Loading...
HomeMy WebLinkAboutCover letter revised plan1 Cavanaugh, Kimberly From:John Odea <john@sullivanengin.com> Sent:Friday, October 13, 2023 12:38 PM To:Karle, Darcy Cc:Cavanaugh, Kimberly; 'Tom Lee' Subject:SE3-6128 / Walters / 38 Washington Attachments:38WashingtonProPier&Sand_10132023.pdf Darcy, Please find aƩached a revised plan for the above reference project. In response to the Commissions comments at the prior meeƟng the following revisions have been incorporated: The proposed pier has been switched to a Seasonal Aluminum structure. To lessen the potenƟal for runoff and erosion, instead of raising the pond edge of the sand area and wall – we have proposed to lower the lawn edge as had been suggested. The proposed wall is called out to be 3” higher than the exisƟng, and it is noted that grade above the wall is to remain 3” below it. The size of the exisƟng sand area is proposed to be lessened. AddiƟonal planƟngs are proposed along the top of the wall by the pond edge, AND along the landward edge of the sand / lawn interface reducing the area that potenƟally contributes runoff. We hope these revisions address most Commissioner’s concerns. John O’Dea, P.E. 711 Main Street / P.O. Box 659 Osterville, MA 02655 508-428-3344 508-428-9617 (fax)