HomeMy WebLinkAboutField Inspection Findings Memo 10-24-24
The Town of Barnstable
Department of Public Works
382 Falmouth Road, Hyannis, MA 02601
508.790.6400
Daniel W. Santos, P.E. Robert R. Steen, P.E.
Director Assistant Director
MEMORANDUM
To: James Kupfer, AICP, MPA, Director | Planning & Development
From: Matthew J. Wrobel, P.E., Sr. Project Manager
Cc: Griffin Beaudoin, P.E., Town Engineer
Date: October 24, 2024
Subject: TOB DPW Engineering Department – Plan Conformance Re-Inspection of Aberle Way
Plan Conformance Field Inspection
The Town of Barnstable DPW Engineering Department has completed the requested field re-
inspection of the Aberle Way subdivision for conformance with the conditions of the decision
issued by the Planning Board on September 9, 2013, and the approved Definitive Subdivision Plan
titled “Definitive Plan of Land in Barnstable, MA #2519 Main Street Riley Subdivision” Prepared
by Down Cape Engineering on June 10, 2013, and revised August 27, 2013. A field inspection
was conducted on September 6, 2024, where the following deviation from the aforementioned
documents was noted.
· The Road Profile Plan depicts (2) 30” x 30” stone pillars to be set at the entrance to Aberle
Way, at the time of the 9/6/2024 inspection the stone pillars had not been set.