Loading...
HomeMy WebLinkAbout1070 IYANNOUGH ROAD/RTE132 - SOLAR f D 70 So I ax- �,*Wr� Town of Barnstable Building .wtuvscwe Post This Card So That�t is Visible From the Street-Approved Plans'Must be Retained-on Job and this Card Must be Kept 9M"S& 0$ Posted Until Final Inspection Has Been Made. ��� �� Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final'Inspection has been made. Permit No. B-19-4149 Applicant Name: Kyzer Gardiola Approvals Date Issued: 01/09/2020 Current Use: Structure Permit Type: Building-Addition/Alteration-Commercial Expiration Date: 07/09/2020 Foundation: Location: 1070 IYANNOUGH ROAD/RTE132, HYANNIS; Map/Lot: 295-019-X02 Zoning District: SPLIT Sheathing: Owner on Record: FESTIVAL OF HYANNIS.LLC Contractor Name:: INVALEON TECHNOLOGIES CORP. Framing: .1 Address: 3333 NEW HYDE PARK RD,STE 100 Contractor Licenser 182825 2 NEW HYDE.PARK, NY 11042 K Est. Project Cost: $352,081.00 Chimney: Description: Installation of 483kWAC of rooftop solar on existing commercial Permit.Fee: $3,303.94 building. Insulation: m Fee Paid: $3,303.64 . Project Review Req: I Final: ..� _Date 1/9/2020 Plumbing/Gas Rough Plumbing: ff This permit shall be deemed abandoned and invalid unless the work authorized by this'permit is commenced within sixmonths after issuan icial Final Plumbing: All work authorized by this permit shall conform to the approved application and the€approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire-Officials are provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work:i _ {' 1.Foundation or Footing Service: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed - Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until,the Inspector has approved the various stages of construction. Health "Pers tracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: � Building plans are to be available on site� g P Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: