HomeMy WebLinkAboutAttar NOI revised plan submission sheet 5-14-24 Shorefront Consulting
Professional Services on Land or At Sea
290 Center St., Dennis Port, MA 02639 www.shorefrontconsulting.com
508-280-8046 shorefrontconsulting@gmail.com
Town of Barnstable May 14, 2024
Conservation Commission
230 South Street
Hyannis, Massachusetts 02601
By hand delivery and email
Re: Notice of Intent Application Filing Package
Proposed Dock Reconstruction, Extension, and New Floats
George and Laurie Attar, Applicants – Deed Book 32835, Page 150 (Units 1, 3, and 4)
Lisa and Jeffrey Bieling – Additional property owners – Deed Book 17464, Page 65 (Unit 2)
Condominium Master Deed Book 3633, Book 109
306 Long Beach Road,
Centerville, MA 02632
Map 185, Parcel 24
On behalf of my clients, George and Laurie Attar, I am submitting 9 copies of a revised plan (24”x 36”) for the above
referenced project. The following revisions have been made to the project plan:
1) The floats were kept at the existing size of (1) 8’x16’ float, and (1) 8’x19’ float (8’x35’ total), but rotated 90
degrees to be parallel to the waterway.
2) There is a magenta colored line that is drawn from each float to the other. The floats were positioned seaward to
line up with a line drawn from the two adjacent floats on each abutting property.
3) The dock and new ramp were extended about 17 feet to meet the new float location. The seaward end of the
floats is now landward of the existing float end, and the boat will now not extend further into the waterway than
it did in the previous orientation, matching adjacent floats.
4) The ramp was extended to 18 feet long to allow for a modest ramp slope at low tide.
5) The approach ramp from the lawn was changed to steps.
6) Two (2) kayak racks were added to the dock section.
▪ “Plan Showing Proposed Dock Reconstruction”, by Down Cape Engineering and Shorefront Consulting, dated
10/1/2023, Revised 5/14/24 (1 sheet)
Waterways will be able to review the revised plan at their May 21, 2024 meeting. Please schedule this revised plan for your
June 5, 2024 public hearing. If there are any questions or concerns regarding this revised plan submittal, please contact me as
soon as possible.
Sincerely,
Mark Burgess
B.S Ocean Engineering
Shorefront Consulting
Enclosures: As Stated
cc: Barnstable Shellfish Biologist (2 copies of the plan only, hand delivered and by email)
conservationprojects@town.barnstable.ma.us (by email)
Barnstable Harbormaster (2 copies of the plan only, hand delivered and by email)
Barnstable Waterways Committee (by email)
Mass. DEP/SERO – Wetlands (by EDEP)
George and Laurie Attar (Applicants)