by Felicia Penn, seconded by Ray Lang with a unanimous vote. No public comment was submitted to the Board in writing. During the public hearing the Board heard the comments of those present, discussed the proposed plans, material submitted with the application, the presentation made by the applicant and the applicant's representatives and the application of the MS and WP Zoning and the spirit and intent of the Zoning Code. Findings of Fact At the hearing of September 8, 2008, the Board unanimously made the following findings of fact: 1. Special Permit Request 2007- 012, seeks relief, under Relief requested on the application • § 240-24.1.4.13 Non-residential development, medical office and ancillary uses and residential use at 94 Main Street greater than 10,000 SF for a 16,450 SF building and to continue single family residential use at 26 Camp Street; • § 240.24.1.4.C.(1)(b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5% • § 240.24.1.10.A Site development standards • Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4' with additional screening in buffer. Relief requested through applicant's public hearing testimony • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be 2 J provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. 2. Property location is 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels 192 and 195 in the MS District and Wellhead Protection Overlay District. 3. The property that is the subject of this application is located within the Hyannis Growth Incentive Zone and is therefore exempt from Cape Cod Commission jurisdiction. 4. The proposal that is the subject of this application complies with the certified Comprehensive Plan. 5. The proposal gained site plan approval #031-08 from Site Plan Review. 6. The proposal for 94 Main Street, Hyannis received approval from Hyannis Main Street Waterfront Historic District Commission on April 18, 2008 to demolish the existing 94 Main Street building. The HMSWHDC reserves final review for actual building design and elevation of the building exterior. The 26 Camp Street property is to remain unchanged. 7. The site is a developed site, as shown on the plan "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008", including four structures, impervious parking areas, one curb cut on Camp Street for the single-family residence and two shared driveways for 94 Main Street and an adjoining property 110 Main Street and landscaped areas. 8. The shared driveways are located on Main Street and Cedar Street. An existing driveway on the 110 Main Street property is proposed to be eliminated to improve access through proposed shared driveways as described above and as shown on the plan. 9. This plan also shows the location of the proposed 2.5 story medical office building with two residential units in the half story and a single family residence at 26 Camp Street that are the subject of the applicant's proposal. 10. The 94 Main Street property is currently used as an office building and the 26 Camp Street property is used as a single-family residence. 11. The proposal meets the requirements of§ 240.24.1.2 E. specifically that the proposal complies with the provisions of this zoning ordinance and is consistent with the applicable criteria for granting Special Permits. 12. The requirements of§ 240-24.1.4 MS District are met in that the proposed use presents the mixed use medically oriented development desirable within this district. 13. The site meets the Wellhead Protection District requirements for 50% or less lot coverage. Proposed lot coverage is 49.7%. Dimensional, Bulk and Other Requirements 14. The proposal as shown on the plans meets.the requirements of§ 240.24.1.4.C. with the exception of Subsection (1) (b) Dimensional, Bulk and Other Requirements 10' required side yard setback reduced to 2.5'. Site Development Standards - 15. Section 240-§ 240.24.1.10.A are met with the exception of: • Subsection (4) Off-Street Parking Requirements (d) Parking lot landscaping [2] Five or more spaces 6' required landscape buffer between property lines and parking spaces reduced to a minimum of 3.2' • Subsection (5) landscaping (c) 20' landscaped setback to residential district reduced to 10.4'with additional screening in buffer. 3 • § 240-21.1.10.A. Site development standards Subsection (4) Off-street Parking Requirements (d) Parking lot standards [3] A six-foot landscape buffer must be provided between a building and a surface area parking lot or drive except at entrances, building loading, and utility locations. 16. Proposed landscaping will enhance the site and provide visual relief from proposed and existing paved areas. Design and Infrastructure Plan 17. § 240.24.11 Design and Infrastructure Plan requirements are met in that the impact on the visual character of surrounding neighborhoods and the community remains unchanged and is in some instances enhanced by the proposed development design; housing opportunities are provided; proposal preserves a shared driveway; allows private investment that supports appropriate economic development. 18. Lighting plan has not been submitted; no finding made as to consistency with the DIP for lighting design. 19. Stormwater management meets DIP standards. 20. Local knowledge of parking for medical office use with associated ancillary uses indicates that existing parking requirements under zoning may not be adequate for client and staff parking. Decision Based on the findings of fact, a motion was duly made by Felicia Penn and seconded by David Munsell to grant a Special Permit pursuant to Sections 240-24.1.4.13, 240.24.1.4.C.(1)(b) and 240.24.1.10.A Subsection (4) (d)[2] and (5)(c) which allows the development of a 16,450 SF building for 2.5 story medical office building with two residential units in the half story at 94 Main Street, a .63 acre parcel, and to continue single family residential use at 26 Camp Street, a .28 acre property, only insofar as such relief is necessary to construct the buildings as shown on the above referenced approved plan. Applicant is Park Square Professional building, LLC and the property location is addressed 94 Main Street and 26 Camp Street, Hyannis, MA and shown on Assessor's Map 327 as Parcels192 and 195 in the MS District and the Wellhead Protection Overlay District. The use is allowed only in strict conformance to the following: Conditions: 1. Applicant shall construct the project in conformance to the plan, sheets 1 through 7, entitled "Mixed Use Development#94 Main Street#26 Camp Street, Hyannis, MA" dated June 9, 2008 as revised through August 19, 2008 prepared by BSC Group, Brian G. Yergatian, RPE Civil #46206. 2. This site and any development or redevelopment thereof shall, at all times, comply with the conditions of this special permit. 3. Copies of the final building design elevations as finally approved by HMSWHDC shall be provided to the Planning Board for their record before the issuance of any building permits pursuant to the relief granted herein. Should this approval cause changes to the site design, layout or require further dimensional relief, an amendment to this special permit shall be obtained prior to the issuance of any building permits pursuant to the relief granted herein. 4. Any change to building use from that permitted herein shall require amendment to this special permit. This includes a change in the percentage of medical office and/or residential use at the 94 Main Street property and any change to the single family residential use at the 26 Camp Street property. 4 5. A detailed site and building lighting plan shall be submitted to the Planning Board for review and approval by the Board or its designee. 6. Applicant has indicated that six parking spaces, in excess of zoning requirements, will be provided•off-site.; An agreement permitting this use of the- off-site property, the location of the off-site property and a plan showing at least six existing spaces on the off-site property shall be submitted to the Building Commissioner before the issuance of a Certificate of Occupancy. One year after the facility is fully leased out the property owner may request the off-site parking requirement to be removed. This request shall be reviewed by the Building Commissioner and the results of the review forwarded to the Planning Board for action by the Board or its designee. 7.- Prior to-the issuance of any foundation building permit, Developer will provide surety $6200 the form and content of which is acceptable to the Town Attorney, shall be posted with the Town Treasurer to be expended on the replacement of landscape materials if such replacement becomes necessary. Any unexpended portion of said performance bond may be released by the Planning Board to Developer or his successor(s) after three years from the date of the initial landscape plantings, such date to be determined by the Building Commissioner, upon the request of Developer. 8. Any existing sidewalks that may be disturbed, removed, or otherwise disrupted as a result of construction pursuant to this special permit shall be repaired to the satisfaction of the Department of Public Works prior to the issuance of a Certificate of Occupancy for the 94 Main Street building. 9. Conditions of the Site Plan approval letter dated August 22, 2008 are hereby incorporated as conditions of this special permit. 10. Developer and its successors will participate in the Town of Barnstable's Transportation Management Association (TMA) upon its formation. Participation shall include: (a) distribution of materials provided by the Town to all tenants, lessees, and purchasers of condominium units within the development; and (b) the identification of a representative for the development who will serve as the contact between the inhabitants and tenants of the development and the Town's TMA. Ordered: Special Permit 2008-002 is granted with conditions as described herein. This decision must be recorded at the Registry of Deeds for it to be in effect. The relief authorized by this decision must be exercised in one year. Appeals of this decision, if any, shall be made pursuant to MGL Chapte 40A, Section 17, within twenty (20) days after the date of the filing of this decision, a copy o ich st be filed in the office of the Town Clerk. 2008 t/Felicia Penn, Vice Chairman Date Signed I, Linda Hutchenrider, Clerk of the Town of Barnstable, Barnstable County, Massachusetts, hereby certify that twenty (20) days have elapsed since the Planning Board filed this decision and that no appeal of the decision has been filed in the office of the Town Clerk. Signed and sealed this day of under the pains and penalties of perjury. Linda Hutchenrider, Town Clerk 5 PROOF OF PUBLICATION TOWN.OF BARNSTABLE PLANNING BOARD NOTICE OF PUBLIC HEARING MONDAY,.AUGUST 11,.2068,7;00 P.M. NEW TOWN HALLS SECOND FLOOR HEARING.ROOM 367.MAIN STREET;HYANNIS,MA To all persons deemed interested in the Planning Board acting under Chapter 40A;;Section 9,and all amendments'thereto;of the General Laws of the Commonwealth of Massachusetts and the Trim of. Bamstable Zoning 0rd nances,specifically Section 240-24.1.Hyanni's Vllage.Zoning bistricts;ygu are hereby noted of a Public Hearing to be held on Monday;August 11;2008 at 7:00 PM,in the Hearing Room of the Barnstable Town'Hall,367..Main Street,Hyannis,MA to consider"Special FermitApplication 20D8-02 fora nonresidential. development greater than 10,000 sflmixed use development purse- antto Section 240 24.1.4;B Special Permits;Dimensional Bulk.anId other requirements pursuant to Sectio�i 240-24 1 4G:and for Site DevelopmentStandardspursuanttoSection240 241.10.Applicant:' is Park Square Professional Building,LLC and the property location is addressed 94 Main Street and 26 Camp Street,Hyannis,MA.and shown onAssesgoes.Map 327 as Parcels 192&195 in,the Hyannis Medical Services District. Copies of the applications and plans are available for review in the. Office of the Planning Board,200gain Street,Hyannis,MAbetween the hours of 00 AM to 00 PM,Monday through Friday: ,:Patrick Princi,Chairman. Planning Board The Bamstable Patriot . July 25 and:Au ist 1, 2990 AbutterReport Page 1 of 4 Planning Board Special Permit Abutter List for Map & Parcel(s): '327192 ,'3271.95' Parties of interest are those directly opposite the subject lot on any public or private street or way and abutters to abutters within 300 feet ring of subject property. Total Count: 78 Close Map &Parcel Ownerl Owner2 Addressl Address 2 Retailing Country Cie CityStateZip 327175 ARENSTRUP, PARK SQUARE TRUST PO BOX 2248 HYANNIS, MA 54S RICHARD D TRS II 02601 CAREY, CHARLES J THE 146 MAIN W DENNIS, MA 327176 TR STREET REALTY 117 POND ST 02670 211 TRUST 327178 PISACANO, MARGO PISACANO, CHARLES P O BOX 126 HYANNISPORT, 18, & MA 02647 WHARTON CAMP SHELL REALTY 73 HARBOR BLUFFS HYANNIS MA 327179 PISACANO, MARGO TRUST RD 02601 20. &CHARLES TRS 327180 VOEGELI, KEVIN 19 CAMP ST HYANNIS, MA 13. LEE &ALICIA 02601 HYANNIS, MA 327181 TYLER,JONATHAN 2 LYNXHOLM CT 02601 18, 327182 TYLER,JONATHAN TYLER REALTY TRUST 2 LYNXHOLM CT HYANNIS, MA USA 13: M TR 02601 327183 TYLER,JONATHAN 2 LYNXHOLM COURT HYANNIS, MA USA 22' M 02601 327184 LITTLE,DAMES L 5 LYNXHOLM COURT HYANNIS, MA02601 USA 94: 327185 PRADA, SORAYA 3 LYNXHOLM COURT HYANNIS, MA USA 19' 02601 327186 SHAPIRO, GARY L THE PREPPER REALTY ONE LYNXHOLM HYANNIS, MA USA 51� TRS TRUST COURT 02601 327187 VOEGELI, KEVIN & 19 CAMP ST HYANNIS, MA USA 19Z ALICIA 02601 32719000A HOGAN, JOHN F 48 CAMP ST- UNIT HYANNIS, MA USA 19: 1 02601 32719000B HOGAN, JOHN F 48 CAMP ST- UNIT HY601 ANNIS, MA USA 19: 327190DOC HOGAN,JOHN F 48 CAMP ST- UNIT HYANNIS, MA USA 19: 1 02601 32719000D HOGAN,JOHN F 48 CAMP ST- UNIT HYANNIS, MA USA 19-. 1 02601 A WOMANS 1855 DORCHESTER DORCHESTER, 32719000E CONCERN INC AVE MA 02124 20. A WOMANS 1855 DORCHESTER DORCHESTER, 32719000E CONCERNINC AVE MA 02122 20. 32719000G SULLIVAN, KELLIE 48 CAMP STREET- HYANNIS, MA 19� M UNIT 7 02601 327190DOH SCHAPIRA,JEFFRY 66 WOODLAND DR CONTOOCOOK, USA 18� A ET AL TRS NH 03229 32719000I CONRAD, NANCY M 48 CAMP ST UNIT 9 HY601 ANNIS, MA USA 16£ 02 http://www.town.bamstable.ma.us/arcims/appgeoapp/AbutterReport.aspx?type=PBSP 7/25/2008 AbutterReport Page 2 of 4 32719000J FLANAGAN, 48 CAMP ST#10 HYANNIS, MA USA 100200 KATHLEEN E 02601 32719000K COX,THOMAS & 48 CAMP ST UNIT HYANNIS, MA 20936/: JANINE M 11 02601 MUNCHERIAN, WATERTOWN, 32719000E ALFRED 47 PURITAN RD MA 02472 USA 16444/: 32719000M COLLARES, BORIS 0 48 CAMP ST, UNIT HYANNIS, MA USA 15226/: &TAELESE 13 02601 32719000N SANTINI,SHERRY A 48 CAMP ST- UNIT HYANNIS, MA 14992/: #14 02601 327190000 HUNTER, DEBORAH 48 CAMP ST, #15 HYANNIS, MA USA 11026/: A 02601 327191 LITTLETON, ROBERT 70 WHITEWOOD RD MILFORD, MA 21004/: FIR 01757 327192 JOHNSTON, GERANIOTIS, LITTLE WOMEN 410 NYES NECK CENTERVILLE, USA 8444/2£ WILLIAM G& EVANGELOS,TRS REALTY TRUST RD MA 02632 327193 PARK SQUARE PROF 110 MAIN ST HYANNIS, MA USA 19439/: BLDG, LLC 02601 327194 PARK SQUARE PROF 110 MAIN ST HYANNIS, MA USA 19439/: BLDG, LLC 02601 PARK SQUARE HYANNIS, MA 327195 PROFESSIONAL 110 MAIN STREET 02601 22463/: BLDG, LLC 327196 DEMAREST, CHAD K THE 15 CEDAR ST 15 CEDAR ST HYANNIS, MA 13589/: TR REALTY TRUST 02601 PISACAN O, HYAN NISPO RT, 327197 CHARLES&MARGO P O BOX 126 MA 02647 13432/: 327198 FENNEY, WILLIAM 35 CEDAR ST HYANNIS, MA USA 8721/1� N,TRS 02601 327199 CAPE COD MENTAL INC 46 WE MAID i ST HYANNIS, MA i czA 3n3n/nc 271.. HEALTH ASSOCIATION, .N� 0 ST MAIN 02601 327200 AIKEN, STEVEN L TR APB REALTY TRUST 83 MAIN ST HYANNIS, MA USA 3764/3( 02601 WHARTON- PISCANO, CHARLES HYANNISPORT, 327201 PISCANO, MARGO TR PO BOX 126 MA 02647 USA 18279/( TR& 327202 LAROCHE, GLENN M 15 PARK SQUARE HYANNIS, MA USA 10482/: 02601 327203 DEROSA, PETER G PO BOX 141 CUMMAQUID, MA USA 2853/2( 02637 327204 MACHERAS,YANNIS 84 PARK ST HYANNIS, MA 13545/: R 02601 http://www.town.bamstable.ma.us/arcims/appgeoapp/AbutterReport.aspx?type=PBSP 7/25/2008 AbutterReport Page 3 of 4 BARNSTABLE,TOWN HYANNIS, MA 327237 OF(REC) 367 MAIN ST 02601 USA 327266 BARNSTABLE,TOWN 367 MAIN ST HYANNIS, MA USA OF (REC) 02601 327267 MCBRIDE, SEAN PO BOX 2448 HYANNIS, MA 12471/( 02601 32818400A VANDEMOER, VANDEMOER, J 68 CAMP STREET HYANNIS, MA USA 6047/0� NICHOLAS ET ALS NICHOLAS 02601 32818400B BRAVMAN, DEBRA 208 SCUDDER BAY CENTERVILLE, 21199/: CIRCLE MA 02632 32818400C DIETZ,ABRAHAM P 68 CAMP ST HYANNIS, MA USA 8145/3: 02601 32818400D MATANGKASOMBUT, GOOD PLANET 99 POND AVE # BROOKLINE, MA 19839/: PONPAN TR REALTY TRUST 806 02445 328188001 CAMP STREET PROF 110 MAIN ST HYANNIS, MA 20471/. BLDG LLC 02601 342016 GOLDEN, WILLIAM A PARKWAY PLACE 187 KEVENEY LANE YARMOUTHPORT, USA 10487/: TR REALTY TRUST MA 02675 342017 GOLDEN, WILLIAM A % B&A REALTY 187 KEVENEY LANE YARMOUTHPORT, USA 3443/2( TRUST MA 02675 342019 RON B LLC 55 PARTRIDGE W YARMOUTH, 21857/: VALLEY RD MA 02673 342021 CORR, EDWARD J JR 42 CEDAR ST HYANNIS, MA USA 1434/6, 02601 DAVENPORT JOHN & C/0 DAVENPORT SOUTH I 342022 PALMER REALTY TRUST 20 NORTH MAIN ST YARMOUTH, MA USA 1144/3: 02664 34202300A MISTER II LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 34202300B MERLESENA, VILLAGE REALTY PO BOX 135 OSTERVILLE, MA USA 9273/3( ROSARIA M TR TRUST 02655 34202300C MERLESENA,JOHN P 0/.MERLESENA, 116 EAST 31ST NEW YORK, NY 21643/1 TR STEPHEN W STREET 10016 34202300D MISTER IV LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 34202300E REBEIRO, ELISABETE 70 MAIN ST#5 HYANNIS, MA USA 11560/: 02601 34202300E MERLESENA,JOHN P PO BOX 721 W BARNSTABLE, USA 8881/2� 'TRUSTEE MA 02668 3420230OG MERLESENA,JOHN P PO BOX 721 W BARNSTABLE, USA 8881/2S TRUSTEE MA 02668 http://www.town.bamstable.ma.us/arcims/appgeoapp/AbutterReport.aspx?type=PBSP 7/25/2008 f AbutterReport Page 4 of 4 ,MERLESENA,JOHN W BARNSTABLE, 34202300H P TRUSTEE P 0 BOX 721 MA 02668 USA 8881/2� 34202300I MISTER V LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 342023001 MISTER VI LLC 60 SMOKE VALLEY OSTERVILLE, MA 21527/: RD 02655 34202300K GESNER, C VALERIE 70 MAIN ST HYANNIS, MA USA 3680/0: 02601 MUNCHERIAN, WATERTOWN, 34202300E ALFRED M 47 PURITAN RD MA 02472 USA 18996/( DE OLIVEIRA, HYANNIS, MA 34202300M JOANA 8 ERIN LN 02601 20124/: 3420230ON FOSS, DONALD W PO BOX 820 HYANNIS, MA USA 11663/: JR 02601 SLATER, EST OF 100 SHEEP W BARNSTABLE, 342023000 DIANA A ET AL TRS MEADOW RD MA 02668 USA 19394/: 34202300P SLATER, EST OF 100 SHEEP W BARNSTABLE, USA 19394/: DIANA A ET AL TRS MEADOW LN MA 02668 342025 ZULLO, JOHN 54 MAIN STREET HYANNIS, MA 19743/( (HYANNIS) 02601 342026 CH LLC 34 SNOWY CREEK HYANNIS, MA 22112/: DR 02601 34203300A FATER, MARC TR C/O CPF REALTY 51 MAIN ST HYANNIS, MA USA 16549/: TRUST 02601 34203300E OATS, MICHAEL F C/O SEASCAPE PO BOX 581 N FALMOUTH, USA 11064/: TR REALTY TRUST MA 02556 34203300C HILL, C EUGENE & 51 MAIN ST HYANNIS, MA USA 4320/0: GAIL P 02601 34203300D LYTLE, ROBERT A 51 MAIN ST- UNIT HYANNIS, MA 14080/: 5 02601 34203300E LYTLE, ROBERT A 51 MAIN ST#5 HYANNIS, MA USA 101672 02601 FENNELL, KATHLEEN J R FENNELL REALTY 501 MASS AVE, 2ND CAMBRIDGE, MA 34203300E M TR TRUST 1994 FL 02139 USA 11178/( This list by itself does NOT constitute a certified list of abutters and is provided only as an aid to the determination of abutters. If a certified list of abutters is required,contact the Assessing Division to have this list certified.The owner and address data on this list is from the Town of Barnstable Assessor's database as of 7/25/2008. http://www.town.bamstable.ma.us/arcims/appgeoapp/AbutterReport.aspx?type=PBSP 7/25/2008 � r Town of Barnstable Regulatory Services nn.MASS.�a Thomas F.Geilere Director � g Elay Building Division - Tom Perry,Building Commissioner 200 Main Street, Hyannis.,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 PLEASE FORWARD THE ATTACHED PAGE(S) TO: TO: ATTN: �C 71� FAX NO. FROM: C_ C&f-A DATE: PAGE(S): 1 - (INCLUDING.COVER SHEET) Rev:121901 5. A detailed site and building lighting plan shall be submitted to the Planning Board for review and approval by the Board or its designee. 6. Applicant has indicated that six parking spaces, in excess of zoning requirements, will be provided off-site. An agreement permitting this use of the off-site property, the location of the off-site property and a plan showing at least six existing spaces on the off-site property shall be submitted to the Building Commissioner before the issuance of a Certificate of Occupancy. One year after the facility is fully leased out the property owner may request the off-site parking requirement to be removed. This request shall be reviewed by the Building Commissioner and the results of the review forwarded to the Planning Board for action by.the.Board or its designee. 7. Prior to the issuance of any foundation building. permit, Developer will provide surety. $6200 the form and content of which is acceptable to the Town Attorney, shall be posted with the Town Treasurer,to be expended on the replacement of landscape materials if such replacement becomes necessary. Any unexpended-portion of said performance bond may be released by the Planning Board to Developer or his successor(s) after. three years from the date of the initial landscape plantings, such date to be determined by the Building Commissioner, upon the request of Developer. 8. Any existing sidewalks that may be disturbed, removed, or otherwise disrupted as a result of construction pursuant to this special permit shall be repaired to the satisfaction of the Department of Public Works prior to the issuance of a Certificate of Occupancy for the 94 Main Street building. 9. Conditions-of the Site Plan approval letter dated August 22, 2008 are hereby incorporated as conditions of this special permit. 10. Developer and its successors will participate in the Town of Barnstable's Transportation Management Association (TMA) upon its formation. Participation shall include: (a) distribution of materials provided by the Town to all tenants, lessees, and purchasers of condominium units within the development; and (b) the identification of a representative for the development who will serve as the contact between the inhabitants and tenants of the development and the Town's TMA. Ordered: Special Permit 2008-002 is granted with conditions as described herein. This decision must be recorded at the Registry of Deeds for it to be in effect..The relief authorized by this decision must be exercised in one year. Appeals of this decision, if any, shall be made pursuant to MGL Chapter,40A, Section 17, within twenty(20) days after the date of the filing of this decision, a COP, o 'rich st be filed in the office of the Town Clerk. 2008 Felicia Penn, Vice Chairman Date Signed I, Linda Hutchenrider, Clerk of the Town of Barnstable, Barnstable County; Massachusetts, - hereby certify that twenty (20) days have elapsed since the Planning_Board filed this decision and that no appeal of the decision has been filed in the office of the Town Clerk. Signed and sealed this day of under the pains and penalties of perjury. Linda Hutchenrider, Town Clerk 5 Message Page 1 of 1 Roma, Paul From: Weil, Ruth Sent: Tuesday, November 18, 2008 8:35 AM To: Roma, Paul Cc: Buntich, JoAnne; Blanchette, Debra Subject: Park Square Professional Building LLC Dear Paul• As per our conversation, please be advised that Park Square Professional Building LLC, owner of property located at 94 Main Street and 26 Camp Street, Hyannis, MA, has fulfilled condition number seven of the special permit issued to it by the Planning Board in Appeal No. 2008-02 by tendering into escrow the sum of$6.200 and by executing an escrow agreement. Thank you. Ruth Ruth J. Weil Town Attorney Town of Barnstable 367 Main Street Hyannis,MA 02601 508-862-4620(telephone) 508-862-4724(fax) 11/19/2008 �apIHETp� Town of Barnstable " Regulatory Services BARNSTABLE, r MASS. Thomas F.Geiler,Director 16.39.rFo ray" Building Division Tom Perry, Building commissioner 200 Main Street, Hyannis,MA 02601 Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder as Owner of the subject property hereby authorize�,, D�/ J�Z �i�0✓ , !�G, to act on my behalf, in all matters relative to work authorized by this building permit application for: MEW •Co ryryAxeme- �ie,ai0-1y 4 T (Address of Job) g z% Signa f Date Ev N6EL of ,� &A*,v/,v77T Print Name Q:FORMS:OWNERPERMLS SION Message Page 1 of 1 Roma, Paul From: Weil, Ruth Sent: Tuesday, November 18, 2008 8:35 AM To: Roma, Paul Cc: Buntich, JoAnne; Blanchette, Debra Subject: Park Square Professional Building LLC Dear Paul: As per our conversation, please be advised that Park Square Professional Building LLC, owner of property located at 94 Main Street and 26 Camp Street,Hyannis, MA, has fulfilled condition number seven of the special permit issued to it by the Planning Board in Appeal No. 2008-02 by tendering into escrow the sum of$6.200 and by executing an escrow agreement. Thank you. Ruth Ruth J. Weil Town Attorney Town of Barnstable 367 Main Street Hyannis,MA 02601 508-862-4620(te bom) 508-862-4724(fax) 3/19/2009 r01 . a Ire rq� Town of Barnstable 200 Main Street,Hyannis,Massachusetts 02601 Mass.y 1639. A Growth Management Department Patricia Daley, Interim Director 367 Main Street,Hyannis, Massachusetts 02601 Phone(508)862-4785 Fax(508)862-4725 www.town.barnstable.ma.us August 22, 2008 Park Square Professional Building, LLC C/O Roy Catignani Consery Group, Inc. P. O. Box 278 Sagamore Beach, MA 02562 N) ,4 cn c n Reference: Site Plan Review#031-08 -Park Square Professional Building 94 Main Street an ��S r�"ee�Tlyannis r. Map 327, Parce s T92-&`r93 CZ) Proposal: Removal of residence at 94 Main Street, Hyannis;preserve reside ce at 26 Camp Street but remove garage on same lot. Build new 2.5 story medical office building with two (2) apartments on the 2nd floor. Dear Mr. Catignani: Please be advised that the above proposal has been found to be administratively approvable subject to the following: • Approval is based upon plans entitled, "Mixed Use Development#94, #102, #110 Main Street  Camp Street, Hyannis, MA, Sheets 1-7", prepared by BSC Group, W. Yarmouth, MA dated June 9, 2008 revised June 12, 2008 for lot coverage calculations. Sheets 3 and 4 revised June 24, 2008, July 7 and August 5 per SPR Staff comments to depict access drive, turning radii, and utilities,with a final revisions per Planning Board dated August 19, 2008 • All outside lighting, fencing and like amenities must receive final approval from the Hyannis Main Street Waterfront Historic District Commission. • Landscape Plan, lighting, and fencing must received final approval for compliance with the Design Infrastructure Plan. • Applicant must obtain all other applicable permits, licenses and approvals required, including, but not limited to, the granting of Planning Board Special Permit relief. i 1 • If plans should change due to the Planning Board Special Permit decision, the applicant must submit final plans to the Site Plan Review Committee which reflect the decision of the Planning Board. • Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification, made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan(Zoning Section 240-104 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. Sincerely, Ellen M. Swiniarski Site Plan/Regulatory Review Coordinator CC: SPR File Tom Perry,Building Commissioner Planning Board Special Permit 2008-02 File Assessor's map and lot number ...... �5......: -3 Z�/7�! C',Z7TEC .S S'�.'OM MUST BE Ae Sewage Permit number .... .. .....................:........ 'v�d, I !. .a:_ t :a STATE TOWN �Q�OFTHEl���O TOWN OF BARNSTX'BLE Z BARNSTABLE. NAM. BUILDING INSPECTOR APPLICATION FOR PERMIT TO ... Q.1 " !. TYPE OF CONSTRUCTION ...:....... L . ....��/......197 . TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: Location .......9 ...1 !1 Via.!!�....5 7...............%!`/.�1 !v Zvi.5.................................................................................................... -P L ProposedUse .........�.w..vh/.N...4............ ......................................................... ....................................... Zoning District ...... .......... : ......................................Fire District .... .... . .a...° '�°°a ............................ nn t'S 0 /iu S /��0%✓ Name of Owner ...4Q.%u.5�!'�...... 1. �. ........................Address ....�'�. ...ltil!�.....>...1 j........ ............/5....................... Name of Builder ..... n� S ..........Address ..../..�.9.....`,5..'.r..1.v...n..�...S..��a..�...L...r.'......!�.d...a..........�'g.`:v...ti..�S Nameof Architect ............... ................................................Address .................................................................................... Number of Rooms .......:................Foundation .......— .......................................... .................................................................... Exterior ....................................................................................Roofing ........... ...................................................................... Floors — .................................................................Interior ......... . .................... ......................................................................... Heating .............: ................................................................Plumbing ............. ................................................................. 43�0 0, 6 d Fireplace ..................................................Approximate Cost .................................................................... ................................ Definitive Plan Approved by Planning Board ________________________________19________. Area X 30� .......................................... Diagram of Lot and Building with Dimensions .............. ons Fee / ............................................. SUBJECT TO APPROVAL OF BOARD OF HEALTH 73 OiY -31 i 7'1 I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name .i.... .... ... .:.................... Nickerson, Augusta 16 6 No ....... ..... Permit for ........ �.P�..1 .............................................................. ....... i I''fain Street Location .......... ................................. . ............. Hyannis 1 « .. .......................................... - Owner Augusta Nickerson ................................... ........... .......... u Type of Construction .....................alu ....... ....... ................................................................. .......... ` P Plot ................. ............ Lot ................................ Permit Granted March 15 ..... Date of Inspection S Date Completed ! PERMIT REFUSED i ................................................................ 19 , ............................................................................... ....................... ........................................... ..... ............................................................................... ......................:........................................................ f, Approved ................................................ 19 1 ............................................................................... ..................... ......................................................... I oF��gyti Town of Bamstable `I 2q1 A BABW3PABLE. 200 Main Street,Hyannis,Massachusetts 02601 MASS. Growth Management Department Patricia Daley,Interim Director 367 Main Street,Hyannis,Massachusetts 02601 Phone(508)862-4785 Fax(508)862-4725 www.town.bamstable.ma.us July 23, 2008 Park Square Professional Building, LLC F C/O Roy Catignam Consery Group, Inc. P. O. Box 278 Sagamore Beach, MA 02562 Reference: Site Plan Review 9031-08 -Park Square Professional Building 94 Main Street and 26 Camp Street, Hyannis Map 327, Parcels 192 & 193 Proposal: Removal of residence atr9r 4 Main-Str-det;Hyannis; preserve residence at 26 Camp Street but remove garage on same lot. Build new 2.5 story medical office building with two (2) apartments on the 2"a floor. Dear Mr. Catignani: Please be advised that subsequent to the formal site plan review meeting on June 26, 2008, the revised plans for the above-referenced proposal were found to be administratively approvable at the site plan review staff meeting held July 22, 2008 subject to the following: Approval is based upon plans entitled, "Mixed Use Development#94, #102,#110 Main Street  Camp Street, Hyannis, MA, Sheets 1-7", prepared by BSC Group,W. Yarmouth, MA dated June 9,2008 revised June 12, 2008 for lot coverage calculations. Sheets 3 and 4 revised June 24, 2008 and July 7, 2008 per SPR Staff comments to depict access drive,turning radii, and utilities. • Final approvals of revisions to Sheet 4, Grading, Drainage &Utilities Plan revised June 24, 2008, depicting existing utilities: water, sewer lines and hydrants and proposed fire service connections, water service, sewer connection, gas connection etc. will need to be obtained from Hyannis Fire Department and Department of Public Works. • Final approval of revisions to Sheet 3, Layout Plan,revised July 7, 2008, depicting revised"S" turn and turning radii will need to be obtained from Hyannis Fire Department. • Revised plans addressing the July 22, 2008 site plan review staff meeting comments that have been incorporated into this letter,will need to be provided for review at a -1 subsequent SPR staff meeting prior to the Planning Board hearing scheduled for August . • The parking space in front of the existing 18"maple tree will need to be eliminated, retaining the existing tree. 0 With the elimination of one parking space in front of the maple tree, one more off-site employee parking space will need to be provided for a total of 6 off-site spaces. Proof of same will need to be provided. • Interior driveway curbing on the North side of the site should be constructed using Cape Cod berm or sloped granite. • The corner by the dumpsters will need to be eased. • Curbing in the public right of way shall be granite along the length of the development as needed to match existing granite. • Sidewalk replacement/construction will need to be provided as follows: Camp Street: Beginning from northern property line of Camp Street to existing newer cement concrete sidewalks beginning just south of gravel parking lot to 110 Main Street, replace with 5 foot wide cement concrete sidewalks that conform to ADA requirements including concrete ramps down to elevation of driveway openings. Replace curb with new vertical granite curb. Reconstruct driveway aprons a and install new drivewayapron with bituminous concrete P aprons meeting ADA requirements of 5 foot wide path of travel with less than 2% cross slope. Cedar Street: Construct new cement concrete sidewalk beginning from the sidewalk on Main Street to the driveway of the abutting property. Construct cement concrete ramps at driveways in conformance with ADA requirements. Walk may be set back from edge of pavement with 4 foot grass strip to be maintained by the property owner. • Fences at the rear of the property are in poor condition and will require replacement with fencing approved under the Design and Infrastructure Plan. • All outside lighting and amenities must be reviewed for compliance with the Design Infrastructure Plan. • Applicant must obtain all other applicable permits, licenses and approvals required, including,but not limited to,the granting of Planning Board Special Permit relief. I >;5 • If plans should change due to the Planning Board Special Permit decision, the applicant must submit final plans to the Site Plan Review Committee which reflect the decision of the Planning Board. • Upon completion of all work, a registered engineer or land surveyor shall submit a letter of certification,made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan(Zoning Section 240-104 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. Sincerely, Ellen A Swiniarski Site Plan/Regulatory Review Coordinator CC: SPR File Tom Perry,Building Commissioner Planning Board Special Permit 2008-02 File I10 11/05/2008 12:20 5088886566 CONSERV GROUP INC PAGE 01/02 try � 4 ill ConSery Group, Inc. FAX TRANSMITTAL SHEET -- VL- At: AJ` A--6Lg- 9-iqVLA7+si2 4Y1 cgs— VJLIOi�6t .1Jh/131e Fax -7 ar' � From: .12&V CAT- oJA)J'l Date: Number of pages including cover sheet:. n 2- 9 c� 4 0 If transmittal is incomplete,please call ConSery Group,lnc. at 508-888-6555.E �+ Our fax nurnbeT is 508-888.6566. co cr N T 1 " 11/05/2008 12:20 5088886566 CONSERV GROUP INC PAGE 02/02 r August 11,2008 Park Square Professional.Bullding, LLC 110 Main Street Hyannis,MA 02801 To Whom It May Concern, Please accept this letter on behalf of the owners of Camp Street Professional Building, LLC as notification of use of six (6) parking spots located.on the properties of 6M9 Camp Street in Hyannis,` MA 02601, Respectfully, van S. Cohen Owner, Manager Camp Street Professlonal Building, �LC r 1 f rp COUNSELING 222 CASE MANAGER EXEC ASST 223 2 COUNSELING STORAGE i 211 2 22 WAITING OFFICE 229 CORR n e w 215 door WAITING COUNSELING ! 217 ' ' UNASSIGNED OFFICE 208 STAFF COUNSELING COUNSELING COUNSELING STAFF 228 230 210 213 2 44 216 PTi ATIENT 2 77 j 0 CORR 1 IE LOBBY Ud 238 d 2 81 OFFICE COUNSELING COUNSELING E V R 232 OFFICE233 COUNSELING CHECK—IN CI COU2O LING 209 219 220 COR© i I ED OFFICE CORR n e W 234 5 20 door _7 OFFICE COUNSELING F20-81 WAITING 235 F2_04_1 HSKP 236 COUNSELING COUNSELING MEETING ROOM, 203 202 1 201 t 4680 sf/ 100sf per person = 47 people total 1 47/ (2) means of egress = 24 people per stair Note: doors shall swing in the direction of egress travel KEY PLAN when serving an occupant load >50 people With a 4 ft wide corridor existing doors are arranged to provide minimum 18" on the pull side of the door per CMR 521 r ISSUED FOR PERMITTI HADCO INDEPENDENCE(E FIXTURE i - NOT FOR CONSTRUCTI -W 100-WATT METAL HALIDEFlXIURE t:: MOUNTED AT A HEIGHT OF 14_FT. ' - - .. PATH SHIELD.TYP. ^92:8 92 740 BTM 570NE-5J.0 ,. ,.. .:.;,.. BIM CHAMBERS 875 0 ..: B ,/ A - - FOR RISER POLE - B] _. ,.. B H SERVICE - -..- 1 A, HOPE 18-STORMTECH - - NATCH'E]65TING " yS� - OF PAVEMENT ) SC 740 CHAMBERS R M=911.82 St B AOF TM CHA BERS087 00 F f • ..,'3: - INV C=8. + R TNory 06N S� � u . =1.25 Sr W �\ A 'INV=88 75+ `pJ m DOMESTIC 1,55 ... NEW 2"SERVICE A A WATER g"'HOPED a D, A CB 0 V=87 - _ BRIAN G. YERGATIAN M1,, ig? - NM 9170 - g1 PROFESSIONAL ENGINEER __.. - A ` R �?: 4.�� - SHUTOFF A NEW 6 CLDI FIRE SERVICE - .. NNECTION TO TOWN OF -PARK SQUARE RIM=91.96 L -` �F;k BARNSTABLE WATER SYSTEM PROFESSIONAL MATCH EXISI7NG BUILDING- MATCH AT E894 DGE OF ". .... ". :' TOWN OF a -- ',. •s BARNSTABL SEWER SYSTEM [��1 EXTERIOR. CONNECTIOE - p MAIN STREET. B CLEANOUT SADDLE AND TAP-EXISTING #J'Y - `INSTALL`. SEWER MAIN - AND k _ - e. B MnMrIIP1o�e #26 CAMP STREET IN PROPOSED MEDICAL/OFFICE BUILDING _ i F.FOOTPRINT n] # .i•: A R 140HYANNIS i. .•# °: - _ HADCO INDEPENDENCE 3 F100 S .� _ a_ x' .• % 104-:WATT METAL HALIDE FIX RE, 4,680 5 -RVICE MASSACHUSETTS d RIM=8B.90 �. �. �:: ^;'-'MOUNTED AT,A HEIGHT OF 14 FT -,� ` INV=84.00 " �i, WITHQUT SHIELD-.'IW:'; a' NEW GAS :.r�., _ PER REQUIREMENTS 12-STORMTECH .. �. ..,. �'' .. . STCOUNTY) MATCH EIISIING '; - SC-740 CHAMBERS ' COMPANY GRADE AT EDGE OF BTM STONE=83.50 - PAVEMENTt;IYP) .-. -:.:':...,.-.. BTM CHAMBERS=84.50 : of LocAy-uTnirr BARN ABLE " RAINAGE UT AND CAP EXIST. - - - UTILITIES S PLAN ':, C 1WATER SERVICE ..� _- - �', `.. A7 THE MAIN '-CUT AND CAP EXISTING .�', � AT THE PROPERTYLINE _ I JUNE 9,2008 _J DESC. . - - COVERAGE CAL T V 6-24-08 SPR STAFF COMMEI I • • _ -._. - � � ',,. - 3 7-07-08 REVISE ACCESS DF - / - - 4 8-05-08 SPR STAFF COMME / 5 8-19-08 PER PLANNING 90, : r , } ` _ PREPARED FOR: e " CONSERV GROUP, INC. P.O. BOX 278 \ - SAGAMORE BEACH, MA GENERAL UTII ITY NOTES. EXISTING SEWER SERVICE CURRENTLY CONNECTED TO EXISTING OFFICE TO BE ' U EDT THE EXTENT FEASIBLE. R �� 2. EXISTING WATER SERVICE AT 94 MAIN STREET SHALLBE ABANDONED. A NEW 2" COMMERCIAL SERVICE AND 6"FIRE SPRINKLER SERVICE TO PROVIDED FOR + - • IItt NEW BUILDING. SC \ `" - t•',� 3. GAS, ELECTRIC, TELEPHONE, CABLE SERVICES TO BE COORDINATED WITH LOCAL 349 Main Street UTILITY COMPANIES. Route 28,Unit D -- 4. ALL CATCH BASINS SHALL BE EQUIPPED WITH DEEP SUMP AND OIL HOODS.- SHALL Yarmouth,Massachusetts I r � 508 778 8� 1E © 2008 BSC Group,Inc. SCALE: 1" = 20' REVISIONS: LOCUS INFORMATION NO. DATE DESC. N _ 1 CURRENT OWNER: PARK SQUARE PROFESSIOAL BLDG., LLC OVERLAY DISTRICT: WP TITLE REFERENCE: BOOK 19439. PAGE 262 NITROGEN SENSITIVE rums BOOK 19439. PAGE 264 ZONE: YES — ZONE II PLAN REFERENCE: BOOK 588, PAGE 9 NE FLOOD — BOOK 39. PAGE 11 ZONE DISTRICT: "C". — BOOK 430, PAGE 86 ZONING DISTRICT: MS — MAIN STREET SETBACKS: FRONT 20' ASSESSORS MAP: 327 SIDE 10' PARCEL- 195 REAR 10' LOCUS MAP I CERTIFY TO THE BEST OF MY NOT TO SCALE PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF THAT THE LOT CORNERS, DIMENSIONS AND SETBACKS TO THE STRUCTURE AS DETERMINED BY t INSTRUMENT SURVEY AND AS SHOWN ON THIS PLAN ARE CORRECT. 4, CRAIG A. FELD i ulD PROFESI�ZONAL LAND SURVEYOR DATE �s•�d'OZ"w t03• N CHAR K. =REST TR. AS � 3z7� FOUNDATION p AS- BUILT PLAN Ctf wit N�//F� WWAM ASTON TR. AIRS MAP 327 PARCEL 192 � N/� a #94 p PARK SQUARE �. PROFESSIONAL M.N. LLC MAIN STREET ASSESSORS MAP 327 - T t PARCEL 195 ] ana �o Q IN PARK NSQUARE PROFESSIONAL 11 M. LLC Li A MP 327 CJ HYANNISPARCEL 94 .4# �ASSACHUSETT Soo �a ( NSTABLE CO TY) o u b�'Ib PARK SQUARE PROFESSIONAL SM LLC ASSESSORS MAP 327 PARCEL 193 PREPARED FOR: CONSERV GROUP, INC. P.O. BOX 278 P SAGAMORE BEACH, MA 02562 508 888-6555 BSC 349 Route 28,Unit D W.Yarmouth Massachusetts 02673 508 778 8919 © 2010 The BSC Group, Inc. SCALE: 1• = 30' 0 3.75 7.5 15 was 0 15 30 80 ► PROD. MGR.: C. FIELD FIELD: P. HAGIST CALC./DESIGN: P. HAGIST DRAWN: P. HAGIST CHECK: C. FIELD FILE: 9310—ABF.DWG DWG. NO: 5872-04 JOB. NO: 4-9315.00 SHEET 1 OF 1 ---------- ------- _0 a) -t5 a) E C W Er P�, ll 0 0 (o U-) JUN 18 2008 0 cy) Lo TOWN OF BARNSTABd c c\j Lo 0 (c) HicWRIC PRESERVATION ARCHITECTURAL ASPHALT SHINGLES CD CHARCOAL GRAY :3 CD 0 CC) CIO - I o r- 00 CLAPBOARDS GRAY TO MATCH 110 llovt. MAIN STREET 0 (D HIP ROOF (REDUCES SCALE 7 HIP ROOF (REDU ES E a) AT EACH END OF BUILDING') ATEACHEND OF BU'Lbi"NG) S*m CHANGE DETAIL SECOND U) -50 CHANGE DETAIL @ SECOND FLOOR TO GIVE A LIGHTER FLOOR TO GIVE A LIGHTER AVILLION LIKE FEEL PAVILLION LIKE FEEL NS tit, m I I'U, U U VV U :W�.0 a u 77. -4 wjl,�i�."-;"�`; I L--Jl jai 777—77- SECOND FLOOR ............ 0 FIRST FLOOR is con \-10" CORNER TRIM 6" x 66" DH WINDOW 0. 38�-O" 5t-OP) w/ 6/6 GRILLES \—PRONOUNCED COVERED ENTRANCE ON PARKING LOT SIDE (40) 4 NORTH ELEVATION cr ** 0 EAST ELEVATION 4*- C? ARCHITECTURAL ASPHALT SHINGLES DORMERS FOR THIRD FLOOR CHARCOAL GRAY APARTMENTS IF DEVELO PIED CLAPBOARDS GRAY TO MATCH 110 cr gffi� LA 7TWM7.77WMm,INA, AiffA,� "V1, .......... jt, Nmo,wl 6AIK�=V��c�. ZE� U', !U U r-REVISIONS 0 -U�!j 1 U 0,q :v, U I T-9-Ir 4R;�, 7 7 41 7t SECOND FLOOR FIRST FLOOR 30f-O" 50P-Op$ 30*-oll DW SOU TH ELEVATION @ ML`A I N STREET DATF(' 6-18-08 SCALE 1/8"=11-ott DRAWN CADD CHKD ... .......... LUL61 FT X4 ........... PROPOSED CEDAR STREET ELEVATIONS SOUTH ELEVATION @ MAIN STREET SHEET & JOB #: 446 ------------ x s N N NEW WALL 4 1/2" BELOW Q-o EXISTING CEILING 0 Q an V c c� C�17Jf g1v� C CD co � Q�tb �faVAA ` x �7 SET DOOR TIGHT TO WALL +�a>7 Q Op ca V CO O �O � CO m cb T 3'-0" x 7'-0" N LO a U) O a) o Wcc INS Zz Ersssss N RELOCATE SIGNAGE by ACOUSTIC CEILING DUFFY w a 3 . w WAITING FRAME ABOVE WINDOW M O BELOW EXIS rG ACOUSTIC h�l CEILING (HVAC) IL Fro PATIENT { w w W �D 90 w NEW DOOR AND FRAME A w0 (HALF GLASS) WITH [�] Ow LOSER PARTIAL PLAN "A" �! PARTIAL CEILING PLAN H HARDWARE D PUSH/PULL ^ C * � � v HOZ AIRV Z ° j � v A w H FP FLOOR UR _. REVISIONS NEW EXIT SIGN Q a 3 -0" -0 x 7 " FE NEW DOORS AS SHOWN SET FRAME TIGHT TO WALL NEW WALL 4 1/2" BELOW EXISTING CEILING II DWG. INFO. PARTIAL PLAN )'BPIPARTIAL CEILINGLAN DATE 7-24-15 a a _.. SCALE 1 2 =1 -0 y . DRAWN CADD C HIS i SPRINKLER HEAD __ APPRVD EXIT SIGN PART PLAN A LIGHT FIXTURE ■ ,r 'r ■s. Unless and until such time as the original stamp s. e• _ of the responsible Registered Architect appears on i this plan: U (A) no person or persons, including any municipal or 1w 'r ? —' _ other public officials. may rely upon the information contained herein: and Y (8) thin plan remains the property of rf ConSery Group Ina '! _ T Q SHEET TITLE: EMERG BATTERY UNIT PART PLAN "�" KEY PLAN ,SECOND FLOOR PLAN SHEET & JOB#: A-1 FOR REVIEW -