Loading...
HomeMy WebLinkAboutEmail Revised Plan Mike Borselli_Proposed Access Stairs and Kayak Dock - 40 Bay RoadFrom: Mike Borselli <mike@falmouthengineering.com> Sent: Friday, June 7, 2024 12:58 PM To: Cavanaugh, Kimberly Cc: Karle, Darcy; Erica Borselli Subject: Proposed Access Stairs and Kayak Dock - 40 Bay Road Aachments: 22054DP sh 1 & 2 rev 6-7-24.pdf Hello Kim, Attached are revised plans for the above referenced property. As you know, the public hearing held on May 28th was continued to June 11th. The revised plans are in response to the initial comments raised at the public hearing and recent comments received by Division of Marine Fisheries. The plans were revised to shift the proposed access stairs and dock to the center of the frontage in response to Commission comments. In response to DMF comments, we offer the following: The plan was revised to adjust the separation from the bottom of the float to substrate from 1’ to 1.5’. No pressure treated piles are proposed. Only two 6” x 6” posts are proposed to be installed in the salt marsh. The area of these two posts is only 0.4 square feet. The proposed access stairs, and dock will provide access for passive recreational purposes. No motorized vessels are intended to use the dock. We trust these revised plans satisfy the Conservation Commission. We will present the revised plans at the continued public hearing. Best Regards, Michael J. Borselli, P.E. President Falmouth Engineering, Inc. 17 Academy Lane, Suite 200 Falmouth, MA 02540 508.495.1225 www.falmouthengineering.com