Loading...
HomeMy WebLinkAbout0000 FALMOUTH ROAD/RTE 28 - Health �7�� ___ ___ _ .- Z-9-i��y OF'THE T� TOWN OF BARNSTABLE � wy OFFICE OF = 96Hd9TAn BOARD OF HEALTH 7 MAS& °ems 1639' 367 MAIN STREET 'F0 MA( HYANNIS, MASS.02601 February 23, 1999 A. Roy Fogelgren RE: Definitive .open space plan of land in Centerville Chairman, Planning Board Petitioner: Cliff Hagberg Barnstable Town Hall Assessors Map 149, Parcels 27 & 29 Hyannis, Ma 02601 Engineer: Cown Cape Engineering. Inc. Date: February 9, 1999 Dear Mr. Fogelgren: The Board of Health has reviewed this Preliminary Open Space Subdivision plan in Centerville makes the following recommendations: The developer must provide public water to each and every lot in this subdivision identified on the submitted plan dated February 9, 1999 identified as PL. BD. #766, plan of Land in Centerville, Massachusetts as prepared for Cliff Hagberg. Public water lines and all connections must meet specifications and/or rules and regulations of the local water department. Each septic system shall be located within the prescribed boundaries of each individual lot. All septic systems shall be located as most distant as possible from the wetlands within each lot. The developer shall have recorded on the deed that variances from Title 5, Minimum Requirements for the Subsurface Disposal of Sanitary Sewage, or the Town of Barnstable Health Regulations whichever is more stringent, will not be granted on any lot in this subdivision. A percolation test must be made on each lot at leaching site, before a Disposal Works Construction Permit will be issued. Maximum groundwater elevations must be determined by using data available from the United States Geological Survey - Probable High Groundwater Levels on Cape Cod, Mass. Each proposed septic system must conform strictly to 310 CMR 15.00, the State Environmental Code, Title 5, and Town of Barnstable Rules and Regulations. Any lawn area created must be covered by at least four (4) inches of loam. All tree stumps, brush and building debris removed when clearing lots or roads must be disposed of at a licensed solid waste disposal facility. Chipping brush and tree stumps is an acceptable alternative. Burial on site is prohibited. The applicant must receive an Order of Conditions from the Conservation Commission, if applicable. ".I ti Prior to Board of Health approval of each building permit, the sewage system and water supply must conform to 310 CMR 15.00, the State Environmental Code, Title 5, or Town Health Regulations, whichever is more stringent. The entire subdivision is located in a groundwater protection (GP) district. No more than four bedrooms can be constructed on each lot as per State Environmental Code and local Health Regulations. Very truly yours, u'san sk, Chairman Ralp rphy, M.D. Sumner Kaufman, M.S.P.H. BOARD OF HEALTH TOWN OF BARNSTABLE SGR/bcs Copy: Cliff Hagberg Town Clerk Down Cape Engineering Health Departmentv/ C/O/MM Fire Department Conservation Commission I TOWN OF BARNSTABLE SUBDIVISION RULES AND REGULATIONS FORM C APPLICATION FOR APPROVAL OF A DEFINITIVE PLAN �. Date: Subdivision l y1 To the Planning Board in the Town of Barnstable: cf, The undersigned authorized applicant(s) or owner(s) of all the land shown on the accompanying Definitive Subdivision plan located and described as follows: Plan Title: Plan Date: �—��0 !'u �� t'lqq Assessor's Map and Parcel Number(s) : MAP /qq PQrct6�t 7fZ1 Zoning: F Area: 3 0 Number of Lots: g Drawn By: 120 Unn C Address: MA Q Zlr�7 Phone: Z_ hereby submits such plan as a Definitive Subdivision plan in accordance with the Rules and Regulations of the Barnstable Planning Board. The undersigned's title to said land is derived as follows: -- ld bc,41 (7 t o PAU (9 PLEASE COMPLETE THE FOLLOWING 1. Access to the develo,,ppment is pproposed fro th following street ( s ) : 01_A fs,+ -dS`tcp/ l�}! ox 2 . Have any of the proposed access roads been designated as Scenic Roads? yes no If yes, which one (s) ? 3. The development will be served by: Town Water Supply Private Wells Town Sewers -mac On-Site Sewage Disposal Systems Package Sewage Treatment Facility 4. Is any part of the development within the following Zoning Groundwater Protection Overlay Districts? GP zone z' es no WP zone es V//no J� Y Y 5. Are there: a. Any wetlands or inland water bodies on his site? yes total acreage no b. Wetlands or inland waterbodies within 200 feet of the perimeter of the subdivision? yes _ Y no 6. Is any of the site within the FEMA 100 year flood plain? yes no 100 - 500 year flood plain? yes no 100 year Velocity Zone? yes no 7. Is the subdivisio in an Historic District? yes no 8. In a District of Critical Planning Concern as designated by the Cape Cod Commission yes no A 9. In a Location within a Critical Habitat as designated by the APCC 1990 publication "Cape Cod Critical Habitats Atlas" yes _ no To the best of my knowledge the information submitted herewith is complete and accurate. Signature of Owner Address Telephone Signature of Owner Address Telephone S ' ture o Address Telephone Authorized Applicant Applicant 's Authorization: 1 p3'Tc72 hZgy l�fy� d�,v�� - [T 1j e4MA& Received by Town Clerk: Date: Time: Fee: Signature: Please make check payable to the Town of Barnstable Received by Board of Health: Date: 2' Time: Z : 3�3 �• ^- . Signatu e: I CB TO RECORD CB 0.19' S72°06'02"W FND FOR REGISTRY USE ONLY 22p� p � 6N S 1 CB FND CB TO RECORD 0.16' S25'36'03"W N/F EMILY F. SAMUELS DB 1215 PG 132 CB TO RECORD 0.10' S60'00'00" W CB Z FND I S' 6 '00 ooy �Z SB FND 6� 2 ' o�� , STONE g' DRIVEWAY 0 / �PL ROPp z ih� . L 65'02'49" LE GO�N� �0 SIN o� 1 a? �N OLD 0 R-30 0 SHED g`L L=4� O 0 p N/F r ARTHUR H. EDWARDS OPEN q• �' OPEN DB 7517 PG 8 2�255 SPACE �� � .o�W SPACE 2 `Jo, LOT 1 00 Area = 26,770 sq.ft 5g 0 A=18.98' 0.61 Acres DRAIN 19.30 60 EASEMENT 00 01� 0 <y 0 r' LOT 2 Area = 30,709 sq.ft 0.71 Acres % �� o 0 F, o •0 N \N cS LOT 3 u; o �W Area = 31,179 sq.ft a' 0.72 Acres N OPEN SPACE r' I 0 l 0 N <J C, SHEET B HINCKLEY lARAfS SUBDIVISION #766 Sp p0 DEFINITIVE SUBDIVISION PLAN AN OPEN SPACE RESIDENTIAL DEVELOPMENT OF LAND IN CENTER VILLE (BARNSTABLE), MA o PREPARED FOR CLIFF HA GBER G DATE: FEBRUARY 9, 1999 SCALE: 1" = 40' 40 0 40 80 120 Feet I, - CLERK OF THE TOWN OF BARNSTABLE, HEREBY CERTIFY THAT NOTICE OF APPROVAL OF THIS PLAN BY THE BARNSTABLE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT THIS OFFICE AND THAT AN APPEAL WAS RECEIVED DURING THE TWENTY DAYS NEXT AFTER SUCH RECEIPT, BUT THAT SAID APPEAL HAS BEEN WITHDRAWN BY AGREEMENT OF THE PARTIES, WHICH AGREEMENT IS TO BE RECORDED WITH THIS PLAN. DATE TOWN CLERK BARNSTABLE PLANNING BOARD APPROVAL UNDER THE SUBDIVISION CONTROL LAW IS REQUIRED DATE: I CERTIFY THAT THIS PLAN WAS MADE IN ACCORDANCE WITH REGISTRY OF DEEDS REGULATIONS EFFECTIVE JANUARY 1, 197 \'olol iss�o o` TIMOTHY yG 2 R N COVELL o No.38035 s 0 J Rq�E LANE . SHUBAEL POND �J SOP 3� own JA �W � ROUND POND FP z <� 2 �o 0 LOCUS MAP SCALE 1" = 2000' ASSESSORS MAP 149 PARCELS 27 & 29 * ZONING: RF 43,560 FT — MIN AREA FRONTAGE — 150 FT * SETBACKS.FRONT — 30 FT SIDE — 15 FT REAR — 15 FT REFER TO ZONING BYLAW SECTION 3-1.7 SHOWING REDUCED LOT AREA REQUIREMENTS FOR OPEN SPACE RESIDENTIAL DEVELOPEMENT. FLOOD ZONE C BARNSTABLE PANEL #250001 0015 C AUGUST 19, 1985 GROUNDWATER OVERLAY DISTRICT: GP MUNICIPAL WATER IS AVAILABLE GAS MAIN IS LOCATED ON LOCUS SIDE OF OLD BARN.—FAL. ROAD OLD BARNSTABLE — FALMOUTH ROAD IS A SCENIC ROAD TOTAL AREA OF PARCEL — 444,351 SF (10.2 ACRES) 85% OF AREA = 377,698 SF± 377,698/43560 = 8.7 LOTS ALLOWABLE (8 LOTS PROVIDED) AREA OF PROPOSED 8 CLUSTER LOTS — 242,588 SF (5.49 ACRES)± AREA OF PROPOSED ROAD — 60,754 SF± (1.39 ACRES) LENGTH OF PROPOSED ROAD — 904 FT± AREA OF OPEN SPACE — 141,009 SF (3.23 ACRES)± 32% OF TOTAL (OPEN SPACE CALCULATIONS DO NOT INCLUDE ANY LOTS OR ROADS) NOTE: THERE IS AN EXISTING 12" WATER MAIN IN APPROXIMATELY THE CENTER OF THE LAYOUT OF NYE ROAD OWNER OF RECORD: NANCY HAGBERG 151 PINE STREET HYANNIS, MA 02601 REF: DEED BOOK 1260 PAGE 181 z o LOT 4 co 642p Area = 32;559 sq.ft � ? Oo 0.75 Acres n' - � r 00 0 0 O W Ln 0 (31 c0 I- t7 1- II O II II J __j Z 00 - CB cD ;n N FND p�00N LOT 2 6616 TO TEMP. Q ^� PB 532 PG 92 N CUL—DE—SAC J Co OPEN A=130.27' _ cv 4 SPACE 0 o DRAIN LOT 5 Q N EASEMENT t n Area = 36,452 sq.ft R=30.00 4 55. 3' 0.84 Acres A=26.08' 4 S 84°47 5S' W A=10.70' �=49°48'23" z d=01°26'31" A=20.90' Q A=02°49'04"`o TO TEMP. CUL—DE—SAC C LOT 1 c9 A=56.38' a w R=30.00 �' A=24,58' S 86'08'02" PB 532 PG 92 L=61*31'56" �` E o '!�=46°56'10" 73.54' �o 10-64' N 84°56'51" E ROPOS D t 213.9 4' ISLAN A=44.05' rn =48°04'00" 150, TEMPORARY < URN AR9 UND L=52.1 1' 2�6 ° 20 ' 52" LOT 6Qj =56°52'26" v� Q Q `j Area = 26,138 sq.ft LOT 8 r" 0.60 Acres cn o o oN Area = 27,988 sq.ft 44.28' fN 0.64 Acres cA `9 N 28'36'51" W Z Y / 0 N o, rr NOTE: APPROVAL OF THIS PLAN IS SUBJECT TO COMPLIANCE WITH THE COVENANT TO BE RECORDED HEREWITH z i S ACCESS AND UTILITY EASEMENT FOR LOT 7 OPEN SPACE R=375.00 A=28.85' =04'24'30" N p0 N � rn� n n 00 � o II II II R=375.00 4 A=99.14' 0 0=1 5*08'52" 20.00' d N 88'01'69" W It —1 180.12' , E N g0.31 28 of N LOT 7 Area = 30,683 sq.ft 0.70 Acres z� N O N CP, CSC W 1 0t� �� Va w •j 1 �m W W cs N SB ro°`' FND 0 G� N101 �O CB FND F x s ° 5 1 FND•ZPl S N/F ROBERT OBRIEN, TR. CERT # 128,681 00 OPEN SPACE N/F RUSSELL PETERSON DB 8942 PG 113 NOTE: N/F JAMES D. SWIFT DB 6372 PG 261 SB FND NO LOT AS SHOWN ON THIS PLAN AND APPROVED IN ACCORDANCE WITH THE OPEN SPACE RESIDENTIAL DEVELOPMENT PROVISIONS OF THE ZONING ORDINANCE OF THE TOWN OF BARNSTABLE SHALL BE FURTHER SUBDIVIDED Co NO I T _ ATE I WATER MAIN GATE Y ICJ e►) c,1 r"Dv L-r 2K -k4' 9 �t,,V 7,10 O 50'V a. o OCATE WATER MAIN & EPTH 100'V. 70 ce 100'V. w w W -jLLI tf) [t > LLJ►. fe 0 � o (0 �- o J w J w J J w J w _I w J w --1 w N f� N N N _ �i r?WJ�I iw > I --` ` - -� - _ �. ' _ —E wc_ HIERLI E , 1 w Id- w w o rn 60 6 0 E r. o co rr II ,w II c: LC cc�11 CIO r`j !_ _! w —0+50 —17.5 0+00 0+50 1+00 1+50 2 00 2+50 3#0 3+50 4+00 4+�0 5+0 5+ 0 6-f60 6+50 7+00 PROPOSED CONSTRUCTION 7+1 O 8+00 18+50 9+00 DRAINAGE CALCULATIONS: RATIONAL METHOD, 10 YEAR STORM DA1 (CUL-DE-SAC AREA) IMPERVIOUS: PAVE/BLDGS: 12,294 SF PERVIOUS: WOODS/GRASS: 31,904 SF CN- 1.0(12,294) + 0.40(31,904) 0.57 44,198 L-312' S-2.9% CN-57 -- 1-3.3 IN/HR Q=CIA - 0.57(3.3 IN/HR.)(44,198/43,560)(448.8)-857 GPM LEACHING AREA REO.=857/0.7=1224 SF REQ. USE (3) 6'X6' LEACHING PITS WITH 4' STONE - 1254 SF,/- DA2 (ENTRANCE AREA) IMPERVIOUS: PAVE/BLDGS: 14,200 SF PERVIOUS: WOODS/GRASS: 44,537 SF CN= 1.0(14,200) + 0.40(44,537) = 0.55 58,737 L-314' S-2.2% CN-.55-- 1-3.251N/HR Q=CIA = 0.55(3.25 IN/HR.)(58,737/43,560)(448.8)=1082 GPM LEACHING AREA REQ.=1082/0.7=1545 SF REO. I ISF 07 F,,'XF{' I FAF NIN(: mr, WITH d' CTOMP" ANn 7r,' SUBDIVISION #766 PLAN &, PROFILE PROPOSED ROAD AN OPEN SPACE RESIDENTIAL DEVELOPEMENT OF [AND IN CENTER VILLE (BARNSTABLE), MA PREPARED FOR CLIFF MA GBER G 21� A%% OF icy ERNE H. o DATE: DECEMBER 20, 1999 Pe✓. z-ho/w CM� y SCALE: 1 " = 40' HORIZ. pb SCALE: 1 " = 4' VERT, PROFILE f EEEO �Q L` 40 0 40 80 120 Feet z t►��� off 508-362-4541 fax 5108 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS �26 939 main A. yarmouth, ma 75 PROFILE SHEET 1 OF 2 100' .C. 100 V.C. 1.20% 1.02q 11.00% 0 to II O N LO N 00 N .— M ►`� M W h (o ►+) r- M t` tI7 M (D N (D cp kN. 0 (0 r- I',, (0 0 N N N 0 (D � � N (p N (p Q � `— � (0 ^ (D11 (ND to 6+00 ,n 6+50 M ,6 7+00 II67+50 8+00 8+50 9+00 9+50 10+00 000) DESIGN FOR POSSIBLE FUTURE EXTENTION 6" LOAM AND HYDROSEED ALL DISTURBED AREAS 50' RIGHT ,OF WAY , 4 3:1 MAX. CUT 3:1 MAX BIT. CONC. SIDEWALK 12"BERM 1�� TOP, 2" BINDER 3" CROWN 12" BERM cv 1" TOP, 1 1/2" BINDER 1 4" PER FOOT 4' i< IT. CONC, PAVEMENT COMPACTED SUBGRADE 3:1 MAX FILL GAS, MAIN 6" BASE MATERIAL WATER MAIN ELEC., TEL, CATV. CONDUIT 2.5' N.F.S. MINERAL AGGREGATE TYPICAL SECTION SCALE: 1/4"a 1' DRAINAGE ELEVATION SCHEDULE: STATION STRUCTURE RIM EL. INV. IN INV. OUT TOP STRUCTURE EL, 2,+00 10' LT CB 1 63.07 - 60.107 61.77 2+00 10' RT. C82 63.07 59.87 59.�77 61.77 1+54 94' PT LP1 63.5 58,77 58.(67 60.7 1 TH1 TH2 ENGINES : AR E OJALA (DCE) EENG EER: AR E OJALA (DCE) EXCAVATOR: STEVE (BORTOLOTTI) EXCAVATOR: STEVE (BORTOLOTTI) 0" 64.0 0" 63.0 6„ ORGANIC 4- ORGANIC A SL A SL 9„ 1OYR2 1 6„ 7.5YR3 2 E E FS KEY: FINE 8" 2.5Y6 2 O=ORGANIC SOIL SAND 1OYR5/1 B SL- SANDY LOAM 11" SL 510 FS= FINE SAND s.L. 36„ 1oYR5/6 MS= MED SAND 36" 1 YR Cl GVL= GRAVEL L SAND 2.5Y6/6 CS= COARSE Cl SL „ 52 C2 LOAM 4$' UNSUITABLE 2.5Y6/2 SILT 5 6 3 REMOVE C2 48" 60.6 80 47.0 LAYER C2 S. SAND MS&GVL RAV• 2.5Y6/6 120 ICYYR 614 96" C4 C3 CS. SAND GRAY, Y8/4 2.5Y6/4 154" 51.2 NO WATER 180" 48,0' NO WATER SOIL LOGS MSdtGVI z.5 GENERAL NOTES: 1. ALL CONSTRUCTION METHODS AND MATERIALS TO CONFORM TO THE TOWN OF BARNSTABLE SUBDIVISION RULES AND REGULATIONS AS AMENDED TO PRESENT, 2. UNSUITABLE FIRM LOAM LAYER TO BE REMOVED FROM LEACHING AREAS FOR A DISTANCE 5' AROUND OUTSIDE STONE ON LP4 + LP5, REPLACE WITH CLEAN SAND, SEE TH2 3. INSPECTIONS REQUIRED PER BARNSTABLE SUBDIVISION REGULATIONS, NOTIFY TOWN PRIOR TO START. 4. UTILITY LOCATIONS ARE APPROXIMATE, NOTIFY DIGSAFE PRIOR TO CONSTRUCTION, 24'0 H-20 F&G TO GRADE MORTA�ALYLP.COMP� NENTS DRAINAGE SWALE ) 4" MIN. WASHED PEASTONE 24"ID ACME RISERS AS REQ. f SEE SCHEDULE F( 4" MIN. PEASTONE 4" PEASTONE OVER ALL 1EEZZ 0 CPP 12"PERF.H-20 HDPE WASHED STONE U IL VARIES H-20 F&G'S ORTAR ALL COMPONENTS (TYP•) 2% CROWN SEE PAVEMENT SECTION TP STRUCTURE EL. LISTED 12"0 H-20 RCP COMPACT SACRFILL 0 0 0 0 COMPACT BACKFILL A GROUT ' p IN 6" LIFTS (95% PRCTR.) o 0o 2 BRILL (2) 1" MD" M 5.02.1 0000000 12" CORR. H-20 HDPE PIPE HOLES (TYP.) o O O O LAY LEVEL BETWEEN PITS 6'-8"X6'm PERF. HDPE q WITH 3' WIDE H-20 ' 1000 C.B. TRAP ELEVATIONS AS LISTED i 12"0 CPP IN DRAINAGE SCHEDULE RENITH CROSS SE TION A -A 2' DEEP LEACHING TRENCH GAL. ELBOW LP1 TO LP2 AND LP2 TO LP3 ONLY L EACHPIT 3 ELSE 12"H-20 HDPE PIPE (LEVEL) 6 GRAVEL NOTE: UNSUITABLE SOIL REMOVAL REQUIRED AROUND H-20 DEEP SUMP LP4 + LP5, SEE SOIL LOGS 1000 GALLON PRECAST REPLACE WITH CATCH BASIN CLEAN SAND, 3/4" — 1 1/2" 6" STONE UNDER WASHIED STONE NOT TO SCALE 4' ARPOUIND PITS SECTION THRU DRAINAGE SUBDIVI'SION #766 PLAN & PR',OFILE PROPOSED ROAD AN OPEN SPAkCE RESIDENTIAL DEVELOPEMENT 0)F LAND 1N CENTERVIL.LE (BARNSTABLE), MA PREPARED FOR CLIFF' IAA GBER G DATE: IDECEMBER 20, 199A 2�\/ a) I olact SCALE: 1 " = 40' HORIZ. SCALE: 1 " = 4' VERT. PROFILE 0 40 80 120 Feet PROFILE SHEET 2 OF 2 MORTAR -------------- H-20 DEEP SUMP 1000 GALLON PRECAST CATCH BASIN ADJ. BLOCKS AS REO. 1 �H Of AiIMI! k OJAu Oran. Na 907 )2 �ro � Ile,. - off 508-362-4541 fax 508 362-9880 I down cape engin e ering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, ma 02675