Loading...
HomeMy WebLinkAboutL200 - Restoration Details0.0 1.0 2.0 3.0 4.0 5.0 LIMIT OF WORKA A' 1.5 "THE REINFORCED HIGH MARSH WILL BE APPROXIMATELY 24" THICK AND COMPRISED OF 50% 8"-10" ROUNDED COBBLE, 25% COIR FIBER AND COMPOST AND 25% COMPATIBLE SEDIMENT. THE MIXTURE OF COBBLES, COIR FIBER, COMPOST AND COMPATIBLE SEDIMENT WILL BE ENCASED IN TWO LAYERS OF 700-GRAM COIR FABRIC AND ONE LAYER OF 20 OZ JUTE-BURLAP. ROUNDED COBBLES WILL BE PLACED IN A NATURAL ARRANGEMENT ALONG THE SEAWARD EDGE OF THE REINFORCED HIGH MARSH TO PROTECT THE REINFORCED HIGH MARSH AND PLANTNGS FROM ICE SCOUR." PLANTING NOTES: 1. ALL PLANT MATERIALS INSTALLED PURSUANT TO THIS SITE DEVELOPMENT PLAN SHALL CONFORM TO THE AMERICAN STANDARD NURSERY STOCK (ANSI Z60.1-1986 OF THE AMERICAN ASSOCIATION OF NURSERYMEN OR EQUIVALENT RECOGNIZED STANDARD, AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH ACCEPTED INDUSTRY PRACTICE. 2. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO COMMENCING PLANTING WORK AND NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY IF CONDITIONS DETRIMENTAL TO NEW AND EXISTING PLANT MATERIAL ARE ENCOUNTERED. 3. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL UNDERGROUND UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE A LOCATING SERVICE TO VERIFY UNDERGROUND UTILITY LOCATIONS. 4. THE CONTRACTOR SHALL STAKE LOCATIONS OF ALL PLANT MATERIALS PRIOR TO INSTALLATION. NOTIFY THE OWNER'S REPRESENTATIVE WHEN STAKING IS COMPLETE AT WHICH TIME A MEETING WILL TAKE PLACE WITH ARCHITECT TO DETERMINE FINAL LOCATIONS. 5. THE CONTRACTOR SHALL INSTALL 4" OF TOPSOIL AND SEED ALL DISTURBED AREAS WITH A WILDFLOWER SEED MIX FROM NEW ENGLAND WETLAND PLANTS, INC. 6. ALL PLANT BEDS & SEEDED AREAS SHALL RECEIVE 3" OF SHREDDED MARSH STRAW AND WEED CONTROL FABRIC. 7. OBSERVED INVASIVE SPECIES SUCH AS ASIAN BITTERSWEET AND AUTUMN OLIVE SHALL BE REMOVED PRIOR TO SITE RESTORATION 8. CONTRACTOR SHALL INSTALL NATURAL TWINE NETTING OVER ENTIRE RESTORATION AREA UNTIL PLANTS ARE ESTABLISHED OR EQUAL MEASURE TO PREVENT GEESE AND DUCKS FROM FORAGING.20" 16" L200 Landscape Restoration Details NO DATE DESCRIPTION DRAWN CHK © SARATOGA ASSOCIATES PROJECT # REVISIONS DATE: CHECKED BY: DRAWN BY: Landscape Architects, Architects, Saratoga Springs, NY Engineers, and Planners, P.C. SCALE: PLOT DATE: 6/29/2023 3:59:45 PM DRAWING #: 2 Short Beach Road Centerville, MA 3 Mill & Main Place, Suite 250 Maynard, MA 01754 June 30, 2023 JLG MWA PLANT SCHEDULE 180 Marsh Hill Road Orange, CT 06477