Loading...
HomeMy WebLinkAboutComment letter Wayne Kurker Colliers Ledge1^’1 Willow Street,Hyannis,MA 02601 «Tel:(508)790-4000 ●Fax:(508)775-0851 www.hyannismarina.com 11/20/2024MarkRousseau Massachusetts Division of Marine Fisheries RE:Colliers Ledge Dear Mr.Rousseau, While the fishermen's concerns about dismantling Colliers Ledge are understandable,it is undeniably one of the most hazardous public safety risks in Nantucket Sound.Each year,several boats strike this ledge.The Coast Guard's proposal to leave the bottom layer of the rock pile in place for the fishermen is a reasonable compromise.However, a depth of more than 7 feet would offer much greater safety for all parties involved. Given the ongoing resistance from fishermen,the best solution would be to relocate Colliers Ledge to a nearby site, as close to the current location as possible.I have attached a chart showing several viable alternatives.Within a short distance of Colliers,there are areas where the rocks could be relocated,creating a comparable artificial reef while ensuring a depth that will not pose a navigational hazard at low tide. ●A.Just over 100 yards to the west of Colliers,there are areas with depths exceeding 15 feet. ●B.Within a quarter mile to the south,there are areas with depths exceeding 20 feet. ®C.Within half a mile to the south,there are areas with depths exceeding 25 feet. The Division of Marine Fisheries should consider supporting the USCG's efforts to use an adjacent site to replicate Colliers Ledge,thereby creating a new artificial reef.This solution would allow the Coast Guard to weigh the pros and cons of the proposal,including the permitting costs. If the USCG is denied the necessary permits,any future disasters in the area may be attributed to those responsible for blocking the project. While permitting will inevitably involve time and money,these "soft costs"would represent only a small fraction of the expense required to transport the rocks to other approved sites in Yarmouth,Harwich,or an upland disposal location.Moving the rocks requires significant logistical coordination,including the use of a deck barge and tugboats for towing the rocks to and from Yarmouth/Harwich,along with a crane barge for unloading.For upland disposal,an unloading dock—likely in New Bedford—would be needed,along with a land crane for offloading the rocks and reloading them into a fleet of trucks to transport them to an upland site. These transportation and unloading costs would escalate significantly,which means that relocating the rocks to a nearby location and creating a new artificial reef next to Colliers would be a more cost-effective solution for the USCG and ultimately benefit taxpayers.Additionally,this approach would likely reduce fishermen's resistance to the project. Thank you for your consideration of this alternative solution. Respectfully, Wayne Kurker,President CC: Christine Perron -McFarland Johnson Inc Dan Deltufo -Appledore Marine Engineering LLC Barnstable Conservation Commission NOTE;4300 YDS original est intrepidCCfO^CONTENDERKEYWEST BOATS