Loading...
HomeMy WebLinkAboutAP-2023-007 Assembly ofGod 959 Mary Dunn HY Architectural PlansSCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:50 AMCoverReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A09/21/2021REACH ASSEMBLY OF GODNOT FOR CONSTRUCTIONOWNER:Reach Assembly of God959 Mary Dunn RoadHyannis, MA 02601Contact: Dennis DaSilva 508-367-1357ARCHITECT:Glenn Knowles & AssociatesOffice: 584 Columbia Rd.Mail: 551 Columbia Rd #255732Boston, MA 02125Contact: Glenn Knowles 617-319-5671CIVIL ENGINEER:Down Cape Engineering, Inc.939 Main StreetYarmouthport, MA 02675Contact: Daniel Ojala 508-362-4541 x106Sheet ListSheetNumberSheet NameA0 CoverA101 Existing Floor PlansA102 Existing ElevationsA103 Proposed Upper LevelA104 Proposed Lower LevelA105 Proposed ElevationsA106 Proposed ElevationsCODE DATA1. BUILDING CODE EDITION: Massachusetts State Building Code, 9th Edition.2. CONSTRUCTION TYPE: 5B3. USE GROUP: A-3 Place of Worship; B Offices4. MIXED USE: Non-Separated: A-3 & B5. GROSS SQUARE FOOTAGE:ExistingProposed Lower Level 7,281 SF11,946 SFUpper Level 7,037 SF11,682 SF total 14,318 SF 23,682 SF6. WORK LEVEL: is "Alteration Level 3" per 780 CMR, Chapter 34, amended 2015 IEBC7. STORIES ABOVE GRADE: The existing building contains a Basement and one story above grade. 8. SPRINKLER: The existing building is equipped with a sprinkler system. The existing system will be expanded for the new work.10. PLUMBING FIXTURE COUNT: Proposed:WOMENLower UpperTotalWC's56= 11Lavatories44= 8MENLower UpperTotalWC's34= 7Urinals11= 2Lavatories34= 7Occupant load for plumbing: Sanctuary 576 (Based on Seating Layout)Multi-purpose Room 213 (Based on 15 SF/person table & chairs)Total789 = 395 Women and 395 MenPer 248 CMR 10.10 Table 1 and notes:Womens' requirements:8 WC's (1 per 50 req'd.) Exceeds code2 Lavs (1 per 200 req'd.) Exceeds code DNUPDNDNDNDNDEMDEMDEMLULA SEWER DRAIN STUDIPEJECTOR MWATER SPRINKLER BOILEHW 400 AMP FIRE HEAT RECOVERY VENTILATORBALCONY ABOVEDEMO -SUBMIT SHORING PLAN TOSTRUCTURAL ENGR. FOR REVIEW.REMOVECARPETREMOVEPLATFORMDEMODEMOSCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:51 AM1/8" = 1'-0"Existing Floor PlansReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1019/21/20211/8" = 1'-0"1EXISTING LOWER LEVEL PLAN1/8" = 1'-0"2EXISTING UPPER LEVEL PLANNOT FOR CONSTRUCTION REMOVE WALLREMOVE STEEPLEREMOVE ROOFREMOVE STEEPLEREMOVE ROOFREMOVE STEEPLEREMOVE ROOFREMOVE WALLREMOVE STEEPLEREMOVE WALLREMOVE ROOFSCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:51 AM1/8" = 1'-0"Existing ElevationsReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1029/21/20211/8" = 1'-0"1EXISTING VIEW FROM MARY DUNN (WEST)1/8" = 1'-0"2EXISTING SIDE VIEW FROM PARKING (SOUTH)1/8" = 1'-0"3EXISTING REAR VIEW FROM PARKING (EAST)1/8" = 1'-0"4EXISTING SIDE VIEW FROM NEIGHBOR (NORTH)NOT FOR CONSTRUCTION DNDNSeats: 576 N.I.C.WELCOME DESKSEATINGBOOKS/MERCHMENWOMENFAMILYMAIN ENTRANCEPLATFORMSENIOR PASTORTREASURYCONFERENCECOPYRECEPTIONCAFE/COFFEENEW WALL, INSULATED METAL PANEL.EXISTING SPACE RENOVATED INTO ADMIN SUITE.-ALL CARPET -2X2 ACT WITH TEGULAR EDGEGLASS DOORS WITH PANIC HARDWARENEW TOILET ROOMSROOF LINE ABOVEINCLINED STRUCTURAL COLUMNS, TYP.ROOF LINE ABOVEPOLISHED CONCRETE FLOORSTOREFRONT -SEECENTRAL GLASS QUOTE GLASS DOORS WITH PANIC HARDWARENEW WALL -INSULATED METAL PANELEXISTING BUILDING FOOTPRINTA5002A5001LOBBYMENWOMENSANCTUARYJAN.CL.NURSERYSECRETARYCL.CL.PASTOR'SOFFICEW.C.BUILT-IN MILLWORK INCLUDEDIN CONTRACT. FURNITURE N.I.C.HC RAMP----7 '-1 1 3 /4 "7'-9 1/4"4'-3 1/2"SCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:52 AM1/8" = 1'-0"Proposed Upper LevelReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1039/21/20211/8" = 1'-0"1PROPOSED UPPER LEVEL PLANRoom Finish Schedule - Upper LevelLevel Name Floor FinishBaseFinishWall FinishCeilingFinishCommentsFirst Floor SeniorPastorCARPET VINYLCOVEPAINT 2X2 ACTFirst Floor Treasury CARPET VINYLCOVEPAINT 2X2 ACTFirst Floor Conference CARPET VINYLCOVEPAINT 2X2 ACTFirst Floor Reception CARPET VINYLCOVEPAINT 2X2 ACTFirst Floor SeniorPastor W.C.12"X12"TILETILECOVETILEWAINSCOTTTO 5'-0" /PAINT TOCLG.2X2 ACTFirst Floor SeniorPastor ClosetCARPET VINYLCOVEPAINT 2X2 ACTFirst Floor Copy CARPET VINYLCOVEPAINT 2X2 ACTFirst Floor Sanctuary CARPET VINYLCOVEPAINT TBDFirst Floor Pastor W.C. - - - - EXISTINGFirst Floor Pastor Closet - - - - EXISTINGFirst Floor SecretaryCloset- - - - EXISTINGFirst Floor Pastor Office - - - - EXISTINGFirst Floor Secretary - - - - EXISTINGFirst Floor Nursery - - - - EXISTINGFirst Floor NurseryStorage- - - - EXISTINGFirst Floor Janitor - - - - EXISTINGFirst Floor Exist. Men - - - - EXISTINGFirst Floor Exist.Women- - - - EXISTINGFirst Floor Family 12"X12"TILETILECOVETILEWAINSCOTTTO 5'-0" /PAINT TOCLG.2X2 ACTFirst Floor Women 12"X12"TILETILECOVETILEWAINSCOTTTO 5'-0" /PAINT TOCLG.2X2 ACTFirst Floor Men 12"X12"TILETILECOVETILEWAINSCOTTTO 5'-0" /PAINT TOCLG.2X2 ACTFirst Floor Lobby TBD VINYLCOVEPAINT TBDNOT FOR CONSTRUCTION CLASSROOMCLASSROOMCLASSROOMK3K2K1KID'S ASSEMBLYCHECK-INGIRLSBOYSSTORAGEADULTEXPANDED KITCHENNEW MOVABLE PARTITIONNEW MOVABLE PARTITIONCLOSETNEW WALL -INSULATED METAL PANELCONCRETE FOUNDATION / RETAINING WALLCONCRETE FOUNDATION / RETAINING WALLEXISTING BUILDING FOOTPRINTA5003FUNCTION ROOMFUNCTION ROOMMECHANICAL AND ELECTRCIAL KITCHEN STORAGEMENWOMENACC. T.JAN.COATSLOWER LOBBYCOLS. -SEE STRUCT'L.COLS. -SEE STRUCT'L.COLS. -SEE STRUCT'L.COLS. -SEE STRUCT'L.COLS. -SEE STRUCT'L.LOADINGSTORAGE20'-0"26'-6"6'-0"33'-6"73'-4"5'-0"13'-7 3/4"6'-5 3/4"21'-3 1/4"21'-8 1/2"5 0 '-0 3 /4 " 3 0 '-4 3 /4 "18'-11 1/4"17'-5 1/4"110'-6"28'-0"SCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:53 AM1/8" = 1'-0"Proposed Lower LevelReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1049/21/20211/8" = 1'-0"1PROPOSED LOWER LEVEL PLANRoom Finish Schedule - Lower LevelLevel Name Floor Finish Base Finish Wall FinishCeilingFinishCommentsLowerLevelClassroom VCT VINYLCOVEPAINT 2X2 ACTLowerLevelClassroom VCT VINYLCOVEPAINT 2X2 ACTLowerLevelClassroom VCT VINYLCOVEPAINT 2X2 ACTLowerLevelK3 VCT VINYLCOVEPAINT 2X2 ACTLowerLevelK2 VCT VINYLCOVEPAINT 2X2 ACTLowerLevelK1 VCT VINYLCOVEPAINT 2X2 ACTLowerLevelKid'sAssemblyCARPET VINYLCOVEPAINT 2X2 ACTLowerLevelStorage VCT VINYLCOVEPAINT 2X2 ACTLowerLevelBoys 12"X12"TILETILE COVE TILEWAINSCOTT TO 5'-0"/ PAINT TOCLG.2X2 ACTLowerLevelAdult 12"X12"TILETILE COVE TILEWAINSCOTT TO 5'-0"/ PAINT TOCLG.2X2 ACTLowerLevelK1 VCT VINYLCOVEPAINT 2X2 ACTLowerLevelStorage VCT VINYLCOVEPAINT 2X2 ACTLowerLevelNew LowerLobbyVCT VINYLCOVEPAINT 2X2 ACTLowerLevelCheck-In VCT VINYLCOVEPAINT 2X2 ACTLowerLevelFunctionRoom- - - - EXISTINGLowerLevelFunctionRoom- - - - EXISTINGLowerLevelExpandedKitchenQUARRYTILEQUARRYTILE- - EXISTINGLowerLevelKitchenStorage- - - - EXISTINGLowerLevelMechanicalAndElectrical- - - - EXISTINGLowerLevelLowerLobby- - - - EXISTINGLowerLevelMen - - - - EXISTINGLowerLevelWomen - - - - EXISTINGLowerLevelJanitor - - - - EXISTINGLowerLevelCoats VCT VINYLCOVEPAINT 2X2 ACTLowerLevelAccessibleToiletEXISTINGLowerLevelLoading VCT VINYLCOVEPAINT 2X2 ACT EXISTINGLowerLevelStorage VCT VINYLCOVEPAINT NONE EXISTINGNOT FOR CONSTRUCTION INSULATED METAL PANELNEW 60 MIL EPDM ROOFSTOREFRONTEXTERNAL INCLINED COLS.36'-4"ROOF AND STEEPLE TO BE REMOVEDNEW HEIGHT29'-6"22'-9"NEW 60 MIL EPDM ROOFINSULATED METAL PANELEXTERNAL INCLINED COLUMNSNEW 60 MIL EPDM ROOFROOF AND STEEPLE TO BE REMOVEDEXISTING STEEPLE62'-7"EXISTING HEIGHT39'-3"SCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:54 AM1/8" = 1'-0"Proposed ElevationsReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1059/21/20211/8" = 1'-0"1PROPOSED VIEW FROM MARY DUNN (WEST)1/8" = 1'-0"2PROPOSED REAR VIEW FROM PARKING (EAST)NOT FOR CONSTRUCTION NEW 60 MIL EPDM ROOFINSULATED METAL PANELROOF AND STEEPLE TO BE REMOVEDNEW 60 MIL EPDM ROOFROOF AND STEEPLE TO BE REMOVEDSCALE:DATE:584 Columbia RoadBoston, MA 02125Revisions:1/9/2023 11:33:55 AM1/8" = 1'-0"Proposed ElevationsReach Church Addition959 Mary Dunn Road, Hyannis, MA 02601A1069/21/20211/8" = 1'-0"2PROPOSED SIDE VIEW FROM NEIGHBOR (NORTH)1/8" = 1'-0"1PROPOSED SIDE VIEW FROM PARKING (SOUTH)STOREFRONTEXTERIOR INCLINED COLUMNSSTOREFRONTNOT FOR CONSTRUCTION