Loading...
HomeMy WebLinkAbout5-13-2024 - DPW Memorandum comments The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director MEMORANDUM To: Paula A. Thompson, P.E., LEED AP, SITES AP, Beals and Thomas, Inc. From: Matthew J. Wrobel, P.E., Senior Project Manager Water & Sewer Cc: Griffin Beaudoin, P.E., Town Engineer Date: May 13, 2024 Subject: TOB DPW Engineering Department Review of Definitive Subdivision Plan Preliminary Subdivision Plan Review The Town of Barnstable DPW Engineering Department has completed the requested review of the Application for Definitive Subdivision Plan and Definitive Subdivision Plan titled “307 MAIN STREET DEFINITIVE SUBDIVISION PLAN IN HYANNIS, MASSACHUSETTS (BARNSTABLE COUNTY) Subdivision Number 828” Prepared by Beals and Thomas, Inc. and dated April 11, 2024. The aforementioned documents were reviewed for compliance with the Town of Barnstable Planning Board Subdivision Regulations, and the following discrepancies between the regulations and submitted documents are listed below. · The Mass Plane Coordinate System coordinates are not provided for two lot corners of proposed lot 2, per §801-24. B (2)(c). · Proposed roadway stationing must begin at the centerline/centerline intersection of Old Colony Road and Proposed Road A, per §801-24. B(3)(d). · The road and road cross section profile drawings do not depict the proposed dry wells (DW-1, DW-2, and DW-3), catch basin (CB-5), or drainage manhole (DMH-1), per §801-24. C(5). · Two benchmarks are not provided for each street, per §801-24. C(9). · A cross section profile should be provided for the end of the proposed road including spot elevations to confirm gutter flow is maintained. TOB DPW Engineering Department Review of Definitive Subdivision Plan May 13, 2024 Page 2 · The proposed drainage swale overflow dry wells (DW-2 and DW-3) are not included in the stormwater analysis report, confirm there is no overflow to Old Colony Road. · The proposed catch basin (CB-5), drain manhole (DMH-1), and leaching basin (DW-1) are not included in the stormwater analysis report. · Water mains and service lines will need to be sleeved if they are unable to meet the minimum required separation to sewer lines defined in §901-9. E. · The proposed sewer connection will require installation of a sewer manhole in Main Street at the junction of the proposed subdivision sewer main and the existing Main Street sewer main, per §901-14. · The proposed sewer connection will require installation of a sampling manhole centered on the property line shared by proposed Lot 5 and the Main Street right of way, per §901- 13. · Sheet C4.0 identifies “ACCESS AND UTILITY EASEMENT” for proposed lots 3,4, and 5, please identify what access is granted by the proposed easement. · Please identify how lot 5 will be accessed, if lot 5 is to be accessed from Main Street, then DPW Engineering will need to review and approve any impacts to paving, curb cuts, and appropriate separation to the intersection. · The new sidewalk along Old Colony Road should include ADA compliant curb ramps on both sides of the proposed roadway, and a crosswalk between curb ramps consistent with the Town of Barnstable’s Standard Crosswalk detail. · The project will require a road opening/trench permit, a stormwater management permit, and a sewer connection permit prior to commencing construction. Before the Application for Definitive Subdivision Plan and Definitive Subdivision Plan submittals can be accepted the discrepancies noted must be corrected. Please make the requested plan and application changes and then resubmit for additional review.