Loading...
HomeMy WebLinkAbout0276 FALMOUTH ROAD/RTE 28 - Health (2) 76 r-%ou-+h dzo r f 276 FALMOUTH RD - CODE ANALYSIS 276 FALMOUTH RD HYANNIS, MA 02601 ,AREA INCLUDED WITHIN SCOPE OF RENOVATION WORK IS 3,787 SF OF M- MERCANTILE IN AN EXISTING +/- 22,000 SF MERCANTILE BUILDING 101 .5 COMPLIANCE METHODS (CODES USED FOR ANALYSIS): 9TH EDITION OF THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE: 2015 IEBC WITH AMENDMENTS (PRESCRIPTIVE COMPLIANCE METHOD) 9TH EDITION OF THE COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE: 2015 IBC WITH AMENDMENTS 521 CMR: MASSACHUSETTS ARCHITECTURAL ACCESS BOARD 248 CMR: BOARD OF STATE EXAMINERS OF PLUMBERS AND GAS FITTERS 301 .1 .1 PRESCRIPTIVE COMPLIANCE METHOD REPAIRS, ALTERATIONS, ADDTIONS AND CHANGES OF OCCUPANCY COMPLYING WITH CHAPTER 4 OF THIS CODE IN BUILDINGS COMPLYING WITH INTERNATIONAL FIRE CODE SHALL BE CONSIDERED IN COMPLIANCE WITH THE PROVISIONS OF THIS CODE. 2015 IBC WITH AMENDMENTS 302.1 CLASSIFICATION USE GROUP: 309.1 M - MERCANTILE TABLE 504.3 ALLOWABLE BUILDING HEIGHT IN FEET ABOVE GRADE M-MERCANTILE USE TYPE 213 FACTOR: S MAX HEIGHT: 75'-0" ACTUAL MAX HEIGHT: 22'-0"+/- COMPLIES TABLE 504.4 ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE M-MERCANTILE USE TYPE 213 FACTOR: S MAX STORIES: 3 ACTUAL STORIES: 1 COMPLIES TABLE 506.2 ALLOWABLE AREA FACTOR M-MERCANTILE USE ��S��REDo ROhir� TYPE 28 FACTOR: S1 p No.5021 p FOXBOROUGH MASSACHUSETT ht OF �` MAX AREA: 50,000 ACTUAL AREA: 22,000 SF COMPLIES TABLE 601 FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS CONSTRUCTION TYPE 2A BEARING EXTERIOR: 0 HOUR ��RE°ARcy, INTERIOR: 0 HOUR ���'�2,L�F rFc NON-BEARING p No.5021 ;0INTERIOR: 0 HOUR FoxsoROUGH FLOOR CONSTRUCTION: 0 HOUR 1nASSACHUSET7 PRIMARY STRUCTURAL FRAME 0 HOUR th OF TABLE 903.2 GROUP B AUTOMATIC SPRINKLER REQUIREMENTS BUILDING AGGREGATE GREATER THAN 24,000 SF SPRINKLERS REQUIRED (SPRINKLERS PROVIDED) COMPLIES 907.2.7 GROUP M FIRE ALARM & DETECTION REQUIREMENTS MANUAL FIRE .ALARM SYSTEM NOT REQUIRED COMPLIES 1003.2 CEILING HEIGHT MINIMUM HEIGHT: 7-6" ACTUAL HEIGHT: 13'-9"+ COMPLIES 1003.3 PROTRUDING OBJECTS COMPLIES W SECTION 1003.3.1 1003.4 FLOOR SURFACE MEANS OF EGRESS WALKING SURFACES SHALL HAVE SLIP RESISTANT SURFACE SECURELY ATTACHED TABLE 1004.1 .1 MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT MERCANTILE: 60 GROSS SF PER OCCUPANT MERCANTILE STORAGE: 300 NET SF PER OCCUPANT OFFICE 100 GROSS SF PER OCCUPANT LUCKY MART MERCANTILE: 2,161 SF/ 60 - 36 OCCUPANTS BUSINESS: 161 SF/ 100 - 2 OCCUPANTS TOTAL: 38 OCCUPANTS SMOKE SHOP MERCANTILE: 1 ,013 SF/ 60 - 17 OCCUPANTS OFFICE: 65 SF/100 1 OCCUPANT MERCANTILE STORAGE: 118 SF/ 300 - 1 OCCUPANT TOTAL: 19 OCCUPANTS 1005.1 MINIMUM REQUIRED EGRESS WIDTH LUCKY MART EGRESS COMPONENTS: .2 x 38 = 7.6" PROVIDED: 104" SMOKE SHOP EGRESS COMPONENTS: .2 x 19 = 3.8" PROVIDED: 138.5" TABLE 1006.3.1 MINIMUM NUMBER OF EXITS OR ACCESS TO EXITS PER STORY EXITS: 1 REQUIRED ACTUAL: 2/3 COMPLIES 1008.1 .1 SIZE OF DOORS MINIMUM CLEAR WIDTH 32" ACTUAL CLEAR WIDTH: 34" COMPLIES MINIMUM HEIGHT 80" ACTUAL HEIGHT: 83.5" COMPLIES TABLE 1017.1 EXIT ACCESS TRAVEL DISTANCE WITH SPRINKLER SYSTEM: 250 FT PERMITTED SEE LIFE SAFETY PLAN COMPLIES TABLE 1020.2 MINIMUM CORRIDOR WIDTH: 36" (OCCUPANT LOAD < 50) ACTUAL EGRESS WIDTH: 4411+ COMPLIES SECTION 1 101 ACCESSIBILITY: 521 CMR: MASSACHUSETTS ARCHITECTURAL ACCESS BOARD 3.3.1 EXISTING BUILDINGS APPLICABILITY WORK BEING PERFORMED AMOUNTS TO LESS THAN 30% OF THE FULL AND FAIR CASH VALUE AND MORE THAN $100,000 RENOVATION COMPLIES WITH MASSACHUSETTS ARCHITECTURAL ACCESS BOARD 248 CMR: BOARD OF STATE EXAMINERS OF PLUMBERS AND GAS FITTERS tERE�'�cy� 10.10 TABLE 1 : MINIMUM FACILITES FOR BUILDING OCCUPANCY ���� t Tic+ r 21 BUILDING CLASSIFICATION: M-MERCANTILE USE °FOXBo OUGHT TOILETS: 1 PER 20 FEMALES / 1 PER 20 MALES MASSACHuserr ,�� OF LAVATORIES: 1 PER 40 (EACH SEX) \y,,SftEDCy? LUCKY MART �� �o F� 38 OCCUPANTS: ? p No.5021 7D 19 OCCUPANTS/ 20 = 1 TOILET PER SEX FOXBOROUGH MASSACHUSETT 19 OCCUPANTS/ 40 = 1 LAVATORY PER SEX OF SMOKE SHOP 19 OCCUPANTS: 10:10 (18) ,(1) 4. - IN BUSINESS OR COMMERCIAL ESTABLISHMENTS (EXCEPT INDUSTRIAL) WHERE THE TOTAL NUMBER OF EMPLOYEES THAT CAN BE ACCOMMODATED AT ANY ONE TIME IS 20 INDIVIDUALS AND THE TOTAL GROSS SPACE IS LESS THAN 2,000 SQUARE FEET, OR DO NOT HAVE REASONABLE ACCESS (WITHIN 300 FEET AND ON THE SAME FLOOR) TO CORE OR COMMON TOILET FACILITIES, ONE TOILET ROOM LOCATED WITHIN THE ESTABLISHMENT PROVIDED WITH THE NUMBER OF FIXTURES ACCORDING TO THE STANDARD SET FORTH IN 248 CMR 10.10(18): TABLE 1 FOR EMPLOYEE FACILITIES, SHALL MEET THE MINIMUM REQUIREMENT. Installation Instructions MSBID2424 1A1@ ROUGH-IN DETAILS PRODUCTS S STRID1000 FINISHED FLOOR . 3/4 (19mm) .TRAINER 12° (305mm) 12° DRAI (305mm) 24° OIC3XH 3'(76mm)PIPE (610mm) (BY OTHERS) 6= Oe� SECTION THRU (152mm) DRAIN CONNECTION SUGGESTED INSTALLATION THRU DRAIN PIPE 889CC MOP 24° HOLDER �—(610mm) BRACKET ,®, ®, 830AA SERVICE INSTRUCTIONS 3 VALVE ¢ WNACUMM BREAKER 1. Level basin and shim as necessary. 30° 2. Drain to be connected to 3"I.P.S.with (762mm) = - QlC3XH gasket. HOSE 832AA--< HOSE ": 3. Lubricate 01C quick.drain connector with liquid BRACKET '• soap.Stretch over pipe with letters facing up MSGzaza and push down as far as possible. WALL GUARD I . 4. Apply silicone.-,sealant at-,all points where „E -: E77AA24 ., n basin meets wall. VINYL r. dfl BUMPER •': 5. Do not install strainer until room is ready 833AA�' for use to prevent loss or damage. SILISEALANT ' _.:.. .CONTENTS OF MSBID242400 .g -,��� - -,• OPTIONAL EQUIPMENT QTY DESCRIPTION PART�NUM8ER=; 1 MOP BASIN 00245100100 1 QIC3XH RUBBER GASKET QIC3XH000 Installation Note : QIC32 Quick Drain Connector for 2" pipe or QIC3SN Quick Drain Connector for 1- STRIDI STRAINER PLATE STRID1000 P P cast iron soil pipe must be ordered separately. 1 INSTRUCTION SHEET 710071-100 SILICONE �SEALANT. FIAT CUSTOMER SERVICE UNITED STATES SILICONE SILICONE SEALANT 1-800-442-1902 SEALANT www.fiatproducts.com 10, 10, _ (254mrn) FIAT CUSTOMER SERVICE CANADA 1-800-387-0369 LM9 U www.fiat.ca AGAINST CONCRETE FRONT VIEW TOP VIEW BLOCK OR WALL BOARD(FINISHED OR UNFINISHED) Product names listed herein are trademarks of FIAT 710071-100 R6V.A 0 FIAT 2010 ITEM#: QUANTITY: _ � D M�m ffEdm PROJECT: APPROVAL: DATE: REGE-NCV TabIEs and Sinks 1 6EN� � • • 20-gauge type 304 stainless steel o % o Single bowl with 1/2 I PS drain basket Easy-to-install 8" gooseneck faucet r included o Holes punched on 4" centers o 8" backsplash Perfect for hand washing ' throughout the workday . T NSF u:A7J:w>~'t7 <J1IL3J�Lry'x�7 rn LM7A:ir7L'17V,:J:ICI7 � ��L:>:J►��IJLy7n 60OHS12 12" 16" 10" 9" 9" 4" 60OHS17 17" 15" 13%11 14" 10" 5%" 01/2019 r>: A , e ® • STAINl.E55 STEEL WAIL MOUNTED _� WITH G005ENECK FAUCETS �- � GOOHS12 • 12" X 16 Ao r ' O GOOHS17 • 17`" X 15" � o «� REGENCYTABLESANDSINKS COM r� -: - ,,� f l •� � � ' F.. 1� 4 t F � � Y{�. j �ra - w T t U i (1%J raw Aft ' f � i The • durable surface for that r� require •h sanitary standard I as moisture, •' • chemical resistance. I f Fiberglass Reinforced Plastic •o$o 0- A Panolam Surface Systems Brand. . t Fiberglass Reinforced Plastic FRP wall and ceiling panels from Panolam Surface Systems for ; those high traffic installations requiring durability and high $ sanitary standards as well as moisture, mildew and chemical resistance.These are the hardworking,easy-to-clean surfaces you need for utility and service areas. - ° ? Available in a range of colors, Panolam FRP easily fits with any F„ s f `' -•• interior style. Because they are engineered to last,they keep their appearance longer than other surfaces. In most cases,traditional "T $ materials such as ceramic tile,stainless steel, painted drywall or concrete simply can't provide the combination of durability,ease S p Y P tY� E` of maintenance and cost effectiveness offered by FRP. f Panolam FRP is a product that resists extreme changes in temperature and humidity. Manufactured in standard building product sizes,it can be installed on most common substrates and finished with readily available seam and trim materials. Seam Treatments and Moldings } 5 - • A 6 rfi ..as_.,p.2 R.._R...,....«. ...r......e.,we6.s;..1 Divider Outside corner Inside corner End cap Fastening rivet The Classic Collection .. _ LT _ - White Bright White Almond Silver a c Ivory Beige Gray Black The Pioneer Collection Taupe Sky Sage Take a closer look at Panolam FRP laminates.Panolam,the company For more information that engineered FRL®Laminates(Fiber Reinforced Laminate)panels,brings you FRP on how FRP can work (Fiberglass Reinforced Plastic)for your most challenging commercial installations. A selection of colors is offered in two distinctive palettes.The Classic Collection for you, contact your gives you a range of traditional white,black and neutral shades that coordinate local distributor or call with design concepts and ideas in our Pioneer Collection.You'll find a trio of rich colors that set Panolam FRP apart from similar products. us at 866-925-4FRP The Classic Collection White Bright White White Smooth Y` Silver Black Almond ` +1 Beige Gray Ivory —e � No �+► AQ. Y The Pioneer Collection Taupe Sky Sage "'C� ._. "a�� ' ,V ,- s '+.5,p .i `^'..�y„ .1V Custom colors can be produced. Contact your local rep for minimums. FRP is manufactured and tested to perform in tough `t environments such as: . • Commercial Kitchens • Car Washesf' • Public Restrooms • Meat and Dairy Facilities • Hospitals • Coolers and Freezers Schools • Supermarkets •,a . •- • Correctional Facilities • Clean Rooms and Labs l E F E Restaurants f Made with Pride j Panolam has been known for the quality of our product design, - engineering and manufacturing for more than 70 years.This reputation is built on the company's extensive product line of surfacing solutions for virtually any location and situation. From the beginning, Panolam has taken pride in the skill and craftsmanship of the workers in our U.S.-based manufacturing facilities.The production of FRP at Panolam's factory in the heartland of Tennessee continues this tradition 1� of American-made quality. L Take a closer look at FRP and you'll understand why we believe it's the product you can rely on for many years to come. Sheet Size Availability Standard:4'width x 8,9,10,&12'lengths Ceilings:2'x Tor 2'x 4' ' Cut:23.75"x 23.75'or 23.75"x 47.75' Other sizes available upon request. Technical Information Flexural strength,psi 14,000 ASTM D790 Flexural strength,psi 14,000 ASTM D790 Flexural modulus,psi x 1(r 0.52 ASTNI D790 Flexural modulus,psi x 1(r 0.69 ASTM 0790 Tensile strength,psi 4,300 ASTM D638 Tensile strength,psi 10,000 ASTM D638 Tensile modulus,psi x 101 0.42 ASTIVI D638 Tensile modulus,psi x 101 1.08 ASTM D638 Barcol hardness 39 ASTM D2538 Barcol hardness 53 ASTM D2538 Coefficient of thermal Coefficient of thermal expansion,intiin—F x 10-5 3.2 ASTM D696 expansion(x105 in/in/F) 3.51 ASTM D696 Water absorption,% 0.2 ASTM D570 Water absorption,% 0.2 ASTM D570 Surface turning Gass A ASTM E-84 Surface burning Class C ASTM E-84 panolam. Your vision. SURFACE SYSTEMS Our mission. ONE CORPORATE DRIVE,SUITE 725,SHELTON,CT 06484 1 877.726.6526 1 W W W.PANOLAM.COM 02018 Panolam Industries Imemational,Inc. Printed in the USA SMPBR000-059 108.1/18 ry FRP Installation Guide Gulia de Instalaci6n de FRP Safety First La Seguridad Es to Mds Importante When cutting or drilling,always wear protective glasses or Utilice siempre lentes de seguridad o goggles,y una goggles and a face mask which covers the face and mouth. mascara que cubra la cara.y la boca para realizar tortes Itching due to glass fibers may be avoided by the use of o perforaciones.Utilice cremas protectoras para evitar barrier creams on exposed skin. la comezdn por fibras de vidrio en la piel expuesta. Storage Conditions Condiciones de Almacenamiento Panels should be stored indoors on a solid,dry,flat surface. Los paneles deben guardarse en un lugar cerrado sobre Do not stand panels on end.Do not stack other materials on una superficie plana,seca y solida,y no se deben colocar top of the FRP panels.Do not store panels in high tem- sobre un extremo.No coloque otros materiales sobre perature or humidity conditions,or an environment where los paneles FRP.No guarde los paneles en lugares con great swings in temperature or humidity exist.Do not store temperatura o humedad elevadas,o en ambientes con directly on concrete floors. cambios bruscos de temperatura o humedad,ni los almacene directamente sobre pisos de concreto. Inspection Inspection Inspect panels for any defects immediately.Do not install Revise los paneles de inmediato en busca de defector y no panels that are of questionable quality.Panolam Industries los instate si no se encuentran en buen estado.Panolam will not be responsible for installation or removal costs of Industries no se responsabiliza por los costos de instalacion unacceptable panels. o remotion de paneles que no se encuentran en buenas condiciones. Pre-Conditioning Acondicionamiento Previo Before installing FRP panels remove the packaging and Antes de instalar los paneles FRP,quite el empaque y permita allow the panels to acclimate to the room temperature and que se adapten durante 24 horas a la temperatura y la humidity for 24 hours.Replicating your finished room oper- humedad de la habitacion.Se recomienda reproducir las ating temperature and humidity conditions is ideal. condiciones de temperatura y humedad de la habitacion terminada. Installation Conditions Condiciones de Instalacidn Installation should not begin until the building is enclosed, No comience la instalacion hasta que el edificio este permanent heating and cooling equipment are in operation cerrado,el equipo de calefaccion y refrigeration este and moisture from plaster,concrete and other materials has funcionando y se haya disipado la humedad del yeso, dissipated. concreto y otros materiales. Tools Needed Nerramientas Necesarias •Use a carbide tip,fine tooth saw blade. •Utilice una hoja de sierra de dientes finos con punta de •Swivel-head shears may be used for small cutouts. carburo. •Use a carbide drill bit for drilling holes. •Se pueden utilizar cortadoras con cabezal giratorio para •If applying panels using adhesive,follow the adhesive tortes pequenos. manufacturer's instructions for their recommendation for •Use una broca de carburo para realizar los orificios. the suggested trowel. •Si aplicara los paneles con adhesivo,siga las instruc- •Use a laminate roller to ensure maximum contact between ciones del fabricante del adhesivo y sus recomendaciones the panels and substrate. sobre la Ilana. •Use un rodillo laminado para asegurarse de que haya el mayor contacto posible entre los paneles y el sustrato. Wall Preparation Preparation de la Pared The wall substrate should be dry,even and free from dirt, El sustrato de la pared debe evtar seco,parejo y libre de grime and dust.Level high spots and fill low spots prior suciedad,hollin y polvo.Nivele las partes salientes y rellene to adhering panels.Warped plywood or OSB should be las depresiones antes de adherir los paneles.Se deben replaced. reemplazar la madera contrachapada o el OSB que se On surfaces that are painted,be sure to remove all loose encuentren deformados. paint.It's ideal to abrade or perforate any primed or painted Asegurese de quitar toda la pintura suelta en superficies surfaces to allow for better adhesive adhesion to the sub- pintadas.Lo ideal es gastar o perforar cualquier superfi- strate.Be sure to remove any dust generated by this cie pintada o revestida para que el adhesivo tenga mejor Continued on page 2 Continda en la pagina 3 Panolam Industries 20 Progress Drive Shelton,CT 06484 1-866-925-4FRP www.panolam.com procedure.In some cases,nylon rivets may be needed in all the way out to the edges of the panel.Be sure to use addition to adhesive to achieve an appropriate bond. the adhesive manufacturer's recommended trowel to ap- For applying FRP over concrete block or brick,the walls ply the proper amount of adhesive.Too little or too much should be furred out with wood or metal studs and the FRP adhesive can lead to installation failure. should be pre-laminated to a substrate and fastened to •Set the initial panel true with the plumb line. the stud.This method will ensure a good installation.If the •Using a laminate roller, f �, ,' , FRP panels must be applied directly over concrete block or 3f ei. �' ; roll firmly over the brick the panels should be installed using nylon drive rivets panel starting at the with no adhesive.The drill holes must be oversized and I top corner nearest the i E proper spacing left between and around the FRP panels to molding rolling down {`` allow for normal expansion and contraction.The above also and away toward the i & applies to installations over ceramic tile,metal surfaces opposite edge.Be 4j and other non-porous manrials.Generally speaking,FRP sure to eliminate any adhesives will not cure properly with non-porous surfaces. trapped air pockets and � :s FRP panels should not be installed near ovens or similar roll 100%of the panel * heat sources.Discoloration may occur and adhesives may firmly for the best bond. be adversly affected.Stainless steel is typically used in •Install the divider and To remove napped air these types of areas. cap molding applying roll panel with laminate miter Adhesive silicone sealant in the If adhesive is chosen to install FRP 7 channels and sliding the molding completely onto the ry r 4` edge of the panel,then pulling away 1/8"to ensure proper panels,use FRP adhesive,which is _; spacing for expansion and contraction.Its best to fasten readily available and formilated spe r• cifically for FRP.Follow all adhesive vw �'-� the exposed edge of the molding to be sure it is not ` pushed tight into the panel just installed as you install manufacturer's recommendations the next panel concerning specific trowel,open time,coverage,etc.The proper , I, '{' 4 •Continue this process,working in one direction around the trowel helps ensure that the correct a_ .r.} entire room. amount of adhesive will be applied. l '_`• , •If the panels are being installed only usingadhesive,you Too much or too little adhesive can ,} ' j ;, . may use finish nails or tacks to hold the panels in place lead to installation failure.Apply the , ` until the adhesive cures(typically above the ceiling line). adhesive to 100%of the backside of the panel using a crosshatch pattern. •If nails or tacks are used,these must be removed once the Be sure to apply the adhesive all the - .` , adhesive cures so that panel movement is not restricted. way out to the edges of the panel. Trowel application •Adhesive and residue should be removed from the face of Do not apply adhesive to the wall, the panels before it dries.Use soap and water or mineral only to the backside of the FRP panels. spirits. Spacing Installing FRP in car wash applications All FRP panels expand and contract due to CA While FRP is an excellent wall finish for car washes,the changes in temperature and humidity.Adequate moisture conditions along with the swings in temperature space must be allowed between and around and humidity call for careful planning and installation the panels to allow for this expansion and methods. contraction.Generally, •Panels should be acclimated to the temperature,moisture allow 1/8"spacing between and humidity conditions 24 hours prior to installation. panels and 1/4"-3/8"gap at the floor and ceiling. •In such a severe environment,expansion and contraction is more prominent and must be allowed for with proper Panels longer than 12'are not recommended. spacing between and around panels. Installing Panels •Panels should not exceed 8'in length and should be •All cutting or drilling should be done prior to applying installed vertically only. adhesive to the panels. •Leave a minimum of 1"gap at floors and ceilings and •Rivet holes should be predrilled in the panels using a bit 1/8"-1/4"between the panels. that is 1/8"-1/4"larger than the rivet shaft. •Use mechanical fasteners.Do not use adhesives. •Base molding,chair rails and handrails should be installed •Oversize all drill holes for fasteners and any handling such that the FRP panel movement is not restricted.As equipment,piping,etc. stated,expansion and contraction of the panels is normal and must be taken into consideration during installation. •Seal all edges to prevent water from getting behind the panels. •Begin installation in a corner.Mark a plumb line 481/8" from the corner. •Install the corner molding and apply silicone sealant in the channel of the mold ng. •Apply the adhesive to the backside of the FRP panels using a crosshatch pattern.Be sure to apply the adhesive Panolam Industries 20 Progress Drive Shelton,CT 06484 1-866-925-4FRP www.panolam.com f agarre al sustrato.Asegurese de limpiar el polvo generado •Instale of moldeado de la esquina y aplique un sellador de durante este procedimiento.En algunos casos,puede silicona en el canal del moldeado. necesitar remaches de nylon ademas del adhesivo para •Aplique adhesivo en la parte trasera de los paneles FRP LA lograr una adherencia adecuada. con un patron cruzado y asegurese de aplicarlo en todo Para aplicar FRP sobre ladrillos o bloques de concreto, el borde del panel.Ademas,asegurese de usar la Ilana las paredes deben estar cubiertas con listones de madera recomendada por el fabricante del adhesivo para aplicar la o metal,y el FRP,previamente laminado con un sustrato, cantidad adecuada de adhesivo;una cantidad excesiva o se debe asegurar a estos listones.Este metodo asegurara insuficiente puede hacer que la instalacion sea un fracaso. una instalacion correcta.Si los paneles FRP se aplican •Coloque el panel initial alineado con la linea de plomo. directamente sobre los ladrillos o los bloques de concreto, deben instalarse con remaches de nylon sin adhesivo. *Tome un rodillo faminado Ji �; Las perforaciones deben ser mas grandes de to necesario y comience a y se debe dejar suficiente espacio entre los paneles rodarlo sobre el panel, FRP y alrededor de ellos,para permitir que se expandan desde el moldeado mas contrai an.Esto tambien sea lica para la instalacion cercano a la esquina '` �G. ` s FS° , ' Fa �,{° Y 9 P P ! , , t,g; sobre bafdosas ceramicas,superficies de metal y otros superior y luego hacia } { thI materiafes no porosos.En general,los adhesivos FRP no abajo,en direction l fi r,p' 0. se secaran correctamente en superficies no porosas. del borde opuesto. Los paneles FRP no deben colocarse cerca de hornos o Asegurese de ire q ar las bolsas de afire que fuentes de calor similares,ya que se pueden decolor ar o los adhesivos pueden verse afectados desfavorablemente. queden en la super- ._.- Generalmente,para estas areas se utiliza acero inoxidable. ficiey pase el rodillo Para quitar el aire atrapado,pase firmemente sobre todo un rodillo lamneado por el panel Adhesivo el panel para lograr una Si elige utilizar adhesivo para instalar los paneles FRP, mejor adherencia. utilice un adhesivo que este disponible y formulado •Instale el divisor y el moldeado de tapa con un sellador especificamente para FRP.Siga todas . _ z de silicona en los canales y deslice el moldeado hacia las recomendaciones del fabricante • el borde del panel.Luego,alejelo 1/8 de pulgada para a del adhesivo en cuanto a una Ilana segurarse de que quede un espacio adecuado para especifica,tiempo abierto(tiempo la expansion y contraccion.Se recomienda ajustar el de espera antes de unir),cobertura, rh borde expuesto del moldeado para asegurarse de que etc.La llana correcta ayuda a zj4 no este apretado con el panel recien instalado al instalar asegurarse de que se aplicara la el siguiente panel. cantidad correcta de adhesivo;una 1 `f� •cantidad excesiva o insuficiente Continue con este procedimiento ytrabaie en una misma • ;� .--�� puede hacer que la instalacion sea " 4 ;� r ; direction en la habitation compieta. un fracaso.Aplique adhesivo en el , •Si los paneles se estan instatando solo con adhesivo, 100%de la parte trasera del panel puede usar tornillos o tachuelas para sostener los paneles con un patron cruzado y aseg6rese hasta que el adhesivo seque(por to general,sobre la linea de aplicarlo en todo el borde del del cielorraso). panel.No aplique adhesivo en la Aplicacion de la Liana •Si utiliza tornillos o tachuelas,debe retirarlos una vez que pared,sino solo en la parte trasera el adhesivo este seco,para que el movimiento del panel de los paneles FRPP, no quede restringido. Espacio •Quite el adhesivo y los residuos de la Cara de los paneles Todos los paneles FRP se expanden y contraen antes de que se sequen.Utilice agua y jabbn,o alcohol por cambios de temperatura y humedad.Para mineral. permitir estos movimientos,se debe dejar un Instalacion de FRP en Lavaderos de Autos espacio adecuado entre los paneles y alrededor Si bien FRP es una termination excelente para lavaderos de de ellos.Por to general,se deja autos,las condiciones de humedad junto con los cambios de un espacio de 1/8 de pulgada temperatura y humedad hacen que sea necesario realizar un entre los paneles y de 1/4 a 3/8 planeamiento y utilizar metodos de instalacion cuidadosos. de pulgada con el piso 2AFTNN— y el cielorraso. •Durante las 24 horas previas a la instalacibn,los paneles se deben adecuar a las condiciones de temperatura No se recomienda utilizar paneles de mas de 12 pies. y humedad. Instalacion de los Paneles •En los ambientes con condiciones hostiles,la expansion •Todos los con y la contraccion son mas prominentes;por to tanto,es y perforaciones deben realizarse antes I de aplicar adhesivo en los paneles. se debe dejar un espacio adecuado entre los paneles y alrededor de ellos. •Los orificios para remaches deben estar previamente mas de 8 pies de largo ben de tener•Los paneles no hechos con una perforadora con una broca que sea entre y se deben instalar de 6ntener to de manera vertical. 1/8 y 1/4 de pulgada mas grande que el eje del remache. •Deje un espacio minimo de 1 pulgada entre los paneles •El moldeado de base,los guardasillas y los pasamanos y el piso o el techo,y de 1/8 a 1/4 de pulgada entre los deben instalarse de manera tal que no restrinjan el paneles. movimiento del panel FRP.Como se menciono,es normal •Use sujetadores mecanicos y no utilice adhesivos. que los paneles se expandan y contraigan,y esto debe tenerse en cuenta durante la instalacion. •Aumente el tamano de los orificios para los sujetadores •Comience la instalacion en una esquina.Marque una y cualquier equipo,tuberia,etc. linea de plomo a 481/8 pulgadas de la esquina. •Selle todos los bordes para evitar que el agua se filtre por detras de los paneles. Panolam Industries 20 Progress Drive Shelton,CT 06484 1-866-925-4FRP www.panotam.com d Limited Warranty Garantia Limitada Subject to the limitations set forth below,Panolam Industries ex- Sujeto a las limitaciones de aqua en adelante,Panolam Industries pressly warrants that our products are reasonably free of defects garantiza expresamente que nuestros productos estyn razonablemente in material and workmanship,and when properly handled and libres de defectos en cuanto a materiales y mano de obra,y que fabricated will conform,within accepted tolerances,to applicable cuando se manipulan y fabrican adecuadamente cumplen con manufacturing specifications as set forth in our technical bro- (dentro de limites de tolerancia aceptados)las especificaciones chure.This warranty shall extend to the original buyer for a period de fabricaci6n que se describen en nuestro folleto tecnico.Esta of twelve(12)months from the date of shipment of this original garantia se extiende al comprador original por un periodo de doce buyer.This warranty does not cover damage resulting from ac- (12)meses desde la fecha de envio de este comprador original, cident,misuse,alteration,abuse or lack of reasonable care. y no cubre danos por accidente,use indebido,atteraci6n,abuso Due to the variety of uses and applications to which this product o falta de cuidados razonables, may be put,and because the manufacturer has no control over the Debido a to variedad de usos y aplicaciones de este producto y a end products fabricated,the warranty set forth above is exclusive que el fabricante no tiene control sobre los productos terminados and in lieu of all other warranties,express or implied,in fact or fabricados,la garantia anteriormente mencionada es exclusiva y by operation of law or otherwise,or arising by course of dealing sustituye cualquier otra garantia,expresa o implicita,segOn los or performance,custom or usage in the trade,including,without hechos o conforme a la ley o de otra manera,o que surja durante limitation,the implied warranties of fitness for a particular purpose el transcurso de negociaci6n o ejecuci6n,personalization o use en merchantility,and Panolam Industries shall have no obligation or el intercambio,que incluye,sin limitaci6n,las garantias implicadas liability to any person or entity in connection with or arising from de idoneidad correspondientes a un comercio de prop6sito particular, the furnishing,sale,installation or repair,use or subsequent sale y Panolam Industries no tiene obligaciones ni responsabilidad frente of any product supplied by it. a cualquier persona o entidad con quienes se relacionen o que surjan The buyer's sole and exclusive remedy for any noncompliance de]as actividades de revestimiento,ventas,instalaci6n o reparaci6n, with the express warranty set forth above shall be limited to repair use o venta subsiguiente de cualquier producto proporcionado. or replacement of the defective product,or,in the event that Ante cualquier falta de cumplimiento de la garantia expresa repair or replacement is not feasible,return of the product and mencionada anteriormente,la Gnica y exclusiva reparaci6n del refund of the purchase price. comprador se limitary a la reparaci6n o sustituci6n del producto Under no circumstances shall the manufacturer be liable in excess defectuoso o,en caso de que esto no sea posible,se limitary a of the purchase price of this product,in eithertort or contract or la devoluci6n del producto y et reembolso del precio de compra. otherwise,for any loss,damage or injury in connection with arising Bajo ninguna circunstancia el fabricante se responsabilizary por un from the purchase,use,or inability to use this product,or for any exceso en el precio de compra de este producto,extracontractual- special,indirect,collateral,incidental,consequential or exemplary mente o bajo contrato o de otra manera,por perdida,danos o lesiones damages such as,but not limited to,loss of anticipated profits relacionadas con la compra,el use o la imposibitidad de use de este or other economic loss.Because some states do not allow the producto o cualquier otro dano cuantificable,indirecto,colateral, exclusion or limitation of incidental or consequential damages, accidental,emergente o punitivo(como lucro cesante o cualquier this limitation may not apply to you. otra p6rdida econ6mica,entre otros).Como algunos estados no Retaining all documentation after purchasing laminate will permiten que se excluyan o limiten los danos accidentales o emergentes, significantly expedite claim resolution. esta limitaci6n puede no aplicarse en su caso. La respuesta a la reclamaci6n se acelerar6 significativamente si mantiene toda la documentaci6n luego de la compra del laminado. Panolam® Fiberglass Reinforced Plastic Panolam Industries 20 Progress Drive Shelton,CT 06484 1-866-925-4FR P www.panolam.com ©2010 Panolam Industries Inc. Printed in U.S.A. Printed on recycled paper Impreso an los EE.UU. Impreso an papal reciclado SMPBR000-060(Rev.3/26/07•Rev.26/Marzo/2007) f (#�mstrong@ Fiberglass-Reinforced Sheet Flooring Installation System NA-5533-215 RESIDENTIAL USE ONLY Product Gauge Adhesive Comment Modified loose lay method: Acrylic double-faced tape at seams or 2"-3"band of S-288 Flooring Adhesive or S-289 Releasable Adhesive at the Concerto III 0.125" 3.2 mm Seams Seams-Double cut Seam Treatment: Full Spread Releasable Apply S-570 using S-564 Concerto Adhesive Method-S-289 Seam Coating Kit Premium 0.155" 3.9 mm Releasable Adhesive or S-761 Seam Adhesive Pickwick Landing I Conventional Full Spread Method(not releasable) - ProEd a 0.055" 1.3 mm S-288 Flooring Adhesive S-580 Flash Cove Adhesive Pickwick (when using the S-288 Landing II 0.075" 1.9 mm Flooring Adhesive only) Pickwick Landing III 0.100" 2.54 mm Installation: Location:All grade levels Pattern Match: Yes,do not reverse pieces Seam Method: Double-cut Seam Treatment:Apply S-570 Seam Coating using the S-564 Low Gloss Seam Coating Kit or S-761 Seam Adhesive Fitting:All methods General Information: Fiberglass flooring in residential applications, can be installed by three installation methods. The flooring can be installed by the modified loose lay installation method using acrylic double-faced tape under seams, or it can be installed by two full spread options using either S-288 Flooring Adhesive or S-289 Releasable Adhesive. Depending on the type of subfloor, size and complexity of the room,and the type of traffic expected in the room, one of the full spread options may be recommended. Fiberglass-reinforced flooring should not be installed by perimeter fastening methods. In certain areas of the country,where seasonal moisture and humidity changes are severe,the movement in wood subfloors can cause a raised area or a buckle in the flooring near a perimeter pinch point.Typically, if this happens, it will occur during prolonged periods of cold weather when interior conditions become very dry and the wood subfloor/underlayment components dry out and shrink. Should this happen and a buckle occurs,the flooring should be gently lifted or pulled back from the pinch point and re-trimmed. 1 Summary of Residential Fiberglass-Reinforced Installation Options Modified Loose S-289 Releasable S-288 Flooring Adhesive Lay Adhesive Spacing(gap)at vertical 1/4" 1/8" None surfaces(walls, pipes,etc) Base cabinets on top of No No Yes flooring Island cabinets on flooring No Yes Yes Bathrooms No Yes Yes Stairs, landings or rooms with No No Yes floor drains Seams on suspended wood; Only 1 Multiple OK Multiple OK underlayments Suitable Substrates(for all installation options): All substrates listed below must be properly prepared and meet certain requirements.There may be other exceptions and special conditions for these substrates to be suitable for the flooring installation. For more information, please call Armstrong Customer Care at 1-800-233-3823 or visit www.floorexpert.com. • Concrete(on all grade levels) • Approved Suspendad Wood Underlayments • Single-layer, Fully Adhered, Existing Resilient Floors • Ceramic Tile,Terrazzo, Marble, Polymeric Poured(seamless)Floors • Existing resilient tile floors that are on grade or suspended NOTE: For wood subfloors and underlayments,the moisture content must be 13%, or less. Do not install over: • Particleboard,waferboard, OSB or single-layer Sturd-I-Floor panels • Existing cushion-backed vinyl flooring • Carpet • Hardwood flooring hat has been installed directly over concrete Job Conditions/Preparation(for all installation options): • Resilient flooring should only be installed in temperature-controlled environments. It is necessary to maintain a constant temperature before,during and after the installation.Therefore,the permanent or temporary HVAC system must be in operation before the installation of resilient flooring. Portable heaters are not recommended as they may not heat the room and subfloor sufficiently. Kerosene heaters should never be used. • All substrates must be sound, dry,clean,smooth,and free from excessive moisture or alkali. Remove dirt, paint,varnish,wax oils,solvents,other foreign matter and contaminates that could cause staining or interfere with a goad bond. • Do not use products containing petroleum solvents or citrus oils to prepare substrates as they can cause staining and expansion of the new flooring. • In renovation or remodel work, remove any existing adhesive residue so that 100%of the overall area of the original substrate is exposed. • When installing over an existing resilient floor, use S-194 Patch, Underlayment&Embossing Leveler/S-195 Underlayment Additive to fill and smooth any embossing in the old floor. • The area to receive resilient flooring and the flooring materials and adhesives should be maintained at a minimum of 65°F(18°C)and a maximum of 100OF(38°C)for 48 hours before installation,during installation, and 48 hours after completion. Maintain a minimum temperature of 55°F(13°C)thereafter. 2 • For concrete substrates, conduct moisture testing(moisture vapor emission rate{MVER))maximum of 5 Ibs and/or percent relative humidity(in-situ probe)maximum 80%.Bond tests must also be conducted for compatibility with the substrate. Keys to Successful Installation: • Proper conditioning of both the jobsite and the flooring is necessary. Do not expose the installation to wide ranges in temperature and moisture/humidity levels in the home. • Store,transport and handle the flooring so as to prevent creases or other distortions in the sheet.Always roll face-out on a cardboard tube. Distortions will generally not disappear or shrink on their own. Sheet must be lying flat at time of installation. • Just prior to installation, lay flooring out flat to acclimate to conditions and allow the roll-up stresses to relax. • Undercut door trim to allow for free movement of the flooring there as well. • Island cabinets are permissible on top of the flooring but perimeter base cabinets should be cut around. • Seams must be double cut, net,with no fullness. Do not straight edge and butt seams. Do not stretch or compress at seams as this will lead to small buckles. • Do not compress the edges of the sheet in any way when installing adjacent flooring materials. Installation of carpet, metal strips and other transition moldings should not push fullness into the flooring. • Always protect flooring from rolling loads from other trades and replacement and/or movement of applicances. • Radiant heated substrates must not exceed a maximum surface temperature of 85°F(29°C). • As with many flooring products,the full spread adhesive methods generally require somewhat more attention to the condition of the substrate so that it will not telegraph irregularities through the finished floor. 1. Preinstallation Care& Materials Estimating • When transporting or storing floor prior to installation,do not kink or distort. • Always roll flooring face out until ready to install. • Just prior to installation, lay flooring out flat to acclimate to conditions. • Flooring and room temperature should be a minimum of 65°F(18"C)for 48 hours preinstallation, during installation, and 48 hours after installation. Minimum 55°F(13'C)thereafter. • Plan layout for minimum number of seams. • Accurately measure length and width of room. Include recessed areas/doorways. • Allow an extra 1-1/2"of flooring on each end for trimming. • If more than one piece of flooring is needed,allow for correct pattern match at seam. 2. Prepare Subfloor Inspect and prepare subfloor. Subfloor must be clean,dry, and smooth. A subfloor is the surface over which your new Armstrong sheet flooring is installed. IF INSTALLING OVER ... PREPARE VINYL FLOORING Must be noncushioned-backed and firmly bonded. • Utility knife to remove loose vinyl Check for loose vinyl,gapped seams,cuts,tears, a Use New Beginning®Floor Stripper&Cleaner to remove rips, or other damage. dirt and wax buildup • S-194 Patch, Underlayment and Embossing Leveler mixed with the S-195 Underlayment Additive • Use smooth edge trowel for applying S-194 and S-195 mixture • Use medium grit sandpaper or sanding block for smoothing rough areas of the Embossing Leveler 3 PLYWOOD If installing a new plywood subfloor, use APA 0 S-194 Patch, Underlayment and Embossing Leveler mixed Underlayment Grade. with the S-195 Underlayment Additive For new or existing plywood subfloors, check for 0 Use smooth edge trowel for applying S-194 and S-195 loose panels, gapped joints, knots, nail holes, mixture or other damage. • Use medium grit sandpaper or sanding block for smoothing rough areas of the Embossing Leveler CONCRETE/CERAMIC • S-194 Patch, Underlayment and Embossing Leveler mixed Must be clean,dry, and dust-free. with the S-195 Underlayment Additive Check for cracks, scaling, levelness,and other • Use New Beginning®Floor Stripper&Cleaner to remove damage. dirt and wax buildup If installing over ceramic tile,terrazzo,or marble, 0 Use smooth edge trowel for applying S-194 and S-195 ensure that the tiles are firmly bonded. mixture • Use medium grit sandpaper or sanding block for smoothing rough areas of the underla ment 3. Room Preparation and Procedure • The flooring must be cut 3/16"to 1/4"away from all vertical surfaces such as walls,cabinets, pipes, etc.to allow an expansion zone for seasonal movement. (This gap will be covered with moldings or wall base.) • Door trim,where the expansion zone cannot be covered with wall base, must be undercut to allow for free movement of the flooring underneath. • Moldings and wall base covering the expansion zone must be raised slightly to allow for free movement of the flooring. The wall base should be nailed into the wall surface, not the floor surface. • Plan the layout for a minimum number of seams. • Do not install over particleboard subfloors, single layer STURD-1 floor panels, existing residential tile that is below grade, any cushioned vinyl,wafer board, carpet, strip or wood or plank flooring. • Always keep the flooring rolled face-out until ready to install. 4. Fitting • Your vinyl sheet flooring should be unrolled and allowed to lay flat in a separate room or area with similar conditions as the installation area. • Do not lay it out over carpet or other soft surface. The subfloor should be solid to prevent distorting the flooring while working or walking on top of it. • Precut the pieces accurately. It is much easier to cut pieces close to size in an area where you can lay them out flat. Generally,allow 1-1/2"(31.8 mm)for each end wall. (With two or more pieces, make sure you have cut them long enough for pattern matching purposes.) • Cut seams net. Pieces that are cut and fit in the morning should be adhered that morning. Pieces that are cut and fit in the afternoon should be adhered that afternoon. • When installing over an existing resilient floor, lay out the installation so the new seams are a minimum of 6" (15.2 cm)away from the original seams. When going over tile floors, seams should fall in the center of the tile. • Recommended fitting procedures include straight scribing, pattern scribing and freehand knifing. 5. Apply Installation Tape Before moving your flooring to installation area, it's best to apply double-face flooring tape where needed at doorways and underneath heavy moveable appliances. • Tape should be placed in the form of a large X under the appliance. Do not overlap tape. Leave release liner on top surface of tape and press tape securely to the substrate using a dry cloth and hand pressure. • If more than one piece of flooring is used,tape at seam will be applied after the flooring is in place and the seam is cut. 4 6. Lay Floor in Place and Final Trim • Make a final check to be sure your prepared subfloor is clean, dry,flat and dust-free. • Carefully reroll the new flooring with design side out and take into the room. • Unroll it and position in the room taking care not to distort it by creating or putting sharp folds into it. • Inspect around walls,cabinets, etc.to be sure that an adequate expansion zone of 3/16"to 1/4"exists at all vertical surfaces and that the flooring can freely slide beneath doorway trim. • Make safety cuts so it will lay flat on the floor. This will make final fitting easier and prevent the material from tearing. • Cut material slightly loose and away from walls wherever molding or wall base will be used to cover the edge of the vinyl. • Flooring should be laying flat and"balanced"in the room. • If there is a seam in your room, it should be bonded with tape first, before bonding the other selected tape locations. • After the seam is properly put together and bonded, gently fold back the edge of the flooring at other areas selected to have tape,and remove release liner from the tape. • Carefully position the floor. It must be laying flat. You can gently lift and reposition again if necessary. • Seal any seams with the S-564 or S-595 Seam Coating Kits to protect against dirt and moisture. Follow instructions on kit. S-761 Seam Adhesive(Seam Treatment) • Using the S-761 applicator bottle, apply a 1/8"bead of S-761 Seam Adhesive along the seam edge. • Tuck the seam edge into place, forcing the S-761 Seam Adhesive up through the seam. • Clean adhesive residue from the surface of the flooring using a clean,white cloth dampened with neutral detergent and water. • Roll the seam using a hand roller. S-564 Seam Coater (Seam Treatment) • Armstrong S-564 Seam Coating Kit for low gloss floors may be used to coat the seams at the completion of the installation. • The freshly applied seam coating must be protected for several hours from dirt, dust and traffic. Follow instructions on package. 7. Finish the Job • Replace or install baseboard moldings or coved wall base to cover expansion zone(gap)around perimeter of room. Fasten molding to vertical surface;do not nail through new floor or into expansion zone. • Leave a slight clearance between molding and flooring so any effects of seasonal movements in your home due to temperature or humidity changes will be minimized. Should a small bubble or buckle occur,the flooring should be gently lifted or pulled back from the pinch point and retrimmed. • At doorways where new flooring meets another floor surface, use a trim molding that covers the edge of the floor. This is the preferred method of installation. Precautions for All Installation Options: • Do not wash or scrub the new flooring for at least 5 days after the installation. This will help prevent excess moisture and cleaning agents from interfering with the bond of the fresh adhesive or vinyl flooring tape. • When moving appliances or heavy furniture, lay a plywood panel on the floor and"walk"the item across it. This protects the floor from scuffing and tears. • Use floor protectors, such as Armstrong Floor Protectors, on furniture to reduce indentation. The heavier the item,the wider the floor protector needed. 5 F7 q 0� Application Number. .....................................� n r- ' SARIMA ILY, MASS. g, Permit Fee.y•.................................Other Fee........................ 039. �y Total Fee Paid a �c x� TOWN OF BARNSTABLE Permit Approval by.................................On........................... C> BUILDING PERMIT � ��j � Map..........�q..............................Parcel..........D."...I...................... APPLICATION Section 1 —Owner's Information and Project Location Project Address 076 -ri9G1'IOUT-P P�1� UNI r✓� Village y N Owners Name Tt L),q /`T: tacr-y nogll Olt/A16 Qi 5TU1g4r- Owners Legal Address 6 6` if A IV S Y City State Zip Z �� Owners Cell# 4 J r 0 E-mail /1 a G/ Section 2 -Use of Structure Use Group—' / ❑ Commercial Structure over 35,000 cubic feet Commercial Structure under 35,000 cubic feet ❑ Single/Two Family Dwelling Section 3 — Type of Permit ❑ New Construction ❑ Move/Relocate ❑ Accessory Structure ❑ Change of use ❑ Demo/(entire structure) ❑ Finish Basement ❑ Family/Amnesty ❑. Fire Alarm Rebuild ❑ Deck Apartment © Sprinkler System ❑ Addition ❑ Retaining wall ❑ Solar S-Renovation ❑ Pool ❑ Insulation Other-Specify Section 4 - Work Description �►9��l T'/(7�� lU/�GL cD�J51 R-c>C( jot> � l�,D�ai� I�P.�,�-ice' Tel V it y'T F 'T a)T ��� L U�i� L P�%�l�l CCvilc dJlcac f I''D e ) tNE Application Number............................................................. a � r MASS. Permit Fee. .Other Fee: ` r,R� s ...... s639. TotalFee Paid.............................................................�n...... TOWN OF BARNSTABLE Permit Approval by.......................... ....On................ K .... BUILDING PERMIT 3 01 Map........................................Parcel............................................. APPLICATION Section 1 —Owner's Information and Project Location Project Address_- Ec�tyn ffu+t� ,�.�, \A-Y ii - .4 Village i4bi sT_�,A Owners Name ' l't i qf tt9 4,e — -MWA-MT- 0 Wuuo- �3m,4000` p d'fi IV Owners Legal Address_ 4,5 b �l( ;y A ye- r City State 46,A Zip ®i m) Owners Cell # 15!�! - 11S7 4 --5-2�4 E-mail C (, ,�i a o� `1 yi • C�wt Section 2 -Use of Structure Use Group ❑ Commercial Structure over 35,000 cubic feet Commercial Structure under 35,000 cubic feet ❑ Single/Two Family Dwelling Section 3 — Type of Permit ❑ New Construction ❑ Move/Relocate ❑ Accessory Structure ❑ Change of use ❑ Demo/(entire structure) ❑ Finish Basement ❑ Family/Amnesty ❑ Fire Alarm Rebuild ❑ Deck Apartment Sprinkler System ❑ Addition ❑ Retaining wall ❑ Solar -N—Renovation ❑ Pool ❑ Insulation Other—Specify Section 4 - Work Description 1'10l 57AI-- 1,oVC-R9Lce-T4k,� c n/tg A1r-- ri rou ro HMIjA,(S Desmarais, Donald From: McKenzie, Marybeth Sent: Thursday, October 10, 2019 4:29 PM To: Desmarais, Donald Subject: 276 Falmouth Rd "Lucky Mart" Hey Don Jan Kvietoh Tatra Building 774317-0593 came in for a building permit for a fit out for a new retail food store.When I started to look into it they had connected to sewer, but did not fill in the existing ST so they never received the COC.TM said for them to pull anew permit to show that the tank has been filled.They are allowed to keep the grease trap per DEP. I left the floor plans and I had him write out the finish schedule on the plan.They will not be making coffee at this time, but plan on doing it in the future. I would make a note on the sign off that coffee isn't allowed at this time until they put in the proper warewashing and hand sink required. I didn't want to sign off on anything because it will be your store. Please call the guy mentioned to let him know what he will need to do. I left all the folders on your chair.Thanks and have a great long weekend. Mb O Marybeth McKenzie R.S. Health Inspector Town of Barnstable (508) 862-4644 1 216 Falmouth Rd.,, HYANN15, MA55 Tenant fit-out p �wX, 'vI5 cam Rough ceiling height 21'10" a 46'-2" .. Finished suspended ceiling height 13"1" Y Building equipped with automatic tare suppression system W 2 'v 34' ,o 37'-91/2" L N t— U IL m IY 8' 6'-7 1/4" Unit 5 tV 2T-81/4" - 6'-9 112 01 O V I Unit 6 -� i I ' � F o to r x I � I 34'-10" E v i yr z,�f Em W o Q s ,S K- k '.Y•�. �. e��Ol 4 —8a SCALE: i �— TOTAL FLOOR eXISt*na colndltlDnS 378187 5Q F ;, DATE 86y - .fa 9/19/2019 t w � 0 T'L dv le - ttH�D wvo t= � � ° a I y I a � 2 Beverage Coolers 1 � c O 34' T Freezer T ro hr ro ZI ♦— rn mm Shelving 0 3O00, OFFICE TIT /10P�'v 6'-1 1/4^ CIGAR HUMIDOR < ,� LUCKY MART � a�P I 2320sq.ft. �1 21'-81/4„CC ]ED bm hr Unit 5 m \ Applicant:1125 Main 5t.Corporation d/b/a Lucky Mart / $� 5`� = HYANNI5 SMOKE SHOP O R E 1243sq.ft. 0 22'-8" - __.. Showcase � - Showcase 1 O Showcase ---J Q �f Showcase tu OUNTER Shelving 5helving Showcase C Unit 6 17 ry I�I I Applicant:5atga Patel Corporation d/b/a Hyannis Smoke Shop V £ t Slhoulcase 4 Z o$ u JLl � COUNTER m 8cr=Po L 12,-2„ tu 'V m Jul O�K S w Shelving o� x m 4�2kn r � 80' . . 1 SCALE: TOTAL AREA 3,6,5QFT proposed floor p DATE r ' 9/19/2019 2-16 Falmouth Rd. , HYANN15, MA55 W Tenant fit-out 7 it Rough ceiling height 21'10 Z of Finished suspended ceiling height 13'T J O Building equipped with automatic fire suppression system W , I I 34' �6 39'-9 1/2" Y 0 ■ m rn 6'-7 1/4" WU N f 2T-8 1/4" U) 6'-9 112 zz ra s 22'-b„ a 0 Imo-T-4 112"� .�. CU I H I � H W W I = I � � 34'•10" I - � I � N � I J E n � I pJWF=-,Qv 12'2"----------- ivp~Cp�m I I W a - 80'- t SCALE: TOTAL FLOOR AREA 31 61 SG FT existOfitions DATE 9/19/2019 J ' m 5 m ' i F o 46'-2„ o � � N F O � W In i a c I o_ Beverage Coolers "v j p 34' .- T Freezer T 31,-q 112,, rn ra y at Al D 0 o I L m B• p v 00 Sheling p, � 3 pp re`�c OFFICE 6'-i 1/a° I CIGAR HUMIDOR ' j OWT LUCKY MART U 2320sgA. yr n N Units 6'-q 1/2.1 (� 1 F Applicant:1123 Main St.Corporation dlbla Lucky Mart I HYANNI5 SMOKE SHOP IQ — I P I . 1243sq.R. Q Showcase 5howoase iun 5haucase I_J Showcase .. w `t j Shelving m Shelving showcase COUNTER -- tr ! ' Unit b Applicant:5atya Patel Corporation d/b/a Hyannis Smoke Shop U E ' Showcase Ll = r COUNTER m Z f to P m m Shelving MI A os 1,-rq ; m = �k r" t` l TOTAL AREA Y� 3T875QtFT proposed floor elan �— DATE 9/19/2019 216 Falmouth Rd., HYAN N 15, MA55 Tenant fit-out UNIT 5 Applicant: 1123 Main St. Corporation d/b/a Lucky Mart F Rough ceiling height 21'10" o aj 46'-2" v Finished suspended ceiling height 13 9 d W � J � Building equipped with automatic fire suppression system W a i 34' ® ro L ' 3T-9 1/2" a � F— O INN II i 6'-7 1/4" By 5V Unit 5 iV mCC :0 27'8 1/4" N) p1 b'-9 1121. O 2r-B" U Unit b 01 k— F- T-4 1/2" - i F F m w i 34'-10^ i r o n i E .o As�� 4 12'_2, 5 z,o f E m On =5. m m F I 80 SCALE: TOTAL FLOOR AREA exlstil'1Q Gond ions 31B7 50 FT DATE n 10/23/2019 i, z J fV J mdW J UNIT 5 Tenant Fitout z � 4b'-2" C U � o 00001 Y ~ gg C E)dsbng finishes to remain:Hood floor,dn}uall,Armstrong suspended ceilings i K z MMA Beverage Coolers 54 FIN15H SCHEDULE: Flooring in sink areas ARMSTRONG Sheet Flooring,cut sheet attached O Wall finish in sink areaa PANOLAM reinforced plastic 8'high from the floor,cut sheet attached T Sinks: Freezer 'T 1.RE65ENCY b00H512 cut sheet attached 31'-q 1/2 � na � 2.FIAT M58I02424 cut sheet attached Y yr pf - S.FIAT FL-9 cut sheet attached ro �.1tt1 H yVQW 9O n — IIIIIIIINT 6 O Shelving 00;A hrs�c� Vm OFFICE �8 b'-11/4" a LUCKY MART °AS 2320sq.R. 0 2T-b 1/4" e yr m C Unit 5 Fo- £ HYANNI5 5MOKE SHOP Applicant:1123 Main 5t.Corporation d/b/a Lucky Mart 1243sq.R. Showcase Showcase H R w O n 5houQ. case d Ll lu no If�1I m w Showcase Shelving °? SheMn m Showcase COUNTER 12' Unit b E F1IHAp�pllcant:Sap Patel rporation d/b/a Hyannis Smoke Shop Shouaasen°3 F u a < < � COUNTER �E ,p Z m n= m C Pa E� �o Shelvin w " -4- 6u U 4 „ SCALE: 'nosed floor n� 11 DATE 10/23/2019 it f� i