HomeMy WebLinkAbout20220429_NOI_NE Wind Barnstable Part 6 Attachment F HDD Engineering Plans YARMOUTH DENNIS SANDWICH MASHPEE LOCATION MAP SCALE: 1" = 10,000' PROJECT LOCATION INDEX OF SHEETS HDD LANDFALL DRILLPATHS SHEET NO.TITLE COVER SHEET GENERAL NOTES HDD OVERALL PLAN AND CASING SECTION HDD 1 - PLAN AND PROFILE HDD 2 - PLAN AND PROFILE STAGING AREA AT HDD ENTRY 1 2 3 4 5 6 BARNSTABLE CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\cover2021.11.03 11:06:44 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING COVER PAGE B C THIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) G GENERAL NOTES CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\general notes2021.11.03 11:06:57 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING GENERAL NOTESTHIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. B C D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) G © 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) DisMHW = 3.3MLLW = 0.0MLW = 0.3HDD21-BH-001 N 2694427 E 972990 HDD21-BH-002 N 2694426 E 972881 HDD21-BH-003 N 2694028 E 973105 HDD21-BH-004 N 2694026 E 972968 HDD21-BH-005 N 2693663 E 973083 HDD21-BH-006 N 2693661 E 972891 HDD21-BH-006 N 2693661 E 972891 1. REFER TO GENERAL NOTES ON SHEET 2. 2. THESE SKETCHES ARE CONCEPTUAL IN NATURE AND ARE NOT FOR CONSTRUCTION. ONLY MAJOR PIECES OF EQUIPMENT ARE SHOWN AND ALL FEATURES SHOWN ARE APPROXIMATE. THE ACTUAL SITE ARRANGEMENT WILL BE DETERMINED BY THE HDD CONTRACTOR. 3. UTILITIES LOCATIONS ARE UNKNOWN. ANY EXISTING UTILITIES MUST BE LOCATED PRIOR TO CONSTRUCTION BY CALLING DIG SAFE PRIOR TO EXCAVATION AND EXPOSING ANY EXISTING UTILITIES AS NEEDED. REQUIRED CLEARANCES SHALL BE PROVIDED FOR ANY EXISTING OVERHEAD UTILITIES. 4. THIS LAYOUT HAS BEEN BASED ON ANTICIPATED MINIMUM SEPARATION DISTANCES OF ADJACENT HDD BORES AT THE ENTRY PITS AND AT THE MHW MARK. INTENDED MINIMUM SEPARATION AT THE EXIT POINT IS 328 FEET. FINAL DESIGN OF ALL HDD DRILLPATHS WILL BE COMPLETED BY THE HDD CONTRACTOR FOR REVIEW BY VINEYARD WIND. 50 SCALE: 1" = 50' 0 100 150 200 NOTES:169.5' (51.7m)CENTER TO CENTERPLAN 5 SCALE: 1" = 5" 0 10 15 20 TYPICAL CROSS SECTION CENTERLINE OF HDD DRILL PATH 1 TOTAL HORIZONTAL LENGTH 1211.4' CENTERLINE OF HDD DRILL PATH 2 TOTAL HORIZONTAL LENGTH 1028.3' TIE-IN WITH SUBSEA TRENCHED SECTION TIE-IN WITH SUBSEA TRENCHED SECTION PIPE SPACER PE4710 NPS28 IPS DR9 CASING PIPE 3x1600mm² Cu SUBSEA CABLE 10.43" O.D. (BY OTHERS) APPROVED THERMAL CONDUCTIVE CEMENTITIOUS GROUT 2-HDPE TREMIE PIPES (TYP.) COMMON LANDINGCRAIGVILLE BEACH ROADMIN. 68' (20m)CENTER TO CENTEREXPORT POWER CABLE PATH MIN. 50' (15m) POINT OF ENTRY TO EDGE OF PARKING LOT MIN. 50' (15m)CLEARANCECLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\staging-32021.11.03 11:08:22 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING HDD OVERALL PLAN THIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. APPROXIMATE MLLW MHW MLW MEAN HIGH WATER LINE MEAN LOW WATER LINE MEAN LOWER LOW WATER LINE LEGEND: CONSTRUCTION FENCE CENTERLINE OF DRILL PATH 2 CENTERLINE OF DRILL PATH 1 MLLW B C D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) G BVC STA. 0+93.8 N. 2694790.4 E. 972990.6 EVCSTA. 3+38.4 N. 2694547.1 E. 973015.6 BVC STA. 8+61.0N. 2694027.3E. 973069.1 EVCSTA. 10+39.3N. 2693849.9 E. 973087.4 EXPORT CABLE CONNECTION EXIT LOCATIONSTA. 12+11.4N. 2693678.7 E. 973105.0 STAGING AREA SEE DWG. 6 CENTERLINE OF HDD DRILL PATH 1 PE4710 NPS28 IPS DR9 CENTERLINE OF HDD DRILL PATH 2PE4710 NPS28 IPS DR9-10-1 8-16-14-12-8-6-4-2-2-2-10-10-18 -18 -18 -18 -18-18-18-16-16-16- 1 6 -16 -16 -16 -16-16-14-14-14-12-12-12-8-8-6-6-4-2-2-2-2-2-21046810104466881010101012MHW = 3.3MLLW = 0.0MLW = 0.3-0+62 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+0012+11 ENTRY LOCATION STA. 0+00.0N. 2694883.7E. 972981.0 HDD21-BH-001 N 2694427 E 972990 HDD21-BH-002 N 2694426 E 972881 HDD21-BH-003 N 2694028 E 973105 HDD21-BH-004 N 2694026 E 972968 HDD21-BH-005 N 2693663 E 973083 HDD21-BH-006 N 2693661 E 972891 ELEVATION (FT, MLLW)ELEVATION (FT, MLLW)-70 -60 -50 -40 -30 -20 -10 0 10 20 -70 -60 -50 -40 -30 -20 -10 0 10 20 -0+60 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+20 TAN G E N T LEN G T H = 9 7 . 1 ' TANGENT L E N G T H = 1 7 4. 5' 20' TOTOP OF CASING EDGE OF PARKING LOT/FENCELINE MIN. 40' COVER FROM MUDLINE TANGENT LENGTH = 522.7'24.9' TOC/L OF BORE8° 15° STA 2+88 TO STA 3+82 INTERPOLATED SURFACE STA 3+82 TO STA 12+11 GEO SUBSEA SURFACE SEE NOTE 2. STA -0+60 TO STA 2+88 FELDMAN SURFACE STA 2+88 TO STA 3+82 INTERPOLATED SURFACE SEE NOTE 2. MLLW EL 0.0 MAX. 53' COVER FROM MUDLINE EVC STA: 3+38.4ELEV: -51.2 BVC STA: 0+93.8 ELEV: -17.1 ENTRY LOCATION STA: 0+00.3 ELEV: 8.1 APPROXIMATE GROUND LEVEL (ABOVE WATER LINE) OR MUDLINE (BELOW WATER LINE) SURFACE CASING AS REQUIREDTO REACH STABLE FORMATION Rmin = 1000'Larc = 247.5' CENTERLINE OF HDD DRILL PATH 1 PE4710 NPS28 IPS DR9 APPROXIMATE MUDLINE BVC STA: 8+61.0ELEV: -59.0 EVC STA: 10+39.3ELEV: -45.7 EXIT LOCATION STA: 12+12.4ELEV: -17.2Rmin = 1000' Larc = 154.2' SURFACE CASING AS REQUIRED 0 0 HOR. 1" = 50' VER. 1" = 25' 50 100 25 25 50 0 0 50 50 SCALE: 1" = 50' 0 100 150 200 PLAN PROFILECRAIGVILLE BEACH ROADCOMMON LANDING CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\plan_profile_15deg2021.11.03 11:08:53 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING HDD 1 - PLAN AND PROFILETHIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. 1. REFER TO GENERAL NOTES ON SHEET 2. 2. GEO SUBSEA SURFACE PROVIDED IN NOAA MLLW FELDMAN SURVEY SURFACE PROVIDED IN NAVD88 DATUM. FELDMAN SURVEY CONVERTED FROM NAVD88 TO NOAA MLLW WITH A CONVERSION OF 2.16 FEET AT COVELL'S BEACH. INTERPOLATED SURFACE SHOWN IN NOAA MLLW. 3.CONTRACTOR TO CONSTRUCT APPROPRIATE CONTAINMENT FOR DRILLING MUD. NOTES: MHW MLW MEAN HIGH WATER LINE MEAN LOW WATER LINE MEAN LOWER LOW WATER LINE LEGEND: CONSTRUCTION FENCE CENTERLINE OF DRILL PATH 2 CENTERLINE OF DRILL PATH 1 MLLW APPROXIMATE MLLW B C D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) G -10-18-1 8-16-14-12-8-6-4-2-2-2-10-10-18 -18 -18-18 -18-18-18-16-16-16 -16 -16 -14-14-12-12-8-8-6-6-4-2-2-2-2-2-21046810104466881010101012MHW = 3.3MLLW = 0.0MLW = 0.3BVC STA. 100+92.0N. 2694791.7E. 972916.9 EVC STA. 103+40.1N. 2694543.7E. 972921.0 BVC STA. 108+43.0N. 2694040.9E. 972929.4 EVC STA. 109+96.8N. 2693887.1E. 972932.0 EXPORT CABLE CONNECTIONEXIT LOCATION STA. 112+08.3N. 2693675.6E. 972935.5 STAGING AREA SEE DWG. 6 CENTERLINE OF HDD DRILL PATH 2 PE4710 NPS28 IPS DR9 CENTERLINE OF HDD DRILL PATH 1PE4710 NPS28 IPS DR9 ENTRY LOCATION STA. 100+00.0N. 2694883.7E. 972915.4 99+38 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00112+08 HDD21-BH-001 N 2694427 E 972990 HDD21-BH-002 N 2694426 E 972881 HDD21-BH-003 N 2694028 E 973105 HDD21-BH-004 N 2694026 E 972968 HDD21-BH-005 N 2693663 E 973083 HDD21-BH-006 N 2693661 E 972891 ELEVATION (FT, MLLW)ELEVATION (FT, MLLW)-70 -60 -50 -40 -30 -20 -10 0 10 20 -70 -60 -50 -40 -30 -20 -10 0 10 20 99+60 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 112+30 TAN G E N T LEN G T H = 9 5 . 3 ' TANGENT L E N G T H = 2 1 3. 6' EDGE OF PARKING LOT/FENCELINE TANGENT LENGTH = 503.0'24.8' TOC/L OF BORE20' TO TOP OF CASING 15° 8° MIN. 40' COVER FROM MUDLINE STA 102+87 TO STA 103+90 INTERPOLATED SURFACE STA 103+90 TO STA 112+08 GEO SUBSEA SURFACE SEE NOTE 2. STA 99+60 TO STA 102+87 FELDMAN SURFACE STA 102+87 TO STA 103+90 INTERPOLATED SURFACE SEE NOTE 2. MLLW EL 0.0 MAX. 53' COVER FROM MUDLINE ENTRY LOCATION STA: 100+00.0ELEV: 8.1 SURFACE CASING AS REQUIRED TO REACH STABLE FORMATION BVC STA: 100+92.0ELEV: -17.0 EXIT LOCATION STA: 112+08.3 ELEV: -20.0 APPROXIMATE MUDLINE APPROXIMATE GROUND LEVEL (ABOVE WATER LINE) OR MUDLINE (BELOW WATER LINE) Rmin = 1000' Larc = 251.2'EVC STA: 103+40.1 ELEV: -52.0 EVCSTA: 109+96.8ELEV: -49.7 BVC STA: 108+43.0ELEV: -59.3 CENTERLINE OF HDD DRILL PATH 2 PE4710 NPS28 IPS DR9 Rmin = 1000'Larc = 179.0' 0 0 HOR. 1" = 50' VER. 1" = 25' 50 50 100 25 25 50 50 SCALE: 1" = 50' 0 100 150 200 PLAN PROFILE SURFACE CASING AS REQUIREDCRAIGVILLE BEACH ROADCOMMON LANDING CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\plan_profile_15deg2021.11.03 11:09:11 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING HDD 2 - PLAN AND PROFILETHIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. APPROXIMATE MLLW 1. REFER TO GENERAL NOTES ON SHEET 2. 2. GEO SUBSEA SURFACE PROVIDED IN NOAA MLLW FELDMAN SURVEY SURFACE PROVIDED IN NAVD88 DATUM. FELDMAN SURVEY CONVERTED FROM NAVD88 TO NOAA MLLW WITH A CONVERSION OF 2.16 FEET AT COVELL'S BEACH. INTERPOLATED SURFACE SHOWN IN NOAA MLLW. 3. CONTRACTOR TO CONSTRUCT APPROPRIATE CONTAINMENT FOR DRILLING MUD. NOTES: MHW MLW MEAN HIGH WATER LINE MEAN LOW WATER LINE MEAN LOWER LOW WATER LINE LEGEND: CONSTRUCTION FENCE CENTERLINE OF DRILL PATH 2 CENTERLINE OF DRILL PATH 1 MLLW B C D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) G POWER UNITSPOILCONTAINERSKID PUMPSKID PUMPSUPPLY TRAILER CONSTRUCTION SITE OFFICE TRAILER MUD RIGSPOILCONTAINER179.5'144.0'48.1'47.9'48.0'48.1'DRILLING RIGSURVEYTRAILERENTRY PIT DRILL PIPEEXCAVATOR71.0'DRILLING RIGSURVEYTRAILERENTRY PIT DRILL PIPEEXCAVATOR49 . 5 '67.1'2-G GGGGGGGGGGGGG20 SCALE: 1" = 20' 0 50 100 ENTRY LOCATION PLAN LEGEND: CONSTRUCTION FENCE CENTERLINE OF DRILL PATH 2 CENTERLINE OF DRILL PATH 1 COMMON LANDING CRAIGVILLE BEACH R O A D SITE ACCESS 65.6' (MIN.)50.5' MINFLOOD LINE 52.8' (50' MIN.) DIRECT PIPE STAGING AREA JOINT BAY JOINT BAY CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. NEW ENGLAND WIND 1 CONNECTOR DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590479\staging-32021.11.03 11:10:04 AMmillington, dylanby:PCW-HDD-STC-DW-0004 G CRAIGVILLE BEACH LANDING STAGING AREA (WITH DIRECT PIPE LAYOUT) THIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. B C D E F A ALL UNITS SHOWN ARE "ENGLISH UNITS" (FEET AND INCHES) FIBER OPTIC PIT LINK BOX PIT FIBER OPTIC PIT LINK BOX PIT G Attachment G Piping Plover Protection Plan 5526/New England Wind 1 Connector G-1 Attachment G: Piping Plover Protection Plan Notice of Intent – Barnstable Epsilon Associates, Inc. Piping Plover Protection Plan New England Wind 1 Connector Craigville Public Beach Landfall Site and Covell’s Beach Landfall Site, Barnstable, MA NHESP File No.: 17-37398 Introduction Park City Wind LLC (the Proponent) has prepared this Piping Plover Protection Plan (PPPP) to respond to Massachusetts Division of Fisheries and Wildlife, Natural Heritage and Endangered Species Program (NHESP) correspondence dated January 17, 2019 relating to the Vineyard Wind Connector 1 as well as an April 15, 2020 consultation regarding the New England Wind 1 Connector (NE Wind 1 Connector, formerly known as Vineyard Wind Connector 2). Specifically, for Vineyard Wind Connector 1, the Proponent and NHESP collaborated to generate a PPPP to avoid noise-related impacts to nesting piping plovers from horizontal directional drilling (HDD) activities at the Covell’s Beach Landfall Site in Barnstable, MA. The NE Wind 1 Connector will utilize a landfall site at either Craigville Public Beach, approximately 0.4 miles west of Covell’s Beach, or at the Covell’s Beach Landfall Site again. Since both landfall sites have similar characteristics and resource areas, the Proponent has modified the PPPP from the Vineyard Wind Connector 1 to apply to both landfall sites under consideration for NE Wind 1 Connector. NHESP’s correspondence in the context of the Vineyard Wind Connector 1 requested the following: Please provide a Piping Plover protection plan that addresses measures to protect state-listed species and their habitats during the nesting season (April 1 – August 31) and a contingency plan in the event problems arise during the HDD cable installation, including: a. Work begins prior to April 1 and lapses for 3 or more days. b. Weather or other unforeseen problems arise which delay the start of work to April 1 – August 31. c. Problems with the HDD drill arise which require physical access to the coastal beach or result in physical disturbance to the coastal beach (e.g. obstructions, blow-outs). d. Details regarding how the work area will be delineated to prevent encroachment onto the coastal beach. I. Commencement of Work The Proponent is developing a construction schedule that anticipates commencing HDD activities at either the Craigville Public Beach Landfall Site or the Covell’s Beach Landfall Site prior to April 1. It is possible that HDD activities at the landfall site could extend beyond that date. It is extremely unlikely that the Proponent would initiate landfall site HDD activities after April 1. However, if for some currently unforeseen reason it is necessary to initiate or re-initiate after a work stoppage of over 48 hours during the Piping Plover nesting season, the Proponent will implement the following measures to avoid disturbing any nesting Piping Plovers near the landfall. 5526/New England Wind 1 Connector G-2 Attachment G: Piping Plover Protection Plan Notice of Intent – Barnstable Epsilon Associates, Inc. A. Notification to NHESP The Proponent will notify NHESP if the need to initiate activities after April 1 arises, including the reason, the anticipated duration of the work, and any other information requested by NHESP. B. Monitoring by Credentialed Biologist Plover monitoring as described in this plan will be carried out only by qualified biologists from an accredited organization or an individual who has at least one year of previous experience at an accredited organization conducting shorebird monitoring for Piping Plovers. C. Pre-Mobilization Plover Survey The Proponent will employ a shorebird monitor to perform a pre-mobilization survey of the beach and dune area adjacent to the parking lot being utilized for HDD staging at the landfall site. The purpose of this survey will be to ascertain the presence or absence of any nesting plovers within 200 yards of the work zone. For the purpose of performing plover monitoring surveys, the work zone will include a portion of the landfall site parking lot as well as the proposed HDD alignment extending across the beach area from the parking lot to Nantucket Sound. If there are no Piping Plover nests, scrapes, or territorial pairs identified within 200 yards of the work zone, the shorebird monitor will document the findings, report to NHESP and the Proponent, and the Proponent will be cleared to mobilize into the area within 48 hours with no further monitoring activities required. However, if any Piping Plover nests, scrapes, or territorial pairs are observed within 200 yards of the work zone, the shorebird monitor will record their locations and will report back to NHESP and the Proponent, and the Proponent will implement the plover monitoring as outlined below. D. Plover Monitoring Plan Monitoring, if necessary, will be consistent with the procedures established under the Massachusetts NHESP’s “Guidelines for Managing Recreational Use of Beaches to Protect Piping Plovers, Terns, and their Habitats in Massachusetts” for use of roads and parking lots in areas where unfledged chicks are present.1 Daily monitoring will be conducted from the time construction equipment is mobilized to the landfall site parking lot extending through the construction phase, including equipment demobilization. Under this protocol, the monitoring intensity will increase with increasing proximity of nests and/or chicks relative to the work zone, and will also increase with increasing frequency of chick observations. If a nest or brood consistently remains more than 100 yards from the work zone, 1 Massachusetts Division of Fisheries & Wildlife, Natural Heritage and Endangered Species Program, “Guidelines for Managing Recreational Use of Beaches to Protect Piping Plovers, Terns, and their Habitats in Massachusetts”, 1993, page 8. 5526/New England Wind 1 Connector G-3 Attachment G: Piping Plover Protection Plan Notice of Intent – Barnstable Epsilon Associates, Inc. the nest will be monitored once per day at dawn (before 0600 hours) during appropriate weather conditions. Nests or broods showing a tendency to occur within 50–100 yards of the work zone will be monitored twice per day at dawn and dusk (before 0600 hours and after 1900 hours) during appropriate weather conditions. Note that no mobilization of construction equipment to the landfall site parking lot will be allowed if any plover nest is observed within 50 yards of the work zone, unless specifically permitted by NHESP. If the qualified shorebird monitor observes that state-listed birds are disturbed by the initiation (or re-initiation) of work, then all work shall cease and notification must be provided to NHESP. E. Training of Construction Personnel This Piping Plover Protection Plan will be incorporated into the construction management plan that is being prepared for the HDD operations, so it can be understood in advance and implemented by site personnel should it be necessary to mobilize for HDD operations after April 1 or if ongoing HDD drilling operations at the landfall site are halted for over 48 hours after April 1. II. Work Stoppage for over 48 Hours and Resumption In the event that HDD operations are paused for over 48 hours after April 1, then work will not resume until a shorebird monitor inspects the area to identify any plover nests within 200 yards of the work zone. If any nests are observed within 200 yards of the work zone, the Proponent will comply with the procedures described above for initiation of construction activities after April 1. III. Delineation of work area to prevent encroachment onto coastal beach The HDD staging area will be located entirely within the paved parking lot at either Craigville Public Beach or Covell’s Beach, and will be secured within a fenced and gated perimeter. If equipment access on Craigville Beach is required for any reason during the shorebird nesting season, then in advance of equipment access, notification and proposed monitoring procedures to be undertaken by the shorebird monitor must be provided to the Division. IV. HDD Design and Breakout Prevention The likelihood of needing physical access to the coastal beach or the risk of impacts to the beach itself are both very low. The HDD design has been informed by site-specific geotechnical data to minimize the risk of a surficial release of drilling mud. These investigations have enabled the Project to understand the containment capacity of the soils at the drill entry point, and to establish maximum drilling pressures to prevent a breakout on the beach. To further reduce the potential for a breakout on the beach, the drilling will likely be conducted within an entry casing first 100-150 feet of the HDD, at which point the drill head will be approximately 20 feet below the grade of the beach. 5526/New England Wind 1 Connector G-4 Attachment G: Piping Plover Protection Plan Notice of Intent – Barnstable Epsilon Associates, Inc. Furthermore, the Project will use a drilling fluid composed of bentonite clay or mud. This benign, natural material will pose little to no threat to water quality or ecological resources in the rare instance of seepage around the HDD operations. Effective construction management during HDD operations will further minimize the already- remote potential for beach or seafloor disturbance through drilling fluid seepage (i.e., frac-out). Drilling fluid seepage can occur when pressurization of the drill hole exceeds the containment capacity of the overburden soil material, but by providing adequate depth of cover for the HDD installation, the risk of seepage can be substantially reduced. Nonetheless, the Proponent will adhere to the operational standards discussed below to minimize the chances of drilling fluid seepage. In the contingency planning for the HDD, prevention of drilling fluid seepage has been a primary consideration in the trajectory of the installation. As such, the HDD drill hole will likely descend from the HDD pit location to a depth of approximately 30 feet below the seafloor before rising toward the exit hole on the seafloor where installation will transition to cable burial. As the pilot hole approaches the targeted exit hole location, the contractor will minimize the amount of drilling fluid near the head to minimize the potential for a release of drilling mud as the drill head reaches the surface of the seafloor. The geometry of the drill hole profile can also affect the potential for drilling fluid seepage. In a profile that makes compound or tight-radii turns, down-hole pressures can build, thus increasing the potential for drilling fluid seepage. The proposed drilling profile, with its smooth and gradual vertical curves, will avoid this potential effect. In addition, horizontal curvature of the HDD route will minimize the potential for pressure buildup caused by drill hole geometry. In the unlikely event that a disturbance of the coastal beach occurs between April 1 and August 31 associated with the HDD, the Proponent will immediately mobilize a shorebird monitor to survey the site in advance of any equipment access on the beach, and will ensure that no remedial actions on the beach interfere with nesting Plovers or their chicks. The monitor will remain on-site until the equipment involved in the remedial operations on the beach has returned to the work limits within the landfall site parking lot. V. Reporting If monitoring is required (because HDD activities begin after April 1, or if there is a work stoppage of over 48 hours after April 1), the shorebird monitor will prepare daily field reports that will be provided to the Proponent and NHESP on a weekly basis until plover chicks from any of the nest being monitored have fledged. In addition to reporting on the status and location of the nest and brood relative to the work zone, the report will provide other pertinent details such as weather, wind direction and velocity, evidence of predators, etc. Photographs will be included to provide a visual record of any unusual observations. Following demobilization of construction equipment from the landfall site parking lot, a summary report describing the monitoring effort will also be prepared and provided to the Proponent and NHESP. 5526/New England Wind 1 Connector G-5 Attachment G: Piping Plover Protection Plan Notice of Intent – Barnstable Epsilon Associates, Inc. VI. Modifications to Plan Any changes to the PPPP must be requested in writing at least two weeks prior to the anticipated implementation of said changes for review and written-approval by the Division. Attachment H Microtunnel Engineering Plans WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W WWWWWWWW CRAIGVILLE BEACH ROAD PLAN-OPTION 2.3.B 1" = 30' PROFILE-OPTION 2.3.B H 1" = 30' V 1":15' B 2 A 2 TYPICAL - BRIDGE SECTION 1" = 5' BOT FOOTINGEL. 0.5 CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. VINEYARD WIND CONNECTOR 2 DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590476\option-2-3b2021.03.10 1:23:20 PMmillington, dylanby:PCW-OCP-STC-DW-0005 C A B CENTERVILLE RIVER CROSSING OPTION 2.3 B C THIS PLAN SET IS CONCEPTUAL AND HAS BEEN ISSUED FOR PERMITTING PURPOSES ONLY; AND, IS NOT INTENDED FOR CONSTRUCTION PURPOSES. NOTES 1. CONFLICTS WITH ABOVE AND BELOW GROUND UTILITIES WILL BE RESOLVED DURING FINAL DESIGN 2. FINAL LIMITS OF RECEIVING PIT SHALL BE COORDINATED WITH TOWN SEWER IMPROVEMENTS PLANS SECTION A 1" = 10'' SECTION B 1" = 10'' JACKING SHAFT 1" = 5' RECEIVING SHAFT 1" = 5' STAGING AREA 1" = 10' CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. VINEYARD WIND CONNECTOR 2 DUCT BANK SHEET DWG. NO.REV: OF STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0590476\option-2-3b2021.03.10 1:22:45 PMmillington, dylanby:PCW-OCP-STC-DW-0005 B A CENTERVILLE RIVER CROSSING OPTION 2.3 B B Attachment I Dune Restoration Plan WWWWWWW W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWG 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G2-G2-G2-G2-G2-G2-G2-G 2-G 2-G 2-G 2-G 2-G GGG4-G4-G4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G 4-G2-G 2-G 2-G 2-G 2-G 2-G2-G2-G2-G2-G 2 -G 2-G 2-G 2-G 2-G 2-G GGGGGGGGGWWWWWWWW4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4-G4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4- G 4-G 4-G 4-G 4-G 4-G O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW O HW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OH W OH W OH W OH W OH W OH W OH W OH W OH W OH W OH W N 0 40 80 SCALE IN FEET GENERAL SHEET NOTES CLIENT: DOC ID: REVISION DESCRIPTIONREV.DATE APPRVDCHKD PROJECT TITLE: CONTRACTOR: DRAWN Stantec Consulting Services Inc. PARK CITY WIND SHEET DWG. NO.REV: OF PCW-OCP-STC-DW- STATUS SCALE FORMAT/SIZE ORIGINAL SHEET - ANSI Dc:\pwworkdir\d0585490\coastal dune plan2022.04.07 1:28:04 PMmillington, dylanby:A 1 1 CRAIGVILLE BEACH SUBSEA CABLE LANDING TRANSITION PLAN LEGEND: D 20 1.DRAWING SCALE IS 1" = 40' 2.THIS DRAWING IS FOR INFORMATION ONLY AND IS NOT FOR CONSTRUCTION 3.THIS DRAWING USES BOTH MASSGIS DATA AND SURVEY DATA. SURVEY DATED OCTOBER 27, 2020; BY FELDMAN LAND SURVEYORS, 152 HAMPDEN STREET BOSTON, MA 02119. 100FT BUFFER FROM COASTAL DUNE 30.0' PROPOSED 2x2 TRANSITION DUCT BANKS 5.0' COASTAL DUNE BETWEEN ROADWAY AND PARKING LOT BARRIER BEACH - COASTAL DUNE BARRIER BEACH BARRIER BEACH BARRIER BEACH - COASTAL BEACH BARRIER BEACH - COASTAL BEACH SALT MARSH SALT MARSH COASTAL DUNE BETWEEN ROADWAY AND PARKING LOT PROPOSED HDD CONDUITS FOR SUBSEA CABLES PROPOSED 4x2 DUCT BANK APPROXIMATE LOCATION OF MEAN LOW WATER 62.0' (TYP.)20.0' (TYP.) JOINT BAYS AND STAGING AREA - SEE DRAWING SET PCW-HDD-STC-DW-0004 FOR ADDITIONAL DETAIL LONG BE A C H R D C R A IG V I L L E B E A C H R D CRAIGVILLE BE A C H R D APPROX. WORK LIMITS EXISTING GIS CONTOURS A 0009 EXISTING GIS CONTOURS Attachment I Dune Restoration Plan, Craigville Public Beach, Barnstable New England Wind 1 Connector PLANTING NOTES 1.Beach grass planting will be undertaken during the next immediate planting period following completion of the construction. 2.Beach grass will be planted using three culms per hole at a minimum spacing of twelve inches on center. Restore preconstruction grades with clean compatible sand and replant 585 square feet of dune with American beach grass (refer to planting notes). AREA OF DUNE TO BE TEMPORARILY DISTURBED BY DUCT BANK INSTALLATION (approximately 585 square feet) LEGEND Approximate Work Limits Coastal Dune Coastal Dune 100’ Buffer 0 25 50 feet