Loading...
HomeMy WebLinkAboutL100 - Restoration PlanMP 11 PM 12 WILD_FLOWERS 4060_SF 3 L200 5 L200 SEDIMENT & EROSION CONTROLS SEE DETAIL: APPROXIMATE MHHW PROPOSED MICRO TUNNEL CENTERLINE 4 L200 Short B e a c h R o a d Cent er vill e Ri v er C r a i g v i l l e B e a c h R o a d EDGE OF SALT MARSH A A ' LIMITS OF WORK JACK SHAFT 2 L200 AB 29 SS 45 BH 6 Bore shaft to be restored to pre-construction grade and replanted with native seed mix. (Refer to detail sheet) JC 7 IF 6REINFORCED HIGH MARSH 0 20'10' L100 Landscape Restoration Plan NO DATE DESCRIPTION DRAWN CHK © SARATOGA ASSOCIATES PROJECT # REVISIONS DATE: CHECKED BY: DRAWN BY: Landscape Architects, Architects, Saratoga Springs, NY Engineers, and Planners, P.C. SCALE: PLOT DATE: 6/29/2023 4:01:58 PM DRAWING #: 2 Short Beach Road Centerville, MA 180 Marsh Hill Road Orange, CT 06477 3 Mill & Main Place, Suite 250 Maynard, MA 01754 June 30, 2023 JLG MWA 1" = 10'-00"