This letter, completed Form R, and attached supporting documentation requests Commission approval of a
minor plan revision to the above-referenced Order of Conditions to install a sculpture as shown on Figure 1.
The work includes installation of a 2’ x 24’ sculpture base that will extend 1-2 feet above grade to support a 10-
foot (+/-) tall sculpture commissioned by the owner (see attached photo of artist’s mock-up).
Work: The work includes excavating a 30’(L) x 4’(W) x 5’(D) trench for construction of a reinforced concrete
footing and wall (detail per approved plans) to support the sculpture and installation of a 15” diameter Weeping
Willow. The sculpture base will be constructed using a backhoe or small excavator and the willow will be
installed using a tree spade to limit disturbance. Backfill material will be stockpiled temporarily on the uphill
side of the trench and any excess material will be removed immediately from the site. All surfaces will be
returned to their original condition following installation of the sculpture. The sculpture will be delivered to the
site by truck and erected with a mobile crane. Both vehicles will be mobilized from the existing driveway and
any areas disturbed during erection will be repaired immediately.
Schedule: We anticipate installation of the sculpture base will take approximately 5-7 days after which all
materials and equipment will be removed and any areas disturbed during installation will be repaired
immediately by re-sodding leaving no potential for erosion. When finished, the sculpture will be delivered to the
site by truck and erected with a mobile crane. Both vehicles will be mobilized from the existing driveway and
any areas disturbed during erection will be repaired immediately.
Erosion Controls: A row of 12” compost filter tube will be installed as shown on the attached plan to ensure
protection of adjacent wetlands. Erosion controls will remain in place until sculpture is installed, and all related
repair work is complete
Mitigation: The work will result in 48 sf of new impervious surface within the 0-50’ wetland buffer requiring an
additional 192 sf (4:1 mitigation ratio). The change results in a revised total required project mitigation of 4,556
sf which is still far less than the 14,448 sf being provided. A copy of the approved and revised Mitigation
Summary is attached.
We anticipate the Project and the additional work described in this request will be complete by September
2023. An extension of the OOC was requested on March 15, 2023 and is currently pending.
Plan Revision - Sculpture
Rushy Marsh Farm Japanese Pavilion
March 23, 2023
TETRA TECH
2
Enclosed is a completed Form E, original documentation (including 2 stamped Figure 1), a check in the
amount of $50 and 8 collated copies of the request. If you have any questions or require any additional
information, please don’t hesitate to contact me directly by email at sean.reardo@tetratetch.com or by phone
at 508-786-2230.
Very truly yours,
Sean P. Reardon, P.E.
Vice President
P:\89057\143-89057-21002\DOCS\SCULPTURE MOD REQUEST.DOCX
Sculpture – Bench Scale Mock-Up
Mitigation Summary
Structure Woods
Pine Needle
Path/Stepping
Stones
Sand Bed/Stone
Mulch
Existing Conditions 53,864
0-50 FT Buffer 0 28,157 840 0 29,122
50-100 FT Buffer 0 23,955 787 0 24,742
Proposed Conditions 53,864
0-50 FT Buffer 0 28,401 406 53 29,122
50-100 FT Buffer 570 22,430 969 71 24,742
Net Alteration
0-50 FT Buffer 0 244 -434 53
50-100 FT Buffer 570 -1,525 182 71
Existing
Buffer Zone
Disturbed Area
to be
Removed
Net Area (SF)Mitigation
Requirement
Required
Mitigation (SF)
Proposed
Mitigation (SF)
(SF)
0-50 FT Buffer 0 185 4 to 1 740 7,602
50-100 FT Buffer 0 1,272 3 to 1 3,816 6,846
4,556 14,448
Note: Sculpture is outsdie original analysis area . Additional 48 sf impervious within 0-50' added to Table 2 only.
Table 1 Alteration Summary - Existing vs. Proposed
Hardscape Softscape
Total (SF)Stone Walls,
Pavers & Water
Feature
137
702
125 53,739
125
0
1,534 52,330
185
262
702
1,409 -1,409
1,272
Tetra Tech
Sculpture Mod
1541 Main Street 22-Mar-23
Cotuit, MA
Japanese Garden, Paviliion and Sound Wall
Table 2 Mitigation Summary
Proposed Impact
(SF)
Mitigation Summary
Japanese Garden, Pavilion and Sound Wall
1541 Main Street
Cotuit, MA
Tetra Tech
February 19, 2020
Rev. February 28, 2020
Rev. March 4, 2021
Structure
Stone Walls,
Pavers &
Water Feature
Woods
Pine Needle
Path/Stepping
Stones
Sand Bed
Existing Conditions 53,864
0-50 FT Buffer 0 125 28,157 840 0 29,122
50-100 FT Buffer 0 0 23,955 787 0 24,742
Proposed Conditions 53,864
0-50 FT Buffer 0 262 28,401 406 53 29,122
50-100 FT Buffer 570 702 22,430 969 71 24,742
Net Alteration
0-50 FT Buffer 0 137 244 -434 53
50-100 FT Buffer 570 702 -1,525 182 71
Buffer Zone
Existing
Disturbed
Area
to be
Removed
(SF)
Proposed
Impact
(SF)
Net Area
(SF)
Mitigation
Requirement
Required
Mitigation
(SF)
Proposed
Mitigation
(SF)
0-50 FT Buffer 0 137 137 4 to 1 548 7,602
50-100 FT Buffer 0 1,272 1,272 3 to 1 3,816 6,846
4,364 14,448
Hardscape
125
1,534
Softscape
53,739
52,330
Total (SF)
Table 1 Alteration Summary - Existing vs. Proposed
1,409
Table 2 Mitigation Summary
-1,409
C:\Users\sean.reardon\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PIQEP5TK\Alteration-Mitigation Summary (2021-03-09).xlsx