Inspection No.3-Wastewater Location Check page 1
Client: BFLR Architects Inc. Project Name: Sandy Neck
--- ----- - -- --
Inspector Joe_Henderson Project No: 6129
.
Inspection Date:__________02/22(2011 Arrival Time: 2;30 pm
Weather:-_____ --- _-- --$unny, 30_F Departure Time:--------------------------------
Group, 3:10pm
Horsley Witten
Inc.
Personnel on site: Terence Plan:'
Bill Smith,RBO New Bathhouse and Garage
Butch Eldredge,RBO Sandy Neck Beach
Mark,RBO Barnstable, MA
Date: July 23,2010
Contractor(s)equipment:
Excavator,Front End loader,Dump Truck
WORK OBSERVED:
Erosion Control ❑ Drainage ❑
Limit of Clearing/Clearing Clearing/Clearing Wastewater
Excavation/Fill/Compaction, ❑ Sidewalk ❑
Road Subbase ❑ Final Gradin ❑
Gravel Base ❑ Surface Stabilization ❑
Pavement/Binder Only ❑ Monuments ❑
Water ❑ Cleanu ❑
Gas/Electric/Telephone ❑ Other: ❑
Photos Taken_ Yes® No ❑
General Notes/Comments:
•A Site visit was conducted to check.the separation distance from the existing well to the proposed
wastewater system.
SITE WORK COMPLETED:
•The contractor has installed and partially backfilled the 7,000 gallon and 3,500 gallon septic
tanks. Pictures were taken during the tank installation by Rebecca Nickerson with the Town of
Barnstable.
Estimated Percent Complete: 15%complete on wastewater installation
WORK RECOMMENDED FOR ACCEPTANCE/ACTION ITEMS:
•The 161.5 setback distance from the existing well has been measured by the contractor and
marked on the pavement. Based on a field check of the measurements taken by the contractor,
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No.3-Wastewater Location Check page 2
the field appears to be located outside the 161.5 well setback,however,this is not a surveyed
confirmation that the field is located as shown on the design plans.
•The well building has been removed,allowing measurements to be taken from the well casing.
The measurements shown on the construction plans were conservatively taken from the closest
well building corner,as the well location was not shown on the existing conditions plan
provided by the Town. Based on measurements from the well,the field is approximately 4-feet
further away from the well than shown on the plans.
NEXT SCHEDULED INSPECTION:
•.Inspection of the Presby field'bottom'of excavation will likely be Wednesday afternoon(2/23)
2/22/2011
Inspector's signature: Date:
Distribution: Owner: John Juros John.Juros@town.bamstable.ma.us
Rebecca Nickerson Rebecca.Nickerson@town.bamstable.ma.us }
Town of Barnstable
Architect: Tim Sawyer Tim@capearchitects.com
Rick Fenuccio rick@capearchitects.com
BUR Architects,Inc.
Contractor: Ken Joudrey krjoudrey@robertbour.com
Robert B:Our kr
Other:
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives.Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 3-Wastewater Location Check page 3
PHOTOS:
it �•� � , r . V �_ « .s - .n '� .r'
. -•� _,'-ram w;- �°' .:. _ � s.Q�,� ��.�„�
Figure 1
7,000 Gallon and 3,500 Gallon Septic tanks installed
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
r
Inspection No.4-Wastewater Presby Leaching Field page 1
Client:________ BFLR ArchitectS,_Inc, Project Name:
_ J ......................Sandy Neck
Inspector: _______ ___ Joe_Henderson Project No____________ __________________________6129
Inspection Date: 02/24/2011 Arrival Time: _ _ 1:10_pm
-----
Weather_______________________Sunny_,_44_F Departure Time::____ ________ __ 1:45_pm
Horsley Witten
Group,Inc.
Personnel on site: Reference Plan:
Butch Eldredge,RBO New Bathhouse and Garage
Mark Curry,RBO Sandy Neck Beach
RBO work crew Barnstable, MA
Date: July 23,2010
Contractor(s)equipment:
Excavator,Front End loader,Dump Truck
WORK OBSERVED:
Erosion Control ❑ Drainage ❑
Limit of Clearing/Clearing Clearing/Clearing ❑ Wastewater
Excavation/Fill/Compaction ❑ Sidewalk ❑
Road Subbase ❑ Final Grading ❑
Gravel Base ❑ Surface Stabilization ❑
Pavement/Binder Only ❑ Monuments ❑
Water ❑ Cleanup
. ❑
Gas/Electric/Telephone, ❑ Other:
Photos Taken: Yes® No❑
General Notes/Comments:
•A Site visit was conducted to observe the installation of the northern Presby leaching field. The
Contractor plans to cover the leaching field prior to the rain expected.Friday (2/25/2011)
SITE WORK COMPLETED:
•The contractor has installed sections 1-4 of the Presby pipe and begun to install the piping from
the distribution box to the Presby field(Presby Field Revised Piping Sketch;-SK-5). The
contractor plans to install a portion of the piping to the distribution box and cap all inlet and vent
piping prior to the rain.
Estimated Percent Complete: 30%complete on wastewater installation
WORK RECOMMENDED FOR ACCEPTANCE/ACTION ITEMS:
•The.contractor proposes to install°and backfill sections 1-4 of the Presby system prior to installing
sections 5-8. Due to the close proximity of the limit of work,backfilling sections 1-4 will be
difficult with sections 5-8 installed;therefore,this procedure is acceptable.
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 '• Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 4-Wastewater Presby Leaching Field page 2
NEXT SCHEDULED INSPECTION:
•. Sections 5-8 of the Presby pipe should be inspected prior to backfill. This work is expected to
be complete Monday(2/28)or Tuesday(3/1). The contractor shall provide 24 hours notice_
prior to the scheduled inspection.
2/24/2011
Inspector's signature: Date:
Distribution: Owner: John Juros John.Juros@town.barnstable.ma.us
Rebecca Nickerson Rebecca.Nickerson@town.barnstable.ma.us
Town of Barnstable
Architect: Tim Sawyer Tim@capearchitects.com
Rick Fenuccio rick@capearchitects.com
BUR Architects,Inc.
Contractor: Ken Joudrey krjoudrey@robertbour.com
Robert B.Our
Other:
_i
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)212-1717 Fax:(401)437-8368
Inspection No.4-Wastewater Presby Leaching Field page 3
PHOTOS:
r�
l i
ip-
♦ t l' m A
Ad
Figure 1
Presby Field Installation
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
f
Inspection No. 5-Presby Field Inspection page I
Client:________ BFLR Architects Inc. Project Name_____ ________ __ Sandy Neck
MOml Inspector_________________________Tom Project No:________________________________------6129
NInspection Date: 02/28/2011 Arrival Time: 11:40_pm
Weather:._______ Rainy_,_Windy_,_40_F Departure Time_______ _________ 12 00_pm
Horsley Witten
Group,Inc.
Personnel on site: Reference Plan:
Mark Curry,RBO New Bathhouse and Garage
RBO work crew Sandy Neck Beach
Barnstable,MA
Contractor(s)equipment: Date: July 23,2010
Excavator
WORK OBSERVED:
Erosion Control ❑ Drainage ❑
Limit of Clearing/Clearing ❑ Wastewater
Excavation/Fill/Compaction ❑ Sidewalk ❑
Road Subbase ❑ Final Gradin ❑
Gravel Base ❑ Surface Stabilization ❑
Pavement/Binder Only ❑ Monuments ❑
Water ❑ Cleanu ❑
Gas/Electric/Telephone ❑ Other: ❑
Photos Taken_ Yes® No❑
General Notes/Comments:
•The contractor installed the second(southern)Presby leaching field as shown in the photos. The
spacing between Presby pipes seems to be equal. The schedule 40 PVC return pipes were
installed. The geotextiles fabric was installed in place. The contractor is backfilling the Presby
leaching field in the afternoon. The vent pipes will be installed later.
SITE WORK COMPLETED:
•The contractor has installed the second Presby pipe between sections 5 to 8 with the return
schedule 40 PVC elbow and pipes as shown in the revised Sketch, SK-5.
Estimated Percent Complete: 50%complete on wastewater installation
WORK RECOMMENDED FOR ACCEPTANCE/ACTION ITEMS:
•The layout of section 5 to 8 of the Presby leaching field was inspected before the backfill.
NEXT SCHEDULED INSPECTION:
•The contractor should notify the Engineer to inspect the entire system including vent pipes and .
clear water test. The contractor shall provide 24 hours advance notice prior to the next
inspection.
3/04/2011.
Inspector's signature: Date:
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 5-Presby Field Inspection page 2
Distribution: Owner: John Juros John.Juros@town.bamstable.ma.us
Rebecca Nickerson Rebecca.Nickerson@town.bamstable.ma.us
Town of Barnstable
Architect: Tim Sawyer Tim@capearchitects.com
Rick Fenuccio rick@capearchitects.com
BUR Architects,Inc.
Contractor: Ken Joudrey kr oudrey@robertbour.com
Robert B.Our
Other:
4
1
t
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 5-Presby Field Inspection page 3
PHOTOS:
-i
': •ka'`; Imo. .., -fir f. •,.,..
41
Figure 1
Presby Field Inlet
r
'i
}
Figure 2
Presby Field Overall
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
r
Inspection No. 6-Clear Water Test page 1 .
Client:_________BFLR_Arcfiitects Inc. Project Name: __ Sandy Neck
o
Inspector:_ ________ _Joe Henderson Project No_____ ________ ________ __________6129
Inspection Date: 03/02/2011 Arrival Time:_ 1:00_pm
` T Weather:_________Sunny_,_Windy,_45_F Departure Time______ ________ ___1 30_pm
Horsley Witten
Group,Inc.
Personnel on site: Reference Plan:
Mark Curry,RBO New Bathhouse and Garage
RBO work crew Sandy Neck Beach
Barnstable,MA
Contractor(s)equipment: Date: July 23,2010
Excavator
WORK OBSERVED:
Erosion Control ❑ Drainage ❑
Limit of Clearing/Clearing Clearing/Clearing Wastewater
Excavation/Fill/Compaction ❑ Sidewalk ❑
Road Subbase ❑ Final Grading ❑
Gravel Base ❑ Surface Stabilization ❑
Pavement/Binder Only ❑ Monuments ❑
Water ❑ Cleanup ❑
Gas/Electric/Telephone ❑ Other: El
Photos Taken_ Yes® No❑
General Notes/Comments:
•A clear water test in the distribution box was conducted.demonstrating of equal flow distribution
to the Presby leaching field.
SITE WORK COMPLETED:
•The contractor filled the distribution box with clean water and the flow out of the distribution box
to the Presby leaching field was observed. Speed levelers on the distribution box outlets were
installed and adjusted to ensure equal flow to the Presby leaching field.
•Additionally,risers are being installed on the 7,000 gallon septic tank and the gas baffle has been
installed on the tank outlet. Risers have been installed on the 3,500 gallon septic tank and the
Zabel filter has been installed at the outlet.
Estimated Percent Complete: 85%complete on wastewater installation
WORK RECOMMENDED FOR ACCEPTANCE/ACTION ITEMS:
• It appeared that there was equal flow from the distribution box to the Presby leaching field. The
contractor can now backfill the area around the leaching field and distribution box.
NEXT SCHEDULED INSPECTION:
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 6-Clear Water Test page 2
•A water tightness test on the 7,000 gallon and 3,500 gallon septic tank is required. The contractor
will fill up the septic tanks once the new water service to the building is.installed.
3/02/2011
Inspector's signature: Date:
Distribution: Owner: John Juros John.Juros@town.bamstable.ma.us
Rebecca Nickerson Rebecca.Nickerson@town.bamstable.ma.us
Town of Barnstable
Architect: Tim Sawyer Tim@capearchitects.com
Rick Fenuccio rick@capearchitects.com
BUR Architects,Inc.
Contractor: Ken Joudrey krjoudrey@robertbour.com
Robert B.Our
Other:
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
n t
Inspection No. 6-Clear Water Test page 3
PHOTOS:
-
r
�y ql t t
) F
e
d
�} L
❑�,. f[��' « F
�r. F k
a � A
lak"
Figure 1
11 Outlet Distribution Box with Speed Levelers
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburypoit,MA 01950 Phone:(978)499-0601 Fax:(978)49970602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
Inspection No. 6-Clear Water Test page 4
4.
� ram• �/µ
0 '
a
4.
-,t..
Figure 2 -
Septic Tanks with Risers
Horsley Witten Group,Inc.
90 Route 6A,Sandwich,MA 02563 Phone:(508)833-6600 Fax:(508)833-3150
30 Green Street,Newburyport,MA 01950 Phone:(978)499-0601 Fax:(978)499-0602
370 Ives Street,Providence,RI 02901 Phone:(401)272-1717 Fax:(401)437-8368
f
�OpTHE r, DATE:
FEE:
» BARNSTABLE,
9 MASS. a ��
i639 `0m REC. BY-2—M
Town of Barnstable
SCHED. DATE
Board of Health
200 Main Street, Hyannis MA-02601
Office: 508-862-4644 Wayne A.Miller,M.D.
FAX: 508-790-6304 Junichi Sawayanagi _
Paul J.Canniff,D.M.D.
VARIANCE REQUEST FORM
LOCATION
Property Address: S.&M K Wvit*- Rom) wa-s— 6a,R.MslrA.&L's , MA
Assessor's Map and Parcel Number: 7.43 L47 Size of Lot: 4000
Wetlands Within 300 Ft. Yes X Business Name: 'SAMW N%L @soma &n lis8
No Subdivision Name:.
APPLICANT'S NAME: Gam W. juyaS Phone fo,&•9Jq.JUL
Did the owner of the property authorize you to represent him or her? ' Yes No
PROPERTY OWNER'S NAME CONTACT PERSON
Name: TQWN OF UrL 17NI3tA Name: 'jamm M!. e1AaSg.41r4 DPW oFA
Address: J{ kkj Sr RY&NNOg MA Address: 8CO f jy-k,jGR9 WAR � J� aZ"f
Phone: Phone: Oft,
VARIANCE FROM REGULATION(List Reg.) REASON FOR VARIANCE(May attach if more space needed)
zZ.� .�4[t� �.vw•t�� VJ4 1.4 A UkS "AY(TNI cfita"f JS A"GANY coca ARaAL.
vajum wr-ft), 7b car Se-"yr»t a .oSab.
Wwft 5.,MIL IL ?o Sam• t-s'Jusiau�.ailtaPr±rrn-�►�Q„�
NATURE OF WORK: House Addition ❑ House Renovation ❑ Repair of Failed Septic System ❑
Checklist (to be completed by office staff-person receiving variance request application)
Please submit copies in 4 separate completed sets.
_ Four(4)copies of the completed variance request form
_ Four(4)copies of engineered plan submitted(e.g.septic system plans)
Completed seven(7)page checklist confirming review of engineered septic system plan by submitting engineer or registered sanitarian
Four(4)copies of labeled dimensional floor plans submitted(e.g.house plans or restaurant kitchen plans)
Signed letter stating that the property owner authorized you to represent him/her,for this request
Applicant understands that the abutters must be notified by certified mail at least ten days prior to meeting date at applicant's expense
(for Title V and/or local sewage regulation variances only)
_ Full menu submitted(for grease trap variance requests only)
Variance request application tee collected(no fee for lifeguard modification renewals,grease trap variance renewals(same owner/lessee only],
outside dining variance renewals(same owner/leasee only],and variances to repair failed sewage disposal systems[only if no expansion to the
building proposed]) "
Variance request submitted at least 15 days prior to meeting date
VARIANCE APPROVED �'�,Wa ne Miller,Chairman
'Mir"two" �� w y.
NOT APPROVED -g _ nichiSaivayanag'
REASON FOR DISAPPROVAL '
41
v y}
v..3.
C:.\cache\Temporary Internet Files\OLKAE\VARIREQ.DQC'"
MAiL-IN REQUESTS
Please mail the completed.variance application form to the address below. Also include four
copies of engineering plans; house plans, authorization letter, etc. (see check-list below). In
addition, please include the required fee amount (see fees at bottom of this page). Make
$95.00 check payable to: Town of Barnstable. Our mailing address is:
Town of Barnstable
Public Health Division
200 Main Street
Hyannis, MA 02601
Checklist
_ Four(4)copies of the completed variance request form
Four(4)copies of engineered plan submitted(e.g.septic system plans)
Completed seven:(7)page checklist confirming review'bf engineered septic system`plan-by"sub mitang engineeAor registered sanitarian
_ Four(4)copies'bf labeled"difri ii ionaPfloorplans'su6mr[ted(e.g.house plansroi restaurant Crtchen plans) y
Signed letter stating that the property owner authorized you to represent him/her for this request
_ Applicant undm.Wnds'that the-abater$must be notified by certified m'ail,ai least,ien`da}s prior to meeting date at applicant's expense(for
Title V and/or local sewage regulation variances only)
Full menu submitted(for grease trap,yariance requests only)
_ $95.00 variance request application fee(no fee for lifeguard modification renewals, grease trapvariance renewals [same owner/lessee only],
outside dining variance renewals[same owner/lessee only ,and variances to repair failed sewage disposal systems[only if no expansion to the
building proposoj,)
Variance request Submitted at least 15 days prior to meeting date
n
;..�r,>
y a'.y a G r• n'�� , �m :;EA.;.+ji L a. P a
w
v
:FOR FAXED REQUESTST w
a��.
Our fax number is (508)'796---630'4 "'Please fax a completed application form.
Alsa,,,you must'mall the jrequlr d r$95•,00 fie, Tease make therche k,°pa;�roble $o.,TTown of
., •
cheq.K, ] s�;be,.rnailed;5to th;c address listed above. In addition, please mail
four'`copies:,ofjenginee.red-+p•izins,,,,ho.use•.pla.n§o,'uthorization letter, etc. (see check-list below):
,J .1.F�' r.Y.4'h:�:C+ a a..,e r..xr:.iW +? ...>� •
Checklist
_ Four(4)copies of engineered plan submitted(e.g.septic system plans)
_ Completed seven(7)page checklist confirming review of engineered,septic system plan by the submitting engineer or registered sanitarian
_ Four(4)copies of labeled dimensional floor plans submitted(e.g.house plans or restaurant kitchen plans)
_ Signed letter stating that the property owner authorized you to represent him/her for this request
_ Applicant understands that the abutters must be notified by certified mail at least ten days prior to meeting date at applicant's expense(for Title
V and/or local sewage regulation variances only)
Full menu submitted(for grease trap variance requests only)
$95.00 variance request application fee (no fee for lifeguard modification renewals, grease.trap variance renewals [same owner/lessee only],
outside dining variance renewals [same owner/lessee only],and variances to repair failed sewage disposal systems[only if no expansion to the
building proposed])
Variance request submitted at least 15 days prior to meeting date
For further assistance on any item above, call (508) 862-4644
Back to Main Public Health Division Page
M
Tuesday,October 13,2009
10:59
Massachusetts Department of Environmental Protection - Drinking Water Program
BACTERIOLOGICAL REPORT
,arcs';"•1�s A CAYtC(1�`Sam IPeS1te YIii�fo"rmat�'Oon'sectons`1)�.
tIPWSr, DEP Col►formTSampl-ing Pao,hel com leten"the P,WS Informatton and DI;P ,pp
INFORMA' Y � �. „
p S D#; 4020023 PWS Name: Sandy Neck Beach City/Town: �y,� µ
dicertfied m thuds.„. L z
West B AS
�'""" '� . =Refer to: our IVIassDEP statefilab:certlficate,,•for prosper dLab MA�Cert#a'n _
III �ANALY�TICAL.INFQRMATION.� * .. Y ,�- �.. - �. -•�
' �6
Primary Lab MA Cert.# M-MA063 Primary Lab Name: Envirotech Laboratories,Inc. Subcontracted? N
Analysis Lab MA Cert.# M-MA063 Analysis Lab: Envirotech Laboratories,Inc.
Resubmit Indicator: Original Reason For Resubmission: Collection Date of Original Sample:
TC Method E.Coli Method Fecal Coliform HPC Method Lab Sample Notes:
COLITAG COLrrAG TEST
DEP APPROVED SAMPLE SITE INFORMATION �,T,OTAL ' E COI or ; 'CHLORINE t, RESULTfH� PC
COLIFORIvI'; FECAL r = 'RESULT i 4 +DA E" 1IME''" �� u•e ;: LSE k
:. �.... . h .. - , , •,:.DATE T]ME r `T re - rlIID#.
t. ,:z: �. "cf $,* r, -" ?t:' `" `w+,..,aw. w�:3+, 1,:Sr+,:,..: ,?
ryy A pPr_ x RRESULT?. "( RESULT #cfu/ml s ;^' �sr iW. :;
#,`,.: —
P..� ,i � ..ATION �, _ ,.: ,,,�:• ., � •u> r �'aN II '" }„� ^", �,M � .•a�� � ,t��'"�
SAMPLE LOC . • ;�
Typeia Code i� �' �r � _,�_ l�f ,. _" .. ar ,r .—_. ., �
RS 001 Pump House P A 10/8/2009 114:35 10/8/2009 116:30 Whitewater DEP-91357A
RS Snack Bar Sink P A 10/8/2009 14:45 10/8/2009 16:30 Whitewater DEP.-91357E
UK
r YotIR ,
J,
1 DEP Sample Type,Location code#and DEP approved Sample Site Location must correspond to the sample information on your DEP Total Coliform Sampling Plan.
2 SWTR systems:HPC samples shall be taken at the same distribution sites and at the same time as total coliform,whenever chlorine residual is not detected at the sample site.
3 Sample Type:RS-Routine Distribution Sample,RO-Original Site Repeat,UR-Upstream Repeat,DR-Downstream Repeat,AR-Additional Repeat,RW-Raw Water,PT-Plant Tap,SS-Special Samler—J
4 Report as#/100mL,P(present),A(absent),or Too Numberous To Count:TNTC-I(invalid)or TNTC-P(present),
5. Collected appropriate number of repeat samples within 24 hours of laboratory notification for coliform-positive or invalid samples. Notify DEP of any routine or repeat E.Coli or fecal positive results by the end of
the business day.
lacer:efiy�under penahties of law that,
amp the peso authors ed to fill and DagteAuthorized Signa a Ronald Saari
out ahas,form anda,the mformatzoncontamed herein zs true,accurate and
t .'rF n „ti2 '��
complete{to the best extent°of my knowledge DATE 10/9/2009
� r r
DEP Review Status: ❑Accepted ❑ Disapprove Review
Page I of I
Tuesday, October 13,2009
11:34
Massachusetts Department:of Environmental Protection -Drinking Water Program
BACTERIOLOGICAL REPORT
' ....._... -....,�.-. < .:. - ts...-.
„, a , ,u - A roved' am leSrte'Informat>ton:seetio_ns b'.
. PWSVINIFORMATION: yRefer to=.ou.r DEP CohformxSam hn <P.lan to hel .eom,lete the PWS,Information,and nEP v pp. .,, . .5.
PWS ID#• 14020023 I PWS Name: ISandyNeckBeach City/Town: lWest Barnstable MA 1 CLASS: JTNC
e cr'tified�methods:'
II�tANALYTICALINFQRMATION,.$:Refer,�to;,yourtMassDEP�state„lab certificate,.forrproper�La�bPMArC , _ �. :,._ .�.-- f- � • ,�� .-�,F--'
Primary Lab MA Cert.# M-MA063 Primary Lab Name: Envirotech Laboratories,Inc. Subcontracted? N
Analysis Lab MA Cert.# FM-MA70673 771.Analysis Lab: Envirotech Laboratories,Inc.
Resubmit Indicator: Original Reason For Resubmission: Collection Date of Original Sample:
TC Method E.Coli Method Fecal Coliform HPC Method
MF-SM9222B EC-MUG-SM 9221F Lab Sample Notes:
DEP APPROVED SAMPLE SITE INFORMATION , TOTALED' *E COLI or 'FIE0RINES HPC COLL�EC TI`ON "� ANALYSdSG "'"coLLECTEDk
COLIFORIv1FECAZ "RESULT e '"RESULT $ K_ -., _, :. "CBI'« SAMPLE, _}
DEP tV DE ; : . .' DATE "TIME DATE T.IIv1B. �.,...,_. k ,. DEP.A roved as :z: z. .
--<...�..�-._,. '.. PP.. ....,,4,5 o t,. ;. ,.,.r � ,:..s .yc, ;'-kG-
, RESULT.. ,r_, m #'cfu/rrtl,. a, «°
,Location .4e ...,, f,:.E .� M, *cxi, �fi! °h� '"S ���} ti1! .Y�'1.
.•a-...-
'� �d '�.,
�..,. . ,�
: ,.Type t 3 -lCode,1 ;.. -,.f.. •..,_ _.��.. .,,p,,:...,<,... g: 't -: {4 +' ii .err ,Y;
RO 001 Guard Shack Private Bathroo 23 0 10/9/2009 13:37 10/9/2009 15:45 Whitewater DEP-91369A
UR 002 Guard Shack Public Bath 89 0 10/9/2009 13:33 10/9/2009 15:45 Whitewater DEP-91369E
DR 003 Guard Shack Spigot 61 0 10/9/2009 13:45 . 10/9/2009 15:45 Whitewater. DEP-91369C
AR 004 Raw Water 97 0 10/9/2009 12:52 10/9/2009 15:45 Whitewater DEP-91369D
RO 005 Snack Bar Left Sink 104 0 10/9/2009 13:07 10/9/2009 15:45 Whitewater DEP-91369E
UR 006 Ladies-Rm. 42 0 10/9/2009 13:02 10/9/2009 15:45 lWhitewater DEP-91369F
DR 007 Men's Rm. 45 0 10/9/2009 13:19 10/9/2009 15:45 lWhitewater DEP-91369G
AR 008 Snack Bar Right Sink 35 0 10/9/2009 • 13:10 10/9/2009 15:45 lWhitewater DEP-91369H
- COPY °
DEP approved Sample Site Location must correspond to the sample information on our DEP Total Coliform Sampling Plan. FOR YON
1 DEP Sample Type,Location code#and D a v Y
S P YP , PP P P P
2 SWTR systems:HPC samples shall be taken at the same distribution sites and at the same time as total coliform,whenever chlorine residual is not detected at the sample site.
Repeat,AR-Additional Repeat,RW-Raw Water PT-Plant Ta SS-Special Sample.
3 Sample Type:RS Routine Distribution Sample,RO-Original Site Repeat,UR-Upstream Repeat,DR-Downstreamp p p, p p
4 Report as#/100mL,P(present),A(absent),or Too Numberous To Count:TNTC-I(invalid)or TNTC-P(present).
5 Collected appropriate number of repeat samples within 24 hours of laboratory notification for coliform-positive or invalid samples. Notify DEP of any routine or repeat E.Coli or fecal positive results.by the.end of
the business day. r
I cetifiy;underP ne ahtces of lawilhat I aimthe person authorized to fills; Laboratory Authorized Signa ure Ronald Saari
out this form and tl:e cnformation,,contamed herean rs true, accurate dnd Q, and Date
_P
l d CO
l to to th'e'best extenfo m knowe e r o/ y g ..
t a� DATE 10/10/2009
DEP Review Status: ❑Accepted ❑ Disapprove Review omments:
N f
Page I of I
DEPARTMENT OF ENVIRONMENTAL PROTECTION B
BACTERIOLOGICAL ANALYSIS REPORT-CONTAMINANT ID#3100
PWSID# PUBLIC WATER SYSTEM NAME TOWN/CITY LABORATORY NAME&ID#'
4020023 Sandy Neck Beach West Barnstable MA Premier Laboratory,LLC. M-CT008 _
DEP APPROVED SAMPLE SITE
SAME LAB. COLLECTION TYPE SAMP ID# COLLECTION ANALYSIS TCM TOT COLIFORM/ CH
FC/ECM FECAL-E.COLI/ LOR.RES.
CODE# LOCATION DATE TIME DATE CODE 100 mi— CODE# 100 MI—RS E7063791 001 Guard Shack-Mens Room 06/06/07 10:40 06/06/07 303 p OR HPC/ml SAMPLE COLLECTED BY:
John Aprea
RS E7063792 002 Snack Shack 06/06/07 10:50 06/06/07 303 p
John Aprea
nv
L13
Y�
SAMPLE TYPE KEY TOTAL COLIFORM 00 M
FECAL COLIFORM/ REMARKS: '
RS-ROUTINE SAMPLE METHOD(TCM) E.COLI METHOD
RO-ORIGINAL SITE REPEAT CODE#
UR-UPSTREAM REPEAT FC/ECM CODE#
MF 3 0 3 _ EC 4 0 0 -
DR-DOWNSTREAM REPEAT MTF 3 0 5 SWTR-MFC 4 0 1 SUBCONTRACTED LAB=APPLICBL
AR-ADD.REPEAT(DIST SYSTEM) P-A 3 0 7 raw water
RW-RAW WATER PG
3 0 9 MMO-MUG 4 0 6 ANALYZED BY
SS-SPECIAL 3 1 1 MMO-MEC-MU 4 0 8 DATE:6l7I2007
PT-PLANT TAP SAMPLE (LA
B USE
NA-MUG 4 1 0 � _- ( )
AUTHORIZED
BY:LAB ID#ASSIGNED BY STATE CERTIFICATION PROGRAM _ (LAB USE
)) DATE:6/7/2007
CAN BE EXPRESSED AS#/100ML,PRESENT(P),ABSENT(A),OR TOO NUMEROUS TO COUNT(TNTC)
COLISURE METHOD-THIS CAN DO TOTAL COLIFORM and E.COLI SIMULTANEOUSLY,HOWEVER THE SAMPLE MUST BE INCUBATED 28 TO
48 HOURS PAGE 1 OF 1
COPY1:COPY TO DEP REGIONAL OFFICE;COPY2:OWNER COPY;COPY3:LAB COPY
AC74BW
e
NEW SHED ROOF W/
A5PHALT SHINGLES
TO MATCH EXIST. -
(EX15T. 5HED ROOF
REMOVED)
EX15T. WDW. `" NEW AND. D.H. WDW5.
TO REMAIN 31"W. X 53" H.
LE
EX15T. W.C. SHINGLES
PATCHED AS REQ.
i
10_3` EX15T. DIM. 12'_4• EX15T. DIM.
PROPOSED LEI=T SIDE ELEVATION
SCALE 1/4" = 1'-0"
PROP05ED ALTERATIONS TO EXISTING
COTTAGE - SANDY NECK- BARN5TABLE,MA.
FOR:
/� /'
PETER ELEFTHERAKI5
REVISED NOV. 30,2006 .SCALP SCALE
FOR H.D.C. - SHED ROOF 1/4" _ ''-o" OCT. 19, 2000 .
PROP05ED REAR ELEVATION A
0 V E gD
DEC - 1 2006 -
BARNSTABLE CONSERVATION
NEW 5HED ROOF W/-
A5PHALT SHINGLES
TO MATCH EX15T. -
(EXIST. 5HED ROOF
REMOVED) NEW AND. 5KYLITE5
® 3'X 2'
EXIST. W.C. 5HINGLE5
PATCHED A5 REQ.
EXIST. WDW. ` ii ` EX15T. W.C. 5HINGLE5
TO REMAIN �' 1` PATCHED A5 REQ.
NEW AND. CASEMENT
EX15T. DOOR TO r -:1:•_... 53"W. X 47" H.
REMAIN
EX15T. DIM:
PROP05ED FRONT ELEVATION
SCALE 1/4" = I'-0"
PROPOSED ALTERATIONS TO EX15TING
COTTAGE - SANDY NECK- BARN5TA13LE,MA.
FOR:
PETER ELEFTHERAKI5
REVI5ED NOV. 30,2006 xALE SCALE
FOR H.D.C. 5HED ROOF 1/4" = I'-o" IOCT. 19, 2000 - 2
PROP05ED REAR ELEVATION A
1 '7 11D
NEW AND. 5KYLITE5
3'X 2'
J PATCH ROOF 5HINGLE5
A5 REQ. TO MATCH EX15T.
@ BOTH 5KYLITE5
EX15T. WDW.
TO REMAIN
22'-7• EXIST. DIM.
PROP05ED RIGHT SIDE ELEVATION
SCALE 114" = P-0"
PROP05ED ALTERATION5 TO EX15TING
COTTAGE - SANDY NECK-BARN5TABLE,MA.
FOR:
PETER ELEfThERAK15
REVISED NOV. 30,2000 5CALE SCALE
FOR. H.D.C. - SHED ROOF '/4" _ -O" OCT. I9, 2000 A-3
PROPO5ED REAR ELEVATION
NEW 5HED ROOF W/
A5PHALT 5HINGLE5
TO MATCH EX15T. -
(EX15T. 5HED ROOF
NEW AND. 5KYLITE5 REMOVED)
3'X 2'
EX15T. W.C. 5HINGLE5
}•;-'11 PATCHED A5 REQ.
EX15T. WDW.
TO REMAIN
NEW AND. D.H. WDW.
EX15T. DOOR
TO REMAIN a EX15T. W.C. SHINGLES
PATCHED A5 REQ.
5'-G'
EX15T. DIM. IG'-s'
PROPOSED REAR ELEVATION PROPOSED ALTERATION5 TO EXI5TING
COTTAGE - 5ANDY NECK- 13ARN5TABLE,MA.
SCALE 114" = 1'-0", FOR:
PETER ELEFTHERAKIS
REVI5ED NOV. 30,2006 SCALE SCALE
FOR H.D.C. - 5HED ROOF 1/4" _ ''-o" OCT. 19, 2000 A-4-
PROPOSED REAR ELEVATION
EXHIBer A i�'� / \. \ \ :, �— aPPuarENur<I1IT s� STANDARD LEGEND
• •_ /_/ �_ �/.'' \\ \\ \ \ / 1/ i /r NOTE not all Sym6ds rAl Opg14(on Pt1100 -
\
EM OF DEfl011MIS TMES
/ 1 ` ��� • /� _ �^---�-^ EXE OF BIWSH
% 10 N a•.\ \ / `�\ v'Y-v-9 EDWOF EONIFE6S TREES
/ ✓ f%�� `.� J } l \ 1 , a RAW AREA
EVU of wa*ss
DIRT ROAD
PARANB,LDT
PAYED ROAD
DRAINAGE OITM
0.25 -- - - - PA11S/T6T
�4�� AC*/r .
18` will —AM#
\\,�— •: ° �� \ f 21+---1PER
NO1w NUMBER
S. t ` ° \7fO � ''`�• i 2 IOW WNM LME
e �
R 10FOOTWI(WREWE
X4.9 SPOT ELEVATION
SIONEWALL
FEINT
701a:33.8-K \ - RUAND16WALL
RAIL ROAD
Tua
STONE JETTY
&) SMAIN6 POOL
mu/Oki
Map 283 Parcel 003 •, '`, ',\�\\\�-��� r� \ ruj 0 BUIIDIN6/STRUCTURE
C-4 Lot *23 ..` .. `,\\\�;\\\\`\ \,\\\\ (.t}�• ODa/P'IER
PAUL KELLY \\ �\ �\ e VAm o AlANIou
\
CrIA5901F .
TOWN OF DARNSTADLE 8E06RAPHIt INFORMATION SYSTEMS UNIT SIGNSTORMDRAN
I W E I11KR�Y11E •NOTE:Will my b on ww mw d o DATA SOIREES:Plalmlda( Imp*wn wgnw 4om I"s owd ozop kk 4 Tho Jmm a UHUIY 901E n TOWER
1'.100 5do alp o d may BDI awl W.Sorol T*vcood Ngito9o�i+on Tar d.Io•1919 0�61 Plmopopb bI6EUD
' : 0 25 50 Ad"d 1{cq Aoo w Smdmt as'fib 4ryomba k;1z appra t ad*10*e m UP*to ew 11dow No k=Cr vxIgT s 4 USHT I m o ElKili(a0E
1 IM01-59 HET• oalapodLlR a o smla d I'•IOD'.
1 z����6.
�-� 4 lUl�tG�v, <iU(`r�s' 1�' 1�' �� �l f'—�� j` � ICI
cc �
a.S'���— r
Q� ��� �� � �5,Q o 1 �� �. �e
t
..
� �
' �
: � .
, �
�,:j - -
►E#
__
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
20 RIVERSIDE DRIVE,LAKEVILLE,MA 02347 508-946-2700
MITT ROMNEY STEPHEN R.PRITCHARD
Governor 0 Secretary
KERRY HEALEY C1` ROBERT W.GOLLEDGE,Jr.
Lieutenant Governor Commissioner
June 30,2006
Mr. John C.Klimm,Town Manager RE: BARNSTABLE--Public Water Supply
Town of Barnstable Administrative-Consent Order
Town Hall Sandy Neck-Beachj
367 Main Street PWS ID#4020023
West Barnstable,Massachusetts 02668 ACO-SE-06-5D008
Dear Mr.Klimm:
Please find attached the following information:
A signed original Administrative Consent Order for your records.
Questions regarding the contents of the attached Order may be directed to Terry Martin,'
Department of Environmental Protection, 20 Riverside Drive, Lakeville, Massachusetts, (508) 946-
2765.
Ve tr flb yours,
David Y.Terry
Deputy Regional Director
Bureau of Resource Protection
T/TM/cb
Tmartin/ACOcoverfina106sandyneck.doc
YADWP ArchivelSERO\Bamstable-4020023-Enf6rcement-2006-06-30
CERTIFIED MAIL NO.7004 1350 0004 4566 1273
This information is available in alternate format.Call Donald M.Gomes,ADA Coordinator at 617-556-1057^3DD Service-1-800-298-2207.
MassDEP on the World Wide Web: hftp://www.mass.gov/dep
0 Printed on Recycled Paper
2
ecc: DEP/SERO cc: DEP-SERO
Shaun Walsh Regional Enforcement Office
Theresa Barao
Rich Gioiosa
Lee MacEachern - -
Brad Lacouture
cc: Barnstable Board of Health
f
M ' `
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS'
DEPARTMENT OF ENVIRONMENTAL PROTECTION
In the matter of:
Sandy Neck Beach Facility ) ACO-SE-06-5D008 '
West Barnstable ) f
{,fie
ADMINISTRATIVE CONSENT ORDER
I. THE PARTIES'
1. The Massachusetts Department of Environmental Protection("MassDEP") is a duly
constituted agency of the Commonwealth of Massachusetts established pursuant to
M.G.L. c. 21A, §7. MassDEP maintains its principal office at One Winter Street, Boston,
.Massachusetts 02108, and its Southeast.Regional Office at 20 Riverside Drive, Lakeville,
Massachusetts 02347.
2. The Town of Barnstable (the "Respondent") operates a town-owned beach facility
located off Sandy_Neck Road,West Barnstab e Massachusetts. The mailing address for
the Respondent is the Marine &Environmental Affairs Division, 1189 Phinney's Lane,
Centerville, Massachusetts, 02362, Attention: Nina Coleman. The Respondent operates a
concession stand and restroom facilities at Sandy Neck Beach.
II. STATEMENT OF FACTS AND LAW
3. MassDEP is responsible for the implementation and enforcement of M.G.L c. 111, § 159
et seq., 42 U.S.C. § 300f—300j (the Federal Safe Drinking Water Act), the Drinking
Water Regulations at 310 CMR 22.00;the Cross Connections,Distribution System
Protection Regulations at 310 CMR 22.22; and the Underground Injection Control
Regulations at 310 CMR 27.00. MassDEP has authority under M.G.L. c. 21A, §16, and
the Administrative Penalty Regulations at 310 CMR 5.00,to assess civil administrative
penalties to persons in noncompliance with the laws and regulations set forth above.
4. Respondent is operating an unapproved public water supply,pursuant to 310 CMR
22.0.0.
In the Matter of Sandy Neck
Beach Facility
ACO-SE-06-5D008
Page 2 of 7
5. The following facts and alleged violations have led MassDEP to issue this Consent
Order:
A. Since at least 1994, the Respondent has operated a concession stand and restrooms at
the Site. By providing water to an average of at least 25 individuals daily at least 60
days of the year,the Respondent owns and operates a public water system as that
term is defined in the Drinking Water Regulations at 310 CMR 22.02.
B. The Respondent's public water system has never received approval from MassDEP,
in violation of 310 CMR 22.03(1) and 310 CMR 22.04(1).
C. During a Site inspection on May 24, 2006, a MassDEP representative observed the
following non-water supply related activities writhin the Zone I of its well, in violation
of 310 CMR 22.21(3)(b): buildings, roadways and parking areas..
6. On May 24, 2006, representatives of the Respondent met with representatives of
MassDEP and presented its responses to the noncompliance matters identified in this
document.
III. DISPOSITION AND ORDER
For the reasons set forth above, MassDEP hereby issues, and the Respondent hereby consents to,
the following Order:
7. The parties have agreed to enter into this Consent Order because they agree that it is in
their own interests, and in the public interest,to proceed promptly with the actions called
for herein rather than to expend additional time and resources litigating the matters set
forth above. Respondent enters into this Consent Order without admitting or denying the
facts or allegations set forth herein. However, Respondent agrees not to contest such facts
and allegations for the purposes of the issuance or enforcement of this Consent Order.
8. MassDEP's authority to issue this Consent Order is conferred by the Statutes and
Regulations cited in Part II of this Consent Order. -
9. The Respondent shall operate its transient, non-community public water supply
under PWS ID #4020023 and shall take the following actions:
A. Within ninety (90) days of the effective date of this Consent Order,the Respondent'
shall:
t .
1. Sample the existing well for contaminants listed in the 2001 Guidelines and
Policies for Public Water Systems -Appendix A - Water Quality Testing
Requirements and report the results to MassDEP immediately upon receipt.
Contaminant testing shall include the following categories: bacteria, inorganic
eoinpounds,volatile organic compounds, secondary contaminants,radionuclides
In the Matter of Sandy Neck
Beach Facility
ACO-SE-06-5D008
Page 3 of 7
(including gross alpha, radium 226;radium 228, uranium and radon). The testin
shall be performed by a Massachusetts certified laboratory using approved g
methodology for each potable water contaminant, and the results submitted on
MassDEP water quality monitoring forms. The Respondent shall thereafter
sample water according to the protocols and sampling schedule that will be issued
by MassDEP after review of the initial sampling results.
2. In accordance with 310 CMR 22.11B, obtain a public water supply certified
operator of the appropriate grade and forward a copy of the contract (MassDEP
Certified Operator Compliance Notice) to MassDEP for review and approval.
The Respondent shall thereafter retain a certified water supply operator to operate
the public water supply system at the Facility at all times in compliance with the
Dunking Water Regulations. As an alternative, the system may apply to the
Board of Registration for temporary emergency certification
to low on-site
personnel to become certified within the prescribed time frame.The Department
must be notified if emergency certification is sought.
3. Submit a"Coliforin Sampling Plan"for MassDEP approval. f
4. Complete and submit the"Cross Connection Program Plan," "Request for
Authorization to Delegate, Subdelegate, Contract Or Subcontract Cross
Connection Responsibilities for Surveyors."
5. Have a cross connection survey conducted on the water system by a
Massachusetts certified cross connection surveyor and submit a cross connection
inspection report to MassDEP.
6. Install any cross connection control devices as identified by the cross ;
connection surveyor.
7. Install a water meter on the source, and record monthly water use on
Statistical Report form. _the Annual
8. Provide to MassDEP the construction specifications of the well w
depth, screen length etc.), if available. ( ell depth,pump
9. Record an Affidavit of Public Water Supply Status in the Registry of Deeds
(Appendix B of the Guidelines & Policies for Public Water Systems) and provide
MassDEP with a copy of said Affidavit with the recording information thereon.
B. The Respondent shall not increase water usage without prior written a r
MassDEP. pp oval of
10. Except as otherwise provided, all notices, submittals and other co
by this Consent Order shall be directed-to: mmunication required
I
In the Matter of Sandy Neck
Beach Facility
ACO-SE-06-5D008
Page 4 of 7
Terry Martin, Environmental Analyst
Massachusetts Department of Environmental Protection
20 Riverside Drive
Lakeville, Massachusetts 02347 .
Such notices, submittals and other communications shall be co Respondent upon receipt by the Department. nsidered delivered by
11• Actions required by this Consent Order shall be taken in accordance with a
ll
federal, state, and local laws, regulations and approvals. This Consent Order shall able
construed as,nor operate as, relieving the Respondent or any other person Order
of be
necessity of complying with all applicable federal, state, and local laws,aws, regulations gul ons and
12. For purposes of M.G.L. c. 21A, §16 and 310 CMR 5.00, this Consent
serve
a Notice of Noncompliance for the Respondent's noncompliance with the requirlements as
cited in Part II above. MassDEP hereby determines, and the Respondent hereby agrees,
that the deadlines set forth above constitute reaso
Respondent to take the actions described. nable periods of time for the
13. The Respondent understands and hereby waives its right to an adjudicatory
before MassDEP on, and judicial review of, the issuance and terms of this onsent Order
and to notice of any such rights of review. This waiver does not extend t
issued by MassDEP. o any other order
14. This Consent-Order may be modified only by written agreement
of the parries hereto.
15. The provisions of this Consent Order are severable, and if any provision of this Con
Order, or the application thereof, is held invalid, such invalidity shall not affect the sent
validity of other provisions of this Consent Order, or the application of such other
provisions, which can be given effect without
provided, however, that MassDEP shall have the discretionlrto void this Coovision or nsent
the event of any such invalidity. nsent Order in
16. Nothing in this Consent Order shall be construed or operate as barring, diminis
adjudicating or in any way affectin
any additional Order or g (i) any legal or equitable right of MassDEP togissue <
to seek any other relief with respect to the subject m
by this Consent Order, or(ii) any legal or equitable right of MaSBDEP t after covered
claim, action, suit, cause of action, or demand which MassDEP may have with ressue pect then
the subject matter covered by this Consent Order, including, p to
action to enforce this Consent Order in an administrative orr j dic al proceeding.any
Notwithstanding the foregoing,MassDEP agrees that it will not seek to assess the
Respondent civil administrative penalties beyond those described in this Consent Or
.-for`the viiol`dions identified in Part II above,provided that the Respondent der
P substantially
In the Matter of Sandy Neck
Beach Facility
ACO-SE-06-5D008 -
Page 5 of 7
satisfies the terms and conditions of this Consent Order and any approval issued
hereunder.
17. This Consent Order shall not be construed or operate as barring, diminishing,
adjudicating, or in any way affecting, any legal or equitable right of MassDEP with
respect to any subject matter not covered by this Consent Order.
18. This Consent Order shall be binding upon the Respondent and upon Respondent's heirs,
successors and assigns. Respondent shall not violate this Consent Order and shall not
allow or suffer Respondent's, employees, agents, contractors.or consultants to violate this
Consent Order. Until Respondent has fully complied with this Consent Order,
Respondent shall provide a copy of this Consenr:Order to each successor or assignee at
such time that any succession or assignment occurs.
19. Respondent shall pay stipulated civil administrative penalties to the Commonwealth in
accordance with the following schedule if the Respondent violates any provision of this
Consent Order:
For each day, or portion thereof, of each violation, the Respondent shall pay stipulated
civil administrative penalties to the Commonwealth as follows:
Period of Violation Penalty per day
1st through 15th day $ 100.00 per day
16th through 30t' day $ 500.00 per da
sc p Y
31 day and thereafter $1000.00 per day
Stipulated civil administrative penalties shall begin to accrue on the day a violation.
occurs and shall continue to accrue until the day the Respondent corrects the violation or
completes performance, whichever is applicable. Stipulated civil administrative penalties
shall accrue regardless of whether MassDEP has notified the Respondent of a violation or
.act of noncompliance. All stipulated civil administrative penalties accruing under this
Consent Order shall be paid within thirty(30) days of the date MassDEP sends the
Respondent a written demand for payment. If a court judgment is necessary to execute a
claim for stipulated penalties under this Consent Order, Respondent agrees to assent to
the entry of such judgment. If simultaneous violations occur, separate penalties shall
accrue for separate violations of this Consent Order. The payment of stipulated civil
administrative penalties shall not alter in any way the Respondent's obligation to
complete performance as required by this Consent Order. MassDEP reserves its right to
elect to pursue alternative remedies and alternative civil and criminal penalties which
maybe available by reason of the Respondent's failure to comply with the requirements
of this Consent Order. In the event the Department collects alternative civil
administrative penalties, Respondent shall not be required to pay stipulated civil
administrative penalties pursuant to this Consent Order for the same violations.
Respondent reserves whatever rights it may have to contest the Department's
ceetermination that Respondent failed`td-:66mply with the"Con"ent Order and/or to contest =-
In the Matter of Sandy Neck
Beach Facility _ y
ACO-SE-06-5D008
Page 6 of 7
the accuracy of the Department's calculation of the amount of the stipulated civil
administrative penalty.
20. The Respondent shall pay all civil administrative penalties due under this Consent Order,
including suspended and/or stipulated penalties, by certified check, cashier's check, or
money order payable to the Commonwealth of Massachusetts. The Respondent shall
clearly print on the face of its payment the Respondent's full name, the file number
appearing on the first page of this Consent Order ACO-SE-06-5D008, and the
Respondent's Federal Employer Identification Number, and shall mail it to:
Massachusetts Department of Environmental Protection
Commonwealth Master Lockbox _
P.O. Box 3982
Boston, Massachusetts 02241-3982
The Respondent shall simultaneously mail a copy of the payment to:
David Y. Terry,Deputy Regional Director
Massachusetts Department of Environmental Protection
20 Riverside Drive
Lakeville, Massachusetts 02347
In the event the Respondent fails to pay in full, any civil administrative penalty as
required by this Consent Order, then pursuant to M.G.L. c. 21A, § 16, Respondent shall
be liable to the Commonwealth for up to three (3) times the amount of the civil
administrative penalty, together with costs,plus interest on the balance due from the time.
such penalty became due and attorneys' fees, including all costs and attorneys' fees
incurred in the collection thereof. The rate of interest shall be the rate set forth in M.G.L.
c. 231, §6C. The Respondent shall not be deemed to have returned to compliance until
the Respondent pays all penalties due under this Consent Order and takes--all actions
required by this Consent Order.
21. Failure on the part of MassDEP to complain of any action or inaction on the part of
Respondent shall not constitute a waiver b Ma
ssDEP ssDEP of any of its rights under this
Consent Order. Further, no waiver by the Department of any provision of this Consent
Order shall be construed as a waiver of any other provision of this Consent Order.
22. The Respondent agrees to provide MassDEP, and MassDEP's employees, representatives
and contractors, access at all reasonable times to the Facility for purposes of conducting
any activity related to its oversight of this Consent Order. Notwithstanding any
provisions of this Consent Order, MassDEP retains all of its access authorities and rights
under applicable state and federal law.
In the Matter of Sandy Neck .
,Beach Facility
ACO-SE-06-51)008
Page 7 of 7
23. The undersigned representatives certify that they are fully authorized to enter into the
terms and conditions of this Consent Order and to legally bind the parties that they
represent.
24. This Consent Order shall become effective on the date that it is executed by MassDEP.
TOWN OF BARNSTABLE
SANDY NECK,BEACH FACILITY
By: Date:
- John C. Klimm, Town Manager "-
Federal Employer Identification No.
MASSAC ETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION
By: Date:
G y S M ran, egi al Director .
So th ast Regional Office
20 erside Drive
Lakeville,Massachusetts 02347
Telephone: (508) 946-2712