Loading...
HomeMy WebLinkAboutEmail 90 Bayshore; O'Brien; Statement of dredge volume from dredgerFrom: Karle, Darcy Sent: Tuesday, December 5, 2023 10:51 AM To: Cavanaugh, Kimberly Cc: Hoopes, Edwin; Assing, Emil Subject: FW: 90 Bayshore; O'Brien; Statement of dredge volume from dredger Aachments: 90 Bay Shore Road Dredging Agreement.pdf Importance: High Hi Kim, Please forward to the Commission and copy the file for todays hearing. Thank you From: Mark Burgess <shorefrontconsulng@gmail.com> Sent: Monday, December 4, 2023 6:49 PM To: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us> Subject: Re: 90 Bayshore; O'Brien; Statement of dredge volume from dredger HI Darcy; I got a copy of the contract between Wayne Kurker and Mr. O'Brien regarding the dredge volume dug and charged. Please add this to the commission's informaon for the COC hearing today. See/zoom you then. Thanks. Mark Burgess B.S. Ocean Engineering Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 12/4/2023 2:14 PM, Karle, Darcy wrote: Hi Mark, I am checking with Liz at MEA. From: Mark Burgess <shorefrontconsulng@gmail.com> Sent: Thursday, November 30, 2023 12:11 PM To: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us> Subject: Re: queson on whether a shellfish survey is needed. Hi Darcy; I've been discussing the shellfish survey with the shellfish guy (John Lowell of East Dennis Oysters). He wants to confirm the survey area going out 50 feet; he's concerned that he'll be in the middle of the river, and that it's cobble out there. I know we have to go 50' on either side of the work area, but do we have to go 50 feet out as well? That's a huge area; 140 samples, at 4 sq. feet per sample, which comes out to double the .5%. Can you confirm that we need to go out as well, or just on both sides please? Thank you very much. Mark Burgess B.S. Ocean Engineering Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 10/26/2023 3:22 PM, Mark Burgess wrote: Hi Darcy: Thanks very much for this informaon. It is very helpful. I wanted to make sure that my next applicaon with Barnstable goes smoothly, and this informaon is great. Have a great day, and thanks for you help; as always. Regards, Mark Burgess B.S. Ocean Engineering Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 10/26/2023 3:10 PM, Karle, Darcy wrote: Hi Mark, Please see Chapter 703. It states you need to include a shellfish survey from a consultant in the applicaon. When you file the NOI you will see in the submission guidelines that you need to also provide copies of the completed NOI applicaon to the Shellfish department and Harbor Master. Once the Shellfish receives the NOI applicaon they will survey the locaon as well and provide their survey to the Commission for the record. As a p. When providing addional informaon in the NOI packet, go over the list A-R under § 703-4. Regulaons and address your project in relaon to each item. Darcy From: Mark Burgess <shorefrontconsulng@gmail.com> Sent: Wednesday, October 25, 2023 1:54 PM To: Karle, Darcy <Darcy.Karle@town.barnstable.ma.us> Subject: queson on whether a shellfish survey is needed. Hi Darcy: I've aached a plan for a property on the Centerville River. He wants to rebuild the dock, extend it a lile, and extend the exisng float system about 6 more feet seaward. The exisng dock is permied and licensed, but the proposed reconstrucon is not within the licensed footprint. Since he's not staying within the licensed footprint, I can't use just the form to authorize the work; I realize he needs an Order of Condions for this type of work. Is this the type of project that needs a separate shellfish survey? For all of my other projects, the shellfish warden came by on their own and then reported back to the commission. Please advise me on whether I need an independent survey so I can get that before I enter local perming. Thank you very much. Regards, -- Mark Burgess B.S. Ocean Engineering Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know.