HomeMy WebLinkAbout1070 IYANNOUGH ROAD/RTE132 - INSULATION & ROOF --- --- - _ - _ ._ _ - --- - - - for �
Town of BarnstableBuilding
HAMs'TnC�, ; Post This Card So That it is Visible From the Street-Approved-Plans Must be Retained on Job and this Card Must be Kept
1MAS& , Posted UntiL;Final,Inspection Has Been Made. �� j
° Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final'Inspection has been made. i i
Permit No. B-19-1836 Applicant Name: Michael Roach Approvals
Date Issued: 06/17/2019 Current Use: Structure
Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 12/17/2019 Foundation:
Location: 1070 IYANNOUGH ROAD/RTE132, HYANNIS Map/Lot: _295-019-X02 Zoning District: SPLIT Sheathing:
Owner on Record: FESTIVAL OF HYANNIS LLC 1 Contractor Name`.Michael Roach framing: 1
Address: 3333 NEW HYDE PARK RD,STE 100 Contractor License: 189239 2
NEW HYDE PARK, NY 11042 ) Est. Project Cost: $323,081.00 Chimney:
Description: installing new 1/2"insulation over existing roofing and installing a Permit fee: $ 160.00
new tpo roof. no demo involved. l Insulation:
Fee Paid:` $ 160.00
Project Review Req: '` Date: .`fy 6/17/2019 Final:
g=• �' y Plumbing/Gas
Rough Plumbing:
l
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced"within six months after issuan�. icia Final Plumbing:
All work authorized by this permit shall conform to the approved application'and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street.or road and shall be maintained open for public-inspection for the entire duration of the
work until the completion of the same. i ; I final Gas:
The Certificate of Occupancy will not be issued until all applicable signatures b the euildin -and Tire Officials are provided on this permit.P Y pP g Y g P P� Electrical
Minimum of Five Call Inspections Required for All Construction Work:) f Service:
1.Foundation or Footing
2.Sheathing Inspection Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed -- r
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection)
6.Insulation
Low Voltage Rough;
7.Final Inspection before Occupancy -
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
6tv L.:-4— FW