Loading...
HomeMy WebLinkAbout0259 OLD TOWN ROAD (2) el Town of Barnstable Building enMsrsetE [Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept ' t� ""S p Posted Until Final Inspection Has Been Made. �1Y.R-yy� 16}¢ 1S' 11 lllllllt %639. Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-20-986 Applicant Name: Allie Kelley Approvals Date Issued: 04/10/2020 Current Use: Structure Permit Type: Building-Solar Panel- Residential Expiration Date: 10/10/2020 Foundation: Location: 259 OLD TOWN ROAD,HYANNIS Map/Lot: 268-007 Zoning District: RB Sheathing: Owner on Record: DUMONT, IAGO& FILHA, MARIA D L NUNES Contractor Nam�PALMETTO SOLAR LLC. Framing: 1 Address: 259 OLD TOWN ROAD Contractor License: 188411 2 HYANNIS, MA 02601 "� Est. Project Cost: $ 17,000.00 Chimne : Description: Install solar electric panels to roof of existing ome to be Permit Fee: $ 136.70 y interconnected with homes electrical system. 17 panels @ 5.27kW Insulation: Fee Paid:i $ 136.70 Project Review Req: Date: 4/10/2020 Final: Plumbing/Gas ``- Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issulican UtTriCia Final Plumbing: All work authorized by this permit shall conform to the approved application and the approvedconstruction documents for which this permit has been granted. All construction,alterations and changes of use of any building and st uctures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building-and-Fire-Officials are provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing Service: 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed _ 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Peli;zll gistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: