Loading...
HomeMy WebLinkAbout0500 OCEAN STREET (47) .�o® DC.ea--Y-, (d�, � no�- ray d E p { Town of Barnstab le,. Building rail rai Pos"Thl Card So°That it is`Visible from fhe Street-:Approvetl Plans Must be:Retained on Job'antl"this°Ca`rd"Must be Kept Posted Unti in I Inspection Has'Been Made p " Where a Certificate;'of Occu ancy.is Re, wired;such Building shall Not be Occupied until a'Final Inspection has been made. 1 e1 mit p. . q Permit No. B-19-3686 Applicant Name: Aaron Strom Approvals Date Issued: 11/19/2019 Current Use: Structure Permit Type: Building—Addition/Alteration-Residential Expiration Date: 05/19/2020 Foundation: Location: 500 BLDG 3D UNIT 124 OCEAN STREET, HYANNIS Map/Lost: 324-040 ODB Zoning District: RB Sheathing: Owner on.Record: LACKENBY, DAVID T&YVONNE Contractor,Name AARON STROM D&S Framing: 1 Address: 500 OCEAN ST#124 Construction 2 HYANNIS, MA 02601 ;% o Contrict'rr License 140358 Chimney: Est Description: removing and reinstalling one window Project Cost: $ 1,000.00 s Insulation: Permit"Fee: .$85.00 Project Review Req: r' Fee Paid: 585.00 Final: Date: 11/19/2019 Plumbing/Gas 71, i Rough Plumbing: "':'Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months"after issuance. Rough Gas: All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Final Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for-p6blic inspection for the entire duration of the work until the completion of the same. I �'��" °° �`° ~'� 4>f Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials:are provided on this permit. Service: Minimum of Five Call Inspections Required for All Construction Work:l a - Rough: 1.Foundation or Footing 2.Sheathing Inspection Final: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Final: 7.final Inspection before Occupancy Health Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Dlv�-Z in AS t✓ SENT