HomeMy WebLinkAbout6-12-20204- Revised Subdivision_stampedAPPLICANT
Beals and Thomas, Inc.
144 Turnpike Road
Southborough, Massachusetts 01772
Job No.: 3447.00
Plan No.: 344700P011C-001
Sheet 1 of 11
WinnDevelopment Company, LP
One Washington Mall, Suite 500
Boston, Massachusetts 02108
CIVIL ENGINEER/SURVEY AND
LANDSCAPE ARCHITECT
HYANNIS, MASSACHUSETTS
(Barnstable County)
IN
Scale: 1" = 2,000'
Locus Map
SHEET INDEX
Cover Sheet
Lotting Plan
Notes, References, and Legend
Topographic Plan
Site Plan
Roadway Plan and Profiles
Roadway Cross Sections
Site Details
307 MAIN STREET
DEFINITIVE SUBDIVISION PLAN
C1.0
C2.0
C3.0
C4.0
C5.0
C6.0
C7.0 - C7.3
LOCUS
OWNER
307 Main Street Nominee Trust, Conrad Watson, Trustee
42C Warehouse Road
Hyannis, Massachusetts 02601
DEFINITIVE SUBDIVISION PLAN - APRIL 11, 2024
Subdivision Number 828
REVISED PER TOWN COMMENTS - MAY 28, 2024
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
Boring
Sample
Elevation
(ft)
Sample
Depth
(ft)
Strata
USDA
Soil
Texture
Class
Corresponding
Rawls
Infiltration
Rate (in/hr)
B-1 +34.9 2.0 to
4.0 Fill Sand 8.27
B-4(OW)+33.5 2.0 to
4.0 Fill Sand 8.27
B-5(OW)+34.7 0.5 to
2.0 Fill Loamy
Sand 2.41
B-3(OW)+26.1 9.0 to
11.0
Glacial
Outwash Sand 8.27
B-4(OW)+29.5 6.0 to
8.0
Glacial
Outwash Sand 8.27
B-5(OW)+25.2 10.0 to
12.0
Glacial
Outwash Sand 8.27
B-6 +24.1 10.0 to
12.0
Glacial
Outwash
Loamy
Sand 2.41
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
EG=25.9FG=EG=33.1FG=26.55EG=34.3FG=27.79EG=36.9FG=29.65EG=36.4FG=32.07EG=36.4FG=34.26EG=36.0FG=29.55EG=34.5FG=27.60EG=25.4FG=25.36EG=25.8FG=25.78EG=26.1FG=26.10EG=26.1FG=26.06EG=26.7FG=26.68BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
(5'-0" [1524] MIN.)SOLIDS STORAGE SUMP
INLET PIPE, OPTIONAL
(IF PIPE IS REQUIRED,
INVERT IS 3" [76] HIGHER
THAN OUTLET INVERT)VARIES1'-3" [381] MIN.PLAN VIEW
TOP SLAB NOT SHOWN
SECTION A-A
12" [305]Ø
REMOVABLE
DROP TEE
FLOW
CONTRACTOR TO GROUT
TO FINISHED GRADE
GRADE RINGS/RISERS
(NOT PROVIDED BY CONTECH)
STORMCEPTOR
INSERT
PERMANENT
POOL ELEVATION
REMOVABLE
DROP TEE
HANDLE
1'-5" [432]1'-8" [508]WEIRA
A
4" [102]Ø
OUTLET
RISER
FLO
W
4" [102]Ø OIL
INSPECTION PIPE
(CAP OPTIONAL)
OUTLET PIPE
TOP SLAB ACCESS
(SEE FRAME AND
COVER DETAIL)
48" [1219]Ø I.D.
MANHOLE STRUCTURE+/-90°MAXBEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com
MC-7200 TECHNICAL SPECIFICATIONS
PART #STUB B C
MC7200IEPP06T 6" (150 mm)42.54" (1081 mm)---
MC7200IEPP06B ---0.86" (22 mm)
MC7200IEPP08T 8" (200 mm)40.50" (1029 mm)---
MC7200IEPP08B ---1.01" (26 mm)
MC7200IEPP10T 10" (250 mm)38.37" (975 mm)---
MC7200IEPP10B ---1.33" (34 mm)
MC7200IEPP12T 12" (300 mm)35.69" (907 mm)---
MC7200IEPP12B ---1.55" (39 mm)
MC7200IEPP15T 15" (375 mm)32.72" (831 mm)---
MC7200IEPP15B ---1.70" (43 mm)
MC7200IEPP18T
18" (450 mm)
29.36" (746 mm)---MC7200IEPP18TW
MC7200IEPP18B ---1.97" (50 mm)
MC7200IEPP18BW
MC7200IEPP24T
24" (600 mm)
23.05" (585 mm)---MC7200IEPP24TW
MC7200IEPP24B ---2.26" (57 mm)
MC7200IEPP24BW
MC7200IEPP30BW 30" (750 mm)---2.95" (75 mm)
MC7200IEPP36BW 36" (900 mm)---3.25" (83 mm)
MC7200IEPP42BW 42" (1050 mm)---3.55" (90 mm)
NOTE: ALL DIMENSIONS ARE NOMINAL
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)100.0" X 60.0" X 79.1" (2540 mm X 1524 mm X 2010 mm)
CHAMBER STORAGE 175.9 CUBIC FEET (4.98 m³)
MINIMUM INSTALLED STORAGE*267.3 CUBIC FEET (7.56 m³)
WEIGHT (NOMINAL)205 lbs.(92.9 kg)
NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)90.0" X 61.0" X 32.8" (2286 mm X 1549 mm X 833 mm)
END CAP STORAGE 39.5 CUBIC FEET (1.12 m³)
MINIMUM INSTALLED STORAGE*115.3 CUBIC FEET (3.26 m³)
WEIGHT (NOMINAL)90 lbs.(40.8 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS,
12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY.
PARTIAL CUT HOLES AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PARTIAL CUT HOLES AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"
B
C
83.4"
(2120 mm)
79.1"
(2010 mm)
INSTALLED
60.0"
(1524 mm)
100.0" (2540 mm)90.0" (2286 mm)
61.0"
(1549 mm)
32.8"
(833 mm)
INSTALLED
38.0"
(965 mm)
CUSTOM PREFABRICATED INVERTS
ARE AVAILABLE UPON REQUEST.
INVENTORIED MANIFOLDS INCLUDE
12-24" (300-600 mm) SIZE ON SIZE
AND 15-48" (375-1200 mm)
ECCENTRIC MANIFOLDS. CUSTOM
INVERT LOCATIONS ON THE MC-7200
END CAP CUT IN THE FIELD ARE NOT
RECOMMENDED FOR PIPE SIZES
GREATER THAN 10" (250 mm). THE
INVERT LOCATION IN COLUMN 'B'
ARE THE HIGHEST POSSIBLE FOR
THE PIPE SIZE.
UPPER JOINT
CORRUGATION
WEB
CREST
CREST
STIFFENING
RIB
VALLEY
STIFFENING RIB
BUILD ROW IN THIS DIRECTION
LOWER JOINT
CORRUGATION
FOOT
2
MC-7200 ISOLATOR ROW PLUS DETAIL
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
CATCH BASIN
OR MANHOLE
OPTIONAL INSPECTION PORT
MC-7200 END CAP
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE FACTORY PARTIAL CUT END CAP PART #:
MC7200IEPP24B OR MC7200IEPP24BW
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
COVER PIPE CONNECTION TO END CAP WITH ADS
GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE
ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
10.3' (3.1 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
ELEVATED BYPASS MANIFOLD
MC-7200 CHAMBER
INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE
PART #: MCFLAMP
3
MC-7200 CROSS SECTION DETAIL
ACCEPTABLE FILL MATERIALS: STORMTECH MC-7200 CHAMBER SYSTEMS
PLEASE NOTE:
1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
COMPACTION REQUIREMENTS.
4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5.WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
NOTES:
1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 60x101
2.MC-7200 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
5.REQUIREMENTS FOR HANDLING AND INSTALLATION:
·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”.
·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL
CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE
PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT
PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.
CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
SUBBASE MAY BE A PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR
PROCESSED AGGREGATE.
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS
LAYER.
AASHTO M145¹
A-1, A-2-4, A-3
OR
AASHTO M43¹
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER
THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN
12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR
PROCESSED AGGREGATE MATERIALS.
B
EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER
ABOVE.
CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹
3, 357, 4, 467, 5, 56, 57
A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹
3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
NO COMPACTION REQUIRED.
7.0'
(2.1 m)
MAX
24"
(600 mm) MIN*
12" (300 mm) MIN100" (2540 mm)
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND
CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
12" (300 mm) MIN
12" (300 mm) MIN 9"
(230 mm) MIN
D
C
B
A
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 30" (750 mm).
DEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 9" (230 mm) MIN
PERIMETER STONE
(SEE NOTE 4)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
MC-7200
END CAP
SUBGRADE SOILS
(SEE NOTE 3)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
60"
(1524 mm)
**THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
PLEASE SEE THE LAYOUT SHEET(S) FOR
PROJECT SPECIFIC REQUIREMENTS.
1
NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL
FOR A PROPER FIT IN END CAP OPENING.
12" (300 mm)
MIN SEPARATION
12" (300 mm) MIN INSERTION
12" (300 mm)
MIN SEPARATION
12" (300 mm)
MIN INSERTION
MC-SERIES END CAP INSERTION DETAIL
MANIFOLD HEADER
MANIFOLD STUB
STORMTECH END CAP
MANIFOLD HEADER
MANIFOLD STUB
6
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-7200
CHAMBER SYSTEM
1.STORMTECH MC-7200 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S
REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS.
2.STORMTECH MC-7200 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-7200
CONSTRUCTION GUIDE".
3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR EXCAVATOR SITUATED OVER THE CHAMBERS.
STORMTECH RECOMMENDS 3 BACKFILL METHODS:
·STONESHOOTER LOCATED OFF THE CHAMBER BED.
·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.
·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.
4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.
5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.
6.MAINTAIN MINIMUM - 9" (230 mm) SPACING BETWEEN THE CHAMBER ROWS.
7.INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS.
8.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING
THE AASHTO M43 DESIGNATION OF #3 OR #4.
9.STONE SHALL BE BROUGHT UP EVENLY AROUND CHAMBERS SO AS NOT TO DISTORT THE CHAMBER
SHAPE. STONE DEPTHS SHOULD NEVER DIFFER BY MORE THAN 12" (300 mm) BETWEEN ADJACENT
CHAMBER ROWS.
10.STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE
AND PRESERVE ROW SPACING.
11.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIAL BEARING
CAPACITIES TO THE SITE DESIGN ENGINEER.
12.ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS
TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE
RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT
1.STORMTECH MC-7200 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-7200
CONSTRUCTION GUIDE".
2.THE USE OF EQUIPMENT OVER MC-7200 CHAMBERS IS LIMITED:
·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.
·NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL
DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH MC-7200 CONSTRUCTION GUIDE".
·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-7200
CONSTRUCTION GUIDE".
3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP
TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO
CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP
AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT
LIMITS FOR CONSTRUCTION EQUIPMENT.
MC-7200 STORMTECH CHAMBER SPECIFICATIONS
1.CHAMBERS SHALL BE STORMTECH MC-7200.
2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED
POLYPROPYLENE COPOLYMERS.
3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR
POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER
CLASSIFICATION 60x101.
4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL
SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.
5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION
REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE
DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2)
SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT
AND MULTIPLE VEHICLE PRESENCES.
6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN
ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC
CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1)
INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT
(75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.
7.REQUIREMENTS FOR HANDLING AND INSTALLATION:
·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE
INTEGRAL, INTERLOCKING STACKING LUGS.
·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER
JOINT SHALL NOT BE LESS THAN 3”.
·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS
CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/IN/IN. THE ASC IS DEFINED IN SECTION
6.2.8 OF ASTM F2418 AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED
TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR
YELLOW COLORS.
8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON
REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A
STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS
FOLLOWS:
·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.
·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER
THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM
F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR
THERMOPLASTIC PIPE.
·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT
DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.
9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.
INSPECTION & MAINTENANCE
STEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A.INSPECTION PORTS (IF PRESENT)
A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG
A.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)
A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B.ALL ISOLATOR PLUS ROWS
B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS
B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE
i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY
ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS
A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED
B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C.VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
4" PVC INSPECTION PORT DETAIL (MC SERIES CHAMBER)
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY.
STORMTECH CHAMBER
4" (100 mm) INSERTA TEE
TO BE CENTERED ON CORRUGATION VALLEY
CONCRETE COLLAR
ASPHALT OVERLAY FOR
TRAFFIC APPLICATIONS
12" (300 mm) MIN WIDTH
8" (200 mm) MIN THICKNESS OF ASPHALT
OVERLAY AND CONCRETE COLLAR
8" NYLOPLAST UNIVERSAL DRAIN BODY
(PART# 2708AG4IPKIT) OR TRAFFIC RATED
BOX W/SOLID LOCKING COVER
CONCRETE COLLAR / ASPHALT OVERLAY
NOT REQUIRED FOR GREENSPACE OR
NON-TRAFFIC APPLICATIONS
4" (100 mm) SDR 35 PIPE
NYLOPLAST 8" LOCKING SOLID
COVER AND FRAME
4
UNDERDRAIN DETAIL
A
A
B B
SECTION A-A
SECTION B-B
NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS
6" (150 mm) TYP FOR SC-740, SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
OUTLET MANIFOLD
STORMTECH
END CAP
STORMTECH
CHAMBERS
STORMTECH
CHAMBER
STORMTECH
END CAP
DUAL WALL
PERFORATED
HDPE
UNDERDRAIN
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
FOUNDATION STONE
BENEATH CHAMBERS
FOUNDATION STONE
BENEATH CHAMBERS
5
GENERAL NOTES
1.CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
2.FOR SITE SPECIFIC DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED
SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com
3.STORMCEPTOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS
DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT.
4.STORMCEPTOR STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2' [610], AND GROUNDWATER
ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION.
CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITH THE CONTECH LOGO.
5.STORMCEPTOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C478 AND AASHTO LOAD FACTOR DESIGN METHOD.
6.ALTERNATE UNITS ARE SHOWN IN MILLIMETERS [mm].
INSTALLATION NOTES
A.ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE
SPECIFIED BY ENGINEER OF RECORD.
B.CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMCEPTOR MANHOLE
STRUCTURE.
C.CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE.
D.CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET PIPE(S). MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE
CENTERLINES TO MATCH PIPE OPENING CENTERLINES.
E.CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS
SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.
www.ContechES.com
®
FRAME AND COVER
(MAY VARY)
NOT TO SCALE
NOTE:
WATER QUALITY UNIT TO BE CONTECH STORMSCEPTOR 450i OR APPROVED EQUAL
BEALS AND THOMAS, INC.
144 Turnpike Road, Suite 210
Southborough, Massachusetts 01772-2104
T 508.366.0560 | www.bealsandthomas.com