Loading...
HomeMy WebLinkAboutStructural Engineer Letter MICHELE CUDILO, P.E. Consulting Structural Engineer 123 Cottonwood Lane • Centerville, Massachusetts 02632-1979 • (508) 737-8521 • mcudilo@comcast.net July 18, 2024 Richard Pereira, Building Inspector Town of Barnstable-Building Division 200 Main St. Hyannis, MA,02601 via email: ric hard.oereirana town.barnstab le.ma.us RE: STRUCTURAL REVIEW OF ZANINELI RESIDENCE CONSTRUCTION POST DEMO: 347 GREAT MARSH RD.,CENTERVILLE, MA Dear Richard, Please be advised that the above captioned project has been inspected on July 118, 2024 to review framing and foundation components. This office has inspected the first floor framing for structural integrity and safety,and finds them inadequate. Existing first floor joists are rotted and deteriorated at the sill over concrete and CIVIL)foundation walls.There are excessive bored plumbing penetrations and insect damage to the wood material. Further there is an area with a mid-span joist lap and no beam support below. The bottom of exterior walls atop the deteriorated joists is also deteriorated and insufficient to carry the 32'clear span roof truss loads. The existing first floor framing conditions are unsafe for modification as-is. Therefore,a demolition and rebuild is necessary to awry the intended loads. Drawing updates and details will be provided for this change of work. Sincerely � jN OF Moss Michele Cudilo, P.E. MICHELE yc /2024-49 o CUDILO rn STRUCTURAL y No 34774 9 90 FG/STS �Q ass/ONAL ENG��