HomeMy WebLinkAbout240820 RDA Bentley 71 South Street (Compiled) - No Check REQUEST for DETERMINATION of APPLICABILITY 71 South Street, Steamship Authority Hyannis Terminal Sewer System Pump Repair August 2024 PREPARED FOR: The Steamship Authority – Hyannis Terminal PO BOX 284 Woods Hole, MA 02536 PREPARED BY: Contents Cover Letter Request for Determination of Applicability Forms WPA Form 1 RDA Submittal Platform for WPA Form 1 (eDEP) Local Forms Project Signature Sheet – Form A-B Property Access Form Abutters Notification Vision Property Card Abutters Map Certified List of Abutters Notification to Abutters Directions to Site Project Narrative Attachments Attachment A – Locus Maps Figure 1 – USGS Topographic Map Figure 2 – Aerial Map Figures 3 & 3A – FEMA Flood Insurance Rate Maps Figure 4 – Constraints Map Figure 5 - Soils Figure 6 – Environmental Justice Communities Attachment B – Project Plans horsleywitten.com August 6, 2024 Barnstable Conservation Commission 367 Main Street Hyannis, MA 02601 Re: Request for Determination of Applicability Sewer System Pump Repair – Hyannis Terminal, Barnstable, Massachusetts Dear Members of the Conservation Commission: On behalf of the Applicant, The Steamship Authority (SSA), Horsley Witten Group, Inc. (HW) is filing the enclosed Request for Determination of Applicability (RDA) for the Sewer System Pump-out relocation at Hyannis Terminal located in Hyannis (Barnstable), Massachusetts. Currently, the vacuum pumps and associated control panel are located in below-grade vaults with the sewage storage tanks. The upgrade will relocate the vacuum pumps and control panel to an aboveground structure in the existing parking area. The Applicant is specifically seeking a negative Determination to allow this work to move forward under this RDA. Proposed activities will occur entirely within existing paved or landscaped areas. Portions of the activities will occur within the 100-foot Buffer Zone to Coastal Bank and all work will occur within Land Subject to Coastal Storm Flowage (LSCSF), jurisdictional areas under the Massachusetts Wetlands Protection Act (M.G.L. Ch 131 § 40) and the Town of Barnstable Wetlands Protection Bylaw (Chapter 237). Downgradient resource areas will be protected through the implementation of an erosion and sedimentation control barrier that will remain in place until all disturbed soils are stabilized. Details of the proposed project are provided on the project plans entitled, “71 South Street, Steamship Authority Hyannis, Barnstable, Massachusetts, Permitting Set,” dated August 5, 2024, prepared by HW in conjunction with GDG Consulting Engineers, Inc. Enclosed please find one original plus 8 copies of the RDA application materials, including project plans, project narrative, locus maps, and abutter materials. A check in the amount of $175.00, made payable to the Town of Barnstable, is enclosed to cover the RDA filing fees. A copy of this RDA has also been provided to the Massachusetts Department of Environmental Protection, Southeast Regional Office via eDEP. Barnstable Conservation Commission August 6, 2024 Page 2 of 2 H:\Projects\2023\23142 Steamship Hyannis Terminal\Permitting\RDA\sourcedoc\2_CoverLetter_Steamship_Hyannis_23142.docx Thank you in advance for reviewing this RDA. Should you have any questions, please do not hesitate to contact HW (508-833-6600). Sincerely, Horsley Witten Group, Inc. Amy M. Ball, PWS, CWS Senior Associate Enclosures cc: MassDEP, Southeast Regional Office Michael Bentley, The Steamship Authority Massachusetts Department of Environmental Protection eDEP Transaction Copy Here is the file you requested for your records. To retain a copy of this file you must save and/or print. Username: Transaction ID: Document: Size of File: Status of Transaction: Date and Time Created: Note: This file only includes forms that were part of your transaction as of the date and time indicated above. If you need a more current copy of your transaction, return to eDEP and select to “Download a Copy” from the Current Submittals page. 1756403 7/29/2024:10:39:35 AM 113.28K 90ROUTE6AEDEP Submittal Platform for WPA Form 1 - RDA In Process Massachusetts Department of Environmental Protection Bureau of Resource Protection­Wetlands Submittal Platform for WPA Form 1 ­ Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 BARNSTABLE City/ Town Revised: 07/19/2022 Page 1 of 1 A. General Information 1. Project Location: a. Street Address 71 SOUTH STREET b. City/Town BARNSTABLE c. State MA d. Zip Code 02601 e. Latitude 41.65097  N f. Longitude 70.27780  W  g. Map/Plat # 326 h. Parcel/Lot # 130 i. Project Description PUMPOUT REPAIR/RELOCATION 2. Applicant: a. First Name MICHAEL b. Last Name BENTLEY c. Organization THE STEAMSHIP AUTHORITY d. Mailing Address PO BOX 284 e. City/Town f. State MA g. Zip Code 02536 h. Phone Number 508­584­5011 i. Email mbentley@steamshipauthority.com 3. Property Owner: more than one owner a. First Name MICHAEL b. Last Name BENTLEY c. Organization THE STEAMSHIP AUTHORITY d. Mailing Address PO BOX 284 e. City/Town f. State MA g. Zip Code 02536 h. Phone Number 508­584­5011 i. Email mbentley@steamshipauthority.com WOODS HOLE WOODS HOLE wpaform1.doc • rev. //2023 WPA Form 1 – Request for Determination of Applicability • Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Water Resources - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Applicant: First Name Last Name Address City/Town State Zip Code Phone Number Email Address 2. Property Owner (if different from Applicant): First Name Last Name Address City/Town State Zip Code Phone Number Email Address (if known) 3. Representative (if any) First Name Last Name Company Name Address City/Town State Zip Code Phone Number Email Address (if known) B. Project Description 1. a. Project Location (use maps and plans to identify the location of the area subject to this request): Street Address City/Town How to find Latitude and Longitude Latitude (Decimal DegreeV Format with 5 digits after decimal e.g. XX.XXXXX) Longitude (Decimal DegreeV Format with 5 digits after decimal e.g. XX.XXXXX) and how to convert to decimal degrees Assessors’ Map Number Assessors’ Lot/Parcel Number c. Title Date Title Date Barnstable MICHAEL BENTLEY PO BOX 284 WOODS HOLE MA 02536 508-548-5001 AMY BALL HORSLEY WITTEN GROUP, INC. 90 ROUTE 6A, UNIT 1 SANDWICH MA 02563 508-833-6600 aball@horsleywitten.com 71 SOUTH STREET BARNSTABLE 41.65097 -70.27780 326 130 b.Area Description (use additional paper, if necessary): Plan and/or Map Reference(s): (use additional paper if necessary) 71 SOUTH STREET, STEAMSHIP AUTHORITY HYANNIS, BARNSTABLE, MA 8/05/2024 Situated in Barnstable Harbor, the property includes ferry terminals equipped with ticket counters, waiting areas, boarding maps, and facilities for passengers. The property houses administrative offices, operational facilities, and docking infrastructure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portion of the work is located within the 100-foot Buffer Zone to a Coastal Bank and within Land Subject to Coastal Storm Flowage. X X 5 August 2024 WOODS HOLE, MARTHA'S VINEYARD & WOODS HOLE, MARTHA'S VINEYARD & 27419 972I Account #241018 Bldg #1 of Card #of UTILITIESTOPO LOCATION CURRENT ASSESSM ENT Total 9720 9720 2,259,500 1,094,900 7 Waterfront 71 SOUTH STREET SUPPLEMENTAL DATA BK-VOL/PAGE SALE DATE PREVIOUS ASSESSM ENTS (HISTORY)RECORD OF OWNERSHIP OTHER ASSESSMENTS APPRAISED VALUE SUMMARY EXEMPTIONS Special Land Value 1,613,400 53,700 592,400 1,094,900NOTES BUILDING PERMIT RECORD LAND LINE VALUATION SECTION B 1 238,029.13 1,094,900 CURRENT OWNER SALE PRICEV/IQ/U Property Location Vision ID Map ID Bldg Name State Use Print Date Total STRT / ROAD VC VISIT / CHANGE HISTORY Sec # 3,354,400 3,354,400 Alt Prcl ID Split Zonin BID Parcel ResExpt Q #DL 1 #DL 2 Adj Unit Pric Land Value 91613 85926 9015 B33774 B33307 Permit Id Issue Date Year Code Description Amount Code Description Number Amount Comm Int 9720 9720 2023 2022 9720 9720 2,133,000 737,300 2021 1,541,000 737,300 592,400 Year Code Assessed Year Code Assessed Year Code Assessed 1,094,900 Appraised Bldg. Value (Card) Appraised Xf (B) Value (Bldg) Appraised Ob (B) Value (Bldg) Appraised Land Value (Bldg) 0 3,354,400Total Appraised Parcel Value Total Appraised Parcel Value 0.00 CodeDescription Appraised Assessed 2,259,500 1,094,900 Total This signature acknowledges a visit by a Data Collector or Assessor 2,870,700 9720 9720 9720 Total 2,259,500 995,400 Total 2,870,3003,254,900 1 1 31 3,354,400 1E D 0 0 IU U 08-26-20050210 0 20198 0 2/5/2024 8:47:10 PM 04-19-2006 08-08-2005 07-15-1995 05-01-1990 10-01-1989 Type OB OT NC CM CM Use Code 972I Trans Auth M96 Description HH Zone 0 Total Card Land Units AC4.60 GM TP JR PT GB IdDate 05-14-2020 05-05-2014 05-31-2009 05-24-2004 02-01-1996 Out Building Other New Constructi Commercial Commercial Description 2,500 76,800 1,000,000 12,000 159,000 05-31-2009 05-31-2009 02-01-1996 04-15-1991 100 100 100 100 100 06-30-2009 06-30-2009 01-01-1997 Amount Insp Date % Comp Date Comp Comments 16X32 PAVILLION-EXPIRED 2 CANOPIES NEW TERMINAL BLDG HY BLDG HY SCALE Parcel Total Land Area:4.60 Total Land Value 326/ 130/ / / 602/31 PLEASANT ST Plan Ref. Land Ct# #SR Life Estate PP STATU Assoc Pid# LOT 1A F_990309_2700345GIS ID PCL C EXEMPT EXM LAND 801 FY2024 BARNSTABLE, MA Type Purpost/Result FR 16 01 01 00 Field Review In Office Review Meas/Est Meas/Est Meas/Listed-Interior Acces CdIs 04 03 03 02 01 HYAN ASSESSING NEIGHBORHOOD Nbhd WF03 Nbhd Name B Tracing Batch VISION Valuation Method C WOODS HOLE, MARTHA'S VINEYAR NANTUCKET STEAMSHIP AUTHORIT BOX 284 MA 02543 Location AdjustmeNotesNhbd Adj 3.800 Nbhd. WF03 Cond. 1.00 Site Index 5 I. Factor 0.37391 Unit Price 176,344.00 Land Units AC4.600 Land Type LA 4 WOODS HOLE 27419 972I 241018 Bldg #1 Sec # of Card # of Dep % Ovr Dep Ovr Comment Misc Imp Ovr Misc Imp Ovr Comment Cost to Cure Ovr Element PAV1 BLK FNC3 FOP DKHD DKAV 71 SOUTH STREET Property Location Vision ID Account # Map ID Bldg Name State Use Print Date BAS FOP FUS Year Built Effective Year Built Depreciation Code Remodel Rating Year Remodeled Functional Obsol External Obsol Cd RCN CdElement CONSTRUCTION DETAIL (CONTINUED) MIXED USE Code PercentageDescription 100 0 0 972I Trans Auth M96 COST / MARKET VALUATION BUILDING SUB-AREA SUMMARY SECTION Cost to Cure Ovr Comment 1,600,800 Description 1,216,203 63,764 560,031 Undeprec Value 247.15 37.05 234.81 Unit Cost 4,921 1,721 2,385 4,921 0 2,385 First Floor Open Porch Upper Story Description CONSTRUCTION DETAIL OB - OUTBUILDING & YARD ITEMS(L) / XF - BUILDING EXTRA FEATURES(B) 87 9,0277,306Ttl Gross Liv / Lease Area G 2002 1995 1,839,997 13 0 0 1 1 1 Code 31 7,445 2/5/2024 8:47:11 PM Depreciation % Trend Factor Condition % Condition Percent Good RCNLD PAVING-ASPH Bulkheading FENCE-6' CHAI Open Porch-roo Dock-Heavy Dock-Ave 52 52 52 87 52 52 1995 1995 1995 2004 1995 1995 3.00 869.29 22.04 55.00 205000.0 100000.0 125,00 480 1,900 1,721 1 1 0.00 0.00 0.00 0.00 0.00 0.00 GradeCond. CdYr BltUnit PriceUnitsL/BDescription L L L B L L Grade Adj Appr. Value 195,000 217,000 21,800 53,700 106,600 52,000 Code Living Area Floor Area 4,921 258 2,266 Description % Good 326/ 130/ / / Style Model Grade Stories Occupancy Exterior Wall 1 Exterior Wall 2 Roof Structure Roof Cover Interior Wall 1 Interior Wall 2 Interior Floor 1 Interior Floor 2 Heating Fuel Heating Type AC Type Size Adj Tbl Total Rooms Bedrooms Full Bathrooms Bath Split Rms/Partitions Heat/AC Frame Type Baths/Plumbing Ceiling/Wall Common Wall Wall Height 1st Floor Use: Sewer Occupan Eff Area 1,839,998 Passenger Terml Commercial Custom Wood Shingle Gable/Hip Asph/F Gls/Cmp Plastered Carpet Vinyl/Asphalt Gas Hot Air Central TRANSPRT BOAT M96 0 Full-0 Half AVERAGE HEAT/AC PKGS WOOD FRAME AVERAGE SUS-CEIL & WL 0% 103 94 B 2 1.00 14 03 03 03 14 05 03 04 03 354I 00 0 00 02 01 02 02 05 00 14.00 905I WOODS HOLE, MARTHA'S VINEYARD & WOODS HOLE, MARTHA'S VINEYARD & 27419 972I Account #241018 Bldg #2 of Card #of UTILITIESTOPO LOCATION CURRENT ASSESSM ENT Total 9720 9720 2,259,500 1,094,900 7 Waterfront 71 SOUTH STREET SUPPLEMENTAL DATA BK-VOL/PAGE SALE DATE PREVIOUS ASSESSM ENTS (HISTORY)RECORD OF OWNERSHIP OTHER ASSESSMENTS APPRAISED VALUE SUMMARY EXEMPTIONS Special Land Value 1,613,400 53,700 592,400 1,094,900NOTES BUILDING PERMIT RECORD LAND LINE VALUATION SECTION B 2 0 0 CURRENT OWNER SALE PRICEV/IQ/U Property Location Vision ID Map ID Bldg Name State Use Print Date Total STRT / ROAD VC VISIT / CHANGE HISTORY Sec # 3,354,400 3,354,400 Alt Prcl ID Split Zonin BID Parcel ResExpt Q #DL 1 #DL 2 Adj Unit Pric Land Value Permit Id Issue Date Year Code Description Amount Code Description Number Amount Comm Int 9720 9720 2023 2022 9720 9720 2,133,000 737,300 2021 1,541,000 737,300 592,400 Year Code Assessed Year Code Assessed Year Code Assessed 1,094,900 Appraised Bldg. Value (Card) Appraised Xf (B) Value (Bldg) Appraised Ob (B) Value (Bldg) Appraised Land Value (Bldg) 0 3,354,400Total Appraised Parcel Value Total Appraised Parcel Value 0.00 CodeDescription Appraised Assessed 2,259,500 1,094,900 Total This signature acknowledges a visit by a Data Collector or Assessor 2,870,700 9720 9720 9720 Total 2,259,500 995,400 Total 2,870,3003,254,900 1 1 32 3,354,400 1E D 0 0 IU U 08-26-20050210 0 20198 0 2/5/2024 8:47:11 PM Type Use Code 972I Trans Auth M96 Description HH Zone 0 Total Card Land Units AC0.00 IdDateDescriptionAmountInsp Date % Comp Date Comp Comments Parcel Total Land Area:4.60 Total Land Value 326/ 130/ / / 602/31 PLEASANT ST Plan Ref. Land Ct# #SR Life Estate PP STATU Assoc Pid# LOT 1A F_990309_2700345GIS ID PCL C EXEMPT EXM LAND 801 FY2024 BARNSTABLE, MA Type Purpost/ResultCdIs HYAN ASSESSING NEIGHBORHOOD Nbhd WF03 Nbhd Name B Tracing Batch VISION Valuation Method C WOODS HOLE, MARTHA'S VINEYAR NANTUCKET STEAMSHIP AUTHORIT BOX 284 MA 02543 Location AdjustmeNotesNhbd Adj 3.800 Nbhd. WF03 Cond. 1.00 Site Index 5 I. Factor 1.00000 Unit Price 0.00 Land Units SF0 Land Type LA 4 WOODS HOLE 27419 972I 241018 Bldg #2 Sec # of Card # of Dep % Ovr Dep Ovr Comment Misc Imp Ovr Misc Imp Ovr Comment Cost to Cure Ovr Element 71 SOUTH STREET Property Location Vision ID Account # Map ID Bldg Name State Use Print Date BAS Year Built Effective Year Built Depreciation Code Remodel Rating Year Remodeled Functional Obsol External Obsol Cd RCN CdElement CONSTRUCTION DETAIL (CONTINUED) MIXED USE Code PercentageDescription 100 0 0 972I Trans Auth M96 COST / MARKET VALUATION BUILDING SUB-AREA SUMMARY SECTION Cost to Cure Ovr Comment 6,100 Description 7,311 Undeprec Value 45.70 Unit Cost 160160First Floor Description CONSTRUCTION DETAIL OB - OUTBUILDING & YARD ITEMS(L) / XF - BUILDING EXTRA FEATURES(B) 84 160160Ttl Gross Liv / Lease Area A 1998 1997 7,311 16 0 0 1 1 1 Code 32 160 2/5/2024 8:47:11 PM Depreciation % Trend Factor Condition % Condition Percent Good RCNLD GradeCond. CdYr BltUnit PriceUnitsL/BDescription Grade Adj Appr. Value Code Living Area Floor Area 160 Description % Good 326/ 130/ / / Style Model Grade Stories Occupancy Exterior Wall 1 Exterior Wall 2 Roof Structure Roof Cover Interior Wall 1 Interior Wall 2 Interior Floor 1 Interior Floor 2 Heating Fuel Heating Type AC Type Size Adj Tbl Total Rooms Bedrooms Full Bathrooms Bath Split Rms/Partitions Heat/AC Frame Type Baths/Plumbing Ceiling/Wall Common Wall Wall Height 1st Floor Use: Sewer Occupan Eff Area 7,311 Utility Bldg Commercial Average Wood Shingle Gable/Hip Asph/F Gls/Cmp Drywall Vinyl/Asphalt Electric Elec Baseboard None RECR OUTBLDG M94 HEAT ONLY WOOD FRAME NONE CEIL & WALLS 5% 118 94 C 1 1.00 14 03 03 05 05 04 07 01 3810 00 0 03 02 00 06 01 10.00 905I WOODS HOLE, MARTHA'S VINEYARD & WOODS HOLE, MARTHA'S VINEYARD & 27419 972I Account #241018 Bldg #3 of Card #of UTILITIESTOPO LOCATION CURRENT ASSESSM ENT Total 9720 9720 2,259,500 1,094,900 7 Waterfront 71 SOUTH STREET SUPPLEMENTAL DATA BK-VOL/PAGE SALE DATE PREVIOUS ASSESSM ENTS (HISTORY)RECORD OF OWNERSHIP OTHER ASSESSMENTS APPRAISED VALUE SUMMARY EXEMPTIONS Special Land Value 1,613,400 53,700 592,400 1,094,900NOTES BUILDING PERMIT RECORD LAND LINE VALUATION SECTION B 3 0 0 CURRENT OWNER SALE PRICEV/IQ/U Property Location Vision ID Map ID Bldg Name State Use Print Date Total STRT / ROAD VC VISIT / CHANGE HISTORY Sec # 3,354,400 3,354,400 Alt Prcl ID Split Zonin BID Parcel ResExpt Q #DL 1 #DL 2 Adj Unit Pric Land Value Permit Id Issue Date Year Code Description Amount Code Description Number Amount Comm Int 9720 9720 2023 2022 9720 9720 2,133,000 737,300 2021 1,541,000 737,300 592,400 Year Code Assessed Year Code Assessed Year Code Assessed 1,094,900 Appraised Bldg. Value (Card) Appraised Xf (B) Value (Bldg) Appraised Ob (B) Value (Bldg) Appraised Land Value (Bldg) 0 3,354,400Total Appraised Parcel Value Total Appraised Parcel Value 0.00 CodeDescription Appraised Assessed 2,259,500 1,094,900 Total This signature acknowledges a visit by a Data Collector or Assessor 2,870,700 9720 9720 9720 Total 2,259,500 995,400 Total 2,870,3003,254,900 1 1 33 3,354,400 1E D 0 0 IU U 08-26-20050210 0 20198 0 2/5/2024 8:47:12 PM Type Use Code 972I Trans Auth M96 Description HH Zone 0 Total Card Land Units AC0.00 IdDateDescriptionAmountInsp Date % Comp Date Comp Comments Parcel Total Land Area:4.60 Total Land Value 326/ 130/ / / 602/31 PLEASANT ST Plan Ref. Land Ct# #SR Life Estate PP STATU Assoc Pid# LOT 1A F_990309_2700345GIS ID PCL C EXEMPT EXM LAND 801 FY2024 BARNSTABLE, MA Type Purpost/ResultCdIs HYAN ASSESSING NEIGHBORHOOD Nbhd WF03 Nbhd Name B Tracing Batch VISION Valuation Method C WOODS HOLE, MARTHA'S VINEYAR NANTUCKET STEAMSHIP AUTHORIT BOX 284 MA 02543 Location AdjustmeNotesNhbd Adj 3.800 Nbhd. WF03 Cond. 1.00 Site Index 5 I. Factor 1.00000 Unit Price 0.00 Land Units SF0 Land Type LA 4 WOODS HOLE 27419 972I 241018 Bldg #3 Sec # of Card # of Dep % Ovr Dep Ovr Comment Misc Imp Ovr Misc Imp Ovr Comment Cost to Cure Ovr Element 71 SOUTH STREET Property Location Vision ID Account # Map ID Bldg Name State Use Print Date BAS Year Built Effective Year Built Depreciation Code Remodel Rating Year Remodeled Functional Obsol External Obsol Cd RCN CdElement CONSTRUCTION DETAIL (CONTINUED) MIXED USE Code PercentageDescription 100 0 0 972I Trans Auth M96 COST / MARKET VALUATION BUILDING SUB-AREA SUMMARY SECTION Cost to Cure Ovr Comment 6,500 Description 7,692 Undeprec Value 128.21 Unit Cost 6060First Floor Description CONSTRUCTION DETAIL OB - OUTBUILDING & YARD ITEMS(L) / XF - BUILDING EXTRA FEATURES(B) 84 6060Ttl Gross Liv / Lease Area A 1998 1997 7,692 16 0 0 1 1 1 Code 33 60 2/5/2024 8:47:12 PM Depreciation % Trend Factor Condition % Condition Percent Good RCNLD GradeCond. CdYr BltUnit PriceUnitsL/BDescription Grade Adj Appr. Value Code Living Area Floor Area 60 Description % Good 326/ 130/ / / Style Model Grade Stories Occupancy Exterior Wall 1 Exterior Wall 2 Roof Structure Roof Cover Interior Wall 1 Interior Wall 2 Interior Floor 1 Interior Floor 2 Heating Fuel Heating Type AC Type Size Adj Tbl Total Rooms Bedrooms Full Bathrooms Bath Split Rms/Partitions Heat/AC Frame Type Baths/Plumbing Ceiling/Wall Common Wall Wall Height 1st Floor Use: Sewer Occupan Eff Area 7,692 Guard House w/fixt Commercial Average Wood Shingle Gable/Hip Asph/F Gls/Cmp Drywall Vinyl/Asphalt Electric Elec Baseboard None RECR OUTBLDG M94 HEAT ONLY WOOD FRAME NONE CEIL & WALLS 5% 116 94 C 1 1.00 14 03 03 05 05 04 07 01 3810 00 0 03 02 00 06 01 10.00 905I 2,100.00 Conservation Request for Determination (RDA) Abutter Map for Subject Parcel This map is for illustration purposes only. It is not adequate for legal boundary determination or regulatory interpretation. This map does not represent an on-the-ground survey. It may be generalized, may not reflect current conditions, and may contain cartographic errors or omissions. Legend Property owners actually touching on the subject parcel upon which work is proposed. Parcel lines shown on this map are only graphic representations of Assessor’s tax parcels. They are not true property boundaries and do not represent accurate relationships to physical objects on the map such as building locations. 88 Town of Barnstable GIS Unit 175 7/29/2024 gis@town.barnstable.ma.us Printed on: 0 ft.175 Subject Parcel Abutters ft. 1 inch = approx. Parcels Town Boundary Railroad Tracks Buildings Approx. Building Buildings Parking Lots Paved Unpaved Roads Paved Road Unpaved Road Bridge Paved Median Water Bodies Conservation Request for Determination (RDA) Abutter List for Subject Parcel Property owners actually touching on the subject parcel upon which work is proposed. Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip 326125 SHOESTRING PROPERTIES LP 297 NORTH STREET HYANNIS 02601MA 326126 SKENDE, VICTOR F & BEVERLY F TRS VICTOR F SKENDE LIVING TRUST 77 SOUTH STREET HYANNIS 02601MA 326129 TULMAN, MICHAEL M TR 1 TELBIN DR SANDWICH 02563MA 326130 WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY BOX 284 WOODS HOLE 02543MA 326131 BARNSTABLE, TOWN OF (MUN)367 MAIN STREET HYANNIS 02601MA 326134 WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY PO BOX 284 WOODS HOLE 02543MA 7/29/2024 4:18 PMReport Generated On:Page 1 of 1 6Total Number of Abutters: This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to have this list certified. HYANNIS, MA 02601 326125 SHOESTRING PROPERTIES LP 297 NORTH STREET Property ID: 77 SOUTH STREET HYANNIS, MA 02601 326126 SKENDE, VICTOR F & BEVERLY F TRS VICTOR F SKENDE LIVING TRUST Property ID: SANDWICH, MA 02563 326129 TULMAN, MICHAEL M TR 1 TELBIN DR Property ID: BOX 284 WOODS HOLE, MA 02543 326130 WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY Property ID: HYANNIS, MA 02601 326131 BARNSTABLE, TOWN OF (MUN) 367 MAIN STREET Property ID: PO BOX 284 WOODS HOLE, MA 02543 326134 WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY Property ID: REQUEST FOR DETERMINATION OF APPLICABILITY ABUTTER NOTIFICATION LETTER DATE: RE: Upcoming Barnstable Conservation Commission Public Hearing To Whom It May Concern, As an immediate abutter of a proposed project, please be advised that a Request for Determination application has been filed with the Barnstable Conservation Commission. APPLICANT: PROJECT ADDRESS OR LOCATION: ASSESSOR’S MAP & PARCEL: MAP PARCEL PROJECT DESCRIPTION: APPLICANT’S AGENT: PUBLIC HEARING: WILL BE HELD REMOTELY VIA ZOOM See agenda posting on Town Clerks website available at least 48 hours in advance of the meeting for details. DATE: / / TIME: P.M. NOTE: Plans and applications describing the proposed activity are on file with the Conservation Commission at https://itlaserfiche.town.barnstable.ma.us/WebLink/Browse.aspx?id=825530&dbid=0&repo=TownOfBarns table, by email to Kimberly.Cavanaugh@town.barnstable.ma.us or by calling (508-862-4093) 20 6:30 08/06/2024 326 130 71 South Street, Barnstable, MA 02601 202408 Amy Ball, Horsley Witten Group, Inc 90 MA-6A #1 Sandwich, MA 02563 Michael Bentley, The Steamship Authority The Steamship Authority (SSA) is seeking to repair and relocate the existing sewer pumpout system at its 71 South Street terminal location. The existing sewage holding tanks for the terminal pump-out system are currently housed in below-grade chambers and are equipped with a vacuum pump-out system and sump pumps. The upgrade project involves repairing and relocating these systems to a new above- grade structure. This work will include associated electrical, HVAC, and piping modifications, particularly the connection of sump drains to the existing septic tank AdoptedMar Propertyo Applicant’ Projectst Barnstabl Applicant’ ACCESS AstheOw theMas General designate purposeo (Notice o possible, eitherwee understan toinspect I/we conf Commiss regarding 1. F ap 2. F of pr  Ihaverea  ________ Signature  ________ Represen rch15,2022,effec owner’sname ’s(Represent reetaddress_ eAssessor’s ’sContactPh TOPROPER wner(s)ofthe sachusettsW Ordinances edstaffarea ofreviewingt f Intent orR noticewillbe ekdaysorwe ndthatifattem ttheoutsidea firm my/our ioners, its ag thisapplicati romthesubm pprovalofthe romtheissua ftheprojecta roject. adtheabove ___________ eofproperty ___________ ntative’ssign  ctiveApril18,202 P e(s):_______ tative’s)Name ___________ Map&Parce honeNumber: RTYPERMIS eaboverefer WetlandsProt (Chapter 23 authorized,a theexistingc Request forD eprovidedtot eekendsasne mptstoconta areasofsaid understandin gent, and its onforthepe missionofthe eNoticeofInt anceoftheO andthefinal eandIunder ____________ yowner  ____________ nature  C Office:508- 2. Permission ___________ e(s)________ ____________ el: Map___ : SION rencedprope tectionAct(M 37), the Bar asamattero conditionsan Determination theapplicant ecessaryfort actmeareun propertyunde ng the purpo s designated riodasdescr eApplication tentRequest Order(s)ofCo inspectionby rstandanda __ __ TowConserv Hyann -862-4093  toAccessP ____________ ___________ ____________ _______ erty,I/wehave MGLCh131 rnstable Con oflaw,toente dthepropos )  to the Ba priortothev theCommiss nsuccessful,t erthisapplica ose of this d staff, to en ibedbelow: (NoticeofIn orRequestfo onditions(app ytheConser greetoallow  ____  Date  ____  Date wnofBavationC 230South nisMassach  E-mail:con Property ___________ ___________ ___________ Parcel___ ebeenadvis 1,Section40 nservation C ertheoutsid sedworkasd arnstable Con visit.Visitswil sionanditsag theCommiss ation. permissiona nter the outs ntentorRequ orDeterminat provalforNo rvationstaffto winspection ___________ esigned ___________ esigned arnstabCommi Street husetts0260 nservation@to ___________ ____________ ___________ _________  sedthatunde 0)andtheTo ommission, eareasofth describedin nservation Co loccurduring genttoexam sioneroritsa and I/we gra side areaso uestforDeter tion;and ticeofIntent) oconfirmthe sasdescrib ________ ________ bleission 01 own.barnstab  ___________ ___________ ____________ ertheprovisio ownofBarns its Agentso hepropertyfo my/ourapplic ommission.W gdaylighthou inesaidprop agentmaypro ant permissi of my/our pro rmination)un )tothecomp ecompletion bed.  ble.ma.us Form _____ ____ _____ onsof stable or its orthe cation Where urson perty.I oceed on to operty ntilthe pletion ofthe mPA 130326 71 South Street, Hyannis, MA 02601 The Steamship Authority 508-566-4009 Amy Ball 8/5/2024 5 August 2024 , Horsley Witten Group, Inc. Walking Directions from Town Hall Walking direction from 367 Main Street, Hyannis, MA 02601, Barnstable Town Hall to project site at The Steamship Authority, 71 South Street, Hyannis, MA 02601. Starting at Barnstable Town Hall head southwest on Main Street, turn left onto South Street, continue straight, and arrive at 71 South Street. Project Narrative i Request for Determination of Applicability 71 South Street, Steamship Authority Hyannis Terminal , Barnstable, MA August 2024 Table of Contents 1.0 PROJECT BACKGROUND ......................................................................................................... 1 2.0 GENERAL SITE DESCRIPTION .................................................................................................. 1 2.1 FEMA Designation ..................................................................................................................... 1 2.2 State-listed Rare Species Habitat .............................................................................................. 1 2.3 Coastal Resource Areas ............................................................................................................. 2 3.0 PROJECT DESCRIPTION ........................................................................................................... 2 4.0 PROTECTION OF RESOURCE AREA INTERESTS ....................................................................... 3 4.1 Erosion and Sedimentation Control .......................................................................................... 3 ATTACHMENTS Attachment A – Figures Figure 1 – USGS Locus Figure 2 – Aerial Photo Figures 3 & 3A – FEMA Flood Zone Maps Figure 4 – Environmental Constraints Figure 5 - Soils Figure 6 –Environmental Justice Communities Attachment B – Project Plans “71 South Street, Steamship Authority Hyannis, Barnstable, Massachusetts,” prepared by Horsley Witten Group, Inc. and GGD Consulting Engineers, Inc., dated August 2024. Request for Determination of Applicability Horsley Witten Group, Inc. 71 South Street, Steamship Authority Hyannis August 2024 Page 1 of 3 Request for Determination of Applicability 71 South Street, Steamship Authority Hyannis Terminal, Barnstable, MA 1.0 PROJECT BACKGROUND The Steamship Authority (SSA) is seeking to repair and relocate the existing sewer pump out system at its 71 South Street terminal location. The existing sewage holding tanks for the terminal pump-out system are currently housed in below-grade chambers and are equipped with a vacuum pump-out system and sump pumps. The upgrade project involves repairing and relocating these systems to a new above-grade structure. This work will include associated electrical, HVAC, and piping modifications, particularly the connection of sump drains to the existing septic tank The Applicant is specifically seeking to perform this work under a negative Determination of Applicability. 2.0 GENERAL SITE DESCRIPTION The project site is comprised of a single parcel located at 71 South Street (7-E-1), in Hyannis, Barnstable, Massachusetts (Attachment A, Figures 1 and 2). The site is bounded by Hyannis Harbor to the south, Pleasant Street to the west, School Street and Hyannis Harbor to the east, and South Street to the north. A regulatory Coastal Bank is located to the southeast of the project site. The entire site is within Land Subject to Coastal Storm Flowage (LSCSF). The site is covered by impervious surfaces, including buildings, parking lots, and drive aisles adjacent to and associated with the SSA loading dock. 2.1 FEMA Designation The current FEMA Flood Insurance Rate Maps (Community Panel Number 25001C0569J, effective July 16, 2014) shows that the majority of the site is located in Zone AE (elevation 12 feet), an area which has a 1% Annual Chance of Flooding (Attachment A, Figure 3). 2.2 State-listed Rare Species Habitat According to the most recent version of the Massachusetts Natural Heritage Atlas (15th Edition, August 1, 2021), the project site does not occur within areas of Estimated Habitat of Rare Wildlife and/or Priority Habitat of Rare Species located at the site, as designated by the Massachusetts Natural Heritage and Endangered Species Program (NHESP) (Attachment A, Figure 4). Request for Determination of Applicability Horsley Witten Group, Inc. 71 South Street, Steamship Authority Hyannis August 2024 Page 2 of 3 2.3 Coastal Resource Areas Coastal resource areas associated with the site include LSCSCF as noted above, and Coastal Bank. Coastal Bank is defined at 310 CMR 10.30(2) as the seaward face or side of any elevated landform, other than a coastal dune, which lies at the landward edge of a coastal beach, land subject to tidal action, or other wetland. The Coastal Bank is located on the southern and eastern side of the parcel along the reinforced embankments of the harbor. The 100-foot Buffer Zone as estimated from the topographic break along the top of the Coastal Bank consists of impervious surfaces including parking lots, roads, and buildings. The coastal resource areas and their associated buffer zones on the property are protected and regulated under the Massachusetts Wetlands Protection Act (M.G.L. Ch 131 § 40) and the Town of Barnstable Wetlands By-law Regulations (Chapter 237). Given the limited nature of the project within an existing paved parking lot, an on-site resource area assessment was not performed. According to available source data in MassGIS, the closest resource area to the project site is a Coastal Bank located along the shoreline; the FEMA maps indicate that the entire site is located within LSCSF. 3.0 PROJECT DESCRIPTION The proposed project involves upgrading and relocating the existing vacuum pump and control panel system The upgrade will involve relocating these components from their current below - grade vaults, where they are situated with the sewage storage tanks, to a new above -ground structure within one of the grassed islands in the existing parking area. This new above-ground shed, measuring 140 square feet (SF), will be positioned approximately 50 feet west of the existing below-grade chambers and elevated approximately eight inches above grade. The vacuum pump and control panel system are used to pump sewage from boats into underground storage tanks. The sewage is then transferred into the Town sewer system, which ensures environmentally responsible treatment and management of waste, preventing any negative impact on the local community and marine environment. The total limit of work for this project encompasses approximately 5,315 SF; only 140 SF will be permanently disturbed for the placement of the new pump -out shed. The remaining 5,175 SF will be temporarily disturbed during the establishment of the underground electrical connections where existing pavement will be saw cut and replaced once the conduit work is complete. Some of the temporary alterations will occur within the outer portion (50-100 feet) of the 100-foot Buffer Zone to the Coastal Bank and all work will occur within LSCSF. The Request for Determination of Applicability Horsley Witten Group, Inc. 71 South Street, Steamship Authority Hyannis August 2024 Page 3 of 3 pumphouse structure where the equipment will be housed is located just beyond the 100 -foot buffer to the Coastal Bank. Details of the proposed project can be found in the attached project plans entitled “71 South Street, Steamship Authority Hyannis, Barnstable, Massachusetts ,” prepared by HW in conjunction with GDG Consulting Engineers, Inc. and dated August 2024. 4.0 PROTECTION OF RESOURCE AREA INTERESTS Direct impacts to the resource areas and their associated buffers will be negligible. The project site is extensively altered by human activity as the entire area is paved and or built upon. The vacuum pump and control panel system are responsible for transferring sewage from boats into underground storage tanks, from which it is subsequently directed into the Town-owned sewer system. This process ensures the environmentally responsible treatment and management of waste, thereby safeguarding the local community and marine environment. The proposed project is designed to address the provisions under the Massachusetts WPA and its implementing regulations at 310 CMR 10.00 and the Barnstable Wetland Regulations. While the proposed work will result in temporary impacts to the Buffer Zone, the project is expected to offer significant long-term benefits. By upgrading and relocating the vacuum pump and control panel system, the project aims to enhance the overall reliability and resilience of the sewage management infrastructure. This upgrade is crucial in safeguarding the adjacent resources and other sensitive environmental areas from potential failure of the existing system, which is at risk of flood damage. The new above-ground structure is designed to improve accessibility and maintenance of the equipment, thereby reducing the likelihood of system malfunctions that could lead to environmental contamination. In doing so, the project will not only mitigate immediate impacts but also contribute to the long-term protection of the surrounding resource areas and the broader marine ecosystem. 4.1 Erosion and Sedimentation Control In addition to other protective measures, the Applicant proposes to safeguard downgradient resource areas by implementing an erosion and sedimentation control program. This program will include the installation of siltation socks (also known as mulch socks or silt socks) at the work limits, inlet protections, and employment of a construction entrance mat as outlined in the project plans. Erosion and sedimentation control barriers will be in place and maintained in good condition throughout the construction period until all work is completed and the pavement has been restored. Attachment A – Locus Maps OCEANSTREETOLDCOLONYROADSOUTH STREET PLEASANT STREETLEWISBAY ROAD JEFFREY WAY DAIS YBLUFF ROADWILLOW STREET SOUTH S T R E E T BAY STREET BOND COURT CHAN NEL POINT R OA D SCHOOL STREETSubject Property Proposed Pumphouse Location Parcels Municipal Boundary Date: 7/16/2024Data Sources: Bureau of GeographicInformation (MassGIS), ESRI This map is for informational purposes andmay not be suitable for legal, engineering,or surveying purposes. Figure 2 Aerial The Steamship Authority - Hyannis Terminal Barnstable, MA Service Layer Credits: World Imagery: MaxarMassGIS Aerial: MassGIS 0 250125 Feet I Path: H:\Projects\2023\23142 Steamship Hyannis Terminal\GIS\Maps\23142_Aerial.aprx BARNSTABLE Site Locus National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 7/19/2024 at 11:20 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 70°16'59"W 41°39'16"N 70°16'21"W 41°38'50"N Basemap Imagery Source: USGS National Map 2023 Attachment B – Project Plans 71 SOUTH STREET, STEAMSHIP AUTHORITY HYANNIS, BARNSTABLE, MASSACHUSETTS Barnstable, MA prepared by Horsley Witten Group, Inc. and GDG Consulting Engineers, Inc. August 2024 Project Number:Registration: VICINITY MAP LOCUS last modified: 07/31/24 printed: 08/05/24 by bkH:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 CV.dwg1 2 3 4 5 6 7 Checked By: Drawn By: Designed By: Date Issued: Revisions Appr.Rev.Date By Description NTS Drawing Number: Prepared By: Plan Set: Prepared For: 71 SOUTH STREET STEAMSHIP AUTHORITY HYANNIS BARNSTABLE, MASSACHUSETTS PERMITTING SET AUGUST 5, 2024 23142 71 SOUTH STREET STEAMSHIP AUTHORITY HYANNIS BARNSTABLE, MASSACHUSETTS The Steamship Authority 228 Palmer Avenue Falmouth, MA 02540 AUGUST 5, 2024 MCL MCL FPL C-1 Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A Sandwich, MA 02563 508-833-6600 voice 508-833-3150 fax CIVIL & SITE ENGINEER: Horsley Witten Group, Inc. www.g-g-d.com 375 Faunce Road, Suite D Dartmouth, MA 02747-1258 508-998-5700 voice 508-998-0883 fax Mechanical & Electrical: GDG Consulting Engineers, Inc. MASSACHUSETTS NTS SITE IN TOWN OF BARNSTABLE Sheet List Table Sheet Number Sheet Title C-1 COVER C-2 NOTES C-3 EXISTING CONDITIONS C-4 SITE PLAN C-5 DETAILS A-1 PUMP HOUSE FLOOR PLAN & DETAILS A-2 PUMP HOUSE ELEVATIONS FOR PERMITTING ONLY C-2 Sheet Number: Project Number: Registration: 23142 last modified: 07/31/24 printed: 08/05/24 by bkH:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 CV.dwgRevisionsAppr.Rev.DateByDescription1234567NOTES71 SOUTH STREETSTEAMSHIP AUTHORITY HYANNISBARNSTABLE, MASSACHUSETTSSurvey Provided By:Prepared For:Plan Set:Plan Title:Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: January 12, 2024The SteamshipAuthority228 Palmer AvenueFalmouth, MA 02540AUGUST 5, 2024MCLMCLFPLChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747-1258Consulting Engineers, Inc.GGDp: 508-998-5700f: 508-998-0883www.g-g-d.comCIVIL & SITE ENGINEER:MECHANICAL & ELECTRICAL:GENERAL CONSTRUCTION NOTES: 1.ALL SITE WORK TO COMPLETE THIS PROJECT, AS INDICATED ON THE DRAWINGS, IN THE SPECIFICATIONS AND AS DESCRIBED BELOW IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 2.IMMEDIATELY CONTACT AND COORDINATE WITH THE ENGINEER AND OWNER IF ANY DEVIATION OR ALTERATION OF THE WORK PROPOSED ON THESE DRAWINGS IS REQUIRED. 3.UTILIZE ALL PRECAUTIONS AND MEASURES TO ENSURE THE SAFETY OF THE PUBLIC, ALL PERSONNEL AND PROPERTY DURING CONSTRUCTION IN ACCORDANCE WITH OSHA STANDARDS, INCLUDING THE INSTALLATION OF TEMPORARY FENCING BARRICADES, SAFETY LIGHTING, CONES, POLICE DETAIL AND/OR FLAGMEN AS DETERMINED NECESSARY BY THE TOWN. THE CONTRACTOR IS RESPONSIBLE FOR THE COST OF POLICE DETAIL AND FOR COORDINATING WITH THE LOCAL OR STATE POLICE DEPARTMENT FOR ALL REQUIRED POLICE DETAIL. 4.MAKE ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS, PAY ALL FEES INCLUDING POLICE DETAILS AND POST ALL BONDS, IF NECESSARY, ASSOCIATED WITH THE SAME, AND COORDINATE WITH THE OWNER AND THE ENGINEER. 5.ALL EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE BASED ON THE BEST INFORMATION AVAILABLE. PRIOR TO THE START OF CONSTRUCTION VERIFY THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, NOTIFY THE OWNER AND THE ENGINEER PRIOR TO INSTALLING ANY PORTION OF THE SITE WORK WHICH WOULD BE AFFECTED. 6.THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS INDICATED ON THE DRAWINGS ARE BASED ON RECORDS OF VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. CONTACT THE APPROPRIATE UTILITY COMPANY, ANY GOVERNING PERMITTING AUTHORITY IN THE TOWN, AND "DIGSAFE" (1-888-344-7233) AT LEAST THREE BUSINESS DAYS PRIOR TO ANY EXCAVATION WORK TO REQUEST EXACT FIELD LOCATION OF UTILITIES. THE CONTRACTOR MUST RESOLVE CONFLICTS BETWEEN THE PROPOSED UTILITIES AND FIELD-LOCATED UTILITIES AND REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR DAMAGES INCURRED AS A RESULT OF UTILITIES OMITTED, INCOMPLETELY OR INACCURATELY SHOWN. THE CONTRACTOR MUST MAINTAIN ACCURATE RECORDS OF THE LOCATION AND ELEVATION OF ALL WORK INSTALLED AND EXISTING UTILITIES FOUND DURING CONSTRUCTION FOR THE PREPARATION OF THE AS-BUILT PLAN. 7.COORDINATE AND MAKE ALL CONNECTION ARRANGEMENTS WITH UTILITY COMPANIES, AS REQUIRED. 8.MAINTAIN ALL EXISTING UTILITIES IN WORKING ORDER AND FREE FROM DAMAGE DURING THE ENTIRE DURATION OF THE PROJECT. REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ALL COST RELATED TO THE REPAIR OF UTILITIES. EXCAVATION REQUIRED WITHIN THE PROXIMITY OF EXISTING UTILITY LINES MUST BE DONE BY HAND. 9.COORDINATE ALL TRENCHING WORK WITH THE PROPER LOCAL & STATE AGENCY. THE CONTRACTOR IS RESPONSIBLE FOR ALL TRENCH SAFETY INCLUDING ANY LOCAL AND/OR STATE PERMITS REQUIRED FOR THE TRENCH WORK. IF THIS WORK IS REQUIRED TO OCCUR OUTSIDE THE AGREED UPON HOURS OF OPERATION FOR THE FACILITY, THE CONTRACTOR MUST PLAN ACCORDINGLY. 10.SAWCUT ALL TRENCH WORK WITHIN EXISTING PAVEMENT AS INDICATED ON THE DRAWINGS. BACKFILL AND COMPACT TRENCH WORK AS INDICATED ON THE DRAWING AND IN THE SPECIFICATIONS. IF SETTLEMENT OCCURS DUE TO INADEQUATE COMPACTION, AS DETERMINED BY THE ENGINEER, WITHIN THE WARRANTY PERIOD, CONTRACTOR IS REQUIRED TO REMOVE, PATCH AND REPAVE AFTER ONE COMPLETE 12-MONTH CYCLE. 11.IMPORT ONLY CLEAN MATERIAL. MATERIAL FROM AN EXISTING OR FORMER 21E SITE AS DEFINED BY THE MASSACHUSETTS CONTINGENCY PLAN 310 CMR 40.0000 WILL NOT BE ACCEPTED . 12.ESTABLISH AND MAINTAIN ALL CONTROL POINTS AND BENCHMARKS DURING CONSTRUCTION INCLUDING BENCHMARK LOCATIONS AND ELEVATIONS AT CRITICAL AREAS. COORDINATE WITH THE ENGINEER THE LOCATION OF ALL CONTROL POINTS AND BENCHMARKS. 13.SITE LAYOUT REQUIRED FOR CONSTRUCTION IS TO BE PROVIDED BY THE CONTRACTOR AND SHOULD BE PERFORMED BY A MASSACHUSETTS' REGISTERED PROFESSIONAL LAND SURVEYOR. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE SURVEYOR FOR ALL SURVEY LAYOUT. IF THE CONTRACTOR CHOOSES TO USE GPS, THEY ASSUME THE LIABILITY FOR THE ACCURACY OF ALL HORIZONTAL AND VERTICAL LAYOUT. 14.MAINTAIN ALL GRADE STAKES SET BY THE SURVEYOR. GRADE STAKES ARE TO REMAIN UNTIL A FINAL INSPECTION OF THE ITEM HAS BEEN COMPLETED BY THE ENGINEER. RE-STAKING OF PREVIOUSLY SURVEYED SITE FEATURES IS THE RESPONSIBILITY (INCLUDING COST) OF THE CONTRACTOR. 15.UNLESS OTHERWISE INDICATED ON THE DRAWINGS AND/OR IN THE SPECIFICATIONS, ALL SITE CONSTRUCTION MATERIALS AND METHODOLOGIES ARE TO CONFORM TO THE MOST RECENT VERSION OF THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 16.PROVIDE ALL CONSTRUCTION SERVICE IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS REGARDING NOISE, VIBRATION, DUST, SEDIMENTATION CONTAINMENT, AND TRENCH WORK. 17.COLLECT SOLID WASTES AND STORE IN A SECURED DUMPSTER. THE DUMPSTER MUST MEET ALL LOCAL AND STATE SOLID WASTE MANAGEMENT REGULATIONS. 18.RESTORE ALL SURFACES EQUAL TO THEIR ORIGINAL CONDITION AFTER CONSTRUCTION IS COMPLETE PER SPECIFICATIONS. LEAVE ALL AREAS NOT DISTURBED BY CONSTRUCTION IN THEIR NATURAL STATE. TAKE CARE TO PREVENT DAMAGE TO SHRUBS, TREES, OTHER LANDSCAPING AND/OR NATURAL FEATURES. WHEREAS THE PLANS DO NOT SHOW ALL LANDSCAPE FEATURES, EXISTING CONDITIONS MUST BE VERIFIED BY THE CONTRACTOR IN ADVANCE OF THE WORK. 19.REGULARLY INSPECT THE PERIMETER OF THE PROPERTY TO CLEAN UP AND REMOVE LOOSE CONSTRUCTION DEBRIS BEFORE IT LEAVES THE SITE. PROMPTLY REMOVE ALL DEMOLITION DEBRIS FROM THE SITE TO AN APPROVED DUMP SITE. 20.ALL TRUCKS LEAVING THE SITE MUST BE COVERED. 21.DO NOT WASH ANY CONCRETE TRUCKS ONSITE. REMOVE BY HAND ANY CEMENT OR CONCRETE DEBRIS LEFT IN THE DISTURBED AREA. 22.BURIAL OF ANY STUMPS, SOLID DEBRIS, AND/OR STONES/BOULDERS ONSITE IS PROHIBITED. DO NOT USE ROAD SALT OR OTHER DE-ICING CHEMICALS ON THE ACCESS ROADWAY. 23.AT THE END OF CONSTRUCTION, REMOVE ALL CONSTRUCTION DEBRIS AND SURPLUS MATERIALS FROM THE SITE AS INDICATED IN THE SPECIFICATIONS. PERFORM A THOROUGH INSPECTION OF THE WORK PERIMETER. COLLECT AND REMOVE ALL MATERIALS AND BLOWN OR WATER CARRIED DEBRIS FROM THE SITE. BASIC CONSTRUCTION SEQUENCE: THE FOLLOWING CONSTRUCTION SEQUENCE IS TO BE USED AS A GENERAL GUIDELINE. COORDINATE WITH THE OWNER, ENGINEERS, AND LANDSCAPE ARCHITECT AND SUBMIT A PROPOSED CONSTRUCTION SEQUENCE FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 1.SURVEY AND STAKE THE PROPOSED LIMIT OF DISTURBANCE AND LIMIT OF SEDIMENTATION BARRIERS. 2.PLACE SEDIMENTATION BARRIERS AS INDICATED ON DRAWINGS AND STAKED OUT IN THE FIELD. UNDER NO CIRCUMSTANCES IS THE LIMIT OF WORK TO EXTEND BEYOND THE SEDIMENTATION BARRIERS/LIMIT OF DISTURBANCE AS INDICATED ON DRAWINGS AS APPROVED BY THE LOCAL CONSERVATION COMMISSION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP). 3.BEGIN UTILITY CONSTRUCTION. THE CONTRACTOR IS FREE TO INSTALL THE UTILITIES IN THE SEQUENCE HE/SHE CHOOSES. IMMEDIATELY REPAIR, REPLACE AND STABILIZE ANY EROSION CONTROL DEVICES DISTURBED DURING THE UNDERGROUND UTILITY CONSTRUCTION. MODIFY TEMPORARY CONVEYANCE DEVICES, AS NECESSARY, TO CONVEY RUNOFF TO TREATMENT AREAS. 4.FINISH PERMANENT STABILIZATION. COMPLETE PERMANENT STORMWATER MANAGEMENT AREA SEEDING AND PLANTING AFTER THE CONTRIBUTING AREA TO THE BASIN HAS REACHED A MINIMUM OF 80% STABILIZATION AND IS NO LONGER REQUIRED AS A CONSTRUCTION SEDIMENTATION BASIN. 5.COMPLETE ALL REMAINING PLANTING AND SEEDING. 16.SWEEP THE ROADWAY TO REMOVE ALL SEDIMENTS. REPAIR DRAINAGE OUTLETS AND BASINS AS REQUIRED. CLEAN AND FLUSH THE DRAINAGE STRUCTURES AND PIPES AT THE END OF CONSTRUCTION AND REMOVE ALL ACCUMULATED SEDIMENTS IN THE STORMWATER MANAGEMENT AREAS. CONTRACTOR MUST INSPECT THE DRAINAGE NETWORK AND REPAIR ANY DAMAGE IMMEDIATELY. 17.ENGINEER TO APPROVE THE REMOVAL OF ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES FOLLOWING VEGETATIVE ESTABLISHMENT OF ALL DISTURBED AREAS AND DETERMINE WHEN THE CONTRIBUTING AREA HAS REACHED A MINIMUM OF 80% STABILIZATION. DEWATERING: 1.A HIGH WATER TABLE IS NOT ANTICIPATED. HOWEVER, IF DEWATERING IS REQUIRED DURING EXCAVATION, TEMPORARILY LOWER THE WATER TABLE BY PUMPING. INSTALL A DEWATERING BASIN AS INDICATED IN THE DEWATERING BASIN DETAIL AND PROVIDE A DEWATERING PLAN DEPICTING PROPOSED DEWATERING LOCATION FOR REVIEW AND APPROVAL. DIRECT THE PUMP DISCHARGE TO BASIN TO PREVENT SEDIMENTS FROM LEAVING THE CONSTRUCTION AREA. INSTALL ADDITIONAL BASINS IF REQUIRED. INSTALL THE BASIN AS INDICATED ON DRAWINGS IF SO NOTED, OTHERWISE INSTALL THE BASIN(S) WITHIN THE LIMIT OF DISTURBANCE INDICATED BY THE SILT FENCE OR STRAWBALES. 2.PRIOR TO ANY DEWATERING, THE DEWATERING PLAN MUST BE APPROVED BY THE ENGINEER. 3.IF DEWATERING IS NECESSARY DURING CONSTRUCTION, IMPLEMENT THE PROPER ESC MEASURES ON SITE TO PREVENT EROSION OR SEDIMENT RUNOFF. THESE MEASURES CAN INCLUDE DEWATERING BAGS, TEMPORARY STRAWBALES, SILT FENCES, SILT SOCKS AND/OR OTHER APPROVED DEVICES AS INDICATED IN THE DETAILS. DEWATERING NOTES: 1.SUPPLY THE DEWATERING SYSTEMS TO: A.DEVELOP A SUBSTANTIALLY DRY AND STABLE SUBGRADE FOR THE PROPOSED WORK; B.PREVENT DAMAGE TO ADJACENT PROPERTIES, BUILDINGS, STRUCTURES, UTILITIES AND RESOURCES AREAS; C.RETAIN ALL SEDIMENTS ON-SITE WITHIN THE WORK AREA; D.PREVENT SEDIMENT DISCHARGE AND DEGRADATION OF THE RESOURCE AREA;. E.PREVENT LOSS OF FINES, QUICK CONDITION, OR SOFTENING OF FOUNDATION SUBGRADE; AND F.MAINTAIN STABILITY OF SIDES AND BOTTOMS OF EXCAVATIONS AND TRENCHES. 2.LOCATE DEWATERING FACILITIES WHERE THEY WILL NOT INTERFERE WITH CONSTRUCTION WORK OR ABUTTING RESOURCES. 3.MODIFY DEWATERING EQUIPMENT AND PROCEDURES WHEN OPERATIONS THREATEN TO CAUSE DAMAGE TO NEW OR EXISTING FACILITIES OR ADJACENT AREAS NOT WITHIN THE LIMIT OF WORK. 4.PRIOR TO INSTALLATION OF THE DEWATERING SYSTEM, PROVIDE THE ENGINEER WITH A SCHEDULE OF DEWATERING PROCEDURES. DEWATERING SCHEDULE AND PROCEDURES ARE SUBJECT TO THE LOCAL AUTHORITY AND ENGINEER'S REVIEW AND APPROVAL AND SHALL INCLUDE AT A MINIMUM THE FOLLOWING INFORMATION: A.THE PROPOSED TYPES OF DEWATERING SYSTEMS; B.ARRANGEMENT, LOCATION AND DEPTHS OF SYSTEM COMPONENTS; C.COMPLETE DESCRIPTION OF EQUIPMENT AND INSTRUMENTATION TO BE USED INCLUDING INSTALLATION, OPERATION AND MAINTENANCE PROCEDURES; D.TYPES AND SIZES OF FILTERS (IF APPLICABLE); E.DESIGN CALCULATIONS DEMONSTRATING ADEQUACY OF THE PROPOSED SYSTEM AND EQUIPMENT; AND F.PROVISIONS AND METHODS OF SEDIMENT REMOVAL AND DISPOSAL OF WATER. G.ALL PERMITS REQUIRED FOR THE WORK, IF NECESSARY. 5.FURNISH ALL MATERIAL/PRODUCTS REQUIRED TO ADEQUATELY PROVIDE DEWATERING WITHOUT DAMAGE TO SURROUNDING PROPERTIES, EXISTING UTILITIES, AND/OR RESOURCE AREA. SUBMIT ALL PRODUCTS AND MATERIALS TO THE ENGINEER FOR REVIEW AND APPROVAL. 6.INTERCEPT AND DIVERT SURFACE WATER RUNOFF AWAY FROM EXCAVATIONS THROUGH THE USE OF DIKES, CURB WALLS, DITCHES, PIPES, SUMPS OR OTHER APPROVED MEANS. 7.IF PUMPS ARE USED, THE PUMP INTAKE LINE SHOULD NOT BE ALLOWED TO SETTLE TO THE BOTTOM OF THE EXCAVATION OR DEWATERING SUMP. 8.PROVIDE AND MAINTAIN HOLDING AREAS/TEMPORARY SETTLING BASINS OF ADEQUATE SIZE TO COLLECT AND PREVENT SURFACE AND SUBSURFACE WATER SEEPAGE FROM ENTERING THE EXCAVATIONS. DIVERT THE WATER TO SETTLING BASINS OR OTHER APPROVED EQUIPMENT REQUIRED TO REDUCE THE AMOUNT OF FINE PARTICLES BEFORE DISCHARGE INTO DRAINAGE PIPES AND NATURAL WATER COURSES. IF A DRAINAGE SYSTEM OR WATER COURSE BECOMES BLOCKED DUE TO DEWATERING OPERATION, IT MUST BE CLEANED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ANY ENFORCEMENT ACTIONS OR FINES RESULTING FROM IMPROPER DEWATERING AND/OR DISCHARGE OF TURBID WATER AND SEDIMENT TO PROTECTED AREAS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ACCOMPLISH DEWATERING IN ACCORDANCE WITH THE MEANS AND METHODS SUBMITTED AND APPROVED BY THE ENGINEER. KEEP THE ENGINEER ADVISED OF ANY CHANGES REQUIRED TO ACCOMMODATE FIELD CONDITIONS AND, ON COMPLETION OF THE DEWATERING SYSTEM INSTALLATION, REVISE AND RESUBMIT THE INFORMATION REQUIRED TO SHOW THE INSTALLED SYSTEM. A.PERFORM DEWATERING OPERATIONS TO LOWER THE GROUNDWATER LEVEL IN EXCAVATIONS AS REQUIRED TO PROVIDE A STABLE, DRY SUBGRADE FOR THE PROSECUTION OF THE PROPOSED WORK. B.MAINTAIN DEWATERING OPERATIONS IN A MANNER THAT PREVENTS BUILDUP OF EXCESSIVE HYDROSTATIC PRESSURE AND DAMAGE TO STRUCTURES, AND THE SUBGRADE. C.DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES TO REMOVE PROMPTLY, AND TO DISPOSE OF PROPERLY, ALL WATER ENTERING EXCAVATIONS AND TO KEEP THEM DRY UNTIL THE PROPOSED WORK IS COMPLETED. D.DO NOT DISCHARGE WATER TO PROTECTED ENVIRONMENTAL RESOURCES WITHOUT TREATMENT TO REMOVE SUSPENDED SOLIDS AND SEDIMENTS. E.DO NOT LAY PIPE AND/OR MASONRY IN WATER. DO NOT ALLOW WATER TO INUNDATE NEW CONCRETE AND NEW BRICK MASONRY WITHIN 48 HOURS AFTER INSTALLATION. PLACE BACKFILL PROMPTLY OR IMPLEMENT OTHER APPROVED METHODS TO PREVENT THE POSSIBILITY OF FLOTATION OF PIPE OR STRUCTURES AFTER INSTALLATION. SEWER INSTALLATION NOTES 1.INSTALL SEWER AND WATER MAINS ACCORDING TO THE FOLLOWING GUIDELINES TO PREVENT FREEZING OF THE MAIN OR SEWER: UTILITY TYPE MIN. COVER OVER MIN. HORIZONTAL DISTANCE TOP OF PIPE TO DRAIN STRUCTURE SANITARY FORCEMAIN 5'3' GRAVITY FORCEMAIN 4'2' WATER MAIN 5'2' 2.INSULATE SANITARY FORCE MAINS, WATER MAINS, HYDRANT PIPING AND DEAD END WATER LINES S WHERE SOIL COVER OR HORIZONTAL SEPARATION TO PRECAST STRUCTURES IS LESS THAN THE DISTANCE SPECIFIED ABOVE AND/OR WHERE SHOWN ON PLANS. 3.I NSULATION: 2" THICK POLYURETHANE INSULATION WITH PVC JACKET PLACED AROUND PIPE OR DESIGNER APPROVED EQUAL. 4.WATER AND SEWER SEPARATION IS TYPICALLY 10-FEET MINIMUM HORIZONTAL AND 18-INCHES VERTICAL WITH SEWER MAINS BELOW THE WATER MAINS (SEE DETAIL). IF SITE CONDITIONS REQUIRE LESS, THEN INSTALL UTILITIES AS INDICATED ON DETAILS. SEWER SYSTEM OPERATION & MAINTENANCE: 1.CLEAN ALL NEWLY INSTALLED FACILITIES, INCLUDING SEWER COLLECTION SYSTEM OF ALL FOREIGN MATERIALS SUCH AS DIRT AND MISCELLANEOUS DEBRIS PRIOR TO SYSTEM TESTING. TESTING MUST BE WITNESSED AND INSPECTED BY THE ENGINEER. NO TESTING IS ALLOWED WITHOUT REMOVAL OF ALL FOREIGN MATERIALS. 2.CONDUCT A LEAKAGE TEST OF ALL SEWER MAINS. TEST MUST BE WITNESSED BY THE ENGINEER. THE CONTRACTOR MUST PROVIDE THE ENGINEER WITH A MINIMUM OF 48-HOURS ADVANCE NOTICE TO THE TIME OF THE PRESSURE TEST. 3.TEST SEWER PIPES FOR LEAKAGE WITH THE FOLLOWING PROCEDURE. INTRODUCE LOW PRESSURE AIR INTO THE SEAL LINE (WITH PNEUMATIC PLUGS) UNTIL THE INTERNAL AIR PRESSURE REACHES 4 psi GREATER THAN THE AVERAGE BACK PRESSURE OF ANY GROUNDWATER THAT MAY BE OVER THE PIPE. ALLOW AT LEAST 2 MINUTES FOR AIR PRESSURE TO STABILIZE. AFTER THE STABILIZATION PERIOD (3.5 psi MINIMUM PRESSURE IN THE PIPE), THE PORTION OF PIPE TESTED IS ACCEPTABLE IF THE TIME REQUIRED IN MINUTES FOR THE PRESSURE TO DECREASE FROM 3.5 TO 3 psi IS NOT LESS THAN 1.90 TIMES THE LENGTH OF PIPE BEING TESTED. 4.VACUUM TEST ALL SEWER MANHOLES. TESTS MUST BE WITNESSED BY THE ENGINEER UNLESS THE SEASONAL GROUNDWATER LEVEL IS MORE THAN 10 FEET FROM THE BOTTOM OF THE MANHOLE. 5.MANDREL TEST ALL SEWER MAINS AFTER 30 DAYS. TESTS MUST BE WITNESSED BY A TOWN REPRESENTATIVE OR THE ENGINEER. EROSION & SEDIMENT CONTROL NOTES: 1.DESIGNATE THE SITE CONSTRUCTION FOREMAN AS THE ON-SITE PERSONNEL RESPONSIBLE FOR THE DAILY INSPECTION AND MAINTENANCE OF ALL SEDIMENT AND EROSION CONTROLS AND IMPLEMENTATION OF ALL NECESSARY MEASURES TO CONTROL EROSION AND PREVENT SEDIMENT FROM LEAVING THE SITE. 2.INSTALL ALL EROSION AND SEDIMENT CONTROL (ESC) MEASURES AS INDICATED ON DRAWINGS IN CONSULTATION WITH THE CONSERVATION AGENT, AND ENGINEER BEFORE ANY CONSTRUCTION ACTIVITIES BEGIN. INSPECT, MAINTAIN REPAIR AND REPLACE EROSION CONTROL MEASURES, AS NECESSARY, DURING THE ENTIRE CONSTRUCTION PERIOD OF THE PROJECT. THE SITE PERIMETER EROSION CONTROLS ARE THE DESIGNATED LIMIT OF WORK. INFORM ALL PERSONNEL WORKING ON THE PROJECT SITE THAT NO CONSTRUCTION ACTIVITY IS TO OCCUR BEYOND THE LIMIT OF WORK AT ANY TIME THROUGHOUT THE CONSTRUCTION PERIOD. 3.MAINTAIN A MINIMUM SURPLUS OF 100 FEET OF EROSION CONTROL BARRIER (SILT FENCE, STRAWBALE, &/OR SILT SOCK) ONSITE AT ALL TIMES. 4.PROTECT THE EXISTING DRAINAGE INFRASTRUCTURE FROM SEDIMENTATION DURING PROJECT CONSTRUCTION UNTIL ACCEPTANCE BY THE OWNER & IN CONFORMANCE WITH THE ORDER OF CONDITIONS. 5.PROTECT THE ADJACENT RESOURCE AREA FROM SEDIMENTATION DURING PROJECT CONSTRUCTION UNTIL ACCEPTANCE BY THE OWNER & IN CONFORMANCE WITH APPLICABLE PERMITS. 6.KEEP THE LIMIT OF CLEARING, GRADING AND DISTURBANCES TO A MINIMUM WITHIN THE PROPOSED AREA OF CONSTRUCTION. PHASE THE SITE WORK IN A MANNER TO MINIMIZE AREAS OF EXPOSED SOIL. IF TREES ARE TO BE CUT ON THE ENTIRE SITE, CLEAR AND GRUB ONLY THOSE AREAS WHICH ARE ACTIVELY UNDER CONSTRUCTION. PROPERLY INSTALL THE SEDIMENTATION CONTROLS PRIOR TO BEGINNING ANY LAND CLEARING ACTIVITY AND/OR OTHER CONSTRUCTION RELATED WORK. 7.MONITOR LOCAL WEATHER REPORTS DURING CONSTRUCTION AND PRIOR TO SCHEDULING EARTHMOVING OR OTHER CONSTRUCTION ACTIVITIES WHICH LEAVE LARGE DISTURBED AREAS UNSTABILIZED. IF INCLEMENT WEATHER IS PREDICTED, USE BEST PROFESSIONAL JUDGEMENT AND GOOD CONSTRUCTION PRACTICES WHEN SCHEDULING CONSTRUCTION ACTIVITIES AND ENSURE THE NECESSARY EROSION CONTROL DEVICES ARE INSTALLED AND FUNCTIONING PROPERLY TO MINIMIZE EROSION FROM ANY IMPENDING WEATHER EVENTS. 8.INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZED SLOPES ON A WEEKLY BASIS AND AFTER EACH RAINFALL EVENT OF .25 INCH OR GREATER. REPAIR IDENTIFIED PROBLEMS WITHIN 24 HOURS TO ENSURE EROSION AND SEDIMENT CONTROLS ARE IN GOOD WORKING ORDER. RESET OR REPLACE MATERIALS AS REQUIRED. 9.SURROUND THE PERIMETER OF SOIL STOCKPILES WITH SILT SOCK, SILT FENCE, STRAWBALES, OR A COMBINATION OF SILT FENCE WITH STRAWBALE, AS DETERMINED NECESSARY. 10.DISTURBED AREAS AND SLOPES MUST NOT BE LEFT UNATTENDED OR EXPOSED FOR EXCESSIVE PERIODS OF TIME SUCH AS THE INACTIVE WINTER SEASON. PROVIDE APPROPRIATE STABILIZATION PRACTICES ON ALL DISTURBED AREAS AS SOON AS POSSIBLE BUT NOT MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED, REINFORCE TEMPORARY AREAS HAVING A SLOPE GREATER THAN 4:1 WITH EROSION BLANKETS OR APPROVED EQUAL UNTIL THE SITE IS PROPERLY STABILIZED. TEMPORARY SWALES MAY ALSO BE REQUIRED IF DETERMINED NECESSARY IN THE FIELD BY THE ENGINEER. 11.INSTALL A SILT SACK OR APPROVED EQUIVALENT IN EACH EXISTING CATCHBASIN RECEIVING RUNOFF FROM THE SITE. UPON THE INSTALLATION OF EACH NEW CATCH BASIN, INSTALL A SILT SACK OR APPROVED EQUIVALENT. INSPECT SILT SACKS, AFTER EACH SIGNIFICANT STORM EVENT AND REMOVE AND EMPTY AS NEEDED FOR THE DURATION OF THE CONSTRUCTION PERIOD. 12.CONTAIN ALL SEDIMENT ONSITE. SWEEP ALL EXITS FROM THE SITE AS NECESSARY INCLUDING ANY SEDIMENT TRACKING. SWEEP PAVED AREAS AS NEEDED TO REMOVE SEDIMENT AND POTENTIAL POLLUTANTS ACCUMULATED DURING SITE CONSTRUCTION. 13.REGULARLY REMOVE ACCUMULATED SEDIMENT FROM ALL TEMPORARY PRACTICES AND AFTER RAIN EVENTS TO MAINTAIN PROPER DRAINAGE. DISPOSE OF IN A PRE-APPROVED LOCATION. 14.PROVIDE ON SITE OR MAKE READILY AVAILABLE THE NECESSARY EQUIPMENT AND SITE PERSONNEL DURING CONSTRUCTION HOURS FOR THE DURATION OF THE PROJECT TO ENSURE ALL EROSION AND SEDIMENTATION CONTROL DEVICES ARE PROPERLY MAINTAINED AND REPAIRED IN A TIMELY AND RESPONSIBLE MANNER. IF SITE WORK IS SUSPENDED DURING THE WINTER MONTHS THE CONTRACTOR MUST CONTINUE TO PROVIDE PERSONNEL AND EQUIPMENT EITHER ON SITE OR READILY AVAILABLE TO PROPERLY MAINTAIN AND REPAIR ALL EROSION AND SEDIMENTATION CONTROL DEVICES IN A TIMELY AND RESPONSIBLE MANNER 15.CONTROL DUST BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS DIRECTED BY THE ENGINEER. LIGHT HALF HEAVY HALF LEGEND STRAIGHT PLUG BOTTOM HINGE TOP HINGE CORNER ELBOW PLUNGER ROD LATCH FORK FORK CATCH PLUNGER ROD CATCH LOCK KEEPER GUIDE LOCK KEEPER ORNAMENTAL TOPS TRUSS RODS STRETCHER BAR HOOK BOLTS PART NO.DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 5 12 4 8 7 6 10 14 13 11 33 2 9 GATE OPENING 24 FT CONSTRUCTION GATE NOT TO SCALE FENCE FABRIC NOTE: FENCING FABRIC SHALL BE #9 GAUGE, STANDARD 2-INCH DIAMOND MESH. 6'-0" MIN. TENSION WIRE END CLAMP TENSION WIRE END CLAMP TEMPORARY PLASTIC FENCE STAND FILLED WITH SAND/CONCRETE OR GALVANIZED RECTANGULAR PIPE BASE 0'-6" TYP. PLAN VIEW SECTION AREA TO BE PROTECTED NOTES: 1.SILT SOCK MANUFACTURER TO BE SILT SOXX OR ENGINEER APPROVED EQUAL. 2.ALL MATERIAL TO MEET MANUFACTURER'S SPECIFICATIONS. 3.SEDIMENT SILT SOCK TO BE FILLED WITH LEAF COMPOST AND/OR WOODY MULCH PER MANUFACTURER'S REQUIREMENTS. 4.FOLLOWING CONSTRUCTION AND SITE STABILIZATION, COMPOST MATERIAL TO BE REMOVED OR DISPERSED ON SITE, AS APPROVED BY THE ENGINEER. SILT SOCK NOT TO SCALE 3"-4" 12"± WORK AREA WATER FLOW WORK AREA 2" x 2" WOODEN STAKE SILT SOCK (12" - 18" TYPICAL) STAKE ON 10' LINEAL SPACING SEDIMENT SILT SOCK AREA TO BE PROTECTED PLAN VIEW SECTION A-A CONSTRUCTION ENTRANCE MAT NOT TO SCALEPUBLIC ROADWAYA NOTE: 1.MATS ARE DESIGNED TO SHAKE LOOSE DEBRIS AND DIRT FROM TRUCK TIRES BEFORE TRUCKS LEAVE THE JOBSITE. 2.MANUFACTURERS/PRODUCTS OR APPROVED EQUIVALENT: YAKMAT: OUTRAK MAT PRESTO GEOSYSTEMS: GEOTERRA GME-SHEILDS: EXIT GRID 3.CONSTRUCTION ENTRANCE(S) TO REMAIN UNTIL INSTALLATION OF PAVEMENT SUB-BASE IS TO BEGIN. 4.SEE SITE PLAN FOR LOCATION. 15' 20' A TEMPORARY CONSTRUCTION ENTRANCE / EXIT MAT EXISTING PAVEMENT TO REMAIN SSSSSSSS SS FLOW FROM PUMP FILTERED WATERFILTERED WATERSILT SOCK AGGREGATE OR STRAW UNDERLAY A A SECTION A - ADEWATERING BAG NOT TO SCALE INSTALLATION NOTES: 1.PLACE LIFTING STRAPS (NOT INCLUDED) UNDER THE UNIT TO FACILITATE REMOVAL AFTER USAGE 2.UNFOLD DEWATERING BAG ON STABILIZED AREA OVER DENSE VEGETATION, STRAW, OR GRAVEL (IF AN INCREASED DRAINAGE SURFACE IS NEEDED) 3.INSERT DISCHARGE HOSE FROM PUMP INTO DEWATERING BAG A MINIMUM OF SIZE INCHES AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE UNIT WITHOUT BEING FILTERED 4.IF USING OPTIONAL ABSORBENTS, PLACE ABSORBENT BOOM INTO THE DEWATERING BAG MAINTENANCE: 1.REPLACE THE UNIT WHEN 1/2 FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE 2.IF USING OPTIONAL OIL ABSORBENTS, REMOVE AND REPLACE ABSORBENT PILLOW WHEN NEAR SATURATION DEWATERING BAG ON AGGREGATE OR STRAW UNDERLAY 7'-6" (TYP) 6'-0" TEMPORARY PLASTIC FENCE STAND FILLED WITH SAND/CONCRETE OR GALVANIZED RECTANGULAR PIPE BASE 1-1/4" GALVANIZED PIPE (TYP) CONSTRUCTION FENCE NOT TO SCALE 0'-6" TYP. GRADE INLET PROTECTION NOT TO SCALE NOTES: 1.SEDIMENT CONTROL INSERTS WILL BE INSTALLED OVER ALL CATCH BASINS/INLETS THAT WILL RECEIVE RUNOFF FROM THE PROJECT SITE. 2.TEMPORARY INLET PROTECTION WILL BE REMOVED AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED. 3.MANUFACTURER WILL BE SILT SACK OR APPROVED EQUIVALENT. 1'-4" MIN. CATCH BASIN OUTLET EXPANSION RESTRAINT 1" REBAR OR EQUAL FOR BAG REMOVAL FROM INLET OVERFLOW SLOTS OR APPROVED EQUIV. DUMP LOOP HANDLES PROPOSED AND/OR EXISTING CATCH BASIN SIDE VIEW (INSTALLED) FOR PERMITTING ONLY TXXXMASS STATE PLANE last modified: 08/05/24 printed: 08/05/24 by bk H:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 EX.dwg SURVEY NOTES1.THE ABOVE GROUND TOPOGRAPHY AND EXISTING SITE CONDITIONS DEPICTED HEREON ARE THE RESULT OF AN ON THEGROUND FIELD SURVEY CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. JANUARY 12, 2024 & FEBRUARY 23, 2024.UNDERGROUND UTILITY LINES LOCATED BY ADVANCED TECHNOLOGIES (AT) UTILITY LOCATING CORP. JANUARY 5, 2024.2.HORIZONTAL DATUM IS MASS STATE PLANE COORDINATE SYSTEM. DATUM ESTABLISHED BY GNSS OBSERVATIONS.3.THE ELEVATIONS DEPICTED HEREON WERE BASED ON THE NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988.4.NO PROPERTY LINE SURVEY WAS CONDUCTED FOR THIS EXISTING CONDITIONS PLAN.5.COASTAL BANK HAS BEEN DETERMINED BY SIGHTING THE FIRST OBSERVABLE BREAK IN THE SLOPE IN THE FIELD ANDCONFIRMED WITH LIDAR ELEVATIONS. LIDAR USED FROM THE BUREAU OF GEOGRAPHIC INFORMATION (MASSGIS),COMMONWEALTH OF MASSACHUSETTS, EXECUTIVE OFFICE OF TECHNOLOGY AND SECURITY SERVICES. NO FIELD DELINEATIONWAS PERFORMED.6.COASTAL BANK CONFORMS TO DEP POLICY FIGURE 4.7.THE ACCURACY OF MEASURED PIPE INVERTS AND PIPE SIZES IS SUBJECT TO FIELD CONDITIONS, THE ABILITY TO MAKE VISUALOBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS AND OTHER CONDITIONS.8.THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF VARIOUS UTILITY COMPANIES, GROUND PENETRATING RADAR AND WHEREVER POSSIBLE, MEASUREMENTS TAKENIN THE FIELD. THIS INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE LOCATION OF ALLUNDERGROUND UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THE FIELD PRIOR TO THE START OF ANY CONSTRUCTION.THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANY, ANY GOVERNING PERMITTING AUTHORITY IN THETOWN OF BARNSTABLE, AND "DIGSAFE" (1-888-344-7233) AT LEAST 72 HOURS PRIOR TO ANY EXCAVATION WORK IN PREVIOUSLYUNALTERED AREAS TO REQUEST EXACT FIELD LOCATION OF UTILITIES.9.UNDERGROUND UTILITIES SOUTH OF VAULTS TAKEN FROM PLAN TITLED "COMPOSITE UTILITY PLAN" BY FAY, SPOFFORD &THORNDIKE LLC DATED JULY 2009.10.THE PROPERTY IS LOCATED WITHIN F.I.R.M ZONE AE EL. 11 AND 12 AS SHOWN ON COMMUNITY PANEL NO, 25001C0569J DATEDJULY 16, 2014.Revisions Appr.Rev.Date By Description 1 2 3 4 5 6 7EXISTING CONDITIONS PLAN 71 SOUTH STREET THE STEAMSHIP AUTHORITY HYANNIS, MASSACHUSETTS Survey Provided By:Prepared For:Plan Set: Plan Title: Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02536 Phone: 508-833-6600 Dated: January 12, 2024 The Steamship Authority 228 Palmer Ave. Falmouth, MA 0254023142 ------------ ------------ ------------ ------------ ------------ ------------ ------------ January 24, 2024 --DWM FPL Sustainable Environmental Solutions 90 Route 6A Sandwich, MA 02563 www.horsleywitten.com 508-833-6600 Horsley Witten Group, Inc.Registration:Project Number:Sheet Number:Date:Designed By:Drawn By:Checked By:C-3(in feet)GRAPHIC SCALE020102040801 INCH = 20 FEETLEGEND:CONTOUR - MAJORTREE LINESEWER/DRAIN PIPECURBGAS/FUEL LINEWALL - RETAININGFENCE - IRONCONTOUR - MINORGENERALUTILITIESWATER LINEXXSYMBOLSDRAIN MANHOLEELECTRIC MANHOLEWVBOULDEREXISTING TREEBENCHMARKSIGNDETECTABLE PADWATER VALVETELEPHONE HANDHOLEELECTRICAL HANDHOLE4450CATCHBASINUP1UTILITY POLEGUYELECTRICAL LINECOMMUNICATIONS LINETTELEPHONE MANHOLEUNKNOWN UNDERGROUND LINEBOLLARDEASEMENTENVIRONMENTALCOASTAL BANKCOASTAL BANK 50' BUFFERCOASTAL BANK 100' BUFFER INSET UGE UGE UGE UGE UGE T MASS STATE PLANEPLEASANT STREETEOP/CURBCONCRETE W A L K CONCRETE W A L K PAVED PARKING CONCRETE DECK12"12"12"12"1 2 " X X X EX. DRAIN LINE TYP. EX. COMMUNICATION CONDUIT TYP. EX. DRAIN STRUCTURE TYP. LIMIT OF WORK AND CONTRUCTION FENCE PROPOSED CONDUITS FM FM FM FM FM FM FM FM FM FM FM FM CONTRACTOR TO COORDINATE WITH STEAMSHIP AUTHORITY ON TRAFFIC DURING CONSTRUCTION INLET PROTECTION (TYP)SSSSSTOCKPILE AREA WITH SILT SOCK PERIMETER 20' X 20' 2" ELECTRIC CONDUITS (4) (SEE SHEET E-3) 6" 6" 1'-9"PUMP SYSTEM & CONTROL PANEL PUMP SYSTEM & CONTROL PANELCLEARZONECLEARZONE 6" 10'-0" 14'-0" 6"UGEUGEUGE UGE UGE UGE FM FM FMFMFMFM FM FMFMFMFM FM FMFMFMFMFM FM FMFMFMFMMASS STATE PLANEMASS STATE PLANEC-4Revisions Appr.Rev.DateByDescription1234567SITE PLAN71 SOUTH STREETSTEAMSHIP AUTHORITY HYANNISBARNSTABLE, MASSACHUSETTSSurvey Provided By:Sheet Number: Project Number: Registration:Prepared For:Plan Set:Plan Title:Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: January 12, 2024The SteamshipAuthority228 Palmer AvenueFalmouth, MA 0254023142 last modified: 08/06/24 printed: 08/06/24 by bkH:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 ST.dwgAUGUST 5, 2024MCLMCLFPLChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. (in feet) GRAPHIC SCALE 020 10 20 40 80 1 INCH = 20 FEET (in feet) GRAPHIC SCALE 02 1 2 4 8 1/2 INCH = 1 FOOT 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747-1258Consulting Engineers, Inc.GGDp: 508-998-5700f: 508-998-0883www.g-g-d.comCIVIL & SITE ENGINEER:MECHANICAL & ELECTRICAL:FOR PERMITTING ONLY last modified: 08/06/24 printed: 08/06/24 by bk H:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 DE.dwg TYPICAL PIPE SUPPORT CONCRETE ANCHOR DETAILNOT TO SCALESTAINLESS STEEL PIPE SUPPORTTO SUIT TYPE OF MOUNTSTAINLESS STEEL CONCRETE ANCHORBOLT TO SUIT PER MANUFACTURER'SRECOMENDATION (3-INCH MINIMUM)PIPENOTE:1.SUPPORTS SHALL BE INSTALLEDEVERY 5-FEET OF PIPE LENGTH, ATALL CHANGES IN DIRECTION, AT ALLPIPE JOINTS AND/OR AS DIRECTEDBY THE ENGINEER.2.SUPPORT SHOWN IS TYPICAL. TYPEAND STYLE PER SITE CONDITIONSAS APPROVED BY THE ENGINEER.3.ALL MATERIALS SHALL BEFIBERGLASS OR STAINLESS STEELGRADE 304 MEETING ASTMSTANDARDS UNLESS OTHERWISEAPPROVED BY THE ENGINEER. SEESPECIFICATIONS.4.CONCRETE ANCHOR BOLT TO BESTAINLESS STEEL & INSTALLED PERFASTENER MANUFACTURER'SRECOMENDATION.WALL STRUCTUREMAX LOAD 50% OF MFR. RECOMMENDED RATING.CLEVISDECKINGANCHOR DETAILSNOT TO SCALEANCHOR FROM DECKCONCRETE SLAB2" X 2" X 1/4"ANGLE S.S. PIPESUPPORT WELDEDTO WALL PLATE.6" WIDE X 1/4" THICK S.S.PLATE, LENGTH ASNECESSARY. ATTACHEDTO WALL WITH ANCHORBOLTS.3/8" 1/2U-BOLTPIPESELF DRILLINGANCHORANGLE IRON WALL PIPE SUPPORTCONCRETETOPPING SLABUSE FULL THREADEDRODSSTRUT MOUNTED PIPE SUPPORTSTRUT & ADJUSTABLE PIPECLAMP (SIZE TO SUIT)PIPESELF DRILLINGANCHORUSE FULL THREADEDRODSTYPICAL PIPE SUPPORT VERTICALCONCRETE ANCHOR DETAILNOT TO SCALENOTE:1.SUPPORTS SHALL BE INSTALLEDEVERY 5-FEET OF PIPE LENGTH, ATALL CHANGES IN DIRECTION, AT ALLPIPE JOINTS AND/OR AS DIRECTEDBY THE ENGINEER.2.SUPPORT SHOWN IS TYPICAL. TYPEAND STYLE PER SITE CONDITIONSAS APPROVED BY THE ENGINEER.3.ALL MATERIALS SHALL BEFIBERGLASS OR STAINLESS STEELGRADE 304 MEETING ASTMSTANDARDS UNLESS OTHERWISEAPPROVED BY THE ENGINEER. SEESPECIFICATIONS.4.CONCRETE ANCHOR BOLT TO BESTAINLESS STEEL & INSTALLED PERFASTENER MANUFACTURER'SRECOMENDATION.CONCRETE ANCHOR(EMBEDMENT 3" MIN.)PIPEPIPE STRAPPIPE STRAPTOP DECKBOTTOMDECKCONCRETE ANCHOR(EMBEDMENT 3" MIN.)COMPACTED SUBGRADE12" (MIN)6" (MIN)PIPEDIAMETERCOMPACTED PEAGRAVEL (SEE NOTES) ORENGINEER APPROVEDONSITE BACKFILL FREEOF DEBRIS & ROCKSDEPTH AND SURFACETREATMENT VARIESCOMMON FILL/ORDINARY BORROWPRIVATE PROPERTY:COMPACTED DENSE GRADE FILLPUBLIC ROADWAY:HIGH DENSITY FLOWABLECONCRETE FILL(SEE DETAIL)VARIESVARIESVARIESVARIESLANDSCAPED AREAPAVED AREANOTES:1.BACKFILL PLACED IN UTILITY TRENCHES INCLUDING DISTURBED AREAS SURROUNDING UTILITYTRENCHES SHALL BE PLACED AND COMPACTED IN 12" (MAX.) VERTICAL LIFTS.2.TRACER TAPE FOR NON-FERROUS PIPE SHALL BE CONSTRUCTED OF A METALLIC CORE BONDED TOPLASTIC LAYERS. THE METALLIC TRACER TAPE SHALL BE A MINIMUM 5mm THICK AND MUST BELOCATABLE AT A DEPTH OF 18 INCHES WITH ORDINARY PIPE LOCATORS.3.PEA GRAVEL SHALL CONSIST OF CLEAN, HARD, ROUND PARTICLES OF GRAVEL MEETING THEFOLLOWING:SIEVE SIZEPERCENT PASSING3/8"85-95NO. 45-15NO. 80-24.CONTRACTOR SHALL ACHIEVE 95% COMPACTION FOR THE BEDDING. TRENCH BACKFILL UNDERROADWAYS SHALL BE COMPACTED TO 95%.5.ALL SEWER PIPE IS 4" UNLESS OTHERWISE SPECIFIED IN THE PLAN. FOR MULTIPLE PIPES IN ATRENCH A 6 INCH MINIMUM SETBACK SHALL BE HELD BETWEEN THE PIPES.TYPICAL SEWER TRENCH DETAILNOT TO SCALEGREEN METALLICTRACER TAPE18"6" (MIN)TYPICAL TRENCH PAVEMENT PATCH DETAIL(EXISTING TOWN ROADWAY RIGHT OF WAY)NOT TO SCALE1'EXISTINGPAVEMENTPAVEMENT PATCH(SEE NOTES)NOTES:1.BITUMINOUS CONCRETE PAVEMENT SHALL BE REMOVED TO A CLEAN STRAIGHT EDGE VIA SAW CUTTING.THE SAW CUT SHALL BE COMPLETED PERPENDICULAR TO THE ROADWAY/SIDEWALK.2.PAVEMENT PATCH - PRIOR TO INSTALLATION OF THE BITUMINOUS TOP COURSE, SAWCUT 1-1/2-INCHES INTOTHE EXISTING PAVEMENT. MILL A 1-FT SECTION OF THE EXISTING TOP PAVEMENT SURFACEPERPENDICULAR TO THE SAWCUT. INSTALL MODIFIED TOP COURSE OVER THE BINDER COURSE AND 1-FTMILLED SECTION.3.AN ASPHALT BASE EMULSION SHALL BE USED AS A TACK COAT BETWEEN EXISTING AND NEW PAVEMENTPER DETAIL.4.CONTRACTOR SHALL MOUND THE TOP COURSE BY A HALF INCH TO ACCOMODATE SETTLEMENT, UNLESSOTHERWISE DIRECTED BY THE ENGINEER.NEW TYPE I-1 BIT. CONC. 2" TOP COURSE OVER 2"BINDER COURSEPAVEMENT ABOVE TRENCHCONTROLLED DENSITYFILL (FLOWABLE FILL)SEE SPECIFICATIONSTRENCHSEAL ALL JOINTS W/HOT POURED BIT.JOINT MATERIALUTILITY SERVICEWATER, SEWER, DRAIN,ELEC./COM CONDUITEMULSION TACK COATOVER ALL EXPOSEDPAVEMENT SURFACEPRIOR TO PAVING9' MIN.9' MIN.SEWER MAINWATER MAIN AND/OR PE WATER TUBING10'10'WATER MAINSEPTIC SEWER PIPEWATER MAIN18" MIN.SEPTIC SEWER PIPEIF SEWER LINES MUST CROSS WATER SUPPLY LINES, BOTH PIPES SHALL BE CONSTRUCTED OF CLASS 150PRESSURE PIPE OR BETTER AND SHALL BE PRESSURE TESTED TO ASSURE WATER TIGHTNESS. IF CROSSINGIS WITHIN 18" MINIMUM, BOTH MAINS MUST BE ENCASED IN CONCRETE 10' EITHER SIDE OF CROSSINGIF CONDITIONS REQUIRE PIPES TO BE CLOSER THAN18", ENCASE SEWER 10' EACH SIDE OF CROSSING ORUSE D.I. FOR SEWER18" MIN.SEWER BELOW >/= 18" SEPARATIONSEWER BELOW < 18" SEPARATIONSEWER ABOVEWATER SERVICE / SEWER CROSSING DETAILNOT TO SCALETANK CONNECTION TO DISCHARGE PIPE DETAILNOT TO SCALEINSTALL DI PIPE TO ELBOWCONNECTION OUTSIDE THE TANKFLANGED DISPACER TO SUITREPLACEMOTORIZED VALVEINSTALL NEW ELBOWEX. MANUALVALVE TO REMAIN NEW HOSE FOR PUMP EXHAUST.CONNECT TO WYE PORTTANK ANCHORING SYSTEM DETAILNOT TO SCALENOTES:HOLD DOWN STRAPS TO BEMANUFACTURED FROM MILD-CARBONSTEEL W/ AN ADJUSTABLETURNBUCKLE AND ANGLE CLIP ONEACH END.NEOPRENE RUBBER LINERS TO WRAPAROUND STRAPS TO PROVIDEELECTRICAL ISOLATION.EXISTING TANKEPOXY ANCHORINGADHESIVE FORCONCRETE4" CORECHISEL BOTTOMOF CORE TOFORM DEAD MANANCHORHOLD-DOWN STRAPW/ NEOPRENE LINERSTRAPTURNBUCKLEANGLE W/ HOLEFOR ANCHORBOLTANCHOR BOLTSS NUT & WASHEREXISTING CONCRETE SLAB8" HDPE FLOOR PENETRATIONNOT TO SCALECUT 8" HDPE FLUSH WITH SLABCONCRETE SLAB4" PIPEFOAM INSULATIONGENERAL NOTES:1.SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONEAND/OR COARSE SAND, FREE FROM LOAM AND CLAY TO A DEPTH NOT LESS THAN 4-FT BELOW THE FINISHPAVEMENT SURFACE. EXCAVATE SANDY-LOAM AND/OR LOAMY-SAND TOPSOIL MATERIAL FROM ALLPAVED AREAS PRIOR TO SUB-BASE INSTALLATION.2.PLACE SUB-BASE IN MAXIMUM 8" LIFTS (COMPACTED TO 95%).3.COMPACT SUB-GRADE FILL TO 95% COMPACTION.4.SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION.5.SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE.6.SWEEP CLEAN THE EXISTING BINDER COURSE SURFACE PRIOR TO INSTALLING THE WEARING COURSE BYA STREET SWEEPING MACHINE .7.APPLY A TACK COAT PER SPECIFICATIONS.BITUMINOUS PAVEMENTNOT TO SCALEAPPROVED SUBGRADECOMPACTED DENSE GRADE, DENSEBLENDED CRUSHED STONE OR RECLAIMEDPAVEMENT BORROW CONFORMING TOSTATE DOT STANDARD SPECIFICATIONSCLASS I TYPE I-1 BIT. PAVEMENT:WEARING SURFACE, ON BINDERCOURSE (PER STATE DOTSTANDARDS)1 12"2 12"8"SAWCUT & PAVEMENT PATCHNOT TO SCALENOTES:1.EXISTING BITUMINOUS PAVEMENT SHALL BE REMOVED TO A CLEAN STRAIGHT EDGE VIA SAWCUTTING. THE SAW CUT SHALL BE COMPLETED PERPENDICULAR TO THE ROADWAY/SIDEWALK.2.PRIOR TO INSTALLING THE WEARING COURSE THE EXISTING VERTICAL PAVEMENT SURFACE SHALLBE SWEPT COMPLETELY CLEAN.3.AFTER PROPER COMPACTION (SEE PAVEMENT DETAIL) SAW CUT NEW PAVEMENT ABUTMENT 3/4"DEEP AND FILL WITH FIBER MODIFIED ASPHALT SEALER AS SHOWN.NEW PAVEMENTSEE PAVEMENT DETAILPAVEMENT PATCH (SEE NOTES)EXISTING PAVEMENTCOMPACTED SUB-BASE(SEE PAVEMENT DETAIL)3/4"SAW KERF FILLED WITH FIBERMODIFIED ASPHALT SEALER1/4"FOR PERMITTING ONLYC-5Sheet Number:Project Number:Registration:23142Revisions Appr.Rev.Date By Description 1 2 3 4 5 6 7DETAILS 71 SOUTH STREET STEAMSHIP AUTHORITY HYANNIS BARNSTABLE, MASSACHUSETTS Survey Provided By:Prepared For:Plan Set: Plan Title: Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02536 Phone: 508-833-6600 Fax: 508-833-3150 Dated: January 12, 2024 The Steamship Authority 228 Palmer Avenue Falmouth, MA 02540 AUGUST 5, 2024 MCL MCL FPL Checked By:Designed By:Date:Drawn By: Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A Sandwich, MA 02563 508-833-6600 voice 508-833-3150 fax Horsley Witten Group, Inc. 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747-1258 Consulting Engineers, Inc.GGD p: 508-998-5700 f: 508-998-0883 www.g-g-d.com CIVIL & SITE ENGINEER:MECHANICAL & ELECTRICAL: SCALE:1" = 1'-0" 2 A-2 A-1 SECTION SCALE:1" = 1'-0" 1 A-1 FLOOR PLAN 2 A-2 A-1 SECTION16" MIN CORNER 0'-8" 8'-4-1/2" TOP PLATE FINISH FLOOR EXISTING GRADE 3 6 A-1 5 A-1 4 A-1 A-1 10" BOTTOM OF FOOTING SCALE:1" = 1'-0" 1 S-1 FOUNDATION PLAN TOP OF FOOTING 1 2 A B 12 12 UNDISTURBED SOIL 14' 10'-0" 5'-0" 1'-4" MIN 2X4 WALL 2-2X6 (1K/1J)3' HDR(2- 2X6)(3K/IJ) 6' HDR 2'-0" FTG 8" CONC. WALL 2'-0" 2'X4" KEY 10 MIL VAPOR BARRIER ON 6-12" CRUSHED COMPACTED STONE 2 #4, 2" H2.5A 2x8 @ 16" 2X4 @ 16" W/MID HEIGHT BRACING2x8 @ 16"2x4 @ 16" CL 2X10 7/16" VENT 5/8" ANCHOR BOLT X 7" EMBEDED W/ 3X3X1/4 WASHER @ 2' OC PENETRATIONS (4- 2") IN SLAB ASPHALT SHINGLE RIDGE CAP 5/8" PLYWOOD 2X8 RIDGE BOARD 30 YEAR ASPHALT SHINGLES SCALE:112" = 1'-0" 3 A-1 WALL SECTION SCALE:112" = 1'-0" 5 A-1 SOFFIT DETAIL SCALE:112" = 1'-0" 4 A-1 SILL DETAIL SCALE:112" = 1'-0" 6 A-1 RIDGE DETAIL 6" FIBERGLASS INSTALLATIONALUMINUM DRIP EDGE 4" FIBERGLASS INSTALLATION TRIMLINE RIDGE VENT HIGH PROFILE-1" HIGH 1" AIR GAP BETWEEN PLYWOOD AND RIDGE BOARD (TYP) 2X6 CEILING JOIST 4' MIN STRIP OF ICE/WATER PROTECTION 1X4 PVC FASCIA BOARD 1X4 PVC SOFFIT BOARD W/ CONTINUOUS PERFORATED VENT 1X4 PVC FREEZE BOARD 5/8 FRP (WHITE) FACED PLYWOOD FASTENED TO 1X3 STRAPPING @ 16" OC W/ SS SCREWS 5/8 FRP (WHITE) FACED PLYWOOD FASTENED TO WALL STUD W/ SS SCREWS OWENS CORNING SILL SEALER OR APPROVED EQUAL ANCHOR TO FOUNDATION 1/2" DIA., 10" LONG, EVERY 32" SEE FOUNDATION PLAN FOR FOUNDATION DETAILS 2X4 WALL FRAME 5/8 FRP (WHITE) FACED PLYWOOD FASTENED TO WALL STUD W/ SS SCREWS 1/2" PLYWOOD PRESSURE TREATED 2X4 ON SILL SEALER WHITE CEDAR SHINGLES WHITE CEDAR SHINGLES HURRICANE TIE 2.5A 2X8 RAFTER ATTACH TO RIDGE W/LS50 CLIP OR 2X4 @ 16" COLLAR TIES A-1 Sheet Number: Project Number: Registration: 23142 last modified: 07/30/24 printed: 07/31/24 by bkH:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 ST.dwgRevisionsAppr.Rev.DateByDescription1234567PUMP HOUSE FLOOR PLAN & DETAILS71 SOUTH STREETSTEAMSHIP AUTHORITY HYANNISBARNSTABLE, MASSACHUSETTSSurvey Provided By:Prepared For:Plan Set:Plan Title:Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: January 12, 2024The SteamshipAuthority228 Palmer AvenueFalmouth, MA 02540JULY 2024MCLMCLFPLChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747-1258Consulting Engineers, Inc.GGDp: 508-998-5700f: 508-998-0883www.g-g-d.comCIVIL & SITE ENGINEER:MECHANICAL & ELECTRICAL: 1A-2A-1SECTIONSCALE:3 4" = 1'-0" 1 A-2 WEST ELEVATION SCALE:3 4" = 1'-0" 2 A-2 NORTH ELEVATION SCALE:3 4" = 1'-0" 4 A-2 SOUTH ELEVATION SCALE:3 4" = 1'-0" 3 A-2 EAST ELEVATION 30 YEAR ARCHITECTURAL ASPHALT SHINGLES W/ ALUMINUM DRIP EDGE COLOR AS SELECTED BY OWNER SINGLE SWING STEEL DOOR W/ SS HARDWARE (ACD3068) COLOR TO MATCH TRIM AS SELECTED BY OWNER PVC LOUVER VENT W/ GALV. MESH/WIRE ON BACK SIDE 1X3 0N 1X8 PVC TRIM PATCHED AND PAINTED COLOR AS SELECTED BY OWNER WHITE CEDAR SHINGLES (TYP) CONT. RIDGE VENT 12 12 DOUBLE SWING STEEL DOOR W/ SS HARDWARE (ACD6068AP/PA) COLOR TO MATCH TRIM AS SELECTED BY OWNER PVC TRIM PATCHED AND PAINTED COLOR AS SELECTED BY OWNER 1X6 PVC TRIM A-2 Sheet Number: Project Number: Registration: 23142 last modified: 07/30/24 printed: 07/31/24 by bkH:\Projects\2023\23142 Steamship Hyannis Terminal\Drawings\23142 ST.dwgRevisionsAppr.Rev.DateByDescription1234567PUMP HOUSE ELEVATIONS71 SOUTH STREETSTEAMSHIP AUTHORITY HYANNISBARNSTABLE, MASSACHUSETTSSurvey Provided By:Prepared For:Plan Set:Plan Title:Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: January 12, 2024The SteamshipAuthority228 Palmer AvenueFalmouth, MA 02540JULY 2024MCLMCLFPLChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747-1258Consulting Engineers, Inc.GGDp: 508-998-5700f: 508-998-0883www.g-g-d.comCIVIL & SITE ENGINEER:MECHANICAL & ELECTRICAL: