Loading...
HomeMy WebLinkAboutSub No. 829 -DPW - Engineering Review - Subdivision 829 Def Plan 6-10-24The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director MEMORANDUM To: Planning Board Via: Karen Pina, Principal Assistant, Planning & Development From: Matthew J. Wrobel, P.E., Senior Project Manager Cc: Griffin Beaudoin, P.E., Town Engineer Date: June 10, 2024 Subject: Review of Definitive Subdivision Application for Subdivision Number 829 We have completed a review of the application materials provided for the above referenced definitive subdivision application which included the following documents: · Form C dated 5-6-2024 · Plan Entitled “Definitive Subdivision Plan of Land on Old Stage Road and Parker Lane in Barnstable, MA. Relocation of Parker Lane On Proposed Lots 1 & 2”, prepared by Gallagher Engineering, dated 1-5-24. Referred to herein as “Plan”. · Waiver request letter prepared by Gallagher Engineer, dated May 6, 2024 · Drainage Report prepared by Gallagher Engineering, dated May 6, 2024 · Test Pit Letter from Gallagher Engineering, dated December 1, 2022. · Deed (Book 35606, Page 316) · Operations & Maintenance Plan, dated May 5, 2024. The aforementioned documents were reviewed for compliance with the Town of Barnstable Subdivision Regulations and best engineering practices. My comments on this application have been provided below. General 1. Per Section 801-5(D), maintenance, including snow plowing, will be the responsibility of the owners of the land within the subdivision. Engineering Department Review of Definitive Subdivision Application for Definitive Subdivision 829 Old Stage & Parker Lane Extension June 10, 2024 Page 2 2. The plan set does not identify the total area of site disturbance associated with constructing the extension of Parker Lane. The applicant should confirm if the proposal exceeds 1-acre of disturbance or is part of a larger common plan of development that will ultimately disturb an area equal to or greater than 1-acre, which would require filing a Stormwater Management Permit. A draft copy of the Stormwater Management Rules & Regulations can be found on The Town of Barnstable’s website at https://www.town.barnstable.ma.us/Departments/PublicWorks/Projects_and_Updates/St ormwater-Management-Regulations.asp. 3. A Road Opening/Trench Permit will need to be obtained prior to commencing construction. Plan Comments 1. Sight distances at the intersection of Old Stage Road and the extension of Parker Lane should be provided in accordance with §801-13-B to confirm access meets the standards of adequacy in §801-12-B. 2. The proposed right of way and roadway surface widths for Parker Lane should be labeled on the plan set to confirm the layout of the proposed road meets the standards of adequacy in §801-12-B. 3. Profiles and cross sections of the proposed roadway in accordance with §801-24-C(1 through 12) should be provided to confirm the grade of the proposed road meets the standards of adequacy in §801-12-B and design standards §801-26-B(5, 6, 8). 4. The existing condition plan’s date appears to include a typo (01-054-24) and should be corrected for clarity. 5. The definitive subdivision plan does not appear to include a legend as required by §801-24- B(1)(a). 6. The assessors map/parcel, subdivision total gross area, zoning districts/overlay districts, and zoning area/dimensional requirements are not located directly beneath the key map as required by §801-24-B(1)(b). 7. The engineer’s stamps in the title block do not include the certification date of the plans as required by §801-24-B(1)(c) and should be resubmitted with the certification date included. 8. The plans depict two lots labeled as “Lot 1”, lots associated with the definitive subdivision application need to be uniquely labeled and lots not associated with the application should be labeled as abutters. The plans should be revised for clarity of which lots are abutters, and which are part of the application. Engineering Department Review of Definitive Subdivision Application for Definitive Subdivision 829 Old Stage & Parker Lane Extension June 10, 2024 Page 3 9. Metes and bounds of the boundary line crossing the Parker Lane right of way should be depicted on the plan set per §801-24-B(1)(g). 10. Roadway classifications for Old Stage Road and Parker Lane and labels identify the presence of existing pavement should be added to the plan set per §801-24-B(1)(f). 11. The total number of linear feet measured along the proposed road’s center line and the gross area of proposed road should be provided beneath the key map per §801-24-B(2)(a). 12. The Massachusetts Plane Coordinate System coordinates of all property corners, lot corners, and street line changes in direction should be provided as required by §801-24-B(2)(c). 13. Road centerline stationing should be revised for consistency with §801-24-B(3)(d). 14. Two bench marks should be provided per §801-24-B(3)(e). 15. An erosion and sediment control plan was not provided and should be submitted as required by §801-24-B(3)(h) and §801-40. 16. Existing utility lines adjoining and within the subdivision are not depicted on the plan set as required by §801-24-B(3)(j). Plans should be revised and resubmitted accordingly to identify utilities including easements if required in accordance with §801-28-A. 17. Test pit data was provided within the drainage report, but the locations of the test pits were not shown on the plan set. The plan set should be revised to depict the location of test pits referenced in the drainage report. 18. The plan set does not appear to propose installation of monuments and should be revised to comply with §801-52. 19. Proposed gas, electric, telephone, and cable utilities are not depicted on the plan set, the plan set should be revised to depict utilities per §801-35-I through M. 20. The driveway for #1650 Old Stage Road should be relocated to Parker Lane upon completion of the proposed roadway in accordance with §801-26-10. 21. The proposed intersection of Old Stage Road and Parker Lane does not appear to comply with the geometric requirements of §801-26-B(3 & 4) and should be revised accordingly. Drainage Report Comments 1. Provided a watershed plan to identify and to confirm all contributing areas are accounted for. Per Section 801-27 “Calculations shall be made from the source of drainage runoff using topographic maps for the entire drainage area, including those areas outside the subdivision.” Engineering Department Review of Definitive Subdivision Application for Definitive Subdivision 829 Old Stage & Parker Lane Extension June 10, 2024 Page 4 2. The drainage report for the proposed conditions indicates lower total precipitation values than what is typically seen for this area. The applicant should revise the rainfall data to utilize NOAA Atlas 14 rainfall values, as this difference will impact all volume and peak elevations. 3. The peak elevations for each storm should be provided for both proposed leaching pits. Review of Waiver Requests It should be noted that the waiver requests shown on the plan set do not match the waiver requests listed on the Waiver Request letter. The applicant should confirm all waivers requested between the plan set and the Waiver Request letter and resubmit the letter including all applicable waiver requests. 1. 801-24.A.1(a)[13] Soil Borings: Test pit logs were provided for review in the application package and showed consistent soil type and depth to groundwater. However, the test pits were not shown on the plan set provided for review. It is recommended that one test pit be performed within the proposed roadway at the intersection of Parker Lane and Old Stage Road. Further, it is recommended that at least one test pit be performed at each drainage system location to at least 4’ below the proposed bottom of the infiltration system. 2. 801-24.A.1.(a)[16] Environmental Analysis Report: No objection to this request. However, the plan should provide a statement as to the location of the property relative to those areas defined in Section 801-24.B(3)(k). 3. 801-24.C Profile Sheet: We do not recommend a waiver of this requirement as there are fairly significant grades along the roadway which warrant a profile to confirm the proposed roadway meets the maximum slope requirements, meets vertical curve requirements, among others. 4. 801-24.E.(6-9) Review: No objection to this request. It was also noted that this request is not mentioned on the waiver request letter but is mentioned on the plan set. The applicant should clarify if this is a request waiver. 5. 801-24J.(5) Binder Course: No objection to this request. 6. 801-24N.(3)(a) Hydrant System: Defer to the Fire Chief’s recommendation. It was also noted that this request is not mentioned on the waiver request letter but is mentioned on the plan set. The applicant should clarify if this is a request waiver. 7. 801-27 Drainage: We do not recommend a waiver of all requirements within 801-27. Not all subsections are applicable to the stated reason for the waiver. The applicant should reference specific subsections that waivers are being requested from. Further comments on the drainage design and analysis have been provided above. 8. 801-27.C.(4) Drainage. 3:1 Slopes: No objection to this request. It was also noted that this request is not mentioned on the waiver request letter but is mentioned on the plan set. The applicant should clarify and resubmit the waiver request letter. Engineering Department Review of Definitive Subdivision Application for Definitive Subdivision 829 Old Stage & Parker Lane Extension June 10, 2024 Page 5 9. 801-27.C.(5) Catch Basins: No objection to this request. The applicant should clarify and resubmit the waiver request letter. 10. 801-29 – Sidewalks: No objection to this request. 11. 801-30 – Curbing and Berms: No objection to this request. 12. 801-41 – Drainage: Waiver not recommended. While a majority of the project features a drainage swale along the roadway, the project does incorporate a catch basin, piping and leaching structure which should be constructed in accordance with these requirements. 13. 801-44 – Roadway Foundation: The applicant has requested a waiver to allow a 9-inch gravel base. The standard cross section requires 12 inches of gravel base plus 3 inches of bituminous concrete. It is recommended that a minimum 12-inch gravel base be provided. If no asphalt is provided, it is recommended that the gravel cross section be increased to 15 inches. 14. 801-45 Roadway Surface: No objection to this request. 15. 801-46 – Sidewalks: See Comment 10. 16. 801-47– Curbing and Berms: See Comment 11. 17. 801-49 – Street Trees: No objection to this request, however, the board may wish to require deeded protection of certain areas of trees to maintain the rural character. 18. 801-52 Monuments: We do not recommend a waiver of this requirement. 19. Appendix A Minor Road B Cross Section: a. Right of way width 40 feet to allow 33 feet wide: No objection. b. Depth of gravel base: See comment 13. c. Roadway surface: See Comment 14. End of Memo