HomeMy WebLinkAbout1550 PHINNEY'S LANE - Health (2) 1
�� ' '* � , _
� ry y ..
--
��.������ �. ���a o
r �.
o � - � ��
- - - :
..
.. .
,;' - � i
� � L.
�.
;: , ,
�, ,�
. ,
..
;> ;, � . ,
t .
. x
,� .�
, .
..�
Ipm\4 'Ur ti \, I� Y� I !-\L.J�..�L.�.. . 1.4unsatisfactory-
�.��ru�r�r��:ry unvpt-`z:'�rurrn2 Printers
satisfacty 3.1 Auto..CodyShops
P'�ARD OF HEALT.I 4. Manufacturers
COMPANY (see"Orders") S. Retal.l Stores
6. Fuel Supo iers
ADDRESS , r;,,_,, a Class: L 7. Miscellaneous
QUANTITIES AND S70RAGE (IN-indoors; OUTwoutdoor
MAJOR MATERIALS Case lots Drums AbOveTanks Undeiground Tanks
IN JUT IN ottr I MIT 1 6 gellon Age
Fuels: _
Gasoline,, Jet Fuel (A)
�Diesel., Kerosene �2 B)
Heavy Oils:
- waste motor oil (C)
new motor oil (C)
transmission/hydraulic V
Synthetic Organics: N,
0 1 •s TJ �/tit f /r� r A (/ ! t \
. Miscellaneous: 1
A A)- �,
-- b-�--
DISPUSAL UMWA TUN REMI.RKS:
1. Sanitary Sewage 2. Water Supply . r
0 Town Sewer _
Public
_ -s Q :On ite Private
3. Tndoor Floor Drains: YES NO ;;; � .; r
[folding tankt, MUC
Catch basin/Dry well .
Un-site system —II1FI3EiiS:`-..___...�_._._.-.•- ---- ._ ._. .------++ 1 —
4. Outdoor Surface dirains:YES N(`
QfloldinL• tank: MUC I ; 1 -, , L. / f�f
O Catch basin/Dry well dirt
Q
On-site system
-e
Y - �' = - •—
S. Waste. Transporter - Licensed?
Name o�Hauler- ..-[��p -Waste Product ce ce
A
j -
e�
rr
arsons) nt.ery e e • .�-
Date
i
1
Registered Professional Engineers (617) 255-6511
Coastal Engineeringro.
inc.
•Civil&Architectural Engineering/Site/Foundation/Shore Protection/Sanitary• 260 Cranberry Highway
•Consultants for Structural Analysis, Protect Feasibility, Environmental
•Land Surveying.• Orleans, Mass. 02653
May 27 , 1987
Town of Barnstable
Board of Health
Town Offices
367 Main Street l i! - N.•Qi
Hyannis, MA 02601 We , /4/
Attention: Ms . Nancy Leitner
Dear Ms . Leitner:
This will confirm our telephone conversation of this date
regarding the fuel oil storage tank located at the Cape Cod Ready
Mix Plant off Phinney' s Lane, Hyannis, MA. While we intend to
comply with your .requirements to provide a containment structure
for the tank, we respectfully request a waiver of the 30 day
requirement for installation and cited in your inspection report
of May 13 , 1987 .
Due to. the present location of the tank, it will be necessary to
relocate it to enable the construction of a suitable containment
structure. It is our intention to empty the tank, construct a
containment structure, relocate the tank into this containment
structure and then refill the tank. All this would be
accomplished prior to the next heating season in the Fall . We
will not refill the tank until your office has approved the
facility provided.
This letter confirms your verbal permission to waive the 30 day
requirement cited in your report of 5/13/87 .
Very truly yours,
COASTAL ENGINEERING CO. ,INC .
W.J . Rowles, P.E .
WJR/ca
cc : John D: W. Joy