HomeMy WebLinkAbout2024 05-17 ACG_DK BarnsConCom Request for X SE-5893 24-001 AVALON CONSULTING GROUP ▪ 41 Cal’s Court, Taunton, MA 02780 ▪ 508.880.2905 ▪ www.avaloncon.com May 17, 2024 Ms. Darcy Karle, Administrator Barnstable Conservation Commission 230 South Street Barnstable, MA 02601 Re: Request for Extension Permit Order of Conditions SE3-5893 379 Parker Road, Osterville, MA 2655 Assessors Map 115 Parcel 002 Project No. 24-001 Dear Commission Members: Enclosed please find nine (9) copies of Form E Extension Permit Request for Order of Conditions SE3-5893 submitted on behalf of the Wianno Club under the Massachusetts Wetlands Protection Act and the Town of Barnstable Wetlands Protection Bylaw for the above referenced property. This filing comprises: •This cover letter; •Form E, Extension Request Form; and a •Check in the amount of $125.00.00 as filing fee. The Wianno Club conducted the work described in the Order of Conditions in the winter of 2021/2022 and installed the required plantings in spring of 2022. The installation of the intake structure in Parker Pond was completed per plan, however the mitigation plantings were installed over a larger area than was proposed in the approved plans. The area in which the plantings were installed is not irrigated and there was a significant drought in the summer and early fall of 2022, during the period when they were becoming established. Based on our review in May 2024 some plants are thriving and some others may need replacing (see photos below). The button bush is alive, but not doing particularly well. Rather than replacing these three individuals with button bush, which prefers more water, we request that the Commission allow the planting of huckleberry (2 gallon) as a replacement. Barnstable Conservation Commission Wianno Extension Request SE3-5893 May 17, 2024 Page 2 AVALON CONSULTING GROUP ▪ 41 Cal’s Court, Taunton, MA 02780 ▪ 508.880.2905 ▪ www.avaloncon.com Photos of mitigation plantings taken May 14, 2024 Barnstable Conservation Commission Wianno Extension Request SE3-5893 May 17, 2024 Page 3 AVALON CONSULTING GROUP ▪ 41 Cal’s Court, Taunton, MA 02780 ▪ 508.880.2905 ▪ www.avaloncon.com The Wianno Club requests a 1-year extension to ensure that plantings are healthy, and replace those that are not, have the mitigation area surveyed, and prepare the Request for a Certificate of Compliance. We look forward to presenting this request to the Commission at your meeting on June 4, 2024. Please do not hesitate to contact me should you have any questions regarding this submittal. Sincerely, Avalon Consulting Group Kelly Durfee Cardoza Principal cc: MassDEP SERO Nick Connelly, Wianno Club Q:\Conservt\DEPFORMS\Form E.doc rev: 09/01/2022 1.Why is extension being requested? _Time to supplement mitigation plantings and provide compliance documentation. 2.What parts of project are completed? _Existing pumphouse rebuilt, cultec installed for infiltration of roof runoff, existing pipe removed, intake screen and piping installed, 10" Pine and 14" Deciduous Trees removed. Mitigation plantings include: 3 Cedar trees, 19 highbush blueberry, 30 flowering rasberry, 3 button bush, mitigation marking stones. The recharge area has been revegetated. __________________________________________________________________ 3.What parts of project are not completed? Include estimated completion date. Three button bush are not thriving. We propose to replace these with huckleberry. Other plants will be monitored and replaced this season if necessary. The mitigation area has not been surveyed. That work will be completed this summer. 4.Are completed parts of project in compliance with the approved plan and Order of Conditions ? __Installation was completed per plan, mitigation plantings were installed over a larger area and not all are thriving. 5.Have special conditions been met to date? Forms were submitted, survey work not completed. 6.How long is extension request for? _One (1) year___________________ 7.Are sediment controls in effective condition? _Erosion controls have been removed. 8.Have any previous Extension Permits been issued for this project? No When? Representative’ sSign ature Date Please submit this form, a cover letter, and a $ 125 check made payable to the Town of Barnstable. Also, prepare an additional eight collated sets for distribution to the commissioners. Town of Barnstable Conservation Commission 230 South Street Hyannis Massachusetts 02601 Office: 508-862-4093 E-mail: conservation@town.barnstable.ma.us FAX: 508-778-2412 Extension Permit Request SE3- 5893 OOC expiration date: 6/24/2024_ Applicant Name: _Wianno Club Project Location _379 Parker Road, Osterville__ Map: _115__ Parcel: __022____ Form E