Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0626 WEST MAIN STREET - Health (2)
PLUMBING GENERAL NOTES 1. ALL PLUMBING INSTALLATION MATERIALS, TESTS, AND APPROVALS SHALL BE ABBREVIATION IN ACCORDANCE WITH THE STATE PLUMBING CODE AND LOCAL CODES AND PLUMBING FIXTURE SCHEDULE PLUMBING GENERAL LEGEND ORDINANCES. INCLUDE ALL COSTS FOR PERMITS AND TESTS AS REQUIRED BY TAG No. FIXTURE MANUFACTURER AND MODEL COLD HOT SAN VENT REMARKS AFF ABOVE FINISH FLOOR LOCAL AUTHORITIES. WATER WATER cD CONDENSATE DRAIN 2. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL TWO NEW BACKFLOW PREVENTERS PROVIDE Z-5955SS—EL SEAT, cl CAST IRON HW HOT WATER ONE FOR THE NEW FIRE PROTECTION SERVICE AND ONE FOR THE DOMESTIC WATER SERVICE. C3 P-1 ADA WATER CLOSET ZURN MODEL Z-5660 1" — 4" 2" Z-6000AV—WS1 VALVE co CLEANOUT -- -- CW COLD WATER THE OUTLET OF THE FIRE PROTECTION BFP UNIT SHALL BE CAPPED FOR CONTINUATION z O PACKAGE INCLUDES Z-5338 FIXTURE CONT CONTINUED G GAS PIPING BY THE FIRE PROTECTION CONTRACTOR. - E P-2 WALL HUNG ADA LAVATORY ZURN ONE—SYSTEM MODEL 1/2" 1/2" 1-1/2" 1-1/2" Z-831 B4 FAUCET, Z-8746 DRAIN N p Z-5338.135.3.07.49.E I P—TRAP, SUPPLIES, TRAP COVER CTE CONNECT To EXISTING U U PROVIDE ZURN Z-7300—SS—MT 3. BELOW SLAB STORM WASTE AND VENT PIPING SHALL BE STANDARD WEIGHT CAST IRON O N Lo O FLORESTONE MODEL 42-3W �� �� �� " cW COLD WATER ECO END CLEANOUT > P-3 ONE PIECE SHOWER STALL " 1/2 1/2 2 1-1/2 SHOWER VALVE, SHOWER HEAD WITH BELL AND SPIGOT FITTINGS. 42 X36 NOMINAL STALL SIZE BRASS STRAINER cWF COLD WATER FILTERED ® FD FLOOR DRAIN V 0 � FD FLOOR DRAIN ZURN MODEL Z-415 3 „ 2„ ,PROVIDE TRAP. DRAIN WITH DN DOWN �'� FCO FCO FLOOR CLEANOUT 4. ABOVESLAB SANITARY, STORM, AND VENT PIPING SHALL BE STANDARD WEIGHT CAST IRON WITH Q V) Q ^d- O— — STRAINER TRAP PRIMER FITTINGS TOILET DRAINS WITH PRIMER DWG DRAWING 0 FFD FLOOR DRAIN WITH FUNNEL 4—BAND NO—HUB CLAMP FITTINGS. (D c 00 " �, PROVIDE TRAP. DRAIN WITH ECo END CLEANOUT z O U FFD FUNNEL FLOOR DRAIN ZURN MODEL Z-400 — — 3 2 'E' STRAINER WITH INTEGRAL FUNNEL 19 FS FLOOR SINK FIN.EL. FINISH FLOOR ELEVATION 5. WATER PIPING SHALL BE TYPE L COPPER WITH LEAD FREE SWEAT FITTINGS. E �00 E W SANITARY PROVIDE VALVES AT ALL BRANCHES AND AT EACH FIXTURE. Li W O 0 REFRIGERATOR FLOOR PROVIDE TRAP. DRAIN WITH Hw HOT WATER FDR DRAIN ZURN MODEL Z-320 — — 3" 29' RECESSED HINGED GRATE W SANITARY BELOW FLOOR HOT WATER PIPING SHALL BE 1„ INSULATED. COLD WATER PIPING SHALL BE 1/2" INSULATED. W s: z , IW INDIRECT WASTE z 0 ..�, " " / FIXTURE NUMBER D IW CONDENSATE DRAIN " 0 _1 NOMINAL 12 X12 X6 WITH 1 2 6. GAS PIPING 2-1/2 SIZE AND SMALLER SHALL BE SCHEDULE 40 STEEL WITH THREADED FITTINGS. 0 N O W FS FLOOR SINK ZURN MODEL Z-1900 - — 3" 2" GRATE, DOME STRAINER RI V VENT ABOVE FLOOR GAS PIPING 3" SIZE AND LARGER SHALL BE SCHEDULE 40 STEEL WITH WELDED FITTINGS. z z z FCO FLOOR CLEANOUT MATCH V VENT BELOW FLOOR W O X I FCO FLOOR CLEANOUT ZURN MODEL Z-1400 — — PIPE — G NATURAL GAS z 7. CONTRACTOR SHALL PROVIDE TO OWNER ONE YEAR GUARANTEE ON ALL Q = Q W WATER SERVICE BALL VALVE MATERIALS AND WORKMANSHIP. LL_ GC GENERAL CONTRACTOR W IN'V INVERT BUTTERFLY VALVE W/ MEMORY STOP 8. THE PLUMBING CONTRACTOR SHALL BE HELD RESPONSIBLE TO HAVE VISITED „ 150,000 BTU HOUR INPUT, NOMINAL IWI INDIRECT WASTE CHECK VALVE THE SITE PRIOR TO SUBMITTING HIS ESTIMATE AND TO HAVE EXAMINED AND " HWH-1 WATER HEATER A.O. SMITH MODEL BTH-150 1 1 — — 100 GALLON STORAGE. 214 GAL/HR NTS NOT TO SCALE GAS SERVICE BALL VALVE FAMILIARIZED HIMSELF WITH THE SITE CONDITIONS OF THE PROJECT. HE SHALL RECOVERY AT 100'F RISE GATE VALVE COMPARE THE DRAWINGS AND SPECIFICATIONS WITH THE RESULTS OF HIS NIC SAN SA SANITARY NOT IN CONTRACT CAPPED PIPE EXAMINATION OF THE SITE AND ASSURE HIMSELF THAT ALL REQUIREMENTS FOR NOTE A COMPLETE PLUMBING SYSTEM MAY BE FULFILLED. NO EXTRA PAYMENT WILL 1. ALL A.D.A. PLUMBING FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE SID STORM DRAIN ELBOW UP OR RISE BE ALLOWED TO THE PLUMBING CONTRACTOR BECAUSE OF UNFAMILIARITY HANDICAP ACCESS CODE AS APPLICABLE. TYrP TYPICAL ELBOW bowN OR DROP WITH THE SITE CONDITIONS. 2. PROVIDE ALL CARRIERS AND SUPPORTS (REQUIRED FOR THE INSTALLATION OF ALL PLUMBING FIXTURES. FIXTURE VTR VENT THRU ROOF HB HOSE BIBB 9. IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW ALL DETAILS OF CON- CARRIERS AND SUPPORTS SHALL BE AS RECOMMENDED BY THE FIXTURE MANUFACTURERS V `ENTk'yi STRAINER STRUCTION, HOWEVER, THE PLUMBING SUBCONTRACTOR SHALL BE REQUIRED TO 3. SUBSTITUTIONS WILL BE CONSIDERED AFTER OBTAINING WRITTEN APPROVAL FROM ARCHITECT FOR PROPOSED FIXTURES. W/ NTH FURNISH AND INSTALL ALL MATERIALS NECESSARY TO COMPLETE THE PLUMB- 4. ALL WATER, WASTE PIPING AND VALVES UNDER ADA USE SINKS SHALL BE COVERED WITH 'TRUEBRO' PRE-MOLDED wH NON-FREEZE WALL HYDRANT UNION SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE AND TO THE FULL EXTENT INSULATION WITH PVC JACKET OF THE DRAWINGS AND SPECIFICATIONS. THE PLUMBING SUBCONTRACTOR 5. CONTRACTOR SHALL BE RESPONSIBLE TO CONFIRM LEFT/RIGHT HAND CONFIGURATIONS FOR WATER CLOSETS, TUBS, ETC. SHALL FURNISH AND INSTALL ALL PARTS WHICH MAY BE REQUIRED BY THE 6. WATER HEATER SHALL BE PROVIDED WITH SAFETY PAN, VACUUM BREAKER, RELIEF VALVE, AND DRAIN VALVE. DRAWINGS AND OMITTED BY THE SPECIFICATIONS, OR VICE VERSA, JUST AS THOSE REQUIRED BY BOTH. SHOULD THERE APPEAR TO BE DISCREPANCIES OR A QUESTION OF INTENT, THE PLUMBING CONTRACTOR SHALL REFER TO THE ARCHITECT/ENGINEER FOR DECISIONS, FURTHERMORE, HIS INTERPRETATION SHALL BE FINAL, CONCLUSIVE, AND BINDING. W 10. WITH THE SUBMISSION OF BID, THE PLUMBING CONTRACTOR SHALL HAVE W W AGREED TO HAVE INCLUDED THE COST OF ALL REQUIRED ITEMS IN HIS PROPOSAL AND THAT HE WILL BE HELD RESPONSIBLE FOR THE APPROVED SATISFACTORY FUNCTIONING OF THE ENTIRE SYSTEM WITHOUT EXTRA O COMPENSATION. LL m 11. CONTRACTOR SHALL FURNISH AND INSTALL MANUAL AIR VENTS AT SYSTEM HIGH O Z POINTS AND HOSE BIB DRAINS AT LOW POINTS. (D - 12. ALL PIPING PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE FIRE CAULKED. Z 06 cca Q USE U.L. LISTED ASSEMBLIES AT PVC PIPE PENETRATIONS (3M OR EQUAL). 0 _ G 13. ALL SANITARY LINES 3" AND SMALLER IN SIZE SHALL PITCH AT 1/4" PER FOOT. -_� U)ALL SANITARY LINES 4" AND LARGER IN SIZE SHALL PITCH AT 1/8" PER FOOT. D - U) 14. ALL PORTIONS OF THE WATER AND GAS .PIPING SYSTEMS SHALL BE PRESSURE TESTED WITH co u- W Z COMPRESSED AIR FOR 2 HOURS AT 150 PSI. NO LOSS OF PRESSURE SHALL OCCUR. W Z ALL DEFECTIVE FITTINGS AND PIPING SECTIONS SHALL BE REPLACED UNTIL PRESSURE TEST (o Q PASSES. I; W Q N 15. CONTRACTOR SHALL CONFIRM ALL PLUMBING CONNECTIONS AT FIXTURES BEFORE INSTALLING ROUGH IN PIPING. 16. PRESSURE TESTING SHALL BE CONDUCTED BEFORE CEILING AND WALL FINISH LAYERS ARE N STALLED. 17. CONTRACTOR SHALL FURNISH AND INSTALL A SAFETY PAN WITH SIDE OUTLET UNDER EACH HOT WATER HEATER. PIPE THE SIDE OUTLET TO JANITOR ROOM SERVICE SINK. TYPE VCOPPER FOR INDIRECT WASTE PIPING. -r REVISIONS 18. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL TYPE 'M' COPPER DRAIN LINES FROM HVAC FAN COIL UNITS TO NEW°SANITARY RECPTORS VIA AIR GAP FITTINGS. 19. PLUMBING CONNECTIONS TO FOOD SERVICE EQUIPMENT SHALL BE PER FOOD SERVICE CONSULTANTS PLUMBING ROUGHIN PLANS. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN THESE DRAWINGS PRIOR TO ROUGHING IN ANY PIPING. THE INFORMATION ON THESE DRAWINGS IS BASED ON THE LATEST AVAILABLE INFORMATION AT THE TIME OF DRAWING ISSUE. 20. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A TRAP PRIMING SYSTEM FOR THE TOILET FLOOR DRAINS. 21. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL SCH 40 CPVC VENT AND COMBUSTION AIR INTAKE PIPING FOR ALL HVAC UNiTS AND THE DOMESTIC HOT WATER HEATER. 22. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL TYPE 'M' COPPER DRAIN LINES FROM FOOD SERVICE EQUIPMENT INDIRECT WASTE CONNECTIONS TO FLOOR RECEPTORS VIA AIR GAPS. 23. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL TYPE 'M' COPPER DRAIN LINES FROM WALKIN COOLER AND FREEZER EVAPORATOR UNITS TO FLOOR RECEPTORS VIA AIR GAPS. INSULATE DRAIN LINES WITH 1" PIPE INSULATION WITH PVC JACKET. HEAT TRACE FREEZER EVAPORATOR DRAIN LINES. 24. THE PLUMBING CONTRACTOR SHALL PROVIDE A DRAIN PAN, VACUUM BREAKER, RELIEF VALVE DRAWN DRAIN VALVE, AND VENT TERMINAL KIT AT THE DOMESTIC WATER HEATER. CHECKED SCALE AS NOTED DATE 1/28/2011 TITLE PLUMBING GENERAL NOTES, LEGEND, AND FIXTURE SCHEDULE W SHEET V) s o P - 1 — SHEET 1 OF 8 m a U 0 Z � N co O CU +, L Ln U _ O O � @ Q V) Q CD 00 �° 0 STAIR 2 ELECTRIC ROOM z O U W L'- OOrE LOCSTER V'VAT , TA�NI� ROOM UP z 0 z . 3„ O N O Lv z0 Q _. � z w � O 2 30 = Q 2" " O 3 3„ O 3" Q W W UNEXCAVATED 5 ® 10 8 4" SANITARY 3" 4„ INTO BUILDING ar-3 2 3 FD 1 CO BY SITE © I 3" CO - CONTRACTOR. 4" 4" 4" INV 52.02' AT I'I 0 ® 10 9 FOUNDATION 3 2" 30 4» 2» 4„ O — 2" 3 CO O 2" VENT DOWN AND 30 3" CO I - 2" PUMPED RISE TO BASEMENT 4 I 3 „ CO CEILING. OFFSET AT „ AND CONNECT 2 SANITARY DROP CEILING AS SHOWN 2" » 3 INTO VERTICAL 11 2" GRAVITY DROP. 4 O O 4» �/ w �- - - - » O w w �2" 2" '1-1�2" VENT OFFSET AT STAIR 1 I 2„ 2„ BASEMENT CEILING d�— O STORAGE 3» LL m 3" 0 Z II 30 O CO ( J - - , --� s -- Z co Q Q FCO STORAGE 3„FD 3„FD 3„ 3"FD 4" 4" » 3» 3" co (n 3" co �..�.� Z � 3 w � z O � S � Q - 9 w Q N 1Q 4" Z U O O 3„ 309 4" GREASE SANITARY REVISIONS 3" INTO BUILDING BY SITE KEYED NOTES THIS SHEET CONTRACTOR. INV 51.93' O 2» 30= I F- 409 AT FOUNDATION 1O 2"' VENT UP 2 � 3" � — „ O2 2"' GREASE SANITARY UP I O CO1 4 O3 3" GREASE SANITARY WITH TRAP UP TO FLOOR DRAIN — , 1 L 2» 5O ® 3" GREASE SANITARY WITH TRAP UP TO FLOOR SINK I 4» DUPLEX SEWAGE EJECTOR FOR O BASEMENT FLOOR DRAINS.5 3"' GREASE SANITARY UP 30"DIA X 36" DEEP BASIN WITH © 3"' GREASE SANITARY WITH TRAP UP TO SPRINKLER ROOM COVER (GRAINGER STOCK #4RK42) TRENCH DRAINA SUMP 1 DUPLEX ALTERNATING CONTROL FCO „ VENT PANEL 12%08 VOLT - 10 - BHP O7 2"' VENT RISE AND OFFSET AT 4 DUAL TEEL )2HP SUBMERSIBLE BASEMENT CEILING © 3» 30 O I SEWAGE PUMPS, 50 GPM AT 20 ® 4"' SANITARY UP GR FEET HEAD EACH (GRAINGER STOCK I 4 4» COI NUMBER #4NX05) O9 2" SANITARY UP 7 4„ 4"Fp EACHKPUMP DISCHA GE.VALVE WITHTO ON 7 FF PROVIDE 10 3" SANITARY WITH TRAP UP TO FLOOR DRAIN I �- FLOAT SWITCHES. 11 2" SANITARY WITH TRAP UP TO MOP BASIN 2" 2" DRAWN: WK 1© 2" BATTERY VENT UP CHECKED: AEM SCALE 1/4"=1'-O" DATE 1/28/2011 ALL SLAB PENETRATIONS SHALL BE COORDINATED WITH TITLE THE STRUCTURAL ENGINEER AND THE GENERAL BASEMENT WASTE CONTRACTOR. LOCATIONS ON PLAN BASED ON DESIGN AND VENT PIPING PHASE COORDINATION ONLY. LAYOUT W SHEET o P - 2 SHEET 2 OF 8 _ m I� A I ® E OF OG H 1" I.W. DROP FROM ICE U O FLAKER & 1-1/4" WALKIN z DRAIN DROP AND OFFSET N INTO FFD " r1r) CO d CHASE AREA FOR U +' Liz I Lc) ELEC. CONDUITS 0 � N ",I- � O CQ -- 00 rl, co ... .._�._.�_.�_..�..__._,�. I INF IN ...FBEEZEB. � --- � � � � � OU Cp . 3»FFD CO IW 1-1/4"IW CO D€ o " 1"I W 3/4»I W �. ..�.. _. W � � O � I W CID CO CO CO 3 »IW /a CD NOWOQ UP z z q�-q W � 1 1— Q IZ W WI » x 6-6" 3"FD 3"FD "F W 114 3 FD ® ® FFD 1 �" " H O� OFFSET DRAIN FROM 12 x 84 ' ell? SECOND FLOOR ICE FLAKER , P-1 4" ABOVE COOLER BOX 14 �y 1 18 P-2 g 3 3"FD 0 2» 2 1"I W 3"FD " ED OFFSET AND DROP 1" — -7 DISPLAY TABLE DRAINS 3"FD C 9 g INTO FUNNEL FLOOR DRAINS 14 i o'-5°,x ,- " P-2 [9 1 P-1 3» ICE FLAKER ABOVE �2" 1-1 2" - FFD _ � . ?� VENT DOWN 3 _ 1 0 © 3 FD IN CHASE O " (Di r 2' 2» 2„ 2 2„ 291 �._. - �-ff / W 2„ �-u W 2" VENT DOWN !?Lt I of a _HOSEIt, rn 61£E3M p' ! � W POSELOBSTER TANKIBB d DRAINAGE BY OWNER O z �. rr nn ozs 3"FD 3"FD FD® 4 3"FD "FD 3"FD 3"FD® O 14 14 ®14 ® D 14 LL W Z OFFSET AND DROP 1" I W Z STEAMER TANK DRAIco S INTO FFD „ a- Q OCR FFD LOBSTER TANK W � � FFp 14 DRAINAGE BY OWNER (V 7- 2BIBS BIBB HOSE HOSE � C) LOADING PLATFORM +-209 d 3"FD I 3"FDR REVISIONS 14 I 14 KEYED NOTES THIS SHEET 3 VENT UP 6�I 15 4" GREASE SANITARY DOWN FROM FLOOR SINK 1� � O 2» VENT DOWN & RISE - COORD WITH CONICSLAB 16 2„ GREASE SANITARY DROP WITH TRAP AND C.O., 1-1/2» EE3O 2" VENT UP V. RISE, 2 GREASE SANITARY DOWN ® 1-1/2" GREASE SANITARY DROP WITH TRAP AND C.O., Q 3" SANITARY DOWN FROM FLIOOR DRAIN 1 3"FS � 1-1/2" V. RISE, 2» 2 SAN DOWN 1 g 2" SANITARY WITH TRAP UP I » —� t » 2 O5 1-1/2" SANITARY DROP WITH TRAP AND C.O., 1-1/2" V. 19 CONNECT 1-1/2" I.W. FROM STEAMER INTO TRENCH DRAIN RISE, 2" SAN DOWN ;n 1 © 2" SANITARY UP _..."..._.� � , € I i u 3„Fp 1 2, O7 2" SANITARY DOWN - COORD WITH CONCRETE SLAB DESK Lu 19 ® (2)1-1/2" SANITARY DROP WITH TRAP AND C.O., 1-1/2" 3"FD 14 V. RISE, 2" SAN DOWN - COORDINATE WITH SHAFT �9 4" SANITARY DOWN Lu m 19 14 10 4" SANITARY UP DRAWN: WK 11 CHECKED: AEM 3" SANITARY WITH TRAP UP FILE Frl C DI: ZA BIBB 1© 3" SANITARY DOWN .- _ ��_ _� SCALE 1/4"=1'-0" 1�3 (3)2" GREASE SANITARY DROPS WITH TRAP, FLOW DATE 1/28/2011 REGULATOR AND C.O., 2" V. OFFSET AND RISE, 3" GREASE TITLE SANITARY DOWN GROUND LEVEL 14 3" GREASE SANITARY DOWN FROM FLOOR DRAIN (OR ALL SLAB PENETRATIONS SHALL BE COORDINATED WITH WASTE AND VENT FUNNEL FLOOR DRAIN) THE STRUCTURAL ENGINEER AND THE GENERAL PIPING LAYOUT CONTRACTOR. LOCATIONS ON PLAN BASED ON DESIGN W SHEET PHASE COORDINATION ONLY. (f� 0 P - 3 — SHEET 3 OF 8 m U 0 Z � E . � O Lo In (/) N N I p C/) +, O 00 , Q (n Q ^d- (_O (_0 0 L}N � D0 w z o _,_, -; U NOW Q Z Z _ w 0 X - I Q Z Q w LL- LLJ 42"DIA. TABLE CLOSET LLJ W DESK DESK Stu" � SHOWER - STORAGE O o BENCH u OPERATION ° ACCOUNTING P-3 oo c I HVAC _� FD TOIL T" FILE ® UNIT `'J P-1 I O ROO FILE 4 I P-2 1 .F - ,�� -E SHELF SHELF SHELF SHELF STAIR 1 W c STORAGE STORAGE 1" I.W. DOWN 0 co U O � HVAC O Z UNIT V �I 3" SCH 40 'PVC VENT AND COMBUSTION AIR Z Q Q INTAKE PIPING TO WXTER HEATER. PIPING ® — `�UNIT SITTING G ON 2NDSHALL TERMINATE THROUGH ROOF VIA F Q .0 J VENT/INTAKE TERMINALS. TYPICAL FLOOR, U) .. W U) V- W Z o HRH OO W � Z � Q WQN >- -_ zUcoz HEIGHT ALO7,,IG THIS WALL 3'-3" �t- 7 REVISIONS HVAC UNIT KEYED NOTES THIS SHEET 1 3" VENT DOWN AND UP THROUGH ROOF CT O NEAR FL DUCT FLOOR �2 2" VENT DOWN & RISE O 1-1/2" SANITARY DROP WITH TRAP AND C.O. 1-1/2" V. RISE, 2" SAN DOWN ® 4" SANITARY DOWN O 2" SANITARY DOWN 1 © 1" I.W. DOWN FROM ICE MAKER PAN THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL SCH 40 CPVC VENT PIPING MAKEUP� AND COMBUSTION AIR PIPING FROM AIR FURNACE TO ROOF. TERMINATE IN WITH UNIT CONCENTRIC VENT TERMINAL. COORDINATE 500 LB. REQUIREMENTS WITH THE HVAC CONTRACTOR DRAWN: WK THE PLUMBING CONTRACTOR SHALL FURNISH CHECKED: AEM AND INSTALL TYPE M COPPER DRAIN LINES FROM FURNACE DRIP CONNECTIONS AND SCALE 1/4"=T-0" EVAPORATOR COIL DRAIN CONNECTIONS. PIPING SHALL DROP AND TERMINATE AT A DATE 1/28/2011 FLOOR RECEPTOR AT THE FIRST FLOOR. TITLE SECOND LEVEL WASTE AND VENT PIPING LAYOUT W SHEET c 0 P - 4 SHEET 4 OF 8 m C3 O Z � E ro (_ In In O O Q) -4- tcn N o o) I p -i-- Q (n 00 ^dam- STAIR 2 ELECTRIC ROOK1 Z 0 U W1- C) 0 � � up z O + Z J 0 CN yz W - __T __�- - - _�®_. 2�y�_ - Li O X w 0- �- W U N EXCAVATED � 2" cwuP IC 2"cw rL ' LOBSTER LATER TANK ROOM FSIB-M-nm M-s" O - � HVAC AN UNIT 2"CW 1 ( 50 CF/HR 1 � I I I 1"G � I I 1 Li O I W WLW/ STAIR '1 , Lm O 1»G z (D i STORAGE STORAGE Z 0,5 Q Q HVAC I ` UNIT 50 CF/HR J �^ �^ VJ VJ —�"cw Y2 — — — — — — — 'cw — — — — I m LL W z W Z co Q W Q N >- _ Z CU c0 _ /4,CW 2„ W REVISIONS KEYED NOTES THIS SHEET SPRINKLER R DOM 1 CAPPED 1" WITH BALL VALVE O Y2"CW UP TO FROST PROOF SILL COCK I /- FOR COONESYSON O OWNERS O GAS LINE UP. SIZE AS NOTED 1" REDU PRESSURE ZONE 3 „ O3 CONNECT GAS TO HVAC UNIT. PROVIDE UNION, REDUCING PRINCIPLE B CKFL W PREVENTER �491CW � NEW 2 REDUCED BUSHING, SHUTOFF VALVE, AND 6" THREADED DRIP LEG. 1" METER FO i IRRIGA ON SYSTEM PRESSURE ZONE TYPE AND E ' ERIOR H SE COCKS BACKFLOW PREVENTER NEW 4' OUBLE CHECK VALVE NEW 1-1/2" WATER METER. PROVIDE BA I, FLOW PREVENTER BY REDUCERS AND UNIONS. PLUMBI CONTRACTOR. CAP OUTLE . CONTINUATION FROM NEW 2" DOMESTIC WATER OUTL' BY FIRE PROTECTION SERVICE INTO BUILDING BY CONTRACTOR. SITE CONTRACTOR. SPACE FOR FIRE PROTECTION PLUMBING CONTRACTOR EQUIPMENT (BY F.P. CONT'R) SHALL CONNECT NEW 2"CW — — n DRAWN: WK f CHECKED: AEM SCALE 1/4"=V-0° DATE 1/28/2011 NEW 6 FIRE PROTECTION SERVICE " INTO BUILDING BY SITE TITLE CONTRACTOR. PLUMBING BASEMENT WATER ALL SLAB PENETRATIONS SHALL BE COORDINATED WITH CONTRACTOR SHALL CONNECT NEW6" WITH 6"X4" REDUCER. AND GAS PIPING THE STRUCTURAL ENGINEER AND THE GENERAL LAYOUT CONTRACTOR. LOCATIONS ON PLAN BASED ON DESIGN W PHASE COORDINATION ONLY. UNLESS SPECIFIED OTHERWISE ALL BRANCH (� SHEET WATER LINES SERVING INDIVIDUAL FIXTURES SHALL BE NOMINAL Y2" SIZE. P - 5 SHEET 5 OF 8 m A D E H U CD O (_0 't v CHASE AREA FOR U 4-1 L I In 2 ELl�c, CONDUITS O � N � � O Q (n Q ^ � CD 0Lli U _._ w O � I 0 zN � z UP ZQ LLB O 10'-- " x 6'- Y2» 1 0' Q =1 < L�J LS"" `4t W Y i — ��y� ' — — — 1 " X 84" H C AH H; AH AH AH AH AH AH AH Y21 W DROP TO PRECISI PLUMBING UCTS TRAP �' 1 P-2 CONNECT ( I I 1- /4"CW, Y2" 140'F H'c t —M+ PRIMER OUTLET TO � I�I I � 3/4 11 'F HW, Y2"CW UP TO ICE CUBER TOILET OOR DRAIN (2) Yr H R - 1 „ 1j IN SECOND FLOOR ;, � 6 TRAPS. I� 2"CW DOWN 2 I LEFT TO RIGHT: 1 1 " U 2"CW 1" 14-��'FCW HWP UP Hv Hv Hv Hv I I I 'F HW UP 109_5" n 6'-5" 34" 11 'F HW, IIII X2„ H R UJ W 1-1/4"G 1„G H H C O3 ..__.. I O ._ � O Cn 14� 1 'G III m U) CL IIII Z I GAS GAs eAs-GAs GAS GAS GAS GAS H C O HVAC — — — — — — — — — — � El 1 V 1-1 4 1 UNIT / GAS GAS—eAs' GAS--GAS GAS—GAS GAS—ens—GAS W ms eas GAs GAS—GAS—GAS GAS—GAS—GAS Gas—GAS---GAs eAs GAs GAS GAS— —�—w--�-GAS AH— AH AH AH •_ ... ___. © Z 75 CF/HR � _ _ _ _ � W CC 1-1/4"G - - 1-1/4"G 1-1 "G Q G UP Q r>As GAS GAS GAs— —GAS W1s -1 2"G r n „ © v♦ 1/2 G I —GAs —w GAs GAS ,- El III ( m � W Z — _ w z I S � � Q c I W Q co 7711 I HC HC I - 2-1 G LOADING PLATFORM ;-F 0 01 4'C , Y2" 40' HW, Y2" 10' H W, �> Y2' H WR REVISIONS 1„G o 7 KEYED NOTES THIS SHEET ' a— eA R FFAQ 1 . F 1 GAS LINE UP. SIZE AS NOTED 10 V'CW & Y2" 110-F HW DROP TO LAVATORY a 13 GAS LINE DOWN. SIZE AS NOTED O Y2 CW TO FREEZEPROOF SILL COCK, Y2 CW DOWN 8 1 O3 V'CW DROP TO SILL COCK I . 14 CONNECT GAS TO HVAC UNIT. PROVIDE UNION, REDUCING 1�1LI- �!. -INc LL A 3 G 3 G TM- C ,R BUSHING, SHUTOFF VALVE, AND 6" THREADED DRIP LEG. 4 Y2"CW DROP AND SPLIT TO TWO SILL COCKS I NEW GAS SERVICE AND O THREADED DRIP LEG A THE f GAS—GAs GAS—GAS— s e BASE OF THE GAS DROP �° METER BY UTILITY O5 1"CW DROP TO WATER CLOSET. FURNISH AND INSTALL O7 I I COMPANY. CONNECTED MECHANICAL WATER HAMMER SHOCK ABSORBER 1/2"GAS MANIFOLD AT 8" 1 a` AH AH AH AH AH DEMAND 1,473 CF/HOUR © Y2"CW & Y2" 140-F HW DROP TO FAUCET AT COMMERCIAL SINK ABOVE FLOOR - - _ © STD R 1-1/2", 3"G DROP IN CHASE WALL t�7 CONNECT Y2"HWR TO HOT WATER (110'F OR 140'F) AT THIS POINT. q 11 AND CONNECT TO METER FURNISH AND INSTALL A NEW BALL VALVE IN THE HWR PIPE. �F. LOW ® ;Y4 CW TO STEAMERS. FURNISH AND INSTALL A NEW NOMINAL ;Y4 I I ST R. REDUCED PRESSURE ZONE BACKFLOW PREVENTER IN THE MAIN all SUPPLY TO THE THREE UNITS. CF O9 Y2"CW TO STEAMER CONNECTION. FURNISH AND INSTALL A 9 R DRAWN: WK MECHANICAL WATER HAMMER ARRESTOR IN THE SUPPLY FILF FILF CREDENZA11 1 HC � CHECKED: AEM CONNECTION TO EACH STEAMER. I CF 3 SCALE 1/4"=1'-0" 10 2" MECHANICAL GAS SHUTOFF VALVE. FURNISH AND INSTALL IN - �- DATE 1/28/2011 DROP TO COOKING LINE WITH 2.5"X2" TRANSITIONS. SHOWN IN HORIZONTAL FOR CLARITY. FURNISH AND INSTALL A MANUAL STEAMERS SHALL BE FITTED TITLE SHUTOFF VALVE UPSTREAM. CONNECT CONTROL CABLE TO FIRE WITH FACTORY MOUNTED GROUND LEVEL SUPRESSION CABINET. 11 CONNECT COOKING APPLIANCE TO GAS MANIFOLD BEHIND FOOD WATER FILTERS WATER AND GAS SERVICE EQUIPMENT. FURNISH AND INSTALL A REDUCING BUSHING, PIPING LAYOUT ,SHUTOFF VALVE, AND U.L. LISTED QUICK CONNECT HOSE AT EACH ALL SLAB PENETRATIONS SHALL BE COORDINATED WITH W APPLIANCE. UNLESS SPECIFIED OTHERWISE ALL BRANCH SHEET m THE STRUCTURAL ENGINEER AND THE GENERAL WATER LINES SERVING INDIVIDUAL CONTRACTOR. LOCATIONS ON PLAN BASED ON DESIGN FIXTURES SHALL BE NOMINAL Y2" SIZE. P — 6 PHASE COORDINATION ONLY. SHEET 6 OF 8 m U 0 Z � E I� O Qo I In r0 0 C/) (D N O� c ) -1-j0 00 � (aj Q m Q ^ c0 CD CDM 00 _ Z O .� U D HVAC O LLLJ L� O UNIT � z 0 CF/HR Q +' C� NC) LW � Q w O X — W l� Li E 42"DIX a TABLE CLOSET DESK DESK SAFE 3,50�LBS. O — STORAGE ems, SH0 =ER EEFCH � OPERATION ACCOUNTING P-3 � HVAC UNIT FILE 40 CF/HR TOILET 1 G FILE .........—.. P-1 ROOM 2- P-21 Fl SHELF SHELF' SHELF— SHELF 1„G LEFT TO RIGHT: I STAIR 1 c�►s c�►s cis c�►s �s—ins �s c�►s—� I 1-1/2"CW DOWN W 1"G 1 CW 1 1" 140'F HW D N III 1 1107 HW ° OWN I W W Ila INLINE WATER FILTER STORAGE I4" HWR D° WN �... Y2 BACKFLOW PREVENTER. ST RAGE SUPPLIED BY OWNER REDUCED PRESSURE ZONE LEFT TO RIGHT: I O INSTALLED BY PLUMBING TYPE. PIPE RELIEF DOWN 1"G, 1-1/4„CW 1' ^„� �.L m Cn CONTRACTOR. TO FFD WITH ICE FLAKER 140'F HW 1 110'� HW HVAC( 1 G DRAINS— -r�►s. 3�4» HWR I, 1-1 4"G UNIT O L �HV—X / 100 1 CF/HR _� 5—GALLON POTABLE WATER 2 UNIT SITTING Q EXPANSION TANK I T 2NDPICAL�LC CI , J _ c�►s �s—runs O U—ws c,�►s 1 _ co 1" SYMMONS TEMPERING I 2 1-1/2"G 1-1/2'G Q � U VALVE. PROVIDE ISOLATIO H L MM W z BALL VALVES ON E F � �►s c,�s cis—ws ws W W z P' RT. Y2"CW 0— � W Q N >- 1-1/4"G z U HOT WATER R CIRC PUMP. 5 GPM ® 1 FEET HEAT. AP N AQUASTAT CONTROL. ICE MAKER INLINE WATER FILTER SUPPLIED BY OWNER T=== STA LED BY PLUMBING CO ACTOR. REVISIONS KEYED NOTES THIS SHEET HVAC 0 GAS LINE DOWN. SIZE AS NOTED UNIT 40 CF/HR 0 CONNECT GAS TO APPLIANCE. PROVIDE UNION, REDUCING OO 18„X 18" „ BUSHING, SHUTOFF VALVE, AND 6 THREADED DRIP LEG. DUCT NEAR FLOOR IC Y2 B(�CKFL W PREVENTER. C REDUCED P ESSURE ZONE O3 1 CW DROP TO WATER CLOSET. FURNISH AND INSTALL TYPE PIP RELIEF DOWN MECHANICAL WATER HAMMER SHOCK ABSORBER TO F D WIT- ICE FLAKER ® X"CW & Y2" 110-F HW DROP TO LAVATORY DRAI O5 Y2" CON ECT V' FILTERED COLDCW & Y2" 110'F HW DROP TO SHOWER VALVE WATER TO ICE MAKER (2) PROVIDE ISOLATION VALVE AND UNION MAKEUP 10O-C AIR OUNIT 200 CF/HR DRAWN: WK CHECKED: AEM SCALE 1/4"=1'-0" DATE 1/28/2011 TITLE SECOND LEVEL WATER AND GAS PIPING LAYOUT UNLESS SPECIFIED OTHERWISE ALL BRANCH LLJ SHEET WATER LINES SERVING INDIVIDUAL (� FIXTURES SHALL BE NOMINAL Y2" SIZE. r P - 7 0 SHEET 7 OF 8 m -------------------------------------------------- z O N p Q00 In U Lo 3/4" CONDENSATE O WASTE TO FFD c -� ON 00 Q U) Q CD M Z O 00 .�..� ^ r" � U + DN — N E, W L O - _ z i = STAIR 2 --- - F D E-13 IND W TO FFD i ON W O zQ CUTTING ROOM i UP i W 0 x 10'-5" x 6'-6" = Q a 14 Q n LL W LLJ E-13 ; FD FD FD 0 TD 1/2" CW +24 2 ' HOSE BIB „ 12 x 84 ( ) 1/2 CW +16" WOMEN (HOSE BIB) , 1/2" HW (140 ) +16" 1 OFDCFREEZER COOLER E-5 (3)1-1/2 IND W. FS LOBSTERSO RETAIL AREA 1/2" HW (140 ) +16„ - , E-5 FD® FS 10'-5" x 6'-5„ FD® PACKING ROOM E-3 MEN - - - - - - - - -— - - - - - - - - - - - - - - - - - - - - - - - - - -------------- FD E-1 FFD -13 IND W TO FFD STAIR 1 ICE FLAKER (SECOND FLOOR) "" 1 E-1 VERIFY 1/2" FCW SUPPLY AND 1/2" HW (140 ) +33" IND W TO FFD ON FIRST FLOOR 1 3 WASTE E-13 n/ W L.Lr----------i i 1/2" CW +33" to 1 JANITOR ; 4----------J W L1J ; FFD ; N � n/ ------- i 1/2" CW+16" / " M -- ------ 1/2" HW(110 )+16" ; L �_____ 1/2" CW +24" � 1-1 2 W. W W (HOSE BIB) rr nn LT 1 V 0 z OZx5 Q G c ' 0 G Z FD® FD® FD® FD0 FD® FD� FD0 J v, (n LOADING DOCK WORKING AREA m LL W z W 'ztZ Q FFD O LT 2 W Q N >- Z CU c0 _ E-12 3/8" IND W TO FS ON FIRST FLOOR `--li O O 1/2" FCW SUPPLY (SECOND FU'OOR) LOADING PLATFORM N CV lit + + i m m E-12 3m 3m OFFICE 1 COOLER E-11 ® 9 ---------------------------------------- REVISIONS �o o FD O FD 3/4" CONDENSATE WASTE TO FS 1/2" CW+16" Z8 2 1/2" HW(110 )+16" O E- 2 E-12 1/2" FCW SUPPLY (SECOND FLOOR) 3/8" IND W TO FS ON FIRST FLOOR EQUIPMENT PLUMBING LEGEND FS o— COLD WATER (C.W.) �— N/A - 10 0— B N A 1 2" HW 140 +16" FILTERED COLD WATER F.C.W. / 3 4" GAS-236 KBTU I E-s (3)1-1/2" IND W. -� HOT WATER H.W. 1 N/A / E-s 10 ( ) / MANIFOLD TO FS TO GREASE INTER O (+30" EQUIP CONN) 1 4" W (MANIFOLD)) INTERCEPTOR FCW GENERATOR 1 2 HW 140 +1/ 6 DIRECT WASTE INDIRECT WASTE (INDIR.W.) � ) 1 4" FCW CONDENSER FLOOR DRAIN FD. ■ GAS 11 I1-1/2" IND W TO FT ) ® ( ) 11 3/4" GAS-144 KBTU KITCHEN ® FLOOR DRAIN W/ FUNNEL (FFD) 8 N/A OFFICE 2 (VERIFY EQUIP CONN ® FLOOR SINK (FS.) +12 ABOVE FINISHED FLOOR TRENCH DRAIN 12" x 84" C)FD o FLOOR TROUGH FT P.C. PLUMBING CONTRACTOR ,1 3/4" GAS-144 KBTU 1/4" FCW (GENERATOR) PROGRESS 0 ( ) 11 1 4 FCW CONDENSER O VERIFY EQUIP CONN S 1-1/2" / IND W TO FT 11 5 09 DRAWN: WK 1/4" FCW (GENERATOR) CHECKED: AEM O11 3/4" GAS-144 KBTU 11 1/4" FCW (CONDENSER) (VERIFY EQUIP CONN 1-1/2" IND W TO FT SCALE 1/4"=1'-O" GENERAL NOTES ,> DATE1/28/2011 b/2" CW +24 1. REFER TO ARCHITECTURAL DOCUMENTS FOR FLOOR DRAIN LOCATIONS. (HOSE BIB) 2. HEIGHTS SHOWN (+24 ) REFER TO HEIGHT OF STUB OUTS FROM WALLS. TITLE 3. PLUMBING CONTRACTOR RESPONSIBLE FOR ALL VALVES, TRAPS, TAILPIECES, FOOD SERVICE FITTINGS, ETC NOT PROVIDED WITH EQUIPMENT. 4. PROVIDE SEPARATE SHUT-OFF VALVES AT EACH CONNECTION EVEN WHEN PLUM BING M Y N ALL HAVE A COMMON SUPPLY LINE. � ROUGH-IN LAYOUT 5. IF A CONFLICT OCCURS BETWEEN A FLOOR DRAIN AND ANOTHER OBJECT, CONTACT THE KITCHEN DESIGN CONSULTANT TO ALTER FLOOR DRAIN LOCATION WITH RESPECT TO EQUIPMENT LOCATIONS. L1J SHEET 6. ALL WORK AND MATERIALS TO CONFORM TO LOCAL & STATE BUILDING CODES. 7. CONSULT WITH OWNERS CHEMICAL VENDOR/REPRESENTATIVE TO VERIFY & P — 8 COORDINATE REQUIREMENTS OF CLEANING CHEMICAL HOOKUPS & CONNECTION Q INSTALLATION. SHEET 8 OF H m 8. PLUMBING CONTRACTOR TO VERIFY ALL NEW AND EXISTING EQUIPMENT PLUMBING REQUIRMENTS.