NOTICE OF INTENT
OCEAN STREET SIDEWALK PROJECT
Town of Barnstable
Department of Public Works
May 28, 2024
TABLE OF CONTENTS
Project Area……………………………………………………………………………….Page 1
Existing Conditions……………………………………………………………………….Page 2
Project Objectives/Scope………………………………………………………………..Page 2
Resource Areas…………………………………………………………………………..Page 3
Mitigation Measures……………………………………………………………………...Page 4
LIST OF APPENDICES
Appendix A: WPA Form 3 – Notice of Intent, NOI Wetland Fee Transmittal Form, and
Chapter 707 Checklist
Appendix B: Project Plans
Appendix C: Project Location and Environmental Maps
Appendix D: Abutters List, Map, and Notification Letter
Appendix E: Stormwater Checklist and Report
Project Area
Ocean Street is located in the Village of Hyannis, from Main Street on the north to
Hawes Avenue on the south. This project is in the southern half of Ocean Street. Land
uses in this area are predominantly residential (single family homes and
condominiums), recreational (Veterans Park Beach and Kalmus Beach), and
undeveloped land (on most of the Kalmus Beach property and in a salt marsh across
the street).
The southern limit of the project is at the intersection of Ocean Street & Hawes Avenue,
adjacent to Kalmus Beach (670 Ocean Street); the northern limit is at the north driveway
for the John F. Kennedy Memorial (480 Ocean Street). The project length is
approximately 2,500 feet (one-half mile), following the road alignment.
All of the work will be on Town properties or within Town roadways. A majority of the
work will be performed along the east side of Ocean Street. Figure 1 below shows the
project area and provides a generalized schematic of the major types of improvements
planned.
Figure 1: Project Area and Primary Improvements Planned
Existing Conditions
Ocean Street is a two-lane road with lane widths approximately 10-feet wide. It is
functionally classified as a minor arterial north of Gosnold Street and a local road south
of Gosnold Street. The statutory speed limit is 30 MPH. There is a four-way stop at the
intersection of Ocean Street, Gosnold Street, and the driveway to Veterans Park Beach.
A curbed sidewalk is present on the west side of Ocean Street from the northern extent
of this project (across from JFK Memorial) to Gosnold Street. There are currently no
other dedicated pedestrian facilities within the project area, and no dedicated bicycle
facilities.
The existing driveway at Kalmus Beach is located on a sharp curve at the corner of
Ocean Street & Hawes Avenue. The roadway geometry and other conditions at this
corner significantly limit drivers’ sight distances.
There is a gap in the watermain between its terminus just south of The Yachtsman
condominiums (500 Ocean Street) and its other terminus at the intersection of Ocean
Street & Hawes Avenue. This limits water pressure and requires more frequent flushing
to maintain water quality.
Project Objectives/Scope
The project objectives are to improve public safety and accessibility, extend the
watermain to close the existing gap, and avoid/minimize environmental impacts.
Proposed scopes of work addressing these objectives are outlined below:
• Improve public safety and accessibility:
o Construct shared use paths to serve pedestrians and bycyclists where
feasible (that is, along the Town properties at 480 and 670 Ocean Street ).
o Construct curbed sidewalks where that is the next-best feasible option
(that is, in front of a couple houses where parking is not an issue).
o Improve road shoulders for pedestrian use where that is the only feasible
option (that is, along both sides of the road at the condominiums).
o Install a raised crosswalk on Ocean Street south of the condos.
o Improve traffic signs and pavement markings.
o Install additional street lights matching the existing street lights in this
area.
o Construct a new driveway and sidewalk to Kalmus Beach at a location
where there are sufficient sight distances for safe turning movements.
• Improve the water system
o Construct a watermain extension to create a looped system, improving
water pressure and reducing routine maintenance.
o Install an additional fire hydrant as requested by the fire district.
• Avoid/minimize environmental impacts
o Avoid altering wetlands and other resource areas.
o Require the contractor to install appropriate erosion and sediment controls
and follow trench dewatering best practices.
o Infiltrate stormwater runoff where feasible.
o Remove excess pavement and replace with a pervious surface when the
current beach driveway at the corner of Ocean Street & Hawes Avenue is
replaced by a new driveway north of the Kalmus Beach sewer pump
station.
o Minimize tree removals and plant replacement trees if appropriate.
Associated work is planned to include repaving where necessary, drainage
adjustments/repairs where necessary, a new gate at the beach driveway, adding
vegetative screening along the sewer pump station fence where feasible, timber
fencing/ timber guardrail along parts of the shared use path, a windsurfing rigging area,
and a rinse station.
Resource Areas
The project includes:
• alterations within the buffer zones of bordering vegetative wetlands, coastal
dunes, coastal banks, and salt marshes1;
• alterations to land subject to coastal storm flowage; and
• alterations to land within the estimated habitat of rare wildlife.
The Project has been designed to comply with the standards of the Massachusetts
Wetland Protection Act Regulations and the Barnstable Wetland Bylaws, and to meet
Massachusetts Stormwater Regulations.
1 Resource areas at Snow’s Creek were characterized and delineated by Green Seal Environmental, Inc. on May 1,
2013, and elsewhere in the project by Sabatia, Inc. on February 25, 2020.
Based on our review of 310 CMR 10.00: Wetlands Protection, and the Barnstable
Wetlands Bylaws, the proposed work activities are subject to the filing of a Notice of
Intent with the Barnstable Conservation Commission, the Massachusetts Department of
Environmental Protection, and MassWildlife's Natural Heritage & Endangered Species
Program.
Mitigation Measures
In order to mitigate impacts to wetland resource areas during construction activities,
best management practices will be utilized as follows:
• Sedimentation control devices such as stabilized construction entrances will be
provided at all construction exits to reduce tracking of sediment beyond the work
area.
• Inlet protection (silt sacks) will be installed at all existing drainage inlets prior to
construction.
• Erosion and sedimentation control devices will be inspected daily during
construction.
• Dewatering activities will use a dewatering bag at the pump discharge for
sediment control and water quality. Filter socks will surround the bag to prevent
erosion.
• Disturbed areas will be limited to the areas within the limit of work. The limits of
work are minimized to the extent practicable.
• All disturbed areas will be stabilized and restored to original conditions with loam
and seed after construction.
• Aggregate stockpiles (sand, gravel, and stone) will not be maintained within
wetland resource areas or their respective buffer zones.
Appendix A:
WPA Form 3 – Notice of Intent
NOI Wetland Fee Transmittal Form
Chapter 707 Checklist
wpaform3.doc • rev. 6/18/2020 Page 1 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
Important:
When filling out
forms on the
computer, use
only the tab key
to move your
cursor - do not
use the return
key.
Note:
Before
completing this
form consult
your local
Conservation
Commission
regarding any
municipal bylaw
or ordinance.
A. General Information
1. Project Location (Note: electronic filers will click on button to locate project site):
Ocean Street town right-of-way from #480 to
#670, and on Town properties at #480 and #670
a. Street Address
Hyannis
b. City/Town
02601
c. Zip Code
Latitude and Longitude: 41.638961 (at project
midpoint)
d. Latitude
-70.280048 (at
project midpoint)
e. Longitude 324
f. Assessors Map/Plat Number
324038 and 324041
g. Parcel /Lot Number
2. Applicant:
Paul
a. First Name
Graves
b. Last Name
Town of Barnstable, Department of Public Works
c. Organization
382 Falmouth Road
d. Street Address
Hyannis
e. City/Town
MA
f. State
02601
g. Zip Code
508-790-6400
h. Phone Number
508-790-6406
i. Fax Number
Paul.Graves@town.barnstable.ma.us
j. Email Address
3. Property owner (required if different from applicant): Check if more than one owner
Mark
a. First Name
Ells
b. Last Name
Town of Barnstable, Town Manager
c. Organization
367 Main Street
d. Street Address
Hyannis
e. City/Town
MA
f. State
02601
g. Zip Code
508-862-4610
h. Phone Number
508-790-6226
i. Fax Number
Mark.Ells@town.barnstable.ma.us
j. Email address
4. Representative (if any):
a. First Name
b. Last Name
c. Company
d. Street Address
e. City/Town
f. State
g. Zip Code
h. Phone Number
i. Fax Number
j. Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
Exempt
a. Total Fee Paid
Exempt
b. State Fee Paid
Exempt
c. City/Town Fee Paid
wpaform3.doc • rev. 6/18/2020 Page 2 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
A. General Information (continued)
6. General Project Description:
Construct sidewalks and shared use paths, a raised crosswalk, and drainage improvements, install
new/additional street lights, construct new driveway and drainage at Kalmus Beach, close existing
driveway at Kalmus Beach, install guardrails, construct watermain extension, repave sections of
Ocean Street, replace/install signs and pavement markings, and associated work.
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. Single Family Home 2. Residential Subdivision
3. Commercial/Industrial 4. Dock/Pier
5. Utilities 6. Coastal engineering Structure
7. Agriculture (e.g., cranberries, forestry) 8. Transportation
9. Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological
Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
Construction of underground utilities per 310 CMR 10.24(7)(b); maintenance and improvement of
existing public roadways per 310 CMR 10.24(7)(c)1
2. Limited Project Type If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8. Property recorded at the Registry of Deeds for:
Barnstable
a. County
C8638
b. Certificate # (if registered land)
0435
c. Book
0513
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
wpaform3.doc • rev. 6/18/2020 Page 3 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
For all projects
affecting other
Resource Areas,
please attach a
narrative
explaining how
the resource
area was
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Bank
1. linear feet
2. linear feet
b. Bordering Vegetated
Wetland
0
1. square feet
2. square feet
c. Land Under
Waterbodies and
Waterways
0
1. square feet
2. square feet
3. cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
d. Bordering Land
Subject to Flooding
1. square feet
2. square feet
3. cubic feet of flood storage lost
4. cubic feet replaced
e. Isolated Land
Subject to Flooding
1. square feet
2. cubic feet of flood storage lost
3. cubic feet replaced
f. Riverfront Area
1. Name of Waterway (if available) - specify coastal or inland
2. Width of Riverfront Area (check one):
25 ft. - Designated Densely Developed Areas only
100 ft. - New agricultural projects only
200 ft. - All other projects
3. Total area of Riverfront Area on the site of the proposed project:
square feet
4. Proposed alteration of the Riverfront Area:
a. total square feet
b. square feet within 100 ft.
c. square feet between 100 ft. and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No
3. Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
wpaform3.doc • rev. 6/18/2020 Page 4 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Designated Port Areas Indicate size under Land Under the Ocean, below
b. Land Under the Ocean
1. square feet
2. cubic yards dredged
c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. Coastal Beaches
1. square feet
2. cubic yards beach nourishment
e. Coastal Dunes 0
1. square feet
2. cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement (if any)
f. Coastal Banks 0
1. linear feet
g. Rocky Intertidal
Shores
1. square feet
h. Salt Marshes 0
1. square feet
2. sq ft restoration, rehab., creation
i. Land Under Salt
Ponds
1. square feet
2. cubic yards dredged
j. Land Containing
Shellfish
1. square feet
k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1. cubic yards dredged
l. Land Subject to
Coastal Storm Flowage
54200
1. square feet
4. Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a. square feet of BVW
b. square feet of Salt Marsh
5. Project Involves Stream Crossings
a. number of new stream crossings
b. number of replacement stream crossings
wpaform3.doc • rev. 6/18/2020 Page 5 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
C. Other Applicable Standards and Requirements
This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions
(310 CMR 10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the
Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the
Massachusetts Natural Heritage Atlas or go to
http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm.
a. Yes No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
Phone: (508) 389-6360
March 10, 2024
b. Date of map
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321
CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR
complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review (unless noted exceptions in Section 2 apply, see below).
c. Submit Supplemental Information for Endangered Species Review
1. Percentage/acreage of property to be altered:
(a) within wetland Resource Area 0.00% / 0.00 acres
percentage/acreage
(b) outside Resource Area 0.23% / 0.11 acre
percentage/acreage
2. Assessor’s Map or right-of-way plan of site
2. Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work
(a) Project description (including description of impacts outside of wetland resource area &
buffer zone)
(b) Photographs representative of the site
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma-
endangered-species-act-mesa-regulatory-review).
Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act.
MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc • rev. 6/18/2020 Page 6 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
(c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for-
a-mesa-project-review).
Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit:
(d) Vegetation cover type map of site
(e) Project plans showing Priority & Estimated Habitat boundaries
(f) OR Check One of the Following
1. Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in-
priority-habitat; the NOI must still be sent to NHESP if the project is within estimated
habitat pursuant to 310 CMR 10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking #
b. Date submitted to NHESP
3. Separate MESA review completed.
Include copy of NHESP “no Take” determination or valid Conservation & Management
Permit with approved plan.
3. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. Not applicable – project is in inland resource area only b. Yes No
If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
South Shore - Cohasset to Rhode Island border, and
the Cape & Islands:
Division of Marine Fisheries -
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 South Rodney French Blvd.
New Bedford, MA 02744
Email: dmf.envreview-south@mass.gov
North Shore - Hull to New Hampshire border:
Division of Marine Fisheries -
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
Email: dmf.envreview-north@mass.gov
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP’s Southeast Regional Office.
c. Is this an aquaculture project? d. Yes No
If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57).
wpaform3.doc • rev. 6/18/2020 Page 7 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
C. Other Applicable Standards and Requirements (cont’d)
Online Users:
Include your
document
transaction
number
(provided on your
receipt page)
with all
supplementary
information you
submit to the
Department.
4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Website for ACEC locations). Note: electronic filers click on Website.
b. ACEC
5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a. Yes No
6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. Yes No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1. Applying for Low Impact Development (LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2. A portion of the site constitutes redevelopment
3. Proprietary BMPs are included in the Stormwater Management System.
b. No. Check why the project is exempt:
1. Single-family house
2. Emergency road repair
3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project) with no discharge to Critical Areas.
D. Additional Information
This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of
the following information you submit to the Department.
1. USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
wpaform3.doc • rev. 6/18/2020 Page 8 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Town of Barnstable
City/Town
D. Additional Information (cont’d)
3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. List the titles and dates for all plans and other materials submitted with this NOI.
Ocean Street Sidewalk Extension
a. Plan Title
Nicolas Clini, E.I.
b. Prepared By
Paul Graves, P.E.
c. Signed and Stamped by
3/8/2024
d. Final Revision Date
varies
e. Scale
f. Additional Plan or Document Title
g. Date
5. If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Report, if needed.
E. Fees
1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number
3. Check date
4. State Check Number
5. Check date
6. Payor name on check: First Name
7. Payor name on check: Last Name
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: When
filling out forms
on the computer,
use only the tab
key to move your
cursor - do not
use the return
key.
A. Applicant Information
1. Location of Project:
Ocean Street right-of-way from #480 to #670,
and on Town properties at #480 and #670
a. Street Address
Town of Barnstable
b. City/Town
N/A
c. Check number
N/A
d. Fee amount
2. Applicant Mailing Address:
Paul
a. First Name
Graves
b. Last Name
Town of Barnstable, Department of Public Works
c. Organization
382 Falmouth Road
d. Mailing Address
Hyannis
e. City/Town
MA
f. State
02601
g. Zip Code
508-790-6400
h. Phone Number
508-790-6406
i. Fax Number
paul.graves@town.barnstable.ma.us
j. Email Address
3. Property Owner (if different):
Mark
a. First Name
Ells
b. Last Name
Town of Barnstable, Town Manager
c. Organization
367 Main Street
d. Mailing Address
Hyannis
e. City/Town
MA
f. State
02601
g. Zip Code
508-862-4610
h. Phone Number
508-790-6226
i. Fax Number
Mark.Ells@town.barnstable.ma.us
j. Email Address
To calculate
filing fees, refer
to the category
fee list and
examples in the
instructions for
filling out WPA
Form 3 (Notice of
Intent).
B. Fees
Fee should be calculated using the following process & worksheet. Please see Instructions before
filling out worksheet.
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category
(identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in
addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then
added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To
calculate the city/town share of the fee, divide the total fee in half and add $12.50.
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number
of Activities
Step
3/Individual
Activity Fee
Step 4/Subtotal Activity
Fee
Step 5/Total Project Fee:
Step 6/Fee Payments:
Total Project Fee: $0.00
a. Total Fee from Step 5
State share of filing Fee: $0.00
b. 1/2 Total Fee less $12.50
City/Town share of filling Fee: $0.00
c. 1/2 Total Fee plus $12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of
this form; and the city/town fee payment.
To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of
Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these
electronically.)
Chap 707/rev. March 2022 Page 1
CHAPTER 707
Regulation Governing Minimum Submission
Requirements for a Notice of Intent Application
The Barnstable Conservation Commission has adopted the following requirements in order to obtain more
consistently complete submission documents necessary for a thorough and efficient review of all Notice of Intent
(NOI) applications. Failure to complete any of the items in this checklist may result in your application being
denied.
Applicant or applicant’s agent should check each box denoting that the task has been completed or in certain
instances, like field staking, denoting that the task will be completed. The following submission checklist covers the
requirements of Chapter 237, Wetlands Protection, of the Part I General Ordinances of the Code of the Town of
Barnstable. This checklist shall be submitted to the Barnstable Conservation Division with the NOI application.
1. Requirements
a. The applicant understands, unless they’ve instructed otherwise, they are applying both
under the Massachusetts Wetlands Protection Act M.G.L. c.131,§40 and
Chapter 237 of the Town of Barnstable General Ordinances.
b. Attach a written narrative to the NOI application (WPA Form 3), available at:
www.mass.gov/eea/agencies/massdep/service/approvals/wpa-form-3.html
describing any project impacts and proposed mitigation as they relate to the following:
1) Any of the interests of Chapter 237 of the General Ordinances and the MassDEP
Wetlands Protection Act M.G.L. 131, §40.
2) The performance standards contained in the MassDEP Wetlands Protection Regulations
(310 CMR 10.00)
3) Chapter 704: Regulation Governing Activity in the 100-ft. Buffer Zone.
4) Chapter 703: Private Docks and Piers.
5) Any other applicable regulations (310 CMR 10.00 or as promulgated under Chapter 237
of the General Ordinances).
c. Enclose proper payment to cover the fee for Chapter 237 filings. Consult current Fee
Schedule at www.townofbarnstable.us/Conservation
d. Please indicate who is to record the Order of Conditions (check one):
Applicant Agent
2. Abutter Notification (See Abutter Notification Regulation, Chapter 706)
Town of Barnstable
Conservation Commission
200 Main Street
Hyannis Massachusetts 02601
Office: 508-862-4093 E-mail: conservation@town.barnstable.ma.us FAX: 508-778-2412
Chap 707/rev. March 2022 Page 2
a. Contact the Conservation Division office at (508) 862-4093 regarding the docketing
process, or see current schedule of Conservation Hearings and submission deadlines at:
www.townofbarnstable.us/Conservation/
b. Provide a copy of the list of abutters within a 100 ft radius of the project parcel.
c. Provide a copy of the Assessor’s Map indicating the parcel of the project site and
showing the 100 ft radius of the project parcel.
d. Provide a copy of the abutter notification letter. Use the form letter provided in our Abutter
Notification Regulation (Chapter 706), available on the Conservation Division
website.
e. Bring the green return receipts, from the certified mailings to the abutters, as proof of
notification to the public hearing. If any mailings are returned, bring the entire envelope,
indicating by postal service stamp the reason for return. You will retain the receipts
afterwards, not the Conservation Division.
f. I further certify under the penalties of perjury that all abutters were notified of the Notice of
Intent Application, pursuant to the requirements of Chapter 237 of the General Ordinances of the
Code of the Town of Barnstable. Notice must be made in writing by certified mail to all abutters
within 100 ft of the property line of the project location.
_______________________________________
Signature of Applicant or Representative Date
3. Field Staking:
a. On or before Tuesday, @ 8:30 a.m., one week prior to the scheduled public hearing, have
your project staked by a professional engineer or registered land surveyor showing all
outside corners of all proposed structures and the continuous proposed “limit of work” line.
b. Have a wetland scientist or other qualified professional flag all wetland resource areas on or
within 100 ft of the work area. Make sure that the flags are sequentially numbered.
c. Provide a project identification stake with bright painted top and applicant name and address,
easily visible from the street approaching the site.
4. Legal Advertisement Fees:
a. Conservation will submit the legal ad for publication in a local newspaper. The applicant or
his/her agent is responsible for payment, by check (payable to the Town of Barnstable), at the
hearing or by mail. The cost of the legal ad will be pre-calculated and posted on the hearing
agenda prior to the hearing.
5. Minimum Documentation for a Complete Application:
a. Provide a completely filled-out (in all parts) NOI application as locally
adopted for the Town of Barnstable, including MassDEP Vegetated Wetland Field Data Form.
Indicate Assessor’s map and parcel of the project, as well as the street or road address, and
pertinent village (i.e., Hyannis, Centerville, Barnstable, etc).
b. Provide two (2) original project plans, stamped in blue or red ink (wet stamp). Plans must be
signed and dated by a Massachusetts licensed, professional engineer, land surveyor, architect or
landscape architect (as applicable), and shall be drawn at a readable scale (1" = 20' preferred).
For multi-acre sites, a second site plan, drawn at larger scale showing the entire site, should also
be provided.
Chap 707/rev. March 2022 Page 3
c. Provide a signed Permission to Access Property, Form PA. The form must be signed by the property
Owner, or legal representative and submitted prior to NOI being docketed and application advertised.
Form PA is available at www.townofbarnstable.us/Conservation/. Do not send the abutter letter
out until the form is submitted to the Conservation Division office.
d. For projects requiring mitigation plantings under Chapter 704-3, 704-4, and 704-5,
mitigation planting location(s) shall clearly be shown on landscaping planting plan. The
planting plan shall include species list (chosen from the Town of Barnstable Conservation
Commission approved planting lists), sizes, densities and/or quantities. The plan shall
also provide area calculations between 0 to 50 and 50 to 100 separately for the amount of
mitigation planting required, and the amount of mitigation planting proposed.
e. Provide detailed, written street directions to the locus (site).
f. Provide a copy of a U.S.G.S. locus map indicating the general area of the project site.
g. Provide a check for the Town of Barnstable portion of the required filing fee. (The portion
payable to the Commonwealth, see 7. e. below)
h. Provide any other documentation, photographs, architectural renderings or other supporting data
prepared by professionals competent in the field which may be relevant to the application.
6. The site plan shall also show:
a. All existing and proposed contours at 2-ft. minimum intervals (1-ft. preferred).
b. Clear delineation of all existing and proposed structures and features. Building structures must
be accurately dimensioned (fixed location) from property lines and wetland resource areas. Plans
shall provide sufficient detail to show all potential wetland impacts, mitigation, compensatory
areas, engineered structures, utilities, landscaping, etc. within the area of jurisdiction. On
complicated sites, existing and proposed conditions must be shown on separate sheets.
c. Locus inset map of the site clearly showing its location relative to surrounding public streets.
d. All wetland resource area flags by individual flag number (matched to the field) to clearly
identify all resource areas on or within 100 feet of the work area. The individual who performed
the flagging and date of flagging shall be identified on the plan next to the resource line.
e. Section views showing changes in grade, cuts and fills.
7. SUBMISSION OF THE COMPLETED APPLICATION WITH PLANS:
a. Provide a signed Permission to Access Property, Form PA. The form must be signed by the property
Owner, or legal representative and submitted prior to NOI being docketed and application advertised.
Form PA is available at www.townofbarnstable.us/Conservation/. Do not send the abutter letter
out until the form is submitted to the Conservation Division office.
b. Email NOI application and all associated materials in PDF format to
Kimberly.Cavanaugh@town.barnstable.ma.us AND Darcy.Karle@town.barnstable.ma.us .
Do not include copies of checks.
All attachments must be named with the hearing date (year first), type, name, address. Examples
20220301 NOI Smith 21 Main Street or 2022031 NOI Plan Smith 21 Main Street.
c. Provide two (2) full NOI applications with folded plans (colored ink stamp) with signature/date
to the Town of Barnstable Conservation Division Office for administrative use;
Appendix B:
Project Plans
30.5'FUTURE GOSNOLDPUMP STATION(BY OTHERS)PROJECT BEGIN/END
STA 0+00
PROJECT BEGIN/END
STA 25+00
30.5'FUTURE GOSNOLDPUMP STATION(BY OTHERS)PROJECT BEGIN/END
STA 0+00
PROJECT BEGIN/END
STA 25+00
C-0.0TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\NOI Submission\C0-COVER SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC Proposed Sidewalk ExtensionCover Sheet
Town of Barnstable
Ocean Street Sidewalk Extension
Notice of Intent Plans
PLAN SHEET INDEX
No. DRAWING TITLE
Locus Map
Scale 1"=300'
Aerial Map
Scale 1"=300'
1"=300'
GENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER
CATCH BASIN
CATCH BASIN CURB INLET
MAIL BOX
ELECTRIC HANDHOLE
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
WATER GATE
PARKING METER
OVERHEAD CABLE/WIRE
CURBING
CONTOURS (ON-THE-GROUND SURVEY DATA)
CONTOURS (PHOTOGRAMMETRIC DATA)
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCED STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD FENCE
EROSION CONTROL BARRIER
TREE LINE
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
C-1.0
LEGEND
AND
GENERAL
NOTESProposed Sidewalk ExtensionPAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE (12" WIDTH)
CROSSWALK (SEE CONSTRUCTION DETAIL)
SOLID WHITE LINE (4" WIDTH)
SOLID YELLOW LINE (4" WIDTH)
BROKEN WHITE LINE (4" WIDTH)
BROKEN YELLOW LINE (4" WIDTH)
DOTTED WHITE LINE (4" WIDTH)
DOTTED YELLOW LINE (4" WIDTH)
DOTTED WHITE LINE EXTENSION (4" WIDTH)
DOTTED YELLOW LINE EXTENSION (4" WIDTH)
DOUBLE WHITE LINE (4" WIDTH)
DOUBLE YELLOW LINE (4" WIDTH)
BIKE LANE WHITE
DBYL
DBWL
BWL
SWL
CW
ONLY
SL
DYLex
DWLex
DYL
BYL
DWL
SYL
JB
CB
MB
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UP
WG
PM
1.TOPOGRAPHICAL INFORMATION FROM A SURVEY PERFORMED BY THE TOWN OF BARNSTABLE IN
2019, SUPPLEMENTED BY MORE RECENT SURVEYS FOR MULTIPLE AREAS IN 2021. THE
HORIZONTAL DATUM FOR THIS SURVEY IS THE MASSACHUSETTS STATE PLANE COORDINATE
SYSTEM, NAD 1983, MAINLAND ZONE. THE VERTICAL DATUM FOR THIS SURVEY IS THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
2.IN FEBRUARY AND MARCH OF 2020, SABATIA, INC. PERSONNEL DELINEATED WETLAND RESOURCE
AREAS IN THE VICINITY OF OCEAN STREET (THE SITE), HAWES AVENUE AND THE ENTRANCE TO
KALMUS PARK BEACH IN BARNSTABLE, MASSACHUSETTS.
3.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY
ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE
COMMENCING WORK, AND SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH
MIGHT BE CAUSED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND
ALL UNDERGROUND UTILITIES. PRIOR TO ANY CONSTRUCTION, CONTACT DIG SAFE (I-800-344-7233)
AND THE TOWN OF BARNSTABLE DEPARTMENT OF PUBLIC WORKS (508-790-6400) TO FIELD VERIFY
LOCATION OF ALL UTILITIES.
4.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION,
ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY
THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE ENGINEER FOR RESOLUTION OF
THE CONFLICT.
5.THE CONTRACTOR SHALL ALTER THE MASONRY OF THE TOP SECTION OF ALL EXISTING DRAINAGE,
WATER, AND SEWER STRUCTURES AS NECESSARY FOR CHANGES IN GRADE, AND RESET ALL
DRAINAGE, WATER, AND SEWER FRAMES, GRATES, COVERS, AND BOXES TO THE PROPOSED FINISH
SURFACE GRADE. REQUIRED NEW MASONRY SHALL BE CLAY BRICK CONFORMING TO M4.05.2.
6.THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION AND ADJUSTMENT OF
GAS, ELECTRIC, TELEPHONE AND ANY OTHER PRIVATE UTILITIES BY THE UTILITY COMPANIES.
7.TREES AND SHRUBS WITHIN THE LIMITS OF GRADING SHALL BE REMOVED ONLY UPON APPROVAL
OF THE ENGINEER.
8.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S
OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT NO
EXPENSE TO THE OWNER.
9.THE TERM "PROPOSED" (PROP) MEANS WORK TO BE CONSTRUCTED USING NEW MATERIALS OR,
WHERE APPLICABLE, RE-USING EXISTING MATERIALS IDENTIFIED AS "REMOVE AND RESET" (R&R).
10.ALL EXISTING SIGNS WITHIN THE PROJECT LIMITS SHALL BE RETAINED UNLESS INDICATED
OTHERWISE ON THE DRAWINGS.
11.EXISTING GRANITE CURB SUITABLE FOR RE-USE AS DETERMINED BY THE ENGINEER SHALL BE
RE-USED IN THE PROPOSED WORK, EXCEPT CURVED STONES OF A DIFFERENT RADIUS THAN
PROPOSED CURB.
12.ALL EXISTING STATE, COUNTY, CITY, AND TOWN LOCATION LINES HAVE BEEN ESTABLISHED FROM
AVAILABLE INFORMATION AND THEIR EXACT LOCATION ARE NOT GUARANTEED. PROPERTY LINES
ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN VERIFIED.
13.DRAINAGE ELEVATIONS ARE PROVIDED FOR DESIGN PURPOSES ONLY. THE CONTRACTOR SHALL
VERIFY BY TEST PIT, THE LOCATIONS OF EXISTING UTILITIES WHICH MAY CONFLICT WITH THE
PROPOSED DRAINAGE DESIGN. ANY FIELD ADJUSTMENTS REQUIRED WILL BE MADE AS APPROVED
OR DIRECTED BY THE ENGINEER. ONLY AFTER THE CONTRACTOR VERIFIES ELEVATIONS FOR THE
CONSTRUCTABILITY OF THE DRAINAGE SYSTEM SHALL ANY STRUCTURES BE ORDERED. ANY FIELD
ADJUSTMENTS TO LINE & GRADE UP TO A DEPTH OF 5' SHALL BE INCLUDED IN THE COST OF THE
PIPE. PIPE EXCAVATION GREATER THAN 5' WILL BE PAID UNDER CLASS B TRENCH EXCAVATION.
14.ALL WORK UNDER THIS CONTRACT SHALL BE DONE IN CONFORMANCE WITH THE CONTRACT
DOCUMENTS AND THE FOLLOWING: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION'S
(MASSDOT'S) STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES DATED 2024; FEDERAL
HIGHWAY ADMINISTRATION'S MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS &
HIGHWAYS, 11TH EDITION, DATED DECEMBER 2023; MASSDOT'S MASSACHUSETTS AMENDMENTS
TO THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS
DATED NOVEMBER 2022; MASSDOT'S CONSTRUCTION STANDARD DETAILS DATED OCTOBER 2017;
MASSDOT'S TRAFFIC MANAGEMENT PLANS AND DETAIL DRAWINGS, CURRENT EDITION; AMERICAN
ASSOCIATION OF NURSERYMEN'S AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1) DATED
2014; U.S. DEPARTMENT OF JUSTICE'S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN;
MASSACHUSETTS ARCHITECTURAL ACCESS BOARD'S RULES AND REGULATIONS (521 CMR) DATED
2006; MASSACHUSETTS HIGHWAY DEPARTMENT'S (NOW MASSDOT'S) PROJECT DEVELOPMENT &
DESIGN GUIDE DATED 2006; COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC
WORKS' (NOW MASSDOT'S) STANDARD DRAWINGS FOR SIGNS AND SUPPORTS DATED 1990;
COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS' (NOW MASSDOT'S)
STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING DATED 1968; THE PLANS,
SPECIFICATIONS, AND SPECIAL PROVISIONS. ALL REFERENCES IN THE FOREGOING
SPECIFICATIONS AND STANDARDS TO THE “DEPARTMENT” OR “ENGINEER” SHALL BE REPLACED
WITH “TOWN OF BARNSTABLE OR THEIR DESIGNATED REPRESENTATIVE.
GENERAL NOTES:
GENERAL
ABAN ABANDON
ADJ ADJUST
APPROX.APPROXIMATE
BIT.BITUMINOUS
BM BENCHMARK
BOS BOTTOM OF SLOPE
(BO)BY OTHERS
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CBSC CATCH BASIN SHALLOW COVER
CEM CEMENT
CLF CHAIN LINK FENCE
CONC CONCRETE
CONSTR CONSTRUCTION
ELEV (or EL.)ELEVATION
EOP EDGE OF PAVEMENT
EXIST (or EX)EXISTING
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN.FOUNDATION
FLDSTN FIELDSTONE
GRAN GRANITE
HWY HIGHWAY
HMA HOT MIX ASPHALT
LT LEFT
MAX MAXIMUM
MB MAILBOX
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
P.G.L.PROFILE GRADE LINE
PROP PROPOSED
PVMT PAVEMENT
REM REMOVE
REMOD REMODEL
RET RETAIN
R&D REMOVE AND DISCARD
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
STA STATION
TEMP TEMPORARY
TOS TOP OF SLOPE
TYP TYPICAL
VGC VERTICAL GRANITE CURB
UTILITIES
ACCMP ASPHALT COATED CORRUGATED METAL PIPE
CAP CORRUGATED ALUMINUM PIPE
CIP CAST IRON PIPE
CIT CHANGE IN TYPE
COND CONDUIT
DIP DUCTILE IRON PIPE
FES FLARED END SECTION
F&C FRAME AND COVER
F&G FRAME AND GRATE
HDPE HIGH DENSITY POLYETHYLENE PIPE
HW HEADWALL
HYD HYDRANT
INV INVERT
LP LIGHT POLE
PVC POLYVINYLCHLORIDE PIPE
PWW PAVED WATER WAY
RCP REINFORCED CONCRETE PIPE
TSV&B TAPPING SLEEVE VALVE AND BOX
UP UTILITY POLE
ALIGNMENT AND GRADING
CC CENTER OF CURVE
HP HIGH POINT
LP LOW POINT
PC POINT OF CURVE
PI POINT OF INTERSECTION
PNT POINT
PCC POINT OF COMPOUND CURVE
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENT
10x45 SPOT ELEVATION
PROFILES
AD ALGEBRAIC DIFFERENCE IN RATES OF GRADES
ELEV ELEVATION
HSD HORIZONTAL SIGHT DISTANCE
K RATE OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
PVC POINT OF VERTICAL CURVE
PVT POINT OF VERTICAL TANGENT
PVRC POINT OF VERTICAL REVERSE CURVE
PVCC POINT OF VERTICAL COMPOUND CURVER
SSD STOPPING SIGHT DISTANCE
VC VERTICAL CURVE
ABBREVIATIONS TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C1-LEGEND AND GENERAL NOTES.dwg3/8/2024
100% DESIGN SET
NJC
NO SCALE
OCEAN STREET
(PUBLIC - 33' WIDE)
OCE
A
N
S
T
R
E
E
T
(PUB
L
I
C
-
3
3
'
W
I
D
E
)
OCEAN STR
E
E
T
(PUBLIC - 33
'
W
I
D
E
)
KALMUS
PARKING
BEACH
LOT
SHEET 3.0
SHEE
T
3
.
1
SHE
E
T
3
.
2
SHEET 3.3
BIT.
S
H
O
U
L
D
E
R
A
R
E
A
VGC
VGC
BIT.
S
H
O
U
L
D
E
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
SIDE
W
A
L
K
VGC
SIDE
W
A
L
K
VGC
30.5'
OCE
A
N
S
T
R
E
E
T
(PUB
L
I
C
-
3
3
'
W
I
D
E
)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP
6
"
D
E
E
P
GRAS
S
E
D
DRAIN
A
G
E
D
I
T
C
H
(TYP.)
FUTURE GOSNOLD
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
OCEAN STREET
(PUBLIC - 33' WIDE)
OCE
A
N
S
T
R
E
E
T
(PUB
L
I
C
-
3
3
'
W
I
D
E
)
OCEAN STR
E
E
T
(PUBLIC - 33
'
W
I
D
E
)
KALMUS
PARKING
BEACH
LOT
SHEET 3.0
SHEE
T
3
.
1
SHE
E
T
3
.
2
SHEET 3.3
BIT.
S
H
O
U
L
D
E
R
A
R
E
A
VGC
VGC
BIT.
S
H
O
U
L
D
E
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
SIDE
W
A
L
K
VGC
SIDE
W
A
L
K
VGC
30.5'
OCE
A
N
S
T
R
E
E
T
(PUB
L
I
C
-
3
3
'
W
I
D
E
)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP
6
"
D
E
E
P
GRAS
S
E
D
DRAIN
A
G
E
D
I
T
C
H
(TYP.)
FUTURE GOSNOLD
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
C-2.0TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C2-DM OVERALL SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
Overall
Sidewalk
LayoutProposed Sidewalk Extension1"=60'
GOSNOLD STREETOCEAN STR
E
E
T
(PUBLIC - 33
'
W
I
D
E
)
OCEAN ST
R
E
E
T
(PUBLIC - 3
3
'
W
I
D
E
)
OCEAN STREET
(PUBLIC - 33' W
I
D
E
)HARBOR BLUFF RDIYANOUGH RDSHEET 3.3
SHEET 3.4
SHEET 3.5
PROJECT BEGINBIT. SHOULDE
R
A
R
E
A
BIT. SHOULDE
R
A
R
E
A
30.5'
FUTURE GOSNOLD
PUMP STATION
(BY OTHERS)
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (4)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (4)
CEM CONC
PEDESTRIAN
CURB RAMPS
GOSNOLD STREETOCEAN STR
E
E
T
(PUBLIC - 33
'
W
I
D
E
)
OCEAN ST
R
E
E
T
(PUBLIC - 3
3
'
W
I
D
E
)
OCEAN STREET
(PUBLIC - 33' W
I
D
E
)HARBOR BLUFF RDIYANOUGH RDSHEET 3.3
SHEET 3.4
SHEET 3.5
PROJECT BEGINBIT. SHOULDE
R
A
R
E
A
BIT. SHOULD
E
R
A
R
E
A
30.5'
FUTURE GOSNOLD
PUMP STATION
(BY OTHERS)
PROP. (1)
CEM CONC
PEDESTRIAN
CURB RAMP
PROP. (4)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (2)
CEM CONC
PEDESTRIAN
CURB RAMPS
PROP. (4)
CEM CONC
PEDESTRIAN
CURB RAMPS
C-2.1TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C2-DM OVERALL SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
Overall
Sidewalk
LayoutProposed Sidewalk Extension1"=60'
OCEAN STREET
(PUBLIC - 33' WIDE)
KALMUS
PARKING
BEACH
LOT
PROP BIT. PVMT
(140 sf±)
BEGIN PROP 8' BIT. SHARED USE PATH
PROP LANDSCAPED AREA
(SEE PLANTING LIST ON SHEET C-8.2)
REM PVMT
(APPROX. 2,497SF±)
PROP 4-IN SYL
(TYP)34.0'VARIES12.0'REM PVMT
(APPROX. 176 SF±)
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
LOAM & SEED
REM PVMT
(APPROX.324 SF±)
PROP STOP
SIGN "R1-1"
PROP
NO LEFT TURN
SIGN "R3-2"PROP
"DO NOT ENTER"
SIGN "R5-1"
PROP TREES
(SEE PLANTING LIST ON SHEET C-8.2)
R&R EXIST FENCE
PROP PVMT
(APPROX. 10,100 SF±)
NET LOSS OF 3
PARKING SPACES
PROP 5' BIT. SIDEWALK
PROP WOOD GUARDRAIL (TYP)
R&D EXIST
"NO PARKING" SIGN
R&D
(R&S GATE AND
POST/BOLLARD)
24'
PROP
BIT. CONC RAMP
SWLPROP
"NO PARKING" SIGN
"R7-1"
W/LEFT ARROW
PROP "TURN" SIGN
"W1-1" POINTING RIGHT
W/"20 MPH ADVISORY SPEED" SIGN
"W13-1P" W/ARROW
PROP
"ONE DIRECTION" SIGN
"W1-6"
W/LARGE ARROW
POTENTIAL MONUMENT LOCATION
(BY OTHERS)
R&R EXIST WOOD GUARD RAIL
SEWAGE
PUMP
STATION
12.0'PROP 3'-5' CLEAR WIDTH (TYP)
R&R EXIST BOULDERS
BEGIN PROP
5' BIT. SIDEWALK
(1,460 SF±)
PROP "PEDESTRIANS PERMITTED" SIGN "D11-2"
AND "BICYCLES PERMITTED" SIGN "D11-1A" AND
ARROW UP PLAQUE "M6-3" ON SINGLE SIGN
PROP
"NO PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP
"NO PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP 3' DUNE
GRASS STRIP
INSTALL BLACK VINYL SLATS
TO PUMP STATION FENCE ENCLOSURE
R&S EXIST BOULDERS
PROP 4-IN
SOLID WHITE
EDGE LINE
(TYP)
PROP BIT. 3' WIDE
LETDOWN CHANNEL
(TYP)
PROP
ASPHALT BERM
(TYP)
PROP AUTOMATED
ENTRANCE GATE. SIZE AND
TYPE T BE DETERMINED AT
A LATER DATE.
R&D EXIST
"NO PARKING" SIGN
PROP STEEL-BACKED
TIMBER GUARDRAIL
W/RUB RAIL (TYP)
PROPOSED 13FT X 13FT ARTIFICIAL
TURF WIND SURFER RIGGING AREA
PROPOSED 8FT x 8FT RINSE STATION/SHOWER
WITH CEMENT CONCRETE OR PLANK PLATFORM,
BENCH, BOTTLE FILL, AND MAINTENANCE
SPIGOT WITH (6) BOLLARDS AS SHOWN
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
END PROP
5' BIT. SIDEWALK
(1,460 SF±)
PROP.
STORMWATER
INFILTRATION
BASIN 1
PROP.
STORMWATER
INFILTRATION
BASIN 2
OCEAN STREET
(PUBLIC - 33' WIDE)
KALMUS
PARKING
BEACH
LOT
PROP BIT. PVMT
(140 sf±)
BEGIN PROP 8' BIT. SHARED USE PATH
PROP LANDSCAPED AREA
(SEE PLANTING LIST ON SHEET C-8.2)
REM PVMT
(APPROX. 2,497SF±)
PROP 4-IN SYL
(TYP)34.0'VARIES12.0'REM PVMT
(APPROX. 176 SF±)
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
LOAM & SEED
REM PVMT
(APPROX.324 SF±)
PROP STOP
SIGN "R1-1"
PROP
NO LEFT TURN
SIGN "R3-2"PROP
"DO NOT ENTER"
SIGN "R5-1"
PROP TREES
(SEE PLANTING LIST ON SHEET C-8.2)
R&R EXIST FENCE
PROP PVMT
(APPROX. 10,100 SF±)
NET LOSS OF 3
PARKING SPACES
PROP 5' BIT. SIDEWALK
PROP WOOD GUARDRAIL (TYP)
R&D EXIST
"NO PARKING" SIGN
R&D
(R&S GATE AND
POST/BOLLARD)
24'
PROP
BIT. CONC RAMP
SWLPROP
"NO PARKING" SIGN
"R7-1"
W/LEFT ARROW
PROP "TURN" SIGN
"W1-1" POINTING RIGHT
W/"20 MPH ADVISORY SPEED" SIGN
"W13-1P" W/ARROW
PROP
"ONE DIRECTION" SIGN
"W1-6"
W/LARGE ARROW
POTENTIAL MONUMENT LOCATION
(BY OTHERS)
R&R EXIST WOOD GUARD RAIL
SEWAGE
PUMP
STATION
12.0'PROP 3'-5' CLEAR WIDTH (TYP)
R&R EXIST BOULDERS
BEGIN PROP
5' BIT. SIDEWALK
(1,460 SF±)
PROP "PEDESTRIANS PERMITTED" SIGN "D11-2"
AND "BICYCLES PERMITTED" SIGN "D11-1A" AND
ARROW UP PLAQUE "M6-3" ON SINGLE SIGN
PROP
"NO PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP
"NO PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP 3' DUNE
GRASS STRIP
INSTALL BLACK VINYL SLATS
TO PUMP STATION FENCE ENCLOSURE
R&S EXIST BOULDERS
PROP 4-IN
SOLID WHITE
EDGE LINE
(TYP)
PROP BIT. 3' WIDE
LETDOWN CHANNEL
(TYP)
PROP
ASPHALT BERM
(TYP)
PROP AUTOMATED
ENTRANCE GATE. SIZE AND
TYPE T BE DETERMINED AT
A LATER DATE.
R&D EXIST
"NO PARKING" SIGN
PROP STEEL-BACKED
TIMBER GUARDRAIL
W/RUB RAIL (TYP)
PROPOSED 13FT X 13FT ARTIFICIAL
TURF WIND SURFER RIGGING AREA
PROPOSED 8FT x 8FT RINSE STATION/SHOWER
WITH CEMENT CONCRETE OR PLANK PLATFORM,
BENCH, BOTTLE FILL, AND MAINTENANCE
SPIGOT WITH (6) BOLLARDS AS SHOWN
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
END PROP
5' BIT. SIDEWALK
(1,460 SF±)
PROP.
STORMWATER
INFILTRATION
BASIN 1
PROP.
STORMWATER
INFILTRATION
BASIN 2
PROP
"TURN" SIGN
"W1-1" POINTING LEFT
W/"20 MPH
ADVISORY SPEED" SIGN
"W13-1P" W/ARROW
PROP
"ONE DIRECTION"
SIGN
"W1-6"
W/LARGE ARROW
C-3.0TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
Sidewalk
LayoutProposed Sidewalk ExtensionSEE INSET VIEW FOR CONTINUATION
INSET VIEW
1"=20'
OCEAN
S
T
R
E
E
T
(PUBLIC
-
3
3'
W
I
D
E
)
OCEAN STREE
T
(PUBLIC - 33' W
I
D
E
)
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND
"BICYCLES PERMITTED" SIGN
"D11-1A" AND ARROW RIGHT
PLAQUE "M6-1" ON SINGLE SIG
N
END PROP 8' BIT.
SHARED USE PATH
PROP CE
M
C
O
N
C
PEDEST
R
I
A
N
CURB RA
M
P
(TYP)
PROP ST
O
P
SIGN "R
1
-
1
"
PROP LADDER STYLE
CROSSWALK (TYP)
PROP "PEDESTRIAN CROSSING
"
SIGN "W11-2" AND DOWNWARD
DIAGONAL ARROW
PLAQUE "W16-7P"
R&D
R&D EXIST
"NO PARKING" SIGNR&D EXIST
"NO PARKING" SIGN
R&R EXIST UTILITY POLE GUY
WIRE AND INSTALL PIPE GUY
ARM TO PROVIDE 10' MIN
VERTICAL CLEARANCE AND 3'
MIN HORIZONTAL CLEARANCE
FOR SHRED USE PATH (BY
OTHERS)
PROP
"NO PAR
K
I
N
G
ANY TIM
E
"
S
I
G
N
"R7-1"
W/DOUBL
E
H
E
A
D
E
D
ARROW
PROP "NO
PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP "PEDESTRIAN CROSSING"
SIGN "W11-2" AND "AHEAD" PLAQUE
"W16-9P"
PROP
"PEDESTRIANS PERMITTED"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
PROP RAISED
PEDESTRIAN CROSSING
(6" HEIGHT) 12" SWL (TYP)
PROP
"PEDESTRIANS
PERMITTED" SIGN
"D11-2" AND ARROW
RIGHT PLAQUE "M6-1"
ON SINGLE SIGN
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP CEM CONC
PEDESTRIAN CURB
RAMP (TYP)
PROP 4-IN
SOLID WHITE
EDGE LINE
(TYP)
PROP 4-IN DOUBLE
YELLOW CENTER
LINE (TYP)R&D EXI
S
T
"NO PAR
K
I
N
G
"
S
I
G
N
BEGIN PROP BIT.
SIDEWALK/
SHOULDER AREA 5.00'SWL
SWL
DBYL
10.0'10.0'TIE INTO EXISTING
STRIPING (TYP)5.00'5.00'4.95'END PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
PROP STEEL-BACK TIMBER
GUARDRAIL W/RUB RAIL (TYP)
PROP
ASPHALT
DRIVEWAY
VGC
SIDEWALK
VGC
R&D EXIST
TIMBER
RET. WALL
PROP 6"
D
E
E
P
GRASSE
D
DRAINAG
E
D
I
T
C
H
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
END PROP 8' BIT.
SHARED USE PATH
PROP.
STORMW
A
T
E
R
INFILTR
A
T
I
O
N
BASIN 1
OCEAN
S
T
R
E
E
T
(PUBLIC
-
3
3'
W
I
D
E
)
OCEAN STREE
T
(PUBLIC - 33' W
I
D
E
)
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND
"BICYCLES PERMITTED" SIGN
"D11-1A" AND ARROW RIGHT
PLAQUE "M6-1" ON SINGLE SIG
N
END PROP 8' BIT.
SHARED USE PATH
PROP CE
M
C
O
N
C
PEDEST
R
I
A
N
CURB RA
M
P
(TYP)
PROP ST
O
P
SIGN "R
1
-
1
"
PROP LADDER STYLE
CROSSWALK (TYP)
PROP "PEDESTRIAN CROSSING
"
SIGN "W11-2" AND DOWNWARD
DIAGONAL ARROW
PLAQUE "W16-7P"
R&D
R&D EXIST
"NO PARKING" SIGNR&D EXIST
"NO PARKING" SIGN
R&R EXIST UTILITY POLE GUY
WIRE AND INSTALL PIPE GUY
ARM TO PROVIDE 10' MIN
VERTICAL CLEARANCE AND 3'
MIN HORIZONTAL CLEARANCE
FOR SHRED USE PATH (BY
OTHERS)
PROP
"NO PAR
K
I
N
G
ANY TIM
E
"
S
I
G
N
"R7-1"
W/DOUBL
E
H
E
A
D
E
D
ARROW
PROP "NO
PARKING
ANY TIME" SIGN
"R7-1"
W/DOUBLEHEADED
ARROW
PROP "PEDESTRIAN CROSSING"
SIGN "W11-2" AND "AHEAD" PLAQUE
"W16-9P"
PROP
"PEDESTRIANS PERMITTED"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
PROP RAISED
PEDESTRIAN CROSSING
(6" HEIGHT) 12" SWL (TYP)
PROP
"PEDESTRIANS
PERMITTED" SIGN
"D11-2" AND ARROW
RIGHT PLAQUE "M6-1"
ON SINGLE SIGN
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP CEM CONC
PEDESTRIAN CURB
RAMP (TYP)
PROP 4-IN
SOLID WHITE
EDGE LINE
(TYP)
PROP 4-IN DOUBLE
YELLOW CENTER
LINE (TYP)R&D EXI
S
T
"NO PAR
K
I
N
G
"
S
I
G
N
BEGIN PROP BIT.
SIDEWALK/
SHOULDER AREA 5.00'SWL
SWL
DBYL
10.0'10.0'TIE INTO EXISTING
STRIPING (TYP)5.00'5.00'4.95'END PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
PROP STEEL-BACK TIMBER
GUARDRAIL W/RUB RAIL (TYP)
PROP
ASPHALT
DRIVEWAY
VGC
SIDEWALK
VGC
R&D EXIST
TIMBER
RET. WALL
PROP 6"
D
E
E
P
GRASSE
D
DRAINAG
E
D
I
T
C
H
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
END PROP 8' BIT.
SHARED USE PATH
PROP.
STORMW
A
T
E
R
INFILTR
A
T
I
O
N
BASIN 1 TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-3.1
Sidewalk
LayoutProposed Sidewalk Extension1"=20'
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STR
E
E
T
(PUBLIC - 3
3
'
W
I
D
E
)
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND
"BICYCLES PERMITTED" SIGN
"D11-1A" AND ARROW RIGHT
PLAQUE "M6-1" ON SINGLE SIGN
END PROP 8' BIT.
SHARED USE PATH
PROP BIT. SIDEWALK/
SHOULDER AREA
BIT. SHOULDER AREA
PROP LADDER STYLE
CROSSWALK (TYP)
PROP "PEDESTRIAN CROSSING"
SIGN "W11-2" AND DOWNWARD
DIAGONAL ARROW
PLAQUE "W16-7P"17.9'18.7'21.3'3.5'±20.9'17.5'18.0'18.7'20.2'21.7'SHORTEN EXIST
BLOCK WALL
(APPROX. 4 LF)10.0'10.0'10.0'EXIST UTIL
I
T
Y
POLE WITH
I
N
SHOULDER
A
R
E
A
R&R EXIST
COBBLE
LANDSCAPE
BED
PROP
"PEDESTRIANS PERMITTED"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
PROP
"PEDESTRIANS
PERMITTED" SIGN
"D11-2" AND ARROW
RIGHT PLAQUE "M6-1"
ON SINGLE SIGN
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA
PROP CEM CONC
PEDESTRIAN CURB
RAMP (TYP)
VGC
VGCSWL
SWL
DBYL
PROP 4-IN
S
O
L
I
D
WHITE EDG
E
L
I
N
E
(TYP)
SWL
DBYL
PROP 4-IN
D
O
U
B
L
E
YELLOW C
E
N
T
E
R
LINE (TYP)
SWL
PROP BIT.
CONC RAMPS
PROP BIT.
CONC RAMPS
PROP VERTICAL
GRANITE CURB
(TYP)
SHORTEN EXIST
BLOCK WALL
(APPROX. 2 LF)5.00'10.0'PROP BIT. SIDEWALK/
SHOULDER AREA10.0'10.0'5.00'BIT. SHOULDER AREA
BIT. SHOUL
D
E
R
A
R
E
A
BIT. SHOUL
D
E
R
A
R
E
A5.00'4.95'5.00'5.00'3.67'5.00'5.00'4.95'END PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
END CURBED
SIDEWALK/BEGIN
PROP BIT. SIDEWALK/
SHOULDER AREA
END CURBED SIDEWALK/
BEGIN PROP BIT. SIDEWALK/
SHOULDER AREA
END PROP BIT. SIDEWALK/
SHOULDER AREA/BEGIN
CURBED SIDEWALK
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
PROP ASPHALT
RAMPS (4.5% MAX.)
PROP
ASPHALT
DRIVEWAY
SIDEWALK
VGC
SIDEWALK
VGC
R&D EXIST
TIMBER
RET. WALL
PROP BIT. SIDEWALK/
SHOULDER AREA
CROSS SLOPES @ 1.5% MAX
AT ALL DRIVEWAYS
(TYP)
OCEAN STREET
(PUBLIC - 33' WIDE)
END PROP 8' BIT.
SHARED USE PATH
CONTINUED
O
N
SHEET NO.
#
#
#
#
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STR
E
E
T
(PUBLIC - 3
3
'
W
I
D
E
)
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND
"BICYCLES PERMITTED" SIGN
"D11-1A" AND ARROW RIGHT
PLAQUE "M6-1" ON SINGLE SIGN
END PROP 8' BIT.
SHARED USE PATH
PROP BIT. SIDEWALK/
SHOULDER AREA
BIT. SHOULDER AREA
PROP LADDER STYLE
CROSSWALK (TYP)
PROP "PEDESTRIAN CROSSING"
SIGN "W11-2" AND DOWNWARD
DIAGONAL ARROW
PLAQUE "W16-7P"17.9'18.7'21.3'3.5'±20.9'17.5'18.0'18.7'20.2'21.7'SHORTEN EXIST
BLOCK WALL
(APPROX. 4 LF)10.0'10.0'10.0'EXIST UTIL
I
T
Y
POLE WITH
I
N
SHOULDER
A
R
E
A
R&R EXIST
COBBLE
LANDSCAPE
BED
PROP
"PEDESTRIANS PERMITTED"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
PROP
"PEDESTRIANS
PERMITTED" SIGN
"D11-2" AND ARROW
RIGHT PLAQUE "M6-1"
ON SINGLE SIGN
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA
PROP CEM CONC
PEDESTRIAN CURB
RAMP (TYP)
VGC
VGCSWL
SWL
DBYL
PROP 4-IN
S
O
L
I
D
WHITE EDG
E
L
I
N
E
(TYP)
SWL
DBYL
PROP 4-IN
D
O
U
B
L
E
YELLOW C
E
N
T
E
R
LINE (TYP)
SWL
PROP BIT.
CONC RAMPS
PROP BIT.
CONC RAMPS
PROP VERTICAL
GRANITE CURB
(TYP)
SHORTEN EXIST
BLOCK WALL
(APPROX. 2 LF)5.00'10.0'PROP BIT. SIDEWALK/
SHOULDER AREA10.0'10.0'5.00'BIT. SHOULDER AREA
BIT. SHOUL
D
E
R
A
R
E
A
BIT. SHOUL
D
E
R
A
R
E
A5.00'4.95'5.00'5.00'3.67'5.00'5.00'4.95'END PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
END CURBED
SIDEWALK/BEGIN
PROP BIT. SIDEWALK/
SHOULDER AREA
END CURBED SIDEWALK/
BEGIN PROP BIT. SIDEWALK/
SHOULDER AREA
END PROP BIT. SIDEWALK/
SHOULDER AREA/BEGIN
CURBED SIDEWALK
BEGIN PROP
BIT. SIDEWALK/
SHOULDER AREA/
ASPHALT RAMP
PROP ASPHALT
RAMPS (4.5% MAX.)
PROP
ASPHALT
DRIVEWAY
SIDEWALK
VGC
SIDEWALK
VGC
R&D EXIST
TIMBER
RET. WALL
PROP BIT. SIDEWALK/
SHOULDER AREA
CROSS SLOPES @ 1.5% MAX
AT ALL DRIVEWAYS
(TYP)
OCEAN STREET
(PUBLIC - 33' WIDE)
END PROP 8' BIT.
SHARED USE PATH
CONTINUED
O
N
SHEET NO.
#
#
#
#TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-3.2
Sidewalk
LayoutProposed Sidewalk Extension1"=20'
GOSNOLD
STREET
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STREET
(PUBLIC - 33' WIDE)
EXIST
SIDEWALK
10.3
'
1
4
.
5
'
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND AND ARROW UP
PLAQUE "M6-3" ON SINGLE SIGN
20.2'21.7'21.6'23.1'22.7'RELOCATE EXIST
HYDRANT OUTSIDE
SHOULDER AREA
EXIST UTILITY
POLE WITHIN
SHOULDER AREA
R&R OR SLIGHTLY
MODIFY EXIST
LANDSCAPE TIMBER
ISLAND
10.0'10.0'10.0'10.0'EXIST UTILITY
POLE WITHIN
SHOULDER AREA
R&R EXIST GUY
WIRE AND INSTALL
A STRONG BACK ON
UTILITY POLE
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
BE REMOVED
R&D
R&D
COORDINATE BEGINNING OF SIDEWALK
LOCATION WITH THE GPI VETERANS
PARK & CAMPUS DESIGN PLANS
BEGIN PROP 8' BIT.
SHARED USE PATH
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP
LADDER STYLE
CROSSWALK (TYP)
PROP
"PEDESTRIAN CROSSING"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
R&R EXIST
"PEDESTRIAN CROSSING"
SIGN "W11-2"
R&R EXIST
"PEDESTRIAN CROSSING"
SIGN "W11-2"
APPROX. 30 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
END PROP BIT. SIDEWALK/
SHOULDER AREA
BEGIN PROP 8' BIT.
SHARED USE PATH
PROP 4-IN SOLID
WHITE EDGE LINE
(TYP)
SWL
DBYL
PROP 4-IN DOUBLE
YELLOW CENTER
LINE (TYP)
SWL
SWL
DBYL
SWL
EXIST TREES TO REMAIN
AND SHALL BE
PROTECTED DURING
CONSTRUCTION
ACTIVITIES. PROVIDE
UNDER-STORY TRIMMING
AS NEEDED FOR CLEAR
PASSAGE WAY (TYP)
TIE INTO
EXIST
SIDEWALKPROP BIT.
SIDEWALK/
SHOULDER AREA
PROP BIT. SIDEWALK/
SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA5.00'5.00'5.00'5.00'5.00'END PROP 8' BIT.
SHARED USE PATH
30.5'
PROP BIT. SIDEWALK/
SHOULDER AREA
CROSS SLOPES @ 1.5% MAX
AT ALL DRIVEWAYS
(TYP)
FUTURE GOSN
O
L
D
PUMP STATION
(BY OTHERS)
BEGIN PROP 8' BIT.
SHARED USE PATH
END PROP
8' BIT.
SIDEWALK
BEGIN PROP
8' BIT. SIDEWALK
GOSNOLD
STREET
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STREET
(PUBLIC - 33' WIDE)
EXIST
SIDEWALK
10.3
'
1
4
.
5
'
PROP
"PEDESTRIANS PERMITTED"
SIGN "D11-2" AND AND ARROW UP
PLAQUE "M6-3" ON SINGLE SIGN
20.2'21.7'21.6'23.1'22.7'RELOCATE EXIST
HYDRANT OUTSIDE
SHOULDER AREA
EXIST UTILITY
POLE WITHIN
SHOULDER AREA
R&R OR SLIGHTLY
MODIFY EXIST
LANDSCAPE TIMBER
ISLAND
10.0'10.0'10.0'10.0'EXIST UTILITY
POLE WITHIN
SHOULDER AREA
R&R EXIST GUY
WIRE AND INSTALL
A STRONG BACK ON
UTILITY POLE
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
BE REMOVED
R&D
R&D
COORDINATE BEGINNING OF SIDEWALK
LOCATION WITH THE GPI VETERANS
PARK & CAMPUS DESIGN PLANS
BEGIN PROP 8' BIT.
SHARED USE PATH
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP
LADDER STYLE
CROSSWALK (TYP)
PROP
"PEDESTRIAN CROSSING"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
R&R EXIST
"PEDESTRIAN CROSSING"
SIGN "W11-2"
R&R EXIST
"PEDESTRIAN CROSSING"
SIGN "W11-2"
APPROX. 30 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
END PROP BIT. SIDEWALK/
SHOULDER AREA
BEGIN PROP 8' BIT.
SHARED USE PATH
PROP 4-IN SOLID
WHITE EDGE LINE
(TYP)
SWL
DBYL
PROP 4-IN DOUBLE
YELLOW CENTER
LINE (TYP)
SWL
SWL
DBYL
SWL
EXIST TREES TO REMAIN
AND SHALL BE
PROTECTED DURING
CONSTRUCTION
ACTIVITIES. PROVIDE
UNDER-STORY TRIMMING
AS NEEDED FOR CLEAR
PASSAGE WAY (TYP)
TIE INTO
EXIST
SIDEWALKPROP BIT.
SIDEWALK/
SHOULDER AREA
PROP BIT. SIDEWALK/
SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA5.00'5.00'5.00'5.00'5.00'END PROP 8' BIT.
SHARED USE PATH
30.5'
PROP BIT. SIDEWALK/
SHOULDER AREA
CROSS SLOPES @ 1.5% MAX
AT ALL DRIVEWAYS
(TYP)
FUTURE GOSN
O
L
D
PUMP STATION
(BY OTHERS)
BEGIN PROP 8' BIT.
SHARED USE PATH
END PROP
8' BIT.
SIDEWALK
BEGIN PROP
8' BIT. SIDEWALK TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-3.3
Sidewalk
LayoutProposed Sidewalk Extension1"=20'
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN ST
R
E
E
T
(PUBLIC
-
3
3
'
W
I
D
E
)
PROP
8' BIT.
SHARED
USE PAT
H
W11-2
W16-2aP
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
R&D
R&D
R&D
R&D
R&D
APPROX. 15 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
R&D R&R EXIS
T
G
U
Y
WIRE AND
INSTALL
A
STRONG
B
A
C
K
O
N
UTILITY P
O
L
E
PROP CE
M
C
O
N
C
PEDESTR
I
A
N
CURB RA
M
P
(TYP)
APPROX. 30 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
PROP POST &
RAIL FENCE
PROP
LADDER
S
T
Y
L
E
CROSSW
A
L
K
(TYP)
R&D
BEGIN PROP 8' BIT.
SHARED USE PATH
END PRO
P
8
'
B
I
T
.
SHARED
U
S
E
P
A
T
H
PROP
"PEDEST
R
I
A
N
C
R
O
S
S
I
N
G
"
SIGNS "W
1
1
-
2
"
A
N
D
DOWNWA
R
D
D
I
A
G
O
N
A
L
ARROW P
L
A
Q
U
E
"
W
1
6
-
7
P
"
LADDER STYLE
CROSSWALK (TYP)
PROP
"PEDESTRIAN CROSSING"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
BEGIN PROP 8' BIT.
SHARED USE PATH
END PROP 8' BIT.
SHARED USE PATH
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
BE REMOVED
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN ST
R
E
E
T
(PUBLIC
-
3
3
'
W
I
D
E
)
PROP
8' BIT.
SHARED
USE PAT
H
W11-2
W16-2aP
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
R&D
R&D
R&D
R&D
R&D
APPROX. 15 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
R&D R&R EXIS
T
G
U
Y
WIRE AND
INSTALL
A
STRONG
B
A
C
K
O
N
UTILITY P
O
L
E
PROP CE
M
C
O
N
C
PEDESTR
I
A
N
CURB RA
M
P
(TYP)
APPROX. 30 LF OF
EXIST POST & RAIL
FENCE TO BE
REMOVED
PROP POST &
RAIL FENCE
PROP
LADDER
S
T
Y
L
E
CROSSW
A
L
K
(TYP)
R&D
BEGIN PROP 8' BIT.
SHARED USE PATH
END PRO
P
8
'
B
I
T
.
SHARED
U
S
E
P
A
T
H
PROP
"PEDEST
R
I
A
N
C
R
O
S
S
I
N
G
"
SIGNS "W
1
1
-
2
"
A
N
D
DOWNWA
R
D
D
I
A
G
O
N
A
L
ARROW P
L
A
Q
U
E
"
W
1
6
-
7
P
"
LADDER STYLE
CROSSWALK (TYP)
PROP
"PEDESTRIAN CROSSING"
SIGN "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"
BEGIN PROP 8' BIT.
SHARED USE PATH
END PROP 8' BIT.
SHARED USE PATH
APPROX. 11 LF OF EXIST
POST & RAIL FENCE TO
BE REMOVED
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-3.4
Sidewalk
LayoutProposed Sidewalk Extension1"=20'
OCEAN STREET
(PUBLIC - 33' WIDE)
PROP
8' BIT.
SHARED
USE PATH
R&R EXIST GUY
WIRE AND
INSTALL A
STRONG BACK ON
UTILITY POLE
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP
P
O
S
T
&
RAIL F
E
N
C
E PROJECT LIMITPROP
LADDER STYLE
CROSSWALK
(TYP)
R&D END PROP 8' BIT.
SHARED USE PATH
PROP
"PEDESTRIAN CROSSING"
SIGNS "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"CONTINUED ONCONTINUED ON
SHEET NO. ####
OCEAN STREET
(PUBLIC - 33' WIDE)
PROP
8' BIT.
SHARED
USE PATH
R&R EXIST GUY
WIRE AND
INSTALL A
STRONG BACK ON
UTILITY POLE
PROP CEM CONC
PEDESTRIAN
CURB RAMP
(TYP)
PROP
P
O
S
T
&
RAIL F
E
N
C
E PROJECT LIMITPROP
LADDER STYLE
CROSSWALK
(TYP)
R&D END PROP 8' BIT.
SHARED USE PATH
PROP
"PEDESTRIAN CROSSING"
SIGNS "W11-2" AND
DOWNWARD DIAGONAL
ARROW PLAQUE "W16-7P"CONTINUED ONCONTINUED ON
SHEET NO. ####TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C3-DM SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC Proposed Sidewalk ExtensionC-3.5
Sidewalk
Layout
1"=20'
OCEAN S
T
R
E
E
T
(PUBLIC
-
3
3
'
W
I
D
E
)108
91112131414PROP LIMIT OF
GRUBBING/CLEARING
PROP EROSION CONTROL
BARRIER (TYP)
HxP
15
15 16
NAVD 88
BASE ELEV
5.00
13.960+00 14.4014.390+50 13.4912.361+00 11.2410.111+50 8.997.862+00 2+500+00 0+50 1+00 1+50 2+00 2+50
-1.50%
-1.50%
3.00%
-4.
5
0
%GRADE BREAK STA = 0+00.00ELEV = 13.96GRADE BREAK STA = 0+06.00
ELEV = 13.87
GRADE BREAK STA = 2+11.94ELEV = 7.50GRADE BREAK STA = 2+06.14
ELEV = 7.59
EXIST SIDEWALK CL
PROP SIDEWALK CL TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C4-GRD SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-4.3
Sidewalk
Plan &
ProfileProposed Sidewalk Extension0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
2 2 4
0
0
20
AS NOTED
OCEAN STREET
(PUBLIC - 33' WIDE)
KALMUS
PARKING
BEACH
LOT
REPLACE EXIST CB
COVER WITH MANHOLE
COVER
NEW RIM= 5.15
PROP
LEACHING CB
RIM= 5.12
RIM= 4.60
HxP
LxP
LxP X6.36
X4.75 X4.82X5.00
X7.48
X5.83X5.05 X5.78
PROP EROSION CONTROL
BARRIER/LIMIT OF GRUBBING
5 X5.46X5.34
LIMIT OF
GRADINGSTORMWATER
INFILTRATION
BASIN A
74
4
45655
6
5
6
7
4
3
3
4
4
3INFIL. BASIN B
5
11'±13'±LIMIT OF GRADING6
5X5.30 X5.21 X5.00 X5.20 X5.5
X5.18X5.15
5X5.22
X5.34
X5.01
X5.43 X5.29X5.27X5.24
X5.33 X5.30
SAWCUT LINE
SAWCUT LINE 555
EX. SLOPE= 0.6%±EX. SLOPE
= 1.0%±
FOREBAY OUTLET
ELEV.= 3.9
FOREBAY OUTLET
ELEV.= 4.6
PROP BIT.
LETDOWN CHANNEL
(TYP)
PROP
APRON/ RIP-RAP
PROP 4' x 8.5'
RIP-RAP
APRON
SAWCUT LINE
FOREBAY OUTLET
ELEV.= 3.8 5455X5.26
PROP TREE LINE/LIMIT
OF CLEARING (TYP)
PROP 4' x 5'
RIP-RAP
APRON
PROP 4' x 5'
RIP-RAP
APRON
PROP 4' x 2'
RIP-RAP APRON
666
77
8
8
7
77677 76
8 8NAVD 88
BASE ELEV
0.00
P-KALMUS ENT RD P-Kalmus Ent Rd
5.590+00 5.065.150+50 5.856.571+00 7.117.411+50 7.477.292+00 6.886.292+50 5.705.143+00 5.123+50 4+00 4+500+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
-2.37%
1.00%
-2.26%
2.96%GRADE BREAK STA = 0+00.00ELEV = 5.59GRADE BREAK STA = 3+44.57ELEV = 5.32PVI STA = 0+37.66
PVI ELEV = 4.74
A.D. = 5.22%
K = 7.67
40' VC
PVC: 0+17.66ELEV: 5.19PVT: 0+57.66ELEV: 5.3387.7' HSD
LOW POINT ELEV = 5.00
LOW POINT STA = 0+34.96
PVI STA = 3+06.99
PVI ELEV = 4.94
A.D. = 3.37%
K = 8.89
30' VC
PVC: 2+91.99ELEV: 5.30PVT: 3+21.99ELEV: 5.09153.9' HSD
LOW POINT ELEV = 5.05
LOW POINT STA = 3+13.10
PVI STA = 1+61.22
PVI ELEV = 8.40
A.D. = -5.33%
K = 26.25
140' VC
PVC: 0+91.22ELEV: 6.33PVT: 2+31.22ELEV: 6.74194.6' SSD
HIGH POINT ELEV = 7.48
HIGH POINT STA = 1+68.92
OCEAN STREET EOPROWEXIST PARKING LOTEOPPAVEMENT SWACUT/ TIE-INOCEAN STREETCENTER LINEEXIST ROAD CL
PROP ROAD CL TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C4-GRD SWALK PLOT.dwg3/8/2024
100% DESIGN SET
NJC
C-4.4
Parking Lot
Entrance Plan
& ProfileProposed Sidewalk Extension0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
2 2 4
0
0
20
AS NOTED
OCEAN STREET
(PUBLIC - 33' WIDE)
KALMUS
PARKING
BEACH
LOT
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
REPLACE EXIST CB
COVER WITH MANHOLE
COVER
NEW RIM= 5.15
CONTRACTOR TO PERFORM TEST PIT TO
CONFIRM EXIST 6" AC WATER MAIN DIAMETER
AND LOCATION.
CUT APPROX. 12' OF 6" AC PIPE AND INSTALL:
(1) 8"x8"x8" TEE
(2) 8" GATE VALVES
(2) 8" DIP
(2) 6"x8" REDUCERS
(2) 6" DIP
(2) 6" FLEX COUPLING TO CONNECT TO 6" AC PIPE
INSTALL THRUST BLOCKS
ON ALL BENDS AND TEES
(TYP)
NEW 8" DI WATER MAIN
EXTENSION
PROP CROSSING 8" DI WATER OVER
EXIST 10" PVC SEWER. MAINTAIN MIN
18" VERTICAL SEPARATION
CONTRACTOR IS RESPONSIBLE FOR BRACING
EXIST UTILITY POLE IN ACCORDANCE WITH THE
UTILITY REQUIREMENT (TYP. ALL UTILITY POLES)
PROP CROSSING 8" DI WATER OVER
EXIST 8" DI SEWER FORCEMAIN.
MAINTAIN MIN 18" VERTICAL SEPARATION
RECONNECT EXIST 1" WATER SERVICE
TO NEW 8" WATER MAIN
PROP
LEACHING CB
RIM= 5.12
PROP
LEACHING CB
RIM= 4.60
PROP 8"x8"x6" TEE WITH 6" GATE
VALVE AND HYDRANT ASSEMBLY
11.25° BENDHAWES AVE.OCEAN
S
T
R
E
E
T
(PUBLIC
-
3
3'
W
I
D
E
)
OCEAN STREE
T
(PUBLIC - 33' W
I
D
E
)
SIDEWALK
PROP 6"
D
E
E
P
GRASSE
D
DRAINAG
E
D
I
T
C
H
(TYP.)
(TYP.)
NEW 8" DI
WATER MAIN
EXTENSION PROP 8" WATER MAIN
CONNECTION TO EXIST 6" AC.
CUT EXIST 6" AC WATER
MAIN AND CONNECT WITH
6" FLEXIBLE COUPLING
AND INSTALL:
(1) 6" DIP
(1) 8"x6" DI REDUCER
(1) 8" DIP
(1) 8" GATE VALVE
ADD
8" GATE
VALVE
PROP DRAINAGE
CULVERT CROSSING.
MAINTAIN MIN 18"
VERTICAL SEPARATION
PROP
8"x8"x6" TEE WITH 6"
GATE VALVE AND
HYDRANT ASSEMBLY
11.25° BEND 11.25°
BEND
C-6.0TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C6-UTILITY-WATER PLOT.dwg3/8/2024
100% DESIGN SET
NJC
Utility
PlansProposed Sidewalk ExtensionNOTES:
1.THE NEW WATER MAIN SHALL NOT BE CONNECTED TO THE WATER
DISTRIBUTION SYSTEM UNTIL THE NEW MAIN HAS BEEN PRESSURE
TESTED, CHLORINATED, FLUSHED, DECHLORINATED, BACTERIA
TESTED AND APPROVED BY VEOLIA.
2.CONTRACTOR SHALL NOT OPERATE ANY WATER VALVES THAT
DIRECTLY CONNECT TO THE HYANNIS WATER DISTRIBUTION SYSTEM.
CONTACT VEOLIA TO OPERATE VALVES AND HYDRANTS.
3.ALL JOINTS WITHIN 40 FEET OF CONNECTIONS SHALL BE RESTRAINED
UNLESS OTHERWISE NOTED.
1"=20'
GOSNOLD
STREET
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STREET
(PUBLIC - 33' WIDE)
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOULDER AREA
30.5'
FUTURE GOSN
O
L
D
PUMP STATION
(BY OTHERS)
RELOCATE THE EXIST HYDRANT
SO THAT STEAMER NOZZLE IS 18"
OFF OF THE BACK OF THE
SHOULDER AREA
OCEAN STREET
(PUBLIC - 33' WIDE)
OCEAN STR
E
E
T
(PUBLIC - 3
3
'
W
I
D
E
)
BIT. SHOULDER AREA
BIT. SHOULDER AREA
BIT. SHOUL
D
E
R
A
R
E
A
BIT. SHOUL
D
E
R
A
R
E
A
SIDEWALK
SIDEWALK
OCEAN STREET
(PUBLIC - 33' WIDE)
PROP 8" WATER MAIN
CONNECTION TO EXIST 6" AC.
CUT EXIST 6" AC WATER
MAIN AND CONNECT WITH
6" FLEXIBLE COUPLING
AND INSTALL:
(1) 6" DIP
(1) 8"x6" DI REDUCER
(1) 8" DIP
(1) 8" GATE VALVE
ADD
8" GATE
VALVE
11.25° BEND
11.25°
BEND
C-6.1TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C6-UTILITY-WATER PLOT.dwg3/8/2024
100% DESIGN SET
NJC
Utility
PlansProposed Sidewalk ExtensionNOTES:
1.THE NEW WATER MAIN SHALL NOT BE CONNECTED TO THE WATER
DISTRIBUTION SYSTEM UNTIL THE NEW MAIN HAS BEEN PRESSURE
TESTED, CHLORINATED, FLUSHED, DECHLORINATED, BACTERIA
TESTED AND APPROVED BY VEOLIA.
2.CONTRACTOR SHALL NOT OPERATE ANY WATER VALVES THAT
DIRECTLY CONNECT TO THE HYANNIS WATER DISTRIBUTION SYSTEM.
CONTACT VEOLIA TO OPERATE VALVES AND HYDRANTS.
3.ALL JOINTS WITHIN 40 FEET OF CONNECTIONS SHALL BE RESTRAINED
UNLESS OTHERWISE NOTED.
1"=20'
CUT & ROLL BACK 1/3 OF BURLAP BEFORE BACKFILLING.
COMPLETELY REMOVE SYNTHETIC BURLAP & LACING
3 INCH HIGH EARTH WATERING SAUCER AROUND TREE PIT
3 INCHES AGED PINE BARK MULCH (PULL MULCH AWAY
MIN. 2 X ROOTBALL DIAMETER
EVERGREEN TREE PLANTING
6 INCHES
ROOTBALL
NOT TO SCALE
BELOW
ROOTBALL
DURING THE FIRST 24 HOURS AFTER PLANTING
WATERING SAUCER SHALL BE FLOODED TWICE
TREE SHALL BE PLANTED SO
FINISHED GRADE AFTER
DO NOT CUT LEADER
TREE SHALL BE SET PLUMB
THAT CROWN IS 3 INCHES ABOVE
SETTLEMENT
UNDISTURBED SUBGRADE
ROOTBALL SHALL BE PLACED ON
BACKFILL MIX PER SPECIFICATIONS
FROM TRUNK OF TREE)
2"-4" SOIL BERM
3" SHREDDED
MULCH AS INDICATED
PRUNE BROKEN OR DEAD
BRANCHES AS DIRECTED BY
LANDSCAPE ARCHITECT
PLANT SHRUB PLUMB
TOP OF ROOTBALL
TO MATCH FINISH
GRADE WITHIN 1"
UNDISTURBED PERVIOUS
SOIL
PREPARED PLANTING
SOIL MIXTURE
REMOVE TOP THIRD OF
BURLAP AT ROOTBALL
SCARIFY BOTTOM OF
PLANTING HOLE 4"
DEEP
SHRUB PLANTING
NOT TO SCALE
TOPSOIL - NO STONES GREATER THAN 1" Ø,
COMPACT WITH A HANDROLLER IN TWO
DIRECTIONS & FINE RAKE PRIOR TO SEEDING
SUBSOIL - COMPACTED AT 90% MAXIMUM DENSITY
SEED - AS SPECIFIED IN NOTES AND DRAWINGS.
TOP DRESS W/ 4" HAY MULCH AFTER SEEDING.
FINISH GRADE
LOAM AND SEED
NOT TO SCALE
SILT SACK
NOT TO SCALE
NOTES:
1.SEDIMENT CONTROL INSERTS TO BE
INSTALLED OVER ALL CATCHBASINS/INLETS
THAT WILL RECEIVE RUNOFF FROM THE
PROJECT SITE.
2.TEMPORARY INLET PROTECTION TO BE
REMOVED AFTER CONTRIBUTING DRAINAGE
AREA HAS BEEN PERMANENTLY STABILIZED.
3.MANUFACTURER TO BE SILT SACK, INLET AND
PIPE PROTECTION OR APPROVED EQUIVALENT.
1" REBAR OR EQUAL
FOR BAG REMOVAL
FROM INLET
OVERFLOW
SLOTS OR
APPROVED
EQUIV.
DUMP LOOP
HANDLES
STAINLESS STEEL
LOCKING BAND
OVERFLOW FEATURE
LIFT HANDLES
GALVANIZED
STEEL FRAME
INLET FILTER BY INLET
AND PIPE PROTECTION,
INC. OR APPROVED
EQUAL
GEOTEXTILE FILTER BAG
WITH REINFORCED
POLYESTER OUTER MESH
3"-4"
PLAN VIEW SECTION
AREA TO BE
PROTECTED
NOTES:
1.MULCH SOCK MANUFACTURER TO BE SILT SOXX OR ENGINEER APPROVED EQUAL.
2.ALL MATERIAL TO MEET MANUFACTURER'S SPECIFICATIONS.
3.SEDIMENT MULCH SOCK TO BE FILLED WITH MULCH COMPOST AND/OR WOODY MULCH PER
MANUFACTURER'S REQUIREMENTS.
4.FOLLOWING CONSTRUCTION AND SITE STABILIZATION, COMPOST MATERIAL TO BE REMOVED
OR DISPERSED ON SITE, AS APPROVED BY THE ENGINEER.
SILT SOCK
NOT TO SCALE
WORK AREA
WATER
FLOW
WORK
AREA
2" x 2"
WOODEN
STAKE
MULCH SOCK
(12" - 18" TYPICAL)
STAKE ON 10'
LINEAL SPACING
SEDIMENT MULCH SOCK
AREA TO BE
PROTECTED
EROSION/SILTATION
CONTROL FENCE AS
NOTED -SEE PLANS &
DETAIL
TIE DOWN STRAP (SEE NOTES)
PUMP DISCHARGE HOSE
SPOUT SEWN INTO BAG
PUMP DISCHARGE HOSE
TIE DOWN STRAP
(SEE NOTES)
SPOUT SEWN INTO BAG
DEWATERING
BAG
STRAW BALE UNDERLAY
SECTION A - A
DEWATERING BAG DETAIL
NOT TO SCALE
EROSION & SEDIMENT CONTROL (ESC) NOTES
1.DESIGNATE ON-SITE PERSONNEL RESPONSIBLE FOR THE DAILY INSPECTION AND MAINTENANCE OF ALL
SEDIMENT AND EROSION CONTROLS AND IMPLEMENTATION OF ALL NECESSARY MEASURES TO CONTROL
EROSION AND PREVENT SEDIMENT FROM LEAVING THE SITE.
2.INSTALL ALL EROSION AND SEDIMENT CONTROL (ESC) MEASURES AS INDICATED ON DRAWINGS IN
CONSULTATION WITH THE CONSERVATION AGENT, AND ENGINEER BEFORE ANY CONSTRUCTION
ACTIVITIES BEGIN. INSPECT, MAINTAIN, REPAIR AND REPLACE EROSION CONTROL MEASURES, AS
NECESSARY, DURING THE ENTIRE CONSTRUCTION PERIOD OF THE PROJECT. THE SITE PERIMETER
EROSION CONTROLS ARE THE DESIGNATED LIMIT OF WORK. INFORM ALL PERSONNEL WORKING ON THE
PROJECT SITE THAT NO CONSTRUCTION ACTIVITY IS TO OCCUR BEYOND THE LIMIT OF WORK AT ANY TIME
THROUGHOUT THE CONSTRUCTION PERIOD.
3.PROTECT THE ADJACENT RESOURCE AREA FROM SEDIMENTATION DURING PROJECT CONSTRUCTION
UNTIL ACCEPTANCE BY THE OWNER & IN CONFORMANCE WITH THE ORDER OF CONDITIONS.
4.KEEP THE LIMIT OF CLEARING, GRADING AND DISTURBANCES TO A MINIMUM WITHIN THE PROPOSED
AREA OF CONSTRUCTION. PHASE THE SITE WORK IN A MANNER TO MINIMIZE AREAS OF EXPOSED SOIL. IF
TREES ARE TO BE CUT, CLEAR AND GRUB ONLY THOSE AREAS WHICH ARE ACTIVELY UNDER
CONSTRUCTION. PROPERLY INSTALL THE SEDIMENTATION CONTROLS PRIOR TO BEGINNING ANY LAND
CLEARING ACTIVITY AND/OR OTHER CONSTRUCTION RELATED WORK.
5.MONITOR LOCAL WEATHER REPORTS DURING CONSTRUCTION AND PRIOR TO SCHEDULING EARTHMOVING
OR OTHER CONSTRUCTION ACTIVITIES WHICH LEAVE LARGE DISTURBED AREAS UNSTABILIZED. IF
INCLEMENT WEATHER IS PREDICTED, USE BEST PROFESSIONAL JUDGEMENT AND GOOD CONSTRUCTION
PRACTICES WHEN SCHEDULING CONSTRUCTION ACTIVITIES AND ENSURE THE NECESSARY EROSION
CONTROL DEVICES ARE INSTALLED AND FUNCTIONING PROPERLY TO MINIMIZE EROSION FROM ANY
IMPENDING WEATHER EVENTS.
6.INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZED SLOPES ON A WEEKLY BASIS AND
AFTER EACH RAINFALL EVENT OF .25 INCH OR GREATER. REPAIR IDENTIFIED PROBLEMS WITHIN 24
HOURS TO ENSURE EROSION AND SEDIMENT CONTROLS ARE IN GOOD WORKING ORDER. RESET OR
REPLACE MATERIALS AS REQUIRED.
7.SURROUND THE PERIMETER OF SOIL STOCKPILES WITH SILT SOCK, SILT FENCE, STRAWBALES, OR A
COMBINATION OF SILT FENCE WITH STRAWBALE, AS DETERMINED NECESSARY.
8.DISTURBED AREAS AND SLOPES MUST NOT BE LEFT UNATTENDED OR EXPOSED FOR EXCESSIVE PERIODS
OF TIME SUCH AS THE INACTIVE WINTER SEASON. PROVIDE APPROPRIATE STABILIZATION PRACTICES ON
ALL DISTURBED AREAS AS SOON AS POSSIBLE BUT NOT MORE THAN 14 DAYS AFTER THE CONSTRUCTION
ACTIVITY IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED, REINFORCE TEMPORARY AREAS
HAVING A SLOPE GREATER THAN 4:1 WITH EROSION BLANKETS OR APPROVED EQUAL UNTIL THE SITE IS
PROPERLY STABILIZED. TEMPORARY SWALES MAY ALSO BE REQUIRED IF DETERMINED NECESSARY IN
THE FIELD BY THE ENGINEER.
9.INSTALL A CATCH BASIN INSERT OR APPROVED EQUIVALENT IN EACH EXISTING CATCH BASIN RECEIVING
RUNOFF FROM THE SITE. UPON THE INSTALLATION OF EACH CATCH BASIN, INSTALL AN INSERT OR
APPROVED EQUIVALENT. INSPECT SILT SACKS, AFTER EACH SIGNIFICANT STORM EVENT AND REMOVE
AND EMPTY AS NEEDED FOR THE DURATION OF THE CONSTRUCTION PERIOD.
10.SMALL SEDIMENTATION BASINS MAY BE CONSTRUCTED ON AN AS-NEEDED BASIS DURING CONSTRUCTION
TO AID IN THE CAPTURE OF SITE RUNOFF AND SEDIMENT. IT WILL BE THE RESPONSIBILITY OF THE SITE
CONTRACTOR, IN CONSULTATION WITH THE ENGINEER, TO SIZE AND CREATE THESE BASINS IN
APPROPRIATE LOCATIONS.
11.CONTAIN ALL SEDIMENT ON SITE. SWEEP ALL EXITS FROM THE SITE AS NECESSARY INCLUDING ANY
SEDIMENT TRACKING. SWEEP PAVED AREAS AS NEEDED TO REMOVE SEDIMENT AND POTENTIAL
POLLUTANTS ACCUMULATED DURING SITE CONSTRUCTION.
12.REMOVE ACCUMULATED SEDIMENT FROM ALL TEMPORARY PRACTICES AND DISPOSE OF IN A
PRE-APPROVED LOCATION.
13.TO ENSURE ALL EROSION AND SEDIMENTATION CONTROL DEVICES ARE PROPERLY MAINTAINED AND
REPAIRED IN A TIMELY AND RESPONSIBLE MANNER, PROVIDE ON SITE,OR MAKE READILY AVAILABLE, THE
NECESSARY EQUIPMENT AND SITE PERSONNEL DURING CONSTRUCTION HOURS FOR THE DURATION OF
THE PROJECT. IF SITE WORK IS SUSPENDED DURING THE WINTER MONTHS THE CONTRACTOR MUST
CONTINUE TO PROVIDE PERSONNEL AND EQUIPMENT ON SITE OR READILY AVAILABLE .
14.PRIOR TO THE INSTALLATION OF FILTER FABRIC AND MEDIA WITHIN THE BIORETENTION AREAS, REMOVE
AND PROPERLY DISPOSE OF SEDIMENT ACCUMULATED IN ANY PARTIALLY CONSTRUCTED OR TEMPORARY
BIORETENTION/DRAINAGE AREA USED FOR SEDIMENT CONTROL DURING CONSTRUCTION. PROVIDE A
SURFACE ELEVATION AT A MINIMUM 1-FOOT ABOVE THE BOTTOM OF MEDIA ELEVATION AS SHOWN IN THE
BIORETENTION SCHEDULE FOR PARTIALLY CONSTRUCTED BIORETENTION AREAS. THIS ALLOWS FOR AN
OVER-DIG OF THE COLLECTED SEDIMENT FROM WITHIN THE BIORETENTION AREA PRIOR TO MEDIA/FABRIC
INSTALLATION.
15.CONTROL DUST BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS DIRECTED BY THE
ENGINEER.
16.THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE DURING CONSTRUCTION OF
ALL STORMWATER FACILITIES INSTALLED OR AFFECTED BY THE PROJECT. REMOVE SEDIMENT OR DEBRIS
COLLECTED WITHIN THESE FACILITIES FROM THE PROJECT WORK PRIOR TO THE OWNER'S ACCEPTANCE.
STORMWATER FACILITY OPERATION & MAINTENANCE:
THE CONTRACTOR IS RESPONSIBLE FOR THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND THE PROPER
INSPECTION AND MAINTENANCE OF ALL STORMWATER MANAGEMENT FACILITIES AS OUTLINED BELOW UNTIL SUCH TIME THAT
THE ROADWAYS AND ASSOCIATED UTILITIES ARE ACCEPTED BY THE OWNER AND THE ENGINEER. REFER TO THE APPROVED
SWPPP FOR ADDITIONAL MAINTENANCE REQUIREMENTS.
1.MAINTAIN A WORKING COPY OF THE SWPPP ON SITE AT ALL TIMES.
2.INSPECT AND RESTORE/CLEAN ALL FACILITIES (INLETS, MANHOLES, INFILTRATION BASINS, ETC.) OF SEDIMENT AND
DEBRIS PRIOR TO THE OWNER'S ACCEPTANCE.
3.REMOVE AND DISPOSE ALL SEDIMENT AND DEBRIS AT A PRE-APPROVED LOCATION AS APPROVED BY THE TOWN OF
BARNSTABLE.
4.INSPECT AFTER EVERY MAJOR RAINFALL EVENT FOR THE ENTIRE DURATION OF THE CONSTRUCTION PROJECT AND THE
FIRST 3 MONTHS AFTER CONSTRUCTION TO ENSURE PROPER STABILIZATION AND CONSTRUCTION.
5.SPECIFIC MAINTENANCE REQUIRED DURING CONSTRUCTION AS FOLLOWS:
A.DRAINAGE STRUCTURES (INLETS, MANHOLES & CATCHBASINS): ALL DRAINAGE STRUCTURES WILL BE INSPECTED TO
MONITOR FOR PROPER OPERATION, COLLECTION OF LITTER OR TRASH, AND STRUCTURAL DETERIORATION. THE
BASINS WILL BE CLEANED OF SEDIMENT (INCLUDING SUMPS) AS NECESSARY, AND REPAIRED WHEN REQUIRED.
B.SEDIMENT FOREBAY: REMOVE SEDIMENT BUILD-UP ON THE FLOOR OF THE FOREBAY AND PROPERLY DISPOSE OF IN A
PRE-APPROVED LOCATION ONCE EVERY YEAR, OR MORE OFTEN AS NECESSARY TO LIMIT SEDIMENT BUILDUP TO LESS
THAN 50 PERCENT OF THE DESIGN VOLUME.
C.BIORETENTION SYSTEMS AND BIOSWALES: INSPECT AFTER STORM EVENTS GREATER THAN OR EQUAL TO THE 1-YEAR,
24-HOUR PRECIPITATION EVENT, OR MORE FREQUENTLY AS NEEDED. REMOVE ANY TRASH AND/OR DEBRIS.
CORRECT ANY EROSION OR GULLYING. REMOVE AND REPLACE ILL-ESTABLISHED, DEAD OR SEVERELY DISEASED
PLANTS ANNUALLY.
D.ENHANCED TREE TRENCH: INSTALL CATCH BASIN INSERTS. INSPECT STRUCTURE AFTER STORM EVENTS GREATER
THAN OR EQUAL TO THE 1-YEAR, 24-HOUR PRECIPITATION EVENT, OR MORE FREQUENTLY AS NEEDED. THE BASINS
WILL BE CLEANED OF SEDIMENT (INCLUDING SUMPS) AS NECESSARY, AND REPAIRED WHEN REQUIRED.
E.TREE FILTER PITS: ALL TREE FILTER PITS WILL BE INSPECTED TO MONITOR FOR PROPER OPERATION, COLLECTION OF
LITTER OR TRASH, AND STRUCTURAL DETERIORATION. THE BASINS AND SEDIMENT FOREBAYS WILL BE CLEANED OF
SEDIMENT (INCLUDING SUMPS) AS NECESSARY, AND REPAIRED WHEN REQUIRED.
F.ROUTINE MAINTENANCE: OTHER ROUTINE MAINTENANCE INCLUDES THE REMOVAL OF TRASH AND LITTER FROM
PAVED AND PERIMETER AREAS, AND ANNUAL STREET AND PARKING LOT SWEEPING AFTER THE SPRING THAW TO
AVOID EXCESSIVE ACCUMULATION OF SEDIMENT IN THE DRAINAGE SYSTEM. INSPECT THE PIPES DRAINING THE
PROJECT ANNUALLY FOR PROPER FLOW.
GENERAL CONSTRUCTION NOTES
1.ALL WORK TO COMPLETE THIS PROJECT AS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS IS
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
2.MAKE ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY
CONSTRUCTION PERMITS, PAY ALL FEES INCLUDING POLICE DETAILS AND POST ALL BONDS, IF
NECESSARY, ASSOCIATED WITH THE SAME, AND COORDINATE WITH THE OWNER AND THE ENGINEER.
3.ALL EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE BASED ON THE BEST INFORMATION
AVAILABLE. PRIOR TO THE START CONSTRUCTION VERIFY THAT THE PROPOSED IMPROVEMENTS SHOWN
ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF
ANY CONFLICTS ARE DISCOVERED, NOTIFY THE OWNER AND THE ENGINEER PRIOR TO INSTALLING ANY
PORTION OF THE SITE WORK WHICH WOULD BE AFFECTED.
4.THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS INDICATED ON THE
DRAWINGS ARE BASED ON RECORDS OF VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE,
MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT
OR COMPLETE. VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES IN THE FIELD
PRIOR TO THE START OF CONSTRUCTION. CONTACT THE APPROPRIATE UTILITY COMPANY, ANY
GOVERNING PERMITTING AUTHORITY IN THE TOWN OF BARNSTABLE, AND "DIGSAFE" (1-888-344-7233) AT
LEAST 72 HOURS PRIOR TO ANY EXCAVATION WORK IN PREVIOUSLY UNALTERED AREAS TO REQUEST
EXACT FIELD LOCATION OF UTILITIES. THE CONTRACTOR MUST RESOLVE CONFLICTS BETWEEN THE
PROPOSED UTILITIES AND FIELD-LOCATED UTILITIES AND REPORT ANY DISCREPANCIES TO THE ENGINEER
IMMEDIATELY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR DAMAGES INCURRED AS A RESULT OF
UTILITIES OMITTED, INCOMPLETELY OR INACCURATELY SHOWN. THE CONTRACTOR MUST MAINTAIN
ACCURATE RECORDS OF THE LOCATION AND ELEVATION OF ALL WORK INSTALLED AND EXISTING
UTILITIES FOUND DURING CONSTRUCTION FOR THE PREPARATION OF THE AS-BUILT PLAN.
5.COORDINATE AND MAKE ALL CONNECTION ARRANGEMENTS WITH UTILITY COMPANIES, AS REQUIRED.
6.THE CONTRACTOR MUST MAINTAIN ALL EXISTING UTILITIES IN WORKING ORDER AND FREE FROM DAMAGE
DURING THE ENTIRE DURATION OF THE PROJECT. REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR
STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER. THE
CONTRACTOR IS RESPONSIBLE FOR ALL COST RELATED TO THE REPAIR OF UTILITIES. EXCAVATION
REQUIRED WITHIN THE PROXIMITY OF EXISTING UTILITY LINES MUST BE DONE BY HAND.
7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING OR REMOLDING ALL DRAINAGE, WATER,
SEWER, OR GAS STRUCTURES WITHIN THE PROJECT LIMITS AS DIRECTED BY THE TOWN.
8.THE CONTRACTOR SHALL NOT STORE ANY APPARATUS, MATERIALS, SUPPLIES, OR EQUIPMENT ON
DRAINAGE STRUCTURES, PRIVATE PROPERTY OR WITHIN 100 FEET OF WETLANDS, UNLESS INDICATED ON
THE DRAWINGS.
9.THE CONTRACTOR SHALL PERFORM TEST PITS AT LOCATIONS WHERE DIRECTED BY THE TOWN AND OR
ENGINEER.
10.COORDINATE ALL TRENCHING WORK WITHIN ROADWAYS WITH THE PROPER LOCAL & STATE AGENCY. THE
CONTRACTOR IS RESPONSIBLE FOR ALL TRENCH SAFETY INCLUDING ANY LOCAL AND/OR STATE PERMITS
REQUIRED FOR THE TRENCH WORK. IF THIS WORK IS REQUIRED TO OCCUR OUTSIDE THE AGREED UPON
HOURS OF OPERATION FOR THE FACILITY, THE CONTRACTOR MUST PLAN ACCORDINGLY.
11.INSTALL ALL UTILITY TRENCH WORK PRIOR TO INSTALLING NEW PAVEMENT AS INDICATED ON THE
DRAWINGS.
12.ALL STRUCTURES AND PIPELINES LOCATED ADJACENT TO THE TRENCH EXCAVATION SHALL BE
PROTECTED AND FIRMLY SUPPORTED BY THE CONTRACTOR UNTIL THE TRENCH IS BACKFILLED.INJURY TO
ANY SUCH STRUCTURE CAUSED BY, OR RESULTING FROM, THE CONTRACTOR'S OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE. ALL UTILITIES REQUIRING REPAIR, RELOCATION OR
ADJUSTMENT AS A RESULT OF THE PROJECT SHALL BE COORDINATED THROUGH THE RESPECTIVE UTILITY
AND THE TOWN.
13.IN THOSE INSTANCES WHERE POWER OR TELEPHONE POLE SUPPORT IS REQUIRED, THE CONTRACTOR
SHALL PROVIDE A MINIMUM 48-HOUR NOTIFICATION TO THE RESPECTIVE UTILITY COMPANY. NO
ADDITIONAL PAYMENT WILL BE PROVIDED FOR TEMPORARY BRACING OF UTILITIES.
14.THE CONTRACTOR IS TO TAKE SPECIAL CARE NOT TO DAMAGE TREES, BUSHES, PLANTS,FLOWERS,
STONEWALLS, FENCES, ETC. WITHIN THE CONSTRUCTION AREA UNLESS THEY ARE NOTED TO BE
REMOVED. CONTRACTOR SHALL REPLACE AT NO COST TO OWNER, ALL DAMAGED ITEMS.
15.CONTRACTOR SHALL REMOVE AND REPLACE, OR REPAIR, ALL CURBS, SIDEWALKS, PAVEMENT AND OTHER
ITEMS DAMAGED BY HIS CONSTRUCTION ACTIVITIES TO AT LEAST THEIR ORIGINAL CONDITION, AND TO
THE SATISFACTION OF THE TOWN AND ENGINEER.
16.THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE A TELEPHONE NUMBER WHERE THE CONTRACTOR
CAN BE REACHED 24 HOURS A DAY, 7 DAYS A WEEK.
17.THE LOCATION AND LIMITS OF ALL ON-SITE WORK AND STORAGE AREAS SHALL BE
REVIEWED/COORDINATED WITH, AND ACCEPTABLE TO THE TOWN. THE CONTRACTOR SHALL LIMIT
ACTIVITIES TO THESE AREAS.
18.THE CONTRACTOR SHALL BE REQUIRED TO TEMPORARILY PAVE ALL DISTURBED TRAVEL
WAYS,SIDEWALKS & DRIVEWAYS NOT UNDER CONSTRUCTION OR IF LEFT DURING NON WORKING HOURS
AND AS REQUIRED BY THE TOWN
19.IMPORT ONLY CLEAN MATERIAL. MATERIAL FROM AN EXISTING OR FORMER 21E SITE AS DEFINED BY THE
MASSACHUSETTS CONTINGENCY PLAN 310 CMR 40.0000 WILL NOT BE ACCEPTED .
20.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH AND MAINTAIN ALL CONTROL POINTS AND
BENCHMARKS DURING CONSTRUCTION INCLUDING BENCHMARK LOCATIONS AND ELEVATIONS AT
CRITICAL AREAS. COORDINATE WITH THE ENGINEER THE LOCATION OF ALL CONTROL POINTS AND
BENCHMARKS.
21.SITE LAYOUT SURVEY REQUIRED FOR CONSTRUCTION MUST BE PROVIDED BY THE CONTRACTOR AND
PERFORMED BY A MASSACHUSETTS' REGISTERED PROFESSIONAL LAND SURVEYOR. THE CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH THE SURVEYOR FOR ALL SITE SURVEY WORK.
22.MAINTAIN ALL GRADE STAKES SET BY THE SURVEYOR. GRADE STAKES ARE TO REMAIN UNTIL A FINAL
INSPECTION OF THE ITEM HAS BEEN COMPLETED BY THE ENGINEER. RE-STAKING OF PREVIOUSLY
SURVEYED SITE FEATURES IS THE RESPONSIBILITY (INCLUDING COST) OF THE CONTRACTOR.
23.PROVIDE ALL CONSTRUCTION SERVICE IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS
REGARDING NOISE, VIBRATION, DUST, SEDIMENTATION CONTAINMENT, AND TRENCH WORK.
24.COLLECT SOLID WASTES AND STORE IN A SECURED DUMPSTER. THE DUMPSTER MUST MEET ALL LOCAL
AND STATE SOLID WASTE MANAGEMENT REGULATIONS.
25.REGULARLY INSPECT THE PERIMETER OF THE PROPERTY TO CLEAN UP AND REMOVE LOOSE
CONSTRUCTION DEBRIS BEFORE IT LEAVES THE SITE. PROMPTLY REMOVE ALL DEMOLITION DEBRIS FROM
THE SITE TO AN APPROVED DUMP SITE.
26.ALL TRUCKS LEAVING THE SITE MUST BE COVERED.
27.DO NOT WASH ANY CONCRETE TRUCKS ONSITE. REMOVE BY HAND ANY CEMENT OR CONCRETE DEBRIS
LEFT IN THE DISTURBED AREA.
28.BURIAL OF ANY STUMPS, SOLID DEBRIS, AND/OR STONES/BOULDERS ONSITE IS PROHIBITED.
29.IMMEDIATELY CONTACT AND COORDINATE WITH THE ENGINEER AND OWNER IF ANY DEVIATION OR
ALTERATION OF THE WORK PROPOSED ON THESE DRAWINGS IS REQUIRED.
30.AT THE END OF CONSTRUCTION, REMOVE ALL CONSTRUCTION DEBRIS AND SURPLUS MATERIALS FROM
THE SITE PERFORM A THOROUGH INSPECTION OF THE WORK PERIMETER. COLLECT AND REMOVE ALL
MATERIALS AND BLOWN OR WATER CARRIED DEBRIS FROM THE SITE.
SURVEY NOTES
1.THE TOPOGRAPHY AND EXISTING CONDITIONS DEPICTED HEREON WERE OBTAINED FROM AN
INSTRUMENT SURVEY CONDUCTED ON THE GROUND BY THE TOWN OF BARNSTABLE- DPW SURVEY
CREW.
2.THIS PLAN DOES NOT SHOW ANY RECORDED OR UNWRITTEN EASEMENTS WHICH MAY EXIST. HOWEVER,
THIS DOES NOT CONSTITUTE A GUARANTEE THAT NO SUCH EASEMENTS EXIST.
3.THE ELEVATIONS DEPICTED HEREON WERE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988.
4.ALL ABUTTING PROPERTY AND BOUNDARY LINES DEPICTED ARE APPROXIMATE ONLY.
5.THE RIGHT-OF-WAY LINES SHOWN HEREON ARE BASED ON A COMPILATION OF RECORD PLANS AND
DEEDS OBTAINED FROM THE PUBLIC RECORDS.
6.EXISTING CONTOUR INTERVALS ARE EQUAL TO ONE FOOT.
7.THE ACCURACY OF MEASURED PIPE INVERTS AND PIPE SIZES IS SUBJECT TO FIELD CONDITIONS, THE
ABILITY TO MAKE VISUAL OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS AND OTHER
CONDITIONS.
DEWATERING
1.A HIGH WATER TABLE IS NOT ANTICIPATED. HOWEVER, IF THE WATER TABLE IS ENCOUNTERED DURING
EXCAVATION, TEMPORARILY LOWER THE WATER TABLE BY PUMPING AS INDICATED IN THE DEWATERING
SUMP DETAIL. INSTALL A DEWATERING BASIN AS INDICATED IN THE DEWATERING BAG DETAIL AND
PROVIDE A DEWATERING PLAN DEPICTING PROPOSED DEWATERING LOCATION. DIRECT THE PUMP
DISCHARGE TO THIS BASIN TO PREVENT SEDIMENTS FROM LEAVING THE CONSTRUCTION AREA. INSTALL
ADDITIONAL BASINS IF REQUIRED. INSTALL THE BASIN AS INDICATED ON DRAWINGS IF SO NOTED,
OTHERWISE INSTALL THE BASIN(S) WITHIN THE LIMIT OF DISTURBANCE INDICATED BY THE SILT FENCE OR
STRAWBALES.
2.PRIOR TO ANY DEWATERING, THE DEWATERING PLAN MUST BE APPROVED BY THE ENGINEER.
3.IF DEWATERING IS NECESSARY DURING CONSTRUCTION, IMPLEMENT THE PROPER ESC MEASURES ON
SITE TO PREVENT EROSION OR SEDIMENT RUNOFF. THESE MEASURES CAN INCLUDE DEWATERING BAGS,
TEMPORARY STRAWBALES, SILT FENCES, SILT SOCKS AND/OR OTHER APPROVED DEVICES AS INDICATED
IN THE DETAILS.
C-8.2
DetailsProposed Sidewalk ExtensionTOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C8- DETAILS.dwg3/8/2024
100% DESIGN SET
NJC
BASE SECTIONSECTION(S)RISERCONCENTRICCONE SECTIONAS REQ'D.24"8"8"
48" DIA. (MIN)
12"
(TYP.)
FINISH
GRADE
SEE NOTE 4.
SEE NOTE 3
OUTLET
COMPACTED
GRAVEL
COMPACTED
SUBGRADE 12"8"SEE NOTE 5
4' (MIN.)INVERTSEE ALTERNATETOP SLAB DIA.
VARIES
MONOLITHIC48" DIA. (MIN.)MIN.Alternate Top Slab
Alternate Eccentric Cone Section
Notes:
1.ALL SECTIONS SHALL BE DESIGNED FOR HS-20
LOADING.
2.PROVIDE "V" KNOCKOUTS FOR PIPES WITH 2"
MAX. CLEARANCE TO OUTSIDE OF PIPE.
MORTAR ALL PIPE CONNECTIONS.
3.JOINT SEALANT BETWEEN PRECAST SECTIONS
SHALL BE PREFORMED BUTYL RUBBER.
4.CATCH BASIN FRAME AND GRATE SHALL BE SET
IN FULL MORTAR BED. ADJUST TO GRADE WITH
CLAY BRICK AND MORTAR (2 BRICK COURSES
TYPICALLY, 5 BRICK COURSES MAXIMUM).
5.OPENING IN TOP SLAB SHALL BE 24"x27" FOR
CATCH BASINS WITH CURB INLETS. OPENING
SHALL BE 24"x24" AT ALL OTHER LOCATIONS.
SEE NOTE 2.
12"
HOOD
SEE NOTE 5
SCALE: N.T.S.
CATCH BASINSCALE: N.T.S.
MUNICIPAL STANDARD
CATCH BASIN FRAME & GRATE
SECTION
PLAN
AA
NOTES:
1.FRAME AND GRATE SHALL BE RATED FOR HS-20 LOADING.
2.MIN FRAME WEIGHT:
4 FLANGE 295 LBS.
3 FLANGE 265 LBS.
3.USE 3 FLANGE FRAMES AT CURB INLETS.
24"2"8"22"
33-1/2"
33-1/2"33-1/2"1-1/4"1-1/4"
TOP OF CURB
X"
SEDIMENT FOREBAY BIORETENTION/BIOSWALE
(SEE DETAIL)
SEDIMENT FOREBAY
NOT TO SCALE
NOTES:
1.SEE SPECIFICATIONS FOR PLANTABLE/PERMEABLE PAVER REQUIREMENTS.
2.INSTALL PLANTABLE/PERMEABLE PAVER SYSTEM PER MANUFACTURERS REQUIREMENTS.
3.SHAPE FOREBAY AS REQUIRED WITH MIN. 6" SIDE SLOPE DEPTH.
4.LANDSCAPE EDGING: HEAVY DUTY STEEL LANDSCAPE EDGING (1
4" THICKNESS) WITH NATURAL FINISH
5.SEE PLANS FOR DIMENSIONS GRADING AND ELEVATIONS FOR SEDIMENT FOREBAY
FLO
W
PLANTABLE CONCRETE PAVER NOTES:
1.REFER TO MANUFACTURERS REQUIREMENTS FOR ADDITIONAL INSTALLATION REQUIREMENTS
2.FILTER FABRIC AROUND PERIMETER AND BOTTOM OF STONE BASE. KEY IN MINIMUM 6".
6" MIN.
FILTER FABRIC OVERLAP
6"
SECTION A - A
SECTION B - B
PLANTABLE CONCRETE PAVER
B
B
A
A
2"
A A
INFILL DETAIL
PLANTABLE CONCRETE
PAVER (SEE DETAIL)
HEAVY DUTY STEEL LANDSCAPE
EDGING
SEE LANDSCAPE PLANS
FOR SLOPE TREATMENT
SEE SITE PLAN
4:1 MAX SLOPE
WEIR NOTCH - SEE DETAIL
COMPACTED
SUBGRADE
CURB INLET
SEE DETAIL
GRANITE CHECK DAM
SEE DETAILGUTTER LINE
BEDDING MATERIAL
PER MANUFACTURER
REQUIREMENTS
PLANTABLE/PERMEABLE
CONCRETE PAVER
1
2" NOMINAL COMPACTED CLEAN
SHARP SAND (ASTM C33) FOR
LEVELING
CRUSHED STONE RESERVOIR MEETING
AASHTO #57 COMPACTED SUBGRADE,
95% MODIFIED PROCTOR DENSITY
PLANTABLE CONCRETE PAVERS SYSTEM
OR APPROVED EQUIVALENT- SEE
SPECIFICATIONS
FILTER FABRIC
(NON-WOVEN MIRAFI
140N OR APPROVED
EQUIVALENT)
SUBBASE SLOPED TO MATCH PAVER
SLOPE
AGGREGATE INFILL MATERIAL:
3
8" PEA GRAVEL
3/8" MINUS CRUSHED ANGULAR ROCK OR LESS
PLANTING SOIL
SAND
BROOM FINISH JUST BELOW DRIVABLE GRASS
MAT SURFACE. SEE SPECIFICATIONS
INFILL THE FIRST 1/2"
OF THE MATS WITH
SAND (ASTM C33) TO
FILL JOINTS BETWEEN
MAT EDGES.
AGGREGATE INFILL.
PAVER MAT
PLAN VIEW
AGGREGATE INFILL.
CRUSHED STONE
CLEAN EDGE
AT CHECKDAM
PROVIDE A CLEAN EDGE
AT INFLOW INTERFACE
HEAVY DUTY
LANDSCAPE EDGING
1 1
2"
NOTES:
1.ALL SECTIONS DESIGNED FOR H20 LOADING IF LOCATED WITH PAVED SURFACES AND/OR
TRAFFIC AREAS.
2.PROVIDE "V" KNOCKOUTS FOR PIPES WITH 2" MAX. CLEARANCE TO OUTSIDE OF PIPE. MORTAR
ALL PIPE CONNECTIONS INSIDE AND OUT.
3.SET RECHARGE BASIN FRAME AND GRATE IN FULL MORTAR BED. ADJUST TO GRADE WITH
PRECAST CONCRETE RISER.
4.FRAME AND COVER TO CONFORM TO MASSACHUSETTS STANDARDS (LEBARON FOUNDRY,
MODEL LK 110A, OR APPR. EQUIV.).
5.GEOTEXTILE FILTER FABRIC: MIRAFI 140N OR EQUIVALENT.
TYPICAL RECHARGE BASIN (RB) DETAIL
NOT TO SCALE
12" MIN.
FABRIC OVERLAP
8"
C
INFLOW PIPE
MONOLITHIC OR KEYED
CONNECTIONS (TYP.)
FRAME AND GRATE/COVER ADJUST WITH RISER WHERE
NECESSARY SET IN MORTAR
(SEE NOTES)
1-1/2" WASHED
STONE
SURROUND STONE
WITH GEOTEXTILE
FILTER FABRIC
1' OF 1-1/2"
WASHED STONE
FOR SUBGRADE
APPROVED
SUBGRADE
PRECAST BASIN
SOD
4" LOAM O
R
M
O
D
.
P
E
A
T
SOD4" LOA
M
O
R
M
O
D
.
P
E
A
T
GRAVEL
BITUMINOUS CONCRETE
36" ± 1"
2'2'
SCALE: N.T.S.
TYPICAL BIT. LETDOWN CHANNEL
NOTES:
1.ALL MATERIAL AND CONSTRUCTION METHODS SHALL
CONFORM TO MASSDOT STANDARD SPECIFICATIONS FOR
HIGHWAYS AND BRIDGES.
1"±
4"
4"
8"
9"
SCALE: N.T.S.
RIP-RAP APRON DETAIL
LOAM AND
SEED (TYP)
6" MIN SELECT GRAVEL
OR CRUSHED STONE
SUB-GRADE/COMPACTED FILL
OR UNDISTURBED MATERIAL
MIRAFI FILTER FABRIC
OR APPROVED EQUAL
12" MIN. DEPTH RIP-RAP
MINIMUM WEIGHT OF STONE = 50 LBS.
MAXIMUM WEIGHT NOT TO EXCEED 125 LBS.
1
2
VARIES
(SEE PLANS)6"1
2
LIMIT OF RIP-RAP
RECESSED GALVANIZED
LIFTING INSERTS TYP
6'-0"1'-0"
6'-0"1'-0"
FLOW
TRENCH GRATE TO BE TITLE
WAVE MODEL
5000 PSI CONCRETE @ 28 DAYS
1'-9"1'-9"
1'-6"
#3 REBAR @ 18" OC
1'-4"
W.W. MESH
(6X6W1.4.4XW1.4) SHEETS
1" COVER OFF BOTTOM
1'-8"2'-4"1'-8"1'-1"6"2''-4"1'-4"7"1'-0"1'-8"1'-0"1'-8"1'-0"
7'-0"
2'-
4
"
SCALE: N.T.S.
SIDEWALK INLET GRATE
C-8.3
DetailsProposed Sidewalk ExtensionTOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisMarch 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Plot\C8- DETAILS.dwg3/8/2024
100% DESIGN SET
NJC
Appendix C:
Project Location and Environmental Maps
+
−
0 300 600ft
Details Add Basemap Save Print Measure Bookmarks
USGS Topographic Quadrangle MapsHome
5/11/24, 5:31 AM USGS Topographic Quadrangle Maps
https://massgis.maps.arcgis.com/home/webmap/viewer.html?layers=561d696d35ec4ca3a23b63e03cdfe100 1/1
BARNSTABLE
MassGIS, Esri, HERE, Garmin, GeoTechnologies, I
0.2mi0.2mi0.2mi0.2mi0.2mi
Find address or place+
–
Massachusetts 2020 Environmental Justice Populations Click in any EJ community for details More inf
Legend
Layers
MA Municipalities
MA 2020 Environmental Justice Block Groups
Minority: the block group minority population is >=
40%, or the block group minority population is >=
25% and the median household income of the
municipality the block group is in is < 150% of the
Massachusetts median household income
Income: at least 25% of households have a median
household income 65% or less than the state
median household income
Language isolation: 25% or more of households do
not include anyone older than 14 who speaks
English very well
Minority and Income
Minority and English isolation
Income and English isolation
Minority, Income and English isolation
5/11/24, 7:10 AM Massachusetts 2020 Environmental Justice Populations
https://mass-eoeea.maps.arcgis.com/apps/webappviewer/index.html?id=1d6f63e7762a48e5930de84ed4849212 1/1
MassHistoric
Commission
Inventory
(Points)
Areas of
Critical
Environmental
C
Census
Coastal and Marine
Features
Conservation / Recreation
Cultural Resources
MassHistoric
Commission
MassHistoric
Commission Inventory
(Points)
MassHistoric
Commission Inventory
(Areas)
MassHistoric
Commission Towns
Environmental Monitoring
(testing/monitoring sites)
Images
Index (grids/tiling schemes
Enter a location…
41.63980, -70.2736 1 L AT LON
+
−
1:18,056
300 m
1000 ft Leaflet | MassGIS 2023 Aerial Imagery
5/11/24, 7:29 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
NHESP
Estimated
Habitats of
Rare Wildlife
Areas of
Critical
Environmental
Concern
ACECs
Boundaries
Areas of
Critical
Data Chapter 91
Conservation / Recreation
Areas of Critical
Environmental Concern
ACECs
Areas of Critical
Environmental
Concern ACECs
Areas of Critical
Environmental
Concern ACECs
Transparent Green
Areas of Critical
Environmental
Concern ACECs
Boundaries
Community Preservation
Act
N t l H it D t
Enter a location…
41.63511, -70.2656 3 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS 2021 Aerial Imagery
5/11/24, 7:20 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
NHESP Priority
Habitats of
Rare Species
NHESP
Estimated
Habitats of
Rare Wildlife
Areas of
Critical
Environmental
Concern
Data Chapter 91
Conservation / Recreation
Areas of Critical
Environmental Concern
ACECs
Areas of Critical
Environmental
Concern ACECs
Areas of Critical
Environmental
Concern ACECs
Transparent Green
Areas of Critical
Environmental
Concern ACECs
Boundaries
Community Preservation
Act
N t l H it D t
Enter a location…
41.63962, -70.2740 9 L AT LON
+
−
1:18,056
300 m
1000 ft Leaflet | MassGIS 2021 Aerial Imagery
5/11/24, 7:24 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Prime Forest
Land
Outstanding
Resource
y
Registry of Motor
Vehicles Locations
Schools
Seaports
Town Halls
Trains
Transmission Lines
WiFi Sites
Physical Resources
Aquifers
Bedrock Lithology
Depth to Bedrock
DFW Coldwater Fisheries
Resources
Ecoregions
Geographic Names
Hydrogeologic Atlas of
Mass.
Enter a location…
41.63745, -70.2803 7 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:39 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
NHESP
Cer tified
Vernal Pools
Potential
Vernal Pools
Prime Forest
Land
Outstanding
Resource
Waters
L d U
ub c Ut ty o de s
Registry of Motor
Vehicles Locations
Schools
Seaports
Town Halls
Trains
Transmission Lines
WiFi Sites
Physical Resources
Aquifers
Bedrock Lithology
Depth to Bedrock
DFW Coldwater Fisheries
Resources
Ecoregions
Geographic Names
Hydrogeologic Atlas of
Mass.
Enter a location…
41.63704, -70.2799 0 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:41 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Hydrologic Soil
Group
Top 20 Soils:
Slope by
Category
Soils Outlines
Soils
Upland Forest
Coastal Plain
Pond Systems
C l
Features
Interior Forest
Land Use
Land Cover Land Use
(2016) Index
Land Cover Land Use
(2016)
Land Use 1951 21
Classes (Cape Cod)
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Enter a location…
41.64098, -70.2676 5 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:45 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
yd o og c So
Group
Top 20 Soils:
Slope by
Category
Soils Outlines
Land Use
Land Cover Land Use
(2016) Index
Land Cover Land Use
(2016)
Land Use 1951 21
Classes (Cape Cod)
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Enter a location…
41.63691, -70.2796 2 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:47 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Hydrologic Soil
Group
Top 20 Soils:
Slope by
Category
S il O tli
Land Use
Land Cover Land Use
(2016) Index
Land Cover Land Use
(2016)
Land Use 1951 21
Classes (Cape Cod)
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Enter a location…
41.63733, -70.2713 8 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:49 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Saturated
Hydraulic
Conductivity
(Ksat)
Top 20 Soils:
Hydrologic Soil
Group
Land Cover Land Use
(2016)
Land Use 1951 21
Classes (Cape Cod)
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Download Links
Land Use Change
1971-1985
Enter a location…
41.63712, -70.2664 9 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:51 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Depth to Water
Table
Top 20 Soils:
Saturated
Hydraulic
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Download Links
Land Use Change
1971-1985
Land Use Change
1971-1999
Land Use Change
1985-1999
Enter a location…
41.63713, -70.2665 1 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:53 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Drainage Class
Top 20 Soils:
Depth to Water
Table
Top 20 Soils:
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Download Links
Land Use Change
1971-1985
Land Use Change
1971-1999
Land Use Change
1985-1999
Enter a location…
41.63612, -70.2674 6 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:54 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Top 20 Soils:
Hydric Rating
by Map Unit
Top 20 Soils:
Drainage Class
Top 20 Soils:
Depth to Water
Table
Top 20 Soils:
Saturated
Land Use 1971 21
Classes
Land Use 1985 21
Classes
Land Use 1999 21
Classes
Land Use 1985 37
Classes
Land Use 1999 37
Classes
Land Use 2005
Land Use 2005
Download Links
Land Use Change
1971-1985
Land Use Change
1971-1999
Land Use Change
1985-1999
Enter a location…
41.63798, -70.2685 9 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:55 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Surficial
Geology
Surface Water
Supply
Watersheds
Land Use Change
1971-1985
Land Use Change
1971-1999
Land Use Change
1985-1999
Outstanding Resource
Waters
Outstanding Resource
Waters
Outstanding Resource
Waters Outlines
Prime Forest Land
Prime Forest Land
Priority Natural
Vegetation Communities
Potential Vernal Pools
NHESP Cer tified
Vernal Pools
Enter a location…
41.63757, -70.2665 3 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:58 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Surficial
Geology Depth
in Feet
Surficial
Geology
Surface Water
Supply
Watersheds
NEHRP Soil
Land Use Change
1971-1985
Land Use Change
1971-1999
Land Use Change
1985-1999
Outstanding Resource
Waters
Outstanding Resource
Waters
Outstanding Resource
Waters Outlines
Prime Forest Land
Prime Forest Land
Priority Natural
Vegetation Communities
Potential Vernal Pools
NHESP Cer tified
V l P l
Enter a location…
41.63534, -70.2664 7 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 7:59 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Paper FIRMs,
where NFHL
Unavailable)
FEMA National
Flood Hazard
Layer Polygons
DEP 2013
or urban land)
Top 20 Soils:
Hydrologic Soil Group
Top 20 Soils: pH (1 to
1Water)
Prime Farmland Soils
Top 20 Soils:
Saturated Hydraulic
Conductivity (Ksat)
Top 20 Soils: Septic
Tank Absorption Fields
Top 20 Soils:
Corrosion of Concrete
Top 20 Soils: Depth to
Water Table
Top 20 Soils: Drainage
Class
Top 20 Soils:
Dwellings with
Enter a location…
41.63430, -70.2785 3 L AT LON
+
−
1:9,028
100 m
500 ft Leaflet | MassGIS
5/11/24, 8:05 AM MassMapper
https://maps.massgis.digital.mass.gov/MassMapper/MassMapper.html?bl=MassGIS Basemap__100&l=massgis%3AGISDATA.ACECS_POLY__GISDATA.ACECS_POLY%3A%3ADefault__ON__100&…1/1
Appendix D:
Abutters List, Map, and Notification Letter
Conservation Notice of Intent (NOI) Abutter List for Subject Parcels , 324038, 324039, 324040CND, 324043, 324045,
324046, 324047, 324048001, 324048002, 324049, 324113, 324114, 324117
Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
324034001 TISE, STEPHEN E & SANDRA M 467 OCEAN STREET HYANNIS 02601MA
324035 BARNSTABLE, TOWN OF (CON)CONSERVATION COMMISSION 230 SOUTH STREET HYANNIS 02601MA
324036 ALBA, DORIAN & ELIDA 109 ROBBINS STREET MILTON 02186MA
324037 JUNKOVIC, ALBINA & PRENCA 175 GARDINER ROAD QUINCY 02169MA
324038 BARNSTABLE, TOWN OF (BCH)367 MAIN STREET HYANNIS 02601MA
324039 LOCKHART, CHARLES F ET AL TRS DUNBAR'S POINT TRUST 490 OCEAN STREET HYANNIS 02601MA
32404000A FORD, THOMAS A & ELAINE M 20 JOHN HALL
CARTWAY
YARMOUTH PORT 02675MA
32404000B COLLINS, BRETT & CORSON,
PRISCILLA
26 ISABELLA ST #3 BOSTON 02116MA
32404000C MILLS, KENNETH W & M. DENISE 500 OCEAN STREET,
UNIT 144
HYANNIS 02601MA
32404000D KO, ALBERT & DINA 500 OCEAN ST UNIT 145 HYANNIS 02601MA
32404000E SCHINDLER, KATHLEEN L 222 KATE'S PATH YARMOUTH PORT 02675MA
32404000F STONEMAN, JAN M & SOFIYA Y 12 ROLLING RIDGE
LANE
SANDWICH 02563MA
32404000G ZECCHINELLI, BRIAN J & KAREN A
TRS
BRIAN J & KAREN A ZECCHINELLI
REV FAM TR
51 EDGEWOOD BROOK
ROAD
BARRE 05641VT
32404000H BILGEN, ERIUGRUL 102 BATHURST AVE POINT CLAIRE QC H9S
4Z8
CANADA ..
5/10/2024 5:20 PMReport Generated On:Page 1 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
32404000H BILGEN, ERIUGRUL 102 BATHURST AVE POINT CLAIRE QC H9S
4Z8
CANADA ..
32404000I KENNEY JR, THOMAS V & SARA 408 BRUNSWICK
AVENUE
TROY 12180NY
32404000J SIMMONS, GEORGE & EILEEN 25 GLENMEADOW
DRIVE
NORTHFORD 06472CT
32404000K FERGUSON, GARRY B & JANE L TRS GARRY AND JANE FERGUSON
LIVING TRUST
19 OSPREY DRIVE COTUIT 02635MA
32404000L STEINBERG, KERRI & ZIRLEN,
JULIANNE
538 HEMENWAY STREET MARLBOROUGH 01752MA
32404000M SIMMONS, GEORGE N & EILEEN 25 GLENMEADOW
DRIVE
NORTHFORD 06472CT
32404000N SAWYER, JOHN C & MARTHA C 500 OCEAN ST #155 HYANNIS 02601MA
32404000O VALLATINI, JOSEPH L & VALLATINI,
ELEANORE TRS
JOSEPH L VALLATINI REVOCABLE
TRUST ET AL
41 SKIPPING STONE PLYMOUTH 02360MA
32404000P BECHTEL, ALAN R & LORI A 21 HILLINGTON DR NORTH EASTON 02356MA
32404000Q DOHERTY, PAULA M P O BOX 10 BELMONT 02478MA
32404000R ELDAMAA, CHAFIC & MAYA 67 WHITNEY AVENUE WESTWOOD 02090MA
32404000S COTTONWOOD LANE LLC 16 AVERY ROAD BLOOMFIELD 06002CT
32404000T ELDERINY, REEM 500 OCEAN STREET UNIT 6 HYANNIS 02601MA
32404000U VALENTE, PASQUALE & MARIA 102 FOREST STREET NEW CANAAN 06840CT
32404000V CONROY, MARTIN E JR 500 OCEAN ST, UNIT 8 HYANNIS 02601MA
32404000W GILLILAND, SARAH E 500 OCEAN STREET
UNIT 9
HYANNIS 02601MA
5/10/2024 5:20 PMReport Generated On:Page 2 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
32404000W GILLILAND, SARAH E 500 OCEAN STREET
UNIT 9
HYANNIS 02601MA
32404000X FANTE, CLARA C TR & MACKEY,
SYLVIA F
5 LONGMEADOW ROAD ARLINGTON 02474MA
32404000Y MCALLISTER, SCOTT A AND AITKEN, ELIZABETH K P O BOX 536 HYANNISPORT 02647MA
32404000Z LIU, LI & TU, JUN 40 HIGH ROCK STREET NEEDHAM 02492MA
3240400AA HARRIS, CHRISTOPHER & KRISTIN 27 MORTON ROAD ARLINGTON 02476MA
3240400AB FRISBY, SHARON M TR SHARON M FRISBY REV TR 56 COBBLE STONE ROAD BARNSTABLE 02630MA
3240400AC GANEM, EDMOND J 3 HILLTOP ROAD METHUEN 01844MA
3240400AD SASSON, JOSEPH ALAN & MICHELLE
TRS
SASSON FAMILY REALTY TRUST 40 REDWOOD ROAD NEWTON 02459MA
3240400AE MCCLEMENS, GLORIANN M &
THOMAS J TRS
MCCLEMENS FAMILY LIVING
TRUST
24 HALF WAY SOUTH DENNIS 02660MA
3240400AF DANNER, CAROLE ANN PO BOX 1810 HYANNIS 02601MA
3240400AG TRIVEDI LLC 1143 HANCOCK ST QUINCY 02169MA
3240400AH FOLEY, MARY M TR MARY M FOLEY TRUST OF 11/1/13 12 PLEASANT STREET WEST NEWTON 02465MA
3240400AI NGUYEN, KHONG A & HUYNH,
PHUONG
5 VALLEY VIEW DRIVE NORTH GRAFTON 01536MA
3240400AJ SLATTERY, PAUL J & SUSAN M 128 SETTLERS RIDGE RD MILFORD 06460-3774CT
3240400AK ANTONOPOULOS, GEORGE &
KATERINA
43 KATHRYN DRIVE ASHLAND 01721MA
5/10/2024 5:20 PMReport Generated On:Page 3 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
3240400AL SILVIA,STEPHANIE REGO& PHILIP
THOMAS III
112 SYCAMORE LANE WESTPORT 02790MA
3240400AM FOLEY, MARY EILEEN 500 OCEAN ST - UNIT 33 HYANNIS 02601MA
3240400AN DOHERTY, THOMAS E & SUSAN 500 OCEAN STREET UNIT 35 HYANNIS 02601MA
3240400AO YOMAZZO, MARK 1 MERLIN'S LANE NEWTON 06470CT
3240400AP ALEXANDER, ANN 500 OCEAN ST # 39 HYANNIS 02601MA
3240400AQ PEIXINHO, ROBERT M & DOREEN M 5 JOYCE RD WALTHAM 02154MA
3240400AR PACHECO, PAULO J & DIANE R 1 GABRIALA LANE WESTPORT 02790MA
3240400AS MOVSESIAN, PAUL & PAULA 53 WHITE AVENUE RIVERSIDE 02915RI
3240400AT FIELD, DANIEL & KARA 319 WEATHERBEE DR WESTWOOD 02090MA
3240400AU HYANNIS 109 LLC 500 OCEAN STREET
UNIT 109
HYANNIS 02601MA
3240400AV MAJESKI, VINCENT N & MARTHA J 3 FAIRBANKS LN NORTH READING 01864MA
3240400AW MARINI, KATHLEEN A TR ET AL KATHLEEN A MARINI TRUST
AGREEMENT
666 MAIN STREET APT
402
WINCHESTER 01890MA
3240400AX WOODWORTH, JOAN H & JEFFREY
R
28 CEDAR HILL DRIVE WESTWOOD 02090MA
3240400AY MAHONEY, LILLIAN TR OCEAN STATE IRREVOCABLE
TRUST
9 CARMEN AVENUE STONEHAM 02180MA
3240400AZ BEASER, RICHARD S &
MARGUERITE M TRS
BEASER FAMILY LIVING TRUST 44 CHATHAM ROAD NEWTON HIGHLANDS 02461MA
3240400BA SURABIAN, KENNETH Z 14 OLD COLONY RD ARLINGTON 02474MA
5/10/2024 5:20 PMReport Generated On:Page 4 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
3240400BA SURABIAN, KENNETH Z 14 OLD COLONY RD ARLINGTON 02474MA
3240400BB JANELLE, RAYMOND T & MARILYN 166 BOYLSTON STREET NEWINGTON 06111CT
3240400BC TOMONIQUE LLC 97-99 ROUTE DE
LATRESNE
CARIGNAN DE
BORDEAUX
33360
3240400BD VOZZELLA, HENRY R TR 33 WESTRIDGE DR SHARON 02067MA
3240400BE SALTMAN, ROGER L & ANNE BREGY 2175 TEN EYCK AVENUE CAZENOVIA 13035-9751NY
3240400BF BALIESTIERO, LAURA L TR MICHAEL A BALIESTIERO
REVOCABLE TRUST
PO BOX 546 CARLISLE 01741MA
3240400BG MCELLIGOTT, MICHAEL B 500 OCEAN STREET
UNIT 133
HYANNIS 02601MA
3240400BH JENSEN, RALPH & BOGGS, E
JACKSON TRS
MARGARET JAYNE JENSEN
REVOCABLE TRUST
4013 W MORRISON AVE TAMPA 33629FL
3240400BI GARROW, ROBERT E & PAULA E TRS ROBERT E GARROW FAMILY TRUST 25 PAMMY'S PATH NORTH EASTON 02356MA
3240400BJ COOKE, RICHARD E TR 500 OCEAN STREET REALTY TRUST 328 NORTH OCEAN
BLVD APT 605
POMPANO BEACH 33062FL
3240400BK ZOLOTAR, ALEXANDER & ELENA 55 FAY LANE NEEDHAM 02494MA
3240400BL ALTOMARE, PATRICIA M 500 OCEAN STREET
UNIT 30
HYANNIS 02601MA
3240400BM LOGAN, JAMES B PO BOX 2491 MANCHESTER 05255VT
3240400BN MORRIS, SHEILA 500 OCEAN STREET
UNIT 26
HYANNIS 02601MA
3240400BO DUFFY, DAVID C 46 KINGS WAY #805B WALTHAM 02451MA
3240400BP ADHIKARI, GUZIDE & MANAS 154 OLD SPRING STREET LEXINGTON 02421MA
5/10/2024 5:20 PMReport Generated On:Page 5 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
3240400BP ADHIKARI, GUZIDE & MANAS 154 OLD SPRING STREET LEXINGTON 02421MA
3240400BQ QUAGLIA, EUGENE P & CAROL ANN 16 RIDGEFIELD ROAD NEW CITY 10956NY
3240400BR DONOHUE, WILLIAM J TR WILLIAM J DONOHUE REV TR 1699 DOWNING STREET
#405
DENVER 80218CO
3240400BS NEVILLE, JAMES P TR JAMES P NEVILLE 2016 FAMILY
TRUST
2 GARDEN LANE UNIT 2 CAMBRIDGE 02138MA
3240400BT GARRITY, EDWARD & LISA &FUSTOLO, STEVEN C & ELISA 11 PINECREST DRIVE WESTBOROUGH 01581MA
3240400BU GUIDONE, JOHN JAY & SHERRI 11 WILLETT POND WESTWOOD 02090MA
3240400BV GUIDONE, JOHN J & SHERRI A 11 WILLETT POND WESTWOOD 02090MA
3240400BW DAY, DOREEN 143 HORSESHOE DR WESTBROOK 06498CT
3240400BX BOLSTER, ROBERT W & AMY L PO BOX 1143 HOLLIS 03049NH
3240400BY MURPHY, THERESE TR MURPHY INVESTMENT TRUST 500 OCEAN STREET #44 HYANNIS 02601MA
3240400BZ PARAB, SHEILA & BHAGWAN D TRS SHIELA PARAB LIVING TRUST 17 GILMORE FARM
ROAD
WESTBOROUGH 01581-2216MA
3240400CA RAMSDELL, MARK P & DONNA L TRS DONNA L RAMSDELL REVOCABLE
TRUST
13 ABBEY RD SHERBORN 01770MA
3240400CB FUSTOLO, CONSTANCE W 15 CUMBERLAND RD BELMONT 02478-2110MA
3240400CC OETTGEN, J PETER & HARRIS,
DARLA A TRS
PETER AND DARLAS FAMILY
TRUST
32 SHORE ROAD MERRIMAC 01860MA
3240400CD GOOD, ARNOLD P & NEWMARK,
LISA M
7385 SOUTHFIELD ROAD NEW ALBANY 43054OH
5/10/2024 5:20 PMReport Generated On:Page 6 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
3240400CE DUFFY, DAVID C & DI LILLO, M
DONNA & LOUIS TRS
SPD CHILDRENS TRUST C/O DUFFY PROPERTIES 465 WAVERLY OAKS RD
STE 500
WALTHAM 02452MA
3240400CF PACHECO, DIANE R & PAULO J 1 GABRIALA LANE WESTPORT 02790MA
3240400CG KILBRIDE, THOMAS A & KATHLEEN
A
38 HARVARD STREET READING 01867MA
3240400CH GOOD, ARNOLD P & NEWMARK,
LISA M &
GOOD, HOWARD A & BARBARA J 7385 SOUTHFIELD ROAD NEW ALBANY 43054OH
3240400CI CHONG, FRANK K & MARIA C TRS 500 OCEAN ST NOMINEE TRUST 44 HALLETT HILL RD WESTON 02193MA
3240400CJ DUFFY, C PAMELA 905 CONCORD AVENUE BELMONT 02478MA
3240400CK MILLS, KENNETH & MARGARET
DENISE
11 BOXWOOD CIRCLE DRACUT 01826MA
3240400CL GROSSMAN, ANDREW J & JENNIFER
L BERGMAN-
500 OCEAN STREET
UNIT 58
HYANNIS 02601MA
3240400CM DUFFY, BRIAN W & ZILLAH MARIA
ODEN
4019 SOUTHWESTERN
ST
HOUSTON 77005TX
3240400CN POTTER, SUSAN M & HALL,
WILLIAM J TRS
DUFFY FAMILY GST TRUST FBO
SUSAN M POTTER
31 LIDO LANE BEDFORD 01730MA
3240400CO DUFFY, BARBARA J & HALL,
WILLIAM J TRS
DUFFY FAMILY GST TRUST FBO
BARBARA J DUFFY
98 BLUEBERRY LANE CONCORD 01742MA
3240400CP DEYOUNG, JOHN E & DOROTHY A 500 OCEAN ST- #66 HYANNIS 02601MA
3240400CQ YAKIMOV, MILEN T &
DOBREVA-YAKIMOVA, VIOLETA B
500 OCEAN UNIT 68 HYANNIS 02601MA
3240400CR RESTUCCIA, ROBERT J 500 OCEAN ST UNIT 70 HYANNIS 02601MA
3240400CS ELDERINY, SALAH ELDIN TR SALAH E ELDERINY LIVING TRUST 500 OCEAN STREET
UNIT 106
HYANNIS 02601MA
5/10/2024 5:20 PMReport Generated On:Page 7 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
UNIT 106
3240400CT BREWSTER, WILLIAM H & PATRICIA 6705 EAST POINTE
PINES ST
PALM BEACH GARDENS 33418FL
3240400CU VELLUCCI, ANTHONY & NATALIE 47 MURRAY AVE MAHWAH 07430NJ
3240400CV LEWIN, JOEL & SUSAN 529 BOYLSTON STREET BROOKLINE 02455MA
3240400CW WALTER, JAMES & MARIANNE &
DUNBAR, DIANE
PO BOX 11730 ALBANY 12211NY
3240400CX VACCARO, JOHN A & SHANA L 18 ANNA MARIE LANE EAST LONGMEADOW 01028MA
3240400CY OTOOLE, MARGARET J & JAMES B
JR
11 SADDLE RIDGE BLOOMFIELD 06002CT
3240400CZ WHETTEN, CYNTHIA H & NATHAN 42 COLLIER ROAD WETHERSFIELD 06109CT
3240400DA SANG, DELIA N 73 CHATHAM ST BROOKLINE 02446MA
3240400DB LACKENBY, DAVID T & YVONNE M
TRS
LACKENBY REALTY TRUST 500 OCEAN STREET
UNIT 124
HYANNIS 02601MA
3240400DC DEVINE, PATRICK J & CATHERINE M 1 LENOX ST-UNIT 311 NORWOOD 02062MA
3240400DD COONEY, M DONNA & KARA B TRS 21 NANCY DR WESTWOOD 02090MA
3240400DE HATFIELD, JAMES & MALLORY 500 OCEAN STREET
UNIT 130
HYANNIS 02601MA
3240400DF KOTSEAS, HARRY P ET AL TRS HJP NOMINEE TRUST 38 LORING ST AUBURN 01501MA
3240400DG MANDEL, PAUL D & PERKINS,
DIANE M TRS
PAUL D MANDEL & DIANE M
PERKINS JRTA
6801 E CYPRESSHEAD
DRIVE
PARKLAND 33067-1605FL
3240400DH DUFFY, ROBERT L JR TR WILLIAM & NICHOLE DUFFY 2021
IRREV TR
221 CONCORD RD WAYLAND 01778MA
5/10/2024 5:20 PMReport Generated On:Page 8 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
IRREV TR
3240400DI DEMATTEO, M JOSEPH & SHANNON
ROSE & ANTH
THE OCEAN STREET REALTY
TRUST
C/O DEMATTEO
PROPERTIES, INC
80 WASHINGTON ST,
STE C-16
NORWELL 02061-1729MA
3240400DJ SCIOLETTI, DANIEL C JR & CYNTHIA
A
62 PINE STREET HYANNIS 02601MA
3240400DK PATALANO, STEVEN MICHAEL &
KAREN A
22 WRIGHT STREET
UNIT 3
STONEHAM 02180MA
3240400DL ROLZHAUSEN, RICHARD & MARY &
YVONNE TRS
RICHARD & MARY ROLZHAUSEN
TRS
933 CENTRAL STREET
#224
FRAMINGHAM 01701MA
3240400DM TOMKINS, BARBARA J 157 LANCASTER ROAD NORTH ANDOVER 01845MA
3240400DN GELERMAN, WALTER TR GELERMAN REALTY TRUST 20 GAINES ROAD SHARON 02067MA
3240400DO DILILLO CHILDRENS TRUST C/O DILILLO, LOUIS & DONNA 284R DODGE ST BEVERLY 01915MA
3240400DP WING SERIES LLC 220 BEACON ST BOSTON 02116MA
3240400DQ HINCKLEY, RALPH H & CAROL G 16 STILLMEADOW RD WESTON 02193MA
3240400DR ANDRE, CAROL TR CAPE 98 REALTY TRUST 5 FOSSEN WAY ANDOVER 01810MA
3240400DS PATALANO, VINCENT JAMES II &
DONNA
60 CHURCH STREET WINCHESTER 01890-2547MA
3240400DT DUFFY, ROBERT L JR & TARA
HUGHES
221 CONCORD ROAD WAYLAND 01778MA
3240400DU DUFFY, ROBERT L JR & WILLIAM J
TRS
PETER D DUFFY 2021 IRREV TRUST C/O DUFFY PROPERTIES 465 WAVERLY OAKS RD
STE 500
WALTHAM 02452MA
324041 BARNSTABLE, TOWN OF (BCH)367 MAIN STREET HYANNIS 02601MA
324042 BARNSTABLE, TOWN OF (MUN)367 MAIN STREET HYANNIS 02601MA
5/10/2024 5:20 PMReport Generated On:Page 9 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
324042 BARNSTABLE, TOWN OF (MUN)367 MAIN STREET HYANNIS 02601MA
324043 FORANCE, MICHAEL D & MARY
ELIZABETH
557 OCEAN STREET HYANNIS 02601MA
324044 BARNSTABLE, TOWN OF (MUN)367 MAIN STREET HYANNIS 02601MA
324045 FORANCE, MICHAEL D 557 OCEAN STREET HYANNIS 02601MA
324046 BATTLE, MARTIN 543 OCEAN ST HYANNIS 02601MA
324047 FELTHAM, PHYLLIS 535 OCEAN STREET HYANNIS 02601MA
324048001 TRAYWICK, MARTIN &
MORESHEAD, KAREN W TR
SEAGULL RESEARCH FOUND R T PO BOX 216 WEST HYANNISPORT 02672MA
324048002 FALKOWSKI, THOMAS J &
MICHELLE
22 MANOR DRIVE EAST SANDWICH 02537MA
324049 EVEREST 599 RATHUN ST LLC 66 ASPEN AVENUE SOUTH GRAFTON 01560MA
324050 CAVANAUGH, MICHAEL L & LYNNE 98 TALCOTT RIDGE
ROAD
SOUTH WINDSOR 06074CT
324054 ORVOSH, DAVID 40 GROVE STREET READING 01867-1637MA
324055 WARREN, GORDON F TR GORDON FREDERICK WARREN LIV
TR
55 CIRCUIT AVENUE HYANNIS 02601MA
324058 BARNSTABLE, TOWN OF (CON)CONSERVATION COMMISSION 230 SOUTH STREET HYANNIS 02601MA
324110 BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLE 02668MA
324113 DECKER-WALKER, SANDRA LEE 511 OCEAN STREET HYANNIS 02601MA
324114 LATIMER, ARLENE C 213 LONG HILL ROAD BOLTON 01740MA
5/10/2024 5:20 PMReport Generated On:Page 10 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
324117 WALKER, SANDRA LEE DECKER 511 OCEAN ST HYANNIS 02601MA
324118 ORVOSH, DAVID 40 GROVE STREET READING 01867-1637MA
325007 CONNER, ROBERT 433 OCEAN STREET HYANNIS 02601MA
325008 GEORGE, MARY F 33 ST MARGARET
STREET
DORCHESTER 02125MA
325009 ST ONGE, RICHARD D JR & VALERIE
C TRS
RICHARD D JR & VALERIE C ST
ONGE LIV TR
427 OCEAN STREET HYANNIS 02601MA
325010 ZHANG, YING & WANG, YINGLI 1018 LOS ROBLES AVE PALO ALTO 94306CA
325011 SORDILLO, ELEANOR TR ELEANOR SORDILLO 2015 TRUST 14 PACIFIC ST SOUTH BOSTON 02127MA
325123 PISACANO, CHARLES ET AL C/O PISACANO, MARGO 73 HARBOR BLUFFS
ROAD
HYANNIS 02601MA
325125 PISACANO, MARGO TR OVER THE BLUFF TRUST PO BOX 126 HYANNIS PORT 02647MA
325126 BARNSTABLE, TOWN OF (CON)CONSERVATION COMMISSION 230 SOUTH STREET HYANNIS 02601MA
325127 BARNSTABLE, TOWN OF (CON)CONSERVATION COMMISSION 230 SOUTH STREET HYANNIS 02601MA
325128 GILLILAND, DAVID A & THERESA A 72 HARBOR BLUFF
ROAD
HYANNIS 02601MA
325130 ROGERS, JANET M 27 HARBOR BLUFFS
ROAD
HYANNIS 02601MA
325131 MCLEAN, DAVID R 50 LEDGEVIEW WAY APT
2203
WRENTHAM 02093MA
325132 CANDELLA, LYNN 11 HARBOR BLUFFS
ROAD
HYANNIS 02601MA
5/10/2024 5:20 PMReport Generated On:Page 11 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
325133 DILORENZO, LEONARD & GARCEAU,
ANNMARIE T
LEONARD DILORENZO LIVING
TRUST
5 HARBOR BLUFFS
ROAD
HYANNIS 02601MA
5/10/2024 5:20 PMReport Generated On:Page 12 of 12 164Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
3,600.00
Conservation Notice of Intent (NOI) Abutter Map for Multiple Subject Parcels
This map is for illustration
purposes only. It is not adequate
for legal boundary determination
or regulatory interpretation. This
map does not represent an
on-the-ground survey. It may be
generalized, may not reflect
current conditions, and may
contain cartographic errors or
omissions.
Legend
Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed.
Parcel lines shown on this map are
only graphic representations of
Assessor’s tax parcels. They are
not true property boundaries and
do not represent accurate
relationships to physical objects
on the map such as building
locations.
150
Town of Barnstable
GIS Unit
300
5/10/2024
gis@town.barnstable.ma.us
Printed on:
0
ft.300
Subject Parcel
Abutters
100 ft. Buffer
ft.
1 inch = approx.
Parcels
Town Boundary
Railroad Tracks
Buildings
Approx. Building
Buildings
Parking Lots
Paved
Unpaved
Roads
Paved Road
Unpaved Road
Bridge
Paved Median
Water Bodies
Notification to Abutters
By Hand Delivery, Certified Mail (return receipt requested), or Certificates of Mailing
This is a notification required by law. You are receiving this notification because you have been
identified as the owner of land abutting another parcel of land for which certain activities are
proposed. Those activities require a permit under the Massachusetts Wetlands Protection Act
(M.G.L. c. 131, § 40).
In accordance with the second paragraph of the Massachusetts Wetlands Protection Act, and 310
CMR 10.05(4)(a) of the Wetlands Regulations, you are hereby notified that:
A. A Notice of Intent was filed with the Town of Barnstable Conservation Commission on May
28, 2024 seeking permission to remove, fill, dredge, or alter an area subject to protection
under M.G.L. c. 131 §40. The following is a description of the proposed activity/activities:
B. The name of the applicant is: Paul Graves, P.E., on behalf of the Town of Barnstable.
C. The address of the land where the activity is proposed is: Ocean Street town right-of-way
from #480 to #670, and on Town properties at #480 and #670.
D. Copies of the Notice of Intent may be examined or obtained at the office of the Town of
Barnstable Conservation Commission, located at 230 South Street, Hyannis, MA 02601. The
regular business hours of the Commission are Monday thru Friday, 8:00 AM to 4:30 PM, and
the Commission may be reached at 508-862-4093.
E. Copies of the Notice of Intent may be obtained from the applicant by calling or emailing Paul
Graves in the Town of Barnstable Department of Public Works at 508-790-6400 or
paul.graves@town.barnstable.ma.us . An administrative fee may be applied for providing
copies of the NOI and plans.
F. Information regarding the date, time, and location of the public hearing regarding the Notice
of Intent may be obtained from the Town of Barnstable Conservation Commission. Notice
of the public hearing will be published at least five business days in advance, in the
__________________________________________.
Notification provided pursuant to the above requirement does no t automatically confer standing to
the recipient to request Departmental Action for the underlying matter. See 310 CMR
10.05(7)(a)4.
Construct sidewalks and shared use paths, a raised crosswalk, and drainage improvements, install
new/additional street lights, construct new driveway and drainage at Kalmus Beach, close existing driveway
at Kalmus Beach, install guardrails, construct watermain extension, repave sections of Ocean Street,
replace/install signs and pavement markings, and associated work.
Appendix E:
Stormwater Checklist and Report
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 1 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
A. Introduction
Important: When
filling out forms
on the computer,
use only the tab
key to move your
cursor - do not
use the return
key.
A Stormwater Report must be submitted with the Notice of Intent permit application to document
compliance with the Stormwater Management Standards. The following checklist is NOT a substitute for
the Stormwater Report (which should provide more substantive and detailed information) but is offered
here as a tool to help the applicant organize their Stormwater Management documentation for their
Report and for the reviewer to assess this information in a consistent format. As noted in the Checklist,
the Stormwater Report must contain the engineering computations and supporting information set forth in
Volume 3 of the Massachusetts Stormwater Handbook. The Stormwater Report must be prepared and
certified by a Registered Professional Engineer (RPE) licensed in the Commonwealth.
The Stormwater Report must include:
• The Stormwater Checklist completed and stamped by a Registered Professional Engineer (see
page 2) that certifies that the Stormwater Report contains all required submittals.1 This Checklist
is to be used as the cover for the completed Stormwater Report.
• Applicant/Project Name
• Project Address
• Name of Firm and Registered Professional Engineer that prepared the Report
• Long-Term Pollution Prevention Plan required by Standards 4-6
• Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan required
by Standard 82
• Operation and Maintenance Plan required by Standard 9
In addition to all plans and supporting information, the Stormwater Report must include a brief narrative
describing stormwater management practices, including environmentally sensitive site design and LID
techniques, along with a diagram depicting runoff through the proposed BMP treatment train. Plans are
required to show existing and proposed conditions, identify all wetland resource areas, NRCS soil types,
critical areas, Land Uses with Higher Potential Pollutant Loads (LUHPPL), and any areas on the site
where infiltration rate is greater than 2.4 inches per hour. The Plans shall identify the drainage areas for
both existing and proposed conditions at a scale that enables verification of supporting calculations.
As noted in the Checklist, the Stormwater Management Report shall document compliance with each of
the Stormwater Management Standards as provided in the Massachusetts Stormwater Handbook. The
soils evaluation and calculations shall be done using the methodologies set forth in Volume 3 of the
Massachusetts Stormwater Handbook.
To ensure that the Stormwater Report is complete, applicants are required to fill in the Stormwater Report
Checklist by checking the box to indicate that the specified information has been included in the
Stormwater Report. If any of the information specified in the checklist has not been submitted, the
applicant must provide an explanation. The completed Stormwater Report Checklist and Certification
must be submitted with the Stormwater Report.
1 The Stormwater Report may also include the Illicit Discharge Compliance Statement required by Standard 10. If not included in
the Stormwater Report, the Illicit Discharge Compliance Statement must be submitted prior to the discharge of stormwater runo ff to
the post-construction best management practices.
2 For some complex projects, it may not be possible to include the Construction Period Erosion and Sedimentation Control Plan i n
the Stormwater Report. In that event, the issuing authority has the discretion to issue an Order of Conditions that approves the
project and includes a condition requiring the proponent to submit the Construction Period Erosion and Sedimentation Control Plan
before commencing any land disturbance activity on the site.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 3 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
LID Measures: Stormwater Standards require LID measures to be considered. Document what
environmentally sensitive design and LID Techniques were considered during the planning and design of
the project:
No disturbance to any Wetland Resource Areas
Site Design Practices (e.g. clustered development, reduced frontage setbacks)
Reduced Impervious Area (Redevelopment Only)
Minimizing disturbance to existing trees and shrubs
LID Site Design Credit Requested:
Credit 1
Credit 2
Credit 3
Use of “country drainage” versus curb and gutter conveyance and pipe
Bioretention Cells (includes Rain Gardens)
Constructed Stormwater Wetlands (includes Gravel Wetlands designs)
Treebox Filter
Water Quality Swale
Grass Channel
Green Roof
Other (describe):
Standard 1: No New Untreated Discharges
No new untreated discharges
Outlets have been designed so there is no erosion or scour to wetlands and waters of the
Commonwealth
Supporting calculations specified in Volume 3 of the Massachusetts Stormwater Handbook included.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 4 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
Standard 2: Peak Rate Attenuation
Standard 2 waiver requested because the project is located in land subject to coastal storm flowage
and stormwater discharge is to a wetland subject to coastal flooding.
Evaluation provided to determine whether off-site flooding increases during the 100-year 24-hour
storm.
Calculations provided to show that post-development peak discharge rates do not exceed pre-
development rates for the 2-year and 10-year 24-hour storms. If evaluation shows that off-site
flooding increases during the 100-year 24-hour storm, calculations are also provided to show that
post-development peak discharge rates do not exceed pre-development rates for the 100-year 24-
hour storm.
Standard 3: Recharge
Soil Analysis provided.
Required Recharge Volume calculation provided.
Required Recharge volume reduced through use of the LID site Design Credits.
Sizing the infiltration, BMPs is based on the following method: Check the method used.
Static Simple Dynamic Dynamic Field1
Runoff from all impervious areas at the site discharging to the infiltration BMP.
Runoff from all impervious areas at the site is not discharging to the infiltration BMP and calculations
are provided showing that the drainage area contributing runoff to the infiltration BMPs is sufficient to
generate the required recharge volume.
Recharge BMPs have been sized to infiltrate the Required Recharge Volume.
Recharge BMPs have been sized to infiltrate the Required Recharge Volume only to the maximum
extent practicable for the following reason:
Site is comprised solely of C and D soils and/or bedrock at the land surface
M.G.L. c. 21E sites pursuant to 310 CMR 40.0000
Solid Waste Landfill pursuant to 310 CMR 19.000
Project is otherwise subject to Stormwater Management Standards only to the maximum extent
practicable.
Calculations showing that the infiltration BMPs will drain in 72 hours are provided.
Property includes a M.G.L. c. 21E site or a solid waste landfill and a mounding analysis is included.
1 80% TSS removal is required prior to discharge to infiltration BMP if Dynamic Field method is used.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 5 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
Standard 3: Recharge (continued)
The infiltration BMP is used to attenuate peak flows during storms greater than or equal to the 10 -
year 24-hour storm and separation to seasonal high groundwater is less than 4 feet and a mounding
analysis is provided.
Documentation is provided showing that infiltration BMPs do not adversely impact nearby wetland
resource areas.
Standard 4: Water Quality
The Long-Term Pollution Prevention Plan typically includes the following:
• Good housekeeping practices;
• Provisions for storing materials and waste products inside or under cover;
• Vehicle washing controls;
• Requirements for routine inspections and maintenance of stormwater BMPs;
• Spill prevention and response plans;
• Provisions for maintenance of lawns, gardens, and other landscaped areas;
• Requirements for storage and use of fertilizers, herbicides, and pesticides;
• Pet waste management provisions;
• Provisions for operation and management of septic systems;
• Provisions for solid waste management;
• Snow disposal and plowing plans relative to Wetland Resource Areas;
• Winter Road Salt and/or Sand Use and Storage restrictions;
• Street sweeping schedules;
• Provisions for prevention of illicit discharges to the stormwater management system;
• Documentation that Stormwater BMPs are designed to provide for shutdown and containment in the
event of a spill or discharges to or near critical areas or from LUHPPL;
• Training for staff or personnel involved with implementing Long-Term Pollution Prevention Plan;
• List of Emergency contacts for implementing Long-Term Pollution Prevention Plan.
A Long-Term Pollution Prevention Plan is attached to Stormwater Report and is included as an
attachment to the Wetlands Notice of Intent.
Treatment BMPs subject to the 44% TSS removal pretreatment requirement and the one inch rule for
calculating the water quality volume are included, and discharge:
is within the Zone II or Interim Wellhead Protection Area
is near or to other critical areas
is within soils with a rapid infiltration rate (greater than 2.4 inches per hour)
involves runoff from land uses with higher potential pollutant loads.
The Required Water Quality Volume is reduced through use of the LID site Design Credits.
Calculations documenting that the treatment train meets the 80% TSS removal requirement and, if
applicable, the 44% TSS removal pretreatment requirement, are provided.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 6 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
Standard 4: Water Quality (continued)
The BMP is sized (and calculations provided) based on:
The ½” or 1” Water Quality Volume or
The equivalent flow rate associated with the Water Quality Volume and documentation is
provided showing that the BMP treats the required water quality volume.
The applicant proposes to use proprietary BMPs, and documentation supporting use of proprietary
BMP and proposed TSS removal rate is provided. This documentation may be in the form of the
propriety BMP checklist found in Volume 2, Chapter 4 of the Massachusetts Stormwater Handbook
and submitting copies of the TARP Report, STEP Report, and/or other third party studies verifying
performance of the proprietary BMPs.
A TMDL exists that indicates a need to reduce pollutants other than TSS and documentation showing
that the BMPs selected are consistent with the TMDL is provided.
Standard 5: Land Uses With Higher Potential Pollutant Loads (LUHPPLs)
The NPDES Multi-Sector General Permit covers the land use and the Stormwater Pollution
Prevention Plan (SWPPP) has been included with the Stormwater Report.
The NPDES Multi-Sector General Permit covers the land use and the SWPPP will be submitted prior
to the discharge of stormwater to the post-construction stormwater BMPs.
The NPDES Multi-Sector General Permit does not cover the land use.
LUHPPLs are located at the site and industry specific source control and pollution prevention
measures have been proposed to reduce or eliminate the exposure of LUHPPLs to rain, snow, snow
melt and runoff, and been included in the long term Pollution Prevention Plan.
All exposure has been eliminated.
All exposure has not been eliminated and all BMPs selected are on MassDEP LUHPPL list.
The LUHPPL has the potential to generate runoff with moderate to higher concentrations of oil and
grease (e.g. all parking lots with >1000 vehicle trips per day) and the treatment train includes an oil
grit separator, a filtering bioretention area, a sand filter or equivalent.
Standard 6: Critical Areas
The discharge is near or to a critical area and the treatment train includes only BMPs that MassDEP
has approved for stormwater discharges to or near that particular class of critical area.
Critical areas and BMPs are identified in the Stormwater Report.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 7 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
Standard 7: Redevelopments and Other Projects Subject to the Standards only to the maximum
extent practicable
The project is subject to the Stormwater Management Standards only to the maximum Extent
Practicable as a:
Limited Project
Small Residential Projects: 5-9 single family houses or 5-9 units in a multi-family development
provided there is no discharge that may potentially affect a critical area.
Small Residential Projects: 2-4 single family houses or 2-4 units in a multi-family development
with a discharge to a critical area
Marina and/or boatyard provided the hull painting, service and maintenance areas are protected
from exposure to rain, snow, snow melt and runoff
Bike Path and/or Foot Path
Redevelopment Project
Redevelopment portion of mix of new and redevelopment.
Certain standards are not fully met (Standard No. 1, 8, 9, and 10 must always be fully met) and an
explanation of why these standards are not met is contained in the Stormwater Report.
The project involves redevelopment and a description of all measures that have been taken to
improve existing conditions is provided in the Stormwater Report. The redevelopment checklist found
in Volume 2 Chapter 3 of the Massachusetts Stormwater Handbook may be used to document that
the proposed stormwater management system (a) complies with Standards 2, 3 and the pretreatment
and structural BMP requirements of Standards 4-6 to the maximum extent practicable and (b)
improves existing conditions.
Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control
A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan must include the
following information:
• Narrative;
• Construction Period Operation and Maintenance Plan;
• Names of Persons or Entity Responsible for Plan Compliance;
• Construction Period Pollution Prevention Measures;
• Erosion and Sedimentation Control Plan Drawings;
• Detail drawings and specifications for erosion control BMPs, including sizing calculations;
• Vegetation Planning;
• Site Development Plan;
• Construction Sequencing Plan;
• Sequencing of Erosion and Sedimentation Controls;
• Operation and Maintenance of Erosion and Sedimentation Controls;
• Inspection Schedule;
• Maintenance Schedule;
• Inspection and Maintenance Log Form.
A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan containing
the information set forth above has been included in the Stormwater Report.
swcheck_ Ocean St.doc • 04/01/08 Stormwater Report Checklist • Page 8 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands Program
Checklist for Stormwater Report
Checklist (continued)
Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control
(continued)
The project is highly complex and information is included in the Stormwater Report that explains why
it is not possible to submit the Construction Period Pollution Prevention and Erosion and
Sedimentation Control Plan with the application. A Construction Period Pollution Prevention and
Erosion and Sedimentation Control has not been included in the Stormwater Report but will be
submitted before land disturbance begins.
The project is not covered by a NPDES Construction General Permit.
The project is covered by a NPDES Construction General Permit and a copy of the SWPPP is in the
Stormwater Report.
The project is covered by a NPDES Construction General Permit but no SWPPP been submitted.
The SWPPP will be submitted BEFORE land disturbance begins.
Standard 9: Operation and Maintenance Plan
The Post Construction Operation and Maintenance Plan is included in the Stormwater Report and
includes the following information:
Name of the stormwater management system owners;
Party responsible for operation and maintenance;
Schedule for implementation of routine and non-routine maintenance tasks;
Plan showing the location of all stormwater BMPs maintenance access areas;
Description and delineation of public safety features;
Estimated operation and maintenance budget; and
Operation and Maintenance Log Form.
The responsible party is not the owner of the parcel where the BMP is located and the Stormwater
Report includes the following submissions:
A copy of the legal instrument (deed, homeowner’s association, utility trust or other legal entity)
that establishes the terms of and legal responsibility for the operation and maintenance of the
project site stormwater BMPs;
A plan and easement deed that allows site access for the legal entity to operate and maintain
BMP functions.
Standard 10: Prohibition of Illicit Discharges
The Long-Term Pollution Prevention Plan includes measures to prevent illicit discharges;
An Illicit Discharge Compliance Statement is attached;
NO Illicit Discharge Compliance Statement is attached but will be submitted prior to the discharge of
any stormwater to post-construction BMPs.
The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director Stormwater Report for Ocean Street Sidewalk Improvement Project Barnstable, MA 02601 Prepared by: Town of Barnstable DPW – Engineering Division 382 Falmouth Road Hyannis, Massachusetts 02601 Date: February 8, 2024
The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director TABLE OF CONTENTS I. INTRODUCTION II. SUMMARY OF REVISIONS APPENDICES A. Post-Development HydroCAD Stormwater Analysis and Forebay Sizing Calculations for Parking and Entrance Driveway B. Swale Stormwater Analysis within 100’ Wetland Buffer Zone C. Post-Development Watershed Plans D. TSS Calculations, Water Quality Volume Calculations, and Stormwater Recharge Calculations E. USGS Hydrologic Soil Report
The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director I. INTRODUCTION This executive summary presents the Stormwater Drainage Analysis for the Proposed Ocean Street Sidewalk Improvement Project in Hyannis, which addresses stormwater improvements within affected wetland resource areas. II. PROJECT STORMWATER NARRATIVE This drainage analysis addresses the design of the stormwater for the proposed impervious area improvements as part of the Ocean Street Sidewalk Improvement Project. The proposed stormwater facilities directly address the increase of impervious areas with wetland resource areas due to the improved changes of the project. The proposed stormwater management facilities consist of two (2) stormwater infiltration basins, containing sediment forebays, and low-profile swales which parallel the proposed sidewalk within the wetland resource areas. Runoff generated from the proposed driveway will be divided by a highpoint at the mid-point of the driveway and directed to bituminous letdown channels leading to sediment forebays which will then treat any runoff before infiltrating through the infiltration basins. Runoff generated from the proposed sidewalk areas will be directed to low-profile swales which run parallel to the sidewalks. These swales have been designed to the maximum extent practicable and provide enough volume to handle generated runoff and sediment removal. O&M procedures for all facilities will require sediment build up to be removed after large storm events, with the stormwater facilities being restored to their natural design state to operate properly. The combination of street sweeping, sediment forebays and the infiltration systems will provide a minimum 5% removal of TSS prior to discharging to the infiltration systems where an additional 80% will be removed. The total TSS removal rate has been calculated to exceed 80% for all subcatchments (see TSS Calculations in Appendix C). Infiltration rates used in the calculations were based upon the Massachusetts Stormwater Handbook and a value of 8.27 in/hr was used. The tables below summarize the calculated stormwater rate of runoff and volume discharge at the project design points for the 2-year, 10-year, 25-year, and 100-year storm events for the infiltration basins. Stormwater facilities were designed to the 25-year storm while analyzing the mitigated effects during the 100-year storm event. Sidewalk calculations were only generated to for the 25-year storm for a 10ft typical section as a conservative approach. All design points are designed to infiltrate and do not contain additional exfiltration mechanisms. The associated plan set dated February 7, 2024, reflects these stormwater improvements.
The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director Pond 1: Basin A Rate (cfs) Storm Event Post 2-year 0.16 10-year 0.20 25-year 0.21 100-year 0.22 Pond 2: Basin B Rate (cfs) Storm Event Post 2-year 0.15 10-year 0.18 25-year 0.18 100-year 0.20 Pond 3: Drainage Swale Rate (cfs) Storm Event Post 25-year 0.00
APPENDIX A Post-Development HydroCAD Stormwater Analysis and Forebay Sizing Calculations for Parking and Entrance Driveway
1S
Subcatchment Area
closer to Ocean St
2S
Subcatchment Area
closer to Kalmus
parking Lot
1P
Basin A
2P
Basin B
Routing Diagram for POST
Prepared by Town of Barnstable - DPW, Printed 8/10/2021
HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 2HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Area Listing (selected nodes)
Area
(sq-ft)
CN Description
(subcatchment-numbers)
11,405 98 Paved parking, HSG A (1S, 2S)
11,405 98 TOTAL AREA
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 3HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(sq-ft)
Soil
Group
Subcatchment
Numbers
11,405 HSG A 1S, 2S
0 HSG B
0 HSG C
0 HSG D
0 Other
11,405 TOTAL AREA
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 4HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Ground Covers (selected nodes)
HSG-A
(sq-ft)
HSG-B
(sq-ft)
HSG-C
(sq-ft)
HSG-D
(sq-ft)
Other
(sq-ft)
Total
(sq-ft)
Ground
Cover
11,405 0 0 0 0 11,405
11,405 0 0 0 0 11,405
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 2-Year Rainfall=3.40"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 5HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5,346 sf 100.00% Impervious Runoff Depth=3.17"Subcatchment 1S:
Tc=6.0 min CN=98 Runoff=0.40 cfs 1,411 cf
Runoff Area=6,059 sf 100.00% Impervious Runoff Depth=3.17"Subcatchment 2S:
Tc=6.0 min CN=98 Runoff=0.45 cfs 1,599 cf
Peak Elev=4.36' Storage=208 cf Inflow=0.40 cfs 1,411 cfPond 1P: Basin A
Outflow=0.16 cfs 1,411 cf
Peak Elev=3.93' Storage=336 cf Inflow=0.45 cfs 1,599 cfPond 2P: Basin B
Outflow=0.15 cfs 1,599 cf
Total Runoff Area = 11,405 sf Runoff Volume = 3,010 cf Average Runoff Depth = 3.17"
0.00% Pervious = 0 sf 100.00% Impervious = 11,405 sf
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 2-Year Rainfall=3.40"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 6HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Subcatchment Area closer to Ocean St
Runoff = 0.40 cfs @ 12.09 hrs, Volume= 1,411 cf, Depth= 3.17"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 2-Year Rainfall=3.40"
Area (sf) CN Description
5,346 98 Paved parking, HSG A
5,346 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Subcatchment 2S: Subcatchment Area closer to Kalmus parking Lot
Runoff = 0.45 cfs @ 12.09 hrs, Volume= 1,599 cf, Depth= 3.17"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 2-Year Rainfall=3.40"
Area (sf) CN Description
6,059 98 Paved parking, HSG A
6,059 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Pond 1P: Basin A
Inflow Area = 5,346 sf,100.00% Impervious, Inflow Depth = 3.17" for 2-Year event
Inflow = 0.40 cfs @ 12.09 hrs, Volume= 1,411 cf
Outflow = 0.16 cfs @ 12.31 hrs, Volume= 1,411 cf, Atten= 60%, Lag= 13.3 min
Discarded = 0.16 cfs @ 12.31 hrs, Volume= 1,411 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.36' @ 12.31 hrs Surf.Area= 633 sf Storage= 208 cf
Plug-Flow detention time= 7.3 min calculated for 1,409 cf (100% of inflow)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 2-Year Rainfall=3.40"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 7HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Center-of-Mass det. time= 7.3 min ( 762.5 - 755.1 )
Volume Invert Avail.Storage Storage Description
#1 4.00' 368 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.60' 2,311 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
2,679 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 513 81.0 0 0 513
4.60 718 108.0 368 368 923
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.60 1,202 150.0 0 0 1,202
5.00 1,449 160.0 529 529 1,456
6.00 2,137 184.0 1,782 2,311 2,135
Device Routing Invert Outlet Devices
#1 Discarded 4.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.16 cfs @ 12.31 hrs HW=4.36' (Free Discharge)
1=Exfiltration ( Controls 0.16 cfs)
Summary for Pond 2P: Basin B
Inflow Area = 6,059 sf,100.00% Impervious, Inflow Depth = 3.17" for 2-Year event
Inflow = 0.45 cfs @ 12.09 hrs, Volume= 1,599 cf
Outflow = 0.15 cfs @ 12.36 hrs, Volume= 1,599 cf, Atten= 65%, Lag= 16.3 min
Discarded = 0.15 cfs @ 12.36 hrs, Volume= 1,599 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 3.93' @ 12.36 hrs Surf.Area= 536 sf Storage= 336 cf
Plug-Flow detention time= 15.2 min calculated for 1,597 cf (100% of inflow)
Center-of-Mass det. time= 15.2 min ( 770.3 - 755.1 )
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 2-Year Rainfall=3.40"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 8HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Volume Invert Avail.Storage Storage Description
#1 3.00' 377 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.00' 1,400 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
1,777 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 215 72.0 0 0 215
4.00 568 104.0 377 377 672
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 1,058 166.0 0 0 1,058
5.00 1,772 191.0 1,400 1,400 1,790
Device Routing Invert Outlet Devices
#1 Discarded 3.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.15 cfs @ 12.36 hrs HW=3.92' (Free Discharge)
1=Exfiltration ( Controls 0.15 cfs)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 10-Year Rainfall=4.95"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 9HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5,346 sf 100.00% Impervious Runoff Depth>4.71"Subcatchment 1S:
Tc=6.0 min CN=98 Runoff=0.58 cfs 2,100 cf
Runoff Area=6,059 sf 100.00% Impervious Runoff Depth>4.71"Subcatchment 2S:
Tc=6.0 min CN=98 Runoff=0.66 cfs 2,380 cf
Peak Elev=4.61' Storage=380 cf Inflow=0.58 cfs 2,100 cfPond 1P: Basin A
Outflow=0.20 cfs 2,100 cf
Peak Elev=4.18' Storage=580 cf Inflow=0.66 cfs 2,380 cfPond 2P: Basin B
Outflow=0.18 cfs 2,380 cf
Total Runoff Area = 11,405 sf Runoff Volume = 4,479 cf Average Runoff Depth = 4.71"
0.00% Pervious = 0 sf 100.00% Impervious = 11,405 sf
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 10-Year Rainfall=4.95"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 10HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Subcatchment Area closer to Ocean St
Runoff = 0.58 cfs @ 12.09 hrs, Volume= 2,100 cf, Depth> 4.71"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 10-Year Rainfall=4.95"
Area (sf) CN Description
5,346 98 Paved parking, HSG A
5,346 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Subcatchment 2S: Subcatchment Area closer to Kalmus parking Lot
Runoff = 0.66 cfs @ 12.09 hrs, Volume= 2,380 cf, Depth> 4.71"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 10-Year Rainfall=4.95"
Area (sf) CN Description
6,059 98 Paved parking, HSG A
6,059 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Pond 1P: Basin A
Inflow Area = 5,346 sf,100.00% Impervious, Inflow Depth > 4.71" for 10-Year event
Inflow = 0.58 cfs @ 12.09 hrs, Volume= 2,100 cf
Outflow = 0.20 cfs @ 12.35 hrs, Volume= 2,100 cf, Atten= 65%, Lag= 15.9 min
Discarded = 0.20 cfs @ 12.35 hrs, Volume= 2,100 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.61' @ 12.35 hrs Surf.Area= 718 sf Storage= 380 cf
Plug-Flow detention time= 11.1 min calculated for 2,097 cf (100% of inflow)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 10-Year Rainfall=4.95"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 11HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Center-of-Mass det. time= 11.1 min ( 759.2 - 748.2 )
Volume Invert Avail.Storage Storage Description
#1 4.00' 368 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.60' 2,311 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
2,679 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 513 81.0 0 0 513
4.60 718 108.0 368 368 923
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.60 1,202 150.0 0 0 1,202
5.00 1,449 160.0 529 529 1,456
6.00 2,137 184.0 1,782 2,311 2,135
Device Routing Invert Outlet Devices
#1 Discarded 4.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.20 cfs @ 12.35 hrs HW=4.61' (Free Discharge)
1=Exfiltration ( Controls 0.20 cfs)
Summary for Pond 2P: Basin B
Inflow Area = 6,059 sf,100.00% Impervious, Inflow Depth > 4.71" for 10-Year event
Inflow = 0.66 cfs @ 12.09 hrs, Volume= 2,380 cf
Outflow = 0.18 cfs @ 12.44 hrs, Volume= 2,380 cf, Atten= 73%, Lag= 21.1 min
Discarded = 0.18 cfs @ 12.44 hrs, Volume= 2,380 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.18' @ 12.44 hrs Surf.Area= 568 sf Storage= 580 cf
Plug-Flow detention time= 21.8 min calculated for 2,380 cf (100% of inflow)
Center-of-Mass det. time= 21.8 min ( 769.9 - 748.2 )
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 10-Year Rainfall=4.95"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 12HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Volume Invert Avail.Storage Storage Description
#1 3.00' 377 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.00' 1,400 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
1,777 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 215 72.0 0 0 215
4.00 568 104.0 377 377 672
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 1,058 166.0 0 0 1,058
5.00 1,772 191.0 1,400 1,400 1,790
Device Routing Invert Outlet Devices
#1 Discarded 3.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.18 cfs @ 12.44 hrs HW=4.18' (Free Discharge)
1=Exfiltration ( Controls 0.18 cfs)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 13HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5,346 sf 100.00% Impervious Runoff Depth>5.68"Subcatchment 1S:
Tc=6.0 min CN=98 Runoff=0.70 cfs 2,531 cf
Runoff Area=6,059 sf 100.00% Impervious Runoff Depth>5.68"Subcatchment 2S:
Tc=6.0 min CN=98 Runoff=0.79 cfs 2,869 cf
Peak Elev=4.71' Storage=509 cf Inflow=0.70 cfs 2,531 cfPond 1P: Basin A
Outflow=0.21 cfs 2,531 cf
Peak Elev=4.33' Storage=755 cf Inflow=0.79 cfs 2,869 cfPond 2P: Basin B
Outflow=0.18 cfs 2,869 cf
Total Runoff Area = 11,405 sf Runoff Volume = 5,400 cf Average Runoff Depth = 5.68"
0.00% Pervious = 0 sf 100.00% Impervious = 11,405 sf
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 14HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Subcatchment Area closer to Ocean St
Runoff = 0.70 cfs @ 12.09 hrs, Volume= 2,531 cf, Depth> 5.68"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 25-Year Rainfall=5.92"
Area (sf) CN Description
5,346 98 Paved parking, HSG A
5,346 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Subcatchment 2S: Subcatchment Area closer to Kalmus parking Lot
Runoff = 0.79 cfs @ 12.09 hrs, Volume= 2,869 cf, Depth> 5.68"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 25-Year Rainfall=5.92"
Area (sf) CN Description
6,059 98 Paved parking, HSG A
6,059 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Pond 1P: Basin A
Inflow Area = 5,346 sf,100.00% Impervious, Inflow Depth > 5.68" for 25-Year event
Inflow = 0.70 cfs @ 12.09 hrs, Volume= 2,531 cf
Outflow = 0.21 cfs @ 12.40 hrs, Volume= 2,531 cf, Atten= 70%, Lag= 19.0 min
Discarded = 0.21 cfs @ 12.40 hrs, Volume= 2,531 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.71' @ 12.40 hrs Surf.Area= 718 sf Storage= 509 cf
Plug-Flow detention time= 13.9 min calculated for 2,531 cf (100% of inflow)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 15HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Center-of-Mass det. time= 13.9 min ( 759.3 - 745.4 )
Volume Invert Avail.Storage Storage Description
#1 4.00' 368 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.60' 2,311 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
2,679 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 513 81.0 0 0 513
4.60 718 108.0 368 368 923
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.60 1,202 150.0 0 0 1,202
5.00 1,449 160.0 529 529 1,456
6.00 2,137 184.0 1,782 2,311 2,135
Device Routing Invert Outlet Devices
#1 Discarded 4.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.21 cfs @ 12.40 hrs HW=4.71' (Free Discharge)
1=Exfiltration ( Controls 0.21 cfs)
Summary for Pond 2P: Basin B
Inflow Area = 6,059 sf,100.00% Impervious, Inflow Depth > 5.68" for 25-Year event
Inflow = 0.79 cfs @ 12.09 hrs, Volume= 2,869 cf
Outflow = 0.18 cfs @ 12.47 hrs, Volume= 2,869 cf, Atten= 77%, Lag= 23.3 min
Discarded = 0.18 cfs @ 12.47 hrs, Volume= 2,869 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.33' @ 12.47 hrs Surf.Area= 568 sf Storage= 755 cf
Plug-Flow detention time= 27.1 min calculated for 2,864 cf (100% of inflow)
Center-of-Mass det. time= 27.0 min ( 772.5 - 745.4 )
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 16HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Volume Invert Avail.Storage Storage Description
#1 3.00' 377 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.00' 1,400 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
1,777 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 215 72.0 0 0 215
4.00 568 104.0 377 377 672
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 1,058 166.0 0 0 1,058
5.00 1,772 191.0 1,400 1,400 1,790
Device Routing Invert Outlet Devices
#1 Discarded 3.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.18 cfs @ 12.47 hrs HW=4.32' (Free Discharge)
1=Exfiltration ( Controls 0.18 cfs)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 100-Year Rainfall=7.42"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 17HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5,346 sf 100.00% Impervious Runoff Depth>7.18"Subcatchment 1S:
Tc=6.0 min CN=98 Runoff=0.87 cfs 3,198 cf
Runoff Area=6,059 sf 100.00% Impervious Runoff Depth>7.18"Subcatchment 2S:
Tc=6.0 min CN=98 Runoff=0.99 cfs 3,624 cf
Peak Elev=4.88' Storage=729 cf Inflow=0.87 cfs 3,198 cfPond 1P: Basin A
Outflow=0.22 cfs 3,198 cf
Peak Elev=4.54' Storage=1,041 cf Inflow=0.99 cfs 3,624 cfPond 2P: Basin B
Outflow=0.20 cfs 3,624 cf
Total Runoff Area = 11,405 sf Runoff Volume = 6,822 cf Average Runoff Depth = 7.18"
0.00% Pervious = 0 sf 100.00% Impervious = 11,405 sf
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 100-Year Rainfall=7.42"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 18HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Subcatchment Area closer to Ocean St
Runoff = 0.87 cfs @ 12.09 hrs, Volume= 3,198 cf, Depth> 7.18"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 100-Year Rainfall=7.42"
Area (sf) CN Description
5,346 98 Paved parking, HSG A
5,346 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Subcatchment 2S: Subcatchment Area closer to Kalmus parking Lot
Runoff = 0.99 cfs @ 12.09 hrs, Volume= 3,624 cf, Depth> 7.18"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 100-Year Rainfall=7.42"
Area (sf) CN Description
6,059 98 Paved parking, HSG A
6,059 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Ditect Entry
Summary for Pond 1P: Basin A
Inflow Area = 5,346 sf,100.00% Impervious, Inflow Depth > 7.18" for 100-Year event
Inflow = 0.87 cfs @ 12.09 hrs, Volume= 3,198 cf
Outflow = 0.22 cfs @ 12.46 hrs, Volume= 3,198 cf, Atten= 75%, Lag= 22.2 min
Discarded = 0.22 cfs @ 12.46 hrs, Volume= 3,198 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.88' @ 12.46 hrs Surf.Area= 718 sf Storage= 729 cf
Plug-Flow detention time= 19.0 min calculated for 3,193 cf (100% of inflow)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 100-Year Rainfall=7.42"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 19HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Center-of-Mass det. time= 19.0 min ( 761.4 - 742.4 )
Volume Invert Avail.Storage Storage Description
#1 4.00' 368 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.60' 2,311 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
2,679 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 513 81.0 0 0 513
4.60 718 108.0 368 368 923
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.60 1,202 150.0 0 0 1,202
5.00 1,449 160.0 529 529 1,456
6.00 2,137 184.0 1,782 2,311 2,135
Device Routing Invert Outlet Devices
#1 Discarded 4.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.22 cfs @ 12.46 hrs HW=4.88' (Free Discharge)
1=Exfiltration ( Controls 0.22 cfs)
Summary for Pond 2P: Basin B
Inflow Area = 6,059 sf,100.00% Impervious, Inflow Depth > 7.18" for 100-Year event
Inflow = 0.99 cfs @ 12.09 hrs, Volume= 3,624 cf
Outflow = 0.20 cfs @ 12.51 hrs, Volume= 3,624 cf, Atten= 80%, Lag= 25.7 min
Discarded = 0.20 cfs @ 12.51 hrs, Volume= 3,624 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.54' @ 12.51 hrs Surf.Area= 568 sf Storage= 1,041 cf
Plug-Flow detention time= 35.9 min calculated for 3,624 cf (100% of inflow)
Center-of-Mass det. time= 35.9 min ( 778.3 - 742.4 )
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 100-Year Rainfall=7.42"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 20HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Volume Invert Avail.Storage Storage Description
#1 3.00' 377 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.00' 1,400 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
1,777 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 215 72.0 0 0 215
4.00 568 104.0 377 377 672
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 1,058 166.0 0 0 1,058
5.00 1,772 191.0 1,400 1,400 1,790
Device Routing Invert Outlet Devices
#1 Discarded 3.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.20 cfs @ 12.51 hrs HW=4.54' (Free Discharge)
1=Exfiltration ( Controls 0.20 cfs)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 7/16/2021Prepared by Town of Barnstable - DPW
Page 5HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 1P-N: Forebay 1A-(North)
Volume Invert Avail.Storage Storage Description
#1 4.00' 269 cf Custom Stage Data (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 148 54.0 0 0 148
5.00 412 79.0 269 269 421
Summary for Pond 1P-S: Forebay 1A (South)
Volume Invert Avail.Storage Storage Description
#1 4.00' 211 cf Custom Stage Data (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 112 42.0 0 0 112
5.00 330 67.0 211 211 336
Summary for Pond 2P-N: Forebay 2B-(North)
Volume Invert Avail.Storage Storage Description
#1 3.00' 125 cf Custom Stage Data (Irregular) Listed below (Recalc)
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 48 27.0 0 0 48
4.00 224 57.0 125 125 253
Summary for Pond 2P-S: Forebay 2B (South)
Volume Invert Avail.Storage Storage Description
#1 3.00' 177 cf Custom Stage Data (Irregular) Listed below (Recalc)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 7/16/2021Prepared by Town of Barnstable - DPW
Page 6HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 78 38.0 0 0 78
4.00 300 68.0 177 177 337
APPENDIX B Swale Stormwater Analysis within 100’ Wetland Buffer Zone
3S
5' wide and 10' long
Sidewalk
3P
Sidewalk Settling Area
Routing Diagram for POST
Prepared by Town Of Barnstable, Printed 2/6/2024
HydroCAD® 10.20-3g s/n 10994 © 2023 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
POST
Printed 2/6/2024Prepared by Town Of Barnstable
Page 2HydroCAD® 10.20-3g s/n 10994 © 2023 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(sq-ft)
Soil
Group
Subcatchment
Numbers
50 HSG A 3S
0 HSG B
0 HSG C
0 HSG D
0 Other
50 TOTAL AREA
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 2/6/2024Prepared by Town Of Barnstable
Page 3HydroCAD® 10.20-3g s/n 10994 © 2023 HydroCAD Software Solutions LLC
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=50 sf 100.00% Impervious Runoff Depth>5.68"Subcatchment 3S: 5' wide and 10' long
Tc=6.0 min CN=98 Runoff=0.01 cfs 24 cf
Peak Elev=100.28' Storage=3 cf Inflow=0.01 cfs 24 cfPond 3P: Sidewalk Settling Area
Outflow=0.00 cfs 24 cf
Total Runoff Area = 50 sf Runoff Volume = 24 cf Average Runoff Depth = 5.68"
0.00% Pervious = 0 sf 100.00% Impervious = 50 sf
Type III 24-hr 25-Year Rainfall=5.92"POST
Printed 2/6/2024Prepared by Town Of Barnstable
Page 4HydroCAD® 10.20-3g s/n 10994 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: 5' wide and 10' long Sidewalk
Runoff = 0.01 cfs @ 12.09 hrs, Volume= 24 cf, Depth> 5.68"
Routed to Pond 3P : Sidewalk Settling Area
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Type III 24-hr 25-Year Rainfall=5.92"
Area (sf) CN Description
50 98 Paved parking, HSG A
50 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Summary for Pond 3P: Sidewalk Settling Area
Inflow Area = 50 sf,100.00% Impervious, Inflow Depth > 5.68" for 25-Year event
Inflow = 0.01 cfs @ 12.09 hrs, Volume= 24 cf
Outflow = 0.00 cfs @ 12.20 hrs, Volume= 24 cf, Atten= 40%, Lag= 6.9 min
Discarded = 0.00 cfs @ 12.20 hrs, Volume= 24 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 100.28' @ 12.20 hrs Surf.Area= 19 sf Storage= 3 cf
Plug-Flow detention time= 4.1 min calculated for 24 cf (100% of inflow)
Center-of-Mass det. time= 4.1 min ( 749.5 - 745.4 )
Volume Invert Avail.Storage Storage Description
#1 100.00' 9 cf 10.00'L x 0.50'H V Shape Swale Z=3.0
Device Routing Invert Outlet Devices
#1 Discarded 100.00'8.270 in/hr Exfiltration over Wetted area
Discarded OutFlow Max=0.00 cfs @ 12.20 hrs HW=100.27' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.00 cfs)
APPENDIX C Post-Development Watershed Plans
HxP
LxP
LxP X6.36
X4.75 X4.82
1_SW_RT
2_SW_
R
T
X5.00
X7.48
X5.83X5.05 X5.78
PROP EROSION CONTROL
BARRIER (TYP)
PROP EROSION CONTROL
BARRIER/LIMIT OF GRUBBING
PROP
E
R
O
S
I
O
N
C
O
N
T
R
O
L
BARRI
E
R
/
L
I
M
I
T
O
F
G
R
U
B
B
I
N
G
5 X5.46X5.34
LIMIT OF
GRADINGSTORMWATER
INFILTRATION
BASIN A
74
4
45655
6
5
6
7
4
3
3
4
4
3INFIL. BASIN B
5
11'±13'±LIMIT OF GRADING
6
5X5.30 X5.21 X5.00 X5.20 X5.5
X5.18X5.15
5X5.22
X5.34
X5.01
X5.43 X5.29X5.27X5.24
X5.33 X5.30
SAWCUT LINE
SAWCUT LINE 55 5
EX. SLOPE= 0.6%±EX. SLOPE
= 1.0%±
FOREBAY OUTLET
ELEV.= 3.9
FOREBAY OUTLET
ELEV.= 4.6
PROP BIT.
LETDOWN CHANNEL
(TYP)
PROP
APRON/ RIP-RAP
PROP 4' x 8.5'
RIP-RAP
APRON
SAWCUT LINE
FOREBAY OUTLET
ELEV.= 3.8 5455X5.26
PROP TREE LINE/LIMIT
OF CLEARING (TYP)
PROP 4' x 5'
RIP-RAP
APRON
PROP 4' x 5'
RIP-RAP
APRON
PROP 4' x 2'
RIP-RAP APRON
666
77
8
8
7
77677 76
8 8OCEAN STREET
(PUBLIC - 33' WIDE)
KALMUS
PARKING
BEACH
LOT
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
PROP 6" DEEP
GRASSED
DRAINAGE DITCH
(TYP.)
W-1TOWN OF BARNSTABLEDepartment of Public WorksAdministration & Technical Support382 Falmouth Road, Hyannis, MA 02601Phone: (508) 790-6400https://townofbarnstable.usDRAWING TITLE
REVISIONS
NO.:DATE:COMMENTS:
5
DRAWING NOTES:
DRAWN BY:
SCALE:
SHEET NO.:
PROJECT NO:
DATE:
4
3
2
1
LAST SAVED BY:PRINTED:FILE PATH:ForOcean Street, HyannisFebruary 8, 2024Clini, NicolasE:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Drawings\Design\2019-10 Watershed.dwg100% DESIGN SET
Watershed
PlanProposed Sidewalk Extension1"=60'
NJC
2/9/2024
APPENDIX D TSS Calculations, Water Quality Volume Calculations, and Stormwater Recharge Calculations
Design Engineer:Job No.:2019.08
Project Name:Calc'd By:Miro
Location:Date:7/15/2021
BMP Removal Rate
Starting TSS
Load TSS Removed
Street Sweeping 5% 100.0% 5%
Sediment Forebay 0% 95.0% 0%
Infiltration Basin 80% 95.0% 76%
Total Removed 81%
Remaining Load
95.0%
95.0%
19.0%
TSS REMOVAL CALCULATION SHEET
Town of Barnstable - DPW
Ocean Street Sidewalk Extension Project
Hyannis, MA
Treatment Train to Discharge Area to Basin A & B
Ocean Street Sidewalk
Extension Project
Hyannis, MA 02601
Design Engineer:Job
No.:2019.08
Project Name:Calc'd
By:Miro
Location:Date:7/15/2021
(North paved swale)
2,934 sf
2,934 * 0.5" * (1/12)= 122 cf
142 cf in Sediment Forebay A
122.2 < 142
(South paved swale)
2,412 sf
2,412 * 0.5" * (1/12)= 100 cf
110 cf in Sediment Forebay A
100.5 < 110
(North paved swale)
2,473 sf
2,473 * 0.5" * (1/12)= 103 cf
142 cf in Sediment Forebay B
103 < 142
(South paved swale)
3,586 sf
3,586 * 0.5" * (1/12)= 149 cf
168 cf in Sediment Forebay B
149 < 168
6,520 sf
272 cf
310 cf
Total Volume Quality Required=
Total Volume Provided=
Town of Barnstable - DPW
Ocean Street Sidewalk Extension Project
Hyannis, MA
Subcatchment Area: 1S
Volume Required=
Subcatchment Area: 2S
Total Impervious Area on the Site=
Volume Required=
Volume Required=
Water Quality Volume is met
Total Impervious Area for the Subcatchment=
Water Quality Volume Required (Vwq)=
Volume Provided=
Water Quality Calulation Sheet
The required water quality treatment volume is calculated as follows:
Vwq = (Dwq)*(Aimp)
Vwq =Required Water Quality Volume
Dwq =Water Quality Depth * 0.5”
Aimp=Area of Impervious (less roof area)
Total Impervious Area for the Subcatchment=
Water Quality Volume Required (Vwq)=
Volume Provided=
Volume Required=Water Quality Volume is met
Subcatchment Area: 1S
Total Impervious Area for the Subcatchment=
Water Quality Volume Required (Vwq)=
Volume Provided=
Water Quality Volume is met
Water Quality Volume is met
Subcatchment Area: 2S
Total Impervious Area for the Subcatchment=
Water Quality Volume Required (Vwq)=
Volume Provided=
1 of 1
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 1-Year Rainfall=2.88"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 1HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 1P: Basin A
Inflow Area = 5,346 sf,100.00% Impervious, Inflow Depth = 2.65" for 1-Year event
Inflow = 0.33 cfs @ 12.09 hrs, Volume= 1,180 cf
Outflow = 0.14 cfs @ 12.29 hrs, Volume= 1,180 cf, Atten= 58%, Lag= 11.9 min
Discarded = 0.14 cfs @ 12.29 hrs, Volume= 1,180 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 4.28' @ 12.29 hrs Surf.Area= 603 sf Storage= 154 cf
Plug-Flow detention time= 5.9 min calculated for 1,178 cf (100% of inflow)
Center-of-Mass det. time= 5.9 min ( 764.6 - 758.7 )
Volume Invert Avail.Storage Storage Description
#1 4.00' 368 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.60' 2,311 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
2,679 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 513 81.0 0 0 513
4.60 718 108.0 368 368 923
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.60 1,202 150.0 0 0 1,202
5.00 1,449 160.0 529 529 1,456
6.00 2,137 184.0 1,782 2,311 2,135
Device Routing Invert Outlet Devices
#1 Discarded 4.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.14 cfs @ 12.29 hrs HW=4.28' (Free Discharge)
1=Exfiltration ( Controls 0.14 cfs)
E:\Engineer\Miro Jakubicka\_Projects\2019-8 Ocean Street- Sidewalk\Admin\Drainage Cal
Type III 24-hr 1-Year Rainfall=2.88"POST
Printed 8/10/2021Prepared by Town of Barnstable - DPW
Page 2HydroCAD® 10.00-25 s/n 10994 © 2019 HydroCAD Software Solutions LLC
Summary for Pond 2P: Basin B
Inflow Area = 6,059 sf,100.00% Impervious, Inflow Depth = 2.65" for 1-Year event
Inflow = 0.38 cfs @ 12.09 hrs, Volume= 1,337 cf
Outflow = 0.13 cfs @ 12.35 hrs, Volume= 1,337 cf, Atten= 64%, Lag= 15.7 min
Discarded = 0.13 cfs @ 12.35 hrs, Volume= 1,337 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 3.79' @ 12.35 hrs Surf.Area= 481 sf Storage= 268 cf
Plug-Flow detention time= 13.5 min calculated for 1,336 cf (100% of inflow)
Center-of-Mass det. time= 13.5 min ( 772.1 - 758.7 )
Volume Invert Avail.Storage Storage Description
#1 3.00' 377 cf Custom Stage Data (Irregular) Listed below (Recalc)
#2 4.00' 1,400 cf Custom Stage Data (Irregular) Listed below (Recalc) -Impervious
1,777 cf Total Available Storage
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
3.00 215 72.0 0 0 215
4.00 568 104.0 377 377 672
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
(feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
4.00 1,058 166.0 0 0 1,058
5.00 1,772 191.0 1,400 1,400 1,790
Device Routing Invert Outlet Devices
#1 Discarded 3.00'8.270 in/hr Exfiltration over Wetted area
Conductivity to Groundwater Elevation = 1.00'
Discarded OutFlow Max=0.13 cfs @ 12.35 hrs HW=3.79' (Free Discharge)
1=Exfiltration ( Controls 0.13 cfs)
APPENDIX E USGS Hydrologic Soil Report
Hydrologic Soil Group—Barnstable County, Massachusetts
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/12/2021
Page 1 of 446100004610100461020046103004610400461050046106004610700461080046109004611000461110046100004610100461020046103004610400461050046106004610700461080046109004611000393200393300393400393500393600393700393800
393200 393300 393400 393500 393600 393700 393800
41° 38' 40'' N 70° 16' 59'' W41° 38' 40'' N70° 16' 29'' W41° 38' 3'' N
70° 16' 59'' W41° 38' 3'' N
70° 16' 29'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 19N WGS84
0 150 300 600 900
Feet
0 45 90 180 270
Meters
Map Scale: 1:3,180 if printed on B portrait (11" x 17") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:25,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Barnstable County, Massachusetts
Survey Area Data: Version 17, Jun 9, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 10, 2018—Nov
17, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Barnstable County, Massachusetts
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/12/2021
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
14A Scitico silt loam, 0 to 3
percent slopes
C/D 2.5 2.4%
66A Ipswich - Pawcatuck -
Matunuck complex, 0
to 2 percent slopes,
very frequently
flooded
A/D 10.0 9.9%
252B Carver coarse sand, 3 to
8 percent slopes
A 50.0 49.4%
607 Water, saline 15.8 15.6%
610 Beaches, sand 15.8 15.6%
665 Udipsamments,
smoothed
7.1 7.0%
Totals for Area of Interest 101.1 100.0%
Hydrologic Soil Group—Barnstable County, Massachusetts
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/12/2021
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Barnstable County, Massachusetts
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/12/2021