Loading...
HomeMy WebLinkAboutField Inspection Findings Memo 10-24-24 The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director MEMORANDUM To: James Kupfer, AICP, MPA, Director | Planning & Development From: Matthew J. Wrobel, P.E., Sr. Project Manager Cc: Griffin Beaudoin, P.E., Town Engineer Date: October 24, 2024 Subject: TOB DPW Engineering Department – Plan Conformance Re-Inspection of Aberle Way Plan Conformance Field Inspection The Town of Barnstable DPW Engineering Department has completed the requested field re- inspection of the Aberle Way subdivision for conformance with the conditions of the decision issued by the Planning Board on September 9, 2013, and the approved Definitive Subdivision Plan titled “Definitive Plan of Land in Barnstable, MA #2519 Main Street Riley Subdivision” Prepared by Down Cape Engineering on June 10, 2013, and revised August 27, 2013. A field inspection was conducted on September 6, 2024, where the following deviation from the aforementioned documents was noted. · The Road Profile Plan depicts (2) 30” x 30” stone pillars to be set at the entrance to Aberle Way, at the time of the 9/6/2024 inspection the stone pillars had not been set.