HomeMy WebLinkAbout0729 PUTNAM AVENUE - Health F 1HE ro Massachusetts
�o yti Town of Barnstable,
Department of Planning and Development
mmsrABLE. ' Office of The Planning Board
MnSs
�AjfD'MAt A` 367 Main Street,Hyannis, Massachusetts 02601 (508)775-1120 ext. 190
DATE: 03/14/90
TO: FIRE DISTRICT
WATER DISTRICT
CONSERVATION COMMISSION
COMMONWEALTH ELECTRIC
BOARD OF HEALTH
ENGINEERING
FROM: BARNSTABLE PLANNING BOARD OFFICE
RE: SUBDIVISION # 7 2 9
PLAN ENTITLED--~COTUIT LANDING FALMOUTH ROAD.. (RTE.w.28 ) BARNSTABLE,'
MASSACHUSETTS DEVELOPERStJUNIPER DEVELOPMENT GROUP _JOHNNL' WARNER'7
ft
PLAN DATED: 09/05/89 AND REVISED 03/13/90
.PLAN LOCATION: NORTH OFF FALMOUTH ROAD/ROUTE 28 , WEST OFF i
INDUSTRY ROAD, NORTH OF PUTNAM AVENUE, ABUTTING COTUIT LANDING
SHOPPING CENTER, MARSTONS MILLS/COTUIT
PLAN ENGINEER: ' LISTON ASSOCIATES, INC.
MAP # 58
PARCEL # 39
ACREAGE:
,ZONING:
LOTS: 7
DATE •SUBMITTED: 03/12/90--45 DAYS 04/26/90
PRELIMINARY--.1& DEFINITIVE
GRID OPEN SPACE
The above captioned subdivision plan has been submitted to the
Planning Board., A public hearing/action has been scheduled for
.PR 2 L 0 9 LS) 9 0 Please forward any recommendations
or comments to the Planning Board office before this date.
Development of Regional Impact
DRI Referral Form
Please attach a copy of the original municipal development permit
application showing the date on which it was received by the Municipal
Agency. Receipt of this information via certified mail or delivered in person
to the Cape Cod Commission constitutes a referral for purposes of chapter
716 of the Acts of 1989, as amended.
TO: Eugene Capoccia
Acting Director of Planning Department
Referred by
Town
Agency/Official Health Department/ Thomas McKean
Todays Date Aril 5 1990
Project Proponent Naive Junipfir Development Group/ Douglas Liston,PE
Address 30 Boston Road
Wayland, MA 01778
"Telephone (508) 358-2713
Brief description of the project:
Subdivision which will result in more than 10 businesses (potentially).
Also would permit new construction of commercial space in excess of 10,
000 sq. ft.
Project location: '
Putnam Avenue and Route 28, Assessor's Map 58, Parcel 39
Forward to:
Cape Cod Commission
First District Court House, Route 6A
Barnstable, Massachusetts 02630
Prepared by Cape Cod Commission staff 3/30/90
TOWN OF BARNSTABLE -
�pQ THE taw ,.
��Q ♦� OFFICE OF {�
BAa i BOARD OF HEALTH ,ter
CrT
� MASIL 86. p
i 39- � 367 MAIN STREET
0 MAY
HYANNIS, MASS.02601
March 30, 1990 e ) s/qo
Douglas Liston, P.E. � � c �M'U"S`Oki
Liston Associates C-%
30 Boston Post Road -
Wayland, MA 01778
RE: Preliminary Subdivision Plan of Lots, Falmouth Road, Barnstable, MA.
Assessor's Map 58, Parcel 39
Dear Mr. Liston:
The Board of Health is in receipt of the revised preliminary subdivision plans
for the above referenced site.
However, not all lot sizes are designated on the plan.
Please submit a plan with each lot size designated.
Very tr ly yours,
Grover C. M. Farrish, M.
Chairman
Board of Health
Town of Barnstable
GF/bs
copy: Planning Board
Juniper Developing Group
I
Development of Regional Impact
DRI Referral Form
Please attach a copy of the original municipal development permit
application showing the date on which it was received by the Municipal
Agency. Receipt of this information via certified mail or delivered in person
to the Cape Cod Commission constitutes a referral for purposes of chapter
716 of the Acts of 1989, as amended.
TO: Eugene capoccia
Acting Director of Planning Department
Referred by
Town of Bgrnstable
Agency/Official Health Department/ Thomas McKean
Todays Date Aril 5 1990
Project Proponent Name Juniper Development Group/ Douglas Liston,PE
Address 30 Boston Road
Wa land MA 01778
Telephone (508) 358-2713
Brief description of the project:
ubdLvision which will result in more than 10 businesses (potentially):
Also would permit new construction of commercial space in excess of 10,0
00 sq. ft.
Protect location: '
Putnam Avenue and Route 28, Assessor's Map 58, Parcel 39
Forward to:
Cape Cod Commission
First District Court House, Route 6A
Barnstable, Massachusetts 02630
Prepared by Cape Cod Commission staff 3/30/90
' I
�PyoFTHE po�y TOWN OF BARNSTABLE
OFFICE OF
D1HE9TI,BL i MAlB. BOARD OF HEALTH
.�
1639. 367 MAIN STREET
HYANNIS, MASS. 02601
October 3, 1989
f
TO: Joseph Bartell
Chairman of the Planning Board
FROM: Dr. Grover C.M. Farrish, M.
Chairman
Board of Health
RE: Preliminary Subdivision/Juniper Development Group
The Board of Health is in receipt of a preliminary subdivision
plan dated September 5, 1989 prepared by Liston Associates,
Inc for Juniper Development Group for the-- site located at
Route 28 Marstons Mills/Cotuit and at the end of Industry Road,
listed as parcel 39 on Assessors Map 58.
We have scheduled to meet with the applicanton October 24,
1989 after 7:00 P.M.
I understand your Board will hold a public meeting concerning
this matter -on October *16, 1989.
Therefore, The Board of Health requests that your Board delay
final action until we can complete a detailed letter to you
prior to November 8, 1989.
ti
4,
FORM 9
APPLICATION FOR TENTATIVE APPROYAL OF PRELIMINARY. PLAN
Marrh 1 2 199-a.
To the Planning Board of the Town of BOtntloblit
The vndtrsigned,being the ownt'1 of oil fond Aclvdtd within o proposed ivbd,v•t-on Chown o-
she Oceomponying pion, entitled "Cit-tti_i-. T.and j n 't Prp-1i_mi_.n,a„".. Plan of Lots Falmouth
and Ulj 99bm,t Ivch pion 0t a preliminary pion showing in .a Road
general way Iht proposed ivbdivition of she fond, and mokes application IC she 600rd for tentolive op•
provol thereof,
The Owner's tint t0 the land it dtrtved vnder deed Itom
dosed N, A v 19__., and rKorded In BOrnslob4 Covntry Reg-stty of Oeedt, Book
Page--.—, or vnder Ctiallicolt of Title No. * rtgntet to toad 49-stry O-slov. Book
*
Page
Appltconl
39 Holton Street Winchester, Ma. 01890
�dd�t,e
* Certificate of Title No. 88583 , dated May 10, 1982, filed in Registrati(
Book 721 , page 23 for the Registry District od Barnstable County and
Certificate of Title No. 69447 , dated December 30, 1976 , filed in
Registration Book 561 , page 47 , subsequently transfered to
Certificate of Title No. 116451 and the John L. Warner deed at the
Barbstable Registry in Deed Book 6571 Page 253 .
Jj
MqR �
At
k/Alo 1104
--
nzziLISTON
ASSOCIATES, INC.
Civil Engineers • Land Surveyors
PRELIMINARY PLAN OF LOTS
FALMOUTH ROAD
BARNSTABLE, MASSACHUSETTS
September 13, 1989
Barnstable Planning Board
Hyannis, MA 02601
Dear Ladies and Gentlemen: .
I herewith submit' a Preliminary Plan of Lots on Falmouth Road, in
Cotuit, Barnstable, MA on behalf of Juniper Development Corp.
Attached hereto is a copy of Form B, signed by George B. Whitten,
a Partner of Cotuit Landings, a check in the amount of $50.00 to
, . cover the filing fee is enclosed, borings 1 and 2 made by GZA
Drilling Inc. , and the hydrology calculations made by this
office.
Borings 1 and 2 were :taken .in,' the locations of the two proposed
catchbasins and were drilled to depth of 17 feet and did not
encounter any groundwater to that depth. The hydrology calcula-
tions were based on a percolation rate of 30 seconds per inch,
which was determined by the perculation test shown on sheet
number 2 of the Preliminary, Plan.
L 'respectfully request that your Board review and approve these
submitted pl
ans lans with your comments on same.
.
Ve truly ours, ;
r
Dougl L. Liston, P.E.
Engineer for , Juniper. Development Corp.
f�
30 Boston Post Road, Wayland, MA. 01778 (508) 358-2713 Fax (508) 358-27,15
RECEIVED
SEP 1 31989
j FORM B- PLANNING BOARD
Application for Tentative Approval of Preliminary Plan
September 12 , 1 g 89
•
To the Planning Board of the Town of Barnstable
The 'undersigIne'do being the owner's `of all land included
within a proposed `subdivision sh6st on the accompanying plan;.
entitled Preliminary Plan of Lots, Faltouth Road
and dated September 5 , 19 89 , submit such plan as a
preliminary plan showing in a general way the proposed subdi-
vision of the land, and makers application to the' Board for
tentative approval thereof.
• The Owner's title to the land is derived *Certificates
N/A , dated N/A ,. 19 , and
recorded in Barnstable County .Registry of Deeds. Book ,
Page , or under Certificate of Title No. * ,
registered in Land Registry District, Book * , Page
*
GI�G�_
• Ap 11
� e
Address ,
* Certificate cf Title.No. `88583, dated May'10, 1982, filed in.Registration
Boa'k 721, Page 23 for .the .Registry District of Barnstable County and Certificate
of Title No. 69447, dated.Dececmber •30, 1976, filed in Registration Book 561,
Page 47,. subsequently transfered to Certificate of Title No. 116451.
•
v.. .
09/12/89 15:44 a 1 508 586 3965 GZA DR I LL I'N'C
C$2A ]DRILLING, xNC• P-$OJE-C-T, XREPORT OF SORI*Q No. i
7215 �TNUT ST. SNE6T
E".' SROCIGTON MA 0240T JUNIPER DEVE'LOPME T G FILE N0. 3
(A DIVIS4'ON OF C;ALDBERG-101140 9 ASSOCIATES, INC) STABLr RA4 CHKb. EeY
ft L=MAN JONfiS Al STAKED KY OTHERS
1srlAa'5tFIED BL �►e BORING LOCATION
GROUND SURFACE UtVA UATL44—
IAaECTOR• DATE START 9/2/89 SDATE-END"-"".9/2/89
'Sl;3LER. GK 0"HERNISE NOTED SAMPLER CONSISTS Of A 2" SPLIT GROUNDWATER READINGS
SM96N DR-'V6N USING A 140 lb. HAMMER FALLING 30 In.
DATE TIME WATER CASING STABILIZAT,T+ON TINE
i�
'G SING: �'OTHERWM NOTED, CASING DRIVEN USING A 360 lb,,
MAIMER' FILLING 24 In. 9/2 um T
COMPLETION
OTHER: 3.3/0 NSA
E 'A L �rr:� �, SAMPLE SAMPLE DESCRIPTION E
N ll `.! DEPTH 14 STRATUM DESCRIPTION
M G 5 N (" (Ft.) BLOWS/66 'BURNISTER CLASSIFICATION S
C 1: $6G 0'-016 1 TOPSOIL 0' TOPSOIL _�b%137 O'6.11 1 V -
0'6 ■
fA` Very lwse, Light brown gray, fine SAND, t� SAND, Silt
trace Silt ,
' :. �) `8 1►-2, 1-2 VerY fosse, brown. fine to medium SAND,
littles'ilt, trace fine Gravel
2 -/1;. 5'-7, 2=5-4-6 Loose, yellow brown fire to medium SAND, '
3
trace fine Gravel, [rase Silt
Gravat,
3 .: 2fl14 10t-12' 5-6-6-8 Mediun dense, yellow brown, fine SAND,
trace t•) fine Gravel, Sitt
4 den
,' t' 15�-1T' 2-12-12-18 Mediuq se yet4ow brown, fine to med 'un
;fit•.
SAND, trace fine Gravel, trace Sitt
17'
BOTTOM OF 80 ,;t Q
A r`.
k
GRANULAR =;£ COHESIVE SOILS REMARKS:
flows/Ft D tyf Blows/ft Density
A- 4 Y" 'E < 2 V. SOFT
4.10
10-30 �- $ M. STIFF
3Q t';E 8*15 STIFF
�'S0 Ne 153
-30 V. STIFF
HARD
tFICATION LINES REPRESENT APPROXIMATE swNDARr BETWEEN SOIL TYPES .TRANSITIONS MAY BE GRADUAL
2) . : LEVEL READINGS HAVE BEEN MADE AT TIMES AND uNOER CONDITIONS STAT90 FLUCTUATIONS OF GRfxZUiER
G ZA TF CUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE .MADE
- -- — -- -- BORIN No.�`_
09/12/89 15.45 V 1 508 586 3965 GZA DRILLING ADM
G21 DRILLING# ZNC. PROJECT XREPORT Of SORI'NG No 2
t�21 Y. C.HEV:TNUT ST. EROCITON MA 02/ JUNIPER MVELOPMEf1T CROUP FILE 'N0. 13707''
�. (A DIV15i'ON 0'f f,&6BERG-'LD[ND & ZWIATES, tNCY — BARAESTAALE. S. y Cam• 'F r
FC;a{gAN BORING LOCATIONAS STAKED BY OTHERS t
'Cl1'39IFIEO'BY: - GROUND SURFACE ELEVATION UATU14 "
IA3PECTORt _ DATE START 9/2189 'DATE 4/2
EMU /$9 �-���
3AMPLER: 114E' S 0"HERWISE NOTED SAMPLER CONSISTS Of A 2" SP'LIT GROUNDWATER READINGS
SSAOOit'DRiVEN USING A 140 lb. HAMMER FALLING 30 In.
` tim's: 3t E�EB D•KHERWISE NOTED, CASING DRIVEN USING A 300 lb. DATE TIME WATER CASING ST118ILiL1TIWi TIME
����NAMMER FALLING 24 In. 9/Z NONE T tLETI;ON
C0;INS SIxET:F:A°*•.. OTHERt 3.3/41, NSA
0 C8 . R
F 3 L -AA% SAMPLE SAMPLE DESCRIPTION E
M STRATUM DESCRIPTION.
K
F G S C (Ft.) BLOWS/60 BURNtSTER CLASSIFICATION S
0 y 0,.0t6 I TOPSOIL 0f TOPSOIL
016 -
%2/6 016.116 2.2 very loose, brown gray. fine to median , SAND, •Silt
SAND, trace,(* Silt 1 6
*8/5 116-21 S Nedilm dense brown, fine SAND. little SAND,
Silt, true F-) fine Gravel
41
r S'i[t, Gravel.
/it) 51.71 3-b-b-9 Nediva dense, yellow brown, fine SAND,
trace Silt .
I
S1lt
24/17 100-12, 11-11-13-16 Medium dense, yellow brown, fine to medium SAND,
SAND, tree fine Gravel, trace Silt
` Gravel,
Silt
15"171 6-12.17-18 Medium dense yellow brown, fine to medfum
SAND, trace fine Gravel, trace Silt
17f
BOTTON Of BORIAS
.O
t' 3
yy .
nn .ti ..Q
�w
'jRANULAR'J COHESIVE SOILS REMARKS:
I.lows/Ft: 'ty Blows/Ft Density
0-- 4 A.1: LOOSE < 2 V. SOFT
4 10 ;: r a LOOSE 2. 4 SOFT
10 30 i DENSE 4- 8 N. ST.IFF
50 , DENSE 8.15 STIFF
s D DEIiSE i 0 V. STIFF
So HARD
TEES �T,RATIFICATION LINES REPRESENT APPROXIMATE BOl1NDARY BETWEEN, SOIL TYPES TRANSITIONS MAY BE GRADUAL.
0'tiE (CATER LEVEL READI'GS HAVE SEEN MADE AT, TIMES AND UNDER CONDITIONS STATED `FLUCTUATIONS OF GROUNDWATER
T (XCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE
BORING No:-�_ s /
t
--------------------------
EXISTING SUBCATCHMENT DATA
--------------------------
SUBCAT # 1
AREA= . 2 ACRES
CN= 90
1C- f 6
PEAS FLOW= 2 CFS
RAINFALL= 5 . 5 INCHES
i
EXISTING ROUTING DATA
---------------------
--------------------
E`XISVING MEMORY DATA
--------------------
--------------------
EXISTING PONDING DATA
---------------------
t
f �
•
HYDRO.GRAPH FOR BUB:CATCH:MENT # 1
-------------------------------
CUBIC FEET PER SECOND
HOUR
10.0 0
10. 2 0
10 .4 0
10. 6 0
1.0 . 8 0
11 .0 0
11 . 2 **** . 1
11 . 4 * * . 1
11 .6 * **** . 2
11 . 8 * * *.** ********* .********. * **** * ** **** ** ******** 1 .6
12 .0 ****** ****, .*:, .* , ,* .**. *,**, * :*.** . 8,
12 . 2 ***.**.k**. . 2
12 . 4 * ** . 2
12 .6 *** . 1
12.8 * * . 1
13 .0 * ** . 1
13. 2 :**** . 1
13 . 4 **** . 1
13 . 6 ** . 1
13 . 8 * . 1
14 . 0 ** . 1
14 . 2 * . 1
14 . 4 * . 1
14 . 6 ** . 1
14 . 8 0
15 . 0 0
1.5 . 2 0
15 . 4 0
15 .-6 0
15 .8 0
16..0 0
16 . 2 0
16 . 4 0
16 . 6 0
16 .e 0
17 . 0 0
17 . 2 0
17 . 4 0
17 .6 0
17 .8 0
18 . 0 0
• 18,. 2 0
18. 4 0
18•.6 0
1.8. 8 0
19 . 0 0
19- 2 0
19 . 4 0,
19.. 6 0.
19:.8 0
2;'Q.0 0
•
O
INPUT THE FUNCTION DESIRED, (10:=MENU) 2
WHAT DO YOU WANT TO BEGIN WITH:
1= A SURCATC:HMENT
2.= A REACH
3:= A MEMORY
4= A STORAGE POND ,OUTFLOW
? 1
AT WHICH SUB,C:A.T. DO YOU WISH
TO BEGIN ( 1- 30 ) ? 1
B;E,GIN W/SUBCAT # 1
W,H10H. 00,M:PU•TATION DO YOU WI.&H T.Q PERFORM .(O=ME,NU)' 13;
THE VOLUME UNDER THE .CALCULATED
HYDR,OGRAPH= . 06 ACRE FT.
WH I CHI COMPUTATION DO YOU WISH TO PERFORM (0=ME1VU).
r
0
r
B;EGIN, WITH SUBCAT 1
WHICH COMPUTATION DO YOU WISH TO PERFORM (O.=MENU): 9�
WHAT DO YOU WANT TO BEGIN WITH:
1= A SUBCATCHMENT
2= A REACH
3= A MEMORY
4= A STORAGE POND OUTFLOW
? 1 --
AT WHICH SUBCAT. DO YOU WISH
TO BEGIN ( 1- 30 } ? 1
BEGIN W/SUBCAT # 1
WHICH COMPUTATION DO YOU WISH TO PERFORM (O=MEN.U); 3
INPUT THE STORAGE POND # .( 1-10) ? 1
ROUTE THROUGH STORAGE POND # 1
DO YOU WANT TO INPUT THE OUTFLOW
OR USE ;ONE OF THE OUTLET CONTROL
DEVICES ( 1=INPUT FLOWS DI;RECTLY,,
2=OUTLET CONTOL DEVICE) ? 1
## 1 ELEVATION= 50 STORAGE VOLUME IN ACRE-FT= :O OUTFLOW IN CFS= 0.
#:# 2 ELEVATION= 51 STORAGE VOLUME IN ACRE-FT= . 315 OUTFLOW IN CFS=
. 0,008
## 3 ELEVATION= 52 STORAGE VOLUME IN ACRE-FT= . 5.63. OUTFLOW IN CFS=
.DD14
THE MAX. WATER DETAINED= . 07 ACRE-FT.
•
�P�QFTHE T TOWN OF BARNSTABLE
OFFICE OF
BAaa9TOBL i MA66. BOARD OF HEALTH
.� p�
1639. `�0 367 MAIN STREET
HYANNIS, MASS.02601
March 28, 1990
Mr. Joseph E. Bartell Re: Preliminary subdivision plan of land in Marstons
Chairman, Planning Board Mills and Cotuit
Barnstable Town Hall Petitioner: Juniper Development Group
Hyannis, Ma 02601 Assessor's Map 58, Parcel 39
Engineer: Liston Associates, Inc.
Date: September 5, 1989, Revised March 13, 1990
Dear Mr. Bartell:
The Board of Health has reviewed this preliminary subdivision plan in Marstons Mills and
Cotuit, makes the following recommendations:
The developer must provide public water to each and every lot in this subdivision.
Public water lines and all connections must meet specifications and/or rules and regulations
of the local water department.
Each septic system shall be located within the prescribed boundaries of each individual
lot.
The developer shall have recorded on the deed that variances from Title 5, Minimum
Requirements for the Subsurface Disposal of Sanitary Sewage, or the Town of Barnstable
Health Regulations whichever is more stringent, will not be granted on any lot in this
subdivision.
A percolation test must be made on the lot at leaching site, before a Disposal Works
Construction .Permit will be issued. Maximum ground water elevations must be determined
by using data available from the United States Geological Survey - Probable High
Groundwater Levels on Cape Cod, Mass. Each proposed septic system must conform strictly
to 310 CMR 15.00, the State Environmental Code, Title 5, and Town of Barnstable. Rules
and Regulations.
All tree stumps, brush and building debris removed when clearing lots or roads must be
disposed of at a licensed solid waste disposal facility. Chipping brush and tree. stumps
is an acceptable alternative. Burial on site is prohibited.
The applicant must receive an Order of Conditions from the Conservation Commission,
if applicable.
Mr. Joseph E. Bartell
Chairman, Planning Board
Re: Juniper Development Group
March 28, 1990
Prior to Board of Health approval of each building permit, the sewage system and water
supply must conform to 310 CMR 15.00, the State Environmental Code, Title 5, or Town
Health Regulations, whichever is more stringent.
Very truly yours,
Grover C. M. Farrish, M.D., Chairman
Ann Jane Eshbaugh
James H. Crocker, Sr.
BOARD OF HEALTH
TOWN OF BARNSTABLE
TM/bs
0 n
THE' TOWN. OF BARNSTABLE
OFFICE OF
B"U O&
TAU
MABB. � BOARD OF HEALTH
� pj
�p t639. `� 367 MAIN STREET
a MAY
HYANNIS, MASS. 02601
September 27, 1989
Mr. Joseph E. Bartell Re: Preliminary subdivision plan of land in Marstons
Chairman, Planning Board Mills and Cotuit
Barnstable Town Hall Petitioner: Juniper Development Group
Hyannis, Ma 02601 Assessor's Map 58, Parcel 39
Engineer: Liston Associates, Inc.
Date: September 5, 1989
Dear Mr. Bartell:
The Board of Health has reviewed this preliminary, subdivision plan in Marstons Mills
and Cotuit makes the following recommendations:
The developer must provide public water to each and every lot in this subdivision.
Public water lines and all connections must meet specifications and/or rules and
regulations of the local water department.
Each septic system shall be located within the prescribed boundaries of each individual
lot.
The developer shall have recorded on the deed that variances from Title 5, Minimum
Requirements for the Subsurface Disposal of Sanitary Sewage, or the Town of Barnstable
Health Regulations whichever is more stringent, will not be granted on any lot in this
subdivision.
A percolation test must be made on the lot at leaching site, before a Disposal Works
Construction Permit will be issued. Maximum ground water elevations must be
determined by using data available from the United States Geological Survey - Probable
Huh Ground Water Levels on Cape Cod, Mass. Each proposed septic system must conform
strictly to 310 CMR 15.00, the State Environmental Code, Title 5, and Town of Barnstable
Rules and Regulations.
All tree stumps, brush and building debris removed when clearing lots or roads must
be disposed of at a licensed solid waste disposal facility. Chipping brush and tree stumps
is an acceptable alternative. Burial on site is prohibited..
The applicant must receive an Order of Conditions from the Conservation Commission,
if applicable.
Mr. Joseph E. Bartell
. . Chairman, Planning Board
Re`: Juniper Development Group
September 27, 1989
Prior to Board of Health approval of each building permit, the sewage system and water
supply must conform to 310 CMR 15.00, the State Environmental Code, Title 5, or Town
Health Regulations, whichever is more stringent.
Very truly yours,
Ann Ja a Eshbaugh
Acting Chairperson
J m e s H. Crcr, Sro .
BOARD OF HEALTH
TOWN OF BARNSTABLE
TM/bs
copy: Juniper Development Group
Town Clerk
Health Department
Liston Associates, Inc.
Centerville/Marstons Mills Fire and Water District
Cotuit Water and Fire District
Conservation Commission
t
1 GZA DRILLING, INC. PROJECT REPORT OF BORING No. 1
SHEET 1-077
1215 W. CHESTNUT ST. BROCKTON, MA 02401 SITE INVESTIGATION FILE No. 13870
(A DIVISION OF GOLDBERG-fO1NO & ASSOCIATES, INC) R7E-2 -MTUIT/BARRETTMF=MA CHKD. BY —JEfi--
FOREMAN: D. ANDERSON BORING LOCATION BY LISTON ASSOCIATES
CLASSIFIED BY: GROUND SURFACE EUVA11UN DATUM
INSPECTOR: LISTON ASSOC DATE START 4/3/90 -UATE-MM— 4/3/9T -
SAMPLER: UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 211 SPLIT GROUNDWATER READINGS
SPOON DRIVEN USING A 140 lb. HAMMER FALLING 30 In.
CASING: UNLESS OTHERWISE NOTED, CASING DRIVEN USING A 300 lb. DATE TIME WATER CASING STABILIZATION TIME
HAMMER FALLING 24 In. 4/3 NO WATER ENC TERED
CASING SIZE: OTHER: 3-3/411 HSA
D C B R
E A L SAMPLE SAMPLE DESCRIPTION E
P S 0 M STRATUM DESCRIPTION
T N W PEN./ DEPTH K
H G S No. REC I (Ft.) BLOWS/6-- BURMISTER CLASSIFICATION S
0 1 24/18 01-2' 4-10-8-13 Median dense, light brown fine SAND and 0f
SILT, Loam - TOPSOIL/SUBSOIL TOPSOIL/SUBSOIL
2'
5
SAND,
10
2 24/22 10'-121 9-12-25-29 Dense, light brown, fine to median SAND, trace Gravel
trace fine Gravel
15
20
3 24/24 01-22, 15-28-36-41 Very dense, light brown, fine to mediun
SAND, trace fine Gravel
25
1'LTNR ST.
� C.AVSTASLE
30
4 18/18 301-3116 19-28-34 Very dense, light brown, fine to median
SAND, trace fine Gravel
3116
BOTTOM OF BORING
J
Blows/Ft SOILS COHESIVE SOILS REMARKS:
Density Blo /Ft Density
s/Ftn s APR, 990
0- 4 V. LOOSE < 2 V. SOFT R
4-10 LOOSE 2- 4 SOFT
10-30 M. DENSE 4- 8 M. STIFF
30-50 DENSE 8-15 STIFF
> 50 V. DENSE 15-30 V. STIFF
> 30 HARD
NOTES: 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL.
2) MAYEOCCUREDUEETOINGS OTHERAVE BEEN MADE AT FACTORS THAN THOSEMES AND PRESENTUATETHEOTIMEIONS STATtD MEASUREMENfSFWEREUMADENS OF GROUNDWATER
GZA BORING No. 1
Y
GZA DRILLING, INC. PROJECT REPORT OF BORING No. 2
SHEET 1--07-1
1215 W. CHESTNUT ST. BROCKTON, MA 02401 SITE INVESTIGATION FILE No. 13870
(A DIVISION OF GOLDBERG-f0INO & ASSOCIATES, INC) RTE-7ff,-=UIT1BARNE$TA9LE.-RA CHKD. BY ----UEA—
FOREMAN: D. ANSERSON BORING LOCATION BY LISTON ASSOC
CLASSIFIED BY: GROUND SURFACE ELEVATION
INSPECTOR: LISTON ASSOC. DATE START 4/3/90 7ATE—ER6— 4/3/91T—
SAMPLER: UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2" SPLIT GROUNDWATER READINGS
SPOON DRIVEN USING A 14o lb. HAMMER FALLING 30 In.
DATE TIME WATER CASING STABILIZATION TIME
CASING: UNLESS OTHERWISE NOTED, CASING DRIVEN USING A 300 lb.
HAMMER FALLING 24 In. 4/3 NO WATER ENCOU4TERED
CASING SIZE: OTHER: 3-3/4" NSA
D C B R
E A L SAMPLE SAMPLE DESCRIPTION E
P S 0 M STRATUM DESCRIPTION
PT N W PEN./ DEPTH K
H G S No. REC (Ft.) BLOWS/6" BURMISTER CLASSIFICATION S
0 1 24/24 01-2' 6-8-7-10 Loose brown, fine SAND & SILT, trace fine 0'
Gravel - TOPSOIL/SUBSOIL TOPSOIL/SUBSOIL
2'
5
SAND,
10
2 24/20 10'-12, 12-12-18-22 MediLan dense Light brown, fine to median
SAND, trace line Gravel trace Gravel
15
20
3 24/24 20'-22' 15-22-31-33 Very dense, Light brown, fine to median
SAND, trace fine Gravel
25
30
4 24/22 30'-32' 21-26-34-38 Very dense, light brown fine to median
SAND, trace fine Gravel
32'
BOTTOM OF BORING
GRANULAR SOILS COHESIVE SOILS REMARKS:
Blows/Ft Density Blows/Ft Density
0- 4 V. LOOSE < 2 V. SOFT
4-10 LOOSE 2- 4 SOFT
10-30 M. DENSE 4- 8 M. STIFF
30-50 DENSE 8-15 STIFF
> 50 V. DENSE 15-30 V. STIFF
> 30 HARD
NOTES: 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL.
2) WATMAYEOCCUREDUEETOINGS OTHERAVE BEEN MADE AT FACTORS THAN THOSEMES AND PRESENTUATETHEOTIMEIONS STATb MEASUREMENfSFWEREUAMADENS OF GROUNDWATER
GZA BORING No. 2
r
GZA DRILLING, INC. PROJECT REPORT OF BORING No. 3
SHEET 1-7-1
1215 W. CHESTNUT ST. BROCKTON, MA 02401 SITE INVESTIGATION FILE No. 13870
(A DIVISION OF GOLDBERG-f0IN0 & ASSOCIATES, INC) R1EZ9—.=UIT/BARNESTAZ; 97% CHKD. BY ---UEF —
FOREMAN: D. ANDERSON BORING LOCATION BY LISTON ASSOC
CLASSIFIED BY: GROUND SURFACE ELEVATION
INSPECTOR: LISTON ASSOC. DATE START 4/3/90 7TATf—Equ— 4/3/9D—
SAMPLER: UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2" SPLIT GROUNDWATER READINGS
SPOON DRIVEN USING A 140 lb. HAMMER FALLING 30 In.
CASING: UNLESS OTHERWISE NOTED, CASING DRIVEN USING A 300 lb. DATE TIME WATER CASING STABILIZATION TIME
HAMMER FALLING 24 In. 4/3 NO WATER ENCOUNTERED
CASING SIZE: OTHER: 3-3/4" HSA
D C B R
E A L SAMPLE SAMPLE DESCRIPTION E
M STRATUM DESCRIPTION
PT N W PEN./ DEPTH K
H G S No. REC (Ft.) BLOWS/6" BURMISTER CLASSIFICATION S
0 1 24/18 01-2' 3-5-7-7 Loose brown, fine SAND & SILT, trace fine 0'
Grave[ - TOPSOIL/SUBSOIL TOPSOIL/SUBSOIL
2'—
5
SAND,
10
2 24/24 10'-12, 8-9-11-1222 Medium dense light brown, fine to medium
SAND, trace fine Gravel trace Gravel
15
20
3 24/20 20'-221 12-12-14-12 Medium dense light brown, fine to medium
SAND, trace fine Gravel
25
30
4 24/24 30'-32' 14-17-22-29 Dense, light brown, fine to medium SAND,
trace fine Gravel
32'
BOTTOM OF BORING
GRANULAR SOILS COHESIVE SOILS REMARKS:
Blows/Ft Density Blows/Ft Density
0- 4 V. LOOSE < 2 V. SOFT
4-10 LOOSE 2- 4 SOFT
10-30 M. DENSE 4- 8 M. STIFF
30-50 DENSE 8-15 STIFF
> 50 V. DENSE 15-30 V. STIFF
> 30 HARD
NOTES: 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY. BE GRADUAL.
2) MAYEOCCUREDUEETOINGS OTHERAVE BEEN MADE AT FACTORS THAN THOSEMES AND PRESENTUATETHE TIMEIONS STAHD MEASUREMENfSFWEREUMADENS OF GROUNDWATER
GZA BORING No. 3
GZA DRILLING, INC. PROJECT REPORT OF ORING No. 4
1215 W. CHESTNUT ST. BROCKTON MA 02401 SITE INVESTIGATION FILE No. 13870
(A DIVISION OF GOLDBERG-f0INO 8 ASSOCIATES, INC) R7E-287=UIT/BARNn7MF BRA CHKD. BY
FOREMAN: D. ANDERSON BORING LOCATION BY LISTON ASSOC
CLASSIFIED BY: J. HEBERT GROUND SURFACE ELEVATION
INSPECTOR: LIbIUM AbbUU. DATE START 4/3/90 AMU— 4/3/91T--
SAMPLER: UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2" SPLIT GROUNDWATER READINGS
SPOON DRIVEN USING A 140 lb. HAMMER FALLING 30 In.
DATE TIME WATER CASING STABILIZATION TIME
CASING: UNLESS OTHERWISE NOTED, CASING DRIVEN USING A 300 lb.
HAMMER FALLING 24 In. 4/3 NO WATER ENCOUMTERED
CASING SIZE: OTHER: 3-3/4" NSA
D C B R
E A L SAMPLE SAMPLE DESCRIPTION E
P S 0 M STRATUM DESCRIPTION
PT N W PEN./ DEPTH K
H G S No. REC (Ft.) BLOWS/6° BURMISTER CLASSIFICATION S
0 1 24/24 01-21 2-4-3-4 Loose brown fine SAND 8 SILT, trace fine 0f
Gravel - TOAOIL/SUBSOIL TOPSOIL/SUBSOIL
2'
5
SAND,
10
2 24/19 101-12, 9-10-10-132 Mediun dense light brown, fine to mediun
SAND, trace line Gravel trace Gravel
15
20
3 24/20 20'-22' 14-19-20-20 Dense, light brown, fine to mediun SAND,
trace fine Gravel
25
30
4 24/24 301-321 21-23-27-28 Dense, light brown, fine to mediun SAND,
trace fine Gravel
32'
BOTTOM OF BORING
GRANULAR SOILS COHESIVE SOILS REMARKS:
Blows/Ft Density Blows/Ft Density
0- 4 V. LOOSE < 2 V. SOFT
4-10 LOOSE 2- 4 SOFT
10-30 M. DENSE 4- 8 M. STIFF
30-50 DENSE 8-15 STIFF
> 50 V. DENSE 15-30 V. STIFF
> 30 HARD
NOTES: 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL.
2) MAYEOCCUREDUEETOIOTHERAFACTORS THAN THOSEMPRESENTUATETHE TIMEIMEASUREMENfSFWEREUMADENS OF GROUNDWATER
GZA BORING No. 4
'~ LISTON
ASSOCIATES, INC.
Civil Engineers • Land Surveyors
Barnstable Planning Board and April 4, 1990 .
Conservation Commission.
Barnstable Town Offices
Hyannis, Mass.
Dear Ladies and Gentlemen,
As agreed in my submittal of the Cotuit Landing, Preliminary Plan
of lots, we •have taken four borings (B 1, B 2, B 3, & B 4, ) and
taken two perculation tests (Pere 1, Perc 2 ) all of which are
labelled and shown on sheets # 4 & #5.
The borings went down to 30 feet and did not encounter ground
water. The perculation tests were taken in the upper soil layer
and were found to be six (6) minutes per inch although the borings
show an underlayer which has a perculation rate of 2 minutes or
less. The proposed Detention Basin was designed for the percula-
tion rate of 6 minutes.
, The Hydrological Calculations show an existing run-off for a 100
year storm of 1. 4 c.f.s. (page 2) ,a post development
H�1JNv f•,_ p
the street of 11 . 9 c. f.s. ( page 3) and on page 7 Q Tom
OrGR'St.�L��
Peak inflow 11 . 9 c.f. s 11 . 8 hrs
.Peak grounddischarge 1 . 2 c. f.s. 12. 2 -13 . 6 hrs "
Peak height 53 . 9 ft. 12 . 6- 12 .8 1yKpR J
1
30 Boston Post Road, Wayland, MA 01778 (508) 358-2713 Fax (508) 358-2715
Cotuit Landing Page 2 April 4, 1990 .
The top of the proposed Detention Basin has been set at 54 . 5 feet
giving a freeboard of 0. 6, even in a 100 year storm.
You will note that I have moved the Detention Basin entirely on a
lot owned by John Warner, so there will be no title problem and
ask that you make the attached plan the plan to be reviewed at
your Public Hearing.
Thank you for your cooperation,
Very truly yours,
ugla L. Liston P.E.
30 Boston Post Road, Wayland, MA 01778 (508) 358-2713 Fax (508) 358-2715
DRAINAGE CALCULATIONS
BASED ON A 100-YEAR / 24-HOUR RAINFALL
COTUIT LANDING
BARNSTABLE, MASSACHUSETTS
I
PREPARED FOR: JOHN L. WARNER
& JUNIPER DEVELOPMENT GROUP
--------------------------
EXISTING SUBCATCHMENT DATA 1 .
--------------------------
SUBCAT. # 1
AREA= 2 . 9 ACRES
CN= 35
TC= 12
PEAK FLOW= 2 CFS
RAINFALL= 7 INCHES
SUBCAT # 2
AREA= 2 . 7 ACRES
CN= 35
TC= 15
PEAK FLOW= 1 CFS
RAINFALL= 7 INCHES
SUBCAT # 3
AREA= 1 . 2 ACRES
CN= 90
TC= 6
PEAK FLOW= 11 CFS
RAINFALL= 7 INCHES
EXISTING ROUTING DATA
---------------------
--------------------
EXISTING MEMORY DATA
--------------------
MEMORY ' 1
PEAK FLOW= 11 . 9 CFS
---------------------
EXISTING PONDING DATA
---------------------
POND # 1
PEAK OUTFLOW= 1 . 2 CFS
MAX. WATER STORED= . 32 AC . FT.
f
2.
PRE-DEVELOPMENT
HYDROGRAPH .FOR SUBCATCHMENT # 1
-------------------------------
CUBIC FEET PER SECOND
HOUR
10 . 0 0
10 . 2 0
.10 . 4 0
10 . 6 0
10 . 8 0
11 .0 . 1
11 . 2
11 . 4 *** . 1
11 . 6 ******* . 2
11 . 8
12 . 0 **************** **************"************** * ****** 1 . 4
12 . 2 ******************* . 5
12 . 4 *********** . 3
12 . 6 ******* . 2
12 . 8 ******"* . 2
13 . 0 ******* . 2
13 . 2 *** . 1
13 . 4 *** . 1 .
13 . 6 *** . 1
13 . 8 *** . 1
14 . 0 *** . 1
14 . 2 *** . 1
14 . 4 *** . 1 •
14 . 6 *** . 1
14 . 8 *** . 1
15 . 0 *** . 1 .
15 . 2 *** . .1
15 . 4 *** . 1
15 . 6 *** . 1
15 . 8 *** . 1
16 . 0 *** . 1
16 . 2 *** . 1
16 . 4 *** . 1
16 . 6 0
16 . 8 0
17 . 0 0
17 . 2 0 .
17 . 4 0
17 . 6 0
17 . 8 0
18 . 0 0
18 . 2 0
18 . 4 0
18 . 6 0
18 . 8 0
19 . 0 0
19 . 2 0
19 . 4 .0
19 . 6 0
19 . 8 0
20 . 0 0
POST-DEVELOPMENT 3 .
SUBCAT #2 (GROUND AREA) & SUBCAT #3 (PAVEMENT OF PROPOSED ROAD)
WHICH FLOW INTO RETENTION BASIN. #1
HYDROGRAPH FOR MEMORY # 1
--------------------------
CUBIC FEET PER SECOND
HOUR
10 . 0 0
10 . 2 0
10 . 4 . 1
10 . 6 . 1
10 . 8 * . 2
11 . 0 * . 3
11 . 2 ** . 5
11 . 4 * * . 6
11 . 6 ******* 1 . 4
11 . 8 * ***** ************ *********************** * ***** ** * **** ** 11 . 9
12 . 0 ********* ******* ************* ** 6 . 600001
12 . 2 ********* ** 2 . 3
12 . 4 *** * 1 . 6
12 . 6 ** *** 1 . 1
12 . 8 ***** 1
13 . 0 *** , g
13 . 2 * . 7000001
13 . 4 *** ' 7000001
13 . 6 *** . 6
13 . 8 * . 6.
.14 . 0 ** . 5
•14 . 2 . 5
14 . 4 ** . 5
14 . 6 ** . 4
14 . 8 ** . 4
15 . 0 * . 4
15 . 2 ** . 4
15 . 4 ** . 4
15 . 6 ** . 4
15 . 8 ** .4
16 . 0 * . 3
16 . 2 * 3
16 . 4 * . 3
16 . 6 * . 2
16 . 8 * . 2
. 2
17 . 2 * . 2
17 . 4 * . 2 '
17 . 6 * . 2
17 . 8 * . 2
18 . 0 * . 2
18. 2 * . 2
18 . 4 * . 2
18 . 6 * . 2 _
18 . 8 * 2
19 . 0 *- . 2
19 . 2 * . 2
. 2 '
19 . 6 * . 2
19 . 8 * . 2
BEGIN. WITH MEMORY 1 4.
WHICH COMPUTATION DO YOU WISH TO PERFORM ( O=MENU ) 3
INPUT THESSTORAGE POND # ( 1-10 ) ? 1
ROUTE THROUGH STORAGE POND # 1
DO YOU WANT TO INPUT THE OUTFLOW
OR USE ONE OF THE OUTLET CONTROL
DEVICES ( 1=INPUT FLOWS DIRECTLY.,
2=OUTLET CONTOL DEVICE) ? 2
HOW MANY STORAGE VS . ELEVATION VALUES
DO YOU WANT TO INPUT (THERE MUST BE ONE
AT EACH INVERT ELEVATION) ? 4
AT EACH ELEVATION INCREMENT, INPUT;
. . . 1 ) THE ELEVATION
. . . 2 ) THE CUMLATIVE STORAGE VOLUME
IN ACRE-FEET
THE ELEVATION= ? 48
THE STORAGE VOLUME IN ACRE-FT= ? 0
THE ELEVATION= ? 50
THE STORAGE VOLUME IN ACRE-FT= ? . 086
THE ELEVATION= ? 52
THE STORAGE VOLUME IN ACRE-FT= . ? . 176
THE ELEVATION= ? 54
THE STORAGE VOLUME IN ACRE-FT= ? . 323
HOW MANY OUTLET CONTROL DEVICES ARE IN
THIS POND ( 1-10 ) ? 2
INPUT THE TYPE DEVICE FOR OUTLET # 1
. . . 1=V-NOTCHED WEIR
. . . 2=RECTANGULAR WEIR
. . . 3=SUBMERGED ORIFICE
. . . 4=CULVERT
4
INPUT THE INVERT ELEVATION FOR
OUTLET # 1
? 48
INPUT THE GEOMETRY OF THE CULVERT
( 1=CIRCULAR, 2=RECTANGULAR) ? 1
INPUT THE DIAMETER OF THE CULVERT
. IN JNCHES ; ? 4
INPUT THE LENGTH OF THE CULVERT IN FEET; ? 50
INPUT MANNINGS # (N) OF THE CULVERT,
INPUT THE SLOPE OF THE CULVERT IN FT/FT ; ? . 005 5.
INPUT. THE .TYPE OF ENTRANCE
. . . 1= SHARP-EDGE PROJECTING INLET
. . . 2= FLUSH INLET, SQUARE EDGE.
. . . 3= CONCRETE PIPE, GROOVE OR BELL
PROJECTING
. . . 4= CONCRETE PIPE, GROOVE OR BELL
FLUSH
. . . 5= 'WELL-ROUNDED ENTRANCE
? 5
INPUT THE TYPE DEVICE FOR OUTLET # 2
. . . 1=V-NOTCHED WEIR
. . . 2=RECTANGULAR WEIR
. . . 3=SUBMERGED ORIFICE
.. . . 4=CULVERT
4
INPUT THE INVERT ELEVATION FOR
OUTLET # 2
? 48
INPUT THE GEOMETRY OF THE CULVERT
( 1=CIRCULAR, 2=RECTANGULAR) ? 1
INPUT THE DIAMETER OF THE CULVERT
IN INCHES ; ? 4
. .INPUT THE LENGTH OF THE CULVERT IN FEET; ? 50
INPUT MANNINGS # (N) OF THE CULVERT,
IF YOU NEED HELP, TYPE 101 ; ? . 013
INPUT THE LENGTH OF THE CULVERT IN FEET; ? 50
INPUT MANNINGS # (N) OF THE CULVERT,
IF YOU NEED HELP, TYPE 101 ; ? . 013
INPUT THE SLOPE OF THE CULVERT IN FT/FT; ? . 005
INPUT THE TYPE OF ENTRANCE
. . . 1= SHARP-EDGE PROJECTING INLET
. . . 2= FLUSH INLET, SQUARE EDGE
. . . 3= CONCRETE PIPE, GROOVE OR BELL
PROJECTING
. . . 4= CONCRETE PIPE , GROOVE OR BELL
FLUSH
. . . 5= WELL-ROUNDED ENTRANCE
� 5
THE MAX. WATER DETAINED= . 32 ACRE-FT
WRITING TO F21POND FILE
WHICH COMPUTATION DO YOU WISH TO PERFORM (O=MENU)
0 ' OZ
£ ' 8 ' 6T
9 ' 9 ' 8T
9 ' * * 0 ' 8T
I * * * O ' 9T
VT D * CT
VT O ' Cl
VT 9 ' ZT
Z ' i ***** *** *********** ***** * * * ** ***** #*** *** ** # ** V ' ZT
Z ' i ** * ** ********* ************ * * *** * ** *** * ***#*# Z ' ZT
0 ' ZT
Z ' * **** ** 9 ' TT
T ' . ***** Z ' TT
T ' ***** 0 ' TT '
0 8 ' 0T
0 9 ` 01
0 t OT
0 ' Z ' OT
0 0 ' OI
2if10H
QNOOHS HHd J HHd OIWIO
-------------------------------
T # QNOd ZIOH HdVHDOHGAH �MO'IdlnO
.9
7 .
STORAGE POND # 1 DATA
--------------------------
------------------------------------------------------------------
TIME INFLOW OUTFLOW ELEVATION STORAGE
. HR. CFS CF3 ACRE-FT.
------------------------------------------------------------------
10 . 0 0 . 0 0 . 0 48 . 1 0 . 00
10 . 2 0 . 0 0 . 0 48 . 1 0 . 00
10 . 4 0 . 1 0 . 0 48 . 1 0 . 01
10 . 6 0 . 1 0 . 0 48 . 1 0 . 01
10 . 8 0 . 2 0 . 0 48 . 1 0 . 01
11 . 0 0 . 3 0 . 1 48 . 2 0 . 01
11 . 2 0 . 5 0 . 1 48 . 3 0 . 02
11 . 4 0 . 6 0 . 2 48 . 5 0 . 03
11 . 6 1 . 4 0 . 2 48 . 7 0 . 04
11 . 8 11 . 9 0 . 8 50 . 5 0 . 16
12 .0 6 . 6 1 . 1 53 . 0 0 . 28
12 . 2 2 . 3 1 . 2 53 . 7 0 . 31
12 . 4 1 . 6 1 . 2 53 . 8 0 . 31
12 . 6 1 . 1 1 . 2 53 . 9 0 . 32
12 . 8 1 . 0 1 . 2 53 . 9 0 . 31
13 . 0 0 . 8 1 . 2 53 . 8 0 . 31
13 . 2 0 . 7 1 , 2 53 . 7 0 . 30
13 . 4 0 . 7 1 . 2 53 . 6 0 . 29
13 . 6 0 . 6 1 . 2 53 . 5 0 . 28
13 . 8 0 . 6 1 . 1 53 . 4 0 . 28
14 . 0 ' 0 . 5 1 . 1 53 . 2 0 . 27
14 . 2 0 . 5 1 . 1 53 ,'1 0 . 26
14 . 4 0 . 5 1 . 1 53 . 0 0 . 25 -
14 . 6 0 . 4 1 . 1 52 . 8 0 . 24
14 . 8 0 . 4 1 . 1 52 . 7 0 . 22
15 . 0 0 . 4 1 . 0 52 . 5 0 . 21
15 . 2 0 . 4 1 . 0 52 . 4 0 . 20
15 . 4 0 . 4 1 . 0 52 . 2 0 . 19
15 .6 0 . 4 1 . 0 52 . 1 0 . 1.8
15 . 8 0 . 4 1 . 0 51 . 9 0 . 17
16 . 0 0 . 3 0 . 9 51 . 7 0 . 16
16 . 2 0 . 3 0 . 9 51 . 5 0 . 15
16 . 4 0 . 3 0 . 9 51 . 3 0 . 14
16 .6 . 0 . 2 0 . 8 51 . 0 0 . 13
16 . 8 0 . 2 . 0 . 8 50 . 8 0 . 12
17 . 0 0 . 2 0 . 8 50 . 6 0 . 11
17 . 2 0 . 2 0 . 7 50 . 4 0 . 10
17 . 4 0 . 2 0 . 7 50 . 2 0 . 10
17 . 6 0 . 2 0 . 7 50 . 0 0 . 09
17 . 8 0 . 2 0 . 6 49 . 8 0 . 08
18 . 0 0 . 2 0 . 6 49 . 7 0 . 07
18 . 2 0 . 2 0 . 5 49 . 6 0 . 07
18 . 4 0 . 2 0 . 5 49 . 4 0 . 06
18 . 6 0 . 2 0 . 5 49 . 3 0 . 06
18 . 8 0 , 2 0 . 4 49 . 3 0 . 06
19 . 0 0 . 2 0 . 4 49 . 2 0 . 05
19 . 2 0 . 2 0 . 4 49 . 1 0 , 05
19 . 4 ' 0 . 2 0 . 3 49 . 0 0 . 05
19 . 6 0 . 2 0 . 3 49 . 0 0 . 05
19 . 8 0 . 2 0 . 3 48 . 9 0 . 04
20 . 0 0 . 2 0 . 3 48 . 9 0 . 04
I
F
a .� K
-"�i�-..•�^ I�
C
FORM B •fi, ' 13 P 1 :15 -
G C:-
Application for Tentative Approval of Preliminary Plan
September 12 , 19 89
To the Planning Board of the Town of Barnstable
The undersigned, being the owners of all land included
within a proposed subdivision shown on the accompanying plan,
entitled Preliminary Plan of Lots, Falmouth Road
and dated September 5 , 19 89 , submit _such plan as a
preliminary plan showing in a general way the proposed subdi-
vision of the land, and makes application to the Board for
tentative approval thereof.
The Owner' s title to the land is derived *Certificates
N/A dated N/A , 19 , and
recorded in Barnstable County Registry of Deeds . Book ,
Page , or under Certificate of Title No. * ,
registered in Land Registry District , Book * , Page
.* r
G
pli n
V
Address
* Certificate of Title No. 88583, dated May 10, 1982, filed in Registration
Book 721, Page 23 for the Registry District of Barnstable County and Certificate.
of Title No. 69447, dated Dace-n>ar 30, 1976, filed in Registration Book 561,
Page 47, subsequently transfered to Certificate of Title No. 116451.
COTUIT LANDING
PRELIMINARY LOT PLAN & PROFILE
C
of Land in Barnstable, Massachusetts
prepared for
JUNIPER DEVELOPEMENT GROUP
C.S.
J 0 H ,N L , WARNER
rrrrm LISTON
IATOS.91MCM
C" ft eam 0 Land Surveyors
�11 PW'20^ VA71M IUML Olm (m) IIIIIIIIIIII-4m
SCALE: 1 40 FEBRUARY 21 ,
0 im 2w
rolb i
i
0 io 40 60 K
DRAWN BY: M.A.F. SHEET #5
&AA
VK
OF
GIM,
%OA- DO W
MUM
C3
�,ro- ol LISTON
LISTON!
ol NO, 6-c,'41
W. 771(o)
PK C.S.
LOT f� , r 1 1% 1\
AREA= 6.75 ��A ES f"d)
NAIL
7C�,
70
To's ro
�lx
-'N J7�'
f
-T 15.4
A
Ij
75
IL2
o
LLJ
Z-
4—
A-rz<ins
(0 C.B. -jro�b
f
10
A.
A,' Al
C!4
LOT #2 C.S.
co+,u
t CK'
0* A
-wT #1 1-6 AREA= 4.27 ACRES "r
er
AREA=' i(Lol ACRES
o—D
ti
C.S.
(f nd)
lool
'110
"oo
4
CV
-00,
—75
oss
7� r
11 2&7V�� 70
C.B. C.B. ,
74 70
U.P. #10 (f nd) 537.5 r
40
(y- WAUNDEFE *7
0
00, U.P. #8 N61-W460E
k, IUMOF"Nam
0 .
W.G.
_7Z X.G.o n re c-ra wo
W.(;.o
RIMt:64.72
ro
BIT PRANG
k!28�" 4t
BIT MANG
MATCH UNE
N,
ow
. SQt�'35
QJ541.55'
9319 46OW ' A ti�
S83�1*35 4�•�, ,e
N 1' 4
mob,, LOT #2
AREA= 4.27 ACRES
LOT #3
AREA= 6.75 ACRES
338.42! a�1.pb
S83'�� 3�5�
836,e7 S
sa3•�� �
�m
s
_LOT #1 � O
AREA= 10.01 ACRES a, SOP
NOTE:
PROPERTY UNE WAS TARN FROM PLANS ENTITLED- '��� Rs30.00
PLAN � LAND / Lr40.85
BARNS7AIN-4 MASS. W �R• 1�
BEING A SUDDIVISM OF LOTS 104A, 104A. AND INDUSTRY ROAD AS SHOWN �� m Gym j► f �
ON LC.C. 228W AND LOTS 106 & 107 AS SHOWN ON LC-C. 22&W.
s
DATED: NOV. 16, 1676 �• S
AND SURVEYED BY
LOT 115
BAX TER t NYE W. 7.55 ACRES Ti 12.
OSTERVI11Y. MAASS fn
N
t /
PLAN OF LAND �8
a S
SL
0010 A SUBDIVISION OLo�1�i3 S SHOWN ON L.C.C. 22BU
DAYM FE L 2, 1662 S�`i '128.92�
REV: 4-20-d2 _ Ng3.53•
• r R-10.00
AND SURVEYED BY
BAXTER t NYE INC.REGISTERED UND SURVEYORS
,
OSTERVILLL BASS.
LOT #116
�q ob
Gyp► �c� ' op .
NOTE.
PARCEL SHOWN HEREON WHICH CONTAINS '. .0 •� S � , �
LOTS #115911691179 do 118 IS SHOWN t
AS PARCEL #39 ON BARNSTABLE ,a
ASSESSORS PLAN NO.58 ' o NOTE.
WATER MAIN WILL BE EXTENDED FROM THE REAR OF
{(I PRESENT SHOPPING CENTER TO RTE. 28 AND WILL
\ � BE JACKED UNDER RTE. 28 TO THE SOUTH SIDE.
LOT f 117 _ THEN IT WILL BE MENDED WESTERLY UNDER THE
DIRECTION AND SUPERVISION OF MR. DANIEL RUGG
$ OF THE CENTERVILLE-OSTERVILLE WATER DEFT.
Z
4 R Lar �11s I I ,�•1d o INDEX PLAN
� OP
-4 FALMOUTH RD., BARNSTABLE, MASSACHUSETTS
INDEX OF SHEETS prepared for
JUNIPER DEVELOPMENT GROUP
:�` „� � ►O SHEET 1 INDEX PLAN
& JOHN L , WARNER
SHEET 2 PRELIMINARY LOT PLAN
tp SHEET 3 PRELIMINARY LOT PLAN & PROFILE TAWSTO , li�lC.
i •�1 aecr Ciril Pbgiwera s Lead S�z*�:�,jrora
SHEET 4 PRELIMINARY LOT PLAN n NOW= NN soar ZWAM ZM W"
SHEET5 » — , SEPTEMBER 5, 1989
# PRELIMINARY LOT PLAN & PROFILE SCALE. 1 — 100 REV: MARCH 139 1990
SHEET #6 PRELIMINARY LOT PLAN & PROFILE o A0 No '°° �.
o �o 00 Aso K
SHEET #7 PRELIMINARY PROFILE
DRAWN BY. M.A.F.
SHEET 1
I
_
\ '
� 65-
6 0
45
0
V.B.
(fnd)
/ 0/;
IV
c /
' (fnd) Y EX G /
33
BOG
'S
7f
NOTE: ABUTTING TOPOGRAPHY, STREET,AND LOT LINES PARTIALLY TAKEN
S\
FROM A PRELIMINARY PLAN OF COTUIT PINES, COTUIT, MASS., DRAWN
BY ARROW ENG. INC., 10 CAPE DR., SUITE B, MASHPEE, MA 026491
DATED NOV 10, 1989.
,
10
W
Z
—55
155
II
-
1
w
_ N, 60
COTUIT LANDING
PRELIMINARY LOT PLAN & PROFILE lol
of Land` in Barnstable, Massachusetts / / , ' loll90,
l
for
prepared 5
0 •._,�� � ,� fnd i ,r . a � i �o
JUNIPERoN
ro
DEVELOPEMENT GROUP _ ,- - roll
\
/ — / 1
9
& JOH N L . WARNER
�HSMLISTON � �- � � �•�' ,- �Y i C.B. e
• _ ,- r 0 fnd) oouRr�
/ t
WINNOW
INC N
Cirl] ftaimeQTB O Land mayors ;� r ^ 4c ... . _ - f — r-- �l \ ,_
IN
so so�ro�s POW ROAX TAZAM issM KM (roe) Isd-ells ��DouGL-As u � ��,��a �r`4�x - _ _ � - o �� 1 \60 6
y µ^,h 4
i � 6 \ 1 \
n r
!! 14� I g �%0Sn o ` DOJ : 1
SCALE: 1 — 40 FEBRUARY 21 , 1990 u ro -
/IV
0 40 so 120 160 200 FT. \ss/ol�aL E! -' 9OFfss�o l
� SUR MATC}{ LINE
Y
DRAWN BY: M.A.F. SHEET #6 �
s r
j - - I - —
\ - — 70
52� —6 0
I
-1. 50
5
\ - d
-35
' \ . - _.. _.. .\� r �,. / � - .,..,,._ r' - . •' 1. ..
C.B.
(fnd)
--3 4—
- / l
I (fnd) i / EX G
I / 33 \ ��
BOG
4orlbg. 1 � �
/6to
NOTE: ABUTTING TOPOGRAPHY STREET ANDi LOT LINES PARTIALLY TAKEN K FROM A PRELIMINARY PLAN OF COTUIIT PINES, COTUIT, MASS., DRAWN
BY ARROW ENG. INC.. 10 CAPE DR., SUITEE B, MASHPEE, MA 02649 -..
DATED NOV. 10, 1989.
i
° Dt� /
10
Je
6
r
— 65
Ar
R 70,
01
to
COTUIT LANDING "o" 1�
.1 I-ool
1
i
i � J
i
N \
PRELIMINARY LOT PLAN & PROFILE -^ \ f r o an inBarnstable, assac uses \ \ , ' it C.S. -901
- _ _ ` . \ ; �6-
prepared for l \ 5Qrob
✓ j fndl �� / ` �\
JUNIPER DEVELOPEMENT GROUP
8c JOHN L . WARNER
oourr 6 i
LMSTON
fnd � � o
405
/IV
Girg l brinoors O Land Srzrverors 6 6 \
(O00) 6
» t G� 19 %'0 3 L:ISTON i'' DOUrLAS 1 '� w- _ _ - i- � • '" � 1 � ' � \ � \ � ' ` `6 _
le
6941
SCALE' i `— 40' FEBRUARY 21 , 1990 �.a�,o g u rc!
S
0 40 80 120 160 200 FT.
ATC N L1 N E C"
o zo 40 60
DRAWN BY: M.A.F. SHEET #6
r
t •
S83•56
35OW
.55
541 �
S1331-3146 Aj, A
499.99 e
sa3'31 wy
N
167.14
� J
J �
LOT #2 '°e. •�-
AREA— 4.27 ACRES
LOT #3 _
AREA— 6.75 ACRES
IIII
6 42
338 �
46OW
wo ' W 5
48•W
838,I3T
sa3•
old
I,
N
I �
S
LOT #1
AREA= 10.01 ACRES
O
Op'
� I� S
O
NOTE.
FROM PLANS EN11T1.ED- 1d ,
PROPERTY LArE WAS TAI�QI � Rs30.00
PLAN OF LAND / L-40.85
IN
BARNSTABLE. Y4SS• t
M GS r
BEING A SUBDIVISION of LOTS 1 o4A. 105A, AND wousTWY ROAD AS SHOWN co ti J►
ON L.C.C. Z'28M AND LOTS 106 t 107 AS SHOWN ON LC.C. Z�4F. - IPA C�
,
QATEDt Nov. 16, 1978
AND SURVEYED BY
LOT 115
BAXTER & NYE INC. 7.5I -ACRES
*'
SURVEYORS REOfSTERED LAND
N
OBTERVILLF.. PASS.
Ak.w
•
8
PLAN OF LAND
�A
8
qi
6 S
BARNST . iIASS.
� �
S
i
Lc.c. rlxu
suBonrlSloN OF LOT �1 a As sl�Io�wN ON _ dd BEING A
�•
8,92 _
A / �S .
DiATEDt FEB. � . Lr■126M
R_80.
S'>
4-20-8'l -.
REV: r
83
� AND SURVEYED BY
r
I
BAXTER t WE INC.
I
RED TERED LAND SURVEYORS
MASS.
OSiERVR1.E. 4d
\ -d
3�
uff #116
lop
9
4
1
II J
G �►
G G
NOTE.
ti
PARCEL SHOWN HEREON WHICH CONTAINS
`
� I LOTS 115,116,117, dt 118 IS SHOWN
•I'1
d
AS PARCEL #39 ON BARNSTABLE �
ASSESSORS PLAN NO.58 ASS d�
,
NOTE
TI
WATER MAIN WILL BE EXTEN DED FROM THE REAR OF
PRESENT SHOPPING CENTER TO RTE. 28 AND WILL
LO? 117
BE JACKED UNDER RTE. 28 TO THE SOUTH SIDE.
THEN R WILL BE EXTENDED Y WESTERL UNDER THE
DIRECTION AND SUPERVISION OF MR. DANIEL RUGG
Za OF THE CENTER111LLE OSiERNILLE WATER DEPT.
\ 8A
v
r O
3w
O
S
�a
i R
R
l
I d�• O
1
P
LDi' file oINDEXPLAN
FALMOUTH RD., BARNSTABE MASSACHUSMS
INDEX OF SHEETS prepared for
P
�
JUNIPER DEVELOPMENT GROUP
SHEET 1 INDEX PLAN
& JOHN
L . WARNER
SHEET 2 PRELIMINARY LOT PLAN
�8 \s e6
� r SHEET 3 PRELIMINARY LOT PLAN & PROFILE
wr
vemw
GYrfI 192ewam O Land Saz.*^v
1
� SHEET 4 PRELIMINARY LOT PLAN a soao� par »oA% UZ&� c�eh �a-�rrts
» , SEPTEMBER 5 1989
SHEET 5 _
.- # PRELIMINARY LOT PLAN & PROFILE SCALE. 1 100 :
REV. MARCH 13 1990
PRELIMINARY LOT PLAN 0
a me go ae Leo
Fr.
& PRFI
� SHEET #6 LE
o 40 ao no K
SHEET 7
# PRELIMINARY PROFILE:
DRAWN BY. M.A.F. SHEET 1
a
i
:
I i
COTUIT LANDING
C.9 ,
PRELIMINARY LOT PLAN & PROFILE
of Land in Barnstable, Massachusetts
prepared for
JUNIPER DEVELOPEMENT GROUP
C.S.
JOHN L . WARNER
LISTON
AS
CIVU JbVineers 0 Land Surveyors
80 0 NO MAD, TAMUM MAM 01M (M) Us-on
SCALE: 1 401 FEBRUARY 21 , 1990
0 40 so 120 160 200 FT.
164 A 0 40 60
DRAWN BY: M.A.F. S HEET #5
0
,5ro.\ DOLI
DOLI
DOM
ST
SM
ic,
LISTON
C�-
JAK4 e
6Q,41
r C.B. U.).7710
LDT
AREA= 6.75 ES n
-W NAL
7PCL_
0,
70
(0, rb.0
-'T
-7
C3 15.4
--175
04— zo
Lai
Z-
M
c�,
3c
C)
rot A
C.B. -jro,�
64
-T 446
110
9!'s
(0 lei
Z-ro
f LOT #2 C.90
'LOT #1
0.01 ACRES
' AREA=
AREA= 4.27 ACRES "0
f
C.B.
ro (fnd)
ro
01
41
lk I
ro
4T
ev
75
N81 VW25*F.
5 ro�
C.9*
MW�,
74 - 70
537.57 /
0 ,
(fnd)
U.:3. #10
60 - (fnd)
0 Ln�-
58500,
U #8
W.G! W.G.
I c
W.
RIM-64.72
BF PRANG
BIT MANG
MATCH LINE "C*
L I -
I
O -A
*^ .
CO u jL-jA N D G
FALMOUTH ROAD RTE . 28
43
Ile
fro\ w eCN,
i
O
O P r - O p O a • 0
- a
a0
0 0
0 sse o
O •ate • .,- . `.„ '•`\
af.3
o _
ortarits
o-
d i
v
0
r °
Ivs Post
fa rt ♦• 0 - 4
s
tom- , s Q ♦a- C ; ¢AO e Y 1` -+
•f. r
r ° o a ♦ 7a -
Io rr IO /o /o
O a
, DO a e• .. . DO . e 0 '
y • 0 / I I
.rr .tr ., y.q•..: i , + ng Q'8n
t Marys
$ Isla d
dro
0 _
® -
LOCUS MAP
SCALE : 1 - 2 083 '
Z1,41-1�h
IFEA
AV va
_ -
1 V7 TS an
0 0 0 I
u _ry o _rs
--
30 BOSTON P SST READ �A �LADhT MASS . 017178 _
— ( 508 ) 358 - 2715713 F� �� a8 358 � 9
i
S83'S635'W
541.55'
' ti
Ss3'3t � '�,• �y
S83'31'35'W
N
167.14
LOT #2 �-
.�• AREA= 4.27 ACRES
LOT #3
AREA= 6.75 ACRES
33&42! ��♦�
W.W446"'VIl
S83'3� C4
- �5
s
-._LOT #1 � O
AREA= 10.01 ACRES Epp►
NOTE:
PROPERTY LINE WAS TAKEN FROM PLANS ENTITLED— .o '1ar ��
R-so.00
PLAN OF LAND L-40.85
IN
SARN AB E. MASS. W ♦�
SEINO A SUBOP4 M OF LOTS 104A. t OdA. AND INDDL RY ROAD AS SHOWN
ON L.C.C. 220M AND LrO M 108 ! 107 AS SHOWN ON L.C.C. 22024F.
s
DATED: NOV. 16, 1 9"
AKIN SURVEYED 01f
LOT 115 .4 0
REGISTERED LAND SURVEYORS 7.lRf ACRES rN
OSiERVNJY. MASS.
t
�8
PLAN OF LAND
SARNSTASLE, MASS. r0 / �• Old �
BEING A 311001VISION of LOT 11 a AS SHOWN ON L.C.C.
DATED: FM 2. 1�2 tj� o� 128.92� r � / Lr 125.8Q �
REV: 4-20-42 « R-80.00
AND SURVEYED BY N = _
WIXTER 4 WE INNREOISTERM LAW SURVEYORS
K4
OSI MILM MASS.
LOT #118 �
9
NOTE: , ny ♦� �►�'�� ���
PARCEL SHOWN HEREON WHICH CONTAINS 's+ v S
LOTS 115.116017. & 118 IS SHOWN a ♦�A e'�♦a♦
AS PARCEL #39 ON BARNSTABLE �♦ ♦d
ASSESSORS PLAN NO.58
5p3v NOTE:-
WATER MAIN WILL BE EXTENDED FROM THE REAR OF
\ �'n' 1 PRESENT SHOPPING CENTER TO RTE. 28 MID WILL
• BE UNDER RTE. 28 TO SOUTH UTH SIDE.
LOT f 117 9d"-
_— THEN R WILL BE EXTENDED WESTERLY UNDER THE
DIRECTION AND SUPERVISION OF MR. DA NIEL RUGG
Za OF THE CENTERVRI E—OSTERMLLE WATER DEPT.
Ole
ksc�
4�' LAT f11i �a
INDEX PLAN
FALMOUTH RD., BARNSTABLE', MASSACHUSMS
INDEX OF SHEETS prepa for
JUNIPER DEVELOPMENT GROUP
,�► � � SHEET 1 INDEX PLAN
& JOHN L . WARNER
SHEET 2 PRELIMINARY LOT PLAN
� SHEET 3 PRELIMINARY LOT PLAN & PROFILE A$$OCIA1P'!3$ EEC.
.�10Z veeow CYrff deers O Lund S1Lv—. ;vm
SHEET 4 PRELIMINARY LOT PLAN W UNM MR WA% WAZARN ZM K"'S ($W =*-Wu
SHEET #5 PRELIMINARY LOT PLAN & PROFILE SCALE: 1 " = 100' REVSEP:
MARCH
1 1989
9
REV. MARCH 13 1990
o n no to gee 40 F'T.
SHEET #6 PRELIMINARY LOT PLAN & PROFILE
0 40 0o foo K
SHEET #7 PRELIMINARY PROFILE
DRAWN BY: M.A.F. SHEET 1
I
1
Ll
♦IN
IN
' 2
IN
I
\ O 5 \
`
1
\ - 11 ` \ \
(7 O \
D � �
v. \
1 1 ` . �� -
.� 1% ,
\ �\ m \ \ 1
\ ,
rri IN
!� Lij
Al
N
1
r U► . ` , \ ,
f , 3
-C er1 ,q YkOD IN
\ �*"c u,0.
i
\ 1 S
1
65 _ Q
c
w
\ + � t
_ 1 f N
IN
I. s
- - - \
\ CH I 1
BEN o +�
MARK.
\ ,
_ \
\ , (('E0. DISK on BND) \ i \ l
1
•i �� \ 1 1
\ 3' . . , t i � � QN,a81.01•
/i
1 ( \
\ �. 1 � H.B.
,,, p� �+ i
I \ ♦ \ R 3170.00 ( (fi'Id) _ 399.71
Lr 207.37
` \
-71
EDGE OF PAVEMENT ,
r JL
1
PRELIMINARY
LOT PLAN-
of Land in
Barnstable Massachusetts
�fo
prepared r
JUNIPER D EVELOPEMENT GROUP
1AT0 [ !SS®� S C.
a 17H ems► O Land S'�rrce
w sa�o� mw ao� � mm am =w••�rss
�. . �. _ >, SEPTEMBER 5 1989
SCALE. 1 40
J..y ""`L,}lv,f�;� R`:., ''..r '�'.. },, e'1E.i �yi(,{.^'^'i 0 -.. 40 80 iGV iW . G.W '. FT.
.
'TON-.='�k'
�\`,';�r`'.,t �4 �cam+ �; •r.. � ''
DRAWN BY. M.A.F.
SHEET 2
_
I
I
C.9•
fn 59,4
I
N61-006'E
1509.85'
rTO
wo
_ L Shcouilt
1d)
1009.88 — I 54&76'
- r.0 \ \
i
MATCH LIN C»
1
A,�
2 &0 c0I.J
W
Zf( ti - - - - — - _ -- -
o ',n- )' )
ol
P 'l� by� I -
o \ 1 ,8 . 72 ACRES -
O ? 5 .
.� -
V t rJ ` (TOTAL) ~- - , — —
S c ; - -
S 6�`
}✓ ra �_
D ,
i Oak IP-�
78
ro
i \
o � 1
h tJ
7
J
,
N
G
Q`01
N , -
1
zs
t
e _
fn
s -
413,84
( ,S -rATE
-
WED -
AY o f�d) - fnd . - -
F
P'4VEM _ �*4 56635'4rW 68.10'
EMT El
S 3WO5'W -
i, -
B
! � TE M.H.S.
, � ,' �'43'37*ry 2� � �(fndJ
EDGE
OF
PAVEMENT
1 -
i
m
'
s
:
n COTUITLANDING
a6-md
T _
PRELIMINARY LOT FLAN & PROFILE
c�e ss ch se of Land in Barnstable, Ma s a u tt
s� I o
re ared for
�
r JUNIPER DEVELOPEMENT GROUP
UsTm
1
AS 1ATM8 11MC.
I
Cirfl 19mafneem O Land Suz'wors
n so Igo, pw a"% usu= um os,T. (m) so-"
S „
! _ ,
SEPTEMBER 5, 1989
M
SCALE. 1 40
N, t 0 40 so i'�'0 160 200 T.
. � ,
*#AV
7 7 77
-►•35boom
'� o 40 60 K
.� 0 20
DRAWN BY: M.A.F. SHEET 3
t
i
� � y
/ ( I
I
,
N61W23'E
112&79"
C.B.
t (fnd) U.P. #1 o sl
o
` R nM o
►�• _ P. #8
q
.
- --- - \�� - w.c. W.G.
�
W.G. call 'I
BIT PAVING RIM=64.72
65
` \ \ B7 PAVING
f
MATCH LINE C
1 - b
--- Z400 L
I �I
o : I
m
roe•4
W to
Z
1�
,
� •
2
U p
I-- m 1
a
c
LOT 115
,
7.55 ACRES
— ROAD
...daft
INDUSTRY
' 22•E, N60.31 I
o � 1C@9.01
WATER. GATE
a p�
•
L10ltT
o
•T I
- POLE , I
' Z
P
S
t /
c� 3
-, --rolb
- C •
NOTE.
WATER MAIN WILL BE EXTENDED FROM THE REAR OF
PRESENT SHOPPING C
ENTER TO RTE. 28 AND WILL
EXIST.
BE JACKED UNDER RTE. 28 TO THE SOUTH SIDE.
—STORY � I
- BRICK w THEN IT WILL BE EXTENDED WESTERLY UNDER THE
ram, _ ,. � ' '��, / ��
94 F - BIT PAVINQ \
_ e ExisnNc wooD FnclNc DIRECTION AND SUPERVISION OF R. A I U
Z061 - �• - - Banc. �, `, o �i _
ED ,'
o OF THE CENTERVILLE OSTERVILLE WATER DEPT.
G,E OF
,qv
BR PAVING ,
NT
- � l
I
I
cif •13
bb
(RTE, NQ �s
, 28
rL
t4jTs
0,� I
COTUIT LANDING
0
. I
k
ft�.
PRELIMINARY LOT PLAN
7 �r3r
�:
o of Land in Barnstable MassachUSett
w re ared for
, o
JUNIPER DEVELOPEMENT GROUP
nLisTm
NOTE:
1ATMS INC
TL o _ TRAFFIC LIGHT dt D''IRECTION 1N
WHICH IT IS POINTED. // � .�
SEPTEMBER �, 1989
L
SCALE*. 40 REV. FEB. 21 1990
., 0 40 ' 80 120 160 200 FT.
Q
o ,� 60 K
J
L
Q
j
DRAWN BY: I .A.F.
SHEET 4
:
,
,
rr
i
COTUIT LANDING
c 9 PRELIMINARY LOT PLAN & PROFILE
2
of Land to Barnstable Massachuse tts
t I
prepared for
�e
JUNIPER D.��• EVELOPEMENT GROUP
C.B.
3
8c JOHN L . WARNER
�) 5� R
3
5\•
HASSOCIA'1"LS INC.
CY 1 fneers O Land Surveyors
;, �• / � ' � 00 80Al= POe! IQAA LTt�110. >r�. OiTJB �) !Ed-!i'10
SCALE. 1 40 FEBRUARY 21 , 1990
- 0 40 80 120 160 2W FT.
\ / !� 0 20 40 60 K
�2 DRAWN BY
: M.A.F. SHEET 5
Y F
i .
LOT # � C.B.
�R'-�' ,- C '•gib '�" \ ` rr;,7� . '" ,,N
`\\ C i
AREA 6.75 AC`i�ES
� ,j
70
3 \ o
I
t
74--
\ 4
i ,I I
�- 1
C S
� 75---_
1 ,
t
f ,
I
W L
1
� o
so
` 1
1
i
, 7 ,
J
r
U
C.B. 6
fnd) -
Al.
/.
LOT #2 a -� C.B.
` AREA- 4.27 ACRES ��fndCb
Ln LOT 1 \ `
/ AREA— 113.01 ACRES
i C.B. i
6 fnd
6
1 1 \ >
( 1 + ,� - /~
VIk
Rl
-75
I
oe'8 ,
C.B. \7 0 ( - C.B. i - \ C.B.
q 74 7p _-- . _ \
a � /- _ r .
-� U.P.u . o _ _ _ fnd fnd
58s on' - _ - — _
,p U P. 8
W.G.
74 /
yS.G.
\ . /� W.G. can
ro RIM=•64.72
~-- , BIT PAVING
wo.
,
J ` BIT MANS
.�_ MATCH LINE C"
-
i
I
p
---.7 0
0
r
/ 5 . 6p
h
5
q5
40
-- �_
_ 35 _
_ s � 1 ,
C.B.
\ fnd / r
� r _
+I --3 4 _
r
h
K ,
[ t
(fnd) � / EX G
33
BOG
40
vt
�i
,
�
/ v
s
I
� U
R .
4 ,NOTE ABUTTING .TOPOGRAPHY, STREET, AND LOT LINES PARTIALLY TAKEN
FROM A PRELIMINARY PLAN OF COTUIT PINES' OTUIT, MASS.,, DRAWN
_ -
-
—
-
BY ARROW ENG. INC., 10 CAPE DR., SUITE B, MASHPEE, MA 02649
DATED NOV. 10, 1989.
0
� \ r
1
f
_ o
s
x
i
r ,
4 d r
_ Z
L _
J
Ir
1 _
_ 70 4.
_ f T'� r
p _ � .,
— 1
COTUIT LAND ,lNr-j
N
PRELIMINARY LOT PLAN & _PROFILE
of Land in Barnstable Massachusetts
/ C.B. 1 a i prepared for
50 ✓ i Co
JUNIPE
R DEVELOPEMENT GROUP. --
8c JOHN L . WARNER
LarroN
t c.B. um1
f /
405_
AS IAT083 IMCM
r 1 �
CYrfl It2filmoors O Land Surverors
00 BOB= PON 20A36 �Z 01M (M) 250--i' l •., � �, := � � .e — 6 6 �
�� i
roo
SCALD. ; 1 — 400 FEBRUQRY 21 , 1990
In
r.. E C" � � � � � � � � � ,
0 � 40 60 M. MATCH LIN,e
DRAW •N BY. M.A.F. SHEET 6 )IV
_:
`7 +0
C�)
-7�
.11 t>t
1� z
lsb
0
6-
_17-14
61
\<
cl� 'Do low
7,3
1� L4L
A-
_7
=T_-
t
T .
7
=7
7=7=
4- -:=4=
----------- t-
-7 /-;.-I f
T I V
f 17-3
t
t
COTU IT LANDING
J_ T -71:
i ------
- ----- re imina Profile of
4
otuit Landin Drive
g
pared for
pre
4 :7. -L
& JOHN L WARNER
4
-7
7 L___7
4- USTON
-NEW
lATM831NCm
4
a" KM SEE= U"m W-un
C.17H &ud eam 0 Land Stxm7ory
F
7 77
ORZ: 1 40'
SCALE: V MARCH 139 1990
ERT: 49
40 so BW FT.
4
'41)
t
20 40 60 M.
SHEET #7
DRAWN BY: D 4D Los Le